Safety Induction
PT. Grid Solutions Indonesia (GE)
GIS 150 kV Muara Karang
North Jakarta
23 OKTOBER 2019
Confidential. Not to be copied, distributed, or reproduced without prior
approval.
Presentation Title 2
Project Overview
Project Name : 500 kV TRANSMISSION NETWORK PROJECT
Location : Muara Karang, North Jakarta, DKI, Indonesia
Owner / Customer : PT. PLN UIP JBB
Scope contract : PACKAGE 4 : DESIGN, SUPPLY AND INSTALLATION OF 150 kV GAS
INSULATED SWITCHGEAR MUARA KARANG BARU
SUBSTATION
Confidential. Not to be copied, distributed, or reproduced without prior
approval.
4
EHS Induction
IN CASE OF FIRES
1. Do Not Panic, Stay Calm
2. If Possible, and you are confidence, please extinguish the fire
3. Do Not Collect Personal Belonging
4. Leave The Office By Nearest Emergency Exit To dedicated site Assembly Point
5. Follow The Instruction of authority and go to dedicated site Assembly Point
IN CASE OF ACCIDENT
Please report to Grid Solutions Indonesia Site Manager/EHS.
PT Grid Solutions Indonesia ( GE ) has a fully trained First Aid Responder, in case of any accident they
will take immediate charge of situation and ensure that Emergency service are contacted, PJB also have
Medical Team with Ambulance. We can coordinate for support on emergency situation
The nearest hospital is Pluit Hospital that take 13 Minutes to reach the hospital. In cace of serious injury
we can call PJB Medical team for arrange Ambulance
Automatic Exsternal Defibrillator (AED) and Fire extinguisher are available in GE office and site Storage if
required.
First Aid Box and fire Extinguisher
Chapter 1 Emergency Procedures
Confidential. Not to be copied, distributed, or reproduced without prior
approval.
5
EHS Induction
You are here
Evacuation Route
Chapter 2
PLN
& TRECTEBEL
GE SUBCONTRACTOR
GE
MEETING ROOM
PRAYING
ROOM
Site Plan & Site Hazards
Presentation Title 6
Chapter 3
Control Room
Nusantara
Regas
Switchyard
Gardu Induk Muara Karang Lama
G
u
d
a
n
g
SITE PLAN MUARA KARANG
1
2
Note : all vehicles are prohibited to parking inside PJB area, except for emergency vehicle (ambulance & fire truck)
Retaining Wall 2
Retaining
Wall
1
Retaining
Wall
3
EVACUATION RUTE
CIVIL WORK
FOR
STRUCTURE
Confidential. Not to be copied, distributed, or reproduced without prior
approval.
January 19, 2023
Presentation Title 8
Regas
GARDU INDUK
MUARA KARANG
BARU
GIS 150 KV
MUARA
KARANG BARU
PROJECT
Moving vehicle.
•Please ensure be carefull when you pass
the road.
•Do not use mobile phone while you have
walk
Import filling & structure work.
Hazards : obstruction material, heavy equipment (truck)
, triping hazard because previously this project area is
scrap yard.
-- Please watch your step
-- dont used mobile phone when you walk
-- keep on safe distance with heavy equipment
Moving vehicle, blind spot
-Please request to security
officer to help when you want to
exit
-- If you walk out, please make
sure traffic is safe before you
cross the road
You are
here
Confidential. Not to be copied, distributed, or reproduced without prior
approval.
Apa itu flagman/banksman?
• Flagman/banksman adalah seseorang yang
bertugas mengatur kelancaran lalulintas
kendaraan/alat berat pada siang ataupun
malam hari saat pekerjaan berlangsung.
Confidential. Not to be copied, distributed, or reproduced without prior
approval.
January 19, 2023
Presentation Title 10
January 19, 2023
Presentation Title 10
Regas
GARDU INDUK
MUARA KARANG
BARU
GIS 150 KV
MUARA
KARANG BARU
PROJECT
Working at height,
•Please do not enter this area
without permission,
•keep safe distance with other
contractor activity
You are
here
Confidential. Not to be copied, distributed, or reproduced without prior
approval.
 Gempa Bumi (Earthquake)
 Tumpahan Minyak/Pelumas (Oil Spill)
 Bahaya Listrik ( Electrical Hazards )
 Kebakaran (Fire)
EMERGENCY POTENTIAL
Confidential. Not to be copied, distributed, or reproduced without prior
approval.
Earthquake
Jika anda berada dalam bangunan
• Lindungi kepala dan badan anda dari reruntuhan
bangunan (dengan bersembunyi dibawah meja dll).
• Mencari tempat yang paling aman dari reruntuhan
goncangan.
• Berlari keluar apabila masih dapat dilakukan.
Jika anda berada di luar bangunan atau area
terbuka
• Berusahalah untuk menghindari bangunan yang ada di sekitar
anda (seperti gedung, tiang listrik, pohon dll).
• Perhatikan tempat anda berpijak hindari apabila terjadi
rekahan tanah
Confidential. Not to be copied, distributed, or reproduced without prior
approval.
Oil Spill
Confidential. Not to be copied, distributed, or reproduced without prior
approval.
Beberapa bahaya akibat listrik :
1. Kebakaran karena arus pendek ( Korsleting )
2. Meledak karena arus terlalu tinggi
3. Tersengat listrik yang bisa berakibat fatal
meninggal karena arus sangat tinggi
Bahaya Listrik ( Electrical Hazards )
Jarak aman dari SUTT150 kV adalah 3,1
Meter
Confidential. Not to be copied, distributed, or reproduced without prior
approval.
January 19, 2023
Presentation Title 15
STRUCTURE ORGANIZATION 500 KV TRANSMISSION NETWORK PROJECT
Organization Chart & Emergency Call Numbers
Chapter 4
Instansi/Jabatan Nama No. Telp
Site Manager GE Syahrial Situmorang 0812-6312-630
Site Safety Officer GE
Rahmad Fadly
Muchlis Ferianto
0813-6461-3506
0821-7606-1633
PT PLN UIP (K3) Ida Silalahi 0812 -2924-4375
Site Safety Officer Subkontraktor
Fanrico
Yuftah
0852 -6258- 0531
0821 -3826- 1578
Site Manager Sintata Karyasari Heru Agus Tri Handoko 0813-9204-7078
Supervisor Sintata Karyasari Agus Liswono 0812-5230-0756
Rumah Sakit /Hospital
RS PLUIT
(021) 2922-8000
Ambulance
Ambulance
(021) 6530-3118
Pemadam Kebakaran/Fire Department Udin
(021) 4483-4444
(021) 4483-5555
Polisi/ Police Department Polsek Penjaringan (021) 6693-066
Confidential. Not to be copied, distributed, or reproduced without prior
approval.
January 19, 2023
Presentation Title 16
STRUCTURE ORGANIZATION 500 KV TRANSMISSION NETWORK PROJECT
Organization Chart & Emergency Call Numbers
Chapter 5
Confidential. Not to be copied, distributed, or reproduced without prior
approval.
SITE EMERGENCY FLOWCART
Confidential. Not to be copied, distributed, or reproduced without prior
approval.
COLOUR CODING ( SISTEM KODE WARNA )
Confidential. Not to be copied, distributed, or reproduced without prior
approval.
January 19, 2023
QEHS Policy
Chapter 5
When to use Stop Work Authority
• Employee are not trained /not competent to perform the task
• Safety risk assessment and/or procedure is not available
• Equipment to complete the task is not available or is damaged
• Personal Protective Equipment (PPE) is not used or is incorrect/ not appropriate
• There is a risk of environmental damage
• EHS standards or regulations will be breached
Stop Work Authority
A program to prevent an incident that as an employee, visitor or contractor you are authorized and
expected to stop any task or operation where you perceive that the risk to people, the environment or
assets is not being properly controlled. You can prevent a serious injury or even save a life!
If you invoke Stop Work Authority report it to a Supervisor and/or EHS
Chapter 6 Stop Work Authority
Confidential. Not to be copied, distributed, or reproduced without prior
approval.
Presentation Title 21
Safety Absolutes
Chapter 7
Confidential. Not to be copied, distributed, or reproduced without prior
approval.
Peringatan
Lisan
Peringatan
Tertulis
Dikeluarkan
dari Site
# Aturan 3 pelanggaran
# Aturan 1 pelanggaran
Pengarahan
Keselamatan
Training
Program
Penghargaan
Pelanggaran dari
Safety Absolutes **
Dikeluarkan dari site
Pelanggaran dari persyaratan
EHS umum *
Tindakan
Disiplin
Tindakan
Pendorong
* Semua persyaratan EHS yang teridentifikasi dan
diterapkan di suatu project
* 10 peraturan – lihat slide berikutnya
Persyaratan
mutlak
Keselamatan
Disciplinary & Safety Absolutes
Tidak ada yang bisa melakukan Aktifitas Risiko Tinggi kecuali sudah
diberi wewenang, terlatih, dan memiliki keterampilan dan pengetahuan
yang cukup dan jika diperlukan, ijin tertulis dari manajer yang
bertanggung jawab diberikan untuk periode waktu tertentu
Tidak ada yang dapat memasuki site dibawah pengaruh alkohol, obat
dan zat lain yang dapat mempengaruhi kemampuan seseorang untuk
menjalan pekerjaannya secara aman.
Tidak ada yang dapat memasuki area terbatas kecuali kondisi udara
telah dibuktikan sudah aman.
Tidak membiarkan dirinnya atau orang lain berada dibawah beban yang
tergantung atau melakukan pengangkatan tanpa rencana pengangkatan
yang layak.
Tidak melakukan perbaikan atau perawatan peralatan tanpa
menerapkan LOTO Personal atau Grup kunci dan tanda untuk
mengisolasi titik energi dan tidak mengikuti prosedur LOTO at all times.
Tidak memotong atau melepas pelindung, pengaman, pengunci atau
alat pengaman lainnya.
Tidak melakukan aktivitas perbaikan di mesin atau peralatan yang aktif
kecuali sudah ada prosedur pengendalian energi yang berbahaya yang
sudah disetujui.
Tidak menggunakan telepon selular atau peralatan lainnya yang dapat
mengganggu cara mengemudi yang aman.
Tidak bekerja di ketinggian tanpa alat perlindung jatuh yang sesuai.
Tidak mengoperasikan alat angkat tanpa mengikuti petunjuk
manufaktur.
Please noted :
Pelanggaran dari
salah satu peraturan
dibawah berakibat
langsung dikeluarkan
dari site…
SAFETY ABSOLUTES
Confidential. Not to be copied, distributed, or reproduced without prior
approval.
Presentation Title 24
MANDATORY PPE:
SPECIFIC PPE BASED ON RISK ASSESSMENT:
PPE Requirements
Chapter 8
Confidential. Not to be copied, distributed, or reproduced without prior
approval.
Presentation Title 25
1. PJB visiting cards must be displayed at all times
2. Visitors to site must be accompanied and supervised at all times
3. Mandatory PPE must be worn at all times on site
4. Drugs and Alcohol will not be tolerated on site
5. Please use your mobile phone with care and be aware of your surrounding area and any potential
hazards
6. No smoking at PJB Area
Site Rules
Chapter 9
Fall Protection
• Falls from height are preventable with the use of
Safe Work Practices and the correct equipment
• Always ensure that you have fall protection when
working at a height that could cause injury
• Fall Protection can be;
• Suitable railings or barriers
• Fall arrest equipment
• Fall restraint equipment
When using fall arrest equipment you should ensure
a Rescue Plan is in place to rescue anyone who
would fall.


Working at Height Rules
Scaffold & Platforms:
• All Scaffolds & Platforms to be inspected
before use – Some form of identification
showing that the equipment is safe to use
should be displayed
• No gaps are permitted in the floors, they
must have tow boards and 2 rails, the top rail
must be approx (1M or 40 Inches) above the
Platform
Working at Height Rules
Confidential. Not to be copied, distributed, or reproduced without prior
approval.
Working at Height Rules
1. Gunakan Fullbody Harness yang sesuai.
2. Pastikan FBH dalam kondisi baik.
3. Pastikan FBH sudah dikaitkan .
4. Periksa, pahami dan ikuti prosedur kerja
ketinggian.
5. .Periksa lantai kerja ,sistem penahan jatuh dan
lanyards terkait dengan aman.
1. Dilarang mengaitkan lanyards pada satu titik
(anchor point)
Confidential. Not to be copied, distributed, or reproduced without prior
approval.
1. Ikuti rencana pengangkatan.
2. Lakukan pre- use visual inspeksi dan
Pengecekan Operasional.
3. Lakukan pengecekan Beban dan jangan
melebihi kapasitas beban yang diangkat.
4. Pengankatan hanya boleh dilakukan oleh
Pekerja yang di latih dan yang berwenang.
1. Dilarang siapapun berdiri beban yang sedang
diangkat.
2. jangan Berdiri diantara beban dan object lain
sehingga kamu bisa terjepit.
3. Jangan gunakan peralatan angkat dan
aksesorisnya yang rusak
Lifting Rules
Confidential. Not to be copied, distributed, or reproduced without prior
approval.
DRUG & ALCOHOL POLICY
Environmental Action:
• If you discover any pollution during
your work you should ;
• Stop Work immediately
• Warn others
• Cordon off / make safe
• Leave the area and report to Site
Management / EHS
Existing Pollution:
• Take action to prevent Spills
• Clean your work area regularly
• Segregate Waste by putting it in the correct
container;
General Waste
Hazardous Waste
Paper
Wood
Metal
Report any Env Incidents / Spills immediately to
ensure corrective action.
Organic
Waste
An organic
Waste
Hazardous
Waste
Confidential. Not to be copied, distributed, or reproduced without prior
approval.
Presentation Title 32
Not Allowed to taking Pictures or Videos during your visit also upload into Social media/ Tidak
diperbolehkan mengambil dan mengupload photo di Project GIS 150 Kv Muara Karang di media
sosial apapun.
Social Media Rules
Chapter 10
Confidential. Not to be copied, distributed, or reproduced without prior
approval.
January 19, 2023

More Related Content

What's hot

Hot work permit
Hot work permitHot work permit
Hot work permit
HenyPamungkasPutri
 
Materi Alat Pelindung Diri (APD)
Materi Alat Pelindung Diri (APD)Materi Alat Pelindung Diri (APD)
Materi Alat Pelindung Diri (APD)
Erwan Kurnia Pratama
 
Safety Talk K3.pptx
Safety Talk K3.pptxSafety Talk K3.pptx
Safety Talk K3.pptx
AdityaPrisonFA
 
Dasar-Dasar Keselamatan dan Kesehatan Kerja (K3).pptx
Dasar-Dasar Keselamatan dan Kesehatan Kerja (K3).pptxDasar-Dasar Keselamatan dan Kesehatan Kerja (K3).pptx
Dasar-Dasar Keselamatan dan Kesehatan Kerja (K3).pptx
salman669792
 
Prosedur darurat kebakaran
Prosedur darurat kebakaranProsedur darurat kebakaran
Prosedur darurat kebakaranSatrio Adi
 
Alat Pemadam Api Ringan | Isi Ulang Tabung Apar
Alat Pemadam Api Ringan | Isi Ulang Tabung AparAlat Pemadam Api Ringan | Isi Ulang Tabung Apar
Alat Pemadam Api Ringan | Isi Ulang Tabung Apar
PT. MUTIARA SAFETYNDO
 
2. peraturan perundangan
2. peraturan perundangan2. peraturan perundangan
2. peraturan perundangan
Winarso Arso
 
Materi k3 prosedur keselamatan kerja dan simbol bahaya
Materi k3 prosedur keselamatan kerja dan simbol bahayaMateri k3 prosedur keselamatan kerja dan simbol bahaya
Materi k3 prosedur keselamatan kerja dan simbol bahaya
Syaifi Al-Mahfudzi
 
Pengurusan Bahan Kimia.pptx
Pengurusan Bahan Kimia.pptxPengurusan Bahan Kimia.pptx
Pengurusan Bahan Kimia.pptx
TiakuNadarajah
 
Trabalho em altura nr 35
Trabalho em altura   nr 35Trabalho em altura   nr 35
Trabalho em altura nr 35
Josiel Leite
 
Apr colocação de vidro
Apr colocação de vidroApr colocação de vidro
Apr colocação de vidro
JUENCIV Serviços e Construção Ltda
 
Curso Básico Trabalhos a Quente.pdf
Curso Básico  Trabalhos a Quente.pdfCurso Básico  Trabalhos a Quente.pdf
Curso Básico Trabalhos a Quente.pdf
JBTst1
 
GUIDELINES CLSR FOR DR rev DRW 021219.pptx
GUIDELINES CLSR FOR DR rev DRW 021219.pptxGUIDELINES CLSR FOR DR rev DRW 021219.pptx
GUIDELINES CLSR FOR DR rev DRW 021219.pptx
AepSyaefudin
 
TRABALHO EM ALTURA - Gianfranco
TRABALHO EM ALTURA - GianfrancoTRABALHO EM ALTURA - Gianfranco
TRABALHO EM ALTURA - Gianfranco
Alex Souza
 
Panduan k3 pengemudi forklift
Panduan k3 pengemudi forkliftPanduan k3 pengemudi forklift
Panduan k3 pengemudi forkliftslametr
 
Lone Working Policy
Lone Working PolicyLone Working Policy
Lone Working Policy
The Pathway Group
 
5. alat pelindung diri
5. alat pelindung diri5. alat pelindung diri
5. alat pelindung diri
Winarso Arso
 
Safety Induction new.pptx
Safety Induction new.pptxSafety Induction new.pptx
Safety Induction new.pptx
ReniMutiaraSari
 
Trabalho a quente modulo II
Trabalho a quente   modulo IITrabalho a quente   modulo II
Trabalho a quente modulo II
emanueltstegeon
 

What's hot (20)

Hot work permit
Hot work permitHot work permit
Hot work permit
 
Materi Alat Pelindung Diri (APD)
Materi Alat Pelindung Diri (APD)Materi Alat Pelindung Diri (APD)
Materi Alat Pelindung Diri (APD)
 
Safety Talk K3.pptx
Safety Talk K3.pptxSafety Talk K3.pptx
Safety Talk K3.pptx
 
Dasar-Dasar Keselamatan dan Kesehatan Kerja (K3).pptx
Dasar-Dasar Keselamatan dan Kesehatan Kerja (K3).pptxDasar-Dasar Keselamatan dan Kesehatan Kerja (K3).pptx
Dasar-Dasar Keselamatan dan Kesehatan Kerja (K3).pptx
 
Prosedur darurat kebakaran
Prosedur darurat kebakaranProsedur darurat kebakaran
Prosedur darurat kebakaran
 
Alat Pemadam Api Ringan | Isi Ulang Tabung Apar
Alat Pemadam Api Ringan | Isi Ulang Tabung AparAlat Pemadam Api Ringan | Isi Ulang Tabung Apar
Alat Pemadam Api Ringan | Isi Ulang Tabung Apar
 
2. peraturan perundangan
2. peraturan perundangan2. peraturan perundangan
2. peraturan perundangan
 
Materi k3 prosedur keselamatan kerja dan simbol bahaya
Materi k3 prosedur keselamatan kerja dan simbol bahayaMateri k3 prosedur keselamatan kerja dan simbol bahaya
Materi k3 prosedur keselamatan kerja dan simbol bahaya
 
Pengurusan Bahan Kimia.pptx
Pengurusan Bahan Kimia.pptxPengurusan Bahan Kimia.pptx
Pengurusan Bahan Kimia.pptx
 
Trabalho em altura nr 35
Trabalho em altura   nr 35Trabalho em altura   nr 35
Trabalho em altura nr 35
 
Apr colocação de vidro
Apr colocação de vidroApr colocação de vidro
Apr colocação de vidro
 
Curso Básico Trabalhos a Quente.pdf
Curso Básico  Trabalhos a Quente.pdfCurso Básico  Trabalhos a Quente.pdf
Curso Básico Trabalhos a Quente.pdf
 
GUIDELINES CLSR FOR DR rev DRW 021219.pptx
GUIDELINES CLSR FOR DR rev DRW 021219.pptxGUIDELINES CLSR FOR DR rev DRW 021219.pptx
GUIDELINES CLSR FOR DR rev DRW 021219.pptx
 
TRABALHO EM ALTURA - Gianfranco
TRABALHO EM ALTURA - GianfrancoTRABALHO EM ALTURA - Gianfranco
TRABALHO EM ALTURA - Gianfranco
 
Panduan k3 pengemudi forklift
Panduan k3 pengemudi forkliftPanduan k3 pengemudi forklift
Panduan k3 pengemudi forklift
 
Lone Working Policy
Lone Working PolicyLone Working Policy
Lone Working Policy
 
5. alat pelindung diri
5. alat pelindung diri5. alat pelindung diri
5. alat pelindung diri
 
K3 l forklift
K3 l forkliftK3 l forklift
K3 l forklift
 
Safety Induction new.pptx
Safety Induction new.pptxSafety Induction new.pptx
Safety Induction new.pptx
 
Trabalho a quente modulo II
Trabalho a quente   modulo IITrabalho a quente   modulo II
Trabalho a quente modulo II
 

Similar to Materi Safety Induction GE 2019 Muara Karang FULL 32 SLIDES (1).pptx

008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdf
008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdf008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdf
008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdf
FESTUS RICHARD SIAME
 
AMA 2A SHE Induction 2022....pdf
AMA 2A SHE Induction 2022....pdfAMA 2A SHE Induction 2022....pdf
AMA 2A SHE Induction 2022....pdf
IbukunOwolabi4
 
Hse guidance working on roofs
Hse guidance working on roofsHse guidance working on roofs
Hse guidance working on roofsMark Bennett
 
UNIT 3 Part A - Safety in Construction & Demolition Operation.pdf
UNIT 3 Part A - Safety in Construction & Demolition Operation.pdfUNIT 3 Part A - Safety in Construction & Demolition Operation.pdf
UNIT 3 Part A - Safety in Construction & Demolition Operation.pdf
PinakRay1
 
Operator Training
Operator TrainingOperator Training
Operator Training
DariusDelon
 
Gds 600 l programming -v2
Gds 600 l programming -v2Gds 600 l programming -v2
Gds 600 l programming -v2
Pawanto Atmajaya
 
AVR-588-OM-E_102.pdf
AVR-588-OM-E_102.pdfAVR-588-OM-E_102.pdf
AVR-588-OM-E_102.pdf
DouglasMartinez43
 
DPL-SP - Safety Induction Presentation 00.pptx
DPL-SP - Safety Induction Presentation 00.pptxDPL-SP - Safety Induction Presentation 00.pptx
DPL-SP - Safety Induction Presentation 00.pptx
AamirAbbas75
 
Lockout tagout refresher training
Lockout tagout refresher trainingLockout tagout refresher training
Lockout tagout refresher trainingJost2012
 
Job Safety Analyses For Energization of Substation..doc
Job Safety Analyses For Energization of Substation..docJob Safety Analyses For Energization of Substation..doc
Job Safety Analyses For Energization of Substation..doc
Atif767782
 
S ky jack_scissorlift_manlift
S ky jack_scissorlift_manliftS ky jack_scissorlift_manlift
S ky jack_scissorlift_manlift
Punya Benja
 
Construction Safety Training
Construction Safety TrainingConstruction Safety Training
Construction Safety Training
Ali Kamal Mostofa Rubel
 
LOTO Training.pdf
LOTO Training.pdfLOTO Training.pdf
LOTO Training.pdf
SyedWasim23
 
HSE-Newsletter-Issue4
HSE-Newsletter-Issue4HSE-Newsletter-Issue4
HSE-Newsletter-Issue4RAMS Boards
 
Manufacturing Lockout/Tagout by FMIC
Manufacturing Lockout/Tagout by FMICManufacturing Lockout/Tagout by FMIC
Manufacturing Lockout/Tagout by FMIC
Atlantic Training, LLC.
 
Lockout Tagout Training by Forestry Mutual
Lockout Tagout Training by Forestry MutualLockout Tagout Training by Forestry Mutual
Lockout Tagout Training by Forestry Mutual
Atlantic Training, LLC.
 
Manufacturing Lockout Tagout by FMIC
Manufacturing Lockout Tagout by FMICManufacturing Lockout Tagout by FMIC
Manufacturing Lockout Tagout by FMIC
Atlantic Training, LLC.
 
Ampeg Micro-Classic 100W 2x10 Bas Gitar Kafa Kabin gitarpazar kullanim klavuz...
Ampeg Micro-Classic 100W 2x10 Bas Gitar Kafa Kabin gitarpazar kullanim klavuz...Ampeg Micro-Classic 100W 2x10 Bas Gitar Kafa Kabin gitarpazar kullanim klavuz...
Ampeg Micro-Classic 100W 2x10 Bas Gitar Kafa Kabin gitarpazar kullanim klavuz...
GitarPazar
 
Home cinema sherwood r 772
Home cinema sherwood r 772Home cinema sherwood r 772
Home cinema sherwood r 772pacomase
 

Similar to Materi Safety Induction GE 2019 Muara Karang FULL 32 SLIDES (1).pptx (20)

008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdf
008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdf008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdf
008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdf
 
AMA 2A SHE Induction 2022....pdf
AMA 2A SHE Induction 2022....pdfAMA 2A SHE Induction 2022....pdf
AMA 2A SHE Induction 2022....pdf
 
Hse guidance working on roofs
Hse guidance working on roofsHse guidance working on roofs
Hse guidance working on roofs
 
UNIT 3 Part A - Safety in Construction & Demolition Operation.pdf
UNIT 3 Part A - Safety in Construction & Demolition Operation.pdfUNIT 3 Part A - Safety in Construction & Demolition Operation.pdf
UNIT 3 Part A - Safety in Construction & Demolition Operation.pdf
 
Operator Training
Operator TrainingOperator Training
Operator Training
 
Gds 600 l programming -v2
Gds 600 l programming -v2Gds 600 l programming -v2
Gds 600 l programming -v2
 
AVR-588-OM-E_102.pdf
AVR-588-OM-E_102.pdfAVR-588-OM-E_102.pdf
AVR-588-OM-E_102.pdf
 
DPL-SP - Safety Induction Presentation 00.pptx
DPL-SP - Safety Induction Presentation 00.pptxDPL-SP - Safety Induction Presentation 00.pptx
DPL-SP - Safety Induction Presentation 00.pptx
 
Lockout tagout refresher training
Lockout tagout refresher trainingLockout tagout refresher training
Lockout tagout refresher training
 
Job Safety Analyses For Energization of Substation..doc
Job Safety Analyses For Energization of Substation..docJob Safety Analyses For Energization of Substation..doc
Job Safety Analyses For Energization of Substation..doc
 
S ky jack_scissorlift_manlift
S ky jack_scissorlift_manliftS ky jack_scissorlift_manlift
S ky jack_scissorlift_manlift
 
Construction Safety Training
Construction Safety TrainingConstruction Safety Training
Construction Safety Training
 
LOTO Training.pdf
LOTO Training.pdfLOTO Training.pdf
LOTO Training.pdf
 
HSE-Newsletter-Issue4
HSE-Newsletter-Issue4HSE-Newsletter-Issue4
HSE-Newsletter-Issue4
 
Manufacturing Lockout/Tagout by FMIC
Manufacturing Lockout/Tagout by FMICManufacturing Lockout/Tagout by FMIC
Manufacturing Lockout/Tagout by FMIC
 
Lockout Tagout Training by Forestry Mutual
Lockout Tagout Training by Forestry MutualLockout Tagout Training by Forestry Mutual
Lockout Tagout Training by Forestry Mutual
 
Manufacturing Lockout Tagout by FMIC
Manufacturing Lockout Tagout by FMICManufacturing Lockout Tagout by FMIC
Manufacturing Lockout Tagout by FMIC
 
Ampeg Micro-Classic 100W 2x10 Bas Gitar Kafa Kabin gitarpazar kullanim klavuz...
Ampeg Micro-Classic 100W 2x10 Bas Gitar Kafa Kabin gitarpazar kullanim klavuz...Ampeg Micro-Classic 100W 2x10 Bas Gitar Kafa Kabin gitarpazar kullanim klavuz...
Ampeg Micro-Classic 100W 2x10 Bas Gitar Kafa Kabin gitarpazar kullanim klavuz...
 
Home cinema sherwood r 772
Home cinema sherwood r 772Home cinema sherwood r 772
Home cinema sherwood r 772
 
SITE INDUCTION Version 2
SITE INDUCTION Version 2SITE INDUCTION Version 2
SITE INDUCTION Version 2
 

More from SintaMarlina3

Rekapitulasi Hasil MCU Karyawan Tahunan 2024
Rekapitulasi Hasil MCU Karyawan Tahunan 2024Rekapitulasi Hasil MCU Karyawan Tahunan 2024
Rekapitulasi Hasil MCU Karyawan Tahunan 2024
SintaMarlina3
 
Materi Safety Talk Persiapan Libur Lebaran
Materi Safety Talk Persiapan Libur LebaranMateri Safety Talk Persiapan Libur Lebaran
Materi Safety Talk Persiapan Libur Lebaran
SintaMarlina3
 
Hazids Training Hazard Identification and Risk Control HSE.ppt
Hazids Training Hazard Identification and Risk Control HSE.pptHazids Training Hazard Identification and Risk Control HSE.ppt
Hazids Training Hazard Identification and Risk Control HSE.ppt
SintaMarlina3
 
JSA PJB - Penanggulangan Bahaya Covid19 (1).docx
JSA PJB - Penanggulangan Bahaya Covid19 (1).docxJSA PJB - Penanggulangan Bahaya Covid19 (1).docx
JSA PJB - Penanggulangan Bahaya Covid19 (1).docx
SintaMarlina3
 
SOSIALISASI PROSEDUR baru dan review lifting activity.pptx
SOSIALISASI PROSEDUR baru dan review lifting activity.pptxSOSIALISASI PROSEDUR baru dan review lifting activity.pptx
SOSIALISASI PROSEDUR baru dan review lifting activity.pptx
SintaMarlina3
 
Meeting P2K3 28-03-23.pdf
Meeting P2K3 28-03-23.pdfMeeting P2K3 28-03-23.pdf
Meeting P2K3 28-03-23.pdf
SintaMarlina3
 
MT Periodic Report - Muhammad Fajar Asri.pptx
MT Periodic Report - Muhammad Fajar Asri.pptxMT Periodic Report - Muhammad Fajar Asri.pptx
MT Periodic Report - Muhammad Fajar Asri.pptx
SintaMarlina3
 
K3LL Gedung Resinda Park Mall.pptx
K3LL Gedung Resinda Park Mall.pptxK3LL Gedung Resinda Park Mall.pptx
K3LL Gedung Resinda Park Mall.pptx
SintaMarlina3
 
SAFETY RIDING.pptx
SAFETY RIDING.pptxSAFETY RIDING.pptx
SAFETY RIDING.pptx
SintaMarlina3
 
TARGET HSE.pptx
TARGET HSE.pptxTARGET HSE.pptx
TARGET HSE.pptx
SintaMarlina3
 
342441534-Materi-Training-5R-New.ppt
342441534-Materi-Training-5R-New.ppt342441534-Materi-Training-5R-New.ppt
342441534-Materi-Training-5R-New.ppt
SintaMarlina3
 
01. Dasar-Dasar Keselamatan dan Kesehatan Kerja (K3) rev.pptx
01. Dasar-Dasar Keselamatan dan Kesehatan Kerja (K3) rev.pptx01. Dasar-Dasar Keselamatan dan Kesehatan Kerja (K3) rev.pptx
01. Dasar-Dasar Keselamatan dan Kesehatan Kerja (K3) rev.pptx
SintaMarlina3
 

More from SintaMarlina3 (12)

Rekapitulasi Hasil MCU Karyawan Tahunan 2024
Rekapitulasi Hasil MCU Karyawan Tahunan 2024Rekapitulasi Hasil MCU Karyawan Tahunan 2024
Rekapitulasi Hasil MCU Karyawan Tahunan 2024
 
Materi Safety Talk Persiapan Libur Lebaran
Materi Safety Talk Persiapan Libur LebaranMateri Safety Talk Persiapan Libur Lebaran
Materi Safety Talk Persiapan Libur Lebaran
 
Hazids Training Hazard Identification and Risk Control HSE.ppt
Hazids Training Hazard Identification and Risk Control HSE.pptHazids Training Hazard Identification and Risk Control HSE.ppt
Hazids Training Hazard Identification and Risk Control HSE.ppt
 
JSA PJB - Penanggulangan Bahaya Covid19 (1).docx
JSA PJB - Penanggulangan Bahaya Covid19 (1).docxJSA PJB - Penanggulangan Bahaya Covid19 (1).docx
JSA PJB - Penanggulangan Bahaya Covid19 (1).docx
 
SOSIALISASI PROSEDUR baru dan review lifting activity.pptx
SOSIALISASI PROSEDUR baru dan review lifting activity.pptxSOSIALISASI PROSEDUR baru dan review lifting activity.pptx
SOSIALISASI PROSEDUR baru dan review lifting activity.pptx
 
Meeting P2K3 28-03-23.pdf
Meeting P2K3 28-03-23.pdfMeeting P2K3 28-03-23.pdf
Meeting P2K3 28-03-23.pdf
 
MT Periodic Report - Muhammad Fajar Asri.pptx
MT Periodic Report - Muhammad Fajar Asri.pptxMT Periodic Report - Muhammad Fajar Asri.pptx
MT Periodic Report - Muhammad Fajar Asri.pptx
 
K3LL Gedung Resinda Park Mall.pptx
K3LL Gedung Resinda Park Mall.pptxK3LL Gedung Resinda Park Mall.pptx
K3LL Gedung Resinda Park Mall.pptx
 
SAFETY RIDING.pptx
SAFETY RIDING.pptxSAFETY RIDING.pptx
SAFETY RIDING.pptx
 
TARGET HSE.pptx
TARGET HSE.pptxTARGET HSE.pptx
TARGET HSE.pptx
 
342441534-Materi-Training-5R-New.ppt
342441534-Materi-Training-5R-New.ppt342441534-Materi-Training-5R-New.ppt
342441534-Materi-Training-5R-New.ppt
 
01. Dasar-Dasar Keselamatan dan Kesehatan Kerja (K3) rev.pptx
01. Dasar-Dasar Keselamatan dan Kesehatan Kerja (K3) rev.pptx01. Dasar-Dasar Keselamatan dan Kesehatan Kerja (K3) rev.pptx
01. Dasar-Dasar Keselamatan dan Kesehatan Kerja (K3) rev.pptx
 

Recently uploaded

Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
DESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABS
DESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABSDESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABS
DESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABS
itech2017
 
Technical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prismsTechnical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prisms
heavyhaig
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
WENKENLI1
 
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTSHeap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Soumen Santra
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
gestioneergodomus
 
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERSCW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
veerababupersonal22
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Christina Lin
 
Water billing management system project report.pdf
Water billing management system project report.pdfWater billing management system project report.pdf
Water billing management system project report.pdf
Kamal Acharya
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
Understanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine LearningUnderstanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine Learning
SUTEJAS
 
Unbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptxUnbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptx
ChristineTorrepenida1
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
Aditya Rajan Patra
 
The Role of Electrical and Electronics Engineers in IOT Technology.pdf
The Role of Electrical and Electronics Engineers in IOT Technology.pdfThe Role of Electrical and Electronics Engineers in IOT Technology.pdf
The Role of Electrical and Electronics Engineers in IOT Technology.pdf
Nettur Technical Training Foundation
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 

Recently uploaded (20)

Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
DESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABS
DESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABSDESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABS
DESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABS
 
Technical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prismsTechnical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prisms
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
 
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTSHeap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
 
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERSCW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
 
Water billing management system project report.pdf
Water billing management system project report.pdfWater billing management system project report.pdf
Water billing management system project report.pdf
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
Understanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine LearningUnderstanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine Learning
 
Unbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptxUnbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptx
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
 
The Role of Electrical and Electronics Engineers in IOT Technology.pdf
The Role of Electrical and Electronics Engineers in IOT Technology.pdfThe Role of Electrical and Electronics Engineers in IOT Technology.pdf
The Role of Electrical and Electronics Engineers in IOT Technology.pdf
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 

Materi Safety Induction GE 2019 Muara Karang FULL 32 SLIDES (1).pptx

  • 1. Confidential. Not to be copied, distributed, or reproduced without prior approval. Safety Induction PT. Grid Solutions Indonesia (GE) GIS 150 kV Muara Karang North Jakarta 23 OKTOBER 2019
  • 2. Confidential. Not to be copied, distributed, or reproduced without prior approval. Presentation Title 2 Project Overview Project Name : 500 kV TRANSMISSION NETWORK PROJECT Location : Muara Karang, North Jakarta, DKI, Indonesia Owner / Customer : PT. PLN UIP JBB Scope contract : PACKAGE 4 : DESIGN, SUPPLY AND INSTALLATION OF 150 kV GAS INSULATED SWITCHGEAR MUARA KARANG BARU SUBSTATION
  • 3. Confidential. Not to be copied, distributed, or reproduced without prior approval. 4 EHS Induction IN CASE OF FIRES 1. Do Not Panic, Stay Calm 2. If Possible, and you are confidence, please extinguish the fire 3. Do Not Collect Personal Belonging 4. Leave The Office By Nearest Emergency Exit To dedicated site Assembly Point 5. Follow The Instruction of authority and go to dedicated site Assembly Point IN CASE OF ACCIDENT Please report to Grid Solutions Indonesia Site Manager/EHS. PT Grid Solutions Indonesia ( GE ) has a fully trained First Aid Responder, in case of any accident they will take immediate charge of situation and ensure that Emergency service are contacted, PJB also have Medical Team with Ambulance. We can coordinate for support on emergency situation The nearest hospital is Pluit Hospital that take 13 Minutes to reach the hospital. In cace of serious injury we can call PJB Medical team for arrange Ambulance Automatic Exsternal Defibrillator (AED) and Fire extinguisher are available in GE office and site Storage if required. First Aid Box and fire Extinguisher Chapter 1 Emergency Procedures
  • 4. Confidential. Not to be copied, distributed, or reproduced without prior approval. 5 EHS Induction You are here Evacuation Route Chapter 2 PLN & TRECTEBEL GE SUBCONTRACTOR GE MEETING ROOM PRAYING ROOM
  • 5. Site Plan & Site Hazards Presentation Title 6 Chapter 3
  • 6. Control Room Nusantara Regas Switchyard Gardu Induk Muara Karang Lama G u d a n g SITE PLAN MUARA KARANG 1 2 Note : all vehicles are prohibited to parking inside PJB area, except for emergency vehicle (ambulance & fire truck) Retaining Wall 2 Retaining Wall 1 Retaining Wall 3 EVACUATION RUTE CIVIL WORK FOR STRUCTURE
  • 7. Confidential. Not to be copied, distributed, or reproduced without prior approval. January 19, 2023 Presentation Title 8 Regas GARDU INDUK MUARA KARANG BARU GIS 150 KV MUARA KARANG BARU PROJECT Moving vehicle. •Please ensure be carefull when you pass the road. •Do not use mobile phone while you have walk Import filling & structure work. Hazards : obstruction material, heavy equipment (truck) , triping hazard because previously this project area is scrap yard. -- Please watch your step -- dont used mobile phone when you walk -- keep on safe distance with heavy equipment Moving vehicle, blind spot -Please request to security officer to help when you want to exit -- If you walk out, please make sure traffic is safe before you cross the road You are here
  • 8. Confidential. Not to be copied, distributed, or reproduced without prior approval. Apa itu flagman/banksman? • Flagman/banksman adalah seseorang yang bertugas mengatur kelancaran lalulintas kendaraan/alat berat pada siang ataupun malam hari saat pekerjaan berlangsung.
  • 9. Confidential. Not to be copied, distributed, or reproduced without prior approval. January 19, 2023 Presentation Title 10 January 19, 2023 Presentation Title 10 Regas GARDU INDUK MUARA KARANG BARU GIS 150 KV MUARA KARANG BARU PROJECT Working at height, •Please do not enter this area without permission, •keep safe distance with other contractor activity You are here
  • 10. Confidential. Not to be copied, distributed, or reproduced without prior approval.  Gempa Bumi (Earthquake)  Tumpahan Minyak/Pelumas (Oil Spill)  Bahaya Listrik ( Electrical Hazards )  Kebakaran (Fire) EMERGENCY POTENTIAL
  • 11. Confidential. Not to be copied, distributed, or reproduced without prior approval. Earthquake Jika anda berada dalam bangunan • Lindungi kepala dan badan anda dari reruntuhan bangunan (dengan bersembunyi dibawah meja dll). • Mencari tempat yang paling aman dari reruntuhan goncangan. • Berlari keluar apabila masih dapat dilakukan. Jika anda berada di luar bangunan atau area terbuka • Berusahalah untuk menghindari bangunan yang ada di sekitar anda (seperti gedung, tiang listrik, pohon dll). • Perhatikan tempat anda berpijak hindari apabila terjadi rekahan tanah
  • 12. Confidential. Not to be copied, distributed, or reproduced without prior approval. Oil Spill
  • 13. Confidential. Not to be copied, distributed, or reproduced without prior approval. Beberapa bahaya akibat listrik : 1. Kebakaran karena arus pendek ( Korsleting ) 2. Meledak karena arus terlalu tinggi 3. Tersengat listrik yang bisa berakibat fatal meninggal karena arus sangat tinggi Bahaya Listrik ( Electrical Hazards ) Jarak aman dari SUTT150 kV adalah 3,1 Meter
  • 14. Confidential. Not to be copied, distributed, or reproduced without prior approval. January 19, 2023 Presentation Title 15 STRUCTURE ORGANIZATION 500 KV TRANSMISSION NETWORK PROJECT Organization Chart & Emergency Call Numbers Chapter 4 Instansi/Jabatan Nama No. Telp Site Manager GE Syahrial Situmorang 0812-6312-630 Site Safety Officer GE Rahmad Fadly Muchlis Ferianto 0813-6461-3506 0821-7606-1633 PT PLN UIP (K3) Ida Silalahi 0812 -2924-4375 Site Safety Officer Subkontraktor Fanrico Yuftah 0852 -6258- 0531 0821 -3826- 1578 Site Manager Sintata Karyasari Heru Agus Tri Handoko 0813-9204-7078 Supervisor Sintata Karyasari Agus Liswono 0812-5230-0756 Rumah Sakit /Hospital RS PLUIT (021) 2922-8000 Ambulance Ambulance (021) 6530-3118 Pemadam Kebakaran/Fire Department Udin (021) 4483-4444 (021) 4483-5555 Polisi/ Police Department Polsek Penjaringan (021) 6693-066
  • 15. Confidential. Not to be copied, distributed, or reproduced without prior approval. January 19, 2023 Presentation Title 16 STRUCTURE ORGANIZATION 500 KV TRANSMISSION NETWORK PROJECT Organization Chart & Emergency Call Numbers Chapter 5
  • 16. Confidential. Not to be copied, distributed, or reproduced without prior approval. SITE EMERGENCY FLOWCART
  • 17. Confidential. Not to be copied, distributed, or reproduced without prior approval. COLOUR CODING ( SISTEM KODE WARNA )
  • 18. Confidential. Not to be copied, distributed, or reproduced without prior approval. January 19, 2023 QEHS Policy Chapter 5
  • 19. When to use Stop Work Authority • Employee are not trained /not competent to perform the task • Safety risk assessment and/or procedure is not available • Equipment to complete the task is not available or is damaged • Personal Protective Equipment (PPE) is not used or is incorrect/ not appropriate • There is a risk of environmental damage • EHS standards or regulations will be breached Stop Work Authority A program to prevent an incident that as an employee, visitor or contractor you are authorized and expected to stop any task or operation where you perceive that the risk to people, the environment or assets is not being properly controlled. You can prevent a serious injury or even save a life! If you invoke Stop Work Authority report it to a Supervisor and/or EHS Chapter 6 Stop Work Authority
  • 20. Confidential. Not to be copied, distributed, or reproduced without prior approval. Presentation Title 21 Safety Absolutes Chapter 7
  • 21. Confidential. Not to be copied, distributed, or reproduced without prior approval. Peringatan Lisan Peringatan Tertulis Dikeluarkan dari Site # Aturan 3 pelanggaran # Aturan 1 pelanggaran Pengarahan Keselamatan Training Program Penghargaan Pelanggaran dari Safety Absolutes ** Dikeluarkan dari site Pelanggaran dari persyaratan EHS umum * Tindakan Disiplin Tindakan Pendorong * Semua persyaratan EHS yang teridentifikasi dan diterapkan di suatu project * 10 peraturan – lihat slide berikutnya Persyaratan mutlak Keselamatan Disciplinary & Safety Absolutes
  • 22. Tidak ada yang bisa melakukan Aktifitas Risiko Tinggi kecuali sudah diberi wewenang, terlatih, dan memiliki keterampilan dan pengetahuan yang cukup dan jika diperlukan, ijin tertulis dari manajer yang bertanggung jawab diberikan untuk periode waktu tertentu Tidak ada yang dapat memasuki site dibawah pengaruh alkohol, obat dan zat lain yang dapat mempengaruhi kemampuan seseorang untuk menjalan pekerjaannya secara aman. Tidak ada yang dapat memasuki area terbatas kecuali kondisi udara telah dibuktikan sudah aman. Tidak membiarkan dirinnya atau orang lain berada dibawah beban yang tergantung atau melakukan pengangkatan tanpa rencana pengangkatan yang layak. Tidak melakukan perbaikan atau perawatan peralatan tanpa menerapkan LOTO Personal atau Grup kunci dan tanda untuk mengisolasi titik energi dan tidak mengikuti prosedur LOTO at all times. Tidak memotong atau melepas pelindung, pengaman, pengunci atau alat pengaman lainnya. Tidak melakukan aktivitas perbaikan di mesin atau peralatan yang aktif kecuali sudah ada prosedur pengendalian energi yang berbahaya yang sudah disetujui. Tidak menggunakan telepon selular atau peralatan lainnya yang dapat mengganggu cara mengemudi yang aman. Tidak bekerja di ketinggian tanpa alat perlindung jatuh yang sesuai. Tidak mengoperasikan alat angkat tanpa mengikuti petunjuk manufaktur. Please noted : Pelanggaran dari salah satu peraturan dibawah berakibat langsung dikeluarkan dari site… SAFETY ABSOLUTES
  • 23. Confidential. Not to be copied, distributed, or reproduced without prior approval. Presentation Title 24 MANDATORY PPE: SPECIFIC PPE BASED ON RISK ASSESSMENT: PPE Requirements Chapter 8
  • 24. Confidential. Not to be copied, distributed, or reproduced without prior approval. Presentation Title 25 1. PJB visiting cards must be displayed at all times 2. Visitors to site must be accompanied and supervised at all times 3. Mandatory PPE must be worn at all times on site 4. Drugs and Alcohol will not be tolerated on site 5. Please use your mobile phone with care and be aware of your surrounding area and any potential hazards 6. No smoking at PJB Area Site Rules Chapter 9
  • 25. Fall Protection • Falls from height are preventable with the use of Safe Work Practices and the correct equipment • Always ensure that you have fall protection when working at a height that could cause injury • Fall Protection can be; • Suitable railings or barriers • Fall arrest equipment • Fall restraint equipment When using fall arrest equipment you should ensure a Rescue Plan is in place to rescue anyone who would fall.   Working at Height Rules
  • 26. Scaffold & Platforms: • All Scaffolds & Platforms to be inspected before use – Some form of identification showing that the equipment is safe to use should be displayed • No gaps are permitted in the floors, they must have tow boards and 2 rails, the top rail must be approx (1M or 40 Inches) above the Platform Working at Height Rules
  • 27. Confidential. Not to be copied, distributed, or reproduced without prior approval. Working at Height Rules 1. Gunakan Fullbody Harness yang sesuai. 2. Pastikan FBH dalam kondisi baik. 3. Pastikan FBH sudah dikaitkan . 4. Periksa, pahami dan ikuti prosedur kerja ketinggian. 5. .Periksa lantai kerja ,sistem penahan jatuh dan lanyards terkait dengan aman. 1. Dilarang mengaitkan lanyards pada satu titik (anchor point)
  • 28. Confidential. Not to be copied, distributed, or reproduced without prior approval. 1. Ikuti rencana pengangkatan. 2. Lakukan pre- use visual inspeksi dan Pengecekan Operasional. 3. Lakukan pengecekan Beban dan jangan melebihi kapasitas beban yang diangkat. 4. Pengankatan hanya boleh dilakukan oleh Pekerja yang di latih dan yang berwenang. 1. Dilarang siapapun berdiri beban yang sedang diangkat. 2. jangan Berdiri diantara beban dan object lain sehingga kamu bisa terjepit. 3. Jangan gunakan peralatan angkat dan aksesorisnya yang rusak Lifting Rules
  • 29. Confidential. Not to be copied, distributed, or reproduced without prior approval. DRUG & ALCOHOL POLICY
  • 30. Environmental Action: • If you discover any pollution during your work you should ; • Stop Work immediately • Warn others • Cordon off / make safe • Leave the area and report to Site Management / EHS Existing Pollution: • Take action to prevent Spills • Clean your work area regularly • Segregate Waste by putting it in the correct container; General Waste Hazardous Waste Paper Wood Metal Report any Env Incidents / Spills immediately to ensure corrective action. Organic Waste An organic Waste Hazardous Waste
  • 31. Confidential. Not to be copied, distributed, or reproduced without prior approval. Presentation Title 32 Not Allowed to taking Pictures or Videos during your visit also upload into Social media/ Tidak diperbolehkan mengambil dan mengupload photo di Project GIS 150 Kv Muara Karang di media sosial apapun. Social Media Rules Chapter 10
  • 32. Confidential. Not to be copied, distributed, or reproduced without prior approval. January 19, 2023