MEASURING TRAINING EFFECTIVENESS
MEASURING TRAINING
       EFFECTIVENESS




                                                                          ~ Share This! ~
                         Post this to your blog, Twitter™, LinkedIn® or Delicious™ accounts or email this to someone who might enjoy it.




                  Share                                              Remix                                              Attribute                                      Share Alike




                                                             11639 E. Wethersfield Road, Scottsdale, AZ 85259 USA
                                                            www.michaelsandassoc.com                  Toll-free: 877-614-8440
2




         © 2011 by Michaels & Associates Docntrain, Ltd. dba Michaels & Associates
Page




         Copyright holder is licensing this under the Creative Commons License, Attribution-Share Alike 3.0. For more information, check out http://creativecommons.org/licenses/by-sa/3.0/us/
MEASURING TRAINING
                                                                                        EFFECTIVENESS




MEASURING THE EFFECTIVENESS OF TRAINING—
T H E B U S I N E S S O F C O R P O R AT E L E A R N I N G
Learning & Development business units are under siege and struggling with the effort of what
appears to be a very confusing, elephantine challenge of measuring the effectiveness of their
training interventions. We need clarity. We need a common sense approach. We need to step
up our practice of corporate learning consulting. Let’s discuss existing principles to prove the
value of Learning & Development (L&D) deliverables in a corporate environment.

In the training industry, many practitioners insist that regardless of the size or maturity (Paul
Kearns consultant, author, teacher at http://www.paulkearns.co.uk/articles.htm) of your
organization, the Kirkpatrick models and/or Phillips methods of evaluation are the only
sound ways to offer validation of the corporate learning product.




                                                                                                    3   Page
MEASURING TRAINING
        EFFECTIVENESS




       Going Back to Basics


       One of the simplest rules for measuring effectiveness is to ensure you’ve developed materials that will actually train corporate employees. I often
       meet training professionals who have left adult learning theory in the college classroom long ago, have forgotten much of it and feel compelled
       to whip out training on demand that is instructionally flawed. All too often, through the quirkiness of corporate fate, some organizations have
       moved competent people from operational positions into training positions without benefit of being formally taught adult learning theory or
       instructional design. Many of these new learning professionals seek the comfort of becoming competent in their positions, but they have gaps in
       their knowledge that cause them to create instructionally flawed materials. Because of these and other reasons, during a career that has
       spanned thirty plus years, I’ve seen a lot of training developed that is simply not going to be effective because of faulty instructional integrity.



                                                                             Organizations spend a lot of money on these materials. Developers still put
                                                                             much work and effort towards developing these materials. This kind of
                                                                             implementation strategy creates frustration all around the world of corporate
                                                                             training, for employees, employers and the learning professional. No wonder
                                                                             we are getting pressure to prove training (or learning) effectiveness to the C-
                                                                             Suite!



                                                                             All this pressure creates another compulsion—a need to measure the
                                                                             effectiveness of the training. Measuring instructionally flawed training is an
                                                                             exercise in futility. Application of adult learning principles combined with
                                                                             execution of good instructional design is a key underlayment to how well
                                                                             employees can learn, and without it, no measurement will yield satisfying
                                                                             results.
4
Page
MEASURING TRAINING
                                                                                                                   EFFECTIVENESS




Additionally, if you are creating e-learning (online or webinar learning), a good understanding of
usability heuristics is imperative (Jakob Nielsen, 10 Heuristics for User Interface Design). Poor
execution in programming or ignorance of usability rules can sabotage all the work of constructing a
beautifully instructionally sound module of training. The most important of these rules, and in my
experience the most flagrantly violated, is to give learners control of their learning experiences.



Formative versus Summative Assessments


Formative assessments in training are those assessments (in lay terms) that engage learners in
assessing themselves and that provide assessment as part of the learning experience (Cowie, B., &
Bell, B. (1999), “A model of formative assessment in science education”, Assessment in
Education, 6: 101-116). Simply stated, formative assessment provides for two-way communication of
the learning so that the assessments themselves are a part of the learning process.



In an ideal corporate training program, each learning module (live, online, webinar, whatever) would
have a small segment of learning. In these segments, we’d develop assessments in which reflective
answers connect disparate information. For instance, in a live training, we’d follow a chunk of training
on a software application with an exercise in using the software processes in the training. The trainer
oversees this exercise and provides mentoring through the exercise. We’d scored the exercise, but
we wouldn’t actually grade it, because it is after all, part of the learning experience. The exercise helps
the trainer gather feedback on which learners “get it” and are successful in completing the exercise,
and helps the learners gain insight on how they are doing. Optimally, the trainer provides (and the
learner seeks) additional sources of knowledge if the assessment results indicate the need for
alternate learning sources.




                                                                                                                               5   Page
MEASURING TRAINING
        EFFECTIVENESS




       Formative assessment is the use of adult cognition that truly engages the learner. Engagement translates to a better and more satisfying
       learning experience. These assessments take place during the learning, and should directly relate to learning objectives that are measurable
       and achievable and, ideally, reflect corporate and business unit goals and objectives, a nearly perfect map where possible. Use of formative
       assessments in exercises and/or in e-learning modules (drag and drop of glossary terms, for instance) can improve learner engagement
       provided the assessments are appropriate, relevant and continue to provide for the natural curiosity of a learner.



       Summative assessments test the effectiveness of the training, and they judge the competency of the learner after the training intervention takes
       place. We use summative assessments to provide quantifiable data about what the learner learned. We grade summative assessments. We
       determine what constitutes a passing grade, and devise paths for those who do not pass. Typically, we use summative assessments as the
       “final” assessment and the learning management system (LMS) houses the scores.



       In my opinion, this is where the pressure to measure the effectiveness of training falls apart. Very often, we use summative assessment
       techniques with training that is not instructionally sound and doesn’t have formative assessments to support the instructional integrity of the
       training. How do you measure effectiveness of training for corporate metric purposes when the underlayment is unsound?
6
Page
MEASURING TRAINING
                                                                                                                                        EFFECTIVENESS




L&D, the Business Unit, the Enterprise


According to Paul Kearns (Evaluating the ROI from Learning - Cromwell Press, Trowbridge, Wiltshire UK.), a solid starting point for corporate
learning professionals (he calls them either trainers or learning consultants) is to begin with evaluating where L&D stands as a group on his six
stage Learning Maturity Model (LMM). He also advises evaluating the business unit and the enterprise on this model. Figure 1 shows an
example of an LMM.




Figure 1. Example of LMM




                                                                                                                                                    7   Page
MEASURING TRAINING
        EFFECTIVENESS




       In a single enterprise, many L&D units can exist, and they exist in varying stages of maturity. What do we mean by “maturity”? Think about these
       scenarios:

                   When you receive an email stating a department needs a five-hour course on X Operation in 30 days, how do you respond? If you
                    jump and throw together a PowerPoint presentation or something similar, you might be in Stage 1, or a reactive mode.

                   If you have worked toward making the line managers aware that L&D follows normal business processes equivalent to theirs, and
                    that a good quality product might result from adequate budgeting and time, you might be at Stage 3.

                   As you attend meetings with business unit executives, you become aware of initiatives that will require segments of employees to
                    learn new skills. If you present a strategy with a budget, an achievable deadline, and a commitment to prove the strategy executed
                    as planned and get the strategy approved, you might be in Stage 4, or a true learning partner.

                   If the CEO knows about your learning strategies, and in fact has helped to steer information to you so that you can include corporate
                    strategies into your work, you might be at Stage 6. You could also be a learning consultant who is teaching the entire organization
                    how to be a learning corporation. Studies show that learning corporations are more profitable than corporations that are not making
                    an investment in being true learning organizations.
8
Page
MEASURING TRAINING
                                                                                                                                      EFFECTIVENESS



So where on the LMM is your L&D unit?

Where is your business unit?

Where is your corporation?


These questions are important to consider. If you are at Stage 1, it
can be almost impossible to measure the effectiveness of your
training because your environment won’t allow you to construct
instructionally sound, engaging training. “Death by PowerPoint”
became a cliché for a reason. Level 1 assessments (often referred to
as “smile sheets”) for training aren’t truly effective if your learners
were not engaged in the learning, unless you are looking for a
negative response as a way to educate line managers of the business
unit. Level 1 assessments in this situation can be a waste of your
time—time better invested in moving your L&D unit further into the
LMM.

As you evaluate your own L&D unit, consider how it works internally,
with the other business units and within the enterprise. If L&D is at
Stage 1, what things can you do incrementally to move forward in
maturity?

           Begin with a through Training Needs Analysis (TNA) in all business units the L&D unit supports. We define the TNA as the process
            of defining on-the-job performance requirements and the gaps between the requirements and what employees are presently doing.

           Approach every training request with questions about what the requester is trying to achieve. Turn your questions into an analysis of
            whatever depth you can manage to help guide the development of the deliverable.




                                                                                                                                                    9 Page
MEASURING TRAINING
       EFFECTIVENESS




               Make allies of the line managers and ask them about their objectives, goals and strategies. They can give you current performance
                metrics for their employees. They are your customers, so pay attention to what they want to achieve, and plan for how you might
                help them.

               Human Resources (HR) departments typically have job descriptions and the competencies required to perform those jobs. Compare
                them with what the line managers are telling you.

               Analyze your information sources. Define the opportunities. Eliminate the non-training issues.

               Develop an L&D strategy for managing training development. Begin discussing with your ally-managers how to plan for training, and
                what you need to be successful so you can make them successful.

               Develop a replicable process for creating instructionally sound training. Paul Kearns recommends the Deming Cycle: Plan, Do,
                Check, Act (PDCA) shown in Figure 2.




                                                        Figure 2. Plan, Do, Check, Act (PDCA) cycle
10
Page
MEASURING TRAINING
                                                                                                                                     EFFECTIVENESS




           I also suggest using an EADDIE form (Evaluate, Analyze, Design, Develop, Implement, Evaluate). I further maintain that either
            process model is fine, as long as you find it replicable, consistent and defendable within your organization. Keep in mind that line
            managers should respect that you have a process that works.

           Practice saying “no” in a nice way. Example: “I probably can get you a presentation in a few hours, but for training that boosts X
            metrics, I’m going to need to go through our process to define your objectives and make sure the training meets them. For instance,
            I’ll ask you what you would like your employees to be able to do at the end of this training. Would you like to meet on Monday to
            start that process?”



The Elephant in the Room

Exuberance regarding the Kirkpatrick and/or Phillips methods of assessment bombards the
corporate training world almost daily, it seems. There is an onslaught of well over sixty
books, countless training sessions and local and national American Society for Training
and Development (ASTD) presentations. It is marketing at its most impressive.


In my opinion, L&D professionals have adopted these assessment methods in
countless L&D units across the world, with very little evaluation. In many L&D units,
unit leaders have not considered the maturity of the units, how they service the line
managers (their customers), or whether the learning developers can actually create
training to support summative assessments. For me, the vast depth of marketing these
instruments as a means of demonstrating ROI raises simple questions: How can this be so
difficult? What is it about these methods that takes so much print space, countless
presentations and evangelizing? Since they take so much explanation, can these
assessment methods be flawed?




                                                                                                                                                   11Page
MEASURING TRAINING
       EFFECTIVENESS




                            Again, in my opinion, the answer is another question: What method isn’t flawed? The flaw lies in
                            execution, and the execution relies on learning professionals to step up their game. Things to
                            consider in using these methods are:

                                   What is your definition of ROI? Is it the same as the business unit manager’s, or the Chief
                                    Financial Officer’s?

                                   There’s tremendous variability in results that unsuspecting learning professionals will
                                    encounter. For an excellent discussion on these variables, see Ron Drew Stone’s
                                    CLOMedia article, “ROI is Like a Box of Chocolates”. He very cleverly proves that
                                    variability in measuring results can negate those results if you aren’t careful and
                                    knowledgeable. He puts accurate measurement truly in the hands of outside consultants
                                    (which is no big wonder since he is a consultant). He raises several excellent points.

                                   Humans are variable. Things that affect humans are varied. A simple example of that is
                                    sales training: how will you isolate the results of your training from variables such as the
                                    natural effects of the economy, a new marketing campaign, a product release slowdown or
                                    failure, compensation adjustments and so forth? Any one or all of these factors can distort
                                    and invalidate your ROI calculations. A random quantity adjustment such as suggested in
                                    Ron Drew Stone’s article is exactly that: random, and not so easy to defend.

                                   Why have a metric assessment separate of those of business unit managers? They are, in
                                    fact, your customers. Servicing them in pursuit of corporate goals is your job. Doesn’t it
                                    make sense to figure out how the business unit managers are measured and to align
                                    training goals and assessments accordingly?

                            Knowing these things, it has seemed to me for some years now that it might be better simply to
                            prove that the training we construct has value (Proving Learning Value or PLV).
12
Page
MEASURING TRAINING
                                                                                                                                           EFFECTIVENESS




Proving Learning Value (PLV)

Even at Stage 1 of the LMM, any professional with the grasp of the concepts presented here (and the additional reading I’ll recommend) can
begin the process of proving learning value within their L&D unit, as it applies to the business units and within the enterprise. Start simply and
incrementally and work towards making your unit a true business partner with the other enterprise units. Begin by:

    1. Understanding business unit goals and how L&D can support them by allying with business unit managers and including yourself in
        business unit meetings.

    2. Understanding the overall goals of the company (as stated in annual reports and CEO messages—and if you are advanced to Stage 5,
        an actual seat at the C-Suite table).

    3. Prioritizing your training interventions according to those goals and objectives.

    4. Using your training needs analysis (and gap information derived from it) to plan the training, learning objectives, formative assessments
        and summative assessments.

    5. Deciding upon your method of proving value. Do you want to use Kearns’ approach? Do you still think the Phillips method work for you?
        Do you need an alternative?




                                                                                                                                                       13  Page
MEASURING TRAINING
        EFFECTIVENESS




       KISS Method – An alternative way to think about Proving Learning Value

       If you really want a simple way to provide reasonable metrics without going down the endless path of measure,
       measure, measure (sometimes forgetting why we are measuring), here’s an idea: use the classic KISS (in this
       case, Keep It Simple Suggestions) method. Consider the following, borrowed from Kirkpatrick, with caution to
       evaluate first:



           1. Did the learners like the training?
                (Level 1 in the Kirkpatrick/Phillips methods, but we can maximize a Level 1 through learner engagement and formative assessments.)
                Did they feel engaged in the learning experience? When they asked if they felt they learned, what was their response? In my opinion,
                smile sheets are vastly underrated. Given the time and resources to create engaging learning, what better use of an instrument than as
                a tool for the learner to express their satisfaction? Remember that this level of assessment is perfectly fine for some training.
                Compliance, regulations and mandatory training having a certain percentage of correct choices required can all be fine for this kind of
                assessment, because the company has to do this training regardless. The questions then center on ensuring a good learning
                experience to make sure employees like learning, and that they haven’t felt the experience was a waste of their time.



           2. Did the learners learn the content?
                What method(s) will you use to prove that? Will you pre-test to find out the level of their knowledge before they took the training, then
                use a post-learning assessment to demonstrate a change? It really could be that simple. Will you use Certainty Based Marking (CBM), a
                relatively new assessment method that measures the confidence of the learner in what they’ve learned (see Create Active
                Assessments With Certainty-Based Marking)?
14
Page
MEASURING TRAINING
                                                                                                                                    EFFECTIVENESS




If the learner is confident and right, you probably solidify the learning experience for them (as much as 95% according to the few studies
available). If the learner is confident in his or her answer but he or she is wrong, you may have a problem with the training, or you may
need to reroute the learner to other materials to clear up learner’s confusion.



Either way, it is a simple process to implement this method of assessment, and it provides excellent information for proving the value of
the training with pre-planned reporting mechanisms. It is great for leadership training, and medical institutions have used CBM
assessments in medical training (where uncertainty in the answers can have potentially disastrous effects) for years. The Level 1 (or
smile sheet) assessments come back with tremendously positive responses as well, because the assessments serve the purpose
of taking ambiguity on the content out of a learner’s mind.


                                                                         3. Can learners perform the trained tasks on the job?
                                                                             Have you set up preplanned support mechanisms online, with
                                                                             managers, in job aids and in work process alignment to
                                                                             ensure they can perform once the intervention is over? If so,
                                                                             can the line managers give you metrics obtained prior to the
                                                                             training? Did you design your learning objectives, modules
                                                                             and formative assessments in alignment
                                                                             to those metrics?


                                                                             If so, post-intervention performance ratings and appraisals
                                                                             should easily demonstrate learners can perform on the job,
                                                                             and you should see metrics improvements as well. Again, not
                                                                             so hard, and easily defensible with proper planning.




                                                                                                                                                15  Page
MEASURING TRAINING
       EFFECTIVENESS




         4. Did the learning intervention affect the bottom line?
            Did you evaluate the goal of the intervention within the confines of corporate revenues and/or risk reduction and/or cost reduction? If you
            did, there should be published metrics on each of these areas that clearly demonstrate impact on the bottom line. Again, did you
            construct the objectives, modules and formative assessments to support those goals? Are there support mechanisms in place to ensure
            success after the interventions? Can you demonstrate positive change?


            We can apply this level of measurement when the whole corporation is all rowing together to achieve the corporate goals. As an
            example, if you can demonstrate that the learning intervention reduced help desk calls by a significant percentage, you can show that
            percentage in reduction of cost. Help desk managers always have metrics, and allying yourself with those managers gives you easy
            access to them.
16
Page
MEASURING TRAINING
                                                                                                                                        EFFECTIVENESS




Suggested Reading List:




        Paul Kearns Training Journal 12 Part Series:                        Measuring For Success – What CEOs Really Think About
                 o    Part 01 – Organisational learning maturity                Learning Investments, Jack J. Phillips and Patricia Pulliam

                 o    Part 02 – Strategic learning                              Phillips

                 o    Part 03 – The attitude of learning consultants
                                                                             ROI is Like a Box of Chocolates, Ron Drew Stone, CLO Media Chief
                 o    Part 04 – Learning cycles                                 Learning Officer Magazine, January 2011
                 o    Part 05 – Evaluation
                                                                             Ten Usability Heristics, Jakob Nielsen
                 o    Part 06 – Performance management
                 o    Part 07 – Business analysis
                 o    Part 08 – Creative designers
                 o    Part 09 – Delivering solutions
                 o    Part 10 – Consulting skills
                 o    Part 11 – Learning consultants as business partners
                 o    Part 12 – Organisation design and development


        Evaluating the ROI From Learning, Paul Kearns

        What CEOs Expect From Corporate Learning, William J.
           Rothwell, John E. Lindlholm, William G. Wallick (American
           Management Association)




                                                                                                                                                    17
       




                                                                                                                                                        Page
MEASURING TRAINING
        EFFECTIVENESS




       There’s no need for overkill. The observable fact is that some people embrace measurement of the effectiveness of training as a means of job
       protection, and in many organizations, measuring training effectiveness is a substitute for getting on with the real work. Sadly, this
       measurement, at worst, becomes an end in itself and, at the least, it is a distraction from our real jobs: getting sound instructional materials to
       employees to support them in their jobs, and contributing to company goals. Provided we include all the other components of good instructional
       design and usability rules, and by using common sense methods of measurement without elaborate contortions, learning professionals can
       ensure training effectiveness soars.

       Michaels & Associates brings the experience and know-how of solid instructional and media design to every project. Feel free to contact us to
       assist with your next training endeavor! Michaels & Associates—where your business is your specialty and improving your business is ours.



           info@michaelsandassoc.com                                  www.michaelsandassoc.com                                        toll-free: 877-614-8440
18
Page
MEASURING TRAINING
                                                                                                                                     EFFECTIVENESS




                                       About the Author

                                       Sherry Michaels is a veteran in the learning industry of more than thirty years and President of Michaels &
                                       Associates, a company specializing in instructional, media and writing design and content development for
                                       learning. Sherry founded the company in 1998 and developed a staff and network of consultants with
                                       development and project management expertise across all disciplines of corporate and academic learning.
                                       Sherry has presented several workshops for the American Society for Training and Development (ASTD), the
                                       Society for Pharmaceutical and Biological Training (SPBT) and the Society for Technical Communications
                                       (STC).

                                       Michaels & Associates provides custom training and documentation solutions for a client list that includes
companies such as Aetna-Schaller Anderson, Activator Methods, Inc., Avnet, automätik education (BMW MINI Cooper, Honda), Banner Health, Cox
Communications, Defense Acquisition University (DAU), Dow Jones, EMCOR, Excellus Blue Cross/Blue Shield, McKesson Pharmaceutical, MetLife,
Pegasus Solutions, Pfizer, Scottsdale Insurance, Standard Pacific Homes, TriZetto Software and Universal Technical Institute.




                                                                                                                                                 19  Page

Measuring Training Effectiveness

  • 1.
  • 2.
    MEASURING TRAINING EFFECTIVENESS ~ Share This! ~ Post this to your blog, Twitter™, LinkedIn® or Delicious™ accounts or email this to someone who might enjoy it. Share Remix Attribute Share Alike 11639 E. Wethersfield Road, Scottsdale, AZ 85259 USA www.michaelsandassoc.com Toll-free: 877-614-8440 2 © 2011 by Michaels & Associates Docntrain, Ltd. dba Michaels & Associates Page Copyright holder is licensing this under the Creative Commons License, Attribution-Share Alike 3.0. For more information, check out http://creativecommons.org/licenses/by-sa/3.0/us/
  • 3.
    MEASURING TRAINING EFFECTIVENESS MEASURING THE EFFECTIVENESS OF TRAINING— T H E B U S I N E S S O F C O R P O R AT E L E A R N I N G Learning & Development business units are under siege and struggling with the effort of what appears to be a very confusing, elephantine challenge of measuring the effectiveness of their training interventions. We need clarity. We need a common sense approach. We need to step up our practice of corporate learning consulting. Let’s discuss existing principles to prove the value of Learning & Development (L&D) deliverables in a corporate environment. In the training industry, many practitioners insist that regardless of the size or maturity (Paul Kearns consultant, author, teacher at http://www.paulkearns.co.uk/articles.htm) of your organization, the Kirkpatrick models and/or Phillips methods of evaluation are the only sound ways to offer validation of the corporate learning product. 3 Page
  • 4.
    MEASURING TRAINING EFFECTIVENESS Going Back to Basics One of the simplest rules for measuring effectiveness is to ensure you’ve developed materials that will actually train corporate employees. I often meet training professionals who have left adult learning theory in the college classroom long ago, have forgotten much of it and feel compelled to whip out training on demand that is instructionally flawed. All too often, through the quirkiness of corporate fate, some organizations have moved competent people from operational positions into training positions without benefit of being formally taught adult learning theory or instructional design. Many of these new learning professionals seek the comfort of becoming competent in their positions, but they have gaps in their knowledge that cause them to create instructionally flawed materials. Because of these and other reasons, during a career that has spanned thirty plus years, I’ve seen a lot of training developed that is simply not going to be effective because of faulty instructional integrity. Organizations spend a lot of money on these materials. Developers still put much work and effort towards developing these materials. This kind of implementation strategy creates frustration all around the world of corporate training, for employees, employers and the learning professional. No wonder we are getting pressure to prove training (or learning) effectiveness to the C- Suite! All this pressure creates another compulsion—a need to measure the effectiveness of the training. Measuring instructionally flawed training is an exercise in futility. Application of adult learning principles combined with execution of good instructional design is a key underlayment to how well employees can learn, and without it, no measurement will yield satisfying results. 4 Page
  • 5.
    MEASURING TRAINING EFFECTIVENESS Additionally, if you are creating e-learning (online or webinar learning), a good understanding of usability heuristics is imperative (Jakob Nielsen, 10 Heuristics for User Interface Design). Poor execution in programming or ignorance of usability rules can sabotage all the work of constructing a beautifully instructionally sound module of training. The most important of these rules, and in my experience the most flagrantly violated, is to give learners control of their learning experiences. Formative versus Summative Assessments Formative assessments in training are those assessments (in lay terms) that engage learners in assessing themselves and that provide assessment as part of the learning experience (Cowie, B., & Bell, B. (1999), “A model of formative assessment in science education”, Assessment in Education, 6: 101-116). Simply stated, formative assessment provides for two-way communication of the learning so that the assessments themselves are a part of the learning process. In an ideal corporate training program, each learning module (live, online, webinar, whatever) would have a small segment of learning. In these segments, we’d develop assessments in which reflective answers connect disparate information. For instance, in a live training, we’d follow a chunk of training on a software application with an exercise in using the software processes in the training. The trainer oversees this exercise and provides mentoring through the exercise. We’d scored the exercise, but we wouldn’t actually grade it, because it is after all, part of the learning experience. The exercise helps the trainer gather feedback on which learners “get it” and are successful in completing the exercise, and helps the learners gain insight on how they are doing. Optimally, the trainer provides (and the learner seeks) additional sources of knowledge if the assessment results indicate the need for alternate learning sources. 5 Page
  • 6.
    MEASURING TRAINING EFFECTIVENESS Formative assessment is the use of adult cognition that truly engages the learner. Engagement translates to a better and more satisfying learning experience. These assessments take place during the learning, and should directly relate to learning objectives that are measurable and achievable and, ideally, reflect corporate and business unit goals and objectives, a nearly perfect map where possible. Use of formative assessments in exercises and/or in e-learning modules (drag and drop of glossary terms, for instance) can improve learner engagement provided the assessments are appropriate, relevant and continue to provide for the natural curiosity of a learner. Summative assessments test the effectiveness of the training, and they judge the competency of the learner after the training intervention takes place. We use summative assessments to provide quantifiable data about what the learner learned. We grade summative assessments. We determine what constitutes a passing grade, and devise paths for those who do not pass. Typically, we use summative assessments as the “final” assessment and the learning management system (LMS) houses the scores. In my opinion, this is where the pressure to measure the effectiveness of training falls apart. Very often, we use summative assessment techniques with training that is not instructionally sound and doesn’t have formative assessments to support the instructional integrity of the training. How do you measure effectiveness of training for corporate metric purposes when the underlayment is unsound? 6 Page
  • 7.
    MEASURING TRAINING EFFECTIVENESS L&D, the Business Unit, the Enterprise According to Paul Kearns (Evaluating the ROI from Learning - Cromwell Press, Trowbridge, Wiltshire UK.), a solid starting point for corporate learning professionals (he calls them either trainers or learning consultants) is to begin with evaluating where L&D stands as a group on his six stage Learning Maturity Model (LMM). He also advises evaluating the business unit and the enterprise on this model. Figure 1 shows an example of an LMM. Figure 1. Example of LMM 7 Page
  • 8.
    MEASURING TRAINING EFFECTIVENESS In a single enterprise, many L&D units can exist, and they exist in varying stages of maturity. What do we mean by “maturity”? Think about these scenarios:  When you receive an email stating a department needs a five-hour course on X Operation in 30 days, how do you respond? If you jump and throw together a PowerPoint presentation or something similar, you might be in Stage 1, or a reactive mode.  If you have worked toward making the line managers aware that L&D follows normal business processes equivalent to theirs, and that a good quality product might result from adequate budgeting and time, you might be at Stage 3.  As you attend meetings with business unit executives, you become aware of initiatives that will require segments of employees to learn new skills. If you present a strategy with a budget, an achievable deadline, and a commitment to prove the strategy executed as planned and get the strategy approved, you might be in Stage 4, or a true learning partner.  If the CEO knows about your learning strategies, and in fact has helped to steer information to you so that you can include corporate strategies into your work, you might be at Stage 6. You could also be a learning consultant who is teaching the entire organization how to be a learning corporation. Studies show that learning corporations are more profitable than corporations that are not making an investment in being true learning organizations. 8 Page
  • 9.
    MEASURING TRAINING EFFECTIVENESS So where on the LMM is your L&D unit? Where is your business unit? Where is your corporation? These questions are important to consider. If you are at Stage 1, it can be almost impossible to measure the effectiveness of your training because your environment won’t allow you to construct instructionally sound, engaging training. “Death by PowerPoint” became a cliché for a reason. Level 1 assessments (often referred to as “smile sheets”) for training aren’t truly effective if your learners were not engaged in the learning, unless you are looking for a negative response as a way to educate line managers of the business unit. Level 1 assessments in this situation can be a waste of your time—time better invested in moving your L&D unit further into the LMM. As you evaluate your own L&D unit, consider how it works internally, with the other business units and within the enterprise. If L&D is at Stage 1, what things can you do incrementally to move forward in maturity?  Begin with a through Training Needs Analysis (TNA) in all business units the L&D unit supports. We define the TNA as the process of defining on-the-job performance requirements and the gaps between the requirements and what employees are presently doing.  Approach every training request with questions about what the requester is trying to achieve. Turn your questions into an analysis of whatever depth you can manage to help guide the development of the deliverable. 9 Page
  • 10.
    MEASURING TRAINING EFFECTIVENESS  Make allies of the line managers and ask them about their objectives, goals and strategies. They can give you current performance metrics for their employees. They are your customers, so pay attention to what they want to achieve, and plan for how you might help them.  Human Resources (HR) departments typically have job descriptions and the competencies required to perform those jobs. Compare them with what the line managers are telling you.  Analyze your information sources. Define the opportunities. Eliminate the non-training issues.  Develop an L&D strategy for managing training development. Begin discussing with your ally-managers how to plan for training, and what you need to be successful so you can make them successful.  Develop a replicable process for creating instructionally sound training. Paul Kearns recommends the Deming Cycle: Plan, Do, Check, Act (PDCA) shown in Figure 2. Figure 2. Plan, Do, Check, Act (PDCA) cycle 10 Page
  • 11.
    MEASURING TRAINING EFFECTIVENESS  I also suggest using an EADDIE form (Evaluate, Analyze, Design, Develop, Implement, Evaluate). I further maintain that either process model is fine, as long as you find it replicable, consistent and defendable within your organization. Keep in mind that line managers should respect that you have a process that works.  Practice saying “no” in a nice way. Example: “I probably can get you a presentation in a few hours, but for training that boosts X metrics, I’m going to need to go through our process to define your objectives and make sure the training meets them. For instance, I’ll ask you what you would like your employees to be able to do at the end of this training. Would you like to meet on Monday to start that process?” The Elephant in the Room Exuberance regarding the Kirkpatrick and/or Phillips methods of assessment bombards the corporate training world almost daily, it seems. There is an onslaught of well over sixty books, countless training sessions and local and national American Society for Training and Development (ASTD) presentations. It is marketing at its most impressive. In my opinion, L&D professionals have adopted these assessment methods in countless L&D units across the world, with very little evaluation. In many L&D units, unit leaders have not considered the maturity of the units, how they service the line managers (their customers), or whether the learning developers can actually create training to support summative assessments. For me, the vast depth of marketing these instruments as a means of demonstrating ROI raises simple questions: How can this be so difficult? What is it about these methods that takes so much print space, countless presentations and evangelizing? Since they take so much explanation, can these assessment methods be flawed? 11Page
  • 12.
    MEASURING TRAINING EFFECTIVENESS Again, in my opinion, the answer is another question: What method isn’t flawed? The flaw lies in execution, and the execution relies on learning professionals to step up their game. Things to consider in using these methods are:  What is your definition of ROI? Is it the same as the business unit manager’s, or the Chief Financial Officer’s?  There’s tremendous variability in results that unsuspecting learning professionals will encounter. For an excellent discussion on these variables, see Ron Drew Stone’s CLOMedia article, “ROI is Like a Box of Chocolates”. He very cleverly proves that variability in measuring results can negate those results if you aren’t careful and knowledgeable. He puts accurate measurement truly in the hands of outside consultants (which is no big wonder since he is a consultant). He raises several excellent points.  Humans are variable. Things that affect humans are varied. A simple example of that is sales training: how will you isolate the results of your training from variables such as the natural effects of the economy, a new marketing campaign, a product release slowdown or failure, compensation adjustments and so forth? Any one or all of these factors can distort and invalidate your ROI calculations. A random quantity adjustment such as suggested in Ron Drew Stone’s article is exactly that: random, and not so easy to defend.  Why have a metric assessment separate of those of business unit managers? They are, in fact, your customers. Servicing them in pursuit of corporate goals is your job. Doesn’t it make sense to figure out how the business unit managers are measured and to align training goals and assessments accordingly? Knowing these things, it has seemed to me for some years now that it might be better simply to prove that the training we construct has value (Proving Learning Value or PLV). 12 Page
  • 13.
    MEASURING TRAINING EFFECTIVENESS Proving Learning Value (PLV) Even at Stage 1 of the LMM, any professional with the grasp of the concepts presented here (and the additional reading I’ll recommend) can begin the process of proving learning value within their L&D unit, as it applies to the business units and within the enterprise. Start simply and incrementally and work towards making your unit a true business partner with the other enterprise units. Begin by: 1. Understanding business unit goals and how L&D can support them by allying with business unit managers and including yourself in business unit meetings. 2. Understanding the overall goals of the company (as stated in annual reports and CEO messages—and if you are advanced to Stage 5, an actual seat at the C-Suite table). 3. Prioritizing your training interventions according to those goals and objectives. 4. Using your training needs analysis (and gap information derived from it) to plan the training, learning objectives, formative assessments and summative assessments. 5. Deciding upon your method of proving value. Do you want to use Kearns’ approach? Do you still think the Phillips method work for you? Do you need an alternative? 13 Page
  • 14.
    MEASURING TRAINING EFFECTIVENESS KISS Method – An alternative way to think about Proving Learning Value If you really want a simple way to provide reasonable metrics without going down the endless path of measure, measure, measure (sometimes forgetting why we are measuring), here’s an idea: use the classic KISS (in this case, Keep It Simple Suggestions) method. Consider the following, borrowed from Kirkpatrick, with caution to evaluate first: 1. Did the learners like the training? (Level 1 in the Kirkpatrick/Phillips methods, but we can maximize a Level 1 through learner engagement and formative assessments.) Did they feel engaged in the learning experience? When they asked if they felt they learned, what was their response? In my opinion, smile sheets are vastly underrated. Given the time and resources to create engaging learning, what better use of an instrument than as a tool for the learner to express their satisfaction? Remember that this level of assessment is perfectly fine for some training. Compliance, regulations and mandatory training having a certain percentage of correct choices required can all be fine for this kind of assessment, because the company has to do this training regardless. The questions then center on ensuring a good learning experience to make sure employees like learning, and that they haven’t felt the experience was a waste of their time. 2. Did the learners learn the content? What method(s) will you use to prove that? Will you pre-test to find out the level of their knowledge before they took the training, then use a post-learning assessment to demonstrate a change? It really could be that simple. Will you use Certainty Based Marking (CBM), a relatively new assessment method that measures the confidence of the learner in what they’ve learned (see Create Active Assessments With Certainty-Based Marking)? 14 Page
  • 15.
    MEASURING TRAINING EFFECTIVENESS If the learner is confident and right, you probably solidify the learning experience for them (as much as 95% according to the few studies available). If the learner is confident in his or her answer but he or she is wrong, you may have a problem with the training, or you may need to reroute the learner to other materials to clear up learner’s confusion. Either way, it is a simple process to implement this method of assessment, and it provides excellent information for proving the value of the training with pre-planned reporting mechanisms. It is great for leadership training, and medical institutions have used CBM assessments in medical training (where uncertainty in the answers can have potentially disastrous effects) for years. The Level 1 (or smile sheet) assessments come back with tremendously positive responses as well, because the assessments serve the purpose of taking ambiguity on the content out of a learner’s mind. 3. Can learners perform the trained tasks on the job? Have you set up preplanned support mechanisms online, with managers, in job aids and in work process alignment to ensure they can perform once the intervention is over? If so, can the line managers give you metrics obtained prior to the training? Did you design your learning objectives, modules and formative assessments in alignment to those metrics? If so, post-intervention performance ratings and appraisals should easily demonstrate learners can perform on the job, and you should see metrics improvements as well. Again, not so hard, and easily defensible with proper planning. 15 Page
  • 16.
    MEASURING TRAINING EFFECTIVENESS 4. Did the learning intervention affect the bottom line? Did you evaluate the goal of the intervention within the confines of corporate revenues and/or risk reduction and/or cost reduction? If you did, there should be published metrics on each of these areas that clearly demonstrate impact on the bottom line. Again, did you construct the objectives, modules and formative assessments to support those goals? Are there support mechanisms in place to ensure success after the interventions? Can you demonstrate positive change? We can apply this level of measurement when the whole corporation is all rowing together to achieve the corporate goals. As an example, if you can demonstrate that the learning intervention reduced help desk calls by a significant percentage, you can show that percentage in reduction of cost. Help desk managers always have metrics, and allying yourself with those managers gives you easy access to them. 16 Page
  • 17.
    MEASURING TRAINING EFFECTIVENESS Suggested Reading List:  Paul Kearns Training Journal 12 Part Series:  Measuring For Success – What CEOs Really Think About o Part 01 – Organisational learning maturity Learning Investments, Jack J. Phillips and Patricia Pulliam o Part 02 – Strategic learning Phillips o Part 03 – The attitude of learning consultants  ROI is Like a Box of Chocolates, Ron Drew Stone, CLO Media Chief o Part 04 – Learning cycles Learning Officer Magazine, January 2011 o Part 05 – Evaluation  Ten Usability Heristics, Jakob Nielsen o Part 06 – Performance management o Part 07 – Business analysis o Part 08 – Creative designers o Part 09 – Delivering solutions o Part 10 – Consulting skills o Part 11 – Learning consultants as business partners o Part 12 – Organisation design and development  Evaluating the ROI From Learning, Paul Kearns  What CEOs Expect From Corporate Learning, William J. Rothwell, John E. Lindlholm, William G. Wallick (American Management Association) 17  Page
  • 18.
    MEASURING TRAINING EFFECTIVENESS There’s no need for overkill. The observable fact is that some people embrace measurement of the effectiveness of training as a means of job protection, and in many organizations, measuring training effectiveness is a substitute for getting on with the real work. Sadly, this measurement, at worst, becomes an end in itself and, at the least, it is a distraction from our real jobs: getting sound instructional materials to employees to support them in their jobs, and contributing to company goals. Provided we include all the other components of good instructional design and usability rules, and by using common sense methods of measurement without elaborate contortions, learning professionals can ensure training effectiveness soars. Michaels & Associates brings the experience and know-how of solid instructional and media design to every project. Feel free to contact us to assist with your next training endeavor! Michaels & Associates—where your business is your specialty and improving your business is ours. info@michaelsandassoc.com www.michaelsandassoc.com toll-free: 877-614-8440 18 Page
  • 19.
    MEASURING TRAINING EFFECTIVENESS About the Author Sherry Michaels is a veteran in the learning industry of more than thirty years and President of Michaels & Associates, a company specializing in instructional, media and writing design and content development for learning. Sherry founded the company in 1998 and developed a staff and network of consultants with development and project management expertise across all disciplines of corporate and academic learning. Sherry has presented several workshops for the American Society for Training and Development (ASTD), the Society for Pharmaceutical and Biological Training (SPBT) and the Society for Technical Communications (STC). Michaels & Associates provides custom training and documentation solutions for a client list that includes companies such as Aetna-Schaller Anderson, Activator Methods, Inc., Avnet, automätik education (BMW MINI Cooper, Honda), Banner Health, Cox Communications, Defense Acquisition University (DAU), Dow Jones, EMCOR, Excellus Blue Cross/Blue Shield, McKesson Pharmaceutical, MetLife, Pegasus Solutions, Pfizer, Scottsdale Insurance, Standard Pacific Homes, TriZetto Software and Universal Technical Institute. 19 Page