SlideShare a Scribd company logo
Mechanical &
Electrical
Engineering
INTRODUCTION TO DRAWING (ARC 30103)
Presented By:
CHAM ZHENG CHEE 0322317 –LEADER
BRYAN FOONG JIA MING 0322258
DARREN TAN QUAN WEN 0322662
CHAN YI FUNG 0323057
HONG SHI LIK 0322081
CHAN KOON QI 0322000
Lecturers:
Ms Sufina Abu Bakar
Ms Hasmanira
Ms Thivilojana
What is Mechanical
Engineering?
Mechanical engineers create and build mechanical devices.
Mechanical engineer is concerned with heat utilization or machine design.
Heat utilization techniques are applied in boilers, air conditioners, and refrigeration units.
Machine design is more focused on hardware, including automobile engines, computers, and
washing machines.
What is Electrical
Engineering?
Electrical engineering is the branch of engineering that deals with the technology of electricity.
Electrical engineers work on components, devices and systems such as microchips and power station
generators.
Examples: Security system, lighting point, electrical substation.
Process for a Project
Client comes out with conceptual brief.
Architect design the needs of client using schematic design.
Meeting consist of: Client’s representative (project manager), Architect, Civil and Structure engineer,
Mechanical and Electrical engineer, Quantity Surveyor, (Landscape Architect, Interior Designer,
Acoustic consultant (Soundproof), Environmental consultant)
Objective:
To go through the design development so that the client is able to provide inputs on the design and
other parties are constantly updated with client’s changes of a certain issue.
Consultant needs to coordinate with each other to further develop the design.
Civil and Structure engineer design road and drainage, retaining wall, sewerage.
The frame of building and coordinate with the Mechanical and Electrical engineer.
Building plan ready and submitted to local authority for approval.
Quantity Surveyor prepare the bill of quantity so that they can incorporate the requirements in the
tender documentation.
Mechanical and Electrical engineer prepares the schedule of prices for tenderer.
Tenderer issues the tender documents and drawings. They will analyse the given documents before
construction process starts.
Constructions can be started after appointing a contractor.
Site meetings carried out to discuss details of the process such as Clarification and suitable ways for
installation.
Testing and Commissioning: check, inspect and test project component.
C.C.C (Certificate of Completion Compliance) is issued by Architect to ensure buyers safety.
Job scope for Mechanical Engineers:
Location of air conditioner.
Location of compressor.
Properties of water tank.
Location of water tanks and piping to each water tap and shower point.
Design Fire-fighting system.
Mechanical and Electrical engineer work together to ensure the system is functional.
Job scope for Electrical Engineers:
Space requirement for electrical substations.
To connect the distribution board to power socket.
Connect lighting points.
Connect telephone line to the house.
Security system

More Related Content

What's hot

ahmed amer
ahmed amerahmed amer
ahmed amer
Ahmed abdaljawad
 
Brijesh cv
Brijesh cvBrijesh cv
Brijesh cv
Brijesh kumar
 
JAGANNATH PATIL RESUME
JAGANNATH PATIL RESUMEJAGANNATH PATIL RESUME
JAGANNATH PATIL RESUME
Jagannath Patil HM
 
CV_Ahmed Zaki
CV_Ahmed ZakiCV_Ahmed Zaki
CV_Ahmed Zaki
ahmed zaki
 
Personal_Data
Personal_DataPersonal_Data
Personal_Data
ayman khatib
 
Elgin building inspector - electrical
Elgin building inspector - electricalElgin building inspector - electrical
Elgin building inspector - electrical
Meghan Knudson
 
Harrison, ohio jobs
Harrison, ohio jobsHarrison, ohio jobs
Harrison, ohio jobs
Stelter & Brinck
 
CV - Syed Mujtaba Hussain
CV - Syed Mujtaba HussainCV - Syed Mujtaba Hussain
CV - Syed Mujtaba Hussain
Syed Mujtaba Hussain
 
Electrical Engineer CV
Electrical Engineer CVElectrical Engineer CV
Electrical Engineer CV
Asif pasha
 
Kumaresan - Resume.
Kumaresan - Resume.Kumaresan - Resume.
Kumaresan - Resume.
Kumaresan Seetharman
 
QAQC
QAQCQAQC
Dubai cv
Dubai cvDubai cv
Dubai cv
Sabir C
 
Mohamed_Baseem
Mohamed_BaseemMohamed_Baseem
Mohamed_Baseem
Mohamed Baseem
 
Mohaideen CV
Mohaideen CVMohaideen CV
Mohaideen CV
Abdul Kadhar
 
CV Rana Tanveer Ahmed rev 1.5
CV Rana Tanveer Ahmed rev 1.5CV Rana Tanveer Ahmed rev 1.5
CV Rana Tanveer Ahmed rev 1.5
Rana Tanveer Ahmed
 
Sayooj cv
Sayooj cvSayooj cv
Sayooj cv
sayooj jayaraj
 
cv islam
cv islamcv islam
cv islam
Islam Allam
 
CV UPDATED Aug 2015 (1)
CV UPDATED Aug  2015 (1)CV UPDATED Aug  2015 (1)
CV UPDATED Aug 2015 (1)
Shiraz khan
 
Hani Shaker mep
Hani Shaker mepHani Shaker mep
Hani Shaker mep
hani ayyad
 
Saad AbuAlsamen - cv3
Saad AbuAlsamen - cv3Saad AbuAlsamen - cv3
Saad AbuAlsamen - cv3
saad abualsamen
 

What's hot (20)

ahmed amer
ahmed amerahmed amer
ahmed amer
 
Brijesh cv
Brijesh cvBrijesh cv
Brijesh cv
 
JAGANNATH PATIL RESUME
JAGANNATH PATIL RESUMEJAGANNATH PATIL RESUME
JAGANNATH PATIL RESUME
 
CV_Ahmed Zaki
CV_Ahmed ZakiCV_Ahmed Zaki
CV_Ahmed Zaki
 
Personal_Data
Personal_DataPersonal_Data
Personal_Data
 
Elgin building inspector - electrical
Elgin building inspector - electricalElgin building inspector - electrical
Elgin building inspector - electrical
 
Harrison, ohio jobs
Harrison, ohio jobsHarrison, ohio jobs
Harrison, ohio jobs
 
CV - Syed Mujtaba Hussain
CV - Syed Mujtaba HussainCV - Syed Mujtaba Hussain
CV - Syed Mujtaba Hussain
 
Electrical Engineer CV
Electrical Engineer CVElectrical Engineer CV
Electrical Engineer CV
 
Kumaresan - Resume.
Kumaresan - Resume.Kumaresan - Resume.
Kumaresan - Resume.
 
QAQC
QAQCQAQC
QAQC
 
Dubai cv
Dubai cvDubai cv
Dubai cv
 
Mohamed_Baseem
Mohamed_BaseemMohamed_Baseem
Mohamed_Baseem
 
Mohaideen CV
Mohaideen CVMohaideen CV
Mohaideen CV
 
CV Rana Tanveer Ahmed rev 1.5
CV Rana Tanveer Ahmed rev 1.5CV Rana Tanveer Ahmed rev 1.5
CV Rana Tanveer Ahmed rev 1.5
 
Sayooj cv
Sayooj cvSayooj cv
Sayooj cv
 
cv islam
cv islamcv islam
cv islam
 
CV UPDATED Aug 2015 (1)
CV UPDATED Aug  2015 (1)CV UPDATED Aug  2015 (1)
CV UPDATED Aug 2015 (1)
 
Hani Shaker mep
Hani Shaker mepHani Shaker mep
Hani Shaker mep
 
Saad AbuAlsamen - cv3
Saad AbuAlsamen - cv3Saad AbuAlsamen - cv3
Saad AbuAlsamen - cv3
 

Viewers also liked

RESUME sen (1)
RESUME sen (1)RESUME sen (1)
RESUME sen (1)
SENTHIL SELVAM
 
Top 8 m&e engineer resume samples
Top 8 m&e engineer resume samplesTop 8 m&e engineer resume samples
Top 8 m&e engineer resume samples
joycejames46
 
SEC23 GEOG Chapt8 Water Qs
SEC23 GEOG Chapt8 Water QsSEC23 GEOG Chapt8 Water Qs
SEC23 GEOG Chapt8 Water Qs
Chen Yugin
 
LED Lighting Protection
LED Lighting ProtectionLED Lighting Protection
LED Lighting Protection
Premier Farnell
 
Lightning protection system on Bekasi Power Plant [beta]
Lightning protection system on Bekasi Power Plant [beta]Lightning protection system on Bekasi Power Plant [beta]
Lightning protection system on Bekasi Power Plant [beta]
R. Bambang Widiatmoko
 
Introduction of nr bim consultant
Introduction of nr bim consultantIntroduction of nr bim consultant
Introduction of nr bim consultant
Neena Deb Ravi Kumar
 
Lightning Protection: Securing Higher Reliability and Meeting the New Standards
Lightning Protection: Securing Higher Reliability and Meeting the New StandardsLightning Protection: Securing Higher Reliability and Meeting the New Standards
Lightning Protection: Securing Higher Reliability and Meeting the New Standards
Sandia National Laboratories: Energy & Climate: Renewables
 
Electrical maintenance engineer kpi
Electrical maintenance engineer kpiElectrical maintenance engineer kpi
Electrical maintenance engineer kpi
qewtiret
 
883-4-S09-S03Z-CN12-RCC-SH-UTC-MF-05-3020-(2-3)-SR7A FIRE TANK
883-4-S09-S03Z-CN12-RCC-SH-UTC-MF-05-3020-(2-3)-SR7A FIRE TANK883-4-S09-S03Z-CN12-RCC-SH-UTC-MF-05-3020-(2-3)-SR7A FIRE TANK
883-4-S09-S03Z-CN12-RCC-SH-UTC-MF-05-3020-(2-3)-SR7A FIRE TANK
Sherif Azab
 
Hydraulic as built drawing volumn 2 of 2
Hydraulic as built drawing volumn 2 of 2Hydraulic as built drawing volumn 2 of 2
Hydraulic as built drawing volumn 2 of 2
ngo hoang duy
 
FIBER OPTIC PROJECT AS-BUILT DRAWING (ABD)
FIBER OPTIC PROJECT AS-BUILT  DRAWING (ABD)FIBER OPTIC PROJECT AS-BUILT  DRAWING (ABD)
FIBER OPTIC PROJECT AS-BUILT DRAWING (ABD)
JOHNSON ADEJOLA ( Msc, CCNA,CFOT, CFOS/D/H/I/O/L
 
Electrical engineer performance appraisal
Electrical engineer performance appraisalElectrical engineer performance appraisal
Electrical engineer performance appraisal
martinezrosie780
 
MEP - QS-Engineer -
MEP - QS-Engineer -MEP - QS-Engineer -
MEP - QS-Engineer -
Thangapandian periasamy
 
Autocad Mep Gettingstarted
Autocad Mep GettingstartedAutocad Mep Gettingstarted
Autocad Mep Gettingstarted
guestedb0170
 
Lightning protection 1 by ambuj mishra
Lightning protection 1 by ambuj mishraLightning protection 1 by ambuj mishra
Lightning protection 1 by ambuj mishra
Ambuj Mishra
 
Lightning protection
Lightning protectionLightning protection
Lightning protection
Vincent Wedelich, PE MBA
 
Quantity Surveying
Quantity SurveyingQuantity Surveying
Quantity Surveying
geddolan
 
BIM (Building Information Modeling) Services | Revit Architecture | Revit Str...
BIM (Building Information Modeling) Services | Revit Architecture | Revit Str...BIM (Building Information Modeling) Services | Revit Architecture | Revit Str...
BIM (Building Information Modeling) Services | Revit Architecture | Revit Str...
Dalbir Dugal
 
Top 8 m&e coordinator resume samples
Top 8 m&e coordinator resume samplesTop 8 m&e coordinator resume samples
Top 8 m&e coordinator resume samples
tonychoper1605
 
Building Information Modeling (BIM)
Building Information Modeling (BIM)Building Information Modeling (BIM)
Building Information Modeling (BIM)
Vulcan Smart Services
 

Viewers also liked (20)

RESUME sen (1)
RESUME sen (1)RESUME sen (1)
RESUME sen (1)
 
Top 8 m&e engineer resume samples
Top 8 m&e engineer resume samplesTop 8 m&e engineer resume samples
Top 8 m&e engineer resume samples
 
SEC23 GEOG Chapt8 Water Qs
SEC23 GEOG Chapt8 Water QsSEC23 GEOG Chapt8 Water Qs
SEC23 GEOG Chapt8 Water Qs
 
LED Lighting Protection
LED Lighting ProtectionLED Lighting Protection
LED Lighting Protection
 
Lightning protection system on Bekasi Power Plant [beta]
Lightning protection system on Bekasi Power Plant [beta]Lightning protection system on Bekasi Power Plant [beta]
Lightning protection system on Bekasi Power Plant [beta]
 
Introduction of nr bim consultant
Introduction of nr bim consultantIntroduction of nr bim consultant
Introduction of nr bim consultant
 
Lightning Protection: Securing Higher Reliability and Meeting the New Standards
Lightning Protection: Securing Higher Reliability and Meeting the New StandardsLightning Protection: Securing Higher Reliability and Meeting the New Standards
Lightning Protection: Securing Higher Reliability and Meeting the New Standards
 
Electrical maintenance engineer kpi
Electrical maintenance engineer kpiElectrical maintenance engineer kpi
Electrical maintenance engineer kpi
 
883-4-S09-S03Z-CN12-RCC-SH-UTC-MF-05-3020-(2-3)-SR7A FIRE TANK
883-4-S09-S03Z-CN12-RCC-SH-UTC-MF-05-3020-(2-3)-SR7A FIRE TANK883-4-S09-S03Z-CN12-RCC-SH-UTC-MF-05-3020-(2-3)-SR7A FIRE TANK
883-4-S09-S03Z-CN12-RCC-SH-UTC-MF-05-3020-(2-3)-SR7A FIRE TANK
 
Hydraulic as built drawing volumn 2 of 2
Hydraulic as built drawing volumn 2 of 2Hydraulic as built drawing volumn 2 of 2
Hydraulic as built drawing volumn 2 of 2
 
FIBER OPTIC PROJECT AS-BUILT DRAWING (ABD)
FIBER OPTIC PROJECT AS-BUILT  DRAWING (ABD)FIBER OPTIC PROJECT AS-BUILT  DRAWING (ABD)
FIBER OPTIC PROJECT AS-BUILT DRAWING (ABD)
 
Electrical engineer performance appraisal
Electrical engineer performance appraisalElectrical engineer performance appraisal
Electrical engineer performance appraisal
 
MEP - QS-Engineer -
MEP - QS-Engineer -MEP - QS-Engineer -
MEP - QS-Engineer -
 
Autocad Mep Gettingstarted
Autocad Mep GettingstartedAutocad Mep Gettingstarted
Autocad Mep Gettingstarted
 
Lightning protection 1 by ambuj mishra
Lightning protection 1 by ambuj mishraLightning protection 1 by ambuj mishra
Lightning protection 1 by ambuj mishra
 
Lightning protection
Lightning protectionLightning protection
Lightning protection
 
Quantity Surveying
Quantity SurveyingQuantity Surveying
Quantity Surveying
 
BIM (Building Information Modeling) Services | Revit Architecture | Revit Str...
BIM (Building Information Modeling) Services | Revit Architecture | Revit Str...BIM (Building Information Modeling) Services | Revit Architecture | Revit Str...
BIM (Building Information Modeling) Services | Revit Architecture | Revit Str...
 
Top 8 m&e coordinator resume samples
Top 8 m&e coordinator resume samplesTop 8 m&e coordinator resume samples
Top 8 m&e coordinator resume samples
 
Building Information Modeling (BIM)
Building Information Modeling (BIM)Building Information Modeling (BIM)
Building Information Modeling (BIM)
 

Similar to Mechanical & electrical engineering

Mechanical electrical-engineering
Mechanical electrical-engineeringMechanical electrical-engineering
Mechanical electrical-engineering
Chan Yifung
 
Sindhu Poorani_ Resume
Sindhu Poorani_ ResumeSindhu Poorani_ Resume
Sindhu Poorani_ Resume
sindhu poorani
 
jordan updated resume 2015
jordan updated resume 2015jordan updated resume 2015
jordan updated resume 2015
Manolito Jordan
 
Ici
IciIci
Hassan mohamed resume 2016 aug (1)
Hassan mohamed resume 2016 aug (1)Hassan mohamed resume 2016 aug (1)
Hassan mohamed resume 2016 aug (1)
Hassan Mohamed
 
c.v. of sales Engineer
c.v. of sales Engineerc.v. of sales Engineer
c.v. of sales Engineer
Ma Faiz
 
Navaneeth New CV
Navaneeth New CVNavaneeth New CV
Navaneeth New CV
Navaneeth bala
 
Brony Electrical Engineer INDIA
Brony Electrical Engineer INDIABrony Electrical Engineer INDIA
Brony Electrical Engineer INDIA
brony mc
 
Different Types of Engineering
Different Types of EngineeringDifferent Types of Engineering
Different Types of Engineering
Taufiq Rahman
 
Resume
ResumeResume
Resume
ABID ALI
 
CV_ Sayantan Ghosh_B.Tech_Electrical
CV_ Sayantan Ghosh_B.Tech_ElectricalCV_ Sayantan Ghosh_B.Tech_Electrical
CV_ Sayantan Ghosh_B.Tech_Electrical
SAYANTAN GHOSH
 
CV_ Sayantan Ghosh_B.Tech_Electrical
CV_ Sayantan Ghosh_B.Tech_ElectricalCV_ Sayantan Ghosh_B.Tech_Electrical
CV_ Sayantan Ghosh_B.Tech_Electrical
SAYANTAN GHOSH
 
Neel Engineers and Contractors
Neel Engineers and ContractorsNeel Engineers and Contractors
Neel Engineers and Contractors
MyPresentations Services
 
EMCI Presentation
EMCI PresentationEMCI Presentation
EMCI Presentation
EMCI Training Institute
 
Resume_Rangarajan (1)
Resume_Rangarajan (1)Resume_Rangarajan (1)
Resume_Rangarajan (1)
Rangarajan Dhamal
 
Yasin ÇAPAR - Portfoilo
Yasin ÇAPAR - PortfoiloYasin ÇAPAR - Portfoilo
Yasin ÇAPAR - Portfoilo
Yasin Çapar
 
Kksc company profile
Kksc company profileKksc company profile
Kksc company profile
kishorkumar341
 
www.mecciengineers.com
www.mecciengineers.comwww.mecciengineers.com
www.mecciengineers.com
nettopperssupport
 
Mecci engineers pvt ltd, Mecci engineers noida, India
 Mecci engineers pvt ltd, Mecci engineers noida, India Mecci engineers pvt ltd, Mecci engineers noida, India
Mecci engineers pvt ltd, Mecci engineers noida, India
nettopperssupport
 
Resume
ResumeResume

Similar to Mechanical & electrical engineering (20)

Mechanical electrical-engineering
Mechanical electrical-engineeringMechanical electrical-engineering
Mechanical electrical-engineering
 
Sindhu Poorani_ Resume
Sindhu Poorani_ ResumeSindhu Poorani_ Resume
Sindhu Poorani_ Resume
 
jordan updated resume 2015
jordan updated resume 2015jordan updated resume 2015
jordan updated resume 2015
 
Ici
IciIci
Ici
 
Hassan mohamed resume 2016 aug (1)
Hassan mohamed resume 2016 aug (1)Hassan mohamed resume 2016 aug (1)
Hassan mohamed resume 2016 aug (1)
 
c.v. of sales Engineer
c.v. of sales Engineerc.v. of sales Engineer
c.v. of sales Engineer
 
Navaneeth New CV
Navaneeth New CVNavaneeth New CV
Navaneeth New CV
 
Brony Electrical Engineer INDIA
Brony Electrical Engineer INDIABrony Electrical Engineer INDIA
Brony Electrical Engineer INDIA
 
Different Types of Engineering
Different Types of EngineeringDifferent Types of Engineering
Different Types of Engineering
 
Resume
ResumeResume
Resume
 
CV_ Sayantan Ghosh_B.Tech_Electrical
CV_ Sayantan Ghosh_B.Tech_ElectricalCV_ Sayantan Ghosh_B.Tech_Electrical
CV_ Sayantan Ghosh_B.Tech_Electrical
 
CV_ Sayantan Ghosh_B.Tech_Electrical
CV_ Sayantan Ghosh_B.Tech_ElectricalCV_ Sayantan Ghosh_B.Tech_Electrical
CV_ Sayantan Ghosh_B.Tech_Electrical
 
Neel Engineers and Contractors
Neel Engineers and ContractorsNeel Engineers and Contractors
Neel Engineers and Contractors
 
EMCI Presentation
EMCI PresentationEMCI Presentation
EMCI Presentation
 
Resume_Rangarajan (1)
Resume_Rangarajan (1)Resume_Rangarajan (1)
Resume_Rangarajan (1)
 
Yasin ÇAPAR - Portfoilo
Yasin ÇAPAR - PortfoiloYasin ÇAPAR - Portfoilo
Yasin ÇAPAR - Portfoilo
 
Kksc company profile
Kksc company profileKksc company profile
Kksc company profile
 
www.mecciengineers.com
www.mecciengineers.comwww.mecciengineers.com
www.mecciengineers.com
 
Mecci engineers pvt ltd, Mecci engineers noida, India
 Mecci engineers pvt ltd, Mecci engineers noida, India Mecci engineers pvt ltd, Mecci engineers noida, India
Mecci engineers pvt ltd, Mecci engineers noida, India
 
Resume
ResumeResume
Resume
 

More from Zheng Chee Cham

Design project two brief rev a
Design project two   brief rev aDesign project two   brief rev a
Design project two brief rev a
Zheng Chee Cham
 
Design project one full brief
Design project one full   briefDesign project one full   brief
Design project one full brief
Zheng Chee Cham
 
Intro to biz exercise 7
Intro to biz exercise 7Intro to biz exercise 7
Intro to biz exercise 7
Zheng Chee Cham
 
Intro to business exercise 6
Intro to business exercise 6Intro to business exercise 6
Intro to business exercise 6
Zheng Chee Cham
 
Intro to business exercise 5.0. ver 2.0
Intro to business exercise 5.0. ver 2.0Intro to business exercise 5.0. ver 2.0
Intro to business exercise 5.0. ver 2.0
Zheng Chee Cham
 
Intro to business exercise 4.1
Intro to business exercise 4.1Intro to business exercise 4.1
Intro to business exercise 4.1
Zheng Chee Cham
 
Intro to business exercise 2
Intro to business exercise 2Intro to business exercise 2
Intro to business exercise 2
Zheng Chee Cham
 
Intro to business exercise 4.1
Intro to business exercise 4.1Intro to business exercise 4.1
Intro to business exercise 4.1
Zheng Chee Cham
 
Intro to biz exercise 7
Intro to biz exercise 7Intro to biz exercise 7
Intro to biz exercise 7
Zheng Chee Cham
 
Intro to business exercise 3
Intro to business exercise 3Intro to business exercise 3
Intro to business exercise 3
Zheng Chee Cham
 
Intro to business exercise 4
Intro to business exercise 4Intro to business exercise 4
Intro to business exercise 4
Zheng Chee Cham
 
Tutorial intro to business exercise 1.0
Tutorial intro to business exercise 1.0Tutorial intro to business exercise 1.0
Tutorial intro to business exercise 1.0
Zheng Chee Cham
 
Charity drive report 2
Charity drive report 2Charity drive report 2
Charity drive report 2
Zheng Chee Cham
 
BUSINESS FINAL FINAL PROJECt
BUSINESS FINAL FINAL PROJECtBUSINESS FINAL FINAL PROJECt
BUSINESS FINAL FINAL PROJECt
Zheng Chee Cham
 
Business project-1 SLIDES
Business project-1 SLIDESBusiness project-1 SLIDES
Business project-1 SLIDES
Zheng Chee Cham
 
BUSINESS FINAL PROJECT
BUSINESS FINAL PROJECTBUSINESS FINAL PROJECT
BUSINESS FINAL PROJECT
Zheng Chee Cham
 
Business project-1
Business project-1Business project-1
Business project-1
Zheng Chee Cham
 
Bus30104 intro to biz assignment business plan aug 2015
Bus30104 intro to biz assignment   business plan aug 2015Bus30104 intro to biz assignment   business plan aug 2015
Bus30104 intro to biz assignment business plan aug 2015
Zheng Chee Cham
 
Bus30104 intro to biz final project aug 2015
Bus30104 intro to biz final project   aug 2015Bus30104 intro to biz final project   aug 2015
Bus30104 intro to biz final project aug 2015
Zheng Chee Cham
 
Assessment comic
Assessment comicAssessment comic
Assessment comic
Zheng Chee Cham
 

More from Zheng Chee Cham (20)

Design project two brief rev a
Design project two   brief rev aDesign project two   brief rev a
Design project two brief rev a
 
Design project one full brief
Design project one full   briefDesign project one full   brief
Design project one full brief
 
Intro to biz exercise 7
Intro to biz exercise 7Intro to biz exercise 7
Intro to biz exercise 7
 
Intro to business exercise 6
Intro to business exercise 6Intro to business exercise 6
Intro to business exercise 6
 
Intro to business exercise 5.0. ver 2.0
Intro to business exercise 5.0. ver 2.0Intro to business exercise 5.0. ver 2.0
Intro to business exercise 5.0. ver 2.0
 
Intro to business exercise 4.1
Intro to business exercise 4.1Intro to business exercise 4.1
Intro to business exercise 4.1
 
Intro to business exercise 2
Intro to business exercise 2Intro to business exercise 2
Intro to business exercise 2
 
Intro to business exercise 4.1
Intro to business exercise 4.1Intro to business exercise 4.1
Intro to business exercise 4.1
 
Intro to biz exercise 7
Intro to biz exercise 7Intro to biz exercise 7
Intro to biz exercise 7
 
Intro to business exercise 3
Intro to business exercise 3Intro to business exercise 3
Intro to business exercise 3
 
Intro to business exercise 4
Intro to business exercise 4Intro to business exercise 4
Intro to business exercise 4
 
Tutorial intro to business exercise 1.0
Tutorial intro to business exercise 1.0Tutorial intro to business exercise 1.0
Tutorial intro to business exercise 1.0
 
Charity drive report 2
Charity drive report 2Charity drive report 2
Charity drive report 2
 
BUSINESS FINAL FINAL PROJECt
BUSINESS FINAL FINAL PROJECtBUSINESS FINAL FINAL PROJECt
BUSINESS FINAL FINAL PROJECt
 
Business project-1 SLIDES
Business project-1 SLIDESBusiness project-1 SLIDES
Business project-1 SLIDES
 
BUSINESS FINAL PROJECT
BUSINESS FINAL PROJECTBUSINESS FINAL PROJECT
BUSINESS FINAL PROJECT
 
Business project-1
Business project-1Business project-1
Business project-1
 
Bus30104 intro to biz assignment business plan aug 2015
Bus30104 intro to biz assignment   business plan aug 2015Bus30104 intro to biz assignment   business plan aug 2015
Bus30104 intro to biz assignment business plan aug 2015
 
Bus30104 intro to biz final project aug 2015
Bus30104 intro to biz final project   aug 2015Bus30104 intro to biz final project   aug 2015
Bus30104 intro to biz final project aug 2015
 
Assessment comic
Assessment comicAssessment comic
Assessment comic
 

Recently uploaded

RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
Dr Ramhari Poudyal
 
Low power architecture of logic gates using adiabatic techniques
Low power architecture of logic gates using adiabatic techniquesLow power architecture of logic gates using adiabatic techniques
Low power architecture of logic gates using adiabatic techniques
nooriasukmaningtyas
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
Victor Morales
 
A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...
nooriasukmaningtyas
 
basic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdfbasic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdf
NidhalKahouli2
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
SyedAbiiAzazi1
 
PPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testingPPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testing
anoopmanoharan2
 
6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)
ClaraZara1
 
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
MIGUELANGEL966976
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
Madan Karki
 
Modelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdfModelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdf
camseq
 
sieving analysis and results interpretation
sieving analysis and results interpretationsieving analysis and results interpretation
sieving analysis and results interpretation
ssuser36d3051
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Christina Lin
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
IJECEIAES
 
Generative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of contentGenerative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of content
Hitesh Mohapatra
 
Self-Control of Emotions by Slidesgo.pptx
Self-Control of Emotions by Slidesgo.pptxSelf-Control of Emotions by Slidesgo.pptx
Self-Control of Emotions by Slidesgo.pptx
iemerc2024
 
PROJECT FORMAT FOR EVS AMITY UNIVERSITY GWALIOR.ppt
PROJECT FORMAT FOR EVS AMITY UNIVERSITY GWALIOR.pptPROJECT FORMAT FOR EVS AMITY UNIVERSITY GWALIOR.ppt
PROJECT FORMAT FOR EVS AMITY UNIVERSITY GWALIOR.ppt
bhadouriyakaku
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
insn4465
 
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单专业办理
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单专业办理一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单专业办理
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单专业办理
zwunae
 

Recently uploaded (20)

RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
 
Low power architecture of logic gates using adiabatic techniques
Low power architecture of logic gates using adiabatic techniquesLow power architecture of logic gates using adiabatic techniques
Low power architecture of logic gates using adiabatic techniques
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
 
A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...
 
basic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdfbasic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdf
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
 
PPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testingPPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testing
 
6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)
 
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
 
Modelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdfModelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdf
 
sieving analysis and results interpretation
sieving analysis and results interpretationsieving analysis and results interpretation
sieving analysis and results interpretation
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
 
Generative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of contentGenerative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of content
 
Self-Control of Emotions by Slidesgo.pptx
Self-Control of Emotions by Slidesgo.pptxSelf-Control of Emotions by Slidesgo.pptx
Self-Control of Emotions by Slidesgo.pptx
 
PROJECT FORMAT FOR EVS AMITY UNIVERSITY GWALIOR.ppt
PROJECT FORMAT FOR EVS AMITY UNIVERSITY GWALIOR.pptPROJECT FORMAT FOR EVS AMITY UNIVERSITY GWALIOR.ppt
PROJECT FORMAT FOR EVS AMITY UNIVERSITY GWALIOR.ppt
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
 
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单专业办理
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单专业办理一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单专业办理
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单专业办理
 

Mechanical & electrical engineering

  • 2. Presented By: CHAM ZHENG CHEE 0322317 –LEADER BRYAN FOONG JIA MING 0322258 DARREN TAN QUAN WEN 0322662 CHAN YI FUNG 0323057 HONG SHI LIK 0322081 CHAN KOON QI 0322000 Lecturers: Ms Sufina Abu Bakar Ms Hasmanira Ms Thivilojana
  • 4. Mechanical engineers create and build mechanical devices. Mechanical engineer is concerned with heat utilization or machine design. Heat utilization techniques are applied in boilers, air conditioners, and refrigeration units. Machine design is more focused on hardware, including automobile engines, computers, and washing machines.
  • 6. Electrical engineering is the branch of engineering that deals with the technology of electricity. Electrical engineers work on components, devices and systems such as microchips and power station generators. Examples: Security system, lighting point, electrical substation.
  • 7. Process for a Project
  • 8. Client comes out with conceptual brief. Architect design the needs of client using schematic design. Meeting consist of: Client’s representative (project manager), Architect, Civil and Structure engineer, Mechanical and Electrical engineer, Quantity Surveyor, (Landscape Architect, Interior Designer, Acoustic consultant (Soundproof), Environmental consultant)
  • 9. Objective: To go through the design development so that the client is able to provide inputs on the design and other parties are constantly updated with client’s changes of a certain issue. Consultant needs to coordinate with each other to further develop the design.
  • 10. Civil and Structure engineer design road and drainage, retaining wall, sewerage. The frame of building and coordinate with the Mechanical and Electrical engineer. Building plan ready and submitted to local authority for approval. Quantity Surveyor prepare the bill of quantity so that they can incorporate the requirements in the tender documentation. Mechanical and Electrical engineer prepares the schedule of prices for tenderer. Tenderer issues the tender documents and drawings. They will analyse the given documents before construction process starts.
  • 11. Constructions can be started after appointing a contractor. Site meetings carried out to discuss details of the process such as Clarification and suitable ways for installation. Testing and Commissioning: check, inspect and test project component. C.C.C (Certificate of Completion Compliance) is issued by Architect to ensure buyers safety.
  • 12. Job scope for Mechanical Engineers: Location of air conditioner. Location of compressor. Properties of water tank. Location of water tanks and piping to each water tap and shower point. Design Fire-fighting system. Mechanical and Electrical engineer work together to ensure the system is functional.
  • 13. Job scope for Electrical Engineers: Space requirement for electrical substations. To connect the distribution board to power socket. Connect lighting points. Connect telephone line to the house. Security system