SlideShare a Scribd company logo
CS
COVERSHEET
DJJDJJ
GARDENCENTEREXPANSION
CARMEL,INDIANA
ORIGINAL
ISSUE DATE:
PERMIT SET
ISSUE DATE:
CONSTRUCTION SET
ISSUE DATE:
DRAWING NUMBER:
PROJECTNo:DRAWNBY:CHECKEDBY:
R
PRE-BID SET POST BID SET
ISSUE DATE ISSUE DATE
REVISIONS
R
DATE DESCRIPTION
081221
01/09/09
-
-
24x36
$FILE$
$DATE$
$TIME$
08-0166
Store #1525
14598 Lowes Way
City of Carmel
Hamilton County, IN
Lowe’s Garden Center
Expansion
Drawing No.Scale:
Project No.
Type:
Date:
Drawn By:
Date:
1
Revisions:
Project Name & Location:
Drawing Name:
PROJECT MANAGER DATE
PROJECT ENGINEER / ARCHITECT DATE
Seal Seal
DATEPROJECT DESIGNER
2
3
4
5
6
7
8
9
It is a violation of law for any person, unless acting under the direction of
licensed Architect, Professional Engineer, Landscape Architect, or Land
Surveyor to alter any item on this document in any way.
Any licensee who alters this document is required by law to affix his or
her seal and to add the notation "Altered By" followed by his or her
signature and the specific description of the alteration or revision.
Drawing Alteration
DO NOT SCALE PLANS
Copying, Printing, Software and other processes required to produce
these prints can stretch or shrink the actual paper or layout. Therefore,
scaling of this drawing may be inaccurate. Contact APD Engineering
with any need for additional dimensions or clarifications.
615 Fishers Run
Victor, NY 14564
585.924.4914.fax
585.742.2222
Copyright 2008C
APD Engineering & Architecture, PLLC
615 Fishers Run
Victor, NY 14564
585.742.2222
585.924.4914.fax
www.apd.com
APD Engineering & Architecture, PLLC
GREYHOUND
PASS
OAK RD
LOCATION SKETCH
N.T.S.
PROJECT
LOCATION
1. EXISTING SITE DEVELOPMENT PLANS PREPARED BY KES CONSULTANTS
INC., HAVING BEEN NAMED "LOWES HOME IMPROVEMENT CENTER S.R.
431/U.S. 31 AND 146th STREET, CARMEL, INDIANA" PLAN C-200.
2. BUILDING FOOTPRINT PLAN PREPARED BY ARCVISION, INC. AND RECEIVED
VIA EMAIL ON 8/27/08.
3. SITE OBSERVATIONS AND PHOTOS TAKEN ONSITE ON 9/10/08.
REFERENCES:
CC
CC
CC
CC
CC
CC
CC
CC
CC
CC
E. 146th STREET
F.F.E. = 824.50–
EXISTING TOTAL BUILDING = 135,197– SF
EXISTING TOTAL GARDEN CENTER = 42,199– SF
EXISTING LOWE’S STORE
EXISTING STORMWATER MANAGEMENT FACILITY
AREA OF PROPOSED SITE IMPROVEMENTS
(SEE PLANS C1, C2, C3 AND C4 FOR MORE
INFORMATION)
12/16/08
CJK
Overall Site Plan
OV 1
1" = 40’
0 40 8020
Graphic Scale: 1"=40’
120
EXISTING 45’ WIDE BUILDING SETBACK
30
14 24 25
27 26
29 29 28 28
28 27
27 27
27 27
29 29 28 28
26
30
9
18
13
PROPOSED GARDEN CENTER EXPANSION = 17,225– SF
NEW TOTAL GARDEN CENTER AREA = 59,424– SF
24x36
$FILE$
$DATE$
$TIME$
08-0166
Store #1525
14598 Lowes Way
City of Carmel
Hamilton County, IN
Lowe’s Garden Center
Expansion
Drawing No.Scale:
Project No.
Type:
Date:
Drawn By:
Date:
1
Revisions:
Project Name & Location:
Drawing Name:
PROJECT MANAGER DATE
PROJECT ENGINEER / ARCHITECT DATE
Seal Seal
DATEPROJECT DESIGNER
2
3
4
5
6
7
8
9
It is a violation of law for any person, unless acting under the direction of
licensed Architect, Professional Engineer, Landscape Architect, or Land
Surveyor to alter any item on this document in any way.
Any licensee who alters this document is required by law to affix his or
her seal and to add the notation "Altered By" followed by his or her
signature and the specific description of the alteration or revision.
Drawing Alteration
DO NOT SCALE PLANS
Copying, Printing, Software and other processes required to produce
these prints can stretch or shrink the actual paper or layout. Therefore,
scaling of this drawing may be inaccurate. Contact APD Engineering
with any need for additional dimensions or clarifications.
615 Fishers Run
Victor, NY 14564
585.924.4914.fax
585.742.2222
Copyright 2008C
APD Engineering & Architecture, PLLC
615 Fishers Run
Victor, NY 14564
585.742.2222
585.924.4914.fax
www.apd.com
APD Engineering & Architecture, PLLC
GREYHOUND
PASS
OAK RD
LOCATION SKETCH
N.T.S.
PROJECT
LOCATION
1. EXISTING SITE DEVELOPMENT PLANS PREPARED BY KES CONSULTANTS
INC., HAVING BEEN NAMED "LOWES HOME IMPROVEMENT CENTER S.R.
431/U.S. 31 AND 146th STREET, CARMEL, INDIANA" PLAN C-200.
2. BUILDING FOOTPRINT PLAN PREPARED BY ARCVISION, INC. AND RECEIVED
VIA EMAIL ON 8/27/08.
3. SITE OBSERVATIONS AND PHOTOS TAKEN ONSITE ON 9/10/08.
REFERENCES:
CC
CC
CC
CC
CC
E. 146th STREET
SITE NOTES:
0 30 60 9015
Graphic Scale: 1"=30’
EXISTING LOWE’S STORE
F.F.E. = 824.50–
EXISTING TOTAL BUILDING = 135,197– SF
EXISTING TOTAL GARDEN CENTER = 42,199– SF
PROPOSED 17,225– SF GARDEN
CENTER EXPANSION (REFER TO
ARCH. PLANS FOR DETAILS)
EXISTING LIGHT POLES TO REMAIN
AND BE PROTECTED DURING CONSTRUCTION
ALL EXISTING LANDSCAPING TO BE
RELOCATED TO NEW PLANTING AREAS (TYP.)
(SEE PLAN C3 FOR DETAILS)
EXISTING R.O.W. FOR LOWE’S WAY
94.7’
90’
PROPOSED CURB (MATCH EXISTING-SEE DETAIL)
EXISTING CART CORRAL
TO BE REMOVED
EXISTING WALL TO BE REMOVED
(REFER TO ARCH. PLANS FOR DETAILS)
RELOCATE EXISTING HANDICAP
PARKING SPACES AS SHOWN (TYP.)
PROPOSED HANDICAP SYMBOLS, STRIPING
AND SIGNS. (SEE DETAILS)
EXISTING LOADING DOCKS
TO REMAIN
EXISTING COVERED
GARDEN CENTER
TO REMAIN
EXISTING OPEN
GARDEN CENTER
TO REMAIN
PROPOSED GARDEN CENTER EXPANSION = 17,225– SF
NEW TOTAL GARDEN CENTER AREA = 59,424– SF
EXISTING PARKING SPACES, LIGHTPOLES,
PLANTING AREAS AND OTHER FEATURES
SHOWN GHOSTED, TO BE REMOVED
PROPOSED CONCRETE SIDEWALK WITH
INTERGAL CURB (TYP.) (SEE DETAIL)
1. TOTAL LOWE’S PARCEL: 16.516– ACRES
2. ZONING: PUD - PLANNED UNIT DEVELOPMENT
3. BUILDING SQUARE FOOTAGE:
EXISTING SALES AREA = 115,390– SF
EXISTING OFFICE AREA = 4,237– SF
EXISTING RECEIVING AREA = 9,370– SF
EXISTING SEASONAL DISPLAY AREA = 6,200– SF
EXISTING TOTAL BUILDING = 135,197– SF
GARDEN CENTER:
EXISTING SHADE STRUCTURES = 5,445– SF
EXISTING COVERED AREA = 11,354– SF
EXISTING OPEN AREA = 25,400– SF
EXISTING TOTAL GARDEN CENTER = 42,199– SF
PROPOSED GARDEN CENTER EXPANSION= 17,225– SF
NEW TOTAL GARDEN CENTER AREA = 59,424– SF
4. PARKING REQUIREMENTS:
EXISTING STANDARD = 666 SPACES
EXISTING HANDICAP = 16 SPACES
EXISTING TOTAL = 682 SPACES (5.04 SPACES/1000 SF)
PROPOSED STANDARD = 617 SPACES
PROPOSED HANDICAP = 16 SPACES
PROPOSED TOTAL = 633 SPACES (4.68 SPACES/1000 SF)
(49 REGULAR SPACES LOST)
REQUIRED PARKING = 676 SPACES (5.00 SPACES /1000 SF)
5. VARIANCES REQUIRED: PARKING (RELIEF FOR 43 SPACES)
6. APPLICABLE SETBACKS ARE AS FOLLOWS:
REQUIRED PROVIDED
MEASURED FROM NEAREST R.O.W. = 90’ 94.7’–
MEASURED FROM R.O.W. OF 146TH ST = 45’ 76.6’–
7. THE SETBACK LINES AND NOTES RELATED TO SETBACKS SHOWN HEREIN ARE INTENDED
TO SHOW APPLICABLE ZONING REQUIREMENTS OF THE CITY OF CARMEL, AS OF THE
DATE OF THIS MAP, AND ARE NOT INTENDED TO IMPOSE ANY ADDITIONAL RESTRICTIONS
OTHER THAN SAID ZONING REQUIREMENTS.
8. ALL EXISTING BUILDING AND SITE INFORMATION SHOWN ON THIS PLAN IS REPRESENTED
BASED ON USE OF THE LISTED REFERENCES.
9. ANY NEW PAVEMENT SECTIONS THAT ARE TO BE REPLACED SHALL MATCH THE EXISTING
PAVEMENT SECTION AND MATERIAL SPECIFICATIONS.
10. ANY EXISTING STRIPING WHICH IS TO REMAIN IN PLACE AND WHICH MAY BECOME
OBSCURED OR DAMAGED DUE TO THE CONSTRUCTION OF IMPROVEMENTS, SHALL BE
REPLACED AND/OR REPAINTED AS NECESSARY.
11. REFER TO ARCHITECTURAL PLANS FOR EXISTING AND PROPOSED BUILDING DIMENSIONS,
SIDEWALK AND CURB DETAILS, ETC., UNLESS NOTED OTHERWISE.
12. APD ENGINEERING IS ONLY RESPONSIBLE FOR THE PROPOSED SITE IMPROVEMENTS
RELATED TO THIS EXPANSION PROJECT. APD ENGINEERING DID NOT PERFORM THE
ORIGINAL SITE DESIGN OR SURVEY AND ACCEPTS NO RESPONSIBILITY FOR EXISTING
SITE CONDITIONS OR FEATURES THAT WERE DESIGNED AND BUILT PREVIOUS TO THE
PREPARATION OF THESE PLANS.
13. THE CONTRACTOR IS RESPONSIBLE FOR SECURING APPROVAL, FOR ALL PROPOSED
TEMPORARY CONSTRUCTION STAGING AND WORK AREAS, FROM ALL REQUIRED
MUNICIPAL DEPARTMENTS, PRIOR TO COMMENCEMENT OF SAID STAGING OR
CONSTRUCTION.
14. ALL SIGN POSTS AND SIGN FACES, AFFECTED BY THE SCOPE OF THIS PROJECT, SHALL
BE INSTALLED TO REFLECT CURRENT DETAIL STANDARDS. ALL TRAFFIC CONTROL
DEVICES AND PAVEMENT MARKINGS WILL COMPLY WITH THE MANUAL OF UNIFORM
TRAFFIC CONTROL DEVICES FOR DESIGN AND INSTALLATION.
15. ALL EXISTING FEATURES, SHOWN GHOSTED, ARE TO BE REMOVED OR RELOCATED, AS NOTED.
9/2/08
CJK
Site Plan
C 1
REVISED PER SITE VISIT OBSERVATIONS 12/16/08
1" = 30’
C.O.
C.O.
C.O.
C.O.
C.O.
M
822
821
823
X
X
X
X
X
X
X
X
X
X
X
X
XX
X
X
X
X
X
X
XX
824.09
824.25
TC = 823.50–
BC = 823.00–
TC = 823.30–
BC = 822.80–
TC = 823.30–
BC = 822.80–
TC = 823.29–
BC = 822.79–
TC = 823.40–
BC = 822.90–
TC = 823.42–
BC = 822.92–
TC = 823.60–
BC = 823.10–
TC = 822.85–
BC = 822.35–
TC = 822.75–
BC = 822.25–
TC = 823.32–
BC = 822.82–
TC = 822.69–
BC = 822.19–
TC = 823.32–
BC = 822.82–
TC = 823.00–
BC = 822.50–
TC = 823.00–
BC = 822.50–
TC = 823.00–
BC = 822.50–
XX
X
824.09
824.25
X
X
X
X
TC = 821.00
BC = 820.40
X
TC = 821.46
BC = 820.85
X
823.19–
823.19–
823.19–
823.45–
821.93
TC = 821.96
TC = 821.75
BC = 821.25
X
XX
X
TC/BC = 821.45–
TC/BC = 821.14–
X
X
X
X
X
X
X
TC = 822.50
BC = 822.00
TC/BC = 821.38
X
X
X
TC/BC = 821.50
TC/BC = 821.62
TC/BC = 821.74
TC/BC = 821.86
X
X
X
821.78
821.90
821.70
X
X
822.00
822.00
X
X
X
TC = 822.00
BC = 821.79
X
TC = 821.58
BC = 821.19
TC = 821.35
BC = 820.85
TC = 821.30
BC = 820.80
TC = 821.59
BC = 821.09
TC = 821.96
BC = 821.51
TC = 821.80
BC = 821.30
BC = 821.54– HP
24x36
$FILE$
$DATE$
$TIME$
08-0166
Store #1525
14598 Lowes Way
City of Carmel
Hamilton County, IN
Lowe’s Garden Center
Expansion
Drawing No.Scale:
Project No.
Type:
Date:
Drawn By:
Date:
1
Revisions:
Project Name & Location:
Drawing Name:
PROJECT MANAGER DATE
PROJECT ENGINEER / ARCHITECT DATE
Seal Seal
DATEPROJECT DESIGNER
2
3
4
5
6
7
8
9
It is a violation of law for any person, unless acting under the direction of
licensed Architect, Professional Engineer, Landscape Architect, or Land
Surveyor to alter any item on this document in any way.
Any licensee who alters this document is required by law to affix his or
her seal and to add the notation "Altered By" followed by his or her
signature and the specific description of the alteration or revision.
Drawing Alteration
DO NOT SCALE PLANS
Copying, Printing, Software and other processes required to produce
these prints can stretch or shrink the actual paper or layout. Therefore,
scaling of this drawing may be inaccurate. Contact APD Engineering
with any need for additional dimensions or clarifications.
615 Fishers Run
Victor, NY 14564
585.924.4914.fax
585.742.2222
Copyright 2008C
APD Engineering & Architecture, PLLC
615 Fishers Run
Victor, NY 14564
585.742.2222
585.924.4914.fax
www.apd.com
APD Engineering & Architecture, PLLC
GREYHOUND
PASS
OAK RD
LOCATION SKETCH
N.T.S.
PROJECT
LOCATION
1. EXISTING SITE DEVELOPMENT PLANS PREPARED BY KES CONSULTANTS
INC., HAVING BEEN NAMED "LOWES HOME IMPROVEMENT CENTER S.R.
431/U.S. 31 AND 146th STREET, CARMEL, INDIANA" PLAN C-200.
2. BUILDING FOOTPRINT PLAN PREPARED BY ARCVISION, INC. AND RECEIVED
VIA EMAIL ON 8/27/08.
3. SITE OBSERVATIONS AND PHOTOS TAKEN ONSITE ON 9/10/08.
REFERENCES:
CC
CC
CC
CC
E. 146th STREET 0 30 60 9015
Graphic Scale: 1"=30’
EXISTING LOWE’S STORE
F.F.E. = 824.50–
EXISTING TOTAL BUILDING = 135,197– SF
EXISTING TOTAL GARDEN CENTER = 42,199– SF
EXISTING COVERED
GARDEN CENTER
EXISTING OPEN
GARDEN CENTER
EXISTING LOADING DOCKS
10/16/08
CJK
Grading & Drainage Plan
C 2
REVISED PER CLIENT COMMENTS 12/16/08
1" = 30’
EX. 18" DIA. STORM
EX. INLET
TG = 821.75–
INV IN = 816.99–
INV OUT = 816.49–
EX. INLET
TG = 820.95–
INV IN = 815.34–
INV OUT = 815.26–
EX. MANHOLE
TG = 823.10–
INV IN = 816.44– (N)
INV IN = 818.44– (W)
INV OUT = 815.44–
EX. INLET
TG = 820.95–
INV IN = 815.05–
INV OUT = 814.55–
EX. 24"
DIA. STORM
EX. IRRIGATION LINE
EX. SAN. MANHOLE
TR = 822.40–
INV IN = 810.30–
INV OUT = 810.20–
EX. SAN. MANHOLE
TR = 822.60–
INV IN = 814.40–
INV OUT = 814.30–
UTILITY NOTES:
EXISTING GRADE CONTOUR
EXISTING GRADE SPOT ELEVATION821.56
X
C.O.
TOP OF CURB/BOTTOM OF CURBTC/BC
PROPOSED SPOT GRADE ELEVATIONS
PROPOSED GRADE CONTOUR
PROPOSED INLET PROTECTION
821.93X
822
LOWER THE EX. TG TO 820.40.
CONVERT EX. INLET TO CURB
INLET.
MAX. 2% SLOPE IN HANDICAP AREA
EX. IRRIGATION LINE TO REMAIN
AND BE PROTECTED DURING
CONSTRUCTION
EX. STORM SEWER TO REMAIN
AND BE PROTECTED DURING
CONSTRUCTION
EX. STORM SEWER TO REMAIN
AND BE PROTECTED DURING
CONSTRUCTION
PROPOSED GARDEN CENTER EXPANSION = 17,225– SF
NEW TOTAL GARDEN CENTER AREA = 59,424– SF
ALL EXISTING UTILITIES AND STORM
DRAINAGE SYSTEMS TO REMAIN AND BE
PROTECTED DURING CONSTRUCTION.
ALL EXISTING UTILITIES AND STORM
DRAINAGE SYSTEMS TO REMAIN AND BE
PROTECTED DURING CONSTRUCTION.
APPROXIMATE LOCATION OF
EXISTING IRRIGATION METER TO
REMAIN AND BE PROTECTED
DURING CONSTRUCTION
1. NO IMPROVEMENTS TO THE EXISTING SITE WATER, GAS, ELECTRIC,
TELEPHONE, SANITARY OR STORM SEWERS ARE ANTICIPATED FOR
THIS EXPANSION PROJECT. DRAINAGE INLET IMPORVEMENTS WILL
BE REQUIRED AS SHOWN.
2. EXISTING UTILITIES AND GRADES SHOWN ARE APPROXIMATE. CONTRACTOR
IS RESPONSIBLE FOR VERIFYING ALL EXISTING UTILITY AND STORM DRAINAGE
SYSTEM LOCATIONS AND PERTINENT FINISHED GRADE ELEVATIONS. ANY
DISCREPANCIES SHALL BE BROUGHT TO THE OWNER OR OWNER’S
REPRESENTATIVE’S ATTENTION WITHIN SUFFICIENT TIME TO ALLOW FOR ANY
NECESSARY REDESIGN.
3. ALL WORK ASSOCIATED WITH THE MODIFICATIONS TO SAID UTILITIES SHALL
BE DONE IN ACCORDANCE WITH ALL LOCAL GOVERNING AUTHORITIES’ AND/OR
AGENCIES’ REQUIREMENTS AND SPECIFICATIONS. GENERAL CONTRACTOR
SHALL HAVE APPROVAL OF ALL GOVERNING AGENCIES HAVING
JURISDICTION OVER THIS SYSTEM PRIOR TO INSTALLATION.
4. CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF ALL EXISTING
UTILITIES DURING CONSTRUCTION. IF SAID UTILITIES BECOME DISTURBED OR
DAMAGED, IT IS THE CONTRACTOR’S RESPONSIBILITY TO REPAIR OR REPLACE
SAID UTILITIES AT THE CONTRACTOR’S EXPENSE AND PER THE LOCAL
GOVERNING AUTHORITIES’ AND/OR AGENCIES’ REQUIREMENTS AND
SPECIFICATIONS.
5. CONTRACTOR TO PROVIDE AND MAINTAIN ALL EROSION AND SILT CONTROL
DEVICES, AS NECESSARY PER THE LOCAL GOVERNING AUTHORITIES’ AND OR
AGENCIES’ REQUIREMENTS AND SPECIFICATIONS.
6. CONTRACTOR IS RESPONSIBLE TO VERIFY THE EXISTENCE OF ANY
IRRIGATION LINES AND SPRINKLER HEADS WITHIN THE LIMITS OF WORK. IF
FOUND, ANY IRRIGATION LINES OR SPRINKLER HEADS SHALL BE RELOCATED/
REPLACED TO MAINTAIN COVERAGE OF LAWN AND LANDSCAPED AREAS.
7. ALL TRENCHING, PIPE LAYING, AND BACKFILLING SHALL BE IN ACCORDANCE
WITH FEDERAL OSHA REGULATIONS.
8. THE LIMIT OF DISTURBANCE WILL BE LESS THAN –1.0 ACRES FOR THIS PROJECT.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR WORKING AND STAGING WITHIN
THE NEW CONSTRUCTION AREAS, OR ADJACENT PAVED/UNDISTURBED AREAS ONLY.
LOWER THE EX. TG TO 820.85.
CONVERT EX. INLET TO CURB
INLET.
24x36
$FILE$
$DATE$
$TIME$
08-0166
Store #1525
14598 Lowes Way
City of Carmel
Hamilton County, IN
Lowe’s Garden Center
Expansion
Drawing No.Scale:
Project No.
Type:
Date:
Drawn By:
Date:
1
Revisions:
Project Name & Location:
Drawing Name:
PROJECT MANAGER DATE
PROJECT ENGINEER / ARCHITECT DATE
Seal Seal
DATEPROJECT DESIGNER
2
3
4
5
6
7
8
9
It is a violation of law for any person, unless acting under the direction of
licensed Architect, Professional Engineer, Landscape Architect, or Land
Surveyor to alter any item on this document in any way.
Any licensee who alters this document is required by law to affix his or
her seal and to add the notation "Altered By" followed by his or her
signature and the specific description of the alteration or revision.
Drawing Alteration
DO NOT SCALE PLANS
Copying, Printing, Software and other processes required to produce
these prints can stretch or shrink the actual paper or layout. Therefore,
scaling of this drawing may be inaccurate. Contact APD Engineering
with any need for additional dimensions or clarifications.
615 Fishers Run
Victor, NY 14564
585.924.4914.fax
585.742.2222
Copyright 2008C
APD Engineering & Architecture, PLLC
615 Fishers Run
Victor, NY 14564
585.742.2222
585.924.4914.fax
www.apd.com
APD Engineering & Architecture, PLLC
GREYHOUND
PASS
OAK RD
LOCATION SKETCH
N.T.S.
PROJECT
LOCATION
1. EXISTING SITE DEVELOPMENT PLANS PREPARED BY KES CONSULTANTS
INC., HAVING BEEN NAMED "LOWES HOME IMPROVEMENT CENTER S.R.
431/U.S. 31 AND 146th STREET, CARMEL, INDIANA" PLAN C-200.
2. BUILDING FOOTPRINT PLAN PREPARED BY ARCVISION, INC. AND RECEIVED
VIA EMAIL ON 8/27/08.
3. SITE OBSERVATIONS AND PHOTOS TAKEN ONSITE ON 9/10/08.
REFERENCES:
CC
CC
CC
CC
E. 146th STREET 0 30 60 9015
Graphic Scale: 1"=30’
PROPOSED GARDEN CENTER AREA = 17,225– SF
NEW TOTAL GARDEN CENTER AREA = 59,424– SF
EXISTING LOWE’S STORE
F.F.E. = 824.50–
EXISTING TOTAL BUILDING = 135,197– SF
EXISTING TOTAL GARDEN CENTER = 42,199– SF
EXISTING COVERED
GARDEN CENTER
EXISTING OPEN
GARDEN CENTER
PLANT LIST
13 CS 3’ O.C.Red Osier Dogwood #3 cont.
10
VD
3’ O.C.
LANDSCAPING NOTES:
2.5’ Ht.CORNUS SERICEA
SOD
SOD
SOD
19
VD
7
CS
3
CS
9
VD
1. ALL EXISTING LANDSCAPING, WHICH CAN BE REMOVED AND RELOCATED, SHALL BE RELOCATED. IF
LANDSCAPING BECOMES DAMAGED DURING REMOVAL, REPLACED WITH THE SAME SPECIES PER THE
PLANT LIST.
2. CONTRACTOR SHALL PROVIDE A ONE (1) YEAR GUARANTEE ON ALL MATERIALS FROM DATE OF FINAL
ACCEPTANCE, INCLUDING ALL NEW AND RELOCATED LANDSCAPING.
3. CONTRACTOR SHALL VERIFY THE LOCATION OF ALL EXISTING UTILITIES PRIOR TO THE COMMENCEMENT
OF WORK. ANY CONFLICTS SHALL BE BROUGHT TO THE OWNER OR OWNER’S REPRESENTATIVES
ATTENTION, AT THE TIME OF DISCOVERY, TO ALLOW SUFFICIENT TIME FOR ANY NECESSARY RE-DESIGN.
4. THE CONTRACTOR SHALL MAINTAIN ALL UTILITY SERVICES TO SURROUNDING AND UPSTREAM PROPERTIES
AT ALL TIMES. UTILITY SERVICES SHALL NOT BE INTERRUPTED WITHOUT APPROVAL FROM THE PROPERTY
OWNER, COUNTY AND UTILITY COMPANIES.
5. DAMAGE TO ANY EXISTING CONDITIONS TO REMAIN WILL BE REPLACED AT CONTRACTOR’S EXPENSE.
6. ALL PLANTS SHALL MEET OR EXCEED THE MINIMUM REQUIREMENTS AS NOTED IN THE LATEST EDITION OF
THE AMERICAN STANDARDS FOR NURSERY STOCK BY THE AMERICAN ASSOCIATION OF NURSERYMEN, ANSI Z60.1.
ALL WORK SHALL BE DONE IN STRICT ACCORDANCE WITH DIVISION 2 OF LOWE’S STANDARD SITE SPECIFICATIONS.
7. ALL PLANTED AREAS SHALL RECEIVE A 3" LAYER OF SHREDDED PINE BARK MULCH OVER A 10 MIL. WEED MAT
EQUAL TO "WEEDBLOCK" BY EASY GARDENER OR DEWITT WEED BARRIER.
PROPOSED FOOTCANDLE CONTOUR1
PROPOSED SHRUBS
3
CS
PROPOSED LIGHTPOLE WITH UPSWING
ARM (REFER TO ARCH. PLANS FOR DETAILS)
10/16/08
CJK
C 3
Landscape & Site Lighting
Plan
REVISED PER CLIENT COMMENTS 12/16/08
1" = 30’
PROPOSED LIGHT POLES (REFER TO ARCH.
PLANS FOR DETAILS) (TYP. OF 4)
LIGHTING NOTES:
1. LIGHTING PHOTOMETRIC CALCULATIONS WERE PERFORMED ON 12/16/08 USING LITHONIA LIGHTING
KVF2 400M ASYFL FIXTURES WITH A 20’ MOUNTING HEIGHT.
10/16/08
CJK
Detail Sheet
C 4
1" = 30’
C
L
PARKING
RESERVED
ACCESSIBLE
VAN
1’-6"
12"
9" DIA.
6"
15
BLUE PAINT
WHITE PAINT6" TYP.
CENTERLINE
N.T.S.
HANDICAP PARKING
STRIPING DETAIL
SEE SIDEWALK DETAIL
N.T.S.
NOTES:
1. SEE SIDEWALK JOINTS DETAIL FOR JOINT SIZE AND SPACING
PAVEMENT
SECTION
6" MIN.
CONCRETE SIDEWALK W/ INTEGRAL CURB DETAIL
1"
ARCHITECTURAL JOINT
SEE CURB DETAIL
5"
24x36
$FILE$
$DATE$
$TIME$
08-0166
Store #1525
14598 Lowes Way
City of Carmel
Hamilton County, IN
Lowe’s Garden Center
Expansion
Drawing No.Scale:
Project No.
Type:
Date:
Drawn By:
Date:
1
Revisions:
Project Name & Location:
Drawing Name:
PROJECT MANAGER DATE
PROJECT ENGINEER / ARCHITECT DATE
Seal Seal
DATEPROJECT DESIGNER
2
3
4
5
6
7
8
9
It is a violation of law for any person, unless acting under the direction of
licensed Architect, Professional Engineer, Landscape Architect, or Land
Surveyor to alter any item on this document in any way.
Any licensee who alters this document is required by law to affix his or
her seal and to add the notation "Altered By" followed by his or her
signature and the specific description of the alteration or revision.
Drawing Alteration
DO NOT SCALE PLANS
Copying, Printing, Software and other processes required to produce
these prints can stretch or shrink the actual paper or layout. Therefore,
scaling of this drawing may be inaccurate. Contact APD Engineering
with any need for additional dimensions or clarifications.
615 Fishers Run
Victor, NY 14564
585.924.4914.fax
585.742.2222
Copyright 2008C
APD Engineering & Architecture, PLLC
615 Fishers Run
Victor, NY 14564
585.742.2222
585.924.4914.fax
www.apd.com
APD Engineering & Architecture, PLLC
1. EXISTING SITE DEVELOPMENT PLANS PREPARED BY KES CONSULTANTS
INC., HAVING BEEN NAMED "LOWES HOME IMPROVEMENT CENTER S.R.
431/U.S. 31 AND 146th STREET, CARMEL, INDIANA" PLAN C-200.
2. BUILDING FOOTPRINT PLAN PREPARED BY ARCVISION, INC. AND RECEIVED
VIA EMAIL ON 8/27/08.
3. SITE OBSERVATIONS AND PHOTOS TAKEN ONSITE ON 9/10/08.
REFERENCES:
GARDENCENTEREXPANSION
CARMEL,INDIANA
ORIGINAL
ISSUE DATE:
PERMIT SET
ISSUE DATE:
CONSTRUCTION SET
ISSUE DATE:
DRAWING NUMBER:
PROJECTNo:DRAWNBY:CHECKEDBY:
R
PRE-BID SET POST BID SET
ISSUE DATE ISSUE DATE
REVISIONS
R
DATE DESCRIPTION
081221
01/09/09
-
-
D1
DEMOLITIONPLAN
DJJDJJ
GARDENCENTEREXPANSION
CARMEL,INDIANA
ORIGINAL
ISSUE DATE:
PERMIT SET
ISSUE DATE:
CONSTRUCTION SET
ISSUE DATE:
DRAWING NUMBER:
PROJECTNo:DRAWNBY:CHECKEDBY:
R
PRE-BID SET POST BID SET
ISSUE DATE ISSUE DATE
REVISIONS
R
DATE DESCRIPTION
081221
01/09/09
-
-
A1
GARDENCENTERFLOORPLAN
ANDDETAILS
DJJDJJ
GARDENCENTEREXPANSION
CARMEL,INDIANA
ORIGINAL
ISSUE DATE:
PERMIT SET
ISSUE DATE:
CONSTRUCTION SET
ISSUE DATE:
DRAWING NUMBER:
PROJECTNo:DRAWNBY:CHECKEDBY:
R
PRE-BID SET POST BID SET
ISSUE DATE ISSUE DATE
REVISIONS
R
DATE DESCRIPTION
081221
01/09/09
-
-
A2
CONSTRUCTIONDETAILS
DJJDJJ
GARDENCENTEREXPANSION
CARMEL,INDIANA
ORIGINAL
ISSUE DATE:
PERMIT SET
ISSUE DATE:
CONSTRUCTION SET
ISSUE DATE:
DRAWING NUMBER:
PROJECTNo:DRAWNBY:CHECKEDBY:
R
PRE-BID SET POST BID SET
ISSUE DATE ISSUE DATE
REVISIONS
R
DATE DESCRIPTION
081221
01/09/09
-
-
A3
EXTERIORELEVATIONS
DJJDJJ
C:DocumentsandSettingsdft18MyDocumentsJOBS08-704-LOWES08704-S1PLN.dwg,1/9/20098:50:43AM,dft18
GARDENCENTEREXPANSION
CARMEL,INDIANA
ORIGINAL
ISSUE DATE:
PERMIT SET
ISSUE DATE:
CONSTRUCTION SET
ISSUE DATE:
DRAWING NUMBER:
PROJECTNo:DRAWNBY:CHECKEDBY:
R
PRE-BID SET POST BID SET
ISSUE DATE ISSUE DATE
REVISIONS
R
DATE DESCRIPTION
081221
5/22/06
-
-
PLAN
C:DocumentsandSettingsdft18MyDocumentsJOBS08-704-LOWES08704-S2-DETS.dwg,1/9/20098:53:12AM,dft18
GARDENCENTEREXPANSION
CARMEL,INDIANA
ORIGINAL
ISSUE DATE:
PERMIT SET
ISSUE DATE:
CONSTRUCTION SET
ISSUE DATE:
DRAWING NUMBER:
PROJECTNo:DRAWNBY:CHECKEDBY:
R
PRE-BID SET POST BID SET
ISSUE DATE ISSUE DATE
REVISIONS
R
DATE DESCRIPTION
081221
5/22/06
-
-
DETAILS
GARDENCENTEREXPANSION
CARMEL,INDIANA
ORIGINAL
ISSUE DATE:
PERMIT SET
ISSUE DATE:
CONSTRUCTION SET
ISSUE DATE:
DRAWING NUMBER:
PROJECTNo:DRAWNBY:CHECKEDBY:
R
PRE-BID SET POST BID SET
ISSUE DATE ISSUE DATE
REVISIONS
R
DATE DESCRIPTION
081221
01/09/09
-
-
E1
LIGHTINGSCHEDULEAND
DETAILS
EVBK
GARDENCENTEREXPANSION
CARMEL,INDIANA
ORIGINAL
ISSUE DATE:
PERMIT SET
ISSUE DATE:
CONSTRUCTION SET
ISSUE DATE:
DRAWING NUMBER:
PROJECTNo:DRAWNBY:CHECKEDBY:
R
PRE-BID SET POST BID SET
ISSUE DATE ISSUE DATE
REVISIONS
R
DATE DESCRIPTION
081221
01/09/09
-
-
E2
GARDENCENTERELECTRICAL
PLANS
EVBK
GARDENCENTEREXPANSION
CARMEL,INDIANA
ORIGINAL
ISSUE DATE:
PERMIT SET
ISSUE DATE:
CONSTRUCTION SET
ISSUE DATE:
DRAWING NUMBER:
PROJECTNo:DRAWNBY:CHECKEDBY:
R
PRE-BID SET POST BID SET
ISSUE DATE ISSUE DATE
REVISIONS
R
DATE DESCRIPTION
081221
01/09/09
-
-
P1
GARDENCENTERPLUMBING
PLAN

More Related Content

What's hot

study of local bye laws, submission drawing,
study of local bye laws, submission drawing, study of local bye laws, submission drawing,
study of local bye laws, submission drawing,
Nitin Thakral
 
Farnsworth house
Farnsworth houseFarnsworth house
Farnsworth house
Anjali Reghu
 
Campus planning
Campus planningCampus planning
Campus planning
Ankit Goglani
 
Role as an architect in MHADA
Role as an architect in MHADARole as an architect in MHADA
Role as an architect in MHADA
Anupama Krishnan
 
Building Economics
Building Economics Building Economics
Building Economics
JIT KUMAR GUPTA
 
High rise MEP.pptx
High rise MEP.pptxHigh rise MEP.pptx
High rise MEP.pptx
GiaBo441347
 
Architectural Concept
Architectural Concept Architectural Concept
Architectural Concept
Dania Abdel-aziz
 
Urban Design basic rules
Urban Design basic rulesUrban Design basic rules
Urban Design basic rules
Tonmoy Barua
 
Design wind load
Design wind loadDesign wind load
Design wind load
Sharda University
 
Micro housing
Micro housingMicro housing
Micro housing
Harsh Bhardwaj
 
Reinforcement detailing
Reinforcement  detailingReinforcement  detailing
Reinforcement detailing
Ali Ishaqi
 
Unit-1 Lecture-2 - Light Weight Construction Materials by Brig. S.K. Sharma
Unit-1 Lecture-2 - Light Weight Construction Materials by Brig. S.K. SharmaUnit-1 Lecture-2 - Light Weight Construction Materials by Brig. S.K. Sharma
Unit-1 Lecture-2 - Light Weight Construction Materials by Brig. S.K. Sharma
THE NORTHCAP UNIVERSITY
 
Vernacular Architecture
Vernacular ArchitectureVernacular Architecture
Vernacular Architecture
Malavika Shekhar
 
Haryana, Delhi, Noida, Chandigarh Building byelaws v
Haryana, Delhi, Noida, Chandigarh Building byelaws vHaryana, Delhi, Noida, Chandigarh Building byelaws v
Haryana, Delhi, Noida, Chandigarh Building byelaws v
BhavishyaPahwa1
 
Peb structures
Peb structuresPeb structures
Peb structureshlksd
 
GROUP HOUSING.pptx
GROUP HOUSING.pptxGROUP HOUSING.pptx
GROUP HOUSING.pptx
kanishka859432
 
Composite Concrete-Steel Construction in Tall Buildings by Dr. Naveed
Composite Concrete-Steel Construction in Tall Buildings by Dr. NaveedComposite Concrete-Steel Construction in Tall Buildings by Dr. Naveed
Composite Concrete-Steel Construction in Tall Buildings by Dr. Naveed
AIT Solutions
 
NBC NORMS FOR HVAC SYSTEMS
NBC NORMS FOR HVAC SYSTEMSNBC NORMS FOR HVAC SYSTEMS
NBC NORMS FOR HVAC SYSTEMS
asif anwar
 

What's hot (20)

study of local bye laws, submission drawing,
study of local bye laws, submission drawing, study of local bye laws, submission drawing,
study of local bye laws, submission drawing,
 
Farnsworth house
Farnsworth houseFarnsworth house
Farnsworth house
 
Campus planning
Campus planningCampus planning
Campus planning
 
Role as an architect in MHADA
Role as an architect in MHADARole as an architect in MHADA
Role as an architect in MHADA
 
Building Economics
Building Economics Building Economics
Building Economics
 
High rise MEP.pptx
High rise MEP.pptxHigh rise MEP.pptx
High rise MEP.pptx
 
Architectural Concept
Architectural Concept Architectural Concept
Architectural Concept
 
Urban Design basic rules
Urban Design basic rulesUrban Design basic rules
Urban Design basic rules
 
Design wind load
Design wind loadDesign wind load
Design wind load
 
Micro housing
Micro housingMicro housing
Micro housing
 
Reinforcement detailing
Reinforcement  detailingReinforcement  detailing
Reinforcement detailing
 
Unit-1 Lecture-2 - Light Weight Construction Materials by Brig. S.K. Sharma
Unit-1 Lecture-2 - Light Weight Construction Materials by Brig. S.K. SharmaUnit-1 Lecture-2 - Light Weight Construction Materials by Brig. S.K. Sharma
Unit-1 Lecture-2 - Light Weight Construction Materials by Brig. S.K. Sharma
 
Vernacular Architecture
Vernacular ArchitectureVernacular Architecture
Vernacular Architecture
 
Group Housing Bye Laws
Group Housing Bye LawsGroup Housing Bye Laws
Group Housing Bye Laws
 
Haryana, Delhi, Noida, Chandigarh Building byelaws v
Haryana, Delhi, Noida, Chandigarh Building byelaws vHaryana, Delhi, Noida, Chandigarh Building byelaws v
Haryana, Delhi, Noida, Chandigarh Building byelaws v
 
Peb structures
Peb structuresPeb structures
Peb structures
 
GROUP HOUSING.pptx
GROUP HOUSING.pptxGROUP HOUSING.pptx
GROUP HOUSING.pptx
 
Composite Concrete-Steel Construction in Tall Buildings by Dr. Naveed
Composite Concrete-Steel Construction in Tall Buildings by Dr. NaveedComposite Concrete-Steel Construction in Tall Buildings by Dr. Naveed
Composite Concrete-Steel Construction in Tall Buildings by Dr. Naveed
 
NBC NORMS FOR HVAC SYSTEMS
NBC NORMS FOR HVAC SYSTEMSNBC NORMS FOR HVAC SYSTEMS
NBC NORMS FOR HVAC SYSTEMS
 
Filler slab
Filler slabFiller slab
Filler slab
 

Viewers also liked

ESCAYOLAS RAOS, POLIGONO DE RAOS, 11 CAMARGO, CANTABRIA ESPAÑA
ESCAYOLAS RAOS, POLIGONO DE RAOS, 11 CAMARGO, CANTABRIA ESPAÑAESCAYOLAS RAOS, POLIGONO DE RAOS, 11 CAMARGO, CANTABRIA ESPAÑA
ESCAYOLAS RAOS, POLIGONO DE RAOS, 11 CAMARGO, CANTABRIA ESPAÑA
Prefabricados Raos
 
Juan Carles Contel, Department of Health, The Journey from a Chronic Care Pro...
Juan Carles Contel, Department of Health, The Journey from a Chronic Care Pro...Juan Carles Contel, Department of Health, The Journey from a Chronic Care Pro...
Juan Carles Contel, Department of Health, The Journey from a Chronic Care Pro...
IBM Cúram Software Health and Social Programs
 
Cura real
Cura realCura real
Cura real
Juarez Teixeira
 
Salida o campamento
Salida o campamentoSalida o campamento
Salida o campamentoyogurdepato
 
Infromation Security as an Institutional Priority
Infromation Security as an Institutional PriorityInfromation Security as an Institutional Priority
Infromation Security as an Institutional Priority
zohaibqadir
 
Vlecko HR certificate
Vlecko HR certificateVlecko HR certificate
Vlecko HR certificateDenise Laros
 
El Proyecto Matriz 5 Constitucion Europea La Gran Mentira
El Proyecto Matriz 5 Constitucion Europea La Gran MentiraEl Proyecto Matriz 5 Constitucion Europea La Gran Mentira
El Proyecto Matriz 5 Constitucion Europea La Gran Mentira
guest7da378
 
Revista nº 169 - Mayo 2013
Revista nº 169 - Mayo 2013Revista nº 169 - Mayo 2013
Revista nº 169 - Mayo 2013andalumedio
 
Cuadernillo tutoria 3
Cuadernillo tutoria 3Cuadernillo tutoria 3
Cuadernillo tutoria 3
JEDANNIE Apellidos
 
Smarter Use Cases
Smarter Use CasesSmarter Use Cases
Smarter Use Cases
Smarter Engagement
 
Energia e espirito
Energia e espiritoEnergia e espirito
Energia e espirito
Eduardo Cardoso Teixeira
 
Case study for st bernard's
Case study for st bernard'sCase study for st bernard's
Case study for st bernard's
Andy Brown
 
Mastering the mobile check in digital dealer october 2012
Mastering the mobile check in digital dealer october 2012Mastering the mobile check in digital dealer october 2012
Mastering the mobile check in digital dealer october 2012
Cars.com
 
Trabajo informatica Componentes del Ordenador
Trabajo informatica Componentes del OrdenadorTrabajo informatica Componentes del Ordenador
Trabajo informatica Componentes del Ordenadormanriquecampoyalejandro
 
E-Wave Networks PVT. LTD>
E-Wave Networks PVT. LTD>E-Wave Networks PVT. LTD>
E-Wave Networks PVT. LTD>
ewavenetworks
 
Screenplay Cyber Planet: Cast of Characters (Bios)
Screenplay Cyber Planet: Cast of Characters (Bios)Screenplay Cyber Planet: Cast of Characters (Bios)
Screenplay Cyber Planet: Cast of Characters (Bios)
Michael Knapp
 
Modelos de negocio para distribución de contenido creativo por Internet
Modelos de negocio para distribución de contenido creativo por InternetModelos de negocio para distribución de contenido creativo por Internet
Modelos de negocio para distribución de contenido creativo por Internet
Iván Lasso
 

Viewers also liked (20)

ESCAYOLAS RAOS, POLIGONO DE RAOS, 11 CAMARGO, CANTABRIA ESPAÑA
ESCAYOLAS RAOS, POLIGONO DE RAOS, 11 CAMARGO, CANTABRIA ESPAÑAESCAYOLAS RAOS, POLIGONO DE RAOS, 11 CAMARGO, CANTABRIA ESPAÑA
ESCAYOLAS RAOS, POLIGONO DE RAOS, 11 CAMARGO, CANTABRIA ESPAÑA
 
Clases De Hcd
Clases De HcdClases De Hcd
Clases De Hcd
 
Krunal_Jani_CV
Krunal_Jani_CVKrunal_Jani_CV
Krunal_Jani_CV
 
Juan Carles Contel, Department of Health, The Journey from a Chronic Care Pro...
Juan Carles Contel, Department of Health, The Journey from a Chronic Care Pro...Juan Carles Contel, Department of Health, The Journey from a Chronic Care Pro...
Juan Carles Contel, Department of Health, The Journey from a Chronic Care Pro...
 
Cura real
Cura realCura real
Cura real
 
Salida o campamento
Salida o campamentoSalida o campamento
Salida o campamento
 
Infromation Security as an Institutional Priority
Infromation Security as an Institutional PriorityInfromation Security as an Institutional Priority
Infromation Security as an Institutional Priority
 
Vlecko HR certificate
Vlecko HR certificateVlecko HR certificate
Vlecko HR certificate
 
El Proyecto Matriz 5 Constitucion Europea La Gran Mentira
El Proyecto Matriz 5 Constitucion Europea La Gran MentiraEl Proyecto Matriz 5 Constitucion Europea La Gran Mentira
El Proyecto Matriz 5 Constitucion Europea La Gran Mentira
 
Revista nº 169 - Mayo 2013
Revista nº 169 - Mayo 2013Revista nº 169 - Mayo 2013
Revista nº 169 - Mayo 2013
 
Cuadernillo tutoria 3
Cuadernillo tutoria 3Cuadernillo tutoria 3
Cuadernillo tutoria 3
 
Smarter Use Cases
Smarter Use CasesSmarter Use Cases
Smarter Use Cases
 
Energia e espirito
Energia e espiritoEnergia e espirito
Energia e espirito
 
Case study for st bernard's
Case study for st bernard'sCase study for st bernard's
Case study for st bernard's
 
Mastering the mobile check in digital dealer october 2012
Mastering the mobile check in digital dealer october 2012Mastering the mobile check in digital dealer october 2012
Mastering the mobile check in digital dealer october 2012
 
Trabajo informatica Componentes del Ordenador
Trabajo informatica Componentes del OrdenadorTrabajo informatica Componentes del Ordenador
Trabajo informatica Componentes del Ordenador
 
E-Wave Networks PVT. LTD>
E-Wave Networks PVT. LTD>E-Wave Networks PVT. LTD>
E-Wave Networks PVT. LTD>
 
Screenplay Cyber Planet: Cast of Characters (Bios)
Screenplay Cyber Planet: Cast of Characters (Bios)Screenplay Cyber Planet: Cast of Characters (Bios)
Screenplay Cyber Planet: Cast of Characters (Bios)
 
Modelos de negocio para distribución de contenido creativo por Internet
Modelos de negocio para distribución de contenido creativo por InternetModelos de negocio para distribución de contenido creativo por Internet
Modelos de negocio para distribución de contenido creativo por Internet
 
Seminario 'Energía Solar: Cocinando con Fotones'
Seminario 'Energía Solar: Cocinando con Fotones'Seminario 'Energía Solar: Cocinando con Fotones'
Seminario 'Energía Solar: Cocinando con Fotones'
 

Similar to Lowe's Carmel, IN

KFC - Surprise, AZ
KFC - Surprise, AZKFC - Surprise, AZ
KFC - Surprise, AZ
Djuan Jackson, NOMA, CDT
 
Farmers Executive Fitness Wilshire Blvd LA CA
Farmers Executive Fitness Wilshire Blvd LA CAFarmers Executive Fitness Wilshire Blvd LA CA
Farmers Executive Fitness Wilshire Blvd LA CA
Richard Clark
 
PROYECTO EN ILUSTRATOR
PROYECTO EN ILUSTRATORPROYECTO EN ILUSTRATOR
PROYECTO EN ILUSTRATOR
panderistas17
 
lot106_plans.pdf
lot106_plans.pdflot106_plans.pdf
lot106_plans.pdf
PhilipTioxon1
 
lot106_plans.pdf
lot106_plans.pdflot106_plans.pdf
lot106_plans.pdf
JUSTINKURTVALENZUELA
 
Architectural_plans-1.pdf
Architectural_plans-1.pdfArchitectural_plans-1.pdf
Architectural_plans-1.pdf
SunnySmith10
 
6320 restrooms
6320 restrooms6320 restrooms
6320 restrooms
Richard Clark
 
Holly Hill Drive Plans 4-11-13
Holly Hill Drive Plans 4-11-13Holly Hill Drive Plans 4-11-13
Holly Hill Drive Plans 4-11-13Chad Henry
 
Item vi.a. doyle street mews pc 09 28-2017
Item vi.a. doyle street mews pc 09 28-2017Item vi.a. doyle street mews pc 09 28-2017
Item vi.a. doyle street mews pc 09 28-2017
E'ville Eye
 
01 architectural cycle 2 interactive
01 architectural   cycle 2 interactive01 architectural   cycle 2 interactive
01 architectural cycle 2 interactive
sergencad sergencad
 
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - URS
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - URSSAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - URS
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - URSSunit Dhingra
 
SALVACION-SAN-FRANCISCO.pdf road design final
SALVACION-SAN-FRANCISCO.pdf road design finalSALVACION-SAN-FRANCISCO.pdf road design final
SALVACION-SAN-FRANCISCO.pdf road design final
SherwinNatino
 
BURTON REMODEL 10-07-16
BURTON REMODEL 10-07-16BURTON REMODEL 10-07-16
BURTON REMODEL 10-07-16Cesar Salinas
 
Ananth.K.Samy_PRo_Sample
Ananth.K.Samy_PRo_SampleAnanth.K.Samy_PRo_Sample
Ananth.K.Samy_PRo_SampleAnanth K.Samy
 
North Campus Parking Garage
North Campus Parking GarageNorth Campus Parking Garage
North Campus Parking GarageTurner Solterman
 

Similar to Lowe's Carmel, IN (20)

IS252_PAA
IS252_PAAIS252_PAA
IS252_PAA
 
KFC - Surprise, AZ
KFC - Surprise, AZKFC - Surprise, AZ
KFC - Surprise, AZ
 
Farmers Executive Fitness Wilshire Blvd LA CA
Farmers Executive Fitness Wilshire Blvd LA CAFarmers Executive Fitness Wilshire Blvd LA CA
Farmers Executive Fitness Wilshire Blvd LA CA
 
PROYECTO EN ILUSTRATOR
PROYECTO EN ILUSTRATORPROYECTO EN ILUSTRATOR
PROYECTO EN ILUSTRATOR
 
lot106_plans.pdf
lot106_plans.pdflot106_plans.pdf
lot106_plans.pdf
 
lot106_plans.pdf
lot106_plans.pdflot106_plans.pdf
lot106_plans.pdf
 
Architectural_plans-1.pdf
Architectural_plans-1.pdfArchitectural_plans-1.pdf
Architectural_plans-1.pdf
 
6320 restrooms
6320 restrooms6320 restrooms
6320 restrooms
 
Holly Hill Drive Plans 4-11-13
Holly Hill Drive Plans 4-11-13Holly Hill Drive Plans 4-11-13
Holly Hill Drive Plans 4-11-13
 
Legazpi City, Philippines
Legazpi City, PhilippinesLegazpi City, Philippines
Legazpi City, Philippines
 
My drawings
My drawingsMy drawings
My drawings
 
Item vi.a. doyle street mews pc 09 28-2017
Item vi.a. doyle street mews pc 09 28-2017Item vi.a. doyle street mews pc 09 28-2017
Item vi.a. doyle street mews pc 09 28-2017
 
01 architectural cycle 2 interactive
01 architectural   cycle 2 interactive01 architectural   cycle 2 interactive
01 architectural cycle 2 interactive
 
SAMPLE PORTFOLIO
SAMPLE PORTFOLIOSAMPLE PORTFOLIO
SAMPLE PORTFOLIO
 
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - URS
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - URSSAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - URS
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - URS
 
SALVACION-SAN-FRANCISCO.pdf road design final
SALVACION-SAN-FRANCISCO.pdf road design finalSALVACION-SAN-FRANCISCO.pdf road design final
SALVACION-SAN-FRANCISCO.pdf road design final
 
SIEMENS HQ
SIEMENS HQSIEMENS HQ
SIEMENS HQ
 
BURTON REMODEL 10-07-16
BURTON REMODEL 10-07-16BURTON REMODEL 10-07-16
BURTON REMODEL 10-07-16
 
Ananth.K.Samy_PRo_Sample
Ananth.K.Samy_PRo_SampleAnanth.K.Samy_PRo_Sample
Ananth.K.Samy_PRo_Sample
 
North Campus Parking Garage
North Campus Parking GarageNorth Campus Parking Garage
North Campus Parking Garage
 

More from Djuan Jackson, NOMA, CDT

Imo's Pizza - St. Charles, MO
Imo's Pizza - St. Charles, MOImo's Pizza - St. Charles, MO
Imo's Pizza - St. Charles, MO
Djuan Jackson, NOMA, CDT
 
Portfolio
PortfolioPortfolio
Vatterott College - St. Ann, MO
Vatterott College  - St. Ann, MOVatterott College  - St. Ann, MO
Vatterott College - St. Ann, MO
Djuan Jackson, NOMA, CDT
 
McClendon Mortuary
McClendon MortuaryMcClendon Mortuary
McClendon Mortuary
Djuan Jackson, NOMA, CDT
 
Lacefield Music
Lacefield MusicLacefield Music
Lacefield Music
Djuan Jackson, NOMA, CDT
 
Lacefield Music C Ds
Lacefield Music   C DsLacefield Music   C Ds
Lacefield Music C Ds
Djuan Jackson, NOMA, CDT
 
Mc Clendon Teat Mortuary C Ds
Mc Clendon Teat Mortuary   C DsMc Clendon Teat Mortuary   C Ds
Mc Clendon Teat Mortuary C Ds
Djuan Jackson, NOMA, CDT
 

More from Djuan Jackson, NOMA, CDT (10)

Resume of Djuan Jackson
Resume of Djuan JacksonResume of Djuan Jackson
Resume of Djuan Jackson
 
Imo's Pizza - St. Charles, MO
Imo's Pizza - St. Charles, MOImo's Pizza - St. Charles, MO
Imo's Pizza - St. Charles, MO
 
Portfolio
PortfolioPortfolio
Portfolio
 
Vatterott College - St. Ann, MO
Vatterott College  - St. Ann, MOVatterott College  - St. Ann, MO
Vatterott College - St. Ann, MO
 
Resume of Djuan Jackson
Resume of Djuan JacksonResume of Djuan Jackson
Resume of Djuan Jackson
 
McClendon Mortuary
McClendon MortuaryMcClendon Mortuary
McClendon Mortuary
 
Lacefield Music
Lacefield MusicLacefield Music
Lacefield Music
 
Lacefield Music C Ds
Lacefield Music   C DsLacefield Music   C Ds
Lacefield Music C Ds
 
Mc Clendon Teat Mortuary C Ds
Mc Clendon Teat Mortuary   C DsMc Clendon Teat Mortuary   C Ds
Mc Clendon Teat Mortuary C Ds
 
Portfolio
PortfolioPortfolio
Portfolio
 

Recently uploaded

20 slides of research movie and artists .pdf
20 slides of research movie and artists .pdf20 slides of research movie and artists .pdf
20 slides of research movie and artists .pdf
ameli25062005
 
一比一原版(CITY毕业证书)谢菲尔德哈勒姆大学毕业证如何办理
一比一原版(CITY毕业证书)谢菲尔德哈勒姆大学毕业证如何办理一比一原版(CITY毕业证书)谢菲尔德哈勒姆大学毕业证如何办理
一比一原版(CITY毕业证书)谢菲尔德哈勒姆大学毕业证如何办理
9a93xvy
 
一比一原版(毕业证)长崎大学毕业证成绩单如何办理
一比一原版(毕业证)长崎大学毕业证成绩单如何办理一比一原版(毕业证)长崎大学毕业证成绩单如何办理
一比一原版(毕业证)长崎大学毕业证成绩单如何办理
taqyed
 
Technoblade The Legacy of a Minecraft Legend.
Technoblade The Legacy of a Minecraft Legend.Technoblade The Legacy of a Minecraft Legend.
Technoblade The Legacy of a Minecraft Legend.
Techno Merch
 
vernacular architecture in response to climate.pdf
vernacular architecture in response to climate.pdfvernacular architecture in response to climate.pdf
vernacular architecture in response to climate.pdf
PrabhjeetSingh219035
 
PORTFOLIO FABIANA VILLANI ARCHITECTURE.pdf
PORTFOLIO FABIANA VILLANI ARCHITECTURE.pdfPORTFOLIO FABIANA VILLANI ARCHITECTURE.pdf
PORTFOLIO FABIANA VILLANI ARCHITECTURE.pdf
fabianavillanib
 
Moldes de letra 3D Alfabeto completo esp
Moldes de letra 3D Alfabeto completo espMoldes de letra 3D Alfabeto completo esp
Moldes de letra 3D Alfabeto completo esp
Hess9
 
White wonder, Work developed by Eva Tschopp
White wonder, Work developed by Eva TschoppWhite wonder, Work developed by Eva Tschopp
White wonder, Work developed by Eva Tschopp
Mansi Shah
 
PDF SubmissionDigital Marketing Institute in Noida
PDF SubmissionDigital Marketing Institute in NoidaPDF SubmissionDigital Marketing Institute in Noida
PDF SubmissionDigital Marketing Institute in Noida
PoojaSaini954651
 
一比一原版(UW毕业证)西雅图华盛顿大学毕业证如何办理
一比一原版(UW毕业证)西雅图华盛顿大学毕业证如何办理一比一原版(UW毕业证)西雅图华盛顿大学毕业证如何办理
一比一原版(UW毕业证)西雅图华盛顿大学毕业证如何办理
kecekev
 
Maximize Your Content with Beautiful Assets : Content & Asset for Landing Page
Maximize Your Content with Beautiful Assets : Content & Asset for Landing Page Maximize Your Content with Beautiful Assets : Content & Asset for Landing Page
Maximize Your Content with Beautiful Assets : Content & Asset for Landing Page
pmgdscunsri
 
一比一原版(BU毕业证书)伯恩茅斯大学毕业证成绩单如何办理
一比一原版(BU毕业证书)伯恩茅斯大学毕业证成绩单如何办理一比一原版(BU毕业证书)伯恩茅斯大学毕业证成绩单如何办理
一比一原版(BU毕业证书)伯恩茅斯大学毕业证成绩单如何办理
h7j5io0
 
一比一原版(MMU毕业证书)曼彻斯特城市大学毕业证成绩单如何办理
一比一原版(MMU毕业证书)曼彻斯特城市大学毕业证成绩单如何办理一比一原版(MMU毕业证书)曼彻斯特城市大学毕业证成绩单如何办理
一比一原版(MMU毕业证书)曼彻斯特城市大学毕业证成绩单如何办理
7sd8fier
 
Design Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinkingDesign Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinking
cy0krjxt
 
RTUYUIJKLDSADAGHBDJNKSMAL,D
RTUYUIJKLDSADAGHBDJNKSMAL,DRTUYUIJKLDSADAGHBDJNKSMAL,D
RTUYUIJKLDSADAGHBDJNKSMAL,D
cy0krjxt
 
Коричневый и Кремовый Деликатный Органический Копирайтер Фрилансер Марке...
Коричневый и Кремовый Деликатный Органический Копирайтер Фрилансер Марке...Коричневый и Кремовый Деликатный Органический Копирайтер Фрилансер Марке...
Коричневый и Кремовый Деликатный Органический Копирайтер Фрилансер Марке...
ameli25062005
 
一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理
一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理
一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理
smpc3nvg
 
一比一原版(NCL毕业证书)纽卡斯尔大学毕业证成绩单如何办理
一比一原版(NCL毕业证书)纽卡斯尔大学毕业证成绩单如何办理一比一原版(NCL毕业证书)纽卡斯尔大学毕业证成绩单如何办理
一比一原版(NCL毕业证书)纽卡斯尔大学毕业证成绩单如何办理
7sd8fier
 
Storytelling For The Web: Integrate Storytelling in your Design Process
Storytelling For The Web: Integrate Storytelling in your Design ProcessStorytelling For The Web: Integrate Storytelling in your Design Process
Storytelling For The Web: Integrate Storytelling in your Design Process
Chiara Aliotta
 
Borys Sutkowski portfolio interior design
Borys Sutkowski portfolio interior designBorys Sutkowski portfolio interior design
Borys Sutkowski portfolio interior design
boryssutkowski
 

Recently uploaded (20)

20 slides of research movie and artists .pdf
20 slides of research movie and artists .pdf20 slides of research movie and artists .pdf
20 slides of research movie and artists .pdf
 
一比一原版(CITY毕业证书)谢菲尔德哈勒姆大学毕业证如何办理
一比一原版(CITY毕业证书)谢菲尔德哈勒姆大学毕业证如何办理一比一原版(CITY毕业证书)谢菲尔德哈勒姆大学毕业证如何办理
一比一原版(CITY毕业证书)谢菲尔德哈勒姆大学毕业证如何办理
 
一比一原版(毕业证)长崎大学毕业证成绩单如何办理
一比一原版(毕业证)长崎大学毕业证成绩单如何办理一比一原版(毕业证)长崎大学毕业证成绩单如何办理
一比一原版(毕业证)长崎大学毕业证成绩单如何办理
 
Technoblade The Legacy of a Minecraft Legend.
Technoblade The Legacy of a Minecraft Legend.Technoblade The Legacy of a Minecraft Legend.
Technoblade The Legacy of a Minecraft Legend.
 
vernacular architecture in response to climate.pdf
vernacular architecture in response to climate.pdfvernacular architecture in response to climate.pdf
vernacular architecture in response to climate.pdf
 
PORTFOLIO FABIANA VILLANI ARCHITECTURE.pdf
PORTFOLIO FABIANA VILLANI ARCHITECTURE.pdfPORTFOLIO FABIANA VILLANI ARCHITECTURE.pdf
PORTFOLIO FABIANA VILLANI ARCHITECTURE.pdf
 
Moldes de letra 3D Alfabeto completo esp
Moldes de letra 3D Alfabeto completo espMoldes de letra 3D Alfabeto completo esp
Moldes de letra 3D Alfabeto completo esp
 
White wonder, Work developed by Eva Tschopp
White wonder, Work developed by Eva TschoppWhite wonder, Work developed by Eva Tschopp
White wonder, Work developed by Eva Tschopp
 
PDF SubmissionDigital Marketing Institute in Noida
PDF SubmissionDigital Marketing Institute in NoidaPDF SubmissionDigital Marketing Institute in Noida
PDF SubmissionDigital Marketing Institute in Noida
 
一比一原版(UW毕业证)西雅图华盛顿大学毕业证如何办理
一比一原版(UW毕业证)西雅图华盛顿大学毕业证如何办理一比一原版(UW毕业证)西雅图华盛顿大学毕业证如何办理
一比一原版(UW毕业证)西雅图华盛顿大学毕业证如何办理
 
Maximize Your Content with Beautiful Assets : Content & Asset for Landing Page
Maximize Your Content with Beautiful Assets : Content & Asset for Landing Page Maximize Your Content with Beautiful Assets : Content & Asset for Landing Page
Maximize Your Content with Beautiful Assets : Content & Asset for Landing Page
 
一比一原版(BU毕业证书)伯恩茅斯大学毕业证成绩单如何办理
一比一原版(BU毕业证书)伯恩茅斯大学毕业证成绩单如何办理一比一原版(BU毕业证书)伯恩茅斯大学毕业证成绩单如何办理
一比一原版(BU毕业证书)伯恩茅斯大学毕业证成绩单如何办理
 
一比一原版(MMU毕业证书)曼彻斯特城市大学毕业证成绩单如何办理
一比一原版(MMU毕业证书)曼彻斯特城市大学毕业证成绩单如何办理一比一原版(MMU毕业证书)曼彻斯特城市大学毕业证成绩单如何办理
一比一原版(MMU毕业证书)曼彻斯特城市大学毕业证成绩单如何办理
 
Design Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinkingDesign Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinking
 
RTUYUIJKLDSADAGHBDJNKSMAL,D
RTUYUIJKLDSADAGHBDJNKSMAL,DRTUYUIJKLDSADAGHBDJNKSMAL,D
RTUYUIJKLDSADAGHBDJNKSMAL,D
 
Коричневый и Кремовый Деликатный Органический Копирайтер Фрилансер Марке...
Коричневый и Кремовый Деликатный Органический Копирайтер Фрилансер Марке...Коричневый и Кремовый Деликатный Органический Копирайтер Фрилансер Марке...
Коричневый и Кремовый Деликатный Органический Копирайтер Фрилансер Марке...
 
一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理
一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理
一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理
 
一比一原版(NCL毕业证书)纽卡斯尔大学毕业证成绩单如何办理
一比一原版(NCL毕业证书)纽卡斯尔大学毕业证成绩单如何办理一比一原版(NCL毕业证书)纽卡斯尔大学毕业证成绩单如何办理
一比一原版(NCL毕业证书)纽卡斯尔大学毕业证成绩单如何办理
 
Storytelling For The Web: Integrate Storytelling in your Design Process
Storytelling For The Web: Integrate Storytelling in your Design ProcessStorytelling For The Web: Integrate Storytelling in your Design Process
Storytelling For The Web: Integrate Storytelling in your Design Process
 
Borys Sutkowski portfolio interior design
Borys Sutkowski portfolio interior designBorys Sutkowski portfolio interior design
Borys Sutkowski portfolio interior design
 

Lowe's Carmel, IN

  • 1. CS COVERSHEET DJJDJJ GARDENCENTEREXPANSION CARMEL,INDIANA ORIGINAL ISSUE DATE: PERMIT SET ISSUE DATE: CONSTRUCTION SET ISSUE DATE: DRAWING NUMBER: PROJECTNo:DRAWNBY:CHECKEDBY: R PRE-BID SET POST BID SET ISSUE DATE ISSUE DATE REVISIONS R DATE DESCRIPTION 081221 01/09/09 - -
  • 2. 24x36 $FILE$ $DATE$ $TIME$ 08-0166 Store #1525 14598 Lowes Way City of Carmel Hamilton County, IN Lowe’s Garden Center Expansion Drawing No.Scale: Project No. Type: Date: Drawn By: Date: 1 Revisions: Project Name & Location: Drawing Name: PROJECT MANAGER DATE PROJECT ENGINEER / ARCHITECT DATE Seal Seal DATEPROJECT DESIGNER 2 3 4 5 6 7 8 9 It is a violation of law for any person, unless acting under the direction of licensed Architect, Professional Engineer, Landscape Architect, or Land Surveyor to alter any item on this document in any way. Any licensee who alters this document is required by law to affix his or her seal and to add the notation "Altered By" followed by his or her signature and the specific description of the alteration or revision. Drawing Alteration DO NOT SCALE PLANS Copying, Printing, Software and other processes required to produce these prints can stretch or shrink the actual paper or layout. Therefore, scaling of this drawing may be inaccurate. Contact APD Engineering with any need for additional dimensions or clarifications. 615 Fishers Run Victor, NY 14564 585.924.4914.fax 585.742.2222 Copyright 2008C APD Engineering & Architecture, PLLC 615 Fishers Run Victor, NY 14564 585.742.2222 585.924.4914.fax www.apd.com APD Engineering & Architecture, PLLC GREYHOUND PASS OAK RD LOCATION SKETCH N.T.S. PROJECT LOCATION 1. EXISTING SITE DEVELOPMENT PLANS PREPARED BY KES CONSULTANTS INC., HAVING BEEN NAMED "LOWES HOME IMPROVEMENT CENTER S.R. 431/U.S. 31 AND 146th STREET, CARMEL, INDIANA" PLAN C-200. 2. BUILDING FOOTPRINT PLAN PREPARED BY ARCVISION, INC. AND RECEIVED VIA EMAIL ON 8/27/08. 3. SITE OBSERVATIONS AND PHOTOS TAKEN ONSITE ON 9/10/08. REFERENCES: CC CC CC CC CC CC CC CC CC CC E. 146th STREET F.F.E. = 824.50– EXISTING TOTAL BUILDING = 135,197– SF EXISTING TOTAL GARDEN CENTER = 42,199– SF EXISTING LOWE’S STORE EXISTING STORMWATER MANAGEMENT FACILITY AREA OF PROPOSED SITE IMPROVEMENTS (SEE PLANS C1, C2, C3 AND C4 FOR MORE INFORMATION) 12/16/08 CJK Overall Site Plan OV 1 1" = 40’ 0 40 8020 Graphic Scale: 1"=40’ 120 EXISTING 45’ WIDE BUILDING SETBACK 30 14 24 25 27 26 29 29 28 28 28 27 27 27 27 27 29 29 28 28 26 30 9 18 13 PROPOSED GARDEN CENTER EXPANSION = 17,225– SF NEW TOTAL GARDEN CENTER AREA = 59,424– SF
  • 3. 24x36 $FILE$ $DATE$ $TIME$ 08-0166 Store #1525 14598 Lowes Way City of Carmel Hamilton County, IN Lowe’s Garden Center Expansion Drawing No.Scale: Project No. Type: Date: Drawn By: Date: 1 Revisions: Project Name & Location: Drawing Name: PROJECT MANAGER DATE PROJECT ENGINEER / ARCHITECT DATE Seal Seal DATEPROJECT DESIGNER 2 3 4 5 6 7 8 9 It is a violation of law for any person, unless acting under the direction of licensed Architect, Professional Engineer, Landscape Architect, or Land Surveyor to alter any item on this document in any way. Any licensee who alters this document is required by law to affix his or her seal and to add the notation "Altered By" followed by his or her signature and the specific description of the alteration or revision. Drawing Alteration DO NOT SCALE PLANS Copying, Printing, Software and other processes required to produce these prints can stretch or shrink the actual paper or layout. Therefore, scaling of this drawing may be inaccurate. Contact APD Engineering with any need for additional dimensions or clarifications. 615 Fishers Run Victor, NY 14564 585.924.4914.fax 585.742.2222 Copyright 2008C APD Engineering & Architecture, PLLC 615 Fishers Run Victor, NY 14564 585.742.2222 585.924.4914.fax www.apd.com APD Engineering & Architecture, PLLC GREYHOUND PASS OAK RD LOCATION SKETCH N.T.S. PROJECT LOCATION 1. EXISTING SITE DEVELOPMENT PLANS PREPARED BY KES CONSULTANTS INC., HAVING BEEN NAMED "LOWES HOME IMPROVEMENT CENTER S.R. 431/U.S. 31 AND 146th STREET, CARMEL, INDIANA" PLAN C-200. 2. BUILDING FOOTPRINT PLAN PREPARED BY ARCVISION, INC. AND RECEIVED VIA EMAIL ON 8/27/08. 3. SITE OBSERVATIONS AND PHOTOS TAKEN ONSITE ON 9/10/08. REFERENCES: CC CC CC CC CC E. 146th STREET SITE NOTES: 0 30 60 9015 Graphic Scale: 1"=30’ EXISTING LOWE’S STORE F.F.E. = 824.50– EXISTING TOTAL BUILDING = 135,197– SF EXISTING TOTAL GARDEN CENTER = 42,199– SF PROPOSED 17,225– SF GARDEN CENTER EXPANSION (REFER TO ARCH. PLANS FOR DETAILS) EXISTING LIGHT POLES TO REMAIN AND BE PROTECTED DURING CONSTRUCTION ALL EXISTING LANDSCAPING TO BE RELOCATED TO NEW PLANTING AREAS (TYP.) (SEE PLAN C3 FOR DETAILS) EXISTING R.O.W. FOR LOWE’S WAY 94.7’ 90’ PROPOSED CURB (MATCH EXISTING-SEE DETAIL) EXISTING CART CORRAL TO BE REMOVED EXISTING WALL TO BE REMOVED (REFER TO ARCH. PLANS FOR DETAILS) RELOCATE EXISTING HANDICAP PARKING SPACES AS SHOWN (TYP.) PROPOSED HANDICAP SYMBOLS, STRIPING AND SIGNS. (SEE DETAILS) EXISTING LOADING DOCKS TO REMAIN EXISTING COVERED GARDEN CENTER TO REMAIN EXISTING OPEN GARDEN CENTER TO REMAIN PROPOSED GARDEN CENTER EXPANSION = 17,225– SF NEW TOTAL GARDEN CENTER AREA = 59,424– SF EXISTING PARKING SPACES, LIGHTPOLES, PLANTING AREAS AND OTHER FEATURES SHOWN GHOSTED, TO BE REMOVED PROPOSED CONCRETE SIDEWALK WITH INTERGAL CURB (TYP.) (SEE DETAIL) 1. TOTAL LOWE’S PARCEL: 16.516– ACRES 2. ZONING: PUD - PLANNED UNIT DEVELOPMENT 3. BUILDING SQUARE FOOTAGE: EXISTING SALES AREA = 115,390– SF EXISTING OFFICE AREA = 4,237– SF EXISTING RECEIVING AREA = 9,370– SF EXISTING SEASONAL DISPLAY AREA = 6,200– SF EXISTING TOTAL BUILDING = 135,197– SF GARDEN CENTER: EXISTING SHADE STRUCTURES = 5,445– SF EXISTING COVERED AREA = 11,354– SF EXISTING OPEN AREA = 25,400– SF EXISTING TOTAL GARDEN CENTER = 42,199– SF PROPOSED GARDEN CENTER EXPANSION= 17,225– SF NEW TOTAL GARDEN CENTER AREA = 59,424– SF 4. PARKING REQUIREMENTS: EXISTING STANDARD = 666 SPACES EXISTING HANDICAP = 16 SPACES EXISTING TOTAL = 682 SPACES (5.04 SPACES/1000 SF) PROPOSED STANDARD = 617 SPACES PROPOSED HANDICAP = 16 SPACES PROPOSED TOTAL = 633 SPACES (4.68 SPACES/1000 SF) (49 REGULAR SPACES LOST) REQUIRED PARKING = 676 SPACES (5.00 SPACES /1000 SF) 5. VARIANCES REQUIRED: PARKING (RELIEF FOR 43 SPACES) 6. APPLICABLE SETBACKS ARE AS FOLLOWS: REQUIRED PROVIDED MEASURED FROM NEAREST R.O.W. = 90’ 94.7’– MEASURED FROM R.O.W. OF 146TH ST = 45’ 76.6’– 7. THE SETBACK LINES AND NOTES RELATED TO SETBACKS SHOWN HEREIN ARE INTENDED TO SHOW APPLICABLE ZONING REQUIREMENTS OF THE CITY OF CARMEL, AS OF THE DATE OF THIS MAP, AND ARE NOT INTENDED TO IMPOSE ANY ADDITIONAL RESTRICTIONS OTHER THAN SAID ZONING REQUIREMENTS. 8. ALL EXISTING BUILDING AND SITE INFORMATION SHOWN ON THIS PLAN IS REPRESENTED BASED ON USE OF THE LISTED REFERENCES. 9. ANY NEW PAVEMENT SECTIONS THAT ARE TO BE REPLACED SHALL MATCH THE EXISTING PAVEMENT SECTION AND MATERIAL SPECIFICATIONS. 10. ANY EXISTING STRIPING WHICH IS TO REMAIN IN PLACE AND WHICH MAY BECOME OBSCURED OR DAMAGED DUE TO THE CONSTRUCTION OF IMPROVEMENTS, SHALL BE REPLACED AND/OR REPAINTED AS NECESSARY. 11. REFER TO ARCHITECTURAL PLANS FOR EXISTING AND PROPOSED BUILDING DIMENSIONS, SIDEWALK AND CURB DETAILS, ETC., UNLESS NOTED OTHERWISE. 12. APD ENGINEERING IS ONLY RESPONSIBLE FOR THE PROPOSED SITE IMPROVEMENTS RELATED TO THIS EXPANSION PROJECT. APD ENGINEERING DID NOT PERFORM THE ORIGINAL SITE DESIGN OR SURVEY AND ACCEPTS NO RESPONSIBILITY FOR EXISTING SITE CONDITIONS OR FEATURES THAT WERE DESIGNED AND BUILT PREVIOUS TO THE PREPARATION OF THESE PLANS. 13. THE CONTRACTOR IS RESPONSIBLE FOR SECURING APPROVAL, FOR ALL PROPOSED TEMPORARY CONSTRUCTION STAGING AND WORK AREAS, FROM ALL REQUIRED MUNICIPAL DEPARTMENTS, PRIOR TO COMMENCEMENT OF SAID STAGING OR CONSTRUCTION. 14. ALL SIGN POSTS AND SIGN FACES, AFFECTED BY THE SCOPE OF THIS PROJECT, SHALL BE INSTALLED TO REFLECT CURRENT DETAIL STANDARDS. ALL TRAFFIC CONTROL DEVICES AND PAVEMENT MARKINGS WILL COMPLY WITH THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES FOR DESIGN AND INSTALLATION. 15. ALL EXISTING FEATURES, SHOWN GHOSTED, ARE TO BE REMOVED OR RELOCATED, AS NOTED. 9/2/08 CJK Site Plan C 1 REVISED PER SITE VISIT OBSERVATIONS 12/16/08 1" = 30’
  • 4. C.O. C.O. C.O. C.O. C.O. M 822 821 823 X X X X X X X X X X X X XX X X X X X X XX 824.09 824.25 TC = 823.50– BC = 823.00– TC = 823.30– BC = 822.80– TC = 823.30– BC = 822.80– TC = 823.29– BC = 822.79– TC = 823.40– BC = 822.90– TC = 823.42– BC = 822.92– TC = 823.60– BC = 823.10– TC = 822.85– BC = 822.35– TC = 822.75– BC = 822.25– TC = 823.32– BC = 822.82– TC = 822.69– BC = 822.19– TC = 823.32– BC = 822.82– TC = 823.00– BC = 822.50– TC = 823.00– BC = 822.50– TC = 823.00– BC = 822.50– XX X 824.09 824.25 X X X X TC = 821.00 BC = 820.40 X TC = 821.46 BC = 820.85 X 823.19– 823.19– 823.19– 823.45– 821.93 TC = 821.96 TC = 821.75 BC = 821.25 X XX X TC/BC = 821.45– TC/BC = 821.14– X X X X X X X TC = 822.50 BC = 822.00 TC/BC = 821.38 X X X TC/BC = 821.50 TC/BC = 821.62 TC/BC = 821.74 TC/BC = 821.86 X X X 821.78 821.90 821.70 X X 822.00 822.00 X X X TC = 822.00 BC = 821.79 X TC = 821.58 BC = 821.19 TC = 821.35 BC = 820.85 TC = 821.30 BC = 820.80 TC = 821.59 BC = 821.09 TC = 821.96 BC = 821.51 TC = 821.80 BC = 821.30 BC = 821.54– HP 24x36 $FILE$ $DATE$ $TIME$ 08-0166 Store #1525 14598 Lowes Way City of Carmel Hamilton County, IN Lowe’s Garden Center Expansion Drawing No.Scale: Project No. Type: Date: Drawn By: Date: 1 Revisions: Project Name & Location: Drawing Name: PROJECT MANAGER DATE PROJECT ENGINEER / ARCHITECT DATE Seal Seal DATEPROJECT DESIGNER 2 3 4 5 6 7 8 9 It is a violation of law for any person, unless acting under the direction of licensed Architect, Professional Engineer, Landscape Architect, or Land Surveyor to alter any item on this document in any way. Any licensee who alters this document is required by law to affix his or her seal and to add the notation "Altered By" followed by his or her signature and the specific description of the alteration or revision. Drawing Alteration DO NOT SCALE PLANS Copying, Printing, Software and other processes required to produce these prints can stretch or shrink the actual paper or layout. Therefore, scaling of this drawing may be inaccurate. Contact APD Engineering with any need for additional dimensions or clarifications. 615 Fishers Run Victor, NY 14564 585.924.4914.fax 585.742.2222 Copyright 2008C APD Engineering & Architecture, PLLC 615 Fishers Run Victor, NY 14564 585.742.2222 585.924.4914.fax www.apd.com APD Engineering & Architecture, PLLC GREYHOUND PASS OAK RD LOCATION SKETCH N.T.S. PROJECT LOCATION 1. EXISTING SITE DEVELOPMENT PLANS PREPARED BY KES CONSULTANTS INC., HAVING BEEN NAMED "LOWES HOME IMPROVEMENT CENTER S.R. 431/U.S. 31 AND 146th STREET, CARMEL, INDIANA" PLAN C-200. 2. BUILDING FOOTPRINT PLAN PREPARED BY ARCVISION, INC. AND RECEIVED VIA EMAIL ON 8/27/08. 3. SITE OBSERVATIONS AND PHOTOS TAKEN ONSITE ON 9/10/08. REFERENCES: CC CC CC CC E. 146th STREET 0 30 60 9015 Graphic Scale: 1"=30’ EXISTING LOWE’S STORE F.F.E. = 824.50– EXISTING TOTAL BUILDING = 135,197– SF EXISTING TOTAL GARDEN CENTER = 42,199– SF EXISTING COVERED GARDEN CENTER EXISTING OPEN GARDEN CENTER EXISTING LOADING DOCKS 10/16/08 CJK Grading & Drainage Plan C 2 REVISED PER CLIENT COMMENTS 12/16/08 1" = 30’ EX. 18" DIA. STORM EX. INLET TG = 821.75– INV IN = 816.99– INV OUT = 816.49– EX. INLET TG = 820.95– INV IN = 815.34– INV OUT = 815.26– EX. MANHOLE TG = 823.10– INV IN = 816.44– (N) INV IN = 818.44– (W) INV OUT = 815.44– EX. INLET TG = 820.95– INV IN = 815.05– INV OUT = 814.55– EX. 24" DIA. STORM EX. IRRIGATION LINE EX. SAN. MANHOLE TR = 822.40– INV IN = 810.30– INV OUT = 810.20– EX. SAN. MANHOLE TR = 822.60– INV IN = 814.40– INV OUT = 814.30– UTILITY NOTES: EXISTING GRADE CONTOUR EXISTING GRADE SPOT ELEVATION821.56 X C.O. TOP OF CURB/BOTTOM OF CURBTC/BC PROPOSED SPOT GRADE ELEVATIONS PROPOSED GRADE CONTOUR PROPOSED INLET PROTECTION 821.93X 822 LOWER THE EX. TG TO 820.40. CONVERT EX. INLET TO CURB INLET. MAX. 2% SLOPE IN HANDICAP AREA EX. IRRIGATION LINE TO REMAIN AND BE PROTECTED DURING CONSTRUCTION EX. STORM SEWER TO REMAIN AND BE PROTECTED DURING CONSTRUCTION EX. STORM SEWER TO REMAIN AND BE PROTECTED DURING CONSTRUCTION PROPOSED GARDEN CENTER EXPANSION = 17,225– SF NEW TOTAL GARDEN CENTER AREA = 59,424– SF ALL EXISTING UTILITIES AND STORM DRAINAGE SYSTEMS TO REMAIN AND BE PROTECTED DURING CONSTRUCTION. ALL EXISTING UTILITIES AND STORM DRAINAGE SYSTEMS TO REMAIN AND BE PROTECTED DURING CONSTRUCTION. APPROXIMATE LOCATION OF EXISTING IRRIGATION METER TO REMAIN AND BE PROTECTED DURING CONSTRUCTION 1. NO IMPROVEMENTS TO THE EXISTING SITE WATER, GAS, ELECTRIC, TELEPHONE, SANITARY OR STORM SEWERS ARE ANTICIPATED FOR THIS EXPANSION PROJECT. DRAINAGE INLET IMPORVEMENTS WILL BE REQUIRED AS SHOWN. 2. EXISTING UTILITIES AND GRADES SHOWN ARE APPROXIMATE. CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL EXISTING UTILITY AND STORM DRAINAGE SYSTEM LOCATIONS AND PERTINENT FINISHED GRADE ELEVATIONS. ANY DISCREPANCIES SHALL BE BROUGHT TO THE OWNER OR OWNER’S REPRESENTATIVE’S ATTENTION WITHIN SUFFICIENT TIME TO ALLOW FOR ANY NECESSARY REDESIGN. 3. ALL WORK ASSOCIATED WITH THE MODIFICATIONS TO SAID UTILITIES SHALL BE DONE IN ACCORDANCE WITH ALL LOCAL GOVERNING AUTHORITIES’ AND/OR AGENCIES’ REQUIREMENTS AND SPECIFICATIONS. GENERAL CONTRACTOR SHALL HAVE APPROVAL OF ALL GOVERNING AGENCIES HAVING JURISDICTION OVER THIS SYSTEM PRIOR TO INSTALLATION. 4. CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF ALL EXISTING UTILITIES DURING CONSTRUCTION. IF SAID UTILITIES BECOME DISTURBED OR DAMAGED, IT IS THE CONTRACTOR’S RESPONSIBILITY TO REPAIR OR REPLACE SAID UTILITIES AT THE CONTRACTOR’S EXPENSE AND PER THE LOCAL GOVERNING AUTHORITIES’ AND/OR AGENCIES’ REQUIREMENTS AND SPECIFICATIONS. 5. CONTRACTOR TO PROVIDE AND MAINTAIN ALL EROSION AND SILT CONTROL DEVICES, AS NECESSARY PER THE LOCAL GOVERNING AUTHORITIES’ AND OR AGENCIES’ REQUIREMENTS AND SPECIFICATIONS. 6. CONTRACTOR IS RESPONSIBLE TO VERIFY THE EXISTENCE OF ANY IRRIGATION LINES AND SPRINKLER HEADS WITHIN THE LIMITS OF WORK. IF FOUND, ANY IRRIGATION LINES OR SPRINKLER HEADS SHALL BE RELOCATED/ REPLACED TO MAINTAIN COVERAGE OF LAWN AND LANDSCAPED AREAS. 7. ALL TRENCHING, PIPE LAYING, AND BACKFILLING SHALL BE IN ACCORDANCE WITH FEDERAL OSHA REGULATIONS. 8. THE LIMIT OF DISTURBANCE WILL BE LESS THAN –1.0 ACRES FOR THIS PROJECT. THE CONTRACTOR SHALL BE RESPONSIBLE FOR WORKING AND STAGING WITHIN THE NEW CONSTRUCTION AREAS, OR ADJACENT PAVED/UNDISTURBED AREAS ONLY. LOWER THE EX. TG TO 820.85. CONVERT EX. INLET TO CURB INLET.
  • 5. 24x36 $FILE$ $DATE$ $TIME$ 08-0166 Store #1525 14598 Lowes Way City of Carmel Hamilton County, IN Lowe’s Garden Center Expansion Drawing No.Scale: Project No. Type: Date: Drawn By: Date: 1 Revisions: Project Name & Location: Drawing Name: PROJECT MANAGER DATE PROJECT ENGINEER / ARCHITECT DATE Seal Seal DATEPROJECT DESIGNER 2 3 4 5 6 7 8 9 It is a violation of law for any person, unless acting under the direction of licensed Architect, Professional Engineer, Landscape Architect, or Land Surveyor to alter any item on this document in any way. Any licensee who alters this document is required by law to affix his or her seal and to add the notation "Altered By" followed by his or her signature and the specific description of the alteration or revision. Drawing Alteration DO NOT SCALE PLANS Copying, Printing, Software and other processes required to produce these prints can stretch or shrink the actual paper or layout. Therefore, scaling of this drawing may be inaccurate. Contact APD Engineering with any need for additional dimensions or clarifications. 615 Fishers Run Victor, NY 14564 585.924.4914.fax 585.742.2222 Copyright 2008C APD Engineering & Architecture, PLLC 615 Fishers Run Victor, NY 14564 585.742.2222 585.924.4914.fax www.apd.com APD Engineering & Architecture, PLLC GREYHOUND PASS OAK RD LOCATION SKETCH N.T.S. PROJECT LOCATION 1. EXISTING SITE DEVELOPMENT PLANS PREPARED BY KES CONSULTANTS INC., HAVING BEEN NAMED "LOWES HOME IMPROVEMENT CENTER S.R. 431/U.S. 31 AND 146th STREET, CARMEL, INDIANA" PLAN C-200. 2. BUILDING FOOTPRINT PLAN PREPARED BY ARCVISION, INC. AND RECEIVED VIA EMAIL ON 8/27/08. 3. SITE OBSERVATIONS AND PHOTOS TAKEN ONSITE ON 9/10/08. REFERENCES: CC CC CC CC E. 146th STREET 0 30 60 9015 Graphic Scale: 1"=30’ PROPOSED GARDEN CENTER AREA = 17,225– SF NEW TOTAL GARDEN CENTER AREA = 59,424– SF EXISTING LOWE’S STORE F.F.E. = 824.50– EXISTING TOTAL BUILDING = 135,197– SF EXISTING TOTAL GARDEN CENTER = 42,199– SF EXISTING COVERED GARDEN CENTER EXISTING OPEN GARDEN CENTER PLANT LIST 13 CS 3’ O.C.Red Osier Dogwood #3 cont. 10 VD 3’ O.C. LANDSCAPING NOTES: 2.5’ Ht.CORNUS SERICEA SOD SOD SOD 19 VD 7 CS 3 CS 9 VD 1. ALL EXISTING LANDSCAPING, WHICH CAN BE REMOVED AND RELOCATED, SHALL BE RELOCATED. IF LANDSCAPING BECOMES DAMAGED DURING REMOVAL, REPLACED WITH THE SAME SPECIES PER THE PLANT LIST. 2. CONTRACTOR SHALL PROVIDE A ONE (1) YEAR GUARANTEE ON ALL MATERIALS FROM DATE OF FINAL ACCEPTANCE, INCLUDING ALL NEW AND RELOCATED LANDSCAPING. 3. CONTRACTOR SHALL VERIFY THE LOCATION OF ALL EXISTING UTILITIES PRIOR TO THE COMMENCEMENT OF WORK. ANY CONFLICTS SHALL BE BROUGHT TO THE OWNER OR OWNER’S REPRESENTATIVES ATTENTION, AT THE TIME OF DISCOVERY, TO ALLOW SUFFICIENT TIME FOR ANY NECESSARY RE-DESIGN. 4. THE CONTRACTOR SHALL MAINTAIN ALL UTILITY SERVICES TO SURROUNDING AND UPSTREAM PROPERTIES AT ALL TIMES. UTILITY SERVICES SHALL NOT BE INTERRUPTED WITHOUT APPROVAL FROM THE PROPERTY OWNER, COUNTY AND UTILITY COMPANIES. 5. DAMAGE TO ANY EXISTING CONDITIONS TO REMAIN WILL BE REPLACED AT CONTRACTOR’S EXPENSE. 6. ALL PLANTS SHALL MEET OR EXCEED THE MINIMUM REQUIREMENTS AS NOTED IN THE LATEST EDITION OF THE AMERICAN STANDARDS FOR NURSERY STOCK BY THE AMERICAN ASSOCIATION OF NURSERYMEN, ANSI Z60.1. ALL WORK SHALL BE DONE IN STRICT ACCORDANCE WITH DIVISION 2 OF LOWE’S STANDARD SITE SPECIFICATIONS. 7. ALL PLANTED AREAS SHALL RECEIVE A 3" LAYER OF SHREDDED PINE BARK MULCH OVER A 10 MIL. WEED MAT EQUAL TO "WEEDBLOCK" BY EASY GARDENER OR DEWITT WEED BARRIER. PROPOSED FOOTCANDLE CONTOUR1 PROPOSED SHRUBS 3 CS PROPOSED LIGHTPOLE WITH UPSWING ARM (REFER TO ARCH. PLANS FOR DETAILS) 10/16/08 CJK C 3 Landscape & Site Lighting Plan REVISED PER CLIENT COMMENTS 12/16/08 1" = 30’ PROPOSED LIGHT POLES (REFER TO ARCH. PLANS FOR DETAILS) (TYP. OF 4) LIGHTING NOTES: 1. LIGHTING PHOTOMETRIC CALCULATIONS WERE PERFORMED ON 12/16/08 USING LITHONIA LIGHTING KVF2 400M ASYFL FIXTURES WITH A 20’ MOUNTING HEIGHT.
  • 6. 10/16/08 CJK Detail Sheet C 4 1" = 30’ C L PARKING RESERVED ACCESSIBLE VAN 1’-6" 12" 9" DIA. 6" 15 BLUE PAINT WHITE PAINT6" TYP. CENTERLINE N.T.S. HANDICAP PARKING STRIPING DETAIL SEE SIDEWALK DETAIL N.T.S. NOTES: 1. SEE SIDEWALK JOINTS DETAIL FOR JOINT SIZE AND SPACING PAVEMENT SECTION 6" MIN. CONCRETE SIDEWALK W/ INTEGRAL CURB DETAIL 1" ARCHITECTURAL JOINT SEE CURB DETAIL 5" 24x36 $FILE$ $DATE$ $TIME$ 08-0166 Store #1525 14598 Lowes Way City of Carmel Hamilton County, IN Lowe’s Garden Center Expansion Drawing No.Scale: Project No. Type: Date: Drawn By: Date: 1 Revisions: Project Name & Location: Drawing Name: PROJECT MANAGER DATE PROJECT ENGINEER / ARCHITECT DATE Seal Seal DATEPROJECT DESIGNER 2 3 4 5 6 7 8 9 It is a violation of law for any person, unless acting under the direction of licensed Architect, Professional Engineer, Landscape Architect, or Land Surveyor to alter any item on this document in any way. Any licensee who alters this document is required by law to affix his or her seal and to add the notation "Altered By" followed by his or her signature and the specific description of the alteration or revision. Drawing Alteration DO NOT SCALE PLANS Copying, Printing, Software and other processes required to produce these prints can stretch or shrink the actual paper or layout. Therefore, scaling of this drawing may be inaccurate. Contact APD Engineering with any need for additional dimensions or clarifications. 615 Fishers Run Victor, NY 14564 585.924.4914.fax 585.742.2222 Copyright 2008C APD Engineering & Architecture, PLLC 615 Fishers Run Victor, NY 14564 585.742.2222 585.924.4914.fax www.apd.com APD Engineering & Architecture, PLLC 1. EXISTING SITE DEVELOPMENT PLANS PREPARED BY KES CONSULTANTS INC., HAVING BEEN NAMED "LOWES HOME IMPROVEMENT CENTER S.R. 431/U.S. 31 AND 146th STREET, CARMEL, INDIANA" PLAN C-200. 2. BUILDING FOOTPRINT PLAN PREPARED BY ARCVISION, INC. AND RECEIVED VIA EMAIL ON 8/27/08. 3. SITE OBSERVATIONS AND PHOTOS TAKEN ONSITE ON 9/10/08. REFERENCES:
  • 7. GARDENCENTEREXPANSION CARMEL,INDIANA ORIGINAL ISSUE DATE: PERMIT SET ISSUE DATE: CONSTRUCTION SET ISSUE DATE: DRAWING NUMBER: PROJECTNo:DRAWNBY:CHECKEDBY: R PRE-BID SET POST BID SET ISSUE DATE ISSUE DATE REVISIONS R DATE DESCRIPTION 081221 01/09/09 - - D1 DEMOLITIONPLAN DJJDJJ
  • 8. GARDENCENTEREXPANSION CARMEL,INDIANA ORIGINAL ISSUE DATE: PERMIT SET ISSUE DATE: CONSTRUCTION SET ISSUE DATE: DRAWING NUMBER: PROJECTNo:DRAWNBY:CHECKEDBY: R PRE-BID SET POST BID SET ISSUE DATE ISSUE DATE REVISIONS R DATE DESCRIPTION 081221 01/09/09 - - A1 GARDENCENTERFLOORPLAN ANDDETAILS DJJDJJ
  • 9. GARDENCENTEREXPANSION CARMEL,INDIANA ORIGINAL ISSUE DATE: PERMIT SET ISSUE DATE: CONSTRUCTION SET ISSUE DATE: DRAWING NUMBER: PROJECTNo:DRAWNBY:CHECKEDBY: R PRE-BID SET POST BID SET ISSUE DATE ISSUE DATE REVISIONS R DATE DESCRIPTION 081221 01/09/09 - - A2 CONSTRUCTIONDETAILS DJJDJJ
  • 10. GARDENCENTEREXPANSION CARMEL,INDIANA ORIGINAL ISSUE DATE: PERMIT SET ISSUE DATE: CONSTRUCTION SET ISSUE DATE: DRAWING NUMBER: PROJECTNo:DRAWNBY:CHECKEDBY: R PRE-BID SET POST BID SET ISSUE DATE ISSUE DATE REVISIONS R DATE DESCRIPTION 081221 01/09/09 - - A3 EXTERIORELEVATIONS DJJDJJ
  • 11. C:DocumentsandSettingsdft18MyDocumentsJOBS08-704-LOWES08704-S1PLN.dwg,1/9/20098:50:43AM,dft18 GARDENCENTEREXPANSION CARMEL,INDIANA ORIGINAL ISSUE DATE: PERMIT SET ISSUE DATE: CONSTRUCTION SET ISSUE DATE: DRAWING NUMBER: PROJECTNo:DRAWNBY:CHECKEDBY: R PRE-BID SET POST BID SET ISSUE DATE ISSUE DATE REVISIONS R DATE DESCRIPTION 081221 5/22/06 - - PLAN
  • 12. C:DocumentsandSettingsdft18MyDocumentsJOBS08-704-LOWES08704-S2-DETS.dwg,1/9/20098:53:12AM,dft18 GARDENCENTEREXPANSION CARMEL,INDIANA ORIGINAL ISSUE DATE: PERMIT SET ISSUE DATE: CONSTRUCTION SET ISSUE DATE: DRAWING NUMBER: PROJECTNo:DRAWNBY:CHECKEDBY: R PRE-BID SET POST BID SET ISSUE DATE ISSUE DATE REVISIONS R DATE DESCRIPTION 081221 5/22/06 - - DETAILS
  • 13. GARDENCENTEREXPANSION CARMEL,INDIANA ORIGINAL ISSUE DATE: PERMIT SET ISSUE DATE: CONSTRUCTION SET ISSUE DATE: DRAWING NUMBER: PROJECTNo:DRAWNBY:CHECKEDBY: R PRE-BID SET POST BID SET ISSUE DATE ISSUE DATE REVISIONS R DATE DESCRIPTION 081221 01/09/09 - - E1 LIGHTINGSCHEDULEAND DETAILS EVBK
  • 14. GARDENCENTEREXPANSION CARMEL,INDIANA ORIGINAL ISSUE DATE: PERMIT SET ISSUE DATE: CONSTRUCTION SET ISSUE DATE: DRAWING NUMBER: PROJECTNo:DRAWNBY:CHECKEDBY: R PRE-BID SET POST BID SET ISSUE DATE ISSUE DATE REVISIONS R DATE DESCRIPTION 081221 01/09/09 - - E2 GARDENCENTERELECTRICAL PLANS EVBK
  • 15. GARDENCENTEREXPANSION CARMEL,INDIANA ORIGINAL ISSUE DATE: PERMIT SET ISSUE DATE: CONSTRUCTION SET ISSUE DATE: DRAWING NUMBER: PROJECTNo:DRAWNBY:CHECKEDBY: R PRE-BID SET POST BID SET ISSUE DATE ISSUE DATE REVISIONS R DATE DESCRIPTION 081221 01/09/09 - - P1 GARDENCENTERPLUMBING PLAN