SlideShare a Scribd company logo
Advanced Lightweight Materials
Summit


Topic
Weighing the costs of Light Weight Material
Implementation
                   Thomas Turner
                   Nicholas Nickson
                   Ashley Turner
                   8/28/2012
Author’s
                                Comment


My policy is to grow my clients Bottom Line by educating
their people and improving their processes.
Truths we should
                                      hold to be self-
                                      evident
•It takes 10,000 working hours in a given trade to become competent.
•Warranty Costs combined for Supplier and OEMs are 10-15 Billion Yearly.
•Warranty costs are split between Suppliers and OEMs fairly evenly.
•By 2016 Café Standards will have driven us all to extremes in vehicle
lightweighting.
•Lightweighting of vehicles encompasses all the raw materials used to make the
vehicle/components.
•Experience of those needing to do lightweighting of vehicles requires extensive
knowledge of manufacturing and materials.
What we are going to
                                 do today?


•Discuss problems we find in the current Engineering/Manufacturing models.

•Define where we want to be in the future.

•Define a generic mass reduction model
Problems in the USA
Manufacturing/Engineering
models.
Problems in the USA
                                                  Manufacturing/Engineering
                                                  model.


Lets start with what we know
•Product Knowledge resides in the Supply base but critical guidance of usage lives within the OEMs..
•Between 2008 and 2012 a terrific experience loss occurred due to the economic downturn.
•We know that our industries have trouble with reoccurring mistakes.
•We know that Cost and Weight reduction efforts sometimes stall and provide poor results.
•We know that with the introduction of new technology, a great deal of our Engineering efforts are
becoming more computerized. As a result our Engineers are doing more Program Management.


Both Suppliers and OEMS agree that manpower is the biggest issue in
Lightweighting , Lowering Cost, and Improving Quality. I believe it’s also quality and use
of those people.
Problems in the USA
                                         Manufacturing/Engineering
                                         model.



What can we fix that would affect what we know?
•Separation of Engineering and Manufacturing needs to be re-thought.
•Bundling of efforts is the key to success in paying for and realizing weight
reduction, cost reduction, and quality improvements.
•Leadership needs to be granted based on experience and team building.
Problems in the USA
                                                       Manufacturing/Engineering
                                                       model.


What can we fix that would affect what we know?
•Separation of Engineering and Manufacturing not such a good idea.

Current product lifecycle model –
Advanced Engineering - Product Engineering – Manufacturing develops process for manufacture - Launch

Proposed-
Blended Manufacturing and Engineering develop product while developing process – launch




Major Change- 30% of Engineering staff needs to be populated with Manufacturing
specialists.
Problems in the
                                       USA
                                       Manufacturing/Engineering
                                       model.
Current Model “worst case”
                                                      The Truth
                  Engineer     Engineer
Engineer         Supervisor    Manager
  3,000 hrs
 experience
                  5,000 hrs   10,000 hrs    Significant savings in weight
                 experience   experience
 Product A       Product A    Product A     are being achieved through the
                                            use of multiple material
                                            combinations. However, we
Proposed Model “worst case”
                                            can not expect novices to think
                  Engineer      Engineer    outside the box and succeed
  Engineer
  10,000 hrs
                 Supervisor     Manager     when average success is a
                 15,000 hrs    20,000 hrs
  experience     experience    experience   struggle .
  Product A      Product A     Product A
Problems in the USA
                                                         Manufacturing/Engineering
                                                         model.


I find team building to be lacking in most of our medium to large corporations.
I have had great success in helping teams to grow with a few
simple rules:

1.   As the leader I will enthusiastically take the blame for all things done wrong by the group.
2.   Praise loud and often .
3.   Use humor to relieve social pressure.
4.   Care for the success of all under you.
5.   Explain what you want from your people and give examples so when they know when they are doing right and when
     they are doing wrong.
6.   Make fun of yourself. Self depreciative humor connects people through vulnerability.
7.   Willingly work for your employee as a subordinate when they need help. i.e. jump in and crunch numbers or carry
     parts for them.
Problems in the USA
                              Manufacturing/Engineering
                              model.


Bundling:


Why bet it all on one card?
Weight Reduction Model
Weight Reduction model




1.   Establish the rules
2.   Gather data
3.   Gather the team
4.   Associate data with Specialists
5.   Target areas of opportunity
6.   Make the changes
7.   Validate
Establish the Rules

The goal is to have the Weight Reduction effort provide
a more effective, lighter vehicle at lower cost.

The contract agreed to by all the participants is key for
defining success. This contract will incorporate the
following:

     •   Length of cycle.
     •   Set up repeat effort with lessons learned.
     •   Use of projected savings to offset current
         expenses.
     •   Understanding that validation of what we have
         currently is a success also.
     •   Final decision process for implementation (Bullet
         proof)
Establish the Rules
                   Part 2.




Bundle for success –
•Reduce Carbon Footprint
•Reduce Raw Material usage
•Increase throughput
•Lower Material Costs
•Increase product life
•Lower Running Costs
•Simplify Assembly
•Prepare for secondary efforts
•Explore and use tax advantages
Gather the data

Information:

• Warranty/Repair history
• Understand raw material utilization
• Categorize components by manufacturing process
• Group Common products for bundling
• Review cost and process at suppliers
• Conduct Transportation evaluation
• Define safety items
• Define injuries and vehicle failures in use
• Review supplier weight and cost reduction ideas
• Interview users
• Comparative analysis with other vehicles
• Software update process, cycle, and cost

How you incorporate this information will greatly affect
speed and success of this effort.
Gather the team

The team should be biased based on the content of the
vehicle and cost content.

Minimum requirements:
Welder
Fabricator
Casting Specialist
Plastics Specialist
Machinist
Estimator
Electrical Specialist
Software Specialist
Buyer
Ceramics specialist
Associate data with Specialist
                        teams


Welder
Fabricator
Casting Specialist
Plastics Specialist
Machinist
Estimator
Electrical Specialist
Software Specialist
Buyer
                                  Flat sheet and formed metallic parts

                                  -Analyze Repair and Warranty costs for cost
                                  reduction and functional improvement.
                                  -Validate Best Practice for the manufacture
                                  and joining of the parts.
                                  -Alternatives for improvement and cost
                                  reduction brain storming.
                                  -Compare estimated cost with real cost.
                                  -Financial evaluation of bundling
                                  components and shipping
The Success of these teams is greatly dependent on
   how the teams are scheduled and lead.




Daily –

Review of previous days progress
Identify road blocks
List opportunities and days schedule
Break into teams


Weekly group discussion-

Review whole vehicle
        Use
        Safety items
        Vehicle requirements
        Brain Storm
Review each other’s team progress
Set goals for the week
Questions?

More Related Content

What's hot

Chapter 2_OM
Chapter 2_OMChapter 2_OM
Chapter 2_OM
guest537689
 
Manufacturing excellence
Manufacturing excellenceManufacturing excellence
Manufacturing excellence
營松 林
 
Lean Principles
Lean PrinciplesLean Principles
Lean Principles
aboobier
 
quality engineering(ME522) part 1
quality engineering(ME522) part 1quality engineering(ME522) part 1
quality engineering(ME522) part 1
INDRANIL BANERJEE
 
Operational Excellence: Getting the most out of your Lean and Six Sigma programs
Operational Excellence: Getting the most out of your Lean and Six Sigma programsOperational Excellence: Getting the most out of your Lean and Six Sigma programs
Operational Excellence: Getting the most out of your Lean and Six Sigma programs
Wilson Perumal and Company
 
Quality managemnt day 1 material
Quality managemnt day 1 materialQuality managemnt day 1 material
Quality managemnt day 1 material
jeashabab
 
160407 Operational Excellence - Creating a High Performing Organization
160407 Operational Excellence - Creating a High Performing Organization160407 Operational Excellence - Creating a High Performing Organization
160407 Operational Excellence - Creating a High Performing Organization
Max Krug
 
Quality Improvement. What Is it and How Can It Help Me?
Quality Improvement. What Is it and How Can It Help Me?Quality Improvement. What Is it and How Can It Help Me?
Quality Improvement. What Is it and How Can It Help Me?
Children’s Trust of South Carolina
 
Wilson Perumal & Company Complexity Workshop
Wilson Perumal & Company Complexity WorkshopWilson Perumal & Company Complexity Workshop
Wilson Perumal & Company Complexity Workshop
Wilson Perumal and Company
 
Six Sigma Tools Template
Six Sigma Tools TemplateSix Sigma Tools Template
Six Sigma Tools Template
acribe
 
8 relationship and comparison between in jit tqm and tpm a review
8 relationship and comparison between in jit  tqm and tpm  a review8 relationship and comparison between in jit  tqm and tpm  a review
8 relationship and comparison between in jit tqm and tpm a review
prjpublications
 
Overview of Training Within Industry (TWI) by Operational Excellence Consulting
Overview of Training Within Industry (TWI) by Operational Excellence ConsultingOverview of Training Within Industry (TWI) by Operational Excellence Consulting
Overview of Training Within Industry (TWI) by Operational Excellence Consulting
Operational Excellence Consulting
 
Toyota production way
Toyota production wayToyota production way
Toyota production way
Peter Bielik
 
Multi team release framework
Multi team release frameworkMulti team release framework
Multi team release framework
Scrum Australia Pty Ltd
 
Flawless Project Delivery
Flawless Project DeliveryFlawless Project Delivery
Flawless Project Delivery
Ken Ede
 
Optimizing Petroleum Refining Unit Operations Training
Optimizing Petroleum Refining Unit Operations TrainingOptimizing Petroleum Refining Unit Operations Training
Optimizing Petroleum Refining Unit Operations Training
Karl Kolmetz
 
Managing A Successful Team Offline Version
Managing A Successful Team Offline VersionManaging A Successful Team Offline Version
Managing A Successful Team Offline Version
DrPaulHancock
 
Taking Lean to the Enterprise
Taking Lean to the EnterpriseTaking Lean to the Enterprise
Taking Lean to the Enterprise
Lean Enterprise Academy
 

What's hot (18)

Chapter 2_OM
Chapter 2_OMChapter 2_OM
Chapter 2_OM
 
Manufacturing excellence
Manufacturing excellenceManufacturing excellence
Manufacturing excellence
 
Lean Principles
Lean PrinciplesLean Principles
Lean Principles
 
quality engineering(ME522) part 1
quality engineering(ME522) part 1quality engineering(ME522) part 1
quality engineering(ME522) part 1
 
Operational Excellence: Getting the most out of your Lean and Six Sigma programs
Operational Excellence: Getting the most out of your Lean and Six Sigma programsOperational Excellence: Getting the most out of your Lean and Six Sigma programs
Operational Excellence: Getting the most out of your Lean and Six Sigma programs
 
Quality managemnt day 1 material
Quality managemnt day 1 materialQuality managemnt day 1 material
Quality managemnt day 1 material
 
160407 Operational Excellence - Creating a High Performing Organization
160407 Operational Excellence - Creating a High Performing Organization160407 Operational Excellence - Creating a High Performing Organization
160407 Operational Excellence - Creating a High Performing Organization
 
Quality Improvement. What Is it and How Can It Help Me?
Quality Improvement. What Is it and How Can It Help Me?Quality Improvement. What Is it and How Can It Help Me?
Quality Improvement. What Is it and How Can It Help Me?
 
Wilson Perumal & Company Complexity Workshop
Wilson Perumal & Company Complexity WorkshopWilson Perumal & Company Complexity Workshop
Wilson Perumal & Company Complexity Workshop
 
Six Sigma Tools Template
Six Sigma Tools TemplateSix Sigma Tools Template
Six Sigma Tools Template
 
8 relationship and comparison between in jit tqm and tpm a review
8 relationship and comparison between in jit  tqm and tpm  a review8 relationship and comparison between in jit  tqm and tpm  a review
8 relationship and comparison between in jit tqm and tpm a review
 
Overview of Training Within Industry (TWI) by Operational Excellence Consulting
Overview of Training Within Industry (TWI) by Operational Excellence ConsultingOverview of Training Within Industry (TWI) by Operational Excellence Consulting
Overview of Training Within Industry (TWI) by Operational Excellence Consulting
 
Toyota production way
Toyota production wayToyota production way
Toyota production way
 
Multi team release framework
Multi team release frameworkMulti team release framework
Multi team release framework
 
Flawless Project Delivery
Flawless Project DeliveryFlawless Project Delivery
Flawless Project Delivery
 
Optimizing Petroleum Refining Unit Operations Training
Optimizing Petroleum Refining Unit Operations TrainingOptimizing Petroleum Refining Unit Operations Training
Optimizing Petroleum Refining Unit Operations Training
 
Managing A Successful Team Offline Version
Managing A Successful Team Offline VersionManaging A Successful Team Offline Version
Managing A Successful Team Offline Version
 
Taking Lean to the Enterprise
Taking Lean to the EnterpriseTaking Lean to the Enterprise
Taking Lean to the Enterprise
 

Similar to Lightweighting , Vehicle,

Vehicle cost weight process improvement 2011
Vehicle cost weight process improvement 2011Vehicle cost weight process improvement 2011
Vehicle cost weight process improvement 2011
tmtrnr
 
Chapter#5
Chapter#5Chapter#5
Innovation in Structural Pack Design
Innovation in Structural Pack DesignInnovation in Structural Pack Design
Innovation in Structural Pack Design
Asian Food Regulation Information Service
 
Operations strategy
Operations strategyOperations strategy
Operations strategy
RajThakuri
 
Perficient's Reliable Asset World Keynote
Perficient's Reliable Asset World KeynotePerficient's Reliable Asset World Keynote
Perficient's Reliable Asset World Keynote
Perficient, Inc.
 
Agile ncr pramila hitachi consulting_future_coaching
Agile ncr pramila hitachi consulting_future_coachingAgile ncr pramila hitachi consulting_future_coaching
Agile ncr pramila hitachi consulting_future_coaching
AgileNCR2016
 
Intro to EGD
Intro to EGDIntro to EGD
Intro to EGD
Melissa Leon
 
Sdec10 lean package implementation
Sdec10 lean package implementationSdec10 lean package implementation
Sdec10 lean package implementation
Terry Bunio
 
Strategic Advantages of Implementing Enventive Software
Strategic Advantages of Implementing Enventive SoftwareStrategic Advantages of Implementing Enventive Software
Strategic Advantages of Implementing Enventive Software
Alan Smith
 
Sample sem 2 winter 2015
Sample sem 2 winter 2015Sample sem 2 winter 2015
Sample sem 2 winter 2015
naveen kumar
 
O ps management lecture 3 design goods & services
O ps management lecture 3 design goods & servicesO ps management lecture 3 design goods & services
O ps management lecture 3 design goods & services
jillmitchell8778
 
Product development and design
Product development and designProduct development and design
Product development and design
SHIVAM AGRAWAL
 
Lean New Product & Process Development
Lean New Product & Process DevelopmentLean New Product & Process Development
Lean New Product & Process Development
ICEES Global Private Limited
 
Understanding Lean and Agile
Understanding Lean and AgileUnderstanding Lean and Agile
Understanding Lean and Agile
Zornitsa Nikolova
 
Sir John Egan Interview (V1) 07 Apr 2016
Sir John Egan Interview (V1) 07 Apr 2016Sir John Egan Interview (V1) 07 Apr 2016
Sir John Egan Interview (V1) 07 Apr 2016
Chris Williams-Lilley
 
Shane Hastie (SoftEd/Agile Alliance of Auckland)
Shane Hastie (SoftEd/Agile Alliance of Auckland)Shane Hastie (SoftEd/Agile Alliance of Auckland)
Shane Hastie (SoftEd/Agile Alliance of Auckland)
AgileNZ Conference
 
TQM.pdf
TQM.pdfTQM.pdf
Strategicadvantagesofimplementingenventive 130724023349-phpapp01
Strategicadvantagesofimplementingenventive 130724023349-phpapp01Strategicadvantagesofimplementingenventive 130724023349-phpapp01
Strategicadvantagesofimplementingenventive 130724023349-phpapp01
Charles (Ronnie) Laing
 
CENTRE FOR CONTINUING EDUCATION EXECUTIVE MBA (OIL & .docx
 CENTRE FOR CONTINUING EDUCATION EXECUTIVE MBA (OIL & .docx CENTRE FOR CONTINUING EDUCATION EXECUTIVE MBA (OIL & .docx
CENTRE FOR CONTINUING EDUCATION EXECUTIVE MBA (OIL & .docx
arnit1
 
Jddemasiembbpmc1
Jddemasiembbpmc1Jddemasiembbpmc1
Jddemasiembbpmc1
jddemasie
 

Similar to Lightweighting , Vehicle, (20)

Vehicle cost weight process improvement 2011
Vehicle cost weight process improvement 2011Vehicle cost weight process improvement 2011
Vehicle cost weight process improvement 2011
 
Chapter#5
Chapter#5Chapter#5
Chapter#5
 
Innovation in Structural Pack Design
Innovation in Structural Pack DesignInnovation in Structural Pack Design
Innovation in Structural Pack Design
 
Operations strategy
Operations strategyOperations strategy
Operations strategy
 
Perficient's Reliable Asset World Keynote
Perficient's Reliable Asset World KeynotePerficient's Reliable Asset World Keynote
Perficient's Reliable Asset World Keynote
 
Agile ncr pramila hitachi consulting_future_coaching
Agile ncr pramila hitachi consulting_future_coachingAgile ncr pramila hitachi consulting_future_coaching
Agile ncr pramila hitachi consulting_future_coaching
 
Intro to EGD
Intro to EGDIntro to EGD
Intro to EGD
 
Sdec10 lean package implementation
Sdec10 lean package implementationSdec10 lean package implementation
Sdec10 lean package implementation
 
Strategic Advantages of Implementing Enventive Software
Strategic Advantages of Implementing Enventive SoftwareStrategic Advantages of Implementing Enventive Software
Strategic Advantages of Implementing Enventive Software
 
Sample sem 2 winter 2015
Sample sem 2 winter 2015Sample sem 2 winter 2015
Sample sem 2 winter 2015
 
O ps management lecture 3 design goods & services
O ps management lecture 3 design goods & servicesO ps management lecture 3 design goods & services
O ps management lecture 3 design goods & services
 
Product development and design
Product development and designProduct development and design
Product development and design
 
Lean New Product & Process Development
Lean New Product & Process DevelopmentLean New Product & Process Development
Lean New Product & Process Development
 
Understanding Lean and Agile
Understanding Lean and AgileUnderstanding Lean and Agile
Understanding Lean and Agile
 
Sir John Egan Interview (V1) 07 Apr 2016
Sir John Egan Interview (V1) 07 Apr 2016Sir John Egan Interview (V1) 07 Apr 2016
Sir John Egan Interview (V1) 07 Apr 2016
 
Shane Hastie (SoftEd/Agile Alliance of Auckland)
Shane Hastie (SoftEd/Agile Alliance of Auckland)Shane Hastie (SoftEd/Agile Alliance of Auckland)
Shane Hastie (SoftEd/Agile Alliance of Auckland)
 
TQM.pdf
TQM.pdfTQM.pdf
TQM.pdf
 
Strategicadvantagesofimplementingenventive 130724023349-phpapp01
Strategicadvantagesofimplementingenventive 130724023349-phpapp01Strategicadvantagesofimplementingenventive 130724023349-phpapp01
Strategicadvantagesofimplementingenventive 130724023349-phpapp01
 
CENTRE FOR CONTINUING EDUCATION EXECUTIVE MBA (OIL & .docx
 CENTRE FOR CONTINUING EDUCATION EXECUTIVE MBA (OIL & .docx CENTRE FOR CONTINUING EDUCATION EXECUTIVE MBA (OIL & .docx
CENTRE FOR CONTINUING EDUCATION EXECUTIVE MBA (OIL & .docx
 
Jddemasiembbpmc1
Jddemasiembbpmc1Jddemasiembbpmc1
Jddemasiembbpmc1
 

Recently uploaded

一比一原版(AUT毕业证)奥克兰理工大学毕业证成绩单如何办理
一比一原版(AUT毕业证)奥克兰理工大学毕业证成绩单如何办理一比一原版(AUT毕业证)奥克兰理工大学毕业证成绩单如何办理
一比一原版(AUT毕业证)奥克兰理工大学毕业证成绩单如何办理
mymwpc
 
Skoda Octavia Rs for Sale Perth | Skoda Perth
Skoda Octavia Rs for Sale Perth | Skoda PerthSkoda Octavia Rs for Sale Perth | Skoda Perth
Skoda Octavia Rs for Sale Perth | Skoda Perth
Perth City Skoda
 
一比一原版(Columbia文凭证书)哥伦比亚大学毕业证如何办理
一比一原版(Columbia文凭证书)哥伦比亚大学毕业证如何办理一比一原版(Columbia文凭证书)哥伦比亚大学毕业证如何办理
一比一原版(Columbia文凭证书)哥伦比亚大学毕业证如何办理
afkxen
 
一比一原版(AIS毕业证)奥克兰商学院毕业证成绩单如何办理
一比一原版(AIS毕业证)奥克兰商学院毕业证成绩单如何办理一比一原版(AIS毕业证)奥克兰商学院毕业证成绩单如何办理
一比一原版(AIS毕业证)奥克兰商学院毕业证成绩单如何办理
eygkup
 
final-slide-deck-ACURE-AQ-December-1-webinar-2022.pdf
final-slide-deck-ACURE-AQ-December-1-webinar-2022.pdffinal-slide-deck-ACURE-AQ-December-1-webinar-2022.pdf
final-slide-deck-ACURE-AQ-December-1-webinar-2022.pdf
Ashfaq Ahmad
 
Globalfleet - global fleet survey 2021 full results
Globalfleet - global fleet survey 2021 full resultsGlobalfleet - global fleet survey 2021 full results
Globalfleet - global fleet survey 2021 full results
vaterland
 
Manual despiece Yamaha fuera de borda pc_e40x_02.pdf
Manual despiece Yamaha fuera de borda pc_e40x_02.pdfManual despiece Yamaha fuera de borda pc_e40x_02.pdf
Manual despiece Yamaha fuera de borda pc_e40x_02.pdf
GermanValentini1
 
Kaizen SMT_MI_PCBA for Quality Engineerspptx
Kaizen SMT_MI_PCBA for Quality EngineerspptxKaizen SMT_MI_PCBA for Quality Engineerspptx
Kaizen SMT_MI_PCBA for Quality Engineerspptx
vaibhavsrivastava482521
 
Hand Gesture Control Robotic Arm using image processing.pptx
Hand Gesture Control Robotic Arm using image processing.pptxHand Gesture Control Robotic Arm using image processing.pptx
Hand Gesture Control Robotic Arm using image processing.pptx
wstatus456
 
AadiShakti Projects ( Asp Cranes ) Raipur
AadiShakti Projects ( Asp Cranes ) RaipurAadiShakti Projects ( Asp Cranes ) Raipur
AadiShakti Projects ( Asp Cranes ) Raipur
AadiShakti Projects
 
快速办理(napier毕业证书)英国龙比亚大学毕业证在读证明一模一样
快速办理(napier毕业证书)英国龙比亚大学毕业证在读证明一模一样快速办理(napier毕业证书)英国龙比亚大学毕业证在读证明一模一样
快速办理(napier毕业证书)英国龙比亚大学毕业证在读证明一模一样
78tq3hi2
 
What do the symbols on vehicle dashboard mean?
What do the symbols on vehicle dashboard mean?What do the symbols on vehicle dashboard mean?
What do the symbols on vehicle dashboard mean?
Hyundai Motor Group
 
EV Charging at Multifamily Properties by Kevin Donnelly
EV Charging at Multifamily Properties by Kevin DonnellyEV Charging at Multifamily Properties by Kevin Donnelly
EV Charging at Multifamily Properties by Kevin Donnelly
Forth
 
TRAINEES-RECORD-BOOK- electronics and electrical
TRAINEES-RECORD-BOOK- electronics and electricalTRAINEES-RECORD-BOOK- electronics and electrical
TRAINEES-RECORD-BOOK- electronics and electrical
JohnCarloPajarilloKa
 
Case Study on Failure Product - Tata Nano
Case Study on Failure Product - Tata NanoCase Study on Failure Product - Tata Nano
Case Study on Failure Product - Tata Nano
chaitanyabelgaumkar
 
What Could Be Behind Your Mercedes Sprinter's Power Loss on Uphill Roads
What Could Be Behind Your Mercedes Sprinter's Power Loss on Uphill RoadsWhat Could Be Behind Your Mercedes Sprinter's Power Loss on Uphill Roads
What Could Be Behind Your Mercedes Sprinter's Power Loss on Uphill Roads
Sprinter Gurus
 
53286592-Global-Entrepreneurship-and-the-Successful-Growth-Strategies-of-Earl...
53286592-Global-Entrepreneurship-and-the-Successful-Growth-Strategies-of-Earl...53286592-Global-Entrepreneurship-and-the-Successful-Growth-Strategies-of-Earl...
53286592-Global-Entrepreneurship-and-the-Successful-Growth-Strategies-of-Earl...
MarynaYurchenko2
 
Here's Why Every Semi-Truck Should Have ELDs
Here's Why Every Semi-Truck Should Have ELDsHere's Why Every Semi-Truck Should Have ELDs
Here's Why Every Semi-Truck Should Have ELDs
jennifermiller8137
 
一比一原版(UNITEC毕业证)UNITEC理工学院毕业证成绩单如何办理
一比一原版(UNITEC毕业证)UNITEC理工学院毕业证成绩单如何办理一比一原版(UNITEC毕业证)UNITEC理工学院毕业证成绩单如何办理
一比一原版(UNITEC毕业证)UNITEC理工学院毕业证成绩单如何办理
bouvoy
 
一比一原版(OP毕业证)奥塔哥理工学院毕业证成绩单如何办理
一比一原版(OP毕业证)奥塔哥理工学院毕业证成绩单如何办理一比一原版(OP毕业证)奥塔哥理工学院毕业证成绩单如何办理
一比一原版(OP毕业证)奥塔哥理工学院毕业证成绩单如何办理
mymwpc
 

Recently uploaded (20)

一比一原版(AUT毕业证)奥克兰理工大学毕业证成绩单如何办理
一比一原版(AUT毕业证)奥克兰理工大学毕业证成绩单如何办理一比一原版(AUT毕业证)奥克兰理工大学毕业证成绩单如何办理
一比一原版(AUT毕业证)奥克兰理工大学毕业证成绩单如何办理
 
Skoda Octavia Rs for Sale Perth | Skoda Perth
Skoda Octavia Rs for Sale Perth | Skoda PerthSkoda Octavia Rs for Sale Perth | Skoda Perth
Skoda Octavia Rs for Sale Perth | Skoda Perth
 
一比一原版(Columbia文凭证书)哥伦比亚大学毕业证如何办理
一比一原版(Columbia文凭证书)哥伦比亚大学毕业证如何办理一比一原版(Columbia文凭证书)哥伦比亚大学毕业证如何办理
一比一原版(Columbia文凭证书)哥伦比亚大学毕业证如何办理
 
一比一原版(AIS毕业证)奥克兰商学院毕业证成绩单如何办理
一比一原版(AIS毕业证)奥克兰商学院毕业证成绩单如何办理一比一原版(AIS毕业证)奥克兰商学院毕业证成绩单如何办理
一比一原版(AIS毕业证)奥克兰商学院毕业证成绩单如何办理
 
final-slide-deck-ACURE-AQ-December-1-webinar-2022.pdf
final-slide-deck-ACURE-AQ-December-1-webinar-2022.pdffinal-slide-deck-ACURE-AQ-December-1-webinar-2022.pdf
final-slide-deck-ACURE-AQ-December-1-webinar-2022.pdf
 
Globalfleet - global fleet survey 2021 full results
Globalfleet - global fleet survey 2021 full resultsGlobalfleet - global fleet survey 2021 full results
Globalfleet - global fleet survey 2021 full results
 
Manual despiece Yamaha fuera de borda pc_e40x_02.pdf
Manual despiece Yamaha fuera de borda pc_e40x_02.pdfManual despiece Yamaha fuera de borda pc_e40x_02.pdf
Manual despiece Yamaha fuera de borda pc_e40x_02.pdf
 
Kaizen SMT_MI_PCBA for Quality Engineerspptx
Kaizen SMT_MI_PCBA for Quality EngineerspptxKaizen SMT_MI_PCBA for Quality Engineerspptx
Kaizen SMT_MI_PCBA for Quality Engineerspptx
 
Hand Gesture Control Robotic Arm using image processing.pptx
Hand Gesture Control Robotic Arm using image processing.pptxHand Gesture Control Robotic Arm using image processing.pptx
Hand Gesture Control Robotic Arm using image processing.pptx
 
AadiShakti Projects ( Asp Cranes ) Raipur
AadiShakti Projects ( Asp Cranes ) RaipurAadiShakti Projects ( Asp Cranes ) Raipur
AadiShakti Projects ( Asp Cranes ) Raipur
 
快速办理(napier毕业证书)英国龙比亚大学毕业证在读证明一模一样
快速办理(napier毕业证书)英国龙比亚大学毕业证在读证明一模一样快速办理(napier毕业证书)英国龙比亚大学毕业证在读证明一模一样
快速办理(napier毕业证书)英国龙比亚大学毕业证在读证明一模一样
 
What do the symbols on vehicle dashboard mean?
What do the symbols on vehicle dashboard mean?What do the symbols on vehicle dashboard mean?
What do the symbols on vehicle dashboard mean?
 
EV Charging at Multifamily Properties by Kevin Donnelly
EV Charging at Multifamily Properties by Kevin DonnellyEV Charging at Multifamily Properties by Kevin Donnelly
EV Charging at Multifamily Properties by Kevin Donnelly
 
TRAINEES-RECORD-BOOK- electronics and electrical
TRAINEES-RECORD-BOOK- electronics and electricalTRAINEES-RECORD-BOOK- electronics and electrical
TRAINEES-RECORD-BOOK- electronics and electrical
 
Case Study on Failure Product - Tata Nano
Case Study on Failure Product - Tata NanoCase Study on Failure Product - Tata Nano
Case Study on Failure Product - Tata Nano
 
What Could Be Behind Your Mercedes Sprinter's Power Loss on Uphill Roads
What Could Be Behind Your Mercedes Sprinter's Power Loss on Uphill RoadsWhat Could Be Behind Your Mercedes Sprinter's Power Loss on Uphill Roads
What Could Be Behind Your Mercedes Sprinter's Power Loss on Uphill Roads
 
53286592-Global-Entrepreneurship-and-the-Successful-Growth-Strategies-of-Earl...
53286592-Global-Entrepreneurship-and-the-Successful-Growth-Strategies-of-Earl...53286592-Global-Entrepreneurship-and-the-Successful-Growth-Strategies-of-Earl...
53286592-Global-Entrepreneurship-and-the-Successful-Growth-Strategies-of-Earl...
 
Here's Why Every Semi-Truck Should Have ELDs
Here's Why Every Semi-Truck Should Have ELDsHere's Why Every Semi-Truck Should Have ELDs
Here's Why Every Semi-Truck Should Have ELDs
 
一比一原版(UNITEC毕业证)UNITEC理工学院毕业证成绩单如何办理
一比一原版(UNITEC毕业证)UNITEC理工学院毕业证成绩单如何办理一比一原版(UNITEC毕业证)UNITEC理工学院毕业证成绩单如何办理
一比一原版(UNITEC毕业证)UNITEC理工学院毕业证成绩单如何办理
 
一比一原版(OP毕业证)奥塔哥理工学院毕业证成绩单如何办理
一比一原版(OP毕业证)奥塔哥理工学院毕业证成绩单如何办理一比一原版(OP毕业证)奥塔哥理工学院毕业证成绩单如何办理
一比一原版(OP毕业证)奥塔哥理工学院毕业证成绩单如何办理
 

Lightweighting , Vehicle,

  • 1. Advanced Lightweight Materials Summit Topic Weighing the costs of Light Weight Material Implementation Thomas Turner Nicholas Nickson Ashley Turner 8/28/2012
  • 2. Author’s Comment My policy is to grow my clients Bottom Line by educating their people and improving their processes.
  • 3. Truths we should hold to be self- evident •It takes 10,000 working hours in a given trade to become competent. •Warranty Costs combined for Supplier and OEMs are 10-15 Billion Yearly. •Warranty costs are split between Suppliers and OEMs fairly evenly. •By 2016 Café Standards will have driven us all to extremes in vehicle lightweighting. •Lightweighting of vehicles encompasses all the raw materials used to make the vehicle/components. •Experience of those needing to do lightweighting of vehicles requires extensive knowledge of manufacturing and materials.
  • 4. What we are going to do today? •Discuss problems we find in the current Engineering/Manufacturing models. •Define where we want to be in the future. •Define a generic mass reduction model
  • 5. Problems in the USA Manufacturing/Engineering models.
  • 6. Problems in the USA Manufacturing/Engineering model. Lets start with what we know •Product Knowledge resides in the Supply base but critical guidance of usage lives within the OEMs.. •Between 2008 and 2012 a terrific experience loss occurred due to the economic downturn. •We know that our industries have trouble with reoccurring mistakes. •We know that Cost and Weight reduction efforts sometimes stall and provide poor results. •We know that with the introduction of new technology, a great deal of our Engineering efforts are becoming more computerized. As a result our Engineers are doing more Program Management. Both Suppliers and OEMS agree that manpower is the biggest issue in Lightweighting , Lowering Cost, and Improving Quality. I believe it’s also quality and use of those people.
  • 7. Problems in the USA Manufacturing/Engineering model. What can we fix that would affect what we know? •Separation of Engineering and Manufacturing needs to be re-thought. •Bundling of efforts is the key to success in paying for and realizing weight reduction, cost reduction, and quality improvements. •Leadership needs to be granted based on experience and team building.
  • 8. Problems in the USA Manufacturing/Engineering model. What can we fix that would affect what we know? •Separation of Engineering and Manufacturing not such a good idea. Current product lifecycle model – Advanced Engineering - Product Engineering – Manufacturing develops process for manufacture - Launch Proposed- Blended Manufacturing and Engineering develop product while developing process – launch Major Change- 30% of Engineering staff needs to be populated with Manufacturing specialists.
  • 9. Problems in the USA Manufacturing/Engineering model. Current Model “worst case” The Truth Engineer Engineer Engineer Supervisor Manager 3,000 hrs experience 5,000 hrs 10,000 hrs Significant savings in weight experience experience Product A Product A Product A are being achieved through the use of multiple material combinations. However, we Proposed Model “worst case” can not expect novices to think Engineer Engineer outside the box and succeed Engineer 10,000 hrs Supervisor Manager when average success is a 15,000 hrs 20,000 hrs experience experience experience struggle . Product A Product A Product A
  • 10. Problems in the USA Manufacturing/Engineering model. I find team building to be lacking in most of our medium to large corporations. I have had great success in helping teams to grow with a few simple rules: 1. As the leader I will enthusiastically take the blame for all things done wrong by the group. 2. Praise loud and often . 3. Use humor to relieve social pressure. 4. Care for the success of all under you. 5. Explain what you want from your people and give examples so when they know when they are doing right and when they are doing wrong. 6. Make fun of yourself. Self depreciative humor connects people through vulnerability. 7. Willingly work for your employee as a subordinate when they need help. i.e. jump in and crunch numbers or carry parts for them.
  • 11. Problems in the USA Manufacturing/Engineering model. Bundling: Why bet it all on one card?
  • 13. Weight Reduction model 1. Establish the rules 2. Gather data 3. Gather the team 4. Associate data with Specialists 5. Target areas of opportunity 6. Make the changes 7. Validate
  • 14. Establish the Rules The goal is to have the Weight Reduction effort provide a more effective, lighter vehicle at lower cost. The contract agreed to by all the participants is key for defining success. This contract will incorporate the following: • Length of cycle. • Set up repeat effort with lessons learned. • Use of projected savings to offset current expenses. • Understanding that validation of what we have currently is a success also. • Final decision process for implementation (Bullet proof)
  • 15. Establish the Rules Part 2. Bundle for success – •Reduce Carbon Footprint •Reduce Raw Material usage •Increase throughput •Lower Material Costs •Increase product life •Lower Running Costs •Simplify Assembly •Prepare for secondary efforts •Explore and use tax advantages
  • 16. Gather the data Information: • Warranty/Repair history • Understand raw material utilization • Categorize components by manufacturing process • Group Common products for bundling • Review cost and process at suppliers • Conduct Transportation evaluation • Define safety items • Define injuries and vehicle failures in use • Review supplier weight and cost reduction ideas • Interview users • Comparative analysis with other vehicles • Software update process, cycle, and cost How you incorporate this information will greatly affect speed and success of this effort.
  • 17. Gather the team The team should be biased based on the content of the vehicle and cost content. Minimum requirements: Welder Fabricator Casting Specialist Plastics Specialist Machinist Estimator Electrical Specialist Software Specialist Buyer Ceramics specialist
  • 18. Associate data with Specialist teams Welder Fabricator Casting Specialist Plastics Specialist Machinist Estimator Electrical Specialist Software Specialist Buyer Flat sheet and formed metallic parts -Analyze Repair and Warranty costs for cost reduction and functional improvement. -Validate Best Practice for the manufacture and joining of the parts. -Alternatives for improvement and cost reduction brain storming. -Compare estimated cost with real cost. -Financial evaluation of bundling components and shipping
  • 19. The Success of these teams is greatly dependent on how the teams are scheduled and lead. Daily – Review of previous days progress Identify road blocks List opportunities and days schedule Break into teams Weekly group discussion- Review whole vehicle Use Safety items Vehicle requirements Brain Storm Review each other’s team progress Set goals for the week

Editor's Notes

  1. This template can be used as a starter file for presenting training materials in a group setting. Sections Right-click on a slide to add sections. Sections can help to organize your slides or facilitate collaboration between multiple authors. Notes Use the Notes section for delivery notes or to provide additional details for the audience. View these notes in Presentation View during your presentation. Keep in mind the font size (important for accessibility, visibility, videotaping, and online production) Coordinated colors Pay particular attention to the graphs, charts, and text boxes. Consider that attendees will print in black and white or grayscale. Run a test print to make sure your colors work when printed in pure black and white and grayscale. Graphics, tables, and graphs Keep it simple: If possible, use consistent, non-distracting styles and colors. Label all graphs and tables.
  2. This is another option for an Overview slides using transitions.
  3. Microsoft Engineering Excellence Microsoft Confidential