This document summarizes recent EPA Region 6 guidance on calculating compliance with emissions limits using continuous emissions monitoring systems (CEMS). It discusses that the guidance clarified that CMS downtime should be excluded from compliance calculations and that hourly averages should be based on individual 1-minute readings rather than 15-minute quadrants. This will impact facilities' compliance demonstrations and enforcement. The document advises facilities to determine how this new guidance affects their compliance calculations and considers working with EPA to resolve any issues.
Curveball Problems for Your Benzene Fenceline Monitoring Program and How to H...All4 Inc.
Nick Leone presented, "Curveball Problems for Your Benzene Fenceline Monitoring Program and How to Handle Them" at the AFPM/API Refinery Sector Rule Workshop in February 2016.
Automation Strategies For Efficiency - California Savings Summit 2013SchoolDude
Opportunities to reduce maintenance breakdowns, increase equipment life and lower energy costs can be found in your building automation systems (BAS). Learn how connecting these systems to technology solutions can help you achieve savings.
Curveball Problems for Your Benzene Fenceline Monitoring Program and How to H...All4 Inc.
Nick Leone presented, "Curveball Problems for Your Benzene Fenceline Monitoring Program and How to Handle Them" at the AFPM/API Refinery Sector Rule Workshop in February 2016.
Automation Strategies For Efficiency - California Savings Summit 2013SchoolDude
Opportunities to reduce maintenance breakdowns, increase equipment life and lower energy costs can be found in your building automation systems (BAS). Learn how connecting these systems to technology solutions can help you achieve savings.
EHR Transitions Webinar: Legacy Support & Staff AugmentationJulie Champagne
Whether it’s a massive enterprise-wide EHR transition or the smaller affair of sunsetting a departmental system, the devil of making such projects work is not only in the details, it’s in the people. By that, we mean figuring out who moves, who stays, and how to execute the transition without having a corrupt end product is paramount. But fear not, there are established best practices for navigating every leg of this journey. In this webinar, you’ll hear from one executive who’s made this type of EHR transition odyssey so your trip can be that much smoother.
Maximize Compliance & Cost Savings with Environmental Preventative MaintenanceTriumvirate Environmental
This presentation addresses the various drivers for environmental PM, as well as best practices for implementing an inspection-based PM program and calendar. Find out who the regulators are and how to ensure compliance with these cost-saving techniques.
LeanCx: Commissioning for Performance, Productivity and ProfitMurray Guy
LeanCx is a proactive project commissioning system that improves collaboration enabling higher performance, productivity and by getting projects completed early enable the team to realize higher profits. This approach is outlined in our LeanCx commissioning guide available on our website at www.i-designs.ca
WHY LeanCX? Disciplined integration of quality control and performance testing into the project from start to finish eliminates waste enabling projects to completed much earlier and to a better level of quality and performance. Higher PERFORMANCE, PROFIT & PRODUCTIVITY
HOW? Establish a collaborative team and utilize a system that promotes fully coordinated constraint free work flow. (Last Planner System + Target Cost Design)
WHAT? Get to the finish line early make more money, move on to the next project
1. TEAM: Create a high performance team that commit to delivering the project utilizing a more integrated project delivery approach. The implementation of a disciplined system is key to promoting the good behavior required to achieve much higher levels of performance. We start the process with a bootcamp to establish buy-in and train people on commissioning and the use Last Planner System
2. SYSTEM: We use the the Last Planner System system to plan, establish constraint free work flow and continually improve the process.
During the design process we also utilize the Target Cost Design system to ensure that the project stays on track to deliver the best value as defined by clearly defined project requirements to the target cost.
1.Plan: Utilize the Last Planner System to establish the project delivery plan
2. Work Flow: Collaborate to achieve constraint free work flow
3. Improve: Track and measure productivity and collaborate with the team to continually improve
4. COLLABORATION: A TEAM with a SYSTEM improves the predictability of achieving performance objectives.
When we get the team to collaborate we can take the performance to a whole new level. This takes some work
1. Target: Collaborativlly establish a meaningful target that includes a higher purpose and something unique that will make a good news story for the project.
2. Test: Test assumptions along the way so the team stay on track to deliver the target as efficiently as possible.
3.Turnover: Establish a plan to turn-over completed systems as early as is possible on a project
Developing A Facilities Vision - Savings Summit 2013SchoolDude
Most people know the importance of Preventive Maintenance, but it can be hard to justify and hard to implement. In this session, you will learn how to justify your PM program by preventing costly mechanical failures, extending the life of your equipment, and reducing energy expenses.
Advancing Compliance Assurance and EHS Management Systems Matt Whitteker
At Assent we’re very active in the compliance community. One of the industry associations we are a proud member and sponsor of is The National Association of EHS Managers (NAEM). It is the largest professional community for corporate environmental, health and safety, and sustainability decision-makers. Assent recently attended NAEM’s Advancing Compliance Assurance and EHS Management Systems conference and was able to get some great insights into the topics affecting compliance and EHS managers today. Here was the agenda: http://ehscompliance.naem.org/agenda.php
Comprehensive Compliance for Environmental, Safety, Quality Requirements in C...Nimonik
Nimonik has 7 step process to ensure thorough and comprehensive regulatory compliance for environmental, occupational health and safety and quality requirements for your organization. By following these steps, you will reduce your operational risk and optimize your processes to become a proactive compliance company. This presentation also covers compliance risks such as accidents and penalties, challenges that organizations face along with a case study of Lac Megantic Oil Train Car disaster in July 2013 that killed 47 people and spilled 6 million litres of oil.
Thomas Axen - Lean Kaizen Applied To Software Testing - EuroSTAR 2010TEST Huddle
EuroSTAR Software Testing Conference 2010 presentation on Lean Kaizen Applied To Software Testing by Thomas Axen . See more at: http://conference.eurostarsoftwaretesting.com/past-presentations/
Voluntarily Disclosing Environmental Violations and Responding to Violation N...Dave Scriven-Young
Keep abreast of recent developments to provide the public broad and easy access to company-specific environmental inspection and compliance data. Know the information you must report and information that you may voluntarily report. Consider the benefits of voluntarily disclosing violations using EPA’s audit policy. Learn the steps to take if you receive a violation notice from EPA.
BlueScape Learn Air Permits & Compliance Training 7-28-15BlueScape
This training by James A. Westbrook, President of BlueScape Environmental covers what facility operators need to know learn about air quality regulations and permits. The topics include types of air regulations, a discussion on what requirements are found in air permits, development of an Air Quality Management System, and working with agencies.
James can be reached at 877-486-9257 for questions, customized training, and air quality permitting and compliance support.
EHR Transitions Webinar: Legacy Support & Staff AugmentationJulie Champagne
Whether it’s a massive enterprise-wide EHR transition or the smaller affair of sunsetting a departmental system, the devil of making such projects work is not only in the details, it’s in the people. By that, we mean figuring out who moves, who stays, and how to execute the transition without having a corrupt end product is paramount. But fear not, there are established best practices for navigating every leg of this journey. In this webinar, you’ll hear from one executive who’s made this type of EHR transition odyssey so your trip can be that much smoother.
Maximize Compliance & Cost Savings with Environmental Preventative MaintenanceTriumvirate Environmental
This presentation addresses the various drivers for environmental PM, as well as best practices for implementing an inspection-based PM program and calendar. Find out who the regulators are and how to ensure compliance with these cost-saving techniques.
LeanCx: Commissioning for Performance, Productivity and ProfitMurray Guy
LeanCx is a proactive project commissioning system that improves collaboration enabling higher performance, productivity and by getting projects completed early enable the team to realize higher profits. This approach is outlined in our LeanCx commissioning guide available on our website at www.i-designs.ca
WHY LeanCX? Disciplined integration of quality control and performance testing into the project from start to finish eliminates waste enabling projects to completed much earlier and to a better level of quality and performance. Higher PERFORMANCE, PROFIT & PRODUCTIVITY
HOW? Establish a collaborative team and utilize a system that promotes fully coordinated constraint free work flow. (Last Planner System + Target Cost Design)
WHAT? Get to the finish line early make more money, move on to the next project
1. TEAM: Create a high performance team that commit to delivering the project utilizing a more integrated project delivery approach. The implementation of a disciplined system is key to promoting the good behavior required to achieve much higher levels of performance. We start the process with a bootcamp to establish buy-in and train people on commissioning and the use Last Planner System
2. SYSTEM: We use the the Last Planner System system to plan, establish constraint free work flow and continually improve the process.
During the design process we also utilize the Target Cost Design system to ensure that the project stays on track to deliver the best value as defined by clearly defined project requirements to the target cost.
1.Plan: Utilize the Last Planner System to establish the project delivery plan
2. Work Flow: Collaborate to achieve constraint free work flow
3. Improve: Track and measure productivity and collaborate with the team to continually improve
4. COLLABORATION: A TEAM with a SYSTEM improves the predictability of achieving performance objectives.
When we get the team to collaborate we can take the performance to a whole new level. This takes some work
1. Target: Collaborativlly establish a meaningful target that includes a higher purpose and something unique that will make a good news story for the project.
2. Test: Test assumptions along the way so the team stay on track to deliver the target as efficiently as possible.
3.Turnover: Establish a plan to turn-over completed systems as early as is possible on a project
Developing A Facilities Vision - Savings Summit 2013SchoolDude
Most people know the importance of Preventive Maintenance, but it can be hard to justify and hard to implement. In this session, you will learn how to justify your PM program by preventing costly mechanical failures, extending the life of your equipment, and reducing energy expenses.
Advancing Compliance Assurance and EHS Management Systems Matt Whitteker
At Assent we’re very active in the compliance community. One of the industry associations we are a proud member and sponsor of is The National Association of EHS Managers (NAEM). It is the largest professional community for corporate environmental, health and safety, and sustainability decision-makers. Assent recently attended NAEM’s Advancing Compliance Assurance and EHS Management Systems conference and was able to get some great insights into the topics affecting compliance and EHS managers today. Here was the agenda: http://ehscompliance.naem.org/agenda.php
Comprehensive Compliance for Environmental, Safety, Quality Requirements in C...Nimonik
Nimonik has 7 step process to ensure thorough and comprehensive regulatory compliance for environmental, occupational health and safety and quality requirements for your organization. By following these steps, you will reduce your operational risk and optimize your processes to become a proactive compliance company. This presentation also covers compliance risks such as accidents and penalties, challenges that organizations face along with a case study of Lac Megantic Oil Train Car disaster in July 2013 that killed 47 people and spilled 6 million litres of oil.
Thomas Axen - Lean Kaizen Applied To Software Testing - EuroSTAR 2010TEST Huddle
EuroSTAR Software Testing Conference 2010 presentation on Lean Kaizen Applied To Software Testing by Thomas Axen . See more at: http://conference.eurostarsoftwaretesting.com/past-presentations/
Voluntarily Disclosing Environmental Violations and Responding to Violation N...Dave Scriven-Young
Keep abreast of recent developments to provide the public broad and easy access to company-specific environmental inspection and compliance data. Know the information you must report and information that you may voluntarily report. Consider the benefits of voluntarily disclosing violations using EPA’s audit policy. Learn the steps to take if you receive a violation notice from EPA.
BlueScape Learn Air Permits & Compliance Training 7-28-15BlueScape
This training by James A. Westbrook, President of BlueScape Environmental covers what facility operators need to know learn about air quality regulations and permits. The topics include types of air regulations, a discussion on what requirements are found in air permits, development of an Air Quality Management System, and working with agencies.
James can be reached at 877-486-9257 for questions, customized training, and air quality permitting and compliance support.
23rd September,2022, I got an opportunity to present my proposition, entitled “Product Development: From Your Backyard Swimming Pool to the English Channel” to the community “Scrum Masters of the Universe”, Des Moines, IA.
This Virtual event registered by 98 attendees.
I emphasized about building large system, what it takes to build such systems successfully.
What are the various aspects we should watch out for to overcome some of the challenges, I have shared.
Some of the interesting questions developed.
1. How Obeya can help us to minimize some of the complexity
2. How do we know to address complexity, should we focus short term or long term ?
3. How UX and Other features development can minimize silos mindset
4. How legacy leadership mindset can be surmounted
Thanks to the participants who were with us till the end, that indicates, dedication, passion and curiosity to learn and grow.
Let us continue this learning journey as a community and support each other with great knowledge and grow.
You can find the video here: Please have a look : https://youtu.be/fEjUIP9MkDU
A big thanks to "Scrum Master of the Universe" Community!!
Strategic Air Planning: Is the Time for a PAL Here?All4 Inc.
Mark Wenclawiak of All4 Inc. presents "Strategic Air Planning: Is the Time for a PAL Here?". The presentation discusses PAL permitting to support industrial growth, major New Source Review (NSR) issues, the importance of strategic planning, and why getting a PAL is particularly advantageous.
Similar to All4 impacts of recent u.s. epa region 6 guidance on cms downtime and data calculation (04-20-18) (20)
"Top 5 Environmental Compliance Issues" presented by Sharon Sadler at College & University Hazardous Material Management Conference on August 6th, 2016.
Top 5 Environmental Compliance Issues for Engineers and ManagersAll4 Inc.
Sally Atkins presents, "Top 5 Environmental Compliance Issues for Engineers and Managers", which covers the compliance issues facility engineers and managers are responsible for handling.
SO2 Data Requirements Rule Modeling StrategiesAll4 Inc.
Presentation, "SO2 Data Requirements Rule Modeling Strategies" by Mark Wenclawiak and Amanda Essner, prepared for the 96th Annual Meeting of the American Meteorological Society.
Benzene Fenceline Monitoring: An Introduction and What the Regulations Don’...All4 Inc.
Kristin Gordon presented, "Benzene Fenceline Monitoring: An Introduction and What the Regulations Don’t Tell You" at the 4C Conference in Austin, Tx in February 2016.
The Petroleum Refinery Sector Rule: What’s all the fuss about and what are th...All4 Inc.
Kristin Gordon presented, "The Petroleum Refinery Sector Rule: What’s all the fuss about and what are the key implications for Texas (including other industry sectors)?” at the AWMA Central Texas Chapter Meeting on January 21, 2016.
US EPA's Electronic Reporting Tool and Compliance and Emissions Data Reportin...All4 Inc.
Kayla Turney presented, "US EPA's Electronic Reporting Tool and Compliance and Emissions Data Reporting Interface: What Do the Requirements REALLY Mean for
Petroleum Refineries?" at the AFPM/API RSR Workshop in February 2016.
On March 1st, ALL4 is hosting a training session on RACT 2 Rule, which affects many facilities in Pennsylvania. For more details, please visit www.all4inc.com/ract2.
"Understanding the Carbon Cycle: Processes, Human Impacts, and Strategies for...MMariSelvam4
The carbon cycle is a critical component of Earth's environmental system, governing the movement and transformation of carbon through various reservoirs, including the atmosphere, oceans, soil, and living organisms. This complex cycle involves several key processes such as photosynthesis, respiration, decomposition, and carbon sequestration, each contributing to the regulation of carbon levels on the planet.
Human activities, particularly fossil fuel combustion and deforestation, have significantly altered the natural carbon cycle, leading to increased atmospheric carbon dioxide concentrations and driving climate change. Understanding the intricacies of the carbon cycle is essential for assessing the impacts of these changes and developing effective mitigation strategies.
By studying the carbon cycle, scientists can identify carbon sources and sinks, measure carbon fluxes, and predict future trends. This knowledge is crucial for crafting policies aimed at reducing carbon emissions, enhancing carbon storage, and promoting sustainable practices. The carbon cycle's interplay with climate systems, ecosystems, and human activities underscores its importance in maintaining a stable and healthy planet.
In-depth exploration of the carbon cycle reveals the delicate balance required to sustain life and the urgent need to address anthropogenic influences. Through research, education, and policy, we can work towards restoring equilibrium in the carbon cycle and ensuring a sustainable future for generations to come.
UNDERSTANDING WHAT GREEN WASHING IS!.pdfJulietMogola
Many companies today use green washing to lure the public into thinking they are conserving the environment but in real sense they are doing more harm. There have been such several cases from very big companies here in Kenya and also globally. This ranges from various sectors from manufacturing and goes to consumer products. Educating people on greenwashing will enable people to make better choices based on their analysis and not on what they see on marketing sites.
WRI’s brand new “Food Service Playbook for Promoting Sustainable Food Choices” gives food service operators the very latest strategies for creating dining environments that empower consumers to choose sustainable, plant-rich dishes. This research builds off our first guide for food service, now with industry experience and insights from nearly 350 academic trials.
Artificial Reefs by Kuddle Life Foundation - May 2024punit537210
Situated in Pondicherry, India, Kuddle Life Foundation is a charitable, non-profit and non-governmental organization (NGO) dedicated to improving the living standards of coastal communities and simultaneously placing a strong emphasis on the protection of marine ecosystems.
One of the key areas we work in is Artificial Reefs. This presentation captures our journey so far and our learnings. We hope you get as excited about marine conservation and artificial reefs as we are.
Please visit our website: https://kuddlelife.org
Our Instagram channel:
@kuddlelifefoundation
Our Linkedin Page:
https://www.linkedin.com/company/kuddlelifefoundation/
and write to us if you have any questions:
info@kuddlelife.org
Natural farming @ Dr. Siddhartha S. Jena.pptxsidjena70
A brief about organic farming/ Natural farming/ Zero budget natural farming/ Subash Palekar Natural farming which keeps us and environment safe and healthy. Next gen Agricultural practices of chemical free farming.
Willie Nelson Net Worth: A Journey Through Music, Movies, and Business Venturesgreendigital
Willie Nelson is a name that resonates within the world of music and entertainment. Known for his unique voice, and masterful guitar skills. and an extraordinary career spanning several decades. Nelson has become a legend in the country music scene. But, his influence extends far beyond the realm of music. with ventures in acting, writing, activism, and business. This comprehensive article delves into Willie Nelson net worth. exploring the various facets of his career that have contributed to his large fortune.
Follow us on: Pinterest
Introduction
Willie Nelson net worth is a testament to his enduring influence and success in many fields. Born on April 29, 1933, in Abbott, Texas. Nelson's journey from a humble beginning to becoming one of the most iconic figures in American music is nothing short of inspirational. His net worth, which estimated to be around $25 million as of 2024. reflects a career that is as diverse as it is prolific.
Early Life and Musical Beginnings
Humble Origins
Willie Hugh Nelson was born during the Great Depression. a time of significant economic hardship in the United States. Raised by his grandparents. Nelson found solace and inspiration in music from an early age. His grandmother taught him to play the guitar. setting the stage for what would become an illustrious career.
First Steps in Music
Nelson's initial foray into the music industry was fraught with challenges. He moved to Nashville, Tennessee, to pursue his dreams, but success did not come . Working as a songwriter, Nelson penned hits for other artists. which helped him gain a foothold in the competitive music scene. His songwriting skills contributed to his early earnings. laying the foundation for his net worth.
Rise to Stardom
Breakthrough Albums
The 1970s marked a turning point in Willie Nelson's career. His albums "Shotgun Willie" (1973), "Red Headed Stranger" (1975). and "Stardust" (1978) received critical acclaim and commercial success. These albums not only solidified his position in the country music genre. but also introduced his music to a broader audience. The success of these albums played a crucial role in boosting Willie Nelson net worth.
Iconic Songs
Willie Nelson net worth is also attributed to his extensive catalog of hit songs. Tracks like "Blue Eyes Crying in the Rain," "On the Road Again," and "Always on My Mind" have become timeless classics. These songs have not only earned Nelson large royalties but have also ensured his continued relevance in the music industry.
Acting and Film Career
Hollywood Ventures
In addition to his music career, Willie Nelson has also made a mark in Hollywood. His distinctive personality and on-screen presence have landed him roles in several films and television shows. Notable appearances include roles in "The Electric Horseman" (1979), "Honeysuckle Rose" (1980), and "Barbarosa" (1982). These acting gigs have added a significant amount to Willie Nelson net worth.
Television Appearances
Nelson's char
Characterization and the Kinetics of drying at the drying oven and with micro...Open Access Research Paper
The objective of this work is to contribute to valorization de Nephelium lappaceum by the characterization of kinetics of drying of seeds of Nephelium lappaceum. The seeds were dehydrated until a constant mass respectively in a drying oven and a microwawe oven. The temperatures and the powers of drying are respectively: 50, 60 and 70°C and 140, 280 and 420 W. The results show that the curves of drying of seeds of Nephelium lappaceum do not present a phase of constant kinetics. The coefficients of diffusion vary between 2.09.10-8 to 2.98. 10-8m-2/s in the interval of 50°C at 70°C and between 4.83×10-07 at 9.04×10-07 m-8/s for the powers going of 140 W with 420 W the relation between Arrhenius and a value of energy of activation of 16.49 kJ. mol-1 expressed the effect of the temperature on effective diffusivity.
All4 impacts of recent u.s. epa region 6 guidance on cms downtime and data calculation (04-20-18)
1. www.all4inc.com
Impacts of Recent U.S. EPA
Region 6 Guidance on CMS
Downtime and Hourly
Calculation
Eric Swisher | eswisher@all4inc.com | 610-422-1117
2. 2 Your environmental compliance is clearly our business.
Regulatory Background
Build Base
Average
Excluded from
Compliance
Demonstration
Reportable CMS
Downtime
Measured
CMS Data
Validation
Compliance
Demonstration
Calculation
Unable to Demonstrate
Compliance in Terms of
the Emission Standard
Express in Terms of
the Emission Standard
Good Bad
Hourly
Average
CEMS
Bad
Good
Compliance
Average
Validation
Good
Bad
3. 3 Your environmental compliance is clearly our business.
Guidance Timeline
April 18, 2017 – ODEQ requested clarification
from U.S. EPA Region 6 on:
1. Reporting of CMS Downtime
2. Calculation of an Hourly Average
June 26, 2017 – U.S. EPA Region 6 responded to
ODEQ (in coordination with OECA & OAQPS)
5. 5 Your environmental compliance is clearly our business.
A valid hour is at least one reading in each quadrant of the hour.
The unit operated the entire hour, and there was no required
maintenance or quality assurance activity conducted in this hour.
Hourly Validation Example
Minute Value
0 1
1 7
2 Invalid
3 Invalid
4 Invalid
5 Invalid
6 Invalid
7 Invalid
8 Invalid
9 Invalid
10 Invalid
11 Invalid
12 Invalid
13 Invalid
14 Invalid
Minute Value
15 Invalid
16 Invalid
17 Invalid
18 Invalid
19 Invalid
20 Invalid
21 Invalid
22 Invalid
23 8
24 9
25 0
26 9
27 5
28 6
29 4
Minute Value
30 2
31 3
32 6
33 2
34 3
35 1
36 6
37 8
38 0
39 Invalid
40 Invalid
41 Invalid
42 Invalid
43 Invalid
44 Invalid
Minute Value
45 2
46 4
47 7
48 Invalid
49 Invalid
50 Invalid
51 5
52 4
53 2
54 Invalid
55 Invalid
56 Invalid
57 Invalid
58 Invalid
59 Invalid
1 2 3 4
36 Invalid Minutes
VALID HOUR
Why: At least one valid reading in each
quadrant of the hour
6. 6 Your environmental compliance is clearly our business.
Impacts on Compliance
U.S. EPA Region 4 CEM Enforcement Plan (May 5,
1989)
• Percent Time Out-of-Compliance (TOOC)
𝑇𝑂𝑂𝐶 =
Time with Excess Emissions
𝑇𝑜𝑡𝑎𝑙 𝑂𝑝𝑒𝑟𝑎𝑡𝑖𝑜𝑛 𝑇𝑖𝑚𝑒 − 𝑴𝒐𝒏𝒊𝒕𝒐𝒓 𝑫𝒐𝒘𝒏𝒕𝒊𝒎𝒆
7. 7 Your environmental compliance is clearly our business.
Regulatory Background
Build Base
Average
Excluded from
Compliance
Demonstration
Reportable CMS
Downtime
Measured
CMS Data
Validation
Compliance
Demonstration
Calculation
Unable to Demonstrate
Compliance in Terms of
the Emission Standard
Express in Terms of
the Emission Standard
Good Bad
Hourly
Average
CEMS
Bad
Good
Compliance
Average
Validation
Good
Bad
8. 8 Your environmental compliance is clearly our business.
ODEQ Concern – Hourly Averages
Hourly average based on:
• 4, 15-minute quadrant averages collected during a
clock hour OR
• 60, 1-minute averages collected during a clock hour
U.S. EPA Region 6 Response
Using the quadrant average “appears to be improper
data reduction”
10. 10 Your environmental compliance is clearly our business.
What’s next?
Future publication in ADI (Federal Register notice)
Working with U.S. EPA to resolve interpretation
• Directly
• Trade Organization
• Legal
Do you know how this impacts your facility?