More Related Content
More from Baddy Peigun (20)
10 final-section-y2-ready-plot-y2 - y2
- 1. SECTION Y2 - Y2
02-03-2015
1 : 100
STARTING DATE
DATE
SCALE
DRAWN BY
CHECKED BY
MEASURED BY
DRAWING NO. SHEET NO.PROJECT TITLE
19-01-2015
KOH JING HAO & SANJEH KUMAR RAMAN
PENANG GROUP
DRAWING TITLE
LHCO. 010
10
40
LEGENDS :
1 FIVE FOOT WALKWAY
2 HALL 1
3 AIR WELL 1
4 HALL 2
5 BASIN
6 TOILET
7 HALL 3
8 AIR WELL 3
9 HALL 4
10 UTILITIES ROOM
11 INACCESSIBLE ROOM
12 ROOM 1
13 ROOM 2
14 ROOM 3
15 AIR WELL 2
ARC1215
METHODS OF DOCUMENTATION AND
MEASURED DRAWINGS
LIAN HUAT COMPANY, 140 LEBUH
CARNARVON, GEORGETOWN
PENANG
LIAN HUAT COMPANY
16 ROOM 4
17 INACCESSIBLE SPACE
18 ROOM 5
19 ROOM 6
20 KITCHEN
21 TERRACE
PENANG GROUP
A1
1
1
FFL : 0.000
SPACE NO.
FINISH FLOOR LEVEL
TIMBER
DRAWING SHEET NO.
DRAWING NAME
TILES FINISHING