Hamdy Waheed Mohamed email:hamdy_4_85@hotmail.com
Senior Electrical Engineer Mob: +966541840640
Hamdy Waheed Mohamed Mostafa
245-North Ring Road- Al- Maseef District -Riyadh-KSA
Cell Phone: 00966-541840640
E-mail: hamdy_4_85@hotmail.com
OBJECTIVE:
To work in a successful and challenging company, like yours as an Electrical Engineer.
PERSONAL DATA
Age: 31
Date of Birth: Jul 4, 1985
Gender: Male
Civil Status: Married
Nationality: Egyptian
Religion: Islam
EDUCATION
Highest Education Second Highest Education
Education Level: Bachelor's / College Degree Secondary (Undergraduate)
Education Field: Engineering(Electrical/Electronic) Others
Course: Egypt General Secondary School
School/University: Ain Shams University Road El Farag
Location: Cairo Cairo
Date: Sep 2002 - Jul 2007 Sep 1999 - Jul 2002
LICENSES/CERTIFICATIONS
License/
Certification
License/
Certification No. Date
1. Society of Egyptian Electrical
Engineers
145225 Jul 30, 2007
2. Saudi Council of Engineers Jul. 1 , 2012
GRADUATION PROJECT:
Excellent
Speed control of three phase induction motor using PWM technique Using Microcontroller Technology
on Inverter"
WORK EXPERIENCE
I have been working for 9 Year(s).
1. Position: Electrical Section Head
Duration: Apr. 2016 – Aug. 2016
Company: Al-Aman Modern Contracting Company
Company Industry: Construction / Building / Engineering
Location Riyadh-Saudi Arabia
Department: Technical Office Engineering Department
Projects:
1. Riyadh Park Mall Shop Drawings and Material Submittal
2. Position: Senior Electrical Design Engineer
Duration: May 2014 – Apr. 2016 (1.9 yrs)
Company: Imar For Urban Consultants
Company Industry: Consulting (IT, Engineering, Management, Science & Technical)
Location Saudi Arabia
Department: Electrical Engineering and design department
Design Projects:
2. AOU (Arab Open University) Al-Medina branch (BIM Technology).
3. Mix Use Building (Modon) Dammam industrial city-2 (BIM Technology)
4. SBC (Saudi Broadcasting Corporation) Headquarter Building.
5. Al-Mousa Compound (8 apartments’ buildings and 16 villas in Riyadh)
6. ELM-2 Headquarter Building.
7. NCSC administration Building.
8. SAGIA (Saudi Arabia General Investment Authority Project).
9. Royal Commission Task-1 (contract 677-C24).
10. Al-Khadrah Compound project.
Hamdy Waheed Mohamed email:hamdy_4_85@hotmail.com
Senior Electrical Engineer Mob: +966541840640
3. Position: Senior Electrical Design Engineer
Duration: Dec. 2013 – Mar. 2014 (0.2 yrs)
Company: Mtmm Mott MacDonald’s
Company Industry: Consulting (IT, Engineering, Management, Science & Technical)
Location Jeddah-Saudi Arabia
Department: Design Department
Design Projects:
11. Hempel Factory-Jeddah (Second Industrial City-Jeddah).
4. Position: Electrical Design Engineer
Duration: May 2012 – Nov. 2013 (1.5 yrs)
Company: MBS Consultants
Company Industry: Consulting (IT, Engineering, Management, Science & Technical)
Location Riyadh-Saudi Arabia
Department: Electrical Design Department
Design Projects:
12. Debba Residential compound.
13. Riyadh Festival yards.
14. Faculty of Basic Science-Dammam (Dammam University).
5. Position: Site Electrical Engineer
Duration: Apr. 2009 - May 2012 (3.1 yrs)
Company: Arab Contractors
Company Industry: Construction / Building / Engineering
Location Cairo-Egypt
Department: Electrical Department
Executed and
supervised
Projects:
15. Cairo Plaza High Rise Building-ALAHLY bank-Cairo
16. King Fahd hospital (El Kaser El Ainy Projects)-Cairo
17. Cinema Work shop Extension building – Giza
18. Central Library project (Cairo university projects)-Giza.
6. Position: Electrical Design Engineer
Duration: Aug. 2007 – Apr. 2009 (1.7 yrs)
Company: Allied Consultants
Company Industry: Consulting (IT, Engineering, Management, Science & Technical)
Location Cairo-Egypt
Department: Electromechanical Design Department
Design Projects:
19. Lot E3 commercial & high Rise Building –Jeddah gate project.
20. Resort cove town center health club – Jeddah.
21. Arkan Ware houses – Abu Dhabi.
22. AMWAJ Hotel – Bahrain.
23. Dalkia DCP (District Cooling Plant)-Bahrain.
24. Pyramids heights (infra structure works for the community) –Cairo.
25. Up town Cairo (ARURA VILLAGE).
26. Greek village (Marassi) – North Cost.
27. Catania village (Marassi) – North Cost.
28. EIM New service center-Abu Rawash –Cairo.
29. Cairo Plaza High Rise Building-ALAHLY bank (39 floors Al-Ahly Bank Head quarter)-
Cairo.
FREELANCE PROJECTS:
30. Shop Drawings RTCC- Riyadh Public Transport Control Center
(Control Building of Riyadh Metro) (BIM Consultant).
31. Shop Drawings NCCB – National Control Center Building (Control
Building of National Grid Company) (BIM Consultant).
32. Shop Drawings Riyadh Park Mall (Al-Aman - Company).
Hamdy Waheed Mohamed email:hamdy_4_85@hotmail.com
Senior Electrical Engineer Mob: +966541840640
JOB RESPONSIBILITIES:
 Making Design and calculations for all types of Electrical Systems works like (Lighting
system, Power system, Cable sizing, Circuit breaker and panel boards sizing and calculations
…etc).
 Making Design and calculations for all types of Low Current works like (Fire Alarm, sound
system, MATV and IPTV system ,Security CCTV , Security Access Control , Nurse Call
System……etc).
 Supervising and Execution of projects.
 Shop Drawings & As built Drawings Preparation , review and correction.
 Technical office support making, material submittal Quotations and pricing break down.
 Specifications preparation and review , Bill of quantities and Bill of materials making and
review.
 Time schedules review, Invoices review, Document management and project status
reporting.
TRAININGS/SEMINARS
Date Topic/Course Title
Feb 1, 2015- Mar 5, 2015 Revit MEP 2015
ADMS
Revit MEP Design
Jun 2, 2011- Jun 30, 2011 Power system harmonics
Society of Electrical Engineers- Egyptian Society of Engineers
Harmonic Causes, analysis and solutions
Oct 1, 2010- Oct 10, 2010 Operational and functional principles of protective devices
Loughborough College
Protection Devices operation and functions
Jul 4, 2006- Jul 31, 2006 Microcontroller Atmel
High Tech. Center-Faculty of Engineering - Cairo University
Micro-controller programming
Jul 1, 2006- Jul 20, 2006 PLC & Classic Control
Jelecom Engineering
PLC Design , programming and operation
Oct. 1, 2011- Oct. 28, 2011 Over head transmission line
Business Integrated Solutions Company
Overhead Transmission Lines Design and construction (cables and Towers)
SKILLS ( 5: Expert , 1 : Poor)
Skill
Level of
Proficiency
Remarks
1 Electrical Design 5 - Expert From Concept design stage, Design Development, final design, tender
drawings and up to shop drawings preparations and review.
2 Lighting Calculation 5 - Expert Indoor Lighting and Outdoor Lighting Calculations and Design
3 Power Consumption
and Load analysis
5 - Expert Using Programs and manual way
4 Dialux Program
4.12
5 - Expert For Lighting Calculations
5 Etap and Ecodial 5 - Expert For load analysis, load calculations , voltage drop and short circuit calculations
6 Microsoft Office 5 - Expert
7 AutoCAD 2015 5 - Expert
8 Revit MEP 2015 4 - Advanced
Languages ( 5: Expert , 1 : Poor)
Language
Level of
Proficiency
1 Arabic 5 – Mother
Tongue
2 English 4 - Expert
PERSONAL CHARACTERISTICS
 Highly Communications Skills.
 Ability to work under pressure and make quick decisions.
 Creativity & Leadership.
References available upon request

Hamdy Waheed CV

  • 1.
    Hamdy Waheed Mohamedemail:hamdy_4_85@hotmail.com Senior Electrical Engineer Mob: +966541840640 Hamdy Waheed Mohamed Mostafa 245-North Ring Road- Al- Maseef District -Riyadh-KSA Cell Phone: 00966-541840640 E-mail: hamdy_4_85@hotmail.com OBJECTIVE: To work in a successful and challenging company, like yours as an Electrical Engineer. PERSONAL DATA Age: 31 Date of Birth: Jul 4, 1985 Gender: Male Civil Status: Married Nationality: Egyptian Religion: Islam EDUCATION Highest Education Second Highest Education Education Level: Bachelor's / College Degree Secondary (Undergraduate) Education Field: Engineering(Electrical/Electronic) Others Course: Egypt General Secondary School School/University: Ain Shams University Road El Farag Location: Cairo Cairo Date: Sep 2002 - Jul 2007 Sep 1999 - Jul 2002 LICENSES/CERTIFICATIONS License/ Certification License/ Certification No. Date 1. Society of Egyptian Electrical Engineers 145225 Jul 30, 2007 2. Saudi Council of Engineers Jul. 1 , 2012 GRADUATION PROJECT: Excellent Speed control of three phase induction motor using PWM technique Using Microcontroller Technology on Inverter" WORK EXPERIENCE I have been working for 9 Year(s). 1. Position: Electrical Section Head Duration: Apr. 2016 – Aug. 2016 Company: Al-Aman Modern Contracting Company Company Industry: Construction / Building / Engineering Location Riyadh-Saudi Arabia Department: Technical Office Engineering Department Projects: 1. Riyadh Park Mall Shop Drawings and Material Submittal 2. Position: Senior Electrical Design Engineer Duration: May 2014 – Apr. 2016 (1.9 yrs) Company: Imar For Urban Consultants Company Industry: Consulting (IT, Engineering, Management, Science & Technical) Location Saudi Arabia Department: Electrical Engineering and design department Design Projects: 2. AOU (Arab Open University) Al-Medina branch (BIM Technology). 3. Mix Use Building (Modon) Dammam industrial city-2 (BIM Technology) 4. SBC (Saudi Broadcasting Corporation) Headquarter Building. 5. Al-Mousa Compound (8 apartments’ buildings and 16 villas in Riyadh) 6. ELM-2 Headquarter Building. 7. NCSC administration Building. 8. SAGIA (Saudi Arabia General Investment Authority Project). 9. Royal Commission Task-1 (contract 677-C24). 10. Al-Khadrah Compound project.
  • 2.
    Hamdy Waheed Mohamedemail:hamdy_4_85@hotmail.com Senior Electrical Engineer Mob: +966541840640 3. Position: Senior Electrical Design Engineer Duration: Dec. 2013 – Mar. 2014 (0.2 yrs) Company: Mtmm Mott MacDonald’s Company Industry: Consulting (IT, Engineering, Management, Science & Technical) Location Jeddah-Saudi Arabia Department: Design Department Design Projects: 11. Hempel Factory-Jeddah (Second Industrial City-Jeddah). 4. Position: Electrical Design Engineer Duration: May 2012 – Nov. 2013 (1.5 yrs) Company: MBS Consultants Company Industry: Consulting (IT, Engineering, Management, Science & Technical) Location Riyadh-Saudi Arabia Department: Electrical Design Department Design Projects: 12. Debba Residential compound. 13. Riyadh Festival yards. 14. Faculty of Basic Science-Dammam (Dammam University). 5. Position: Site Electrical Engineer Duration: Apr. 2009 - May 2012 (3.1 yrs) Company: Arab Contractors Company Industry: Construction / Building / Engineering Location Cairo-Egypt Department: Electrical Department Executed and supervised Projects: 15. Cairo Plaza High Rise Building-ALAHLY bank-Cairo 16. King Fahd hospital (El Kaser El Ainy Projects)-Cairo 17. Cinema Work shop Extension building – Giza 18. Central Library project (Cairo university projects)-Giza. 6. Position: Electrical Design Engineer Duration: Aug. 2007 – Apr. 2009 (1.7 yrs) Company: Allied Consultants Company Industry: Consulting (IT, Engineering, Management, Science & Technical) Location Cairo-Egypt Department: Electromechanical Design Department Design Projects: 19. Lot E3 commercial & high Rise Building –Jeddah gate project. 20. Resort cove town center health club – Jeddah. 21. Arkan Ware houses – Abu Dhabi. 22. AMWAJ Hotel – Bahrain. 23. Dalkia DCP (District Cooling Plant)-Bahrain. 24. Pyramids heights (infra structure works for the community) –Cairo. 25. Up town Cairo (ARURA VILLAGE). 26. Greek village (Marassi) – North Cost. 27. Catania village (Marassi) – North Cost. 28. EIM New service center-Abu Rawash –Cairo. 29. Cairo Plaza High Rise Building-ALAHLY bank (39 floors Al-Ahly Bank Head quarter)- Cairo. FREELANCE PROJECTS: 30. Shop Drawings RTCC- Riyadh Public Transport Control Center (Control Building of Riyadh Metro) (BIM Consultant). 31. Shop Drawings NCCB – National Control Center Building (Control Building of National Grid Company) (BIM Consultant). 32. Shop Drawings Riyadh Park Mall (Al-Aman - Company).
  • 3.
    Hamdy Waheed Mohamedemail:hamdy_4_85@hotmail.com Senior Electrical Engineer Mob: +966541840640 JOB RESPONSIBILITIES:  Making Design and calculations for all types of Electrical Systems works like (Lighting system, Power system, Cable sizing, Circuit breaker and panel boards sizing and calculations …etc).  Making Design and calculations for all types of Low Current works like (Fire Alarm, sound system, MATV and IPTV system ,Security CCTV , Security Access Control , Nurse Call System……etc).  Supervising and Execution of projects.  Shop Drawings & As built Drawings Preparation , review and correction.  Technical office support making, material submittal Quotations and pricing break down.  Specifications preparation and review , Bill of quantities and Bill of materials making and review.  Time schedules review, Invoices review, Document management and project status reporting. TRAININGS/SEMINARS Date Topic/Course Title Feb 1, 2015- Mar 5, 2015 Revit MEP 2015 ADMS Revit MEP Design Jun 2, 2011- Jun 30, 2011 Power system harmonics Society of Electrical Engineers- Egyptian Society of Engineers Harmonic Causes, analysis and solutions Oct 1, 2010- Oct 10, 2010 Operational and functional principles of protective devices Loughborough College Protection Devices operation and functions Jul 4, 2006- Jul 31, 2006 Microcontroller Atmel High Tech. Center-Faculty of Engineering - Cairo University Micro-controller programming Jul 1, 2006- Jul 20, 2006 PLC & Classic Control Jelecom Engineering PLC Design , programming and operation Oct. 1, 2011- Oct. 28, 2011 Over head transmission line Business Integrated Solutions Company Overhead Transmission Lines Design and construction (cables and Towers) SKILLS ( 5: Expert , 1 : Poor) Skill Level of Proficiency Remarks 1 Electrical Design 5 - Expert From Concept design stage, Design Development, final design, tender drawings and up to shop drawings preparations and review. 2 Lighting Calculation 5 - Expert Indoor Lighting and Outdoor Lighting Calculations and Design 3 Power Consumption and Load analysis 5 - Expert Using Programs and manual way 4 Dialux Program 4.12 5 - Expert For Lighting Calculations 5 Etap and Ecodial 5 - Expert For load analysis, load calculations , voltage drop and short circuit calculations 6 Microsoft Office 5 - Expert 7 AutoCAD 2015 5 - Expert 8 Revit MEP 2015 4 - Advanced Languages ( 5: Expert , 1 : Poor) Language Level of Proficiency 1 Arabic 5 – Mother Tongue 2 English 4 - Expert PERSONAL CHARACTERISTICS  Highly Communications Skills.  Ability to work under pressure and make quick decisions.  Creativity & Leadership. References available upon request