This document contains the resume of Muhammad Naveed Rafique. It summarizes his educational qualifications and over 4.5 years of experience in quality assurance and quality control roles on construction projects in the UAE. His roles have included inspection, ensuring compliance with quality standards, and coordinating with consultants and subcontractors. He is currently working as a Junior QA/QC Engineer for a company in Abu Dhabi.
Javelin is an easy way to test network defenses in real time, and then automate the fix. Our log analysis data gives us the power to proactively contain the most active and damaging IT security threats in the wild today.
In under two minutes you can test your network for free. Click calendly.com/brian-campbell to reserve a time.
6 Effective Techniques to Troubleshoot Outlook ProblemsDataNumen, Inc.
When people come across Outlook errors, they may confuse about how to figure out behind reasons such as oversized PST file, harmful add-ins, corrupted profile and solve the error at last. As an old Outlook user, I'd like to share some skills in troubleshooting Outlook problems.
Javelin is an easy way to test network defenses in real time, and then automate the fix. Our log analysis data gives us the power to proactively contain the most active and damaging IT security threats in the wild today.
In under two minutes you can test your network for free. Click calendly.com/brian-campbell to reserve a time.
6 Effective Techniques to Troubleshoot Outlook ProblemsDataNumen, Inc.
When people come across Outlook errors, they may confuse about how to figure out behind reasons such as oversized PST file, harmful add-ins, corrupted profile and solve the error at last. As an old Outlook user, I'd like to share some skills in troubleshooting Outlook problems.
This bulletin gives an estimate of the accuracy of MERCATOR OCEAN’s analyses and forecast for the season of October-November-December 2012. It also provides a summary of useful information on the context of the production for this period. Diagnostics will be displayed for the global 1/12° (PSY4), global ¼° (PSY3), the Atlantic and Mediterranean zoom at 1/12° (PSY2), and the Iberia-Biscay-Ireland (IBI) monitoring and forecasting systems currently producing daily 3D temperature, salinity and current products. Surface Chlorophyll concentrations from the BIOMER biogeochemical monitoring and forecasting system are also displayed and compared with simultaneous observations.
Editorial – April 2010
Greetings all,
Over the past 10 years, Mercator Ocean and Coriolis have been working together both at French, European and international
level for the development of global ocean monitoring and forecasting capabilities. For the first time, this Newsletter is jointly
coordinated by Mercator Ocean and Coriolis teams. The first goal is to foster interactions between the french Mercator Ocean
Modelling/Data Asssimilation and Coriolis Observations communities, and to a larger extent, enhance communication at european
and international levels. The second objective is to broaden the themes of the scientific papers to Operational Oceanography in
general, hence reaching a wider audience within both Modelling/Data Asssimilation and Observations groups.
Once a year in April, Mercator Ocean and Coriolis will publish a common newsletter merging the Mercator Ocean Newsletter on
the one side and the Coriolis one on the other side. Mercator Ocean will still publish 3 other issues per year of its Newsletter in
July, October and January each year, more focused on Ocean Modeling and Data Assimilation aspects. The present issue will be
posted simultaneously on Mercator Ocean and Coriolis websites.
We will meet again next year in April 2011 for a new jointly coordinated Newsletter between Mercator Ocean and Coriolis.
Regarding next July 2010 Newsletter coordinated by Mercator Ocean only, it will display studies about coastal ocean systems.
We wish you a pleasant reading,
The Editorial Board
Editorial – Apr 2014 – The Pre-operational PREVIMER system
Greetings all,
This new issue of the Mercator Ocean newsletter is dedicated to the Pre-operational PREVIMER system (see article 1, this issue for a general
introduction to the Previmer system) which provides coastal observations and forecasts along French coasts: currents, waves, sea levels, temperature,
salinity, primary production and turbidity. Previmer marine environment data come from in situ observations, satellite images, and numerical models.
They are centralized and archived in Center for Data in Coastal Operational Oceanography, then published on website and finally disseminated to users.
The present issue describes in details all the components of the PREVIMER users system.
The Previmer project was launched on 2006 to enlarge the French operational oceanography capability towards the coastal areas. The first phase
(2006-2007) focused on various demonstrators (sea states, coastal circulation, primary production and water quality). The second phase (2008-2013)
has ended last December 2013 and aimed at building infrastructures and tools in order to ensure an operational service for the benefit of a wide
community (private companies, public organisms, defense, and citizens).
The four main components that constituted the Previmer project are:
❶ in situ observations: instrumental development, data acquisition, deployment and exploitation of optimized instrumental networks to produce
specific coastal data. This component is illustrated in the 3 following papers by Charria et al., Beurret and Thomas as well as Beurret et al.
❷ modeling tools: development and evolution of numerical models, coupling of hydrodynamical (waves and circulation), sedimentological,
biogeochemical models, data assimilation, tools for the chemical and toxicity risk analysis. This component is illustrated with 7 papers: see for example
the papers in this issue by Pineau-Guillou et al, Ardhuin et al. and Garnier et al.
❸ interface tools for users and advanced products: satellite data processing, synthetic indicators, data, images, dissemination thanks to the web.
This component is illustrated in this issue in the 2 following papers: Theetten et al. and Raynaud et al.
❹ data center dedicated to coastal operational oceanography (CDOCO): acquisition, quality control, diffusion of observations and model results,
implementation of the models and data center, daily production of services and products. This component is illustrated in the following paper: Faillot et
al., this issue.
Franck Dumas and Laurence Crosnier, Editors.
1. MUHAMMAD NAVEED RAFIQUE
M
Email:- naveed.npcuae@gmail.com
Contact No: +971-52-7970178 & +971-56-2253801
Key Experience:-
4.5 Years Working Experience (3 Years in UAE) in Building Construction/both Precast & CIS
Works.
Qualification:-
B-Tech( Pass ) - Civil Technology Preston University from Islamabad, Pakistan
Continue
2014
3 Year Diploma in Civil Technology Punjab Board of Technical Education Lahore, Pakistan 2011
Secondary School Certificate Federal Board of Intermediate & Secondary
Education, Pakistan
2008
AutoCAD Diploma Swedish Group of Technical Institutes Punjab, Pakistan 2008
Computer Skills:-
Well experience of Microsoft Office Automation (Ms Word, Ms Excel, DOS & Internet)
Well experience of Auto CAD (2D & 3D)
Well understanding of Microsoft Windows (XP Professional & Home Edition, 2000, Me &
9x), Internet Explorer.
Well understanding of Software & Hardware Installation & all types of
Office Installation.
Languages:-
English
Arabic (Workable)
Urdu
Punjabi
Engineering Skill:-
Windows & Ms
Quality Assurance / Quality Control.
Execution as a Contractor.
Auto CAD Operator.
Surveying & Leveling.
2. Experience record:-
01 – Seidco General Contracting LLC Aug - 2015 to Till Date
Project Prive by Damac (B + 3P 32 Floor)
Client DAMAC
Consultant LASACA Engineering & Consulting
Position QA/ QC Inspector
Key Role:
Assist Sr.QA/ QC Engineer for review of prequalification, material submittals, method
statements as per specifications.
Strict implementation of ISO 9001:2008 Quality Standard and all other applicable standards /
related procedures.
Controls the documents and data control system.
To conduct inspection, arrange sampling; monitor the required test and record inspections
and
tests as per the requirements.
Closing of the site instructions and any NCRs raised by the consultant.
Responsible for preparation of All Method Statements & ITP’s.
Responsible for submission of Material Submittal, Shop Drawings, Method of Statements etc.
Responsible for submission of Test Result Submittal.
Responsible for the technical co-ordination with the consultant and sub-contractor.
Responsible for Preparation of Material Inspection Request to Consultant.
02 - National Projects & Construction LLC, Abu Dhabi UAE. Jan-2013 to Till Date
Project Emirati Housing Development at Jebel Hafeet Alain, UAE 3000 Villas.
Client Musanada, Abu Dhabi UAE.
Developer Tamouh Investment LLC, Abu Dhabi UAE.
Project Management Royal Architects & Project Management, Abu Dhabi UAE.
Consultant Associated Consulting Engineering International.
Project Work Description
This project comprises of the following:
The total plot area for the development is 453.8 Hectare ), which will
include 3,000 units of Emirati housing units, Infrastructure including –
potable water, electricity, sewerage, storm water, street lighting, fire
fighting system, irrigation, telecommunication networks, landscaping and
road works. The project is mandated by Estidama 2 Pearls Rating System
for New Communities, New Buildings and New Villas.
Position Jnr.QA/QC Engineer
Key Role:
Assist QA/QC Manager for review of prequalification, material submittals, method
statements as per specifications.
Strict implementation of ISO 9001:2008 Quality Standard and all other applicable standards /
related procedures.
Controls the documents and data control system.
To conduct inspection, arrange sampling; monitor the required test and record inspections
3. and
tests as per the requirements.
Closing of the site instructions and any NCRs raised by the consultant.
Responsible for preparation of All Method Statements & ITP’s.
Responsible for submission of Material Submittal, Shop Drawings, Method of Statements etc.
Responsible for submission of Test Result Submittal.
Responsible for the technical co-ordination with the consultant and sub-contractor.
Responsible for Preparation of Material Inspection Request to Consultant.
03 - Raise Rise Constriction Company. Since August-2011 to January-2013
Project Construction of Yusra Medical & Dental Complex Islamabad.
Consultant Yusra Medical & Dental Complex Islamabad.
Project Work Description This project comprises of the following:
Total Plot Area-1,74,080 sft
College Main-Building-Frame Structure 6th Storied with Raft Foundation.
150 bed Hospital-Frame Structure 4th storied with Raft Foundation.
Auditorium Hall-Frame STRUCTURE 2 storied with Basement.
Lecture Halls-Frame Structure with Raft Foundation.
500 Bed Hostel-Frames Structure with Raft Foundation.
Mosque-Frame Structure & Retaining Wall-RCC
Position Site Supervisor
Key Role:
Daily Site Inspection of Site Activities with Consultant.
After Daily Inspection Reporting to Site Engineer.
Supervision of all Civil & Survey works activities and ensuring that all activities are carried out in
all Specific manner and accordance to the relevant approved drawings.
100% checking of Payments claimed by the Sub-contractor.
Preparing the Monthly Bills for the Payment.
Responsible for the Material being used was complied with the project Specifications.
Supervised and monitor the step by step construction procedure and see to it that there is no
de-standard.
Responsible for the technical co-ordination with the consultant and sub-contractor.
Personal Detail:
Father’s Name:
Nationality:
Muhammad Rafique
Pakistani
Profession: Associate Civil Engineer
Year with Company:
Position in Company:
Passport No:
Date of Birth:
Marital Status:
Contact No:
Email:
Since January-2013 to Till Date
Jnr.QA/QC Engineer
CU9562881
28-Feb-1990
Single
+971-52-7970178 & +971-56-2253801
naveed.npcuae@gmail.com
Reference:
Reference will be furnished at further request.
Abid Ali Shah QA QC Engineer (+971-55-4796166).