HIRADC stands for hazard identification risk assessment and determining control
HIRADC is a cool step to start identify hazard, assess risk and determine the control.
HIRADC stands for hazard identification risk assessment and determining control
HIRADC is a cool step to start identify hazard, assess risk and determine the control.
2. PR JSA
83%
17%
0%
100% 100% 100%
0%
20%
40%
60%
80%
100%
120%
Test and
Services
Project &
Operation
Technology Sales HC Finance
JSA
3. Schedule Inspeksi Semester 1
Jadwal Inspeksi/Safety Patrol P2K3
PT. Trusur Unggul Teknusa
2023
No. Area Week-3 Feb Week-4 Feb Week-3 Mar Week-4 MarWeek-3 Jun Week-4 Jun
1 Area Workshop wahib miranti rais
2 Area Lab mustofa suroso ipa teguh akbar
Jadwal Inspeksi APAR dan P3K
PT. Trusur Unggul Teknusa
2023
No. Area Feb Mar Apr Mei Jun
1 APAR dan P3K Rais Ipa Teguh Miranti Suroso Sinta
4. Tanggal : 24 Feb 2023
Lokasi : R. Meeting Workshop
Peserta : 50 orang
Susulan : 5 orang
Pemeriksaan :
1. Pemeriksaan Fisik
2. Pemeriksaan Darah
3. Pemeriksaan Urin
4. Rontgen
5. Pemeriksaan Fungsi Hati (SGPT
SGOT)
6. Pemeriksaan Gula Darah Puasa
Medical Check Up TRUSUR
6. Report MWT
No Tanggal Inspector Lokasi Dokumentasi Temuan Tindak Lanjut Target PIC Status Dokumentasi P
1 27/02/2023
1. Indra Rinaldhi - CTSO
2. Nugroho Arimulyo - CMO
3. Zulham Mustamin - COO
4. Andreas Sunar Ratnoaji - VPOPMIR
Ruang Innovation
Terdapat tipping point jalur kabel
dispenser yang melintang di lantai
Lakukan pemindahan
dispenser dekat ke sumber
listrik agar tidak ada kabel
melintang
13/02/2023 HC, HSE Open
2 27/02/2023
1. Indra Rinaldhi - CTSO
2. Nugroho Arimulyo - CMO
3. Zulham Mustamin - COO
4. Andreas Sunar Ratnoaji - VPOPMIR
Kamar Mandi Lt. 3 Gd. Lab Lantai kamar mandi berkerak
Bersihkan dengan cairan
pembersih kerak
13/02/2023 HC Open
3 27/02/2023
1. Indra Rinaldhi - CTSO
2. Nugroho Arimulyo - CMO
3. Zulham Mustamin - COO
4. Andreas Sunar Ratnoaji - VPOPMIR
Kamar Mandi Lt. 3 Gd. Lab Exhaust fan dalam keadaan mati Lakukan perbaikan 13/02/2023 HC Open
4 27/02/2023
1. Indra Rinaldhi - CTSO
2. Nugroho Arimulyo - CMO
3. Zulham Mustamin - COO
4. Andreas Sunar Ratnoaji - VPOPMIR
Gd. Lab Lt.3
Belum ada sign APAR dan arah jalur
evakuasi
Buat dan tempelkan sign
APAR dan penanda arah
evakuasi
13/02/2023 HSE
5 27/02/2023
1. Indra Rinaldhi - CTSO
2. Nugroho Arimulyo - CMO
3. Zulham Mustamin - COO
4. Andreas Sunar Ratnoaji - VPOPMIR
Ruang Kerja HC dan CTSO
Terdapat barang-barang yang tidak
tertata dan rak CEMS yang belum
terpakai
Tentukan TPS, Terapkan 5R,
buang yang tidak terpakai,
buatkan lemari/racking
27/03/2023 HSE, HC
7. Report MWT
6 27/02/2023
1. Indra Rinaldhi - CTSO
2. Nugroho Arimulyo - CMO
3. Zulham Mustamin - COO
4. Andreas Sunar Ratnoaji - VPOPMIR
Ruang Kerja HC dan CTSO
Arah bukaan pintu belum ditentukan
sehingga berpotensi bertabrakan saat
dibuka bersamaan
Buat sign arah bukaan pintu 13/02/2023 HSE
7 27/02/2023
1. Indra Rinaldhi - CTSO
2. Nugroho Arimulyo - CMO
3. Zulham Mustamin - COO
4. Andreas Sunar Ratnoaji - VPOPMIR
Musholla Lt.2
Terdapat kebocoran atau rembes dari
dinding belakang
Lakukan renovasi perbaikan 27/03/2023 HSE, HC
8 27/02/2023
1. Indra Rinaldhi - CTSO
2. Nugroho Arimulyo - CMO
3. Zulham Mustamin - COO
4. Andreas Sunar Ratnoaji - VPOPMIR
Toilet Lt.2
Tipping point ditemukan di depan pintu
kamar mandi
Buatkan penandaan warning
line
27/03/2023 HSE, HC
9 27/02/2023
1. Indra Rinaldhi - CTSO
2. Nugroho Arimulyo - CMO
3. Zulham Mustamin - COO
4. Andreas Sunar Ratnoaji - VPOPMIR
R. Laboratorium Jalur kabel belum dioptimasi
Optimasi jalur kabel di ruang
laboratorium
27/03/2023 HSE, HC, TS
10 27/02/2023
1. Indra Rinaldhi - CTSO
2. Nugroho Arimulyo - CMO
3. Zulham Mustamin - COO
4. Andreas Sunar Ratnoaji - VPOPMIR
Lt.2 Gd. Lab
Belum ada sign APAR dan arah jalur
evakuasi
Buatkan sign APAR dan arah
jalur evakuasi
27/03/2023 HSE
8. Report MWT
11 27/02/2023
1. Indra Rinaldhi - CTSO
2. Nugroho Arimulyo - CMO
3. Zulham Mustamin - COO
4. Andreas Sunar Ratnoaji - VPOPMIR
R. Laboratorium Belum ada sign wajib APD Lab
Buatkan sign wajib APD
Laboratorium, buat ruang
sterilisasi sebelum masuk ke
Lab, buat gantungan APD
27/03/2023 HSE, TS
12 27/02/2023
1. Indra Rinaldhi - CTSO
2. Nugroho Arimulyo - CMO
3. Zulham Mustamin - COO
4. Andreas Sunar Ratnoaji - VPOPMIR
R. Laboratorium
Rak penyimpanan tabung gas amber
menghalangi area kerja
Besi palang kuda lemari
asam dimodifikasi agar tidak
menghalangi rak
penyimpanan tabung gas
amber
27/03/2023 HSE, TS
13 27/02/2023
1. Indra Rinaldhi - CTSO
2. Nugroho Arimulyo - CMO
3. Zulham Mustamin - COO
4. Andreas Sunar Ratnoaji - VPOPMIR
R. Laboratorium
Tabung gas bertekanan sudah ada SDS
namun belum terikat
Tabung gas bertekanan
harus dipindahkan dari Lab
dan dibuatkan TPS serta
harus selalu terikat
27/03/2023 HSE, TS
14 27/02/2023
1. Indra Rinaldhi - CTSO
2. Nugroho Arimulyo - CMO
3. Zulham Mustamin - COO
4. Andreas Sunar Ratnoaji - VPOPMIR
R. Laboratorium
Belum ada prosedur identifikasi dan
penanganan kebocoran gas dan belum
ada detector kebocoran gas
Dibuatkan prosedur
identifikasi dan penanganan
kebocoran gas dan ajukan
pengadaan oksigen detector
serta oksigen medis
27/03/2023 HSE, TS
15 27/02/2023
1. Indra Rinaldhi - CTSO
2. Nugroho Arimulyo - CMO
3. Zulham Mustamin - COO
4. Andreas Sunar Ratnoaji - VPOPMIR
R. Laboratorium
cara kerja blower yang seharusnya
membuang udara dari dalam ke luar
malah terjadi sebaliknya
Dilakukan servis atau
diputus aliran arus listrik dan
ditutup permanent
27/03/2023 HSE, TS
9. Report MWT
17 27/02/2023
1. Indra Rinaldhi - CTSO
2. Nugroho Arimulyo - CMO
3. Zulham Mustamin - COO
4. Andreas Sunar Ratnoaji - VPOPMIR
R. Laboratorium
Area kerja belum menerapkan 5R
sehingga belum tertata area kerjanya
Perlu diterapkan 5R,
dibuatkan border line, dan
ditentukan TPS nya
27/03/2023 TS
18 27/02/2023
1. Indra Rinaldhi - CTSO
2. Nugroho Arimulyo - CMO
3. Zulham Mustamin - COO
4. Andreas Sunar Ratnoaji - VPOPMIR
Kamar Mandi Lt. 1 Gd. Lab
Tipping point ditemukan di depan pintu
kamar mandi
Buatkan penandaan warning
line
27/03/2023 HSE
19 27/02/2023
1. Indra Rinaldhi - CTSO
2. Nugroho Arimulyo - CMO
3. Zulham Mustamin - COO
4. Andreas Sunar Ratnoaji - VPOPMIR
Lobby Gd. Lab lt.1 tidak ada sign APAR dan apar terhalang
Perlu dibuatkan sign apar
dan border line APAR
27/03/2023 HSE
20 27/02/2023
1. Indra Rinaldhi - CTSO
2. Nugroho Arimulyo - CMO
3. Zulham Mustamin - COO
4. Andreas Sunar Ratnoaji - VPOPMIR
Gd. Lab Lt.1
sering ditemukan kecoa menurut
pengakuan pekerja, diduga dari ruang
kosong dibawah tangga di ruang
meeting Lab
Dilakukan pembasmian
sarang kecoa
27/03/2023 HSE, HC
10. Progress SMK3
No Item Progress Keterangan
1 Dokumen dan SOP 75% Implementasi :
1. Sales -> mengisi form kaji ulang tender dan kontrak di dashboard
dengan menambahkan requirement k3 nya
2. Project and all dept -> PR dan PO dibuatkan note K3 nya dan harus
direview oleh Ahli K3 dan disetor hse
3. Project -> FAT tolong disetor ke hse
2 Training & Sertifikasi 75% Damkar kelas D 2 orang – done
P3K Kemnaker 1 orang – done
K3 Bejana Tekan 1 orang – on progress training
3 MCU 95% Masih ada 3 orang yang belum MCU
4 Hiperkes, SKP, Kalibrasi
Alat Vendor MCU
100% Done
5 SK P2K3 100% Done
6 Laporan P2K3 Triwulan 1 40% Koordinasi dengan HC terkait data ketenagakerjaan dan legal
7 SK Tim Tanggap Darurat 20% Perlu direvisi, disesuaikan dengan sertifikasi
8 Pengukuran LingKer 50% Pengukuran on progress, menunggu hasil laporan dan lampiran
sertifikat Ahli K3 Lingker dan kalibrasi alat
11. Timeline SMK3
No Proses Maret April May
4 1 2 3 4 1 2 3 4
1 Apply Audit
2 Invoicing DP
50%
3 Submit All Doc.
Ke Auditor
4 Auditor Review
5 Perbaikan Hasil
Review
6 Audit
7 Perbaikan Hasil
Audit
8 Surat Ket Lulus
Audit SMK3
12. Draft Susunan Tim Tanggap Darurat
Ketua
Sinta Marlina
Koordinator Tim P3K
Gd.Workshop
Selvia Apriyanti Y
Anggota Tim P3K Gd.
Workshop
M. Farel Daniswara
Koordinator Tim
Damkar
Gd. Workshop
Aditya Dwicahyo
Anggota Tim Damkar
Gd. Workshop
Mustofa Hadiansyah
Koordinator Tim
Evakuasi
Gd. Workshop
Suroso
Anggota Tim EVakuasi
Gd. Workshop
Ipa Teguh Akbar
Koordinator Tim P3K
Gd. Lab
Miranti
Anggota Tim P3K Gd.
Lab
Dyah Wahyu Larasaty
Koordinator Tim
Damkar Gd. Lab
M. Firyal Azka F.
Anggota Tim Damkar
Gd. Lab
Muhammad Rais
Koordinator Tim
Evakuasi Gd. Lab
Faridz Abimanyu
Anggota Tim Evakuasi
Gd. Lab
Soni Suedi
Wakil Ketua
Muhammad Rais