1
SUMMER TRAINING PROJECT REPORT
on
‘HUMAN RESOURCES RECURITMENT’
HONEYWELL, AMBALA
SUBMITTED FOR PARTIAL FULFILLMENT OF THE DEGREE OF
MASTER OF BUSINESS
ADMINISTRATION
[2014-2015]
By
ANUPAM RAJ PATWA
(Roll No.: 1368670020)
EXTERNAL SUPERVISOR INTERNAL SUPERVISOR
SUSHIL KUMAR SAHU SUNITA SINGHAL
HR Manager ASSIATANT PROFESER
HONEYWELL Automation India Ltd, AIAM, GRATER NOIDA
AMBALA
ACCURATE INTITUTEOF ADVANCEMANAGEMENT, GRATER NOIDA
(Affiliated to UPTU and Approved by AICT
2
Accurate Institute of Advanced Management
(Affiliated to UPTU and Approved by AICTE)
______________________________________
Date:
HEAD OF MBA PROGRAM’S CERTIFICATE
Certified that the Summer Training Project Report titled “HUMAN RESOURCES
REQUIRTMENT” is carried out by Mr. ANUPAM RAJ PATWA, Roll
No.1368670020, a student of MBA –III semester at Accurate Institute of Advanced
Management, Greater Noida, under the supervision of –Shaurabh Chandra HR Manager
(Designation) Honeywell Automation India Ltd.
This is an original work carried out by the said student to the best of my knowledge and I
recommend for the submission of this summer Training Project Report to Uttar Pradesh
Technical University, Lucknow in the partial fulfillment of the award of MBA Dagree.
Prof.(Dr.) Amar Kr. Saxena
Director,AIAM,Greater Noida.
Plot No. 49, Knowledge Park-3, Greater NOIDA-201306 (UP), Phone: 0120-2328235, Fax:
0120-2320355 E. Mail.: info@accurate.in, Web: http//www.aiam.in
3
DECLARATION
To,
The Director,
Accurate Institute of Advance Management,
Plot No.-49, Knowledge Park 3
Greater Noida
Utter Pradesh – 201308.
Respected Sir,
I hereby declare that this project report entitled “HUMAN RESOURCES
REQUIRTMENT"iswritten and submitted by me under the kind guidance of Mr. Saurabh
Chandra,HRManager, Industry Guide and Mrs.SUNITA SINGHAL, Asst.Prof, AIAM,
Gr. Noida (U.P.). The findings and interpretations in the report are based on both primary and
secondary data collection. This project is not copied from any source or other Project submitted
for similar purpose.
DATE:
PLACE: Greater Noida
ROLL NO.: 1368670020
4
Signature of student
PREFACE
The learning process of classroom is incomplete without any practical field experience. It is
because of the reason that our Institute like any other, has provision for practical training, so
practical training is vital. Accordingly we had our training with Honeywell Automation India
Ltd.
This 8 weeks training gave us an insight into the working of an organization and learn how some
of the important concepts that we have been studying as a student of management are applicable
in the field. The project is a sincere attempt to focus on the subject in a lucid manner. I sincerely
attempted to effort to carry out study in deep on subject.
During this period we had the opportunity to observe the company’s performance, place in the
industry, its products, pricing, advertisement, promotions and its good will through our market
survey. It is hoped that this study will provide valuable information in various issues related to
Honeywell Automation India Ltd, oriented industries.
ANUPAM RAJ PATWA
5
Roll no.:- 1368670020
ACKNOWLEDGEMENT
With immense please we are presenting “Human Resources Recruitment” Project report
as part of the curriculum of ‘Master of Management Studies’. We wish to thank all the people who
gave us unending support.
I express my profound thanks to Director and Prof. Amar Sexena, project guide and all
those who have indirectly guided and helped us in preparation of this project.
We also like to extend our gratitude to all staff and our colleagues of College of
Management, who provided moral support, a conductive work environment and the much-needed
inspiration to conclude the project in time and a special thanks to my parents who are integral part
of the project.
Thanking you.
Accurate Institute of Advance Management
Knowledge Park 3, Greater Noida
6
CONTENT
Title Pages
Chapter 1 INTRODUCTION OF THE STUDY 08-31
Objectives of Study, scope of study, HRM & HRD definition, Use Of HRM in org., Advantage/
Important of HR, HR Topic- Function, Training & Development, Intro. Of Orientation, Team
Management Skills, HR Recruitment, Need, Role, Scope Objective, Advantages, Changing Role,
RMS, HR Telephonic Interview, Challenges.
Chapter 2 INTRODUCTION OF THE ORGANISATION 32-51
Introduction Of Company, Company Profile, Global Process, What To Do, Company
Recognition, History of organization,
Chapter 3 PROFILE OF THE ORGANISATIO 53-74
About Company, Company Profile, Data Bank, Facilities, Aim & Approach, Quality Policy &
Processes, Clientele, Why HAIL, Executive Manager Consultant Takes Care Of (Quality, Cost,
On Time Delivery, Retention, Specialization Level Of Recruitment, Function Area, Job Profile,
JD for Position, Email, Format, Weekly States Report, Form of Interviews.
Chapter 4 RESEARCH METHODOLOGY 75-78
Research, Methodology of Study, Data Collection, Kind of Research, Research Design.
Chapter 5 DATA ANALYISIS AND INTERPRETATION 79-92
Question of Form of interview, Sources, Stage, Track, Position, Time, Grades of Employees,
Asking Question, and Theoretical Framework.
Chapter 6 FINDING, CONCLUSION, SUGGESTION, AND LIMITATION 93-100
7
Finding, imitation of Study, Conclusion, Suggestion, Wibliography, Bibliography, Questionnaire
on Recruitment Process.
List of Diagrams
Sr. No.: PARTICULARS Pg. No.
1 Form of Interview 42
2 Source of Candidate 43
3 Telephonic Interview Round 43
4 Track Candidate 44
5 Define Candidate 44
6 Time Spent 45
7 Different Process 45
8 Basic Questions 46
9 Cost Calculating System 46
10 Evaluation and control of Process 47
11 Facility for trainees 47
8
INTRODUCTION
OF
TOPIC
9
Objectives of the study:
The main objectives of the study are as follows:
i. To understand the process of recruitment
ii. To know the sources of recruitment at various levels and various jobs
iii. To critically analyze the functioning of recruitment procedures
iv. To identify the probable area of improvement to make recruitment procedure more
effective
v. To know the managerial satisfaction level as well as to know the yield ratio
vi. To search or headhunt people whose, skill fits into the company’s values
Scope of study:
The benefit of the study for the researcher is that it helped to gain knowledge and experience and
also provided the opportunity to study and understand the prevalent recruitment procedures.
The key points of my research study are:
i. To Understand and analyze various HR factors including recruitment procedure at
consultant.
10
ii. To suggest any measures/recommendations for the improvement of the recruitment
procedures
11
Human Resource Management and Human Resource Development
Definition:
HRM is the process of managing people in organizations in a structured and thorough
manner. This covers the fields of staffing (hiring people), retention of people, pay and perks setting
and management, performance management, change management and taking care of exits from
the company to round off the activities. This is the traditional definition of HRM which leads some
12
experts to define it as a modern version of the Personnel Management function that was used
earlier.
We have chosen the term “art and science” as HRM is both the art of managing people by
recourse to creative and innovative approaches; it is a science as well because of the precision and
rigorous application of theory that is required.
Human Resource Development (HRD) means to develop available manpower through
suitable methods such as training, promotions, transfers and opportunities for career development.
HRD programs create a team of well-trained, efficient and capable managers and subordinates.
Such team constitutes an important asset of an enterprise. One organisation is different from
another mainly because of the people (employees) working there in. According to Peter F. Drucker,
"The prosperity, if not the survival of any business depends on the performance of its managers of
tomorrow." The human resource should be nurtured and used for the benefit of the organisation.
Uses of Human Resource Management in an organization:
 Human Resource Management (HRM) is the function within an organization that focuses
on recruitment of, management of, and providing direction for the people who work in the
organization. It can also be performed by line managers.
 Human Resource Management is the organizational function that deals with issues related
to people such as compensation, hiring, performance management, organization
development, safety, wellness, benefits, employee motivation, communication,
administration, and training.
13
 HRM is also a strategic and comprehensive approach to managing people and the
workplace culture and environment. Effective HRM enables employees to contribute
effectively and productively to the overall company direction and the accomplishment of
the organization's goals and objectives.
 Human Resource Management is moving away from traditional personnel, administration,
and transactional roles, which are increasingly outsourced. HRM is now expected to add
value to the strategic utilization of employees and that employee programs impact the
business in measurable ways. The new role of HRM involves strategic direction and HRM
metrics and measurements to demonstrate value.
 The Human Resource Management (HRM) function includes a variety of activities, and
key among them is responsibility for human resources -- for deciding what staffing needs
you have and whether to use independent contractors or hire employees to fill these needs,
recruiting and training the best employees, ensuring they are high performers, dealing with
performance issues, and ensuring your personnel and management practices conform to
various regulations. Activities also include managing your approach to employee benefits
and compensation, employee records and personnel policies. Usually small businesses
(for-profit or nonprofit) have to carry out these activities themselves because they can't yet
afford part- or full-time help. However, they should always ensure that employees have -
- and are aware of -- personnel policies which conform to current regulations. These
policies are often in the form of employee manuals, which all employees have.
 HRM is widening with every passing day. It covers but is not limited to HR planning,
hiring (recruitment and selection), training and development, payroll management,
14
rewards and recognitions, Industrial relations, grievance handling, legal procedures etc. In
other words, we can say that it’s about developing and managing harmonious relationships
at workplace and striking a balance between organizational goals and individual goals.
Advantages / Importance of HR:
 Meeting manpower needs: Every Organisation needs adequate and properly qualified staff
for the conduct of regular business activities. Imaginative HRP is needed in order to meet
the growing and changing human resource needs of an organisation.
 Replacement of manpower: The existing manpower in an Organisation is affected due to
various reasons such as retirement and removal of employees and labour turnover. HRP is
needed to estimate the shortfall in the manpower requirement and also for making suitable
arrangements for the recruitment and appointment of new staff.
 Meeting growing manpower needs: The expansion or modernisation programme may be
undertaken by the enterprise. Manpower planning is needed in order to forecast and meet
additional manpower requirement due to expansion and growth needs through recruitment
and suitable training programs.
 Meeting challenges of technological environment: HRP is helpful in effective use of
technological progress. To meet the challenge of new technology existing employees need
to be retrained and new employees may be recruited.
15
 Coping with change: HRP enables an enterprise to cope with changes in competitive forces,
markets, products, and technology and government regulations. Such changes generate
changes in job content, skill, number and type of personals.
 Increasing investment in HR: An employee who picks up skills and abilities becomes a
valuable resource because an organisation makes investments in its manpower either
through direct training or job assignments.
 Adjusting manpower requirements: A situation may develop in; an organisation when there
will be surplus staff in one department and shortage of staff in some other department.
Transfers and promotions are made for meeting such situations.
 Recruitment and selection of employees: HRP suggests the type of manpower required in
an organisation with necessary details. This facilitates recruitment and selection of suitable
personnel for jobs in the Organisation. Introduction of appropriate selection tests and
procedures is also possible as per the manpower requirements.
 Placement of manpower: HRP is needed as it facilitates placement of newly selected
persons in different departments as per the qualifications and also as per the need of
different departments. Surplus or shortage of manpower is avoided and this ensures
optimum utilization of available manpower.
 Training of manpower: HRP is helpful in selection and training activities. It ensures that
adequate numbers of persons are trained to fill up the future vacancies in the Organisation.
16
HR TOPICS - FUNCTIONS
Recruitment and Selection Process
Complete Recruitment life cycle
 Levels of Companies
 Technologies and Domineer
 Portal Explanation
 Explanation of Job Description and Analyzing of Requirement
 Sourcing of Profiles from Portals
 Screening of profiles as per the requirement
 Calling the Candidates
 Formatting of profiles and Tracker’s Preparation
 Maintenance of Database
Training and Development
 Concept of Training and Development
 Training Needs Identification Process
 Designing Annual Training Plans
 Training Execution
 Designing Employee Development Initiatives
 Designing Supervisory Development Programs
 Designing Management Development Programs
 What is Training ROI and how to Calculate
 Introduction to Best Trainer Skills, Knowledge and Abilities
17
Induction and Orientation
 How to Design Induction Programs and Execution
 How to Design on the Job Training Programs and Monitoring
 How to evaluate effectiveness of Induction and on the Job Training Programs
 Probation Confirmation and HR Role
Team Management Skills
 Understanding What is a Team
 Understanding Team Development Stages
 What is your Team Membership Orientation
 How to improve your effectiveness as Team Member
 What is Team Leadership
 Understanding my Orientation
HR Recruitment:
18
According to Edwin Flippo, "Recruitment is the process of searching for prospective employees
and stimulating them to apply for jobs in the Organisation."
Recruitment is a continuous process whereby the firm attempts to develop a pool of qualified
applicants for the future human resources needs even though specific vacancies do not exist.
Usually, the recruitment process starts when a manger initiates an employee requisition for a
specific vacancy or an anticipated vacancy.
It is the process to discover sources of manpower to meet the requirement of staffing schedule and
to employ effective measures for attracting that manpower in adequate numbers to facilitate
effective selection of an efficient working force.
Recruitment of candidates is the function preceding the selection, which helps create a pool of
prospective employees for the organisation so that the management can select the right candidate
for the right job from this pool. The main objective of the recruitment process is to expedite the
selection process.
Recruitment is almost central to any management process and failure in recruitment can create
difficulties for any company including an adverse effect on its profitability and inappropriate levels
of staffing or skills. Inadequate recruitment can lead to labor shortages, or problems in
management decision making and the recruitment process could itself be improved by following
management theories. The recruitment process could be improved in sophistication with Rodgers
seven point plan, Munro-Frasers five-fold grading system, psychological tests, personal
interviews, etc. Recommendations for specific and differentiated selection systems for different
professions and specializations have been given. A new national selection system for psychiatrists,
anesthetists and dental surgeons has been proposed within the UK health sector
19
Need for Recruitment
The need for recruitment may be due to the following reasons / situations
 Vacancies: due to promotions, transfers, retirement, termination, permanent disability,
death and labour turnover.
 Creation of new vacancies: due to growth, expansion and diversification of business
activities of an enterprise.
 In addition, new vacancies are possible due to job respecification.
The recruitment and selection is the major function of the human resource department and
recruitment process is the first step towards creating the competitive strength and the strategic
advantage for the organisations. Recruitment process involves a systematic procedure from
sourcing the candidates to arranging and conducting the interviews and requires many resources
and time. A general recruitment process is as follows:
Identifying the vacancy:
The recruitment process begins with the human resource department receiving requisitions for
recruitment from any department of the company. These contain:
• Posts to be filled
• Number of persons
• Duties to be performed
• Qualifications required
20
 Preparing the job description and person specification.
 Locating and developing the sources of required number and type of employees
(Advertising etc).
 Short-listing and identifying the prospective employee with required characteristics.
 Arranging the interviews with the selected candidates.
 Conducting the interview and decision making
The HR Role in Recruitment changed and HRM:
 Decides about the design of the recruitment processes and to decide about the split of roles
and responsibilities between Human Resources and Hiring Manager
 Decides about the right profile of the candidate
 Decides about the sources of candidates
 Decides about the measures to be monitored to measure the success of the process
A traditional role of HR in Recruitment was an administrative part of the whole process. The HRM
was responsible for maintaining the vacancies advertised and monitored, but the real impact of
HRM to the performance of the whole recruitment process was minimal.
But as the role of Human Resources in the business was increasing, the HR Strategy was changed.
From making the process working to the real management of HR Processes and the Recruitment
Process was the first to manage.
The role of HR in Recruitment is very important as HRM is the function to work on the
development of the recruitment process and to make the process very competitive on the market.
As the job market gets more and more competitive, the clearly defined HR Role in Recruitment
21
will be growing quickly. HRM is not a function to conduct all the interviews today, the main role
of Human Resources is to make the recruitment process more attractive and competitive on the job
market.
Scope of HR Recruitment:
 HR jobs are one of most important tasks in any company or organization.
 To structure the Recruitment policy of company for different categories of employees.
 To analyses the recruitment policy of the organization.
 To compare the Recruitment policy with general policy.
 To provide a systematic recruitment process.
 It extends to the whole Organization. It covers corporate office, sites and works
appointments all over India.
 It covers workers, Clerical Staff, Officers, Jr. Management, Middle Management and
Senior Management cadres.
 A recruitment agency provides you with career counseling which renders a crystal clear
picture of what are the possible career options out there for you and which job option suits
you the best.
22
Objective of HR
 To obtain the number and quality of employees that can be selected in order to help the
organization to achieve its goals and objectives.
 Recruitment helps to create a pool of prospective employees for the organization so that
the management can select the right candidate for the right job from this pool.
 Recruitment acts as a link between the employers and the job seekers and ensures the
placement of right candidate at the right place at the right time.
 Recruitment serves as the first step in fulfilling the needs of organizations for a competitive,
motivated and flexible human resource that can help achieve its objectives.
 The recruitment process exists as the organization hire new people, who are aligned with
the expectations and they can fit into the organization quickly.
Advantage of Outsourcing Recruitment/Hiring of Consultancy
Traditionally, recruitment is seen as the cost incurring process in an organization. HR outsourcing
helps the HR professionals of the organisations to concentrate on the strategic functions and
processes of human resource management rather than wasting their efforts, time and money on the
routine work.
Outsourcing the recruitment process helps to cut the recruitment costs to 20 % and also provide
economies of scale to the large sized organizations.
The major advantages of outsourcing performance management are:
23
Outsourcing is beneficial for both the corporate organisations that use the outsourcing services as
well as the consultancies that provide the service to the corporate. Apart from increasing their
revenues, outsourcing provides business opportunities to the service providers, enhancing the skill
set of the service providers and exposure to the different corporate experiences thereby increasing
their expertise.
The advantages accruing to the corporate are:
 Turning the management's focus to strategic level processes of HRM
 Accessibility to the expertise of the service providers
 Freedom from red tape and adhering to strict rules and regulations
 Optimal resource utilisation
 Structured and fair performance management.
 A satisfied and, hence, highly productive employees
 Value creation, operational flexibility and competitive advantage
Result
Qualitative/Quantitative Hiring of consultancy
Time saving of
Company
Focus Management
Effort
Cost Reduction
24
Therefore outsourcing helps both the organisations and the consultancies to grow and perform
better.
Changing Role of Recruitment Intermediaries:
Recruitment consultancies, agencies or intermediaries are witnessing a boom in the demand of
their services, both by the employers and the job seekers. With an already saturated job market,
the recruitment intermediaries have gained a vital position acting as a link between the job seekers
and the employers.
But at the same time, one of the major threats faced by this industry is the growing popularity of
e-recruitment. With the changing demand, technologies and the penetration and increasing use of
internet, the recruitment consultancies or the intermediaries are facing tough competition. To retain
and maintain their position in the recruitment market, the recruitment intermediaries or consultants
(as they are commonly known) are witnessing and incorporating various changes in terms of their
role, functions and the services.
According to a survey amongst top employers, most of them agree with the growing influence of
technology and the Internet on the recruitment processes. 70 per cent of employers reported the
use of application portal on their company’s official website. Apart from that, the emerging
popularity of the job portals is also growing.
But the fact that the intermediaries or the consultants are able to provide their expert services,
economies of scale, up to 40 percent savings in the recruitment costs, knowledge of the market,
the candidates, understanding of the requirements, and most importantly, the assess to the suitable
and talented candidates and the structured recruitment processes. The recruitment intermediaries
25
save the organisations from the tedious of weeding out unsuitable resumes, co-coordinating
interviews, posting vacancies etc. give them an edge over the other sources of recruitment.
To retain their position as the service providers in the recruitment market, the recruitment
intermediaries are providing vale added services to the organisations. They are incorporating the
use of internet and job portals, making their services more efficient.
Despite of the growing use of the internet, the recruitment intermediaries are predicted to continue
dominating the recruitment market in the anticipated future.
Recruitment Management System
Recruitment management system is the comprehensive tool to manage the entire recruitment
processes of an organisation. It is one of the technological tools facilitated by the information
management systems to the HR of organisations. Just like performance management, payroll and
other systems, Recruitment management system helps to contour the recruitment processes and
effectively managing the ROI on recruitment.
The features, functions and major benefits of the recruitment management system are 4explained
below:
 Structure and systematically organize the entire recruitment processes.
 Recruitment management system facilitates faster, unbiased, accurate and reliable
processing of applications from various applications.
 Helps to reduce the time-per-hire and cost-per-hire.
26
 Recruitment management system helps to incorporate and integrate the various links like
the application system on the official website of the company, the unsolicited applications,
outsourcing recruitment, the final decision making to the main recruitment process.
 Recruitment management system maintains an automated active database of the applicants
facilitating the talent management and increasing the efficiency of the recruitment
processes.
 Recruitment management system provides and a flexible, automated and interactive
interface between the online application system, the recruitment department of the
company and the job seeker.
 Offers tolls and support to enhance productivity, solutions and optimizing the recruitment
processes to ensure improved ROI.
 Recruitment management system helps to communicate and create healthy relationships
with the candidates through the entire recruitment process.
 The Recruitment Management System (RMS) is an innovative information system tool
which helps to sane the time and costs of the recruiters and improving the recruitment
processes.
27
HR Recruitment Process
28
29
1. Client need assessment
 Define objectives and specifications
 Understand client's business and culture
 Understand the job/position specifications
 Understand roles and responsibilities of the prospective candidate
 Develop a search plan and review with the client
2. Candidate Identification
 Identify target sources
 Extensive organization mapping, research & database search of the profile
 Provide status report to client about the available talent pool
3. Candidate assessment and Presentation
 Screen and evaluate candidates
 Personal Interviews with Candidates wherever possible - assess skills, interest level and
cultural fit
 Discuss the shortlist with the client and send resumes
4. Candidate interview, selection & Presentation of Offer
 Facilitate interviews with the client
 Obtain feedback
 Participate in decision making process
 Provide inputs on candidate's desired compensation
30
5. Closure & Follow up
 Negotiate offer acceptance
 Execute Reference check, Compensation & Job Level Discussions
 Coordinate Joining Formalities and on boarding as per predefined date
 Closing review to understand client's level of satisfaction.
HR Telephonic Interview Questions:
 Tell me about yourself?
 Tell me about your job profile?
 How much current CTC, you’re getting in current organization?
 How much you’re expecting form new organization?
 How the notice period you required if you are selected?
 Why did you want to resign from your previous job?
HR Challenges in Recruitment
Recruitment is a function that requires business perspective, expertise, ability to find and match
the best potential candidate for the organisation, diplomacy, marketing skills (as to sell the position
to the candidate) and wisdom to align the recruitment processes for the benefit of the organisation.
The HR professionals – handling the recruitment function of the organisation- are constantly facing
new challenges. The biggest challenge for such professionals is to source or recruit the best people
or potential candidate for the organisation.
31
In the last few years, the job market has undergone some fundamental changes in terms of
technologies, sources of recruitment, competition in the market etc. In an already saturated job
market, where the practices like poaching and raiding are gaining momentum, HR professionals
are constantly facing new challenges in one of their most important function- recruitment. They
have to face and conquer various challenges to find the best candidates for their organisations.
The major challenges faced by the HR in recruitment are:
 Adaptability to globalization – The HR professionals are expected and required to keep in
tune with the changing times, i.e. the changes taking place across the globe. HR should
maintain the timeliness of the process
 Lack of motivation – Recruitment is considered to be a thankless job. Even if the
organisation is achieving results, HR department or professionals are not thanked for
recruiting the right employees and performers.
 Process analysis – The immediacy and speed of the recruitment process are the main
concerns of the HR in recruitment. The process should be flexible, adaptive and responsive
to the immediate requirements. The recruitment process should also be cost effective.
 Strategic prioritization – The emerging new systems are both an opportunity as well as a
challenge for the HR professionals. Therefore, reviewing staffing needs and prioritizing
the tasks to meet the changes in the market has become a challenge for the recruitment
professionals.
32
INTRODUCTION
OF
THE ORGANISATION
33
INTRODUCTION OF COMPANY
Our Company:
Honeywell invents and manufactures technologies to address some of the world’s toughest
challenges initiated by revolutionary macrotrends in science, technology and society. A Fortune
100 company, we create solutions to improve the quality of life of people around the globe:
generating clean, healthy energy – and using it more efficiently. Increasing our safety and security.
Enabling people around the world to connect, communicate, and collaborate. And equipping our
customers to be even more productive. With approximately 132,000 employees worldwide,
including more than 22,000 engineers and scientists, we have an unrelenting commitment to
quality and delivering results in everything we make and do.
34
Company Profile:
Honeywell Security is an international supplier and distributor of electronic security systems and
solutions. Our products monitor and protect millions of homes, businesses and government
facilities across the globe.
Honeywell Security is a business unit of Honeywell International, a $36.6 billion diversified
technology and manufacturing leader, serving customers worldwide with aerospace products and
services; control technologies for buildings, homes and industry; automotive products;
turbochargers; and specialty materials. Based in Morris Township, N.J., Honeywell's shares are
traded on the New York, London and Chicago Stock Exchanges. It is one of the 30 stocks that
make up the Dow Jones Industrial Average and is also a component of the Standard & Poor's 500
Index.
Honeywell Security has an extraordinary range of solutions across Intrusion detection, Video
Surveillance, Access Control Technologies & Home net systems and invests over $100 million a
year in research and development. It has its engineering "centers of excellence" in the U.S.,
Canada, China, Korea, India, Scotland,Germany and France and leverages technologies that are
developed elsewhere in Honeywell and brings them to the security business. Example: Video
analysis software developed by Honeywell Labs, advanced sensors from the Sensing and Control
business or GPS systems from Aerospace.
35
Honeywell Security South Asia operations spans across Sri Lanka, Pakistan, Bangladesh, Nepal
and other South Asian countries with HQ in India. We have our offices in Gurgaon, Mumbai,
Bangalore and Kolkata catering to all four corners of the country. An exponentially growing
business unit of Honeywell International, Honeywell Security caters to all electronic security
needs for Industrial, Government, Defense, Transportation, Commercial, Retail, Hotel, Hospital,
Corporate Buildings, IT, ITES, Banking and also the Residential market.
One of the key initiatives identified by Honeywell Security was to start a manufacturing facility
locally in India. Honeywell Security South Asia made history by starting manufacturing in India
in collaboration with ED&S at Hopetown facility in Oct 2008 in Dehradun, Uttrakhand.
The manufacturing unit is spread over 2000 sq ft and is well equipped with all testing
equipments. The production floor is ESD protected and temperature and humidity controlled.
A twelve member team comprising of trained engineers, technicians operate for the security
business.
As a starting point high volume CCTV surveillance cameras are being manufactured, but
gradually the production basket will also include intrusion alarm systems and home systems as
well.
36
Global Processes:
Honeywell’s ability to continually improve comes from successfully achieving two seemingly
competing tasks at once – productivity and growth. Our global processes are Honeywell’s core
internal business processes such as Six Sigma, FT, HOS and VPD that drive efficiency and service
quality. By relentlessly executing on these processes, Honeywell brings world-class products and
services to market faster and more cost-effectively for our customers.
What We Do
Aerospace Advancements:
Honeywell Aerospace mechanical and electrical innovations are used today on virtually every
commercial and defense aircraft platform. Our aerospace team invents and integrates thousands of
products and services that deliver safe, efficient, productive and comfortable experiences
worldwide.
Automation Smart TechnologyandControl Solutions:
Families, businesses, and communities use Honeywell environmental controls, life safety,
security, sensing, scanning, and mobility products, as well as building and process solutions in
homes, buildings, industrial facilities, and public and private utilities around the world.
37
Cutting-Edge Performance Materials andTechnologies:
Honeywell is a global leader in designing and creating high-purity, high-quality performance
chemicals and materials. Our technologies can do everything from reducing emissions to stopping
bullets. They enable the production of cleaner, more efficient fuels, increase capacity in oil
refineries, speed drug discovery, and protect medicines.
Efficient TransportationSystems:
Honeywell Transportation Systems provides world-class technologies and solutions to
automakers, their suppliers, and the public. Our technologies make passenger and commercial
vehicles throughout the world perform better and more efficiently.
Solutions Around the Globe:
We're committed to growing to serve more customers – and to constantly making our products and
services even better. Operating throughout the world enables us to better understand the challenges
that our customers face – and to provide even better solutions. Today, approximately 55% of our
revenues are now generated outside the U.S., making Honeywell a truly global enterprise.
38
Americas:
Headquartered in Morris Township, New Jersey, Honeywell employs more than 69,000 employees
in our research and development centers, manufacturing facilities and administrative offices across
the region. Throughout the U.S., Mexico, Canada and Brazil we have a team of unparalleled vision,
talent, and dedication. Their commitment to results and to continuous improvement is what drives
Honeywell forward – with achievements like:
 A complete modernization of the Los Angeles, CA city wastewater treatment system.
Integrated Honeywell controls were used to streamline operations and reduce
environmental risks.
 A partnership with Petrobras in Brazil to expand its diesel production capacity and
commission new safe, efficient offshore vessels to process natural gas off the coast of
Brazil.
China:
Since 1935, China has been critical to Honeywell's growth and innovation strategies. Today, we
have around 12,000 employees located in 20 cities, including five major technology centers in
Shanghai, Beijing, Tianjin, Nanjing and Chongqing with more than 1,400 scientists and engineers
focused on research and development, engineering and design.
Honeywell is playing a major role in the growth of China's aviation industry. We provide fly-by-
wire flight controls, wheel and brake systems, auxiliary power units and the inertial reference and
39
air data systems for the new C919 platform from Commercial Aircraft Corporation of China Ltd.
(COMAC). Green Jet Fuel made from Honeywell technology powered the first biofuel flight in
the region in 2011.
Honeywell is honored to have been selected to develop and implement China's first smart grid
pilot project for managing energy use in commercial buildings.
India:
Honeywell's presence in India dates back to the 1930s, when refining technology from Honeywell's
UOP group was commissioned in India's very first refinery in the state of Assam. Today, with
more than 12,000 employees, Honeywell operates state-of-the-art engineering and manufacturing
facilities in Pune, Guragon, Chennai and Dehradun. Our India operations include automation
control solutions, turbochargers, and refining.
Honeywell also has global centers of excellence for technology and product development across
the region. We developed the world's first turbo technology for a 2-cylinder micro-diesel engine
in India, which is helping to drive a new chapter of ultra-fuel-efficient micro vehicles for the
growing region.
40
Asia Pacific:
Honeywell continues to build on our manufacturing, engineering, and sales capabilities across the
Asia Pacific region. Each of our businesses – Aerospace, Automation and Control Solutions,
Performance Materials and Technologies, and Transportation Systems – is growing and expanding
here. Today, we have around 6,000 colleagues in the region.
In Korea and Japan, our turbo operations work with major car and truck manufacturers to provide
tailored turbocharging solutions for local markets and global customers, as well as semiconductor
manufacturing operations for our Electronic Materials business in Thailand, Korea and Japan. The
Honeywell Process Solutions and Building Solutions businesses employ more than 100 engineers
and technicians. In our research and development center in Sydney, Australia, we design
automation and control software. Honeywell's UOP group has a design and operations center in
Kuala Lumpur, Malaysia to serve oil and gas customers across Southeast Asia .
Europe, the Middle East& Africa (EMEA):
Today more than 32,000 of our colleagues represent Honeywell's four businesses across Europe,
the Middle East and Africa, and we continue to expand to deliver better results and serve more
customers. Our 23 research and development centers in the region are innovating and creating
solutions to meet the region's needs, including:
 Smart grid solutions that can cut peak energy use in commercial and industrial facilities
41
 Advanced turbos that will help customers reach new emissions and fuel efficiency
standards without compromising on power and performance
To address the projected increase in air travel across Europe and the globe, we are harnessing the
expertise of both our Aerospace and Automation Control Systems businesses. We are developing
a modernized infrastructure that will allow people and aircraft to be moved into, around and out
of airports faster, safer and more efficiently – saving time and fuel, and ensuring travelers fewer
hassles and more peace of mind.
Company Recognition:
Honeywell has been recognized as a leading company in a variety of different ways including:
World's Most Admired
Companies
2008-2014
Best in Sector -
Diversified Industrials
& Best Financial
Reporting
2014
A Top Military
Friendly Employer
2014
42
2014 All America
Executive Team - Most
Honored Companies
2014
Top 100 Global
Innovators in 2013 by
Thomson Reuters
2011-2013
Ethisphere Most
Ethical Companies
2013
Indo-American
Chamber of
Commerce Corporate
Execllence Award for
Technology &
Communications
Minority Engineer Top
50 Employer
2011-2013
Woman Engineer Top
50 Employer
2009, 2011-2013
43
HISTORY OF THE ORGENISATION:
Honeywell's story stretches back more than 125 years and encompasses several predecessor
companies and the inspiring work of tens of thousands of people. But our core mission and values
have been consistent from the start:
 Our vision for a secure, comfortable, more efficient future...
 Our steadfast belief in the power of innovation ...
 And our relentless insistence on continuous improvement.
From our genesis in 1885 to today, these are the principles that led us to the advancements and
innovations of the past century and a quarter ... And they'll continue to inspire
and guide us as we create new solutions for the challenges of tomorrow.
n 2002, David M. Cote was named Chairman and CEO of
Honeywell. Under his leadership the company focuses on five initiatives:
Growth, Productivity, Cash, People and the company's Enablers - Honeywell Operating System,
Velocity Product Development™ and Functional Transformation.
Under Cote's leadership, Honeywell has delivered strong performance in sales growth, earnings
per share, segment profit and cash flow. Today, the company has great positions in good industries
44
globally, with approximately 50% of its products and solutions providing energy efficiency
benefits.
More than 125 Years of Innovation
Honeywell's roots reach to 1885, when an inventor named Albert Butz patented the furnace
regulator and alarm. He formed the Butz Thermo-Electric Regulator Co., Minneapolis, in April,
1886, and soon invented an ingenious device he called the "damper flapper” – an ingenious
predecessor to the modern thermostat.
Here's how it worked. When a room cooled below a predetermined temperature, a thermostat
closed the circuit and energized an armature. This pulled the stop from the motor gears, allowing
a crank attached to the main motor shaft to turn one-half revolution. A chain connected to the crank
opened the furnace's air damper to let in air. This made the fire burn hotter. When the temperature
rose to the preset level, the thermostat signaled the motor to turn another half revolution, closing
the damper and damping the fire. The temperature correction was automatic. Over the years, many
Honeywell products have been based upon similar, but more complicated closed-loop systems.
The Consolidated Temperature Controlling Co. acquired Butz's patents and business, and by 1893,
had renamed itself Electric Heat Regulator Co. In 1898, the company was purchased by W. R.
Sweatt, who, by 1916, named the company Minneapolis Heat Regulator Company, expanded its
product line and patented the first electric motor approved by Underwriters Laboratories.
Meanwhile, in Wabash, Indiana...
45
In 1904, a young engineer named Mark Honeywell – from whom our name originated – was
perfecting the heat generator as part of his plumbing and heating business. Two years later, he
formed the Honeywell Heating Specialty Co. Incorporated, specializing in hot water heat
generators.
The 1927 Merger
In 1927, Minneapolis Heat Regulator Company and Honeywell Heating Specialty Co. merged to
form the Minneapolis-Honeywell Regulator Co., and became the largest producer of high-quality
jeweled clocks. W. R. Sweatt became Chairman and Mark Honeywell became President. The
company quickly grew as it began to tackle more challenges, including industrial controls and
indicators.
Business Around the World
The company has been selling its products throughout the world for a long time. In 1934, the
company acquired Time-O-Stat Controls Corporation and began establishing a track record of
global expansion. We established offices in Toronto, the Netherlands, London and Stockholm. By
46
1941, The company had distributors in Chile, Panama, Trinidad, New Zealand, Argentina, and
South Africa. By 1972, we operated 25 wholly-owned subsidiaries, 142 branch offices, and joint
ventures in five countries outside the U.S. In 1993, the company opened affiliates in Abu Dhabi,
China, Oman, Romania, and the Ukraine. By 1998, the company had operations in 95 countries.
Products, Developments and Acquisitions
Minneapolis-Honeywell Regulator Co. leveraged its scientific and engineering talent to adapt to
changing times. We radically improved mass production and added an array of aeronautical
equipment to our portfolio.
In 1942, we invented the electronic autopilot, which proved vital to the U.S. war effort.
In 1953, the cmpany introduced the iconic T-86 "Round" thermostat, which replaced chunky,
rectangular models. One of the world's most recognizable designs, it remains in production today
and is used in more households around the world than any other thermostat.
47
In 1954, the began working to make gyroscopes more sensitive and precise while reducing their
size and weight – and continued improving them over the next two decades.
In 1955, we established a partnership with Raytheon Corp., marking Honeywell's entry into the
computer business.
In 1957, we began working on fire detection and alarm systems. In many North American cities,
the red and black "Protected by Honeywell" window stickers and placards were nearly as
recognizable as the “Round” thermostat. Today we are the global leader in the industry.
The company's name was officially changed to Honeywell Inc. in 1963.
Six years later, Honeywell instruments helped U.S. astronauts Neil Armstrong and Edwin "Buzz"
Aldrin land on the moon.
In 1970, Honeywell merged its computer business with General Electric's to form Honeywell
Information Systems.
48
In 1986, the personal computer emerged and the company formed Honeywell Bull, a global joint
venture with Compagnie des Machines Bull of France and NEC Corporation of Japan. Its
ownership level was gradually decreased until,
In 1991, Honeywell was no longer in the computer business. The company's digital computer
knowledge lives on today in the field of automation control, integrating sensors, and activators.
In 1986, Honeywell took a bold step to increase its investment in aerospace innovation with the
purchase of Sperry Aerospace, making us the world's leading integrator of avionics systems.
Sperry contributed flight controls, space vehicles, and the first FAA-certified wind shear warning
system.
The AlliedSignal Connection
During World War I, Germany controlled much of the world's chemical industry, causing
shortages among the U.S. and our allies of critical drugs and dyes. In 1920, publisher Eugene
49
Meyer and scientist William Nichols formed the Allied Chemical & Dye Corporation as a
partnership of five American chemical companies.
In 1928, Allied opened a synthetic ammonia plant and quickly became the world's leading
producer of ammonia .
After World War II, Allied began manufacturing other new products, including nylon 6 (used in
manufacturing everything from tires to clothes) and refrigerants.
In 1962, Allied bought Union Texas Natural Gas, which owned oil and gas properties throughout
the Americas. Allied focused on it mainly as a supplier of raw materials for its chemical products,
but this changed in the early 1970s when CEO John Connor (secretary of commerce under Lyndon
Johnson) began investing in oil and gas exploration. By 1979, when Edward Hennessy Jr. became
CEO, Union Texas produced 80% of Allied's income.
50
Now Allied Corp., the company in 1981 went on to purchase the Bendix Corp., an aerospace and
automotive company, in 1983. By 1984, Bendix generated 50% of Allied's income, while oil and
gas generated 38%.
In 1985, Allied merged with the Signal Companies, adding critical mass to its aerospace,
automotive and engineered materials businesses. Signal was originally a California company that
produced gasoline from natural gas and entered oil production in 1928.
Aerospace was now Allied-Signal's largest sector. In mid-1991, with new leadership in many key
businesses, Allied-Signal began taking bold actions to become more efficient, increase
productivity, and position the company as a global competitive force. The Allied-Signal name was
changed to AlliedSignal in 1993 to reinforce a one-company image and signify the full integration
of all of its businesses.
In 1992, the company sold its remaining interest in Union Texas through a public offering for
$940 million in net proceeds.
51
Throughout the 1990s, CEO Lawrence A. Bossidy led process of continued growth and efficiency
that quintupled the market value of AlliedSignal shares and significantly outperformed the Dow
Jones Industrial Average and the S&P 500.
52
PROFILE
OF THE
ORGANIZATION
53
Address: Honeywell Automation India Ltd, 56 & 57
Hadapsar Industrial Estate, Pune (Maharashtra)
Contact No: 020-6603-9577 / 9850732702
Website - www.honeywellautomation india.com
About Company
Honeywell Automation India Ltd is located at Mumbai (India) Assists companies in search of
qualified and experienced professionals across sectors and industries.
We are a prominent executive search & selection company, providing a wide range of recruitment
solutions for various requirements. We are a team of dedicated professionals offering services
across India.
Established in 1920 with licenses, HAIL is leading Indian and International companies for their
middle & senior management requirements. HAIL caters to both domestic placements across India
as well as international locations. We have turnover of 200 caror.
54
Our team of 125 head hunters have extensive previous professional work experience and currently
specialize in different domains across industries and professionally head hunt and source
candidates based on specific client requirements.
“Recruiting at a Speed using the best technology,
We believe Time is Money hence sourcing the right resource in shorts”
Jim Turley, Chairman and CEO
Honeywell Automation India Ltd.
Fact Sheet
Year of Establishment : 1857
Nature of Business : Manufacturer, Service Provider
Major Markets : Indian Subcontinent, East Asia, Middle East and South East Asia
Contact Details
Company Name: Honeywell Automation India Ltd
Contact Person: Mr. Ghufran Ahmad Khan
Contact No.: + (91)-7814972169
Address: Honeywell Automation India Ltd, 56 & 57
Hadapsar Industrial Estate, Pune (Maharashtra)
Web Site: http://www.honeywellautomationindia.com
55
Company Profile
Honeywell Security is an international supplier and distributor of electronic security systems and
solutions. Our products monitor and protect millions of homes, businesses and government
facilities across the globe.
Honeywell Security is a business unit of Honeywell International, a $36.6 billion diversified
technology and manufacturing leader, serving customers worldwide with aerospace products and
services; control technologies for buildings, homes and industry; automotive products;
turbochargers; and specialty materials. Based in Morris Township, N.J., Honeywell's shares are
traded on the New York, London and Chicago Stock Exchanges. It is one of the 30 stocks that
make up the Dow Jones Industrial Average and is also a component of the Standard & Poor's 500
Index.
Honeywell Security has an extraordinary range of solutions across Intrusion detection, Video
Surveillance, Access Control Technologies & Home net systems and invests over $100 million a
year in research and development. It has its engineering "centers of excellence" in the U.S.,
Canada, China, Korea, India, Scotland,Germany and France and leverages technologies that are
developed elsewhere in Honeywell and brings them to the security business. Example: Video
analysis software developed by Honeywell Labs, advanced sensors from the Sensing and Control
business or GPS systems from Aerospace.
56
DATA BANK
We have a fairly large data bank comprising of candidates in Managerial functions, HRD,
Accounts, Finance, Engineering, Information Technology and Marketing to suit the requirements
of Management at all levels of functions. Our data bank consists of candidates from different
locations and in various countries. They could even supply candidates with very rare skill sets and
experience from their data bank. This is helpful to identify candidates for specific locations within
short notice.
FACILITIES
A completely computerized Network environment with sophisticated software for maintaining and
accessing data bank - An extensive library covering almost all subjects relating to business. - Three
telephone lines, Fax, Internet and email facility. - A good job site on the web to publicize the
requirements immediately. - Dedicated Team of Consultants and staff who believe in
Right People!! Right Solutions!!
Aim & Approach of HAIL
Aim
Aim is to ensure we match you with your ideal job every time. With an ethos that focuses on the
needs and aspirations of each individual candidate, rather than simply ‘filling jobs’, we make sure
we understand what you want first before discussing any relevant career options.
If our client’s are looking for full time, part time, permanent or temporary opportunities, our
specialist consultants are on hand to guide you through the options to match you with your ideal
job.
57
Our aim is to offer our clients the best consultancy services in India. This means that we provide
clients with full consultancy service, from identifying the relevant candidate, to closing the
position at short span of Time.
Initiatives
We proactively seek grant schemes that match your needs and help you tailor your projects to take
maximum advantage of grant opportunities.
Our extensive professional network and experience in a wide range of grant schemes ensure that
we track the latest developments in incentive schemes and identify opportunities as they arise. You
can then adapt your decisions to better fit public objectives.
Partnership
Close collaboration with clients regularly leads to long-lasting partnerships. The better we know
you and your organization, the better we can advise you. This leaves you free to focus on your
core business while we deal with grants acquisition, administration and project management. We
also partner with clients in their consortia, technological platforms and other public-private
partnerships.
Approach
Our Approach towards Client is distinctive. Large amount of support teams, provide clients with
the complete range of fully integrated recruitment solutions from each site. True client
partnerships, an advanced internet development strategy and our focus on placing people are part
of what makes us different.
Quality Policy / Processes
Quality Policy
58
Our consultants go through a stringent pre-qualification phase to ensure that they have the
expertise that the clients require. We select experienced personnel with established professional
consulting experience. We put strong emphasis on Attitude, Communication and Team Player
skills and demonstrated ability to stretch themselves to contribute to the successful completion of
projects. We engage in reference checks, drug tests, and background checks before deploying our
manpower to the project.
Our Philosophy Service to the customers and the candidates is our motto. Each employer is
important to us and gets personalized attention, irrespective of size or even volume of business
generated. Similarly, every candidate is treated with warmth and understanding. We make every
effort required to find suitable placement for the job seekers. It is essentially this philosophy which
has enabled us to attain our present stature.
CLIENTEL
59
ROLTA NETWORK18 PROCESSWARE ZENTA POLARIES ADLABS
FILMS
WHY HAIL?
 A perfect mix of Business focus and technology which is backed with a specialized team
of Professional recruiters who are continuously updated with technical training and high
end support.
 State of the art Infrastructure, Well equipped & Air-conditioned work station.
 Capability to source high number of candidates for the Clients, scale up and double
candidates when needed for project works.
 Critical strength to always stand up on efficiency and quality in fulfilling commitments at
the workplace.
Executive Management Consultant takes care of:
60
Quality
Our consultants go through a stringent pre-qualification phase to ensure that they have the
expertise that the clients require. We select experienced personnel with established professional
consulting experience. We put strong emphasis on Attitude, Communication and Team Player
skills and demonstrated ability to stretch themselves to contribute to the successful completion of
projects. We engage in reference checks, drug tests, and background checks before deploying our
manpower to the project.
Cost
We keep our overheads low and therefore we can compete with the biggest of staffing firms
to provide a fair and competitive rate.
On Time Delivery
That is a promise we made to ourselves. We have taken extreme care to ensure that delivery
is met and we are proud of our track record that shows 90% of the candidates selected take up our
projects. Our support function facilitates our consultants to move from project to project. This
ensures that they are ready to work ‘when and where’ our clients need them.
Retention
Our retention level of consultants on the project is at an enviable rate of 95%. This does not
happen accidentally. We spend quality time on the staffing needs and ensure that the staffing
solution we provide really fulfills the clients’ needs.
61
Specialization in level of recruitment
EMC handles the below 3 Levels of Recruitment:
 Middle & Senior Level of Management
 Junior & Middle Level of Management
 Junior & Senior Level of Management
HAIL deals with all “IT requirements” & below mentioned are some of the Functional area of
recruitment where HAIL is specialized:
 Software Engineers (Core Java, JSP, J2ME, J2EE, C++, C#, VB, VB script, VB.net,
ASP.net, HTML, Autocad)
 Manual Testing Engineers (Performance Testing (Web Load), Functional Testing,
Integration Testing ,White box Testing , Database testing (SQL, Oracle) )
 Automation Testing Engineers (Winrunner, Loadrunner, Rational Robot, QTP, Skilktest)
 Project Lead/Lead Management/Project Manager
 Informatica, Autosys, Database Administrator (Oracle , SQL, DB2,DB Attritions)
 Network / System support/System Integration
 Symbian, Brew, Android, iphone, Blackberry, Fixed line data
 Data center Operations
 .net (VB/ ASP/ VC/ C#/ Sharepoint)
 Sr. Ops Engineer/Ops Manager
 Assistant Manager Service Delivery (Networking / System Integration / IT Operation)
 Crystal Report
62
 Weblogic / Websphere / WAP
 Java / JSP / J2ee / J2me / Junit
 Siebel / PHP / Perl / People soft
 SAP (FICO / BASIS / ABAP / SRM / CRM)
 UML / XML / HTML / DHTML
 Unix / Linux / Windows
 QTP / Win Runner / Load Runner
 SQL / Oracle / DB2 / PL SQL / D2K / Dbase
 Lotus / Mainframes
 3DMax / Coral Draw / Adobe Photoshop
 Adobe Pagemaker / Adobe Illustrator
 Apache
 Cold Fusion
 Matlab / Labview
 Rational Robot / MQC / Silk Test
 C / C++ / C# / VB / VC / VC++ / ASP / Foxpro
 Network / System / Support / Implementation Engineer
 Delivery Managers (PMP & ITIL certified)
Functional Area of Recruitment Specialization
HAIL deals with all “IT Non requirements” & below mentioned are some of the Functional area
of recruitment where EMC is specialized:
63
 Sales & Marketing (All areas): Executives, Regional Manager, Marketing Head, AM-
Sales, Branding Manager.
 Accounts & Finance (All areas)
 Engineers Civil / Mechanical / Chemical
 Draftsman / Interior Design Engineer
 Secretary to CFO / MD / VP
 Process Trainers / VNA Trainers
 Admin Executive / Front Office Exec
 Project Manager, Sr. Mgr / Mgr Production & Planning, DGM Operation, Manager
Contract & Planning, Manager Design
 Commercial Head, Piping Engineer, Manager Quality, Executive Procurement, Architects
 Road Surveyor
 GM, VP, AVP – Finance , Financial Analyst, Investor Relation
 HR & Admin: Manager HR, Sr.Exe. / Exe. HR.
 Legal : Manager Legal , Compliance Manager, Company Secretary
How does recruiters/consultant get paid?
A recruitment consultant primarily acts from a position of self-interest. Their job is to generate
revenue by making sales. Sales mean selling their service, their ability to find the right candidate,
to prospective employers. In effect they are selling you. This means they will be eager to champion
you, their product, to the employer, likewise they will be keen to ensure that you will accept the
position if offered.
64
Exactly how a recruitment consultant is paid depends on whether it is a permanent or contract
position. Generally for a permanent placement the company receives a proportion of your salary,
or a set fee agreed with the employer. The more you earn the more they stand to make. Knowing
this should ease any concerns you have; in this you are both on the same side. For a contract the
consultant will receive a margin of your rate.
Job Profile in HAIL:
 Sourcing resumes through different job portals like Naukri, monster etc.
 Based on the clients requirements screening the resumes and judging the Candidates to
meet the particular requirement.
 Initial phone screening of candidates to judge communications and background.
 Short listing the candidates as per client’s requirements and then scheduling up the
interviews.
 Regular follow up with the selected candidates to confirm their joining dates, ensuring the
maximum of them are placed successfully with the respective organization
 Maintaining and updating database of potential, prospective and rejected candidates
 Constantly be in touch with the candidate until he/she joins.
 Co-ordinate with other recruiters to work as a team.
 Maintaining a database of candidates.
 Handling end to end recruitments.
65
Requirements I worked on in HAIL
 Relationship Officers / Sr. Relationship Officers / Territory Manager for the Location of
Delhi and Mumbai(Lower parel), for the Quikr India Pvt Ltd
 Sales Manager for the Location of Ahmedabad, for Quikr India Pvt Ltd
 Asp.Net for the Location of Mumbai(Malad), for the 3G Services
 Project Engineer for the location of Mumbai, for Sigma Byte
 Secretary to MD for the location of Mumbai(Andheri),for Financial Technologies
 Project Co-ordinator with Onmobile Global Ltd.
 Techlead Position for Atidan Technologies
Recruitment Email sent to candidate regarding the same
Dear Candidate,
This is to bring to your kind notice that we have an opening for the post of Relationship
Officer/ Sr. Relationship Officer with Quikr.com
URL: - http://www.quikr.com/html/about.hail
Location: Delhi
Designation: Sr. Relationship Officer/ Relationship officer
Experience: 2+ Years
66
Essential
Qualities:
Excellent Communication Skill, Positive attitude, passionate, highly
motivated,
Should come from online, yellow pages, space selling and should have
a good idea about online sales/marketing
Job
Responsibility:
Responsible for monitoring accessing, improving the ad sales, revenue
monitoring
Able to independently ideate and came out with solution to client and ad
sales team
Monitoring All ad positions, ad campaigning’s, sales etc.
Monitoring their sales / telesales team.
If your candidature suits the mentioned profile then kindly send us the following details:
1. your updated resume in MS Word format.
2. Present CTC
3. Expected CTC
4. Notice Period
As the requirement is a bit urgent, an early response on this would be highly appreciated.
Alternatively if you know someone suitable and available then Please
refer (or) let us know their contact details. We shall check their willingness for this
opportunity. Please, respond at the earliest.
67
Best regards,
HR| HAIL-Honeywell Automation India Ltd.
Direct: 9223499000 || honeywellauomationindia@.in
Recruitment Email sent to candidate
Hi,
Opening with Onmobile Global Ltd for Project Co-ordinator
OnMobile [NSE: ONMOBILE] is one of the largest white-labelled Data and Value Added Services
[VAS] companies for Mobile, Landline and Media Service Providers. OnMobile touches the lives
of over 1 billion mobile users across 55 countries every month.With our diverse product portfolio
of Mobile Music, multi-screen Video Gateway and delivery solutions, Phone Backup and Personal
Cloud Management solutions, Voice and Video portals, M-Commerce products and services, we
generate 2 – 5% contribution for top customers and top line revenues of over US $800 million for
over 92 customers globally. We deliver our products by the best combination of a hosted Cloud
with on-site operations at the customer premises or through products deployed in customer
networks.Founded in 2000, OnMobile has 1500 employees spread across India, U.S., LATAM,
Africa, Australia, Middle East and Europe. The company was publicly listed in India in 2008.
Recent acquisitions include Voxmobili (2007), Telisma (2008), and Dilithium Networks (2010).
Location: Bangalore
Website: http://www.onmobile.com/
68
JD for Position:-
Job Title Project Coordinator
Department India Private Operators – PMO
Qualification B.Tech / BE / MCA / MBA
Experience 1-3years
Job Description
Role
Project co-ordinator is a Project Management Office role.
 The role requires the person to plan, drive, co-ordinate and
track projects with various internal stakeholders.
 Schedule regular meetings with the action owners for
status tracking.
 Update the senior members of the organization on the
status of the projects, highlight Requirements, risks and
gating issues and probable resolutions.
 Prepare and analyse the data collected from various
reports and present it to the leaders for further analysis and
decision making.
Skills
1) Good Analytical, negotiation and communication skills.
2) Good skills in Excel and ppt. Should have good ability to
analyze data, prepare and present analysis to internal stakeholders.
69
3) Ability to plan, drive, co-ordinate and track projects with
various internal stakeholders and report the progress to the AVP.
4) Should possess good Project management skills. Telecom
Knowledge and System level knowledge preferred.
Location Bangalore
If this profile suits your candidature, kindly send the updated resume mentioning the following
details:-
1) Total Experience
2) Relevant Exp.
3) Current CTC
4) Expected CTC
5) Notice Period
Best regards,
HR| HAIL-Honeywell Automation India Ltd.
Direct: 9223499000 || honeywellautomtionindia@.in
Recruitment Email sent to candidate
From: HAIL <hail@.in>
To:
Sent: Tuesday, 15 May 2012 3:15 PM
Subject: Opening with Atidan Technologies for Tech Lead
70
Hi,
As per the discussion, I am sending the Company’s profile and Job Description.
Opening with Atidan Technologies for the post of Tech Lead
Atidan Technologies is an IT industry. It’s an U.S. based multinational company. Atidan
combines offshore cost-efficiency and 24 hour work cycles with direct team interaction at different
location-delivering low-risk, high-performance solutions to help you improve communications,
streamline workflow and increase productivity.
URL: - http://www.atidan.com/Pages/index.aspx
Location: - Mumbai
Job Description:-
1) Candidate must have atleast 6 yrs of experience.
2) Exp working on web based projects is a must.
3) Exposure on SharePoint is preferable.
4) Exposure working with US clients is a must.
5) Applicant should be working as a tech lead.
Interview: - On Saturday (19th May 2012)
Timing: - 9 AM TO 12 PM
Interview Procedure:-
1) Aptitude Test (HR Interview)
71
2) Computer Programming Test (.Net Test)
3) Technical Interview – 1
4) Technical Interview – 2
If this profile suits your candidature kindly send the following details:-
1) Updated Resume in word format.
2) Total Exp.
3) Relevant Exp.
4) Current CTC.
5) Expected CTC.
6) Notice Period.
Best regards,
HR| HAIL-Honeywell Automation India Ltd
Direct: 9223499000 || hail@.in
72
Format of Candidate Interview Schedule details sent to Organization
Hi,
Below mentioned is the interview schedule for AM / Manager HR:
Sr.
No
Candidate
Name
Interview
Date
Intervie
w Time
Contact
No
Mod
e
Locatio
n
Position
1
Veena
Kashelkar
17th May 12 10.00 am 98000000 F2F Mumbai
AM/Manage
r HR
2
Richa
Mehta
17th May 12 11.00 am
983300000
0
F2F Mumbai
AM/Manage
r HR
2 Ragni Jethi 18th May 12 11.00 am
983390000
0
F2F Mumbai
AM/Manage
r HR
73
Weekly Status Report
Date
Candidate's
Name
Contact No Client
Position
Applied for
Location CV Sent
29-May-12 Soham Raval 97277000000 Quikr S M Ahmedabad CV sent
Tracker sent to Company consists of the following elements:
Status (CV sent or not), Source (Consultant Name), Candidate Name, Current Company
(candidate is working with), Yrs Of Experience, Location, Education, Current Designation,
Current CTC, Expected CTC, Position Applied For, Contact No., Profile Sent Date, Line
Manager, 1st Level - Resume Screening, Mode, Date, 2nd Level - PI or TI, Date, 3 Level – PI,
Date, Final Status, Client CTC if offered.
74
Form attached along with candidate resume while forwarding to the Client (i.e.
organization)
Executive Management Consultant
Name
Position applied for
Current Company
Current Position
Highest qualification
Total Exp
Relevant Exp
Current CTC
Expected CTC
Notice period
Current Location
Willing to work in Location Opted
for (Y/N)Reason for Job Change
Why the Client (e.g. Tata/FT)
Why Consultant has shortlisted the
CV
75
Research
Methodology
76
RESEARCH:
RESEARCH is a ‘careful investigation or inquiry especially through search for new facts in any
branch of knowledge’.
METHODOLOGY OF STUDY:
The project is a systematic presentation consisting of the enunciated problem, formulated
hypothesis, collected facts of data, analyzed facts and proposed conclusions in form of
recommendations.
The data has been collected from both the sources primary and secondary sources.
DATA COLLECTION:
Primary Data:
Primary data was collected through survey method by distributing questionnaires to employees.
The questionnaires were carefully designed by taking into account the parameters of my study.
Secondary Data:
Data was collected from web sites, going through the records of the organisation, etc. It is the data
which has been collected by individual or someone else for the purpose of other than those of our
particular research study. Or in other words we can say that secondary data is the data used
previously for the analysis and the results are undertaken for the next process.
77
KIND OF RESEARCH:
The research done by
EXPLORATORY RESEARCH:
This kind of research has the primary objective of development of insights into the problem. It
studies the main area where the problem lies and also tries to evaluate some appropriate courses
of action.
Sample Design:
A complete interaction and enumeration of all the employees was not possible so a sample was
chosen that consisted of 25 employees. The research was taken by necessary steps to avoid any
biased while collecting the data.
Tools ofAnalysis:
The data collected from both the sources is analyzed and interpreted in the systematic manner
with the help of statistical tool like percentages.
RESEARCH DESIGN:
A research design is the arrangement of the condition for collection and analysis of data in
a manner that aims to combine relevance to the research purpose with economy in procedure.
78
A research design is the specification of methods and procedure for acquiring the information
needed to structure or to solve problems. It is the overall operation pattern or framework of the
project that stipulates what information is to be collected from which source and be what
procedures.
1 What is study about?
2 What is study being made?
3 Where will the study be carried out?
4 What type of data is required?
5 Where can the required data be found?
6 What will be the sample design?
7 Technique of data collection.
8 How will data be analyzed?
79
Data Analysis
And
Interpretation
80
The analysis of the data is done as per the survey finding. The data is represented graphically in
percentage. The percentage of the people opinion were analyzed and expressed in the form of
charts.
Question 1: What form of interview did you prefer?
Most of the manager Prefer Personal interviews, 30% prefer to take telephonic interviews where
as only 20% goes for video conferencing and rest 10% adopt some other means of interviews.
81
Question 2: What source you adopt to source candidates?
Source: Compiled from questionnaire data
Interpretation:
This analysis indicates that most of the respondent i.e. 85% responded for Job Portal, 10%
responded for Candidate referral and 5% responded for Advertising.
Candidate
Referral
10%
Advertising
5%
Job Portal
85%
Candidate Referral
Advertising
Job Portal
82
Question 3: How many stages are involved in selecting the candidate? / How
many Question you are asking during the Telephonic interview round?
Most of the Executives Prefer two stages of interview, 40% prefer to take three stages interviews
whereas only 10% goes for four rounds and rest 5% sometimes opt for one round of interviews.
One
5%
Two
45%
Three
40%
Four
10%
One
Two
Three
Four
83
Question 4: How do you track the source of candidate?
Most of the Executives 80% prefer online, 15% prefer Data where as only 5% goes for software
to source a candidate.
Question 5: Does the organization clearly define the position objectives,
requirements and candidate specifications in the recruitment process?
Software
5%
Online
80%
Data
15%
Software Online Data
Yes
95%
No
5%
Yes
No
84
This analysis indicates that most of the respondent i.e. 95% responded for Yes and 5% responded
for No.
Question 6: What is the average time spent by executives during recruitment
(each candidate)?
This analysis indicates that most of the respondent i.e. 60% responded for 1 to 5 minutes, 20%
responded for 5 to 10 mins, whereas 10% responded for 10 – 15 mins and rest 10% responded for
more than 15 mins.
1 - 5 minutes
60%
5 - 10 mins
20%
10 - 15 mins
10%
more than 15 mins
10%
1 - 5 minutes
5 - 10 mins
10 - 15 mins
more than 15 mins
85
Question7: Do you follow different recruitment process fordifferent grades of
employees?
This analysis indicates that most of the respondent i.e. 95% responded for Yes and 5% responded
for No.
Yes
95%
No
5%
Yes
No
86
Question 8: What are the basic questions you ask to the candidate?
This analysis indicates that the entire respondent i.e. 100% responded for asking all the basic
questions.
Question 9: Do you have any system to calculate cost per recruitment?
Experience (Total /
Relevent)
0%
Current / Expected
CTC
0%
Current Job Profile
0%
Notice Period
0%
All of the Above
100%
Experience (Total / Relevent)
Current / Expected CTC
Current Job Profile
Notice Period
All of the Above
Yes
30%
No
70%
Yes
No
87
This analysis indicates that most of the respondent i.e. 70% responded for No and 30% responded
for Yes.
Question 10: Is there any provision for evaluation and control of recruitment
process?
This analysis indicates that most of the respondent i.e. 55% responded for No and 45% responded
for Yes.
Yes
45%
No
55%
Yes No
88
Question 11: Is there any facility for absorbing the trainees in your
organization?
This analysis indicates that most of the respondent i.e. 70% responded for Yes and 30% responded
for No.
No
30%
Yes
70%
No Yes
89
THEORITICAL FRAMEWORK:
THEORIES REGARDING RECRUITMENT
RECRUITMENTIS TWO WAY STREET:
It takes recruiter and a recruitee: It takes a recruiter and a recruitee recruiter has a choice whom
to recruit and whom not;
As per Behling et al, there are three ways in which a prospective employee makes a decision to
join an organization.
Accordingly, the following three theories of recruitment have been evolved:
 Objective factor theory
 Subjective factor theory
 Critical contact theory
These theories can be explained as follows:
Objective Factor Theory
It assumes that the applicants are rational. As per this theory, the choice of organization by a
potential employee depends on objective assessment of tangible factors such as;
Pay package, Location, Opportunity per career growth, Nature of work and Educational
opportunities. The employer according to this theory considers certain factors among others;
educational qualification, years of experience and special qualification/experience.
90
Subjective Factor Theory
The decision making is dominated by social and psychological factors. The status of the job,
reputation of the organization and other similar factors plays an important role.
According to this theory, compatibility of individual personality with the image of organization is
decisive factor in choosing an organization by individual candidate seeking for employment. These
subjective factors are; Personal compatibility for the position, Competence and Best fit.
Critical Factor Theory
The critical factors observed by the candidate during his interaction with the organization play a
vital role in decision making. Recruiter being in touch with the candidate, promptness of response
and similar factors are important. This theory is more valid with the experienced professionals.
There are instances when a candidate is unable to choose an organization out of alternative based
on Objective and Subjective factor(s) listed above. This is due to many reasons such as limited
contact and insufficient data with regards to the organization or its own inability to analyze and
come to ant conclusion. In such cases, certain critical factors observed by the manager during
interview and contact with personnel of the organization will have profound influence in his
decision process.
It must be noted that, the theoretical base given above by Behling et al was mostly influenced by
the working condition which existed in developed countries like The United States of America and
European countries. In these countries, vacancies are many and there is scarcity of suitable hands
unlike in developing countries like Cameroon where vacancies are less and hands are more
resulting to large scarce unemployment. The theoretical base given above cannot be applied in
91
developing countries except in hid paid jobs where higher skills and better knowledge are the
prerequisites. In such cases, candidates have variety of choices and he is the master of his choice.
In production, servicing and clerical jobs, unemployment is where the number of job seekers far
exceeds the vacancies.
In such a situation, candidates have little choice and such, grab whatever organization call him or
her for employment. In such a case, the potential organization is in a better place to choose the
candidates from the many available.
Hence, the recruitment process should be that of filtering and re-distributing potential candidates
not only, for actual or anticipated organization vacancies but also searching for prospective
employee.
From Behling’s review, it could be assessed that workers output will increase due to certain
objectives of motivating them through regular payment. This will help to influence their working
conditions thereby making them to be effective at work.
Problems arise when unemployment rate is high and the number of those seeking for jobs far
exceeds the vacancies that exist. In this case, candidates have little choice to be offered the job in
the institution. Though they possess the knowledge, education, the process should be to filter and
re-discover their potentials.
When this happens, right (qualified) employees should be placed in the right positions and as a
result, it will lead to an increase in productivity.
Due to the subjective factor of a candidate being best fit for the job, it is not the best procedure to
determine whether his output will increase or decrease but it should be assessed from the critical
factor observed during interview and the contact with the personnel of the organization that will
influence his productivity and his decision making.
92
Personality–Job Fit Theory
The personality–job fit theory postulates that a person's personality traits will reveal insight as to
adaptability within an organization. The degree of confluence between a person and the
organization is expressed as their Person-Organization (P-O) fit. This also referred to as a person–
environment fit. A common measure of the P-O fit is workplace efficacy; the rate at which workers
are able to complete tasks. These tasks are mitigated by workplace environs- for example, a worker
who works more efficiently as an individual than in a team will have a higher P-O fit for a
workplace that stresses individual tasks (such as accountancy). By matching the right personality
with the right company workers can achieve a better synergy and avoid pitfalls such as high
turnover and low job satisfaction. Employees are more likely to stay committed to organisations if
the fit is 'good'.
In practice, P-O fit would be used to gauge integration with organizational competencies. The
Individual is assessed on these competencies, which reveals efficacy, motivation, influence, and
co-worker respect. Competencies can be assessed using various tools like psychological tests,
competency based interview, situational analysis, etc.
If the Individual displays a high P-O fit, we can say that the Individual would most likely be able
to adjust to the company environment and work culture, and would be able to perform at an
optimum level.
93
Findings,
Conclusion,
Suggestions,
And Limitation
94
FINDINGS:
 According to the Survey, Recruitment differs from company to company for each
category.
 According to the Survey, the company do utilize internet sites for the recruitment process
and for finding the talent candidate
 According to survey it is observed that the company are utilizing the job description in
order to make screening process more efficient
Limitation of the study:
The study is subjected to the following limitations
 The study is based on the data provided by the company statements so, the limitations of
the company’s employees remaining are equally applicable.
 In some cases data is collected from the companies past records.
95
CONCLUSIONS:
 Polices adopted by EMC are transparent, legal and scientific.
 Recruitment is fair.
 The recruitment should not be lengthy.
 To some extent a clear picture of the required candidate should be made in order to search
for appropriate candidates.
 Most of the employees were satisfied but changes are required according to the changing
scenario as recruitment process has a great impact on the working of the company as a
fresh blood, new idea enters in the company.
SUGGESTIONS:
 Time management is very essential and it should not be ignored at any level of the
process.
 Recruitment policy is satisfactory in EMC but the periodicity of recruitment is being
more which needs to be reduced.
 Communication, personal and technical skills need to be tested for employees
96
97
WIBLIOGRAPHY:
http://recruitment.naukrihub.com/meaning-of-recruitment.html
http://www.fempower.co.za/01/index.php?option=com_content&task=view&id=19&Itemid=34
http://en.wikipedia.org/wiki/Recruitment
https://www.google.co.in/
http://www.emc.com/
BIBLIOGRAPHY:
 C.B Mamoria and S.V. Gankar (2004), Personal Management Text and Cases. Himalaya
Publication.
 Essentials of HRM and IR - P.Subba Rao.
 Personal Management - C.B.Memoria.
 Research Methodology -C.R.Kothari.
 Personnel and Human Resource Management – P. Subba Rao, Himalaya Publication
98
Questionnaire on Recruitment Process:
Name –
Company’s name –
Designation –
Date-
Note – Please fill the appropriate option.
Question 1: What form of interview did you prefer? ( )
a. Personal interviews b. telephonic interviews c. video conferencing d. Other
Question 2: What source you adopt to source candidates? ( )
a. Candidate referral b. Advertising c. Job portals
Question 3: How many stages are involved in selecting the candidate? / How many Question
you are asking during the Telephonic interview round? ( )
a. 1 b. 2 c. 3 d. 4 e. More
Question 4: How do you track the source of candidate? ( )
a. Software b. Online c. Data
99
Question 5: Does the organization clearly define the position objectives, requirements and
candidate specifications in the recruitment process? ( )
a. Yes b. No
Question 6: What is the average time spent by executives during recruitment (each
candidate) ? ( )
a. 1mins to 5mins. b. 5 to 10 mins.
c. 10 to 15mins. d. More
Question 7: Do you follow different recruitment process for different grades of employees?
( )
a. No b. Yes
Question 8: What are the basic questions you ask to the candidate? ( )
a. Experience (Total/Relevant)
b. Current CTC/Expected CTC
c. Job Profile
d. Notice period
e. All the Above
Question 9: Do you have any system to calculate cost per recruitment? ( )
a. No
b. Yes, please specify –
100
Question 10: Is there any provision for evaluation and control of recruitment process?
( )
a. Yes b. No
Question 11: Is there any facility for absorbing the trainees in your organization?
a. Yes b. No ( )

‘Human resources recuritment’ project report

  • 1.
    1 SUMMER TRAINING PROJECTREPORT on ‘HUMAN RESOURCES RECURITMENT’ HONEYWELL, AMBALA SUBMITTED FOR PARTIAL FULFILLMENT OF THE DEGREE OF MASTER OF BUSINESS ADMINISTRATION [2014-2015] By ANUPAM RAJ PATWA (Roll No.: 1368670020) EXTERNAL SUPERVISOR INTERNAL SUPERVISOR SUSHIL KUMAR SAHU SUNITA SINGHAL HR Manager ASSIATANT PROFESER HONEYWELL Automation India Ltd, AIAM, GRATER NOIDA AMBALA ACCURATE INTITUTEOF ADVANCEMANAGEMENT, GRATER NOIDA (Affiliated to UPTU and Approved by AICT
  • 2.
    2 Accurate Institute ofAdvanced Management (Affiliated to UPTU and Approved by AICTE) ______________________________________ Date: HEAD OF MBA PROGRAM’S CERTIFICATE Certified that the Summer Training Project Report titled “HUMAN RESOURCES REQUIRTMENT” is carried out by Mr. ANUPAM RAJ PATWA, Roll No.1368670020, a student of MBA –III semester at Accurate Institute of Advanced Management, Greater Noida, under the supervision of –Shaurabh Chandra HR Manager (Designation) Honeywell Automation India Ltd. This is an original work carried out by the said student to the best of my knowledge and I recommend for the submission of this summer Training Project Report to Uttar Pradesh Technical University, Lucknow in the partial fulfillment of the award of MBA Dagree. Prof.(Dr.) Amar Kr. Saxena Director,AIAM,Greater Noida. Plot No. 49, Knowledge Park-3, Greater NOIDA-201306 (UP), Phone: 0120-2328235, Fax: 0120-2320355 E. Mail.: info@accurate.in, Web: http//www.aiam.in
  • 3.
    3 DECLARATION To, The Director, Accurate Instituteof Advance Management, Plot No.-49, Knowledge Park 3 Greater Noida Utter Pradesh – 201308. Respected Sir, I hereby declare that this project report entitled “HUMAN RESOURCES REQUIRTMENT"iswritten and submitted by me under the kind guidance of Mr. Saurabh Chandra,HRManager, Industry Guide and Mrs.SUNITA SINGHAL, Asst.Prof, AIAM, Gr. Noida (U.P.). The findings and interpretations in the report are based on both primary and secondary data collection. This project is not copied from any source or other Project submitted for similar purpose. DATE: PLACE: Greater Noida ROLL NO.: 1368670020
  • 4.
    4 Signature of student PREFACE Thelearning process of classroom is incomplete without any practical field experience. It is because of the reason that our Institute like any other, has provision for practical training, so practical training is vital. Accordingly we had our training with Honeywell Automation India Ltd. This 8 weeks training gave us an insight into the working of an organization and learn how some of the important concepts that we have been studying as a student of management are applicable in the field. The project is a sincere attempt to focus on the subject in a lucid manner. I sincerely attempted to effort to carry out study in deep on subject. During this period we had the opportunity to observe the company’s performance, place in the industry, its products, pricing, advertisement, promotions and its good will through our market survey. It is hoped that this study will provide valuable information in various issues related to Honeywell Automation India Ltd, oriented industries. ANUPAM RAJ PATWA
  • 5.
    5 Roll no.:- 1368670020 ACKNOWLEDGEMENT Withimmense please we are presenting “Human Resources Recruitment” Project report as part of the curriculum of ‘Master of Management Studies’. We wish to thank all the people who gave us unending support. I express my profound thanks to Director and Prof. Amar Sexena, project guide and all those who have indirectly guided and helped us in preparation of this project. We also like to extend our gratitude to all staff and our colleagues of College of Management, who provided moral support, a conductive work environment and the much-needed inspiration to conclude the project in time and a special thanks to my parents who are integral part of the project. Thanking you. Accurate Institute of Advance Management Knowledge Park 3, Greater Noida
  • 6.
    6 CONTENT Title Pages Chapter 1INTRODUCTION OF THE STUDY 08-31 Objectives of Study, scope of study, HRM & HRD definition, Use Of HRM in org., Advantage/ Important of HR, HR Topic- Function, Training & Development, Intro. Of Orientation, Team Management Skills, HR Recruitment, Need, Role, Scope Objective, Advantages, Changing Role, RMS, HR Telephonic Interview, Challenges. Chapter 2 INTRODUCTION OF THE ORGANISATION 32-51 Introduction Of Company, Company Profile, Global Process, What To Do, Company Recognition, History of organization, Chapter 3 PROFILE OF THE ORGANISATIO 53-74 About Company, Company Profile, Data Bank, Facilities, Aim & Approach, Quality Policy & Processes, Clientele, Why HAIL, Executive Manager Consultant Takes Care Of (Quality, Cost, On Time Delivery, Retention, Specialization Level Of Recruitment, Function Area, Job Profile, JD for Position, Email, Format, Weekly States Report, Form of Interviews. Chapter 4 RESEARCH METHODOLOGY 75-78 Research, Methodology of Study, Data Collection, Kind of Research, Research Design. Chapter 5 DATA ANALYISIS AND INTERPRETATION 79-92 Question of Form of interview, Sources, Stage, Track, Position, Time, Grades of Employees, Asking Question, and Theoretical Framework. Chapter 6 FINDING, CONCLUSION, SUGGESTION, AND LIMITATION 93-100
  • 7.
    7 Finding, imitation ofStudy, Conclusion, Suggestion, Wibliography, Bibliography, Questionnaire on Recruitment Process. List of Diagrams Sr. No.: PARTICULARS Pg. No. 1 Form of Interview 42 2 Source of Candidate 43 3 Telephonic Interview Round 43 4 Track Candidate 44 5 Define Candidate 44 6 Time Spent 45 7 Different Process 45 8 Basic Questions 46 9 Cost Calculating System 46 10 Evaluation and control of Process 47 11 Facility for trainees 47
  • 8.
  • 9.
    9 Objectives of thestudy: The main objectives of the study are as follows: i. To understand the process of recruitment ii. To know the sources of recruitment at various levels and various jobs iii. To critically analyze the functioning of recruitment procedures iv. To identify the probable area of improvement to make recruitment procedure more effective v. To know the managerial satisfaction level as well as to know the yield ratio vi. To search or headhunt people whose, skill fits into the company’s values Scope of study: The benefit of the study for the researcher is that it helped to gain knowledge and experience and also provided the opportunity to study and understand the prevalent recruitment procedures. The key points of my research study are: i. To Understand and analyze various HR factors including recruitment procedure at consultant.
  • 10.
    10 ii. To suggestany measures/recommendations for the improvement of the recruitment procedures
  • 11.
    11 Human Resource Managementand Human Resource Development Definition: HRM is the process of managing people in organizations in a structured and thorough manner. This covers the fields of staffing (hiring people), retention of people, pay and perks setting and management, performance management, change management and taking care of exits from the company to round off the activities. This is the traditional definition of HRM which leads some
  • 12.
    12 experts to defineit as a modern version of the Personnel Management function that was used earlier. We have chosen the term “art and science” as HRM is both the art of managing people by recourse to creative and innovative approaches; it is a science as well because of the precision and rigorous application of theory that is required. Human Resource Development (HRD) means to develop available manpower through suitable methods such as training, promotions, transfers and opportunities for career development. HRD programs create a team of well-trained, efficient and capable managers and subordinates. Such team constitutes an important asset of an enterprise. One organisation is different from another mainly because of the people (employees) working there in. According to Peter F. Drucker, "The prosperity, if not the survival of any business depends on the performance of its managers of tomorrow." The human resource should be nurtured and used for the benefit of the organisation. Uses of Human Resource Management in an organization:  Human Resource Management (HRM) is the function within an organization that focuses on recruitment of, management of, and providing direction for the people who work in the organization. It can also be performed by line managers.  Human Resource Management is the organizational function that deals with issues related to people such as compensation, hiring, performance management, organization development, safety, wellness, benefits, employee motivation, communication, administration, and training.
  • 13.
    13  HRM isalso a strategic and comprehensive approach to managing people and the workplace culture and environment. Effective HRM enables employees to contribute effectively and productively to the overall company direction and the accomplishment of the organization's goals and objectives.  Human Resource Management is moving away from traditional personnel, administration, and transactional roles, which are increasingly outsourced. HRM is now expected to add value to the strategic utilization of employees and that employee programs impact the business in measurable ways. The new role of HRM involves strategic direction and HRM metrics and measurements to demonstrate value.  The Human Resource Management (HRM) function includes a variety of activities, and key among them is responsibility for human resources -- for deciding what staffing needs you have and whether to use independent contractors or hire employees to fill these needs, recruiting and training the best employees, ensuring they are high performers, dealing with performance issues, and ensuring your personnel and management practices conform to various regulations. Activities also include managing your approach to employee benefits and compensation, employee records and personnel policies. Usually small businesses (for-profit or nonprofit) have to carry out these activities themselves because they can't yet afford part- or full-time help. However, they should always ensure that employees have - - and are aware of -- personnel policies which conform to current regulations. These policies are often in the form of employee manuals, which all employees have.  HRM is widening with every passing day. It covers but is not limited to HR planning, hiring (recruitment and selection), training and development, payroll management,
  • 14.
    14 rewards and recognitions,Industrial relations, grievance handling, legal procedures etc. In other words, we can say that it’s about developing and managing harmonious relationships at workplace and striking a balance between organizational goals and individual goals. Advantages / Importance of HR:  Meeting manpower needs: Every Organisation needs adequate and properly qualified staff for the conduct of regular business activities. Imaginative HRP is needed in order to meet the growing and changing human resource needs of an organisation.  Replacement of manpower: The existing manpower in an Organisation is affected due to various reasons such as retirement and removal of employees and labour turnover. HRP is needed to estimate the shortfall in the manpower requirement and also for making suitable arrangements for the recruitment and appointment of new staff.  Meeting growing manpower needs: The expansion or modernisation programme may be undertaken by the enterprise. Manpower planning is needed in order to forecast and meet additional manpower requirement due to expansion and growth needs through recruitment and suitable training programs.  Meeting challenges of technological environment: HRP is helpful in effective use of technological progress. To meet the challenge of new technology existing employees need to be retrained and new employees may be recruited.
  • 15.
    15  Coping withchange: HRP enables an enterprise to cope with changes in competitive forces, markets, products, and technology and government regulations. Such changes generate changes in job content, skill, number and type of personals.  Increasing investment in HR: An employee who picks up skills and abilities becomes a valuable resource because an organisation makes investments in its manpower either through direct training or job assignments.  Adjusting manpower requirements: A situation may develop in; an organisation when there will be surplus staff in one department and shortage of staff in some other department. Transfers and promotions are made for meeting such situations.  Recruitment and selection of employees: HRP suggests the type of manpower required in an organisation with necessary details. This facilitates recruitment and selection of suitable personnel for jobs in the Organisation. Introduction of appropriate selection tests and procedures is also possible as per the manpower requirements.  Placement of manpower: HRP is needed as it facilitates placement of newly selected persons in different departments as per the qualifications and also as per the need of different departments. Surplus or shortage of manpower is avoided and this ensures optimum utilization of available manpower.  Training of manpower: HRP is helpful in selection and training activities. It ensures that adequate numbers of persons are trained to fill up the future vacancies in the Organisation.
  • 16.
    16 HR TOPICS -FUNCTIONS Recruitment and Selection Process Complete Recruitment life cycle  Levels of Companies  Technologies and Domineer  Portal Explanation  Explanation of Job Description and Analyzing of Requirement  Sourcing of Profiles from Portals  Screening of profiles as per the requirement  Calling the Candidates  Formatting of profiles and Tracker’s Preparation  Maintenance of Database Training and Development  Concept of Training and Development  Training Needs Identification Process  Designing Annual Training Plans  Training Execution  Designing Employee Development Initiatives  Designing Supervisory Development Programs  Designing Management Development Programs  What is Training ROI and how to Calculate  Introduction to Best Trainer Skills, Knowledge and Abilities
  • 17.
    17 Induction and Orientation How to Design Induction Programs and Execution  How to Design on the Job Training Programs and Monitoring  How to evaluate effectiveness of Induction and on the Job Training Programs  Probation Confirmation and HR Role Team Management Skills  Understanding What is a Team  Understanding Team Development Stages  What is your Team Membership Orientation  How to improve your effectiveness as Team Member  What is Team Leadership  Understanding my Orientation HR Recruitment:
  • 18.
    18 According to EdwinFlippo, "Recruitment is the process of searching for prospective employees and stimulating them to apply for jobs in the Organisation." Recruitment is a continuous process whereby the firm attempts to develop a pool of qualified applicants for the future human resources needs even though specific vacancies do not exist. Usually, the recruitment process starts when a manger initiates an employee requisition for a specific vacancy or an anticipated vacancy. It is the process to discover sources of manpower to meet the requirement of staffing schedule and to employ effective measures for attracting that manpower in adequate numbers to facilitate effective selection of an efficient working force. Recruitment of candidates is the function preceding the selection, which helps create a pool of prospective employees for the organisation so that the management can select the right candidate for the right job from this pool. The main objective of the recruitment process is to expedite the selection process. Recruitment is almost central to any management process and failure in recruitment can create difficulties for any company including an adverse effect on its profitability and inappropriate levels of staffing or skills. Inadequate recruitment can lead to labor shortages, or problems in management decision making and the recruitment process could itself be improved by following management theories. The recruitment process could be improved in sophistication with Rodgers seven point plan, Munro-Frasers five-fold grading system, psychological tests, personal interviews, etc. Recommendations for specific and differentiated selection systems for different professions and specializations have been given. A new national selection system for psychiatrists, anesthetists and dental surgeons has been proposed within the UK health sector
  • 19.
    19 Need for Recruitment Theneed for recruitment may be due to the following reasons / situations  Vacancies: due to promotions, transfers, retirement, termination, permanent disability, death and labour turnover.  Creation of new vacancies: due to growth, expansion and diversification of business activities of an enterprise.  In addition, new vacancies are possible due to job respecification. The recruitment and selection is the major function of the human resource department and recruitment process is the first step towards creating the competitive strength and the strategic advantage for the organisations. Recruitment process involves a systematic procedure from sourcing the candidates to arranging and conducting the interviews and requires many resources and time. A general recruitment process is as follows: Identifying the vacancy: The recruitment process begins with the human resource department receiving requisitions for recruitment from any department of the company. These contain: • Posts to be filled • Number of persons • Duties to be performed • Qualifications required
  • 20.
    20  Preparing thejob description and person specification.  Locating and developing the sources of required number and type of employees (Advertising etc).  Short-listing and identifying the prospective employee with required characteristics.  Arranging the interviews with the selected candidates.  Conducting the interview and decision making The HR Role in Recruitment changed and HRM:  Decides about the design of the recruitment processes and to decide about the split of roles and responsibilities between Human Resources and Hiring Manager  Decides about the right profile of the candidate  Decides about the sources of candidates  Decides about the measures to be monitored to measure the success of the process A traditional role of HR in Recruitment was an administrative part of the whole process. The HRM was responsible for maintaining the vacancies advertised and monitored, but the real impact of HRM to the performance of the whole recruitment process was minimal. But as the role of Human Resources in the business was increasing, the HR Strategy was changed. From making the process working to the real management of HR Processes and the Recruitment Process was the first to manage. The role of HR in Recruitment is very important as HRM is the function to work on the development of the recruitment process and to make the process very competitive on the market. As the job market gets more and more competitive, the clearly defined HR Role in Recruitment
  • 21.
    21 will be growingquickly. HRM is not a function to conduct all the interviews today, the main role of Human Resources is to make the recruitment process more attractive and competitive on the job market. Scope of HR Recruitment:  HR jobs are one of most important tasks in any company or organization.  To structure the Recruitment policy of company for different categories of employees.  To analyses the recruitment policy of the organization.  To compare the Recruitment policy with general policy.  To provide a systematic recruitment process.  It extends to the whole Organization. It covers corporate office, sites and works appointments all over India.  It covers workers, Clerical Staff, Officers, Jr. Management, Middle Management and Senior Management cadres.  A recruitment agency provides you with career counseling which renders a crystal clear picture of what are the possible career options out there for you and which job option suits you the best.
  • 22.
    22 Objective of HR To obtain the number and quality of employees that can be selected in order to help the organization to achieve its goals and objectives.  Recruitment helps to create a pool of prospective employees for the organization so that the management can select the right candidate for the right job from this pool.  Recruitment acts as a link between the employers and the job seekers and ensures the placement of right candidate at the right place at the right time.  Recruitment serves as the first step in fulfilling the needs of organizations for a competitive, motivated and flexible human resource that can help achieve its objectives.  The recruitment process exists as the organization hire new people, who are aligned with the expectations and they can fit into the organization quickly. Advantage of Outsourcing Recruitment/Hiring of Consultancy Traditionally, recruitment is seen as the cost incurring process in an organization. HR outsourcing helps the HR professionals of the organisations to concentrate on the strategic functions and processes of human resource management rather than wasting their efforts, time and money on the routine work. Outsourcing the recruitment process helps to cut the recruitment costs to 20 % and also provide economies of scale to the large sized organizations. The major advantages of outsourcing performance management are:
  • 23.
    23 Outsourcing is beneficialfor both the corporate organisations that use the outsourcing services as well as the consultancies that provide the service to the corporate. Apart from increasing their revenues, outsourcing provides business opportunities to the service providers, enhancing the skill set of the service providers and exposure to the different corporate experiences thereby increasing their expertise. The advantages accruing to the corporate are:  Turning the management's focus to strategic level processes of HRM  Accessibility to the expertise of the service providers  Freedom from red tape and adhering to strict rules and regulations  Optimal resource utilisation  Structured and fair performance management.  A satisfied and, hence, highly productive employees  Value creation, operational flexibility and competitive advantage Result Qualitative/Quantitative Hiring of consultancy Time saving of Company Focus Management Effort Cost Reduction
  • 24.
    24 Therefore outsourcing helpsboth the organisations and the consultancies to grow and perform better. Changing Role of Recruitment Intermediaries: Recruitment consultancies, agencies or intermediaries are witnessing a boom in the demand of their services, both by the employers and the job seekers. With an already saturated job market, the recruitment intermediaries have gained a vital position acting as a link between the job seekers and the employers. But at the same time, one of the major threats faced by this industry is the growing popularity of e-recruitment. With the changing demand, technologies and the penetration and increasing use of internet, the recruitment consultancies or the intermediaries are facing tough competition. To retain and maintain their position in the recruitment market, the recruitment intermediaries or consultants (as they are commonly known) are witnessing and incorporating various changes in terms of their role, functions and the services. According to a survey amongst top employers, most of them agree with the growing influence of technology and the Internet on the recruitment processes. 70 per cent of employers reported the use of application portal on their company’s official website. Apart from that, the emerging popularity of the job portals is also growing. But the fact that the intermediaries or the consultants are able to provide their expert services, economies of scale, up to 40 percent savings in the recruitment costs, knowledge of the market, the candidates, understanding of the requirements, and most importantly, the assess to the suitable and talented candidates and the structured recruitment processes. The recruitment intermediaries
  • 25.
    25 save the organisationsfrom the tedious of weeding out unsuitable resumes, co-coordinating interviews, posting vacancies etc. give them an edge over the other sources of recruitment. To retain their position as the service providers in the recruitment market, the recruitment intermediaries are providing vale added services to the organisations. They are incorporating the use of internet and job portals, making their services more efficient. Despite of the growing use of the internet, the recruitment intermediaries are predicted to continue dominating the recruitment market in the anticipated future. Recruitment Management System Recruitment management system is the comprehensive tool to manage the entire recruitment processes of an organisation. It is one of the technological tools facilitated by the information management systems to the HR of organisations. Just like performance management, payroll and other systems, Recruitment management system helps to contour the recruitment processes and effectively managing the ROI on recruitment. The features, functions and major benefits of the recruitment management system are 4explained below:  Structure and systematically organize the entire recruitment processes.  Recruitment management system facilitates faster, unbiased, accurate and reliable processing of applications from various applications.  Helps to reduce the time-per-hire and cost-per-hire.
  • 26.
    26  Recruitment managementsystem helps to incorporate and integrate the various links like the application system on the official website of the company, the unsolicited applications, outsourcing recruitment, the final decision making to the main recruitment process.  Recruitment management system maintains an automated active database of the applicants facilitating the talent management and increasing the efficiency of the recruitment processes.  Recruitment management system provides and a flexible, automated and interactive interface between the online application system, the recruitment department of the company and the job seeker.  Offers tolls and support to enhance productivity, solutions and optimizing the recruitment processes to ensure improved ROI.  Recruitment management system helps to communicate and create healthy relationships with the candidates through the entire recruitment process.  The Recruitment Management System (RMS) is an innovative information system tool which helps to sane the time and costs of the recruiters and improving the recruitment processes.
  • 27.
  • 28.
  • 29.
    29 1. Client needassessment  Define objectives and specifications  Understand client's business and culture  Understand the job/position specifications  Understand roles and responsibilities of the prospective candidate  Develop a search plan and review with the client 2. Candidate Identification  Identify target sources  Extensive organization mapping, research & database search of the profile  Provide status report to client about the available talent pool 3. Candidate assessment and Presentation  Screen and evaluate candidates  Personal Interviews with Candidates wherever possible - assess skills, interest level and cultural fit  Discuss the shortlist with the client and send resumes 4. Candidate interview, selection & Presentation of Offer  Facilitate interviews with the client  Obtain feedback  Participate in decision making process  Provide inputs on candidate's desired compensation
  • 30.
    30 5. Closure &Follow up  Negotiate offer acceptance  Execute Reference check, Compensation & Job Level Discussions  Coordinate Joining Formalities and on boarding as per predefined date  Closing review to understand client's level of satisfaction. HR Telephonic Interview Questions:  Tell me about yourself?  Tell me about your job profile?  How much current CTC, you’re getting in current organization?  How much you’re expecting form new organization?  How the notice period you required if you are selected?  Why did you want to resign from your previous job? HR Challenges in Recruitment Recruitment is a function that requires business perspective, expertise, ability to find and match the best potential candidate for the organisation, diplomacy, marketing skills (as to sell the position to the candidate) and wisdom to align the recruitment processes for the benefit of the organisation. The HR professionals – handling the recruitment function of the organisation- are constantly facing new challenges. The biggest challenge for such professionals is to source or recruit the best people or potential candidate for the organisation.
  • 31.
    31 In the lastfew years, the job market has undergone some fundamental changes in terms of technologies, sources of recruitment, competition in the market etc. In an already saturated job market, where the practices like poaching and raiding are gaining momentum, HR professionals are constantly facing new challenges in one of their most important function- recruitment. They have to face and conquer various challenges to find the best candidates for their organisations. The major challenges faced by the HR in recruitment are:  Adaptability to globalization – The HR professionals are expected and required to keep in tune with the changing times, i.e. the changes taking place across the globe. HR should maintain the timeliness of the process  Lack of motivation – Recruitment is considered to be a thankless job. Even if the organisation is achieving results, HR department or professionals are not thanked for recruiting the right employees and performers.  Process analysis – The immediacy and speed of the recruitment process are the main concerns of the HR in recruitment. The process should be flexible, adaptive and responsive to the immediate requirements. The recruitment process should also be cost effective.  Strategic prioritization – The emerging new systems are both an opportunity as well as a challenge for the HR professionals. Therefore, reviewing staffing needs and prioritizing the tasks to meet the changes in the market has become a challenge for the recruitment professionals.
  • 32.
  • 33.
    33 INTRODUCTION OF COMPANY OurCompany: Honeywell invents and manufactures technologies to address some of the world’s toughest challenges initiated by revolutionary macrotrends in science, technology and society. A Fortune 100 company, we create solutions to improve the quality of life of people around the globe: generating clean, healthy energy – and using it more efficiently. Increasing our safety and security. Enabling people around the world to connect, communicate, and collaborate. And equipping our customers to be even more productive. With approximately 132,000 employees worldwide, including more than 22,000 engineers and scientists, we have an unrelenting commitment to quality and delivering results in everything we make and do.
  • 34.
    34 Company Profile: Honeywell Securityis an international supplier and distributor of electronic security systems and solutions. Our products monitor and protect millions of homes, businesses and government facilities across the globe. Honeywell Security is a business unit of Honeywell International, a $36.6 billion diversified technology and manufacturing leader, serving customers worldwide with aerospace products and services; control technologies for buildings, homes and industry; automotive products; turbochargers; and specialty materials. Based in Morris Township, N.J., Honeywell's shares are traded on the New York, London and Chicago Stock Exchanges. It is one of the 30 stocks that make up the Dow Jones Industrial Average and is also a component of the Standard & Poor's 500 Index. Honeywell Security has an extraordinary range of solutions across Intrusion detection, Video Surveillance, Access Control Technologies & Home net systems and invests over $100 million a year in research and development. It has its engineering "centers of excellence" in the U.S., Canada, China, Korea, India, Scotland,Germany and France and leverages technologies that are developed elsewhere in Honeywell and brings them to the security business. Example: Video analysis software developed by Honeywell Labs, advanced sensors from the Sensing and Control business or GPS systems from Aerospace.
  • 35.
    35 Honeywell Security SouthAsia operations spans across Sri Lanka, Pakistan, Bangladesh, Nepal and other South Asian countries with HQ in India. We have our offices in Gurgaon, Mumbai, Bangalore and Kolkata catering to all four corners of the country. An exponentially growing business unit of Honeywell International, Honeywell Security caters to all electronic security needs for Industrial, Government, Defense, Transportation, Commercial, Retail, Hotel, Hospital, Corporate Buildings, IT, ITES, Banking and also the Residential market. One of the key initiatives identified by Honeywell Security was to start a manufacturing facility locally in India. Honeywell Security South Asia made history by starting manufacturing in India in collaboration with ED&S at Hopetown facility in Oct 2008 in Dehradun, Uttrakhand. The manufacturing unit is spread over 2000 sq ft and is well equipped with all testing equipments. The production floor is ESD protected and temperature and humidity controlled. A twelve member team comprising of trained engineers, technicians operate for the security business. As a starting point high volume CCTV surveillance cameras are being manufactured, but gradually the production basket will also include intrusion alarm systems and home systems as well.
  • 36.
    36 Global Processes: Honeywell’s abilityto continually improve comes from successfully achieving two seemingly competing tasks at once – productivity and growth. Our global processes are Honeywell’s core internal business processes such as Six Sigma, FT, HOS and VPD that drive efficiency and service quality. By relentlessly executing on these processes, Honeywell brings world-class products and services to market faster and more cost-effectively for our customers. What We Do Aerospace Advancements: Honeywell Aerospace mechanical and electrical innovations are used today on virtually every commercial and defense aircraft platform. Our aerospace team invents and integrates thousands of products and services that deliver safe, efficient, productive and comfortable experiences worldwide. Automation Smart TechnologyandControl Solutions: Families, businesses, and communities use Honeywell environmental controls, life safety, security, sensing, scanning, and mobility products, as well as building and process solutions in homes, buildings, industrial facilities, and public and private utilities around the world.
  • 37.
    37 Cutting-Edge Performance MaterialsandTechnologies: Honeywell is a global leader in designing and creating high-purity, high-quality performance chemicals and materials. Our technologies can do everything from reducing emissions to stopping bullets. They enable the production of cleaner, more efficient fuels, increase capacity in oil refineries, speed drug discovery, and protect medicines. Efficient TransportationSystems: Honeywell Transportation Systems provides world-class technologies and solutions to automakers, their suppliers, and the public. Our technologies make passenger and commercial vehicles throughout the world perform better and more efficiently. Solutions Around the Globe: We're committed to growing to serve more customers – and to constantly making our products and services even better. Operating throughout the world enables us to better understand the challenges that our customers face – and to provide even better solutions. Today, approximately 55% of our revenues are now generated outside the U.S., making Honeywell a truly global enterprise.
  • 38.
    38 Americas: Headquartered in MorrisTownship, New Jersey, Honeywell employs more than 69,000 employees in our research and development centers, manufacturing facilities and administrative offices across the region. Throughout the U.S., Mexico, Canada and Brazil we have a team of unparalleled vision, talent, and dedication. Their commitment to results and to continuous improvement is what drives Honeywell forward – with achievements like:  A complete modernization of the Los Angeles, CA city wastewater treatment system. Integrated Honeywell controls were used to streamline operations and reduce environmental risks.  A partnership with Petrobras in Brazil to expand its diesel production capacity and commission new safe, efficient offshore vessels to process natural gas off the coast of Brazil. China: Since 1935, China has been critical to Honeywell's growth and innovation strategies. Today, we have around 12,000 employees located in 20 cities, including five major technology centers in Shanghai, Beijing, Tianjin, Nanjing and Chongqing with more than 1,400 scientists and engineers focused on research and development, engineering and design. Honeywell is playing a major role in the growth of China's aviation industry. We provide fly-by- wire flight controls, wheel and brake systems, auxiliary power units and the inertial reference and
  • 39.
    39 air data systemsfor the new C919 platform from Commercial Aircraft Corporation of China Ltd. (COMAC). Green Jet Fuel made from Honeywell technology powered the first biofuel flight in the region in 2011. Honeywell is honored to have been selected to develop and implement China's first smart grid pilot project for managing energy use in commercial buildings. India: Honeywell's presence in India dates back to the 1930s, when refining technology from Honeywell's UOP group was commissioned in India's very first refinery in the state of Assam. Today, with more than 12,000 employees, Honeywell operates state-of-the-art engineering and manufacturing facilities in Pune, Guragon, Chennai and Dehradun. Our India operations include automation control solutions, turbochargers, and refining. Honeywell also has global centers of excellence for technology and product development across the region. We developed the world's first turbo technology for a 2-cylinder micro-diesel engine in India, which is helping to drive a new chapter of ultra-fuel-efficient micro vehicles for the growing region.
  • 40.
    40 Asia Pacific: Honeywell continuesto build on our manufacturing, engineering, and sales capabilities across the Asia Pacific region. Each of our businesses – Aerospace, Automation and Control Solutions, Performance Materials and Technologies, and Transportation Systems – is growing and expanding here. Today, we have around 6,000 colleagues in the region. In Korea and Japan, our turbo operations work with major car and truck manufacturers to provide tailored turbocharging solutions for local markets and global customers, as well as semiconductor manufacturing operations for our Electronic Materials business in Thailand, Korea and Japan. The Honeywell Process Solutions and Building Solutions businesses employ more than 100 engineers and technicians. In our research and development center in Sydney, Australia, we design automation and control software. Honeywell's UOP group has a design and operations center in Kuala Lumpur, Malaysia to serve oil and gas customers across Southeast Asia . Europe, the Middle East& Africa (EMEA): Today more than 32,000 of our colleagues represent Honeywell's four businesses across Europe, the Middle East and Africa, and we continue to expand to deliver better results and serve more customers. Our 23 research and development centers in the region are innovating and creating solutions to meet the region's needs, including:  Smart grid solutions that can cut peak energy use in commercial and industrial facilities
  • 41.
    41  Advanced turbosthat will help customers reach new emissions and fuel efficiency standards without compromising on power and performance To address the projected increase in air travel across Europe and the globe, we are harnessing the expertise of both our Aerospace and Automation Control Systems businesses. We are developing a modernized infrastructure that will allow people and aircraft to be moved into, around and out of airports faster, safer and more efficiently – saving time and fuel, and ensuring travelers fewer hassles and more peace of mind. Company Recognition: Honeywell has been recognized as a leading company in a variety of different ways including: World's Most Admired Companies 2008-2014 Best in Sector - Diversified Industrials & Best Financial Reporting 2014 A Top Military Friendly Employer 2014
  • 42.
    42 2014 All America ExecutiveTeam - Most Honored Companies 2014 Top 100 Global Innovators in 2013 by Thomson Reuters 2011-2013 Ethisphere Most Ethical Companies 2013 Indo-American Chamber of Commerce Corporate Execllence Award for Technology & Communications Minority Engineer Top 50 Employer 2011-2013 Woman Engineer Top 50 Employer 2009, 2011-2013
  • 43.
    43 HISTORY OF THEORGENISATION: Honeywell's story stretches back more than 125 years and encompasses several predecessor companies and the inspiring work of tens of thousands of people. But our core mission and values have been consistent from the start:  Our vision for a secure, comfortable, more efficient future...  Our steadfast belief in the power of innovation ...  And our relentless insistence on continuous improvement. From our genesis in 1885 to today, these are the principles that led us to the advancements and innovations of the past century and a quarter ... And they'll continue to inspire and guide us as we create new solutions for the challenges of tomorrow. n 2002, David M. Cote was named Chairman and CEO of Honeywell. Under his leadership the company focuses on five initiatives: Growth, Productivity, Cash, People and the company's Enablers - Honeywell Operating System, Velocity Product Development™ and Functional Transformation. Under Cote's leadership, Honeywell has delivered strong performance in sales growth, earnings per share, segment profit and cash flow. Today, the company has great positions in good industries
  • 44.
    44 globally, with approximately50% of its products and solutions providing energy efficiency benefits. More than 125 Years of Innovation Honeywell's roots reach to 1885, when an inventor named Albert Butz patented the furnace regulator and alarm. He formed the Butz Thermo-Electric Regulator Co., Minneapolis, in April, 1886, and soon invented an ingenious device he called the "damper flapper” – an ingenious predecessor to the modern thermostat. Here's how it worked. When a room cooled below a predetermined temperature, a thermostat closed the circuit and energized an armature. This pulled the stop from the motor gears, allowing a crank attached to the main motor shaft to turn one-half revolution. A chain connected to the crank opened the furnace's air damper to let in air. This made the fire burn hotter. When the temperature rose to the preset level, the thermostat signaled the motor to turn another half revolution, closing the damper and damping the fire. The temperature correction was automatic. Over the years, many Honeywell products have been based upon similar, but more complicated closed-loop systems. The Consolidated Temperature Controlling Co. acquired Butz's patents and business, and by 1893, had renamed itself Electric Heat Regulator Co. In 1898, the company was purchased by W. R. Sweatt, who, by 1916, named the company Minneapolis Heat Regulator Company, expanded its product line and patented the first electric motor approved by Underwriters Laboratories. Meanwhile, in Wabash, Indiana...
  • 45.
    45 In 1904, ayoung engineer named Mark Honeywell – from whom our name originated – was perfecting the heat generator as part of his plumbing and heating business. Two years later, he formed the Honeywell Heating Specialty Co. Incorporated, specializing in hot water heat generators. The 1927 Merger In 1927, Minneapolis Heat Regulator Company and Honeywell Heating Specialty Co. merged to form the Minneapolis-Honeywell Regulator Co., and became the largest producer of high-quality jeweled clocks. W. R. Sweatt became Chairman and Mark Honeywell became President. The company quickly grew as it began to tackle more challenges, including industrial controls and indicators. Business Around the World The company has been selling its products throughout the world for a long time. In 1934, the company acquired Time-O-Stat Controls Corporation and began establishing a track record of global expansion. We established offices in Toronto, the Netherlands, London and Stockholm. By
  • 46.
    46 1941, The companyhad distributors in Chile, Panama, Trinidad, New Zealand, Argentina, and South Africa. By 1972, we operated 25 wholly-owned subsidiaries, 142 branch offices, and joint ventures in five countries outside the U.S. In 1993, the company opened affiliates in Abu Dhabi, China, Oman, Romania, and the Ukraine. By 1998, the company had operations in 95 countries. Products, Developments and Acquisitions Minneapolis-Honeywell Regulator Co. leveraged its scientific and engineering talent to adapt to changing times. We radically improved mass production and added an array of aeronautical equipment to our portfolio. In 1942, we invented the electronic autopilot, which proved vital to the U.S. war effort. In 1953, the cmpany introduced the iconic T-86 "Round" thermostat, which replaced chunky, rectangular models. One of the world's most recognizable designs, it remains in production today and is used in more households around the world than any other thermostat.
  • 47.
    47 In 1954, thebegan working to make gyroscopes more sensitive and precise while reducing their size and weight – and continued improving them over the next two decades. In 1955, we established a partnership with Raytheon Corp., marking Honeywell's entry into the computer business. In 1957, we began working on fire detection and alarm systems. In many North American cities, the red and black "Protected by Honeywell" window stickers and placards were nearly as recognizable as the “Round” thermostat. Today we are the global leader in the industry. The company's name was officially changed to Honeywell Inc. in 1963. Six years later, Honeywell instruments helped U.S. astronauts Neil Armstrong and Edwin "Buzz" Aldrin land on the moon. In 1970, Honeywell merged its computer business with General Electric's to form Honeywell Information Systems.
  • 48.
    48 In 1986, thepersonal computer emerged and the company formed Honeywell Bull, a global joint venture with Compagnie des Machines Bull of France and NEC Corporation of Japan. Its ownership level was gradually decreased until, In 1991, Honeywell was no longer in the computer business. The company's digital computer knowledge lives on today in the field of automation control, integrating sensors, and activators. In 1986, Honeywell took a bold step to increase its investment in aerospace innovation with the purchase of Sperry Aerospace, making us the world's leading integrator of avionics systems. Sperry contributed flight controls, space vehicles, and the first FAA-certified wind shear warning system. The AlliedSignal Connection During World War I, Germany controlled much of the world's chemical industry, causing shortages among the U.S. and our allies of critical drugs and dyes. In 1920, publisher Eugene
  • 49.
    49 Meyer and scientistWilliam Nichols formed the Allied Chemical & Dye Corporation as a partnership of five American chemical companies. In 1928, Allied opened a synthetic ammonia plant and quickly became the world's leading producer of ammonia . After World War II, Allied began manufacturing other new products, including nylon 6 (used in manufacturing everything from tires to clothes) and refrigerants. In 1962, Allied bought Union Texas Natural Gas, which owned oil and gas properties throughout the Americas. Allied focused on it mainly as a supplier of raw materials for its chemical products, but this changed in the early 1970s when CEO John Connor (secretary of commerce under Lyndon Johnson) began investing in oil and gas exploration. By 1979, when Edward Hennessy Jr. became CEO, Union Texas produced 80% of Allied's income.
  • 50.
    50 Now Allied Corp.,the company in 1981 went on to purchase the Bendix Corp., an aerospace and automotive company, in 1983. By 1984, Bendix generated 50% of Allied's income, while oil and gas generated 38%. In 1985, Allied merged with the Signal Companies, adding critical mass to its aerospace, automotive and engineered materials businesses. Signal was originally a California company that produced gasoline from natural gas and entered oil production in 1928. Aerospace was now Allied-Signal's largest sector. In mid-1991, with new leadership in many key businesses, Allied-Signal began taking bold actions to become more efficient, increase productivity, and position the company as a global competitive force. The Allied-Signal name was changed to AlliedSignal in 1993 to reinforce a one-company image and signify the full integration of all of its businesses. In 1992, the company sold its remaining interest in Union Texas through a public offering for $940 million in net proceeds.
  • 51.
    51 Throughout the 1990s,CEO Lawrence A. Bossidy led process of continued growth and efficiency that quintupled the market value of AlliedSignal shares and significantly outperformed the Dow Jones Industrial Average and the S&P 500.
  • 52.
  • 53.
    53 Address: Honeywell AutomationIndia Ltd, 56 & 57 Hadapsar Industrial Estate, Pune (Maharashtra) Contact No: 020-6603-9577 / 9850732702 Website - www.honeywellautomation india.com About Company Honeywell Automation India Ltd is located at Mumbai (India) Assists companies in search of qualified and experienced professionals across sectors and industries. We are a prominent executive search & selection company, providing a wide range of recruitment solutions for various requirements. We are a team of dedicated professionals offering services across India. Established in 1920 with licenses, HAIL is leading Indian and International companies for their middle & senior management requirements. HAIL caters to both domestic placements across India as well as international locations. We have turnover of 200 caror.
  • 54.
    54 Our team of125 head hunters have extensive previous professional work experience and currently specialize in different domains across industries and professionally head hunt and source candidates based on specific client requirements. “Recruiting at a Speed using the best technology, We believe Time is Money hence sourcing the right resource in shorts” Jim Turley, Chairman and CEO Honeywell Automation India Ltd. Fact Sheet Year of Establishment : 1857 Nature of Business : Manufacturer, Service Provider Major Markets : Indian Subcontinent, East Asia, Middle East and South East Asia Contact Details Company Name: Honeywell Automation India Ltd Contact Person: Mr. Ghufran Ahmad Khan Contact No.: + (91)-7814972169 Address: Honeywell Automation India Ltd, 56 & 57 Hadapsar Industrial Estate, Pune (Maharashtra) Web Site: http://www.honeywellautomationindia.com
  • 55.
    55 Company Profile Honeywell Securityis an international supplier and distributor of electronic security systems and solutions. Our products monitor and protect millions of homes, businesses and government facilities across the globe. Honeywell Security is a business unit of Honeywell International, a $36.6 billion diversified technology and manufacturing leader, serving customers worldwide with aerospace products and services; control technologies for buildings, homes and industry; automotive products; turbochargers; and specialty materials. Based in Morris Township, N.J., Honeywell's shares are traded on the New York, London and Chicago Stock Exchanges. It is one of the 30 stocks that make up the Dow Jones Industrial Average and is also a component of the Standard & Poor's 500 Index. Honeywell Security has an extraordinary range of solutions across Intrusion detection, Video Surveillance, Access Control Technologies & Home net systems and invests over $100 million a year in research and development. It has its engineering "centers of excellence" in the U.S., Canada, China, Korea, India, Scotland,Germany and France and leverages technologies that are developed elsewhere in Honeywell and brings them to the security business. Example: Video analysis software developed by Honeywell Labs, advanced sensors from the Sensing and Control business or GPS systems from Aerospace.
  • 56.
    56 DATA BANK We havea fairly large data bank comprising of candidates in Managerial functions, HRD, Accounts, Finance, Engineering, Information Technology and Marketing to suit the requirements of Management at all levels of functions. Our data bank consists of candidates from different locations and in various countries. They could even supply candidates with very rare skill sets and experience from their data bank. This is helpful to identify candidates for specific locations within short notice. FACILITIES A completely computerized Network environment with sophisticated software for maintaining and accessing data bank - An extensive library covering almost all subjects relating to business. - Three telephone lines, Fax, Internet and email facility. - A good job site on the web to publicize the requirements immediately. - Dedicated Team of Consultants and staff who believe in Right People!! Right Solutions!! Aim & Approach of HAIL Aim Aim is to ensure we match you with your ideal job every time. With an ethos that focuses on the needs and aspirations of each individual candidate, rather than simply ‘filling jobs’, we make sure we understand what you want first before discussing any relevant career options. If our client’s are looking for full time, part time, permanent or temporary opportunities, our specialist consultants are on hand to guide you through the options to match you with your ideal job.
  • 57.
    57 Our aim isto offer our clients the best consultancy services in India. This means that we provide clients with full consultancy service, from identifying the relevant candidate, to closing the position at short span of Time. Initiatives We proactively seek grant schemes that match your needs and help you tailor your projects to take maximum advantage of grant opportunities. Our extensive professional network and experience in a wide range of grant schemes ensure that we track the latest developments in incentive schemes and identify opportunities as they arise. You can then adapt your decisions to better fit public objectives. Partnership Close collaboration with clients regularly leads to long-lasting partnerships. The better we know you and your organization, the better we can advise you. This leaves you free to focus on your core business while we deal with grants acquisition, administration and project management. We also partner with clients in their consortia, technological platforms and other public-private partnerships. Approach Our Approach towards Client is distinctive. Large amount of support teams, provide clients with the complete range of fully integrated recruitment solutions from each site. True client partnerships, an advanced internet development strategy and our focus on placing people are part of what makes us different. Quality Policy / Processes Quality Policy
  • 58.
    58 Our consultants gothrough a stringent pre-qualification phase to ensure that they have the expertise that the clients require. We select experienced personnel with established professional consulting experience. We put strong emphasis on Attitude, Communication and Team Player skills and demonstrated ability to stretch themselves to contribute to the successful completion of projects. We engage in reference checks, drug tests, and background checks before deploying our manpower to the project. Our Philosophy Service to the customers and the candidates is our motto. Each employer is important to us and gets personalized attention, irrespective of size or even volume of business generated. Similarly, every candidate is treated with warmth and understanding. We make every effort required to find suitable placement for the job seekers. It is essentially this philosophy which has enabled us to attain our present stature. CLIENTEL
  • 59.
    59 ROLTA NETWORK18 PROCESSWAREZENTA POLARIES ADLABS FILMS WHY HAIL?  A perfect mix of Business focus and technology which is backed with a specialized team of Professional recruiters who are continuously updated with technical training and high end support.  State of the art Infrastructure, Well equipped & Air-conditioned work station.  Capability to source high number of candidates for the Clients, scale up and double candidates when needed for project works.  Critical strength to always stand up on efficiency and quality in fulfilling commitments at the workplace. Executive Management Consultant takes care of:
  • 60.
    60 Quality Our consultants gothrough a stringent pre-qualification phase to ensure that they have the expertise that the clients require. We select experienced personnel with established professional consulting experience. We put strong emphasis on Attitude, Communication and Team Player skills and demonstrated ability to stretch themselves to contribute to the successful completion of projects. We engage in reference checks, drug tests, and background checks before deploying our manpower to the project. Cost We keep our overheads low and therefore we can compete with the biggest of staffing firms to provide a fair and competitive rate. On Time Delivery That is a promise we made to ourselves. We have taken extreme care to ensure that delivery is met and we are proud of our track record that shows 90% of the candidates selected take up our projects. Our support function facilitates our consultants to move from project to project. This ensures that they are ready to work ‘when and where’ our clients need them. Retention Our retention level of consultants on the project is at an enviable rate of 95%. This does not happen accidentally. We spend quality time on the staffing needs and ensure that the staffing solution we provide really fulfills the clients’ needs.
  • 61.
    61 Specialization in levelof recruitment EMC handles the below 3 Levels of Recruitment:  Middle & Senior Level of Management  Junior & Middle Level of Management  Junior & Senior Level of Management HAIL deals with all “IT requirements” & below mentioned are some of the Functional area of recruitment where HAIL is specialized:  Software Engineers (Core Java, JSP, J2ME, J2EE, C++, C#, VB, VB script, VB.net, ASP.net, HTML, Autocad)  Manual Testing Engineers (Performance Testing (Web Load), Functional Testing, Integration Testing ,White box Testing , Database testing (SQL, Oracle) )  Automation Testing Engineers (Winrunner, Loadrunner, Rational Robot, QTP, Skilktest)  Project Lead/Lead Management/Project Manager  Informatica, Autosys, Database Administrator (Oracle , SQL, DB2,DB Attritions)  Network / System support/System Integration  Symbian, Brew, Android, iphone, Blackberry, Fixed line data  Data center Operations  .net (VB/ ASP/ VC/ C#/ Sharepoint)  Sr. Ops Engineer/Ops Manager  Assistant Manager Service Delivery (Networking / System Integration / IT Operation)  Crystal Report
  • 62.
    62  Weblogic /Websphere / WAP  Java / JSP / J2ee / J2me / Junit  Siebel / PHP / Perl / People soft  SAP (FICO / BASIS / ABAP / SRM / CRM)  UML / XML / HTML / DHTML  Unix / Linux / Windows  QTP / Win Runner / Load Runner  SQL / Oracle / DB2 / PL SQL / D2K / Dbase  Lotus / Mainframes  3DMax / Coral Draw / Adobe Photoshop  Adobe Pagemaker / Adobe Illustrator  Apache  Cold Fusion  Matlab / Labview  Rational Robot / MQC / Silk Test  C / C++ / C# / VB / VC / VC++ / ASP / Foxpro  Network / System / Support / Implementation Engineer  Delivery Managers (PMP & ITIL certified) Functional Area of Recruitment Specialization HAIL deals with all “IT Non requirements” & below mentioned are some of the Functional area of recruitment where EMC is specialized:
  • 63.
    63  Sales &Marketing (All areas): Executives, Regional Manager, Marketing Head, AM- Sales, Branding Manager.  Accounts & Finance (All areas)  Engineers Civil / Mechanical / Chemical  Draftsman / Interior Design Engineer  Secretary to CFO / MD / VP  Process Trainers / VNA Trainers  Admin Executive / Front Office Exec  Project Manager, Sr. Mgr / Mgr Production & Planning, DGM Operation, Manager Contract & Planning, Manager Design  Commercial Head, Piping Engineer, Manager Quality, Executive Procurement, Architects  Road Surveyor  GM, VP, AVP – Finance , Financial Analyst, Investor Relation  HR & Admin: Manager HR, Sr.Exe. / Exe. HR.  Legal : Manager Legal , Compliance Manager, Company Secretary How does recruiters/consultant get paid? A recruitment consultant primarily acts from a position of self-interest. Their job is to generate revenue by making sales. Sales mean selling their service, their ability to find the right candidate, to prospective employers. In effect they are selling you. This means they will be eager to champion you, their product, to the employer, likewise they will be keen to ensure that you will accept the position if offered.
  • 64.
    64 Exactly how arecruitment consultant is paid depends on whether it is a permanent or contract position. Generally for a permanent placement the company receives a proportion of your salary, or a set fee agreed with the employer. The more you earn the more they stand to make. Knowing this should ease any concerns you have; in this you are both on the same side. For a contract the consultant will receive a margin of your rate. Job Profile in HAIL:  Sourcing resumes through different job portals like Naukri, monster etc.  Based on the clients requirements screening the resumes and judging the Candidates to meet the particular requirement.  Initial phone screening of candidates to judge communications and background.  Short listing the candidates as per client’s requirements and then scheduling up the interviews.  Regular follow up with the selected candidates to confirm their joining dates, ensuring the maximum of them are placed successfully with the respective organization  Maintaining and updating database of potential, prospective and rejected candidates  Constantly be in touch with the candidate until he/she joins.  Co-ordinate with other recruiters to work as a team.  Maintaining a database of candidates.  Handling end to end recruitments.
  • 65.
    65 Requirements I workedon in HAIL  Relationship Officers / Sr. Relationship Officers / Territory Manager for the Location of Delhi and Mumbai(Lower parel), for the Quikr India Pvt Ltd  Sales Manager for the Location of Ahmedabad, for Quikr India Pvt Ltd  Asp.Net for the Location of Mumbai(Malad), for the 3G Services  Project Engineer for the location of Mumbai, for Sigma Byte  Secretary to MD for the location of Mumbai(Andheri),for Financial Technologies  Project Co-ordinator with Onmobile Global Ltd.  Techlead Position for Atidan Technologies Recruitment Email sent to candidate regarding the same Dear Candidate, This is to bring to your kind notice that we have an opening for the post of Relationship Officer/ Sr. Relationship Officer with Quikr.com URL: - http://www.quikr.com/html/about.hail Location: Delhi Designation: Sr. Relationship Officer/ Relationship officer Experience: 2+ Years
  • 66.
    66 Essential Qualities: Excellent Communication Skill,Positive attitude, passionate, highly motivated, Should come from online, yellow pages, space selling and should have a good idea about online sales/marketing Job Responsibility: Responsible for monitoring accessing, improving the ad sales, revenue monitoring Able to independently ideate and came out with solution to client and ad sales team Monitoring All ad positions, ad campaigning’s, sales etc. Monitoring their sales / telesales team. If your candidature suits the mentioned profile then kindly send us the following details: 1. your updated resume in MS Word format. 2. Present CTC 3. Expected CTC 4. Notice Period As the requirement is a bit urgent, an early response on this would be highly appreciated. Alternatively if you know someone suitable and available then Please refer (or) let us know their contact details. We shall check their willingness for this opportunity. Please, respond at the earliest.
  • 67.
    67 Best regards, HR| HAIL-HoneywellAutomation India Ltd. Direct: 9223499000 || honeywellauomationindia@.in Recruitment Email sent to candidate Hi, Opening with Onmobile Global Ltd for Project Co-ordinator OnMobile [NSE: ONMOBILE] is one of the largest white-labelled Data and Value Added Services [VAS] companies for Mobile, Landline and Media Service Providers. OnMobile touches the lives of over 1 billion mobile users across 55 countries every month.With our diverse product portfolio of Mobile Music, multi-screen Video Gateway and delivery solutions, Phone Backup and Personal Cloud Management solutions, Voice and Video portals, M-Commerce products and services, we generate 2 – 5% contribution for top customers and top line revenues of over US $800 million for over 92 customers globally. We deliver our products by the best combination of a hosted Cloud with on-site operations at the customer premises or through products deployed in customer networks.Founded in 2000, OnMobile has 1500 employees spread across India, U.S., LATAM, Africa, Australia, Middle East and Europe. The company was publicly listed in India in 2008. Recent acquisitions include Voxmobili (2007), Telisma (2008), and Dilithium Networks (2010). Location: Bangalore Website: http://www.onmobile.com/
  • 68.
    68 JD for Position:- JobTitle Project Coordinator Department India Private Operators – PMO Qualification B.Tech / BE / MCA / MBA Experience 1-3years Job Description Role Project co-ordinator is a Project Management Office role.  The role requires the person to plan, drive, co-ordinate and track projects with various internal stakeholders.  Schedule regular meetings with the action owners for status tracking.  Update the senior members of the organization on the status of the projects, highlight Requirements, risks and gating issues and probable resolutions.  Prepare and analyse the data collected from various reports and present it to the leaders for further analysis and decision making. Skills 1) Good Analytical, negotiation and communication skills. 2) Good skills in Excel and ppt. Should have good ability to analyze data, prepare and present analysis to internal stakeholders.
  • 69.
    69 3) Ability toplan, drive, co-ordinate and track projects with various internal stakeholders and report the progress to the AVP. 4) Should possess good Project management skills. Telecom Knowledge and System level knowledge preferred. Location Bangalore If this profile suits your candidature, kindly send the updated resume mentioning the following details:- 1) Total Experience 2) Relevant Exp. 3) Current CTC 4) Expected CTC 5) Notice Period Best regards, HR| HAIL-Honeywell Automation India Ltd. Direct: 9223499000 || honeywellautomtionindia@.in Recruitment Email sent to candidate From: HAIL <hail@.in> To: Sent: Tuesday, 15 May 2012 3:15 PM Subject: Opening with Atidan Technologies for Tech Lead
  • 70.
    70 Hi, As per thediscussion, I am sending the Company’s profile and Job Description. Opening with Atidan Technologies for the post of Tech Lead Atidan Technologies is an IT industry. It’s an U.S. based multinational company. Atidan combines offshore cost-efficiency and 24 hour work cycles with direct team interaction at different location-delivering low-risk, high-performance solutions to help you improve communications, streamline workflow and increase productivity. URL: - http://www.atidan.com/Pages/index.aspx Location: - Mumbai Job Description:- 1) Candidate must have atleast 6 yrs of experience. 2) Exp working on web based projects is a must. 3) Exposure on SharePoint is preferable. 4) Exposure working with US clients is a must. 5) Applicant should be working as a tech lead. Interview: - On Saturday (19th May 2012) Timing: - 9 AM TO 12 PM Interview Procedure:- 1) Aptitude Test (HR Interview)
  • 71.
    71 2) Computer ProgrammingTest (.Net Test) 3) Technical Interview – 1 4) Technical Interview – 2 If this profile suits your candidature kindly send the following details:- 1) Updated Resume in word format. 2) Total Exp. 3) Relevant Exp. 4) Current CTC. 5) Expected CTC. 6) Notice Period. Best regards, HR| HAIL-Honeywell Automation India Ltd Direct: 9223499000 || hail@.in
  • 72.
    72 Format of CandidateInterview Schedule details sent to Organization Hi, Below mentioned is the interview schedule for AM / Manager HR: Sr. No Candidate Name Interview Date Intervie w Time Contact No Mod e Locatio n Position 1 Veena Kashelkar 17th May 12 10.00 am 98000000 F2F Mumbai AM/Manage r HR 2 Richa Mehta 17th May 12 11.00 am 983300000 0 F2F Mumbai AM/Manage r HR 2 Ragni Jethi 18th May 12 11.00 am 983390000 0 F2F Mumbai AM/Manage r HR
  • 73.
    73 Weekly Status Report Date Candidate's Name ContactNo Client Position Applied for Location CV Sent 29-May-12 Soham Raval 97277000000 Quikr S M Ahmedabad CV sent Tracker sent to Company consists of the following elements: Status (CV sent or not), Source (Consultant Name), Candidate Name, Current Company (candidate is working with), Yrs Of Experience, Location, Education, Current Designation, Current CTC, Expected CTC, Position Applied For, Contact No., Profile Sent Date, Line Manager, 1st Level - Resume Screening, Mode, Date, 2nd Level - PI or TI, Date, 3 Level – PI, Date, Final Status, Client CTC if offered.
  • 74.
    74 Form attached alongwith candidate resume while forwarding to the Client (i.e. organization) Executive Management Consultant Name Position applied for Current Company Current Position Highest qualification Total Exp Relevant Exp Current CTC Expected CTC Notice period Current Location Willing to work in Location Opted for (Y/N)Reason for Job Change Why the Client (e.g. Tata/FT) Why Consultant has shortlisted the CV
  • 75.
  • 76.
    76 RESEARCH: RESEARCH is a‘careful investigation or inquiry especially through search for new facts in any branch of knowledge’. METHODOLOGY OF STUDY: The project is a systematic presentation consisting of the enunciated problem, formulated hypothesis, collected facts of data, analyzed facts and proposed conclusions in form of recommendations. The data has been collected from both the sources primary and secondary sources. DATA COLLECTION: Primary Data: Primary data was collected through survey method by distributing questionnaires to employees. The questionnaires were carefully designed by taking into account the parameters of my study. Secondary Data: Data was collected from web sites, going through the records of the organisation, etc. It is the data which has been collected by individual or someone else for the purpose of other than those of our particular research study. Or in other words we can say that secondary data is the data used previously for the analysis and the results are undertaken for the next process.
  • 77.
    77 KIND OF RESEARCH: Theresearch done by EXPLORATORY RESEARCH: This kind of research has the primary objective of development of insights into the problem. It studies the main area where the problem lies and also tries to evaluate some appropriate courses of action. Sample Design: A complete interaction and enumeration of all the employees was not possible so a sample was chosen that consisted of 25 employees. The research was taken by necessary steps to avoid any biased while collecting the data. Tools ofAnalysis: The data collected from both the sources is analyzed and interpreted in the systematic manner with the help of statistical tool like percentages. RESEARCH DESIGN: A research design is the arrangement of the condition for collection and analysis of data in a manner that aims to combine relevance to the research purpose with economy in procedure.
  • 78.
    78 A research designis the specification of methods and procedure for acquiring the information needed to structure or to solve problems. It is the overall operation pattern or framework of the project that stipulates what information is to be collected from which source and be what procedures. 1 What is study about? 2 What is study being made? 3 Where will the study be carried out? 4 What type of data is required? 5 Where can the required data be found? 6 What will be the sample design? 7 Technique of data collection. 8 How will data be analyzed?
  • 79.
  • 80.
    80 The analysis ofthe data is done as per the survey finding. The data is represented graphically in percentage. The percentage of the people opinion were analyzed and expressed in the form of charts. Question 1: What form of interview did you prefer? Most of the manager Prefer Personal interviews, 30% prefer to take telephonic interviews where as only 20% goes for video conferencing and rest 10% adopt some other means of interviews.
  • 81.
    81 Question 2: Whatsource you adopt to source candidates? Source: Compiled from questionnaire data Interpretation: This analysis indicates that most of the respondent i.e. 85% responded for Job Portal, 10% responded for Candidate referral and 5% responded for Advertising. Candidate Referral 10% Advertising 5% Job Portal 85% Candidate Referral Advertising Job Portal
  • 82.
    82 Question 3: Howmany stages are involved in selecting the candidate? / How many Question you are asking during the Telephonic interview round? Most of the Executives Prefer two stages of interview, 40% prefer to take three stages interviews whereas only 10% goes for four rounds and rest 5% sometimes opt for one round of interviews. One 5% Two 45% Three 40% Four 10% One Two Three Four
  • 83.
    83 Question 4: Howdo you track the source of candidate? Most of the Executives 80% prefer online, 15% prefer Data where as only 5% goes for software to source a candidate. Question 5: Does the organization clearly define the position objectives, requirements and candidate specifications in the recruitment process? Software 5% Online 80% Data 15% Software Online Data Yes 95% No 5% Yes No
  • 84.
    84 This analysis indicatesthat most of the respondent i.e. 95% responded for Yes and 5% responded for No. Question 6: What is the average time spent by executives during recruitment (each candidate)? This analysis indicates that most of the respondent i.e. 60% responded for 1 to 5 minutes, 20% responded for 5 to 10 mins, whereas 10% responded for 10 – 15 mins and rest 10% responded for more than 15 mins. 1 - 5 minutes 60% 5 - 10 mins 20% 10 - 15 mins 10% more than 15 mins 10% 1 - 5 minutes 5 - 10 mins 10 - 15 mins more than 15 mins
  • 85.
    85 Question7: Do youfollow different recruitment process fordifferent grades of employees? This analysis indicates that most of the respondent i.e. 95% responded for Yes and 5% responded for No. Yes 95% No 5% Yes No
  • 86.
    86 Question 8: Whatare the basic questions you ask to the candidate? This analysis indicates that the entire respondent i.e. 100% responded for asking all the basic questions. Question 9: Do you have any system to calculate cost per recruitment? Experience (Total / Relevent) 0% Current / Expected CTC 0% Current Job Profile 0% Notice Period 0% All of the Above 100% Experience (Total / Relevent) Current / Expected CTC Current Job Profile Notice Period All of the Above Yes 30% No 70% Yes No
  • 87.
    87 This analysis indicatesthat most of the respondent i.e. 70% responded for No and 30% responded for Yes. Question 10: Is there any provision for evaluation and control of recruitment process? This analysis indicates that most of the respondent i.e. 55% responded for No and 45% responded for Yes. Yes 45% No 55% Yes No
  • 88.
    88 Question 11: Isthere any facility for absorbing the trainees in your organization? This analysis indicates that most of the respondent i.e. 70% responded for Yes and 30% responded for No. No 30% Yes 70% No Yes
  • 89.
    89 THEORITICAL FRAMEWORK: THEORIES REGARDINGRECRUITMENT RECRUITMENTIS TWO WAY STREET: It takes recruiter and a recruitee: It takes a recruiter and a recruitee recruiter has a choice whom to recruit and whom not; As per Behling et al, there are three ways in which a prospective employee makes a decision to join an organization. Accordingly, the following three theories of recruitment have been evolved:  Objective factor theory  Subjective factor theory  Critical contact theory These theories can be explained as follows: Objective Factor Theory It assumes that the applicants are rational. As per this theory, the choice of organization by a potential employee depends on objective assessment of tangible factors such as; Pay package, Location, Opportunity per career growth, Nature of work and Educational opportunities. The employer according to this theory considers certain factors among others; educational qualification, years of experience and special qualification/experience.
  • 90.
    90 Subjective Factor Theory Thedecision making is dominated by social and psychological factors. The status of the job, reputation of the organization and other similar factors plays an important role. According to this theory, compatibility of individual personality with the image of organization is decisive factor in choosing an organization by individual candidate seeking for employment. These subjective factors are; Personal compatibility for the position, Competence and Best fit. Critical Factor Theory The critical factors observed by the candidate during his interaction with the organization play a vital role in decision making. Recruiter being in touch with the candidate, promptness of response and similar factors are important. This theory is more valid with the experienced professionals. There are instances when a candidate is unable to choose an organization out of alternative based on Objective and Subjective factor(s) listed above. This is due to many reasons such as limited contact and insufficient data with regards to the organization or its own inability to analyze and come to ant conclusion. In such cases, certain critical factors observed by the manager during interview and contact with personnel of the organization will have profound influence in his decision process. It must be noted that, the theoretical base given above by Behling et al was mostly influenced by the working condition which existed in developed countries like The United States of America and European countries. In these countries, vacancies are many and there is scarcity of suitable hands unlike in developing countries like Cameroon where vacancies are less and hands are more resulting to large scarce unemployment. The theoretical base given above cannot be applied in
  • 91.
    91 developing countries exceptin hid paid jobs where higher skills and better knowledge are the prerequisites. In such cases, candidates have variety of choices and he is the master of his choice. In production, servicing and clerical jobs, unemployment is where the number of job seekers far exceeds the vacancies. In such a situation, candidates have little choice and such, grab whatever organization call him or her for employment. In such a case, the potential organization is in a better place to choose the candidates from the many available. Hence, the recruitment process should be that of filtering and re-distributing potential candidates not only, for actual or anticipated organization vacancies but also searching for prospective employee. From Behling’s review, it could be assessed that workers output will increase due to certain objectives of motivating them through regular payment. This will help to influence their working conditions thereby making them to be effective at work. Problems arise when unemployment rate is high and the number of those seeking for jobs far exceeds the vacancies that exist. In this case, candidates have little choice to be offered the job in the institution. Though they possess the knowledge, education, the process should be to filter and re-discover their potentials. When this happens, right (qualified) employees should be placed in the right positions and as a result, it will lead to an increase in productivity. Due to the subjective factor of a candidate being best fit for the job, it is not the best procedure to determine whether his output will increase or decrease but it should be assessed from the critical factor observed during interview and the contact with the personnel of the organization that will influence his productivity and his decision making.
  • 92.
    92 Personality–Job Fit Theory Thepersonality–job fit theory postulates that a person's personality traits will reveal insight as to adaptability within an organization. The degree of confluence between a person and the organization is expressed as their Person-Organization (P-O) fit. This also referred to as a person– environment fit. A common measure of the P-O fit is workplace efficacy; the rate at which workers are able to complete tasks. These tasks are mitigated by workplace environs- for example, a worker who works more efficiently as an individual than in a team will have a higher P-O fit for a workplace that stresses individual tasks (such as accountancy). By matching the right personality with the right company workers can achieve a better synergy and avoid pitfalls such as high turnover and low job satisfaction. Employees are more likely to stay committed to organisations if the fit is 'good'. In practice, P-O fit would be used to gauge integration with organizational competencies. The Individual is assessed on these competencies, which reveals efficacy, motivation, influence, and co-worker respect. Competencies can be assessed using various tools like psychological tests, competency based interview, situational analysis, etc. If the Individual displays a high P-O fit, we can say that the Individual would most likely be able to adjust to the company environment and work culture, and would be able to perform at an optimum level.
  • 93.
  • 94.
    94 FINDINGS:  According tothe Survey, Recruitment differs from company to company for each category.  According to the Survey, the company do utilize internet sites for the recruitment process and for finding the talent candidate  According to survey it is observed that the company are utilizing the job description in order to make screening process more efficient Limitation of the study: The study is subjected to the following limitations  The study is based on the data provided by the company statements so, the limitations of the company’s employees remaining are equally applicable.  In some cases data is collected from the companies past records.
  • 95.
    95 CONCLUSIONS:  Polices adoptedby EMC are transparent, legal and scientific.  Recruitment is fair.  The recruitment should not be lengthy.  To some extent a clear picture of the required candidate should be made in order to search for appropriate candidates.  Most of the employees were satisfied but changes are required according to the changing scenario as recruitment process has a great impact on the working of the company as a fresh blood, new idea enters in the company. SUGGESTIONS:  Time management is very essential and it should not be ignored at any level of the process.  Recruitment policy is satisfactory in EMC but the periodicity of recruitment is being more which needs to be reduced.  Communication, personal and technical skills need to be tested for employees
  • 96.
  • 97.
    97 WIBLIOGRAPHY: http://recruitment.naukrihub.com/meaning-of-recruitment.html http://www.fempower.co.za/01/index.php?option=com_content&task=view&id=19&Itemid=34 http://en.wikipedia.org/wiki/Recruitment https://www.google.co.in/ http://www.emc.com/ BIBLIOGRAPHY:  C.B Mamoriaand S.V. Gankar (2004), Personal Management Text and Cases. Himalaya Publication.  Essentials of HRM and IR - P.Subba Rao.  Personal Management - C.B.Memoria.  Research Methodology -C.R.Kothari.  Personnel and Human Resource Management – P. Subba Rao, Himalaya Publication
  • 98.
    98 Questionnaire on RecruitmentProcess: Name – Company’s name – Designation – Date- Note – Please fill the appropriate option. Question 1: What form of interview did you prefer? ( ) a. Personal interviews b. telephonic interviews c. video conferencing d. Other Question 2: What source you adopt to source candidates? ( ) a. Candidate referral b. Advertising c. Job portals Question 3: How many stages are involved in selecting the candidate? / How many Question you are asking during the Telephonic interview round? ( ) a. 1 b. 2 c. 3 d. 4 e. More Question 4: How do you track the source of candidate? ( ) a. Software b. Online c. Data
  • 99.
    99 Question 5: Doesthe organization clearly define the position objectives, requirements and candidate specifications in the recruitment process? ( ) a. Yes b. No Question 6: What is the average time spent by executives during recruitment (each candidate) ? ( ) a. 1mins to 5mins. b. 5 to 10 mins. c. 10 to 15mins. d. More Question 7: Do you follow different recruitment process for different grades of employees? ( ) a. No b. Yes Question 8: What are the basic questions you ask to the candidate? ( ) a. Experience (Total/Relevant) b. Current CTC/Expected CTC c. Job Profile d. Notice period e. All the Above Question 9: Do you have any system to calculate cost per recruitment? ( ) a. No b. Yes, please specify –
  • 100.
    100 Question 10: Isthere any provision for evaluation and control of recruitment process? ( ) a. Yes b. No Question 11: Is there any facility for absorbing the trainees in your organization? a. Yes b. No ( )