Agenda





Overview of New Source Review (NSR)
Major Modification
VOC, GHG, and PM2.5 Emissions Under NSR
• VOC
• GHG
• PM2.5



2

Flexibility in Air Permitting

Your environmental compliance is clearly our business.
New Source Review


Construction permits for major new sources or
major modifications fall under the “Major New
Source Review (NSR)” rules. There are 2 types:
• Prevention of Significant Deterioration (PSD) permits
in attainment areas.
• Non-attainment New Source Review (NNSR) permits
in non-attainment areas.



3

Major NSR permits are required prior to
commencing construction.

Your environmental compliance is clearly our business.
NAAQS Summary
Averaging Period

NAAQS (µg/m3)

1-Hour

40,000

8-Hour

10,000

Ozone

8-Hour

75 ppb

Pb

3-Month Rolling

0.15

PM10

24-Hour

150

24-Hour

35

Annual

12

1-Hour

188

Annual

100

1-Hour

196

3-Hour

1,300

Pollutant

CO

PM2.5

NO2

SO2
4

Your environmental compliance is clearly our business.
NSR Applicability


NSR can apply to:
• New major sources.
• Modifications to existing major sources.
• Modifications to existing minor sources.





5

Major source criteria is based on “potential to
emit”.
Major modification criteria is based on “net
emissions increase”.

Your environmental compliance is clearly our business.
NSR Major Modification


Major modification means any physical change in
or change in the method of operation of a major
stationary source that would result in:
• a significant emissions increase (as defined in
paragraph (b)(40) of this section) of a regulated NSR
pollutant (as defined in paragraph (b)(50) of this
section) and
• a significant net emissions increase of that pollutant
from the major stationary source.

6

Your environmental compliance is clearly our business.
Assessing VOC Permitting




NNSR applies for non-attainment areas and areas
in the Ozone Transport Region.
NNSR significance levels are less than PSD levels.
• Precursor pollutant (NOX).



Degree of non-attainment is considered.
• 25 tons for VOC and NOX in severe non-attainment
areas.
• Emission Reduction Credits (ERCs) required at a ratio
of 1.3 to 1.


7

Lowest Achievable Emission Rate (LAER).
Your environmental compliance is clearly our business.
Assessing GHG Permitting


8

May 2010: Prevention of Significant Deterioration
(PSD) and Title V Greenhouse Gas Tailoring Rule
(GHG Tailoring Rule).
• January 2011: Step 1 - GHG air permitting began for
facilities that would otherwise require permitting.
• July 2011: Step 2 - GHG permitting began for all
facilities that would emit more than 100,000 tons of
CO2e per year and facilities that undergo modification
that would increase emissions by 75,000 tons of CO2e
per year.
• July 2012: Step 3 amendments and streamlining
options.

Your environmental compliance is clearly our business.
Assessing GHG Permitting


July 2012: Step 3 amendments and streamlining
options.
• Step 1 and Step 2 PSD and Title V GHG thresholds not
changed.
• Revisions to 40 CFR Part 52 for better implementation
of establishing PALs for GHG emissions.

9

Your environmental compliance is clearly our business.
GHG Permitting


Currently must address GHG in all applications.
• Demonstrate PSD status.
• Best Available Control Technology (BACT) analysis.



Full GHG emission inventories required in renewal
applications.
• “Major source” label for another pollutant.



Tailoring Rule Step 4 by April 2016.
• Thresholds could be lowered.

10

Your environmental compliance is clearly our business.
GHG Standards


NSPS/NESHAP requirements for energy efficiency.
• Output based standard in current EGU proposal.




Questionable GHG control technologies.
Energy efficiency requirements.
• Introduced in “Boiler MACT.”
• Could be part of Step 4.
• Could be added to existing standards.

11

Your environmental compliance is clearly our business.
PM2.5 PSD Permitting








PM2.5 emissions may not have been quantified
previously.
Precursor emissions (NOX and SO2) need to be
considered.
Significance Level for PM2.5 is 10 tpy.
Air quality modeling for PM2.5 is difficult.
• No “exemption” modeling via SILs.
• May trigger ambient monitoring requirements.

12

Your environmental compliance is clearly our business.
PM2.5 NNSR Permitting


NNSR pollutants trigger only that pollutant for
NNSR permitting.
• Facility 100 tpy PM2.5 – Significance Level 10 tpy.
• Facility 100 tpy NOX – Significance Level 40 tpy.
• Facility 100 tpy SO2 - Significance Level 40 tpy.



Must offset PM2.5 increase with emission
reduction credits (ERCs).
• ERCs are difficult to find and expensive to secure.
• May need to demonstrate ERCs can be used.



13

Lowest Achievable Emission Rate (LAER) Control
Technology is required.
Your environmental compliance is clearly our business.
PM2.5 Emission Testing


Method 201A for sizing of particulate.
• Difficult to use on wet sources.
• May need to utilize Method 5 and scale results.



Method 202 for condensable particulate matter.
• Blank correction requires extended sampling times.
• Artifact formation may occur with long sampling
times.



Other test methods allowed.
• API Wet Stack Method.
• U.S. EPA Conditional Test Method 039.

14

Your environmental compliance is clearly our business.
Future Planning


Strategic planning for facility future must consider
implications of both new air rule applicability and
air permitting implications:
• New rules likely require facility changes.
• No exemption for pollution control projects.
• Permitting issues can impact project design.

15

Your environmental compliance is clearly our business.
PAL Option






16

“Plantwide Applicability Limitation” (PAL) is an
available regulatory option that can potentially
ease air permitting PSD cycle.
Federal PSD rule provides for PALs based on
historic actual emissions.
PALs are pollutant specific and could be a critical
part of a facility strategic plan.

Your environmental compliance is clearly our business.
PAL Planning Approach







17

Develop historic facility-wide baseline emission
rates and potential PAL levels.
Address potential NAAQS issues.
Consider new rules, facility operations plans,
potential energy efficiency improvements, new
technologies, low hanging fruit for emissions
reductions.
Weigh value of PAL for each pollutant.

Your environmental compliance is clearly our business.
Questions/Comments

John Slade| jslade@all4inc.com | (610) 933-5246 x136
Dan Holland | dholland@all4inc.com | (610) 933-5246 x115

www.all4inc.com
Kimberton, PA | 610.933.5246
Kennesaw, GA | 678.460.0324

More Related Content

What's hot

Implications of the New NESHAP/NSPS for the Oil and Gas Sector
Implications of the New NESHAP/NSPS for the Oil and Gas SectorImplications of the New NESHAP/NSPS for the Oil and Gas Sector
Implications of the New NESHAP/NSPS for the Oil and Gas Sector
Cindy Bishop
 
Case Study - NSR 2010
Case Study - NSR 2010Case Study - NSR 2010
Case Study - NSR 2010All4 Inc.
 
Greenhouse Gas Tailoring Rule
Greenhouse Gas Tailoring RuleGreenhouse Gas Tailoring Rule
Greenhouse Gas Tailoring RuleAll4 Inc.
 
Applying ashrae 62.1 to LEED
Applying ashrae 62.1 to LEEDApplying ashrae 62.1 to LEED
Applying ashrae 62.1 to LEED
leluongvang
 
Deq notes linden
Deq notes lindenDeq notes linden
Deq notes linden
Marjorie Frisch
 
Estimate of Impacts of EPA Proposals to Reduce Air Emissions from Hydraulic F...
Estimate of Impacts of EPA Proposals to Reduce Air Emissions from Hydraulic F...Estimate of Impacts of EPA Proposals to Reduce Air Emissions from Hydraulic F...
Estimate of Impacts of EPA Proposals to Reduce Air Emissions from Hydraulic F...
Marcellus Drilling News
 
Air Permit Review Changes
Air Permit Review ChangesAir Permit Review Changes
Air Permit Review Changes
Andrew Shroads
 
Landfill Compliance Monitoring: Achieving Long Term Efficiency
Landfill Compliance Monitoring: Achieving Long Term EfficiencyLandfill Compliance Monitoring: Achieving Long Term Efficiency
Landfill Compliance Monitoring: Achieving Long Term Efficiency
HydroTerra Pty Ltd
 
Utility MATS - Compliance with the Low Emitting EGU Compliance Option
Utility MATS - Compliance with the Low Emitting EGU Compliance OptionUtility MATS - Compliance with the Low Emitting EGU Compliance Option
Utility MATS - Compliance with the Low Emitting EGU Compliance Option
All4 Inc.
 
D dix awma conference air toxics evaluation requirements 062718
D dix awma conference air toxics evaluation requirements 062718D dix awma conference air toxics evaluation requirements 062718
D dix awma conference air toxics evaluation requirements 062718
All4 Inc.
 
PAHs_are_families_Watertech2014
PAHs_are_families_Watertech2014PAHs_are_families_Watertech2014
PAHs_are_families_Watertech2014
Chemistry Matters Inc.
 
Peace River AER Inquiry 2014 - Baytex Study Summary
Peace River AER Inquiry 2014 - Baytex Study SummaryPeace River AER Inquiry 2014 - Baytex Study Summary
Peace River AER Inquiry 2014 - Baytex Study Summary
Chemistry Matters Inc.
 
IRJET- Guidelines to Improve Fiscal Natural Gas Metering Accuracy and Consist...
IRJET- Guidelines to Improve Fiscal Natural Gas Metering Accuracy and Consist...IRJET- Guidelines to Improve Fiscal Natural Gas Metering Accuracy and Consist...
IRJET- Guidelines to Improve Fiscal Natural Gas Metering Accuracy and Consist...
IRJET Journal
 
Jahangir mian-air qualityspecialist-2018
Jahangir mian-air qualityspecialist-2018Jahangir mian-air qualityspecialist-2018
Jahangir mian-air qualityspecialist-2018
JAHANGIR MIAN
 
BlueScape Get the Air Permit for Energy Projects Webinar 9-10-13
BlueScape Get the Air Permit for Energy Projects Webinar 9-10-13BlueScape Get the Air Permit for Energy Projects Webinar 9-10-13
BlueScape Get the Air Permit for Energy Projects Webinar 9-10-13
BlueScape
 
Groundwater Rule Overview and Best Practices
Groundwater Rule Overview and Best PracticesGroundwater Rule Overview and Best Practices
Groundwater Rule Overview and Best Practices
WaterTrax and Linko Technology
 
PHMSA Final Rule (part 1) for Gas Transmission Pipelines
PHMSA Final Rule (part 1) for Gas Transmission Pipelines PHMSA Final Rule (part 1) for Gas Transmission Pipelines
PHMSA Final Rule (part 1) for Gas Transmission Pipelines
Audubon Engineering Company
 
Presentation Slides: PHMSA Final Rule (Part 1) for Hazardous Liquid Pipelines
Presentation Slides: PHMSA Final Rule (Part 1) for Hazardous Liquid PipelinesPresentation Slides: PHMSA Final Rule (Part 1) for Hazardous Liquid Pipelines
Presentation Slides: PHMSA Final Rule (Part 1) for Hazardous Liquid Pipelines
Audubon Engineering Company
 
Increment modeling091007
Increment modeling091007Increment modeling091007
Increment modeling091007CMelt
 
Presentation Slides: PHMSA Final Rule (Part 1) for Gas Transmission Pipelines
Presentation Slides: PHMSA Final Rule (Part 1) for Gas Transmission PipelinesPresentation Slides: PHMSA Final Rule (Part 1) for Gas Transmission Pipelines
Presentation Slides: PHMSA Final Rule (Part 1) for Gas Transmission Pipelines
Audubon Engineering Company
 

What's hot (20)

Implications of the New NESHAP/NSPS for the Oil and Gas Sector
Implications of the New NESHAP/NSPS for the Oil and Gas SectorImplications of the New NESHAP/NSPS for the Oil and Gas Sector
Implications of the New NESHAP/NSPS for the Oil and Gas Sector
 
Case Study - NSR 2010
Case Study - NSR 2010Case Study - NSR 2010
Case Study - NSR 2010
 
Greenhouse Gas Tailoring Rule
Greenhouse Gas Tailoring RuleGreenhouse Gas Tailoring Rule
Greenhouse Gas Tailoring Rule
 
Applying ashrae 62.1 to LEED
Applying ashrae 62.1 to LEEDApplying ashrae 62.1 to LEED
Applying ashrae 62.1 to LEED
 
Deq notes linden
Deq notes lindenDeq notes linden
Deq notes linden
 
Estimate of Impacts of EPA Proposals to Reduce Air Emissions from Hydraulic F...
Estimate of Impacts of EPA Proposals to Reduce Air Emissions from Hydraulic F...Estimate of Impacts of EPA Proposals to Reduce Air Emissions from Hydraulic F...
Estimate of Impacts of EPA Proposals to Reduce Air Emissions from Hydraulic F...
 
Air Permit Review Changes
Air Permit Review ChangesAir Permit Review Changes
Air Permit Review Changes
 
Landfill Compliance Monitoring: Achieving Long Term Efficiency
Landfill Compliance Monitoring: Achieving Long Term EfficiencyLandfill Compliance Monitoring: Achieving Long Term Efficiency
Landfill Compliance Monitoring: Achieving Long Term Efficiency
 
Utility MATS - Compliance with the Low Emitting EGU Compliance Option
Utility MATS - Compliance with the Low Emitting EGU Compliance OptionUtility MATS - Compliance with the Low Emitting EGU Compliance Option
Utility MATS - Compliance with the Low Emitting EGU Compliance Option
 
D dix awma conference air toxics evaluation requirements 062718
D dix awma conference air toxics evaluation requirements 062718D dix awma conference air toxics evaluation requirements 062718
D dix awma conference air toxics evaluation requirements 062718
 
PAHs_are_families_Watertech2014
PAHs_are_families_Watertech2014PAHs_are_families_Watertech2014
PAHs_are_families_Watertech2014
 
Peace River AER Inquiry 2014 - Baytex Study Summary
Peace River AER Inquiry 2014 - Baytex Study SummaryPeace River AER Inquiry 2014 - Baytex Study Summary
Peace River AER Inquiry 2014 - Baytex Study Summary
 
IRJET- Guidelines to Improve Fiscal Natural Gas Metering Accuracy and Consist...
IRJET- Guidelines to Improve Fiscal Natural Gas Metering Accuracy and Consist...IRJET- Guidelines to Improve Fiscal Natural Gas Metering Accuracy and Consist...
IRJET- Guidelines to Improve Fiscal Natural Gas Metering Accuracy and Consist...
 
Jahangir mian-air qualityspecialist-2018
Jahangir mian-air qualityspecialist-2018Jahangir mian-air qualityspecialist-2018
Jahangir mian-air qualityspecialist-2018
 
BlueScape Get the Air Permit for Energy Projects Webinar 9-10-13
BlueScape Get the Air Permit for Energy Projects Webinar 9-10-13BlueScape Get the Air Permit for Energy Projects Webinar 9-10-13
BlueScape Get the Air Permit for Energy Projects Webinar 9-10-13
 
Groundwater Rule Overview and Best Practices
Groundwater Rule Overview and Best PracticesGroundwater Rule Overview and Best Practices
Groundwater Rule Overview and Best Practices
 
PHMSA Final Rule (part 1) for Gas Transmission Pipelines
PHMSA Final Rule (part 1) for Gas Transmission Pipelines PHMSA Final Rule (part 1) for Gas Transmission Pipelines
PHMSA Final Rule (part 1) for Gas Transmission Pipelines
 
Presentation Slides: PHMSA Final Rule (Part 1) for Hazardous Liquid Pipelines
Presentation Slides: PHMSA Final Rule (Part 1) for Hazardous Liquid PipelinesPresentation Slides: PHMSA Final Rule (Part 1) for Hazardous Liquid Pipelines
Presentation Slides: PHMSA Final Rule (Part 1) for Hazardous Liquid Pipelines
 
Increment modeling091007
Increment modeling091007Increment modeling091007
Increment modeling091007
 
Presentation Slides: PHMSA Final Rule (Part 1) for Gas Transmission Pipelines
Presentation Slides: PHMSA Final Rule (Part 1) for Gas Transmission PipelinesPresentation Slides: PHMSA Final Rule (Part 1) for Gas Transmission Pipelines
Presentation Slides: PHMSA Final Rule (Part 1) for Gas Transmission Pipelines
 

Viewers also liked

Presentation on Perchloroethylene and its Regulation: Colorado School of Publ...
Presentation on Perchloroethylene and its Regulation: Colorado School of Publ...Presentation on Perchloroethylene and its Regulation: Colorado School of Publ...
Presentation on Perchloroethylene and its Regulation: Colorado School of Publ...Elizabeth Bemis
 
topic_9-1
topic_9-1topic_9-1
topic_9-15045033
 
Monitoring of volatile organic compounds
Monitoring of volatile organic compounds   Monitoring of volatile organic compounds
Monitoring of volatile organic compounds
Filippo Casadei
 
ultrasonic
ultrasonicultrasonic
ultrasonic5045033
 
Environmental Chemistry
Environmental ChemistryEnvironmental Chemistry
Environmental Chemistry
Robert Slinn
 
Remediation Techniques
Remediation TechniquesRemediation Techniques
Remediation TechniquesStephine Smith
 
Cems brochure 2013
Cems brochure 2013Cems brochure 2013
Cems brochure 2013a1-cbiss
 

Viewers also liked (7)

Presentation on Perchloroethylene and its Regulation: Colorado School of Publ...
Presentation on Perchloroethylene and its Regulation: Colorado School of Publ...Presentation on Perchloroethylene and its Regulation: Colorado School of Publ...
Presentation on Perchloroethylene and its Regulation: Colorado School of Publ...
 
topic_9-1
topic_9-1topic_9-1
topic_9-1
 
Monitoring of volatile organic compounds
Monitoring of volatile organic compounds   Monitoring of volatile organic compounds
Monitoring of volatile organic compounds
 
ultrasonic
ultrasonicultrasonic
ultrasonic
 
Environmental Chemistry
Environmental ChemistryEnvironmental Chemistry
Environmental Chemistry
 
Remediation Techniques
Remediation TechniquesRemediation Techniques
Remediation Techniques
 
Cems brochure 2013
Cems brochure 2013Cems brochure 2013
Cems brochure 2013
 

Similar to Implications of Greenhouse Gas (GHG), Volatile Organic Compounds (VOC), and Fine Particulate (PM2.5)

Strategic Air Planning: Is the Time for a PAL Here?
Strategic Air Planning: Is the Time for a PAL Here?Strategic Air Planning: Is the Time for a PAL Here?
Strategic Air Planning: Is the Time for a PAL Here?
All4 Inc.
 
Naaqs oct 15
Naaqs oct 15Naaqs oct 15
Naaqs oct 15
All4 Inc.
 
Srivastav, Piyush, NAQS Environmental Experts, Crash Course in PSD Permitting...
Srivastav, Piyush, NAQS Environmental Experts, Crash Course in PSD Permitting...Srivastav, Piyush, NAQS Environmental Experts, Crash Course in PSD Permitting...
Srivastav, Piyush, NAQS Environmental Experts, Crash Course in PSD Permitting...
Kevin Perry
 
Project Planning and Air Permit Issues
Project Planning and Air Permit IssuesProject Planning and Air Permit Issues
Project Planning and Air Permit IssuesAll4 Inc.
 
Techniques for SO2 Designations
Techniques for SO2 DesignationsTechniques for SO2 Designations
Techniques for SO2 Designations
All4 Inc.
 
4 c nsr presentation 032318 all4 mccall
4 c nsr presentation 032318   all4 mccall4 c nsr presentation 032318   all4 mccall
4 c nsr presentation 032318 all4 mccall
All4 Inc.
 
SO2 Data Requirements Rule - a Proactive Compliance Approach
SO2 Data Requirements Rule - a Proactive Compliance ApproachSO2 Data Requirements Rule - a Proactive Compliance Approach
SO2 Data Requirements Rule - a Proactive Compliance Approach
All4 Inc.
 
Design, Permitting and Construction Considerations for Marcellus Shale Gas Co...
Design, Permitting and Construction Considerations for Marcellus Shale Gas Co...Design, Permitting and Construction Considerations for Marcellus Shale Gas Co...
Design, Permitting and Construction Considerations for Marcellus Shale Gas Co...All4 Inc.
 
All4 tcc acit pres ipt guidance 2017
All4 tcc acit pres ipt guidance 2017All4 tcc acit pres ipt guidance 2017
All4 tcc acit pres ipt guidance 2017
All4 Inc.
 
The complexities of new source review air permitting – a case study ddix 020116
The complexities of new source review air permitting – a case study ddix 020116The complexities of new source review air permitting – a case study ddix 020116
The complexities of new source review air permitting – a case study ddix 020116
All4 Inc.
 
PM2.5 Modeling for PSD
PM2.5 Modeling for PSDPM2.5 Modeling for PSD
PM2.5 Modeling for PSD
All4 Inc.
 
What YOU Need to Know About the 1-hour NAAQS Implementation Process
What YOU Need to Know About the 1-hour NAAQS Implementation ProcessWhat YOU Need to Know About the 1-hour NAAQS Implementation Process
What YOU Need to Know About the 1-hour NAAQS Implementation ProcessAll4 Inc.
 
Strategic Air Planning: Is the time for a PAL here?
Strategic Air Planning: Is the time for a PAL here?Strategic Air Planning: Is the time for a PAL here?
Strategic Air Planning: Is the time for a PAL here?All4 Inc.
 
LNG proposed standardsNova Scotia Liquefied Natural Gas Proposed Greenhouse G...
LNG proposed standardsNova Scotia Liquefied Natural Gas Proposed Greenhouse G...LNG proposed standardsNova Scotia Liquefied Natural Gas Proposed Greenhouse G...
LNG proposed standardsNova Scotia Liquefied Natural Gas Proposed Greenhouse G...
Marcellus Drilling News
 
BlueScape Air Quality in 2015: What You Need to Know Webinar 2-10-15
BlueScape Air Quality in 2015: What You Need to Know Webinar 2-10-15BlueScape Air Quality in 2015: What You Need to Know Webinar 2-10-15
BlueScape Air Quality in 2015: What You Need to Know Webinar 2-10-15
BlueScape
 
BlueScape How to Create a CEQA Air Quality Analysis for Development Projects ...
BlueScape How to Create a CEQA Air Quality Analysis for Development Projects ...BlueScape How to Create a CEQA Air Quality Analysis for Development Projects ...
BlueScape How to Create a CEQA Air Quality Analysis for Development Projects ...
BlueScape
 
Impact of New NSPS and NESHAP Regulations on Oil & Gas Industry
Impact of New NSPS and NESHAP  Regulations on Oil & Gas IndustryImpact of New NSPS and NESHAP  Regulations on Oil & Gas Industry
Impact of New NSPS and NESHAP Regulations on Oil & Gas Industry
bishopcj
 
Boiler MACT and Strategic Air Permitting
Boiler MACT and Strategic Air PermittingBoiler MACT and Strategic Air Permitting
Boiler MACT and Strategic Air Permitting
All4 Inc.
 
BlueScape GHG Tailoring Rule Webinar 9-9-10
BlueScape GHG Tailoring Rule Webinar  9-9-10BlueScape GHG Tailoring Rule Webinar  9-9-10
BlueScape GHG Tailoring Rule Webinar 9-9-10
BlueScape
 
Sgcp14beckmanncp
Sgcp14beckmanncpSgcp14beckmanncp
Sgcp14beckmanncp
Justin Hayward
 

Similar to Implications of Greenhouse Gas (GHG), Volatile Organic Compounds (VOC), and Fine Particulate (PM2.5) (20)

Strategic Air Planning: Is the Time for a PAL Here?
Strategic Air Planning: Is the Time for a PAL Here?Strategic Air Planning: Is the Time for a PAL Here?
Strategic Air Planning: Is the Time for a PAL Here?
 
Naaqs oct 15
Naaqs oct 15Naaqs oct 15
Naaqs oct 15
 
Srivastav, Piyush, NAQS Environmental Experts, Crash Course in PSD Permitting...
Srivastav, Piyush, NAQS Environmental Experts, Crash Course in PSD Permitting...Srivastav, Piyush, NAQS Environmental Experts, Crash Course in PSD Permitting...
Srivastav, Piyush, NAQS Environmental Experts, Crash Course in PSD Permitting...
 
Project Planning and Air Permit Issues
Project Planning and Air Permit IssuesProject Planning and Air Permit Issues
Project Planning and Air Permit Issues
 
Techniques for SO2 Designations
Techniques for SO2 DesignationsTechniques for SO2 Designations
Techniques for SO2 Designations
 
4 c nsr presentation 032318 all4 mccall
4 c nsr presentation 032318   all4 mccall4 c nsr presentation 032318   all4 mccall
4 c nsr presentation 032318 all4 mccall
 
SO2 Data Requirements Rule - a Proactive Compliance Approach
SO2 Data Requirements Rule - a Proactive Compliance ApproachSO2 Data Requirements Rule - a Proactive Compliance Approach
SO2 Data Requirements Rule - a Proactive Compliance Approach
 
Design, Permitting and Construction Considerations for Marcellus Shale Gas Co...
Design, Permitting and Construction Considerations for Marcellus Shale Gas Co...Design, Permitting and Construction Considerations for Marcellus Shale Gas Co...
Design, Permitting and Construction Considerations for Marcellus Shale Gas Co...
 
All4 tcc acit pres ipt guidance 2017
All4 tcc acit pres ipt guidance 2017All4 tcc acit pres ipt guidance 2017
All4 tcc acit pres ipt guidance 2017
 
The complexities of new source review air permitting – a case study ddix 020116
The complexities of new source review air permitting – a case study ddix 020116The complexities of new source review air permitting – a case study ddix 020116
The complexities of new source review air permitting – a case study ddix 020116
 
PM2.5 Modeling for PSD
PM2.5 Modeling for PSDPM2.5 Modeling for PSD
PM2.5 Modeling for PSD
 
What YOU Need to Know About the 1-hour NAAQS Implementation Process
What YOU Need to Know About the 1-hour NAAQS Implementation ProcessWhat YOU Need to Know About the 1-hour NAAQS Implementation Process
What YOU Need to Know About the 1-hour NAAQS Implementation Process
 
Strategic Air Planning: Is the time for a PAL here?
Strategic Air Planning: Is the time for a PAL here?Strategic Air Planning: Is the time for a PAL here?
Strategic Air Planning: Is the time for a PAL here?
 
LNG proposed standardsNova Scotia Liquefied Natural Gas Proposed Greenhouse G...
LNG proposed standardsNova Scotia Liquefied Natural Gas Proposed Greenhouse G...LNG proposed standardsNova Scotia Liquefied Natural Gas Proposed Greenhouse G...
LNG proposed standardsNova Scotia Liquefied Natural Gas Proposed Greenhouse G...
 
BlueScape Air Quality in 2015: What You Need to Know Webinar 2-10-15
BlueScape Air Quality in 2015: What You Need to Know Webinar 2-10-15BlueScape Air Quality in 2015: What You Need to Know Webinar 2-10-15
BlueScape Air Quality in 2015: What You Need to Know Webinar 2-10-15
 
BlueScape How to Create a CEQA Air Quality Analysis for Development Projects ...
BlueScape How to Create a CEQA Air Quality Analysis for Development Projects ...BlueScape How to Create a CEQA Air Quality Analysis for Development Projects ...
BlueScape How to Create a CEQA Air Quality Analysis for Development Projects ...
 
Impact of New NSPS and NESHAP Regulations on Oil & Gas Industry
Impact of New NSPS and NESHAP  Regulations on Oil & Gas IndustryImpact of New NSPS and NESHAP  Regulations on Oil & Gas Industry
Impact of New NSPS and NESHAP Regulations on Oil & Gas Industry
 
Boiler MACT and Strategic Air Permitting
Boiler MACT and Strategic Air PermittingBoiler MACT and Strategic Air Permitting
Boiler MACT and Strategic Air Permitting
 
BlueScape GHG Tailoring Rule Webinar 9-9-10
BlueScape GHG Tailoring Rule Webinar  9-9-10BlueScape GHG Tailoring Rule Webinar  9-9-10
BlueScape GHG Tailoring Rule Webinar 9-9-10
 
Sgcp14beckmanncp
Sgcp14beckmanncpSgcp14beckmanncp
Sgcp14beckmanncp
 

More from All4 Inc.

Impacts of U.S. EPA Region 6 Guidance on CMS Downtime and Data Calculations
Impacts of U.S. EPA Region 6 Guidance on CMS Downtime and Data CalculationsImpacts of U.S. EPA Region 6 Guidance on CMS Downtime and Data Calculations
Impacts of U.S. EPA Region 6 Guidance on CMS Downtime and Data Calculations
All4 Inc.
 
Implementing a DAHS for Compliance with the Refinery Sector Rule
Implementing a DAHS for Compliance with the Refinery Sector RuleImplementing a DAHS for Compliance with the Refinery Sector Rule
Implementing a DAHS for Compliance with the Refinery Sector Rule
All4 Inc.
 
NSR Reform Updates
NSR Reform Updates NSR Reform Updates
NSR Reform Updates
All4 Inc.
 
Tceq recent permitting changes 4 c-2019-f_dougherty (1-31-19)
Tceq recent permitting changes 4 c-2019-f_dougherty (1-31-19)Tceq recent permitting changes 4 c-2019-f_dougherty (1-31-19)
Tceq recent permitting changes 4 c-2019-f_dougherty (1-31-19)
All4 Inc.
 
All4 impacts of recent u.s. epa region 6 guidance on cms downtime and data ...
All4   impacts of recent u.s. epa region 6 guidance on cms downtime and data ...All4   impacts of recent u.s. epa region 6 guidance on cms downtime and data ...
All4 impacts of recent u.s. epa region 6 guidance on cms downtime and data ...
All4 Inc.
 
Air Quality Compliance Training 12-8-16
Air Quality Compliance Training 12-8-16Air Quality Compliance Training 12-8-16
Air Quality Compliance Training 12-8-16
All4 Inc.
 
CEDRI-NextGen
CEDRI-NextGenCEDRI-NextGen
CEDRI-NextGen
All4 Inc.
 
understanding the validity and increased scrutiny of data used for compliance...
understanding the validity and increased scrutiny of data used for compliance...understanding the validity and increased scrutiny of data used for compliance...
understanding the validity and increased scrutiny of data used for compliance...
All4 Inc.
 
CUHMMC Presentation
CUHMMC PresentationCUHMMC Presentation
CUHMMC Presentation
All4 Inc.
 
Preview of ALL4 Air Quality Compliance - PIOGATech
Preview of ALL4 Air Quality Compliance - PIOGATechPreview of ALL4 Air Quality Compliance - PIOGATech
Preview of ALL4 Air Quality Compliance - PIOGATech
All4 Inc.
 
Top 5 Environmental Compliance Issues for Engineers and Managers
Top 5 Environmental Compliance Issues for Engineers and ManagersTop 5 Environmental Compliance Issues for Engineers and Managers
Top 5 Environmental Compliance Issues for Engineers and Managers
All4 Inc.
 
SO2 Data Requirements Rule Modeling Strategies
SO2 Data Requirements Rule Modeling StrategiesSO2 Data Requirements Rule Modeling Strategies
SO2 Data Requirements Rule Modeling Strategies
All4 Inc.
 
The Good vs. Bad: The Specifics for Validating CMS Data
The Good vs. Bad: The Specifics for Validating CMS DataThe Good vs. Bad: The Specifics for Validating CMS Data
The Good vs. Bad: The Specifics for Validating CMS Data
All4 Inc.
 
Benzene Fenceline Monitoring: An Introduction and What the Regulations Don’...
Benzene Fenceline Monitoring:  An Introduction and What the Regulations Don’...Benzene Fenceline Monitoring:  An Introduction and What the Regulations Don’...
Benzene Fenceline Monitoring: An Introduction and What the Regulations Don’...
All4 Inc.
 
The Petroleum Refinery Sector Rule: What’s all the fuss about and what are th...
The Petroleum Refinery Sector Rule: What’s all the fuss about and what are th...The Petroleum Refinery Sector Rule: What’s all the fuss about and what are th...
The Petroleum Refinery Sector Rule: What’s all the fuss about and what are th...
All4 Inc.
 
US EPA's Electronic Reporting Tool and Compliance and Emissions Data Reportin...
US EPA's Electronic Reporting Tool and Compliance and Emissions Data Reportin...US EPA's Electronic Reporting Tool and Compliance and Emissions Data Reportin...
US EPA's Electronic Reporting Tool and Compliance and Emissions Data Reportin...
All4 Inc.
 
Curveball Problems for Your Benzene Fenceline Monitoring Program and How to H...
Curveball Problems for Your Benzene Fenceline Monitoring Program and How to H...Curveball Problems for Your Benzene Fenceline Monitoring Program and How to H...
Curveball Problems for Your Benzene Fenceline Monitoring Program and How to H...
All4 Inc.
 
RACT 2 Review - ALL4
RACT 2 Review - ALL4RACT 2 Review - ALL4
RACT 2 Review - ALL4
All4 Inc.
 
Mact compliance plans
Mact compliance plansMact compliance plans
Mact compliance plans
All4 Inc.
 
Complying with the NAAQS – PM2.5 Air Quality Modeling Considerations by ALL4
Complying with the NAAQS – PM2.5 Air Quality Modeling Considerations by ALL4Complying with the NAAQS – PM2.5 Air Quality Modeling Considerations by ALL4
Complying with the NAAQS – PM2.5 Air Quality Modeling Considerations by ALL4
All4 Inc.
 

More from All4 Inc. (20)

Impacts of U.S. EPA Region 6 Guidance on CMS Downtime and Data Calculations
Impacts of U.S. EPA Region 6 Guidance on CMS Downtime and Data CalculationsImpacts of U.S. EPA Region 6 Guidance on CMS Downtime and Data Calculations
Impacts of U.S. EPA Region 6 Guidance on CMS Downtime and Data Calculations
 
Implementing a DAHS for Compliance with the Refinery Sector Rule
Implementing a DAHS for Compliance with the Refinery Sector RuleImplementing a DAHS for Compliance with the Refinery Sector Rule
Implementing a DAHS for Compliance with the Refinery Sector Rule
 
NSR Reform Updates
NSR Reform Updates NSR Reform Updates
NSR Reform Updates
 
Tceq recent permitting changes 4 c-2019-f_dougherty (1-31-19)
Tceq recent permitting changes 4 c-2019-f_dougherty (1-31-19)Tceq recent permitting changes 4 c-2019-f_dougherty (1-31-19)
Tceq recent permitting changes 4 c-2019-f_dougherty (1-31-19)
 
All4 impacts of recent u.s. epa region 6 guidance on cms downtime and data ...
All4   impacts of recent u.s. epa region 6 guidance on cms downtime and data ...All4   impacts of recent u.s. epa region 6 guidance on cms downtime and data ...
All4 impacts of recent u.s. epa region 6 guidance on cms downtime and data ...
 
Air Quality Compliance Training 12-8-16
Air Quality Compliance Training 12-8-16Air Quality Compliance Training 12-8-16
Air Quality Compliance Training 12-8-16
 
CEDRI-NextGen
CEDRI-NextGenCEDRI-NextGen
CEDRI-NextGen
 
understanding the validity and increased scrutiny of data used for compliance...
understanding the validity and increased scrutiny of data used for compliance...understanding the validity and increased scrutiny of data used for compliance...
understanding the validity and increased scrutiny of data used for compliance...
 
CUHMMC Presentation
CUHMMC PresentationCUHMMC Presentation
CUHMMC Presentation
 
Preview of ALL4 Air Quality Compliance - PIOGATech
Preview of ALL4 Air Quality Compliance - PIOGATechPreview of ALL4 Air Quality Compliance - PIOGATech
Preview of ALL4 Air Quality Compliance - PIOGATech
 
Top 5 Environmental Compliance Issues for Engineers and Managers
Top 5 Environmental Compliance Issues for Engineers and ManagersTop 5 Environmental Compliance Issues for Engineers and Managers
Top 5 Environmental Compliance Issues for Engineers and Managers
 
SO2 Data Requirements Rule Modeling Strategies
SO2 Data Requirements Rule Modeling StrategiesSO2 Data Requirements Rule Modeling Strategies
SO2 Data Requirements Rule Modeling Strategies
 
The Good vs. Bad: The Specifics for Validating CMS Data
The Good vs. Bad: The Specifics for Validating CMS DataThe Good vs. Bad: The Specifics for Validating CMS Data
The Good vs. Bad: The Specifics for Validating CMS Data
 
Benzene Fenceline Monitoring: An Introduction and What the Regulations Don’...
Benzene Fenceline Monitoring:  An Introduction and What the Regulations Don’...Benzene Fenceline Monitoring:  An Introduction and What the Regulations Don’...
Benzene Fenceline Monitoring: An Introduction and What the Regulations Don’...
 
The Petroleum Refinery Sector Rule: What’s all the fuss about and what are th...
The Petroleum Refinery Sector Rule: What’s all the fuss about and what are th...The Petroleum Refinery Sector Rule: What’s all the fuss about and what are th...
The Petroleum Refinery Sector Rule: What’s all the fuss about and what are th...
 
US EPA's Electronic Reporting Tool and Compliance and Emissions Data Reportin...
US EPA's Electronic Reporting Tool and Compliance and Emissions Data Reportin...US EPA's Electronic Reporting Tool and Compliance and Emissions Data Reportin...
US EPA's Electronic Reporting Tool and Compliance and Emissions Data Reportin...
 
Curveball Problems for Your Benzene Fenceline Monitoring Program and How to H...
Curveball Problems for Your Benzene Fenceline Monitoring Program and How to H...Curveball Problems for Your Benzene Fenceline Monitoring Program and How to H...
Curveball Problems for Your Benzene Fenceline Monitoring Program and How to H...
 
RACT 2 Review - ALL4
RACT 2 Review - ALL4RACT 2 Review - ALL4
RACT 2 Review - ALL4
 
Mact compliance plans
Mact compliance plansMact compliance plans
Mact compliance plans
 
Complying with the NAAQS – PM2.5 Air Quality Modeling Considerations by ALL4
Complying with the NAAQS – PM2.5 Air Quality Modeling Considerations by ALL4Complying with the NAAQS – PM2.5 Air Quality Modeling Considerations by ALL4
Complying with the NAAQS – PM2.5 Air Quality Modeling Considerations by ALL4
 

Recently uploaded

Uni Systems Copilot event_05062024_C.Vlachos.pdf
Uni Systems Copilot event_05062024_C.Vlachos.pdfUni Systems Copilot event_05062024_C.Vlachos.pdf
Uni Systems Copilot event_05062024_C.Vlachos.pdf
Uni Systems S.M.S.A.
 
Climate Impact of Software Testing at Nordic Testing Days
Climate Impact of Software Testing at Nordic Testing DaysClimate Impact of Software Testing at Nordic Testing Days
Climate Impact of Software Testing at Nordic Testing Days
Kari Kakkonen
 
UiPath Test Automation using UiPath Test Suite series, part 5
UiPath Test Automation using UiPath Test Suite series, part 5UiPath Test Automation using UiPath Test Suite series, part 5
UiPath Test Automation using UiPath Test Suite series, part 5
DianaGray10
 
Pushing the limits of ePRTC: 100ns holdover for 100 days
Pushing the limits of ePRTC: 100ns holdover for 100 daysPushing the limits of ePRTC: 100ns holdover for 100 days
Pushing the limits of ePRTC: 100ns holdover for 100 days
Adtran
 
Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!
Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!
Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!
SOFTTECHHUB
 
A tale of scale & speed: How the US Navy is enabling software delivery from l...
A tale of scale & speed: How the US Navy is enabling software delivery from l...A tale of scale & speed: How the US Navy is enabling software delivery from l...
A tale of scale & speed: How the US Navy is enabling software delivery from l...
sonjaschweigert1
 
FIDO Alliance Osaka Seminar: The WebAuthn API and Discoverable Credentials.pdf
FIDO Alliance Osaka Seminar: The WebAuthn API and Discoverable Credentials.pdfFIDO Alliance Osaka Seminar: The WebAuthn API and Discoverable Credentials.pdf
FIDO Alliance Osaka Seminar: The WebAuthn API and Discoverable Credentials.pdf
FIDO Alliance
 
Large Language Model (LLM) and it’s Geospatial Applications
Large Language Model (LLM) and it’s Geospatial ApplicationsLarge Language Model (LLM) and it’s Geospatial Applications
Large Language Model (LLM) and it’s Geospatial Applications
Rohit Gautam
 
Video Streaming: Then, Now, and in the Future
Video Streaming: Then, Now, and in the FutureVideo Streaming: Then, Now, and in the Future
Video Streaming: Then, Now, and in the Future
Alpen-Adria-Universität
 
Essentials of Automations: The Art of Triggers and Actions in FME
Essentials of Automations: The Art of Triggers and Actions in FMEEssentials of Automations: The Art of Triggers and Actions in FME
Essentials of Automations: The Art of Triggers and Actions in FME
Safe Software
 
UiPath Test Automation using UiPath Test Suite series, part 6
UiPath Test Automation using UiPath Test Suite series, part 6UiPath Test Automation using UiPath Test Suite series, part 6
UiPath Test Automation using UiPath Test Suite series, part 6
DianaGray10
 
Monitoring Java Application Security with JDK Tools and JFR Events
Monitoring Java Application Security with JDK Tools and JFR EventsMonitoring Java Application Security with JDK Tools and JFR Events
Monitoring Java Application Security with JDK Tools and JFR Events
Ana-Maria Mihalceanu
 
Elizabeth Buie - Older adults: Are we really designing for our future selves?
Elizabeth Buie - Older adults: Are we really designing for our future selves?Elizabeth Buie - Older adults: Are we really designing for our future selves?
Elizabeth Buie - Older adults: Are we really designing for our future selves?
Nexer Digital
 
GridMate - End to end testing is a critical piece to ensure quality and avoid...
GridMate - End to end testing is a critical piece to ensure quality and avoid...GridMate - End to end testing is a critical piece to ensure quality and avoid...
GridMate - End to end testing is a critical piece to ensure quality and avoid...
ThomasParaiso2
 
RESUME BUILDER APPLICATION Project for students
RESUME BUILDER APPLICATION Project for studentsRESUME BUILDER APPLICATION Project for students
RESUME BUILDER APPLICATION Project for students
KAMESHS29
 
Observability Concepts EVERY Developer Should Know -- DeveloperWeek Europe.pdf
Observability Concepts EVERY Developer Should Know -- DeveloperWeek Europe.pdfObservability Concepts EVERY Developer Should Know -- DeveloperWeek Europe.pdf
Observability Concepts EVERY Developer Should Know -- DeveloperWeek Europe.pdf
Paige Cruz
 
Enchancing adoption of Open Source Libraries. A case study on Albumentations.AI
Enchancing adoption of Open Source Libraries. A case study on Albumentations.AIEnchancing adoption of Open Source Libraries. A case study on Albumentations.AI
Enchancing adoption of Open Source Libraries. A case study on Albumentations.AI
Vladimir Iglovikov, Ph.D.
 
Introduction to CHERI technology - Cybersecurity
Introduction to CHERI technology - CybersecurityIntroduction to CHERI technology - Cybersecurity
Introduction to CHERI technology - Cybersecurity
mikeeftimakis1
 
Artificial Intelligence for XMLDevelopment
Artificial Intelligence for XMLDevelopmentArtificial Intelligence for XMLDevelopment
Artificial Intelligence for XMLDevelopment
Octavian Nadolu
 
DevOps and Testing slides at DASA Connect
DevOps and Testing slides at DASA ConnectDevOps and Testing slides at DASA Connect
DevOps and Testing slides at DASA Connect
Kari Kakkonen
 

Recently uploaded (20)

Uni Systems Copilot event_05062024_C.Vlachos.pdf
Uni Systems Copilot event_05062024_C.Vlachos.pdfUni Systems Copilot event_05062024_C.Vlachos.pdf
Uni Systems Copilot event_05062024_C.Vlachos.pdf
 
Climate Impact of Software Testing at Nordic Testing Days
Climate Impact of Software Testing at Nordic Testing DaysClimate Impact of Software Testing at Nordic Testing Days
Climate Impact of Software Testing at Nordic Testing Days
 
UiPath Test Automation using UiPath Test Suite series, part 5
UiPath Test Automation using UiPath Test Suite series, part 5UiPath Test Automation using UiPath Test Suite series, part 5
UiPath Test Automation using UiPath Test Suite series, part 5
 
Pushing the limits of ePRTC: 100ns holdover for 100 days
Pushing the limits of ePRTC: 100ns holdover for 100 daysPushing the limits of ePRTC: 100ns holdover for 100 days
Pushing the limits of ePRTC: 100ns holdover for 100 days
 
Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!
Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!
Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!
 
A tale of scale & speed: How the US Navy is enabling software delivery from l...
A tale of scale & speed: How the US Navy is enabling software delivery from l...A tale of scale & speed: How the US Navy is enabling software delivery from l...
A tale of scale & speed: How the US Navy is enabling software delivery from l...
 
FIDO Alliance Osaka Seminar: The WebAuthn API and Discoverable Credentials.pdf
FIDO Alliance Osaka Seminar: The WebAuthn API and Discoverable Credentials.pdfFIDO Alliance Osaka Seminar: The WebAuthn API and Discoverable Credentials.pdf
FIDO Alliance Osaka Seminar: The WebAuthn API and Discoverable Credentials.pdf
 
Large Language Model (LLM) and it’s Geospatial Applications
Large Language Model (LLM) and it’s Geospatial ApplicationsLarge Language Model (LLM) and it’s Geospatial Applications
Large Language Model (LLM) and it’s Geospatial Applications
 
Video Streaming: Then, Now, and in the Future
Video Streaming: Then, Now, and in the FutureVideo Streaming: Then, Now, and in the Future
Video Streaming: Then, Now, and in the Future
 
Essentials of Automations: The Art of Triggers and Actions in FME
Essentials of Automations: The Art of Triggers and Actions in FMEEssentials of Automations: The Art of Triggers and Actions in FME
Essentials of Automations: The Art of Triggers and Actions in FME
 
UiPath Test Automation using UiPath Test Suite series, part 6
UiPath Test Automation using UiPath Test Suite series, part 6UiPath Test Automation using UiPath Test Suite series, part 6
UiPath Test Automation using UiPath Test Suite series, part 6
 
Monitoring Java Application Security with JDK Tools and JFR Events
Monitoring Java Application Security with JDK Tools and JFR EventsMonitoring Java Application Security with JDK Tools and JFR Events
Monitoring Java Application Security with JDK Tools and JFR Events
 
Elizabeth Buie - Older adults: Are we really designing for our future selves?
Elizabeth Buie - Older adults: Are we really designing for our future selves?Elizabeth Buie - Older adults: Are we really designing for our future selves?
Elizabeth Buie - Older adults: Are we really designing for our future selves?
 
GridMate - End to end testing is a critical piece to ensure quality and avoid...
GridMate - End to end testing is a critical piece to ensure quality and avoid...GridMate - End to end testing is a critical piece to ensure quality and avoid...
GridMate - End to end testing is a critical piece to ensure quality and avoid...
 
RESUME BUILDER APPLICATION Project for students
RESUME BUILDER APPLICATION Project for studentsRESUME BUILDER APPLICATION Project for students
RESUME BUILDER APPLICATION Project for students
 
Observability Concepts EVERY Developer Should Know -- DeveloperWeek Europe.pdf
Observability Concepts EVERY Developer Should Know -- DeveloperWeek Europe.pdfObservability Concepts EVERY Developer Should Know -- DeveloperWeek Europe.pdf
Observability Concepts EVERY Developer Should Know -- DeveloperWeek Europe.pdf
 
Enchancing adoption of Open Source Libraries. A case study on Albumentations.AI
Enchancing adoption of Open Source Libraries. A case study on Albumentations.AIEnchancing adoption of Open Source Libraries. A case study on Albumentations.AI
Enchancing adoption of Open Source Libraries. A case study on Albumentations.AI
 
Introduction to CHERI technology - Cybersecurity
Introduction to CHERI technology - CybersecurityIntroduction to CHERI technology - Cybersecurity
Introduction to CHERI technology - Cybersecurity
 
Artificial Intelligence for XMLDevelopment
Artificial Intelligence for XMLDevelopmentArtificial Intelligence for XMLDevelopment
Artificial Intelligence for XMLDevelopment
 
DevOps and Testing slides at DASA Connect
DevOps and Testing slides at DASA ConnectDevOps and Testing slides at DASA Connect
DevOps and Testing slides at DASA Connect
 

Implications of Greenhouse Gas (GHG), Volatile Organic Compounds (VOC), and Fine Particulate (PM2.5)

  • 1. Implications of Greenhouse Gas (GHG), Volatile Organic Compounds (VOC), and Fine Particulate (PM2.5) to Air Quality Permitting John Slade | jslade@all4inc.com | (610) 933-5246 x136 Dan Holland |dholland@all4inc.com | (610) 933-5246 x115 November 6, 2013 www.all4inc.com Kimberton, PA | 610.933.5246 Kennesaw, GA | 678.460.0324
  • 2. Agenda    Overview of New Source Review (NSR) Major Modification VOC, GHG, and PM2.5 Emissions Under NSR • VOC • GHG • PM2.5  2 Flexibility in Air Permitting Your environmental compliance is clearly our business.
  • 3. New Source Review  Construction permits for major new sources or major modifications fall under the “Major New Source Review (NSR)” rules. There are 2 types: • Prevention of Significant Deterioration (PSD) permits in attainment areas. • Non-attainment New Source Review (NNSR) permits in non-attainment areas.  3 Major NSR permits are required prior to commencing construction. Your environmental compliance is clearly our business.
  • 4. NAAQS Summary Averaging Period NAAQS (µg/m3) 1-Hour 40,000 8-Hour 10,000 Ozone 8-Hour 75 ppb Pb 3-Month Rolling 0.15 PM10 24-Hour 150 24-Hour 35 Annual 12 1-Hour 188 Annual 100 1-Hour 196 3-Hour 1,300 Pollutant CO PM2.5 NO2 SO2 4 Your environmental compliance is clearly our business.
  • 5. NSR Applicability  NSR can apply to: • New major sources. • Modifications to existing major sources. • Modifications to existing minor sources.   5 Major source criteria is based on “potential to emit”. Major modification criteria is based on “net emissions increase”. Your environmental compliance is clearly our business.
  • 6. NSR Major Modification  Major modification means any physical change in or change in the method of operation of a major stationary source that would result in: • a significant emissions increase (as defined in paragraph (b)(40) of this section) of a regulated NSR pollutant (as defined in paragraph (b)(50) of this section) and • a significant net emissions increase of that pollutant from the major stationary source. 6 Your environmental compliance is clearly our business.
  • 7. Assessing VOC Permitting   NNSR applies for non-attainment areas and areas in the Ozone Transport Region. NNSR significance levels are less than PSD levels. • Precursor pollutant (NOX).  Degree of non-attainment is considered. • 25 tons for VOC and NOX in severe non-attainment areas. • Emission Reduction Credits (ERCs) required at a ratio of 1.3 to 1.  7 Lowest Achievable Emission Rate (LAER). Your environmental compliance is clearly our business.
  • 8. Assessing GHG Permitting  8 May 2010: Prevention of Significant Deterioration (PSD) and Title V Greenhouse Gas Tailoring Rule (GHG Tailoring Rule). • January 2011: Step 1 - GHG air permitting began for facilities that would otherwise require permitting. • July 2011: Step 2 - GHG permitting began for all facilities that would emit more than 100,000 tons of CO2e per year and facilities that undergo modification that would increase emissions by 75,000 tons of CO2e per year. • July 2012: Step 3 amendments and streamlining options. Your environmental compliance is clearly our business.
  • 9. Assessing GHG Permitting  July 2012: Step 3 amendments and streamlining options. • Step 1 and Step 2 PSD and Title V GHG thresholds not changed. • Revisions to 40 CFR Part 52 for better implementation of establishing PALs for GHG emissions. 9 Your environmental compliance is clearly our business.
  • 10. GHG Permitting  Currently must address GHG in all applications. • Demonstrate PSD status. • Best Available Control Technology (BACT) analysis.  Full GHG emission inventories required in renewal applications. • “Major source” label for another pollutant.  Tailoring Rule Step 4 by April 2016. • Thresholds could be lowered. 10 Your environmental compliance is clearly our business.
  • 11. GHG Standards  NSPS/NESHAP requirements for energy efficiency. • Output based standard in current EGU proposal.   Questionable GHG control technologies. Energy efficiency requirements. • Introduced in “Boiler MACT.” • Could be part of Step 4. • Could be added to existing standards. 11 Your environmental compliance is clearly our business.
  • 12. PM2.5 PSD Permitting     PM2.5 emissions may not have been quantified previously. Precursor emissions (NOX and SO2) need to be considered. Significance Level for PM2.5 is 10 tpy. Air quality modeling for PM2.5 is difficult. • No “exemption” modeling via SILs. • May trigger ambient monitoring requirements. 12 Your environmental compliance is clearly our business.
  • 13. PM2.5 NNSR Permitting  NNSR pollutants trigger only that pollutant for NNSR permitting. • Facility 100 tpy PM2.5 – Significance Level 10 tpy. • Facility 100 tpy NOX – Significance Level 40 tpy. • Facility 100 tpy SO2 - Significance Level 40 tpy.  Must offset PM2.5 increase with emission reduction credits (ERCs). • ERCs are difficult to find and expensive to secure. • May need to demonstrate ERCs can be used.  13 Lowest Achievable Emission Rate (LAER) Control Technology is required. Your environmental compliance is clearly our business.
  • 14. PM2.5 Emission Testing  Method 201A for sizing of particulate. • Difficult to use on wet sources. • May need to utilize Method 5 and scale results.  Method 202 for condensable particulate matter. • Blank correction requires extended sampling times. • Artifact formation may occur with long sampling times.  Other test methods allowed. • API Wet Stack Method. • U.S. EPA Conditional Test Method 039. 14 Your environmental compliance is clearly our business.
  • 15. Future Planning  Strategic planning for facility future must consider implications of both new air rule applicability and air permitting implications: • New rules likely require facility changes. • No exemption for pollution control projects. • Permitting issues can impact project design. 15 Your environmental compliance is clearly our business.
  • 16. PAL Option    16 “Plantwide Applicability Limitation” (PAL) is an available regulatory option that can potentially ease air permitting PSD cycle. Federal PSD rule provides for PALs based on historic actual emissions. PALs are pollutant specific and could be a critical part of a facility strategic plan. Your environmental compliance is clearly our business.
  • 17. PAL Planning Approach     17 Develop historic facility-wide baseline emission rates and potential PAL levels. Address potential NAAQS issues. Consider new rules, facility operations plans, potential energy efficiency improvements, new technologies, low hanging fruit for emissions reductions. Weigh value of PAL for each pollutant. Your environmental compliance is clearly our business.
  • 18. Questions/Comments John Slade| jslade@all4inc.com | (610) 933-5246 x136 Dan Holland | dholland@all4inc.com | (610) 933-5246 x115 www.all4inc.com Kimberton, PA | 610.933.5246 Kennesaw, GA | 678.460.0324