SlideShare a Scribd company logo
1 of 1
Download to read offline
SECTION Y2 - Y2
02-03-2015
1 : 100
STARTING DATE
DATE
SCALE
DRAWN BY
CHECKED BY
MEASURED BY
DRAWING NO. SHEET NO.PROJECT TITLE
19-01-2015
KOH JING HAO & SANJEH KUMAR RAMAN
PENANG GROUP
DRAWING TITLE
LHCO. 010
10
40
LEGENDS :
1 FIVE FOOT WALKWAY
2 HALL 1
3 AIR WELL 1
4 HALL 2
5 BASIN
6 TOILET
7 HALL 3
8 AIR WELL 3
9 HALL 4
10 UTILITIES ROOM
11 INACCESSIBLE ROOM
12 ROOM 1
13 ROOM 2
14 ROOM 3
15 AIR WELL 2
ARC1215
METHODS OF DOCUMENTATION AND
MEASURED DRAWINGS
LIAN HUAT COMPANY, 140 LEBUH
CARNARVON, GEORGETOWN
PENANG
LIAN HUAT COMPANY
16 ROOM 4
17 INACCESSIBLE SPACE
18 ROOM 5
19 ROOM 6
20 KITCHEN
21 TERRACE
PENANG GROUP
A1
1
1
FFL : 0.000
SPACE NO.
FINISH FLOOR LEVEL
TIMBER
DRAWING SHEET NO.
DRAWING NAME
TILES FINISHING

More Related Content

What's hot

25 final window detail w1 ready plot (2) a1 titleblock landscape updated
25 final window detail w1 ready plot (2) a1 titleblock landscape updated25 final window detail w1 ready plot (2) a1 titleblock landscape updated
25 final window detail w1 ready plot (2) a1 titleblock landscape updatedBaddy Peigun
 
Final drawing
Final drawingFinal drawing
Final drawingBennyTS
 
Measure Drawings Penang Lian Huat Company JAN 2015
Measure Drawings Penang Lian Huat Company JAN 2015Measure Drawings Penang Lian Huat Company JAN 2015
Measure Drawings Penang Lian Huat Company JAN 2015JoyeeLee0131
 
33 final window detail fg1 ready plot a1 titleblock landscape updated
33 final window detail fg1 ready plot a1 titleblock landscape updated33 final window detail fg1 ready plot a1 titleblock landscape updated
33 final window detail fg1 ready plot a1 titleblock landscape updatedBaddy Peigun
 
28 final window detail w5 ready plot a1 titleblock landscape updated
28 final window detail w5 ready plot a1 titleblock landscape updated28 final window detail w5 ready plot a1 titleblock landscape updated
28 final window detail w5 ready plot a1 titleblock landscape updatedBaddy Peigun
 
Isbell Remodel - Schematic Pkg - Aug 13, 2015
Isbell Remodel - Schematic Pkg - Aug 13, 2015Isbell Remodel - Schematic Pkg - Aug 13, 2015
Isbell Remodel - Schematic Pkg - Aug 13, 2015Brandon Swan
 
24 finalised door schedule d17 ready plot a1 titleblock landscape updated d
24 finalised door schedule d17 ready plot a1 titleblock landscape updated d24 finalised door schedule d17 ready plot a1 titleblock landscape updated d
24 finalised door schedule d17 ready plot a1 titleblock landscape updated dBaddy Peigun
 
2 final site section ready plot a1 titleblock landscape updated
2 final site section ready plot a1 titleblock landscape updated2 final site section ready plot a1 titleblock landscape updated
2 final site section ready plot a1 titleblock landscape updatedBaddy Peigun
 
ARCH 390 D AAYO Technical/Des Drawings
ARCH 390 D AAYO Technical/Des DrawingsARCH 390 D AAYO Technical/Des Drawings
ARCH 390 D AAYO Technical/Des DrawingsAustinAyo
 
REVIT_MEP_ADT17_PAL Portfolio
REVIT_MEP_ADT17_PAL PortfolioREVIT_MEP_ADT17_PAL Portfolio
REVIT_MEP_ADT17_PAL PortfolioPaul Little
 
sem 2.5 measured drawings
sem 2.5 measured drawingssem 2.5 measured drawings
sem 2.5 measured drawingsYeeQun
 
data and voice quantity-Model
data and voice quantity-Modeldata and voice quantity-Model
data and voice quantity-ModelUday Both
 
prestige bougainvillea gardens sector 150 noida brochure
prestige bougainvillea gardens sector 150 noida brochure prestige bougainvillea gardens sector 150 noida brochure
prestige bougainvillea gardens sector 150 noida brochure SrishtiSharma143
 
Commercial project
Commercial projectCommercial project
Commercial projectAyat Aljafar
 

What's hot (18)

25 final window detail w1 ready plot (2) a1 titleblock landscape updated
25 final window detail w1 ready plot (2) a1 titleblock landscape updated25 final window detail w1 ready plot (2) a1 titleblock landscape updated
25 final window detail w1 ready plot (2) a1 titleblock landscape updated
 
Final drawing
Final drawingFinal drawing
Final drawing
 
Measure Drawings Penang Lian Huat Company JAN 2015
Measure Drawings Penang Lian Huat Company JAN 2015Measure Drawings Penang Lian Huat Company JAN 2015
Measure Drawings Penang Lian Huat Company JAN 2015
 
33 final window detail fg1 ready plot a1 titleblock landscape updated
33 final window detail fg1 ready plot a1 titleblock landscape updated33 final window detail fg1 ready plot a1 titleblock landscape updated
33 final window detail fg1 ready plot a1 titleblock landscape updated
 
28 final window detail w5 ready plot a1 titleblock landscape updated
28 final window detail w5 ready plot a1 titleblock landscape updated28 final window detail w5 ready plot a1 titleblock landscape updated
28 final window detail w5 ready plot a1 titleblock landscape updated
 
Isbell Remodel - Schematic Pkg - Aug 13, 2015
Isbell Remodel - Schematic Pkg - Aug 13, 2015Isbell Remodel - Schematic Pkg - Aug 13, 2015
Isbell Remodel - Schematic Pkg - Aug 13, 2015
 
24 finalised door schedule d17 ready plot a1 titleblock landscape updated d
24 finalised door schedule d17 ready plot a1 titleblock landscape updated d24 finalised door schedule d17 ready plot a1 titleblock landscape updated d
24 finalised door schedule d17 ready plot a1 titleblock landscape updated d
 
2 final site section ready plot a1 titleblock landscape updated
2 final site section ready plot a1 titleblock landscape updated2 final site section ready plot a1 titleblock landscape updated
2 final site section ready plot a1 titleblock landscape updated
 
ARCH 390 D AAYO Technical/Des Drawings
ARCH 390 D AAYO Technical/Des DrawingsARCH 390 D AAYO Technical/Des Drawings
ARCH 390 D AAYO Technical/Des Drawings
 
REVIT_MEP_ADT17_PAL Portfolio
REVIT_MEP_ADT17_PAL PortfolioREVIT_MEP_ADT17_PAL Portfolio
REVIT_MEP_ADT17_PAL Portfolio
 
sem 2.5 measured drawings
sem 2.5 measured drawingssem 2.5 measured drawings
sem 2.5 measured drawings
 
WH-1070A-B01-ASD-431
WH-1070A-B01-ASD-431WH-1070A-B01-ASD-431
WH-1070A-B01-ASD-431
 
data and voice quantity-Model
data and voice quantity-Modeldata and voice quantity-Model
data and voice quantity-Model
 
prestige bougainvillea gardens sector 150 noida brochure
prestige bougainvillea gardens sector 150 noida brochure prestige bougainvillea gardens sector 150 noida brochure
prestige bougainvillea gardens sector 150 noida brochure
 
Plumbing Project
Plumbing ProjectPlumbing Project
Plumbing Project
 
Final 2
Final 2Final 2
Final 2
 
Commercial project
Commercial projectCommercial project
Commercial project
 
Ceiling Plan
Ceiling PlanCeiling Plan
Ceiling Plan
 

Viewers also liked

Measured drawing section
Measured drawing sectionMeasured drawing section
Measured drawing sectionharrietmaybe
 
measured drawing dewan bandar ipoh
measured drawing dewan bandar ipohmeasured drawing dewan bandar ipoh
measured drawing dewan bandar ipohJia Jun Chok
 
SECTIONAL_DRAWING_SECTION_HH
SECTIONAL_DRAWING_SECTION_HHSECTIONAL_DRAWING_SECTION_HH
SECTIONAL_DRAWING_SECTION_HHamroz S.K
 
Building Service 2 Presentation
Building Service 2 PresentationBuilding Service 2 Presentation
Building Service 2 PresentationKellyann Hiew
 
District Officer's House
District Officer's HouseDistrict Officer's House
District Officer's HouseCheah Ee Von
 
Sun Yat Sen Museum Penang Measured Drawings
Sun Yat Sen Museum Penang Measured DrawingsSun Yat Sen Museum Penang Measured Drawings
Sun Yat Sen Museum Penang Measured Drawingsdouglasloon
 
District Officer's House DWG
District Officer's House DWGDistrict Officer's House DWG
District Officer's House DWGCheah Ee Von
 
Final Report, Tzu Ji Charity House (Ipoh)
Final Report, Tzu Ji Charity House (Ipoh)Final Report, Tzu Ji Charity House (Ipoh)
Final Report, Tzu Ji Charity House (Ipoh)Johan Syahriz
 
Measured drawings report
Measured drawings reportMeasured drawings report
Measured drawings reportKen Wong
 

Viewers also liked (11)

CNC FINAL.pdf
CNC FINAL.pdfCNC FINAL.pdf
CNC FINAL.pdf
 
Measured drawing section
Measured drawing sectionMeasured drawing section
Measured drawing section
 
measured drawing dewan bandar ipoh
measured drawing dewan bandar ipohmeasured drawing dewan bandar ipoh
measured drawing dewan bandar ipoh
 
SECTIONAL_DRAWING_SECTION_HH
SECTIONAL_DRAWING_SECTION_HHSECTIONAL_DRAWING_SECTION_HH
SECTIONAL_DRAWING_SECTION_HH
 
Building Service 2 Presentation
Building Service 2 PresentationBuilding Service 2 Presentation
Building Service 2 Presentation
 
District Officer's House
District Officer's HouseDistrict Officer's House
District Officer's House
 
Measured Drawings
Measured DrawingsMeasured Drawings
Measured Drawings
 
Sun Yat Sen Museum Penang Measured Drawings
Sun Yat Sen Museum Penang Measured DrawingsSun Yat Sen Museum Penang Measured Drawings
Sun Yat Sen Museum Penang Measured Drawings
 
District Officer's House DWG
District Officer's House DWGDistrict Officer's House DWG
District Officer's House DWG
 
Final Report, Tzu Ji Charity House (Ipoh)
Final Report, Tzu Ji Charity House (Ipoh)Final Report, Tzu Ji Charity House (Ipoh)
Final Report, Tzu Ji Charity House (Ipoh)
 
Measured drawings report
Measured drawings reportMeasured drawings report
Measured drawings report
 

More from Baddy Peigun

Architectural Portfolio
Architectural PortfolioArchitectural Portfolio
Architectural PortfolioBaddy Peigun
 
Adp (how pei ngoh (0316929))
Adp (how pei ngoh (0316929))Adp (how pei ngoh (0316929))
Adp (how pei ngoh (0316929))Baddy Peigun
 
Building science 2
Building science 2Building science 2
Building science 2Baddy Peigun
 
building services project 1
building services project 1building services project 1
building services project 1Baddy Peigun
 
shape grammar project 1
shape grammar project 1 shape grammar project 1
shape grammar project 1 Baddy Peigun
 
shape grammar project 1
shape grammar project 1shape grammar project 1
shape grammar project 1Baddy Peigun
 
Extension report b
Extension report bExtension report b
Extension report bBaddy Peigun
 
Building structure (project 1:Fettuccine Truss Bridge)
Building structure (project 1:Fettuccine Truss Bridge)Building structure (project 1:Fettuccine Truss Bridge)
Building structure (project 1:Fettuccine Truss Bridge)Baddy Peigun
 
40 finalised tiles detail1 tiles detail2 tiles detail3 ready plot a1 titleblo...
40 finalised tiles detail1 tiles detail2 tiles detail3 ready plot a1 titleblo...40 finalised tiles detail1 tiles detail2 tiles detail3 ready plot a1 titleblo...
40 finalised tiles detail1 tiles detail2 tiles detail3 ready plot a1 titleblo...Baddy Peigun
 
39 finalised lattice screen detail gd3 gd4 gd5 ready plot layout1
39 finalised lattice screen detail gd3 gd4 gd5 ready plot layout139 finalised lattice screen detail gd3 gd4 gd5 ready plot layout1
39 finalised lattice screen detail gd3 gd4 gd5 ready plot layout1Baddy Peigun
 
38 finalised lattice screen detail gd1 gd2 ready plot layout1
38 finalised lattice screen detail gd1 gd2 ready plot layout138 finalised lattice screen detail gd1 gd2 ready plot layout1
38 finalised lattice screen detail gd1 gd2 ready plot layout1Baddy Peigun
 
36 final-arc-detail-ad1-arc-detail-ad2-ready-plot-a1 titleblock landscape upd...
36 final-arc-detail-ad1-arc-detail-ad2-ready-plot-a1 titleblock landscape upd...36 final-arc-detail-ad1-arc-detail-ad2-ready-plot-a1 titleblock landscape upd...
36 final-arc-detail-ad1-arc-detail-ad2-ready-plot-a1 titleblock landscape upd...Baddy Peigun
 
35 final jackroof detail r1 ready plot a1 titleblock landscape updated
35 final jackroof detail r1 ready plot a1 titleblock landscape updated35 final jackroof detail r1 ready plot a1 titleblock landscape updated
35 final jackroof detail r1 ready plot a1 titleblock landscape updatedBaddy Peigun
 
32 final window detail lw5 lw6 ready plot a1 titleblock landscape updated
32 final window detail lw5 lw6 ready plot a1 titleblock landscape updated32 final window detail lw5 lw6 ready plot a1 titleblock landscape updated
32 final window detail lw5 lw6 ready plot a1 titleblock landscape updatedBaddy Peigun
 
31 final window detail lw3 lw4 ready plot a1 titleblock landscape updated
31 final window detail lw3 lw4 ready plot a1 titleblock landscape updated31 final window detail lw3 lw4 ready plot a1 titleblock landscape updated
31 final window detail lw3 lw4 ready plot a1 titleblock landscape updatedBaddy Peigun
 
30 final window detail lw1 lw2 ready plot a1 titleblock landscape updated
30 final window detail lw1 lw2 ready plot a1 titleblock landscape updated30 final window detail lw1 lw2 ready plot a1 titleblock landscape updated
30 final window detail lw1 lw2 ready plot a1 titleblock landscape updatedBaddy Peigun
 
29 final window detail av1 av2 ready plot a1 titleblock landscape updated
29 final window detail av1 av2 ready plot a1 titleblock landscape updated29 final window detail av1 av2 ready plot a1 titleblock landscape updated
29 final window detail av1 av2 ready plot a1 titleblock landscape updatedBaddy Peigun
 

More from Baddy Peigun (20)

Architectural Portfolio
Architectural PortfolioArchitectural Portfolio
Architectural Portfolio
 
Adp (how pei ngoh (0316929))
Adp (how pei ngoh (0316929))Adp (how pei ngoh (0316929))
Adp (how pei ngoh (0316929))
 
Site analysis
Site analysis Site analysis
Site analysis
 
Lighting proposal
Lighting  proposalLighting  proposal
Lighting proposal
 
Building science 2
Building science 2Building science 2
Building science 2
 
Theory & urbanism
Theory & urbanismTheory & urbanism
Theory & urbanism
 
building services project 1
building services project 1building services project 1
building services project 1
 
shape grammar project 1
shape grammar project 1 shape grammar project 1
shape grammar project 1
 
shape grammar project 1
shape grammar project 1shape grammar project 1
shape grammar project 1
 
Extension report b
Extension report bExtension report b
Extension report b
 
Building structure (project 1:Fettuccine Truss Bridge)
Building structure (project 1:Fettuccine Truss Bridge)Building structure (project 1:Fettuccine Truss Bridge)
Building structure (project 1:Fettuccine Truss Bridge)
 
40 finalised tiles detail1 tiles detail2 tiles detail3 ready plot a1 titleblo...
40 finalised tiles detail1 tiles detail2 tiles detail3 ready plot a1 titleblo...40 finalised tiles detail1 tiles detail2 tiles detail3 ready plot a1 titleblo...
40 finalised tiles detail1 tiles detail2 tiles detail3 ready plot a1 titleblo...
 
39 finalised lattice screen detail gd3 gd4 gd5 ready plot layout1
39 finalised lattice screen detail gd3 gd4 gd5 ready plot layout139 finalised lattice screen detail gd3 gd4 gd5 ready plot layout1
39 finalised lattice screen detail gd3 gd4 gd5 ready plot layout1
 
38 finalised lattice screen detail gd1 gd2 ready plot layout1
38 finalised lattice screen detail gd1 gd2 ready plot layout138 finalised lattice screen detail gd1 gd2 ready plot layout1
38 finalised lattice screen detail gd1 gd2 ready plot layout1
 
36 final-arc-detail-ad1-arc-detail-ad2-ready-plot-a1 titleblock landscape upd...
36 final-arc-detail-ad1-arc-detail-ad2-ready-plot-a1 titleblock landscape upd...36 final-arc-detail-ad1-arc-detail-ad2-ready-plot-a1 titleblock landscape upd...
36 final-arc-detail-ad1-arc-detail-ad2-ready-plot-a1 titleblock landscape upd...
 
35 final jackroof detail r1 ready plot a1 titleblock landscape updated
35 final jackroof detail r1 ready plot a1 titleblock landscape updated35 final jackroof detail r1 ready plot a1 titleblock landscape updated
35 final jackroof detail r1 ready plot a1 titleblock landscape updated
 
32 final window detail lw5 lw6 ready plot a1 titleblock landscape updated
32 final window detail lw5 lw6 ready plot a1 titleblock landscape updated32 final window detail lw5 lw6 ready plot a1 titleblock landscape updated
32 final window detail lw5 lw6 ready plot a1 titleblock landscape updated
 
31 final window detail lw3 lw4 ready plot a1 titleblock landscape updated
31 final window detail lw3 lw4 ready plot a1 titleblock landscape updated31 final window detail lw3 lw4 ready plot a1 titleblock landscape updated
31 final window detail lw3 lw4 ready plot a1 titleblock landscape updated
 
30 final window detail lw1 lw2 ready plot a1 titleblock landscape updated
30 final window detail lw1 lw2 ready plot a1 titleblock landscape updated30 final window detail lw1 lw2 ready plot a1 titleblock landscape updated
30 final window detail lw1 lw2 ready plot a1 titleblock landscape updated
 
29 final window detail av1 av2 ready plot a1 titleblock landscape updated
29 final window detail av1 av2 ready plot a1 titleblock landscape updated29 final window detail av1 av2 ready plot a1 titleblock landscape updated
29 final window detail av1 av2 ready plot a1 titleblock landscape updated
 

10 final-section-y2-ready-plot-y2 - y2

  • 1. SECTION Y2 - Y2 02-03-2015 1 : 100 STARTING DATE DATE SCALE DRAWN BY CHECKED BY MEASURED BY DRAWING NO. SHEET NO.PROJECT TITLE 19-01-2015 KOH JING HAO & SANJEH KUMAR RAMAN PENANG GROUP DRAWING TITLE LHCO. 010 10 40 LEGENDS : 1 FIVE FOOT WALKWAY 2 HALL 1 3 AIR WELL 1 4 HALL 2 5 BASIN 6 TOILET 7 HALL 3 8 AIR WELL 3 9 HALL 4 10 UTILITIES ROOM 11 INACCESSIBLE ROOM 12 ROOM 1 13 ROOM 2 14 ROOM 3 15 AIR WELL 2 ARC1215 METHODS OF DOCUMENTATION AND MEASURED DRAWINGS LIAN HUAT COMPANY, 140 LEBUH CARNARVON, GEORGETOWN PENANG LIAN HUAT COMPANY 16 ROOM 4 17 INACCESSIBLE SPACE 18 ROOM 5 19 ROOM 6 20 KITCHEN 21 TERRACE PENANG GROUP A1 1 1 FFL : 0.000 SPACE NO. FINISH FLOOR LEVEL TIMBER DRAWING SHEET NO. DRAWING NAME TILES FINISHING