SlideShare a Scribd company logo
1 of 43
Download to read offline
LEVERAGING NEW ANALYTICS TO
CHANGE THE CONVERSATION AROUND
FACILITIES ON CAMPUS
April 28, 2016
Presented by:
Dr. Bruce Meyer
Assistant VP Campus Operations
BGSU
Brendon W. Martin
Account Manager
Sightlines
Public Research University
Bowling Green, Ohio
Sightlines member
since 2009
5M
Supported
GSF
477
Maintained
Acres
16,908
Student
Headcount
Established
1910
2
Who Partners with Sightlines?
Robust membership includes colleges, universities, consortiums and state systems
3
* U.S. News 2016 Rankings
Sightlines is proud to
announce that:
• 450 colleges and
universities are
Sightlines clients
including over 325
ROPA members.
• Consistently over 90%
member retention rate
• We have clients in
over 40 states, the
District of Columbia
and four Canadian
provinces
• More than 125 new
institutions became
Sightlines members
since 2013
Sightlines advises state
systems in:
• Alaska
• California
• Connecticut
• Hawaii
• Maine
• Massachusetts
• Minnesota
• Mississippi
• Missouri
• Nebraska
• New Hampshire
• New Jersey
• Pennsylvania
• Texas
• West Virginia
Serving the Nation’s Leading Institutions:
• 70% of the Top 20 Colleges*
• 75% of the Top 20 Universities*
• 34 Flagship State Universities
• 14 of the 14 Big 10 Institutions
• 9 of the 12 Ivy Plus Institutions
Changing the Conversation
A framework for integrated planning
4
Why focus on your facilities
Physical assets dwarf the institution’s direct financial assets
Across higher education, campus replacement
values are on average, four times larger than
institutional endowments
$1.8 Billion –
Replacement Value
$188.89 Million –
2014 Endowment Value*
*As reported in 2015 US News & World Report
5
0%
5%
10%
15%
20%
25%
30%
%ofGSF
Sightlines Database- Construction Age BGSU
Putting Your Campus Building Age in Context
6
Pre-War
Built before 1951
Durable construction
Older but typically lasts
longer
Post-War
Built from 1951 to 1975
Lower-quality
construction
Already needing more
repairs and renovations
Modern
Built from 1976 to 1990
Quick-flash construction
Low-quality building
components
Complex
Built in 1991 and newer
Technically complex
spaces
Higher-quality, more
expensive to maintain &
repair
Pre-War Post-War Modern Complex
The campus age drives the overall risk profile
48% of Space built
between 1960 and 1970
5% 5% 4%
24%
30%
18%
32%
33%
30%
40%
32%
48%
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
BGSU - Entire
Campus
BGSU - E&G BGSU - Aux
%ofTotalCampusGSF
Campus Age by Category
Under 10 10 to 25 25 to 50 Over 50
Auxiliary Space is Older than E&G
An evenly distributed age profile is recommended to balance building risk
7
Buildings Under 10
Little work. “Honeymoon” period.
Low Risk
Buildings 10 to 25
Short life-cycle needs; primarily space
renewal.
Medium Risk
Buildings 25 to 50
Major envelope and mechanical life cycles come
due.
Higher Risk
Buildings over 50
Life cycles of major building components are past due.
Failures are possible.
Highest risk
Weighted
Reno. Age
41.6 39.6 43.9
8
Identifying High-Risk Space
Lower quality construction paired with aging building components
1.46M
1.45M
0.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
4.0
Pre-War
(pre-1950)
Post War &
Modern
(1950-1990)
Complex
(post-1990)
GSF(Millions)
BGSU
Total GSF by Construction Vintage
Under 10 10 to 25 25 to 50 Over 50
Building
Constru
ct. Year
GSF
Kreischer Quad 1966 300,000
Harshman Quad 1964 299,924
Jerome Library 1965 194,467
McDonald Quad 1962 191,828
Founders Quad 1956 188,877
Life Science Building 1965 126,335
Examples of High Risk Buildings
60%
40%
% of GSF
Addressing Deferred
Maintenance with Campus
Operations Input
9
$483
$0
$100
$200
$300
$400
$500
$600
Asset Reinvestment Backlog
TotalDollars(Millions)
ROPA+ Prediction: Total BGSU Space
10
$290
$145
$48
$0
$100
$200
$300
$400
$500
$600
Total 10 Year Need
TotalDollars(Millions)
Current Need 10 Year Renewal Need Remaining Need
Prediction
(Capital Risk)
Discovery
(Asset Reinvestment)
1% 2%
15%
13%
8%
46%
15%
Total Current Need by System
Small Building Renovation Roofing
Electrical Plumbing
Interiors HVAC
Building Exteriors
Prediction
(Capital Risk)
Total Current Need by System
$290M in current need (items currently in backlog)
11
$290
$145
$48
$0
$100
$200
$300
$400
$500
$600
TotalDollars(Millions)
Current Need
10 Year Renewal Need
Remaining Need
BGSU 10 Year Prediction Chart with Demolitions and Renovations
Using Sightlines ROPA+ Modeling, selecting certain buildings decreases deferred maintenance
12
$290
$145
$48
$0
$100
$200
$300
$400
$500
$600
TotalDollars(Millions)
Current Need
10 Year Renewal Need
Remaining Need
$483M
$206
$144
$48
$0
$100
$200
$300
$400
$500
$600
Current Need
10 Year Renewal Need
Remaining Need
Option 2
Demolitions of following
buildings:
Harshman Quad: FY17
West Hall: FY17
Family & Con: FY17
Johnston Hall: FY17 (Completed)
Admin: FY20 (Earliest Date)
Psychology Building: FY20
(Earliest Date)
Renovations of following
buildings:
South Hall: FY16 (In-Process)
Park Ave WRHS: FY16
(Completed)
HHS: FY16 (Completed)
Moseley Hall: FY17 (In-Process)
University Hall: FY17 (In-Process)
Hanna Hall with Addition: FY20
Add New Buildings:
Greek Housing: FY16 (In-
Process)
$398M
18% decrease
$85
Campus Operations
Centralization
14
Centralization, Why?
 University Initiative
 Lower cost using volume
discounts
 Contractor
expertise/licenses
 Liability shift
 Identify trends and new
technology
 Planning/scheduling
initiatives with customers
 Preventative Maintenance
schedules
 Establish capital plans for
future investment
 Proactive approach not
reactive
 Accountability Index shift
 Customer can focus on
their expertise!
15
Support for Centralization
SERVICE
• Develop automated
VMI processes to
reduce inventory
and provide just in
time deliveries with
RPS and Grainger
• Consistent level of
quality service
• Active On Site
Supervision
EXPERTISE
• Unified training on
equipment, safety,
and procedures
• Specialized
technology for
maintenance and
custodial
• Preventive
maintenance
programs
• Experience
management team
RESPONSE
• Divided campus
into 4 zones for
round the clock
coverage on
maintenance and
custodial
• Ability to move
specialized
equipment and staff
for emergencies and
special requests
EFFICIENCY
• Sharing resources
among staff such as
equipment, tools,
vehicles, and golf
carts
• Reduced staffing to
provide service
levels based on
customer and
building needs
• Best pricing on
equipment and
supplies
• Work order system
for tracking
16
Centralization Update
 Bowen Thompson Student Union, 2013
Maintenance and Custodial Services
 Rec Wellness (Fieldhouse and Rec Center) 2014
Maintenance and Custodial Services
 Intercollegiate Athletics, 2015
Fields, Facilities, Maintenance & Custodial
 Logistics, 2014-2015
Consolidated services from Campus Operations,
Residence Life and Capital Planning
 Ice Arena and Stroh Center, 2016/17 17
3,600,000
3,800,000
4,000,000
4,200,000
4,400,000
4,600,000
4,800,000
5,000,000
5,200,000
0
50
100
150
200
250
300
350
FY08 FY09 FY10 FY11 FY12 FY13 FY14 FY15 FY16 FY17
TotalCampusGSF
StaffFTE
Campus Operations Staffing compared to GSF
Headcount GSF
Staff FTE vs. Square Footage
Even with added GSF, Staff FTE is lower
18
$0.00
$1.00
$2.00
$3.00
$4.00
$5.00
$6.00
$/GSF
Facilities Operating Budget Actuals
Daily Service Planned Maintenance Utilities Average
Operating Budget Actuals
BGSU is operating at $0.25/GSF less than peer institutions
19
Peer Average BGSU
$5.30
$5.05
6% decrease;
$6.6M in cost avoidance
ROPA Peers: California University of PA, Indiana University of PA, Kent State University,
Miami University of Ohio, Northern Arizona University, University of Cincinnati,
University of New Hampshire, University of North Texas, University of Southern
Mississippi,, University of Toledo, and Westfield State University
$0.00
$0.05
$0.10
$0.15
$0.20
$0.25
$0.30
$0.35
$0.40
$0.45
$0.50
FY11 FY12 FY13 FY14 FY15
$/GSF
Planned Maintenance
Planned Maintenance Best Practice
Planned Maintenance Continues to Increase
FY15 PM efforts put BGSU above peer average
20
$0.00
$0.05
$0.10
$0.15
$0.20
$0.25
$0.30
$0.35
$0.40
$0.45
$0.50
$/GSF
Planned Maintenance vs Peers
Planned Maintenance Peer Average
Best Practice
Peers Ordered by Tech Rating
2.3%
3.7%
2.8%
3.3%
6.2%ofBudget
Centralization Challenges
 Budgeting for Programs vs. Facility Needs
 Level of expectations increases with transfer
 Policies and Procedure may be localized
 Subsidized student employment
 “Beck and Call” style of management
 Budgetary consistency for Auxiliaries
 Trouble letting go of former responsibilities
21
Admissions Tour
 How do we look from a visitors point of view?
Students, Parents, Alumni
What makes our campus distinctive?
First impressions?
Restrooms
22
Structure and Organizational
 Review of all positions, eliminated duplication and increased
consolidation/responsibility/accountability
 Flattened the organization
 Superintendent Positions
 Team Leaders
 Moved residential hall maintenance to residential hall supervision
 Mechanical Room Organization Project for Campus
 739 spaces completed
 Established four zones throughout campus for building maintenance
responsibility in the Academic Buildings and Auxiliaries
23
Communication
 Weekly Staff Meetings
 Directors Meetings
 Semester update and communication meetings with the
entire team
 Meet with the students at the end of each academic summer
semester
 Supervision training, monthly safety training/compliance
and custodial team training and workshops
 Training programs each summer related to customer service
 Meetings with the City, USG, Faculty Senate
24
Communication
 Building Representative Meetings each Semester
 Capital Planning
 Police
 Health and Safety
 Scheduled meetings with our customer that include Res Life,
Rec Wellness, Athletics and BTSU to discuss projects,
concerns and areas of opportunities
25
Work Order System
 BGSU establishes CMMS specs, decision matrix developed
by Supply Chain Management Class
 Work Order history since 2012 has been consolidated into
one database, providing more accurate records of
maintenance needs and Customer Transparency
 95,000+ Work Orders submitted
 Over 2,070 per month
 Average of 100 work orders per day
26
Work Orders
Increased work order reporting has resulted in increased PM identification
27
0
5,000
10,000
15,000
20,000
25,000
#ofWorkOrders
# of Work Orders
Daily Service PM
0%
1%
2%
3%
4%
5%
6%
7%
%ofWorkOrders
% of Work Orders that are PM
% PM
Technology Improvements and VMI
 Introduction of microfiber cleaning systems has reduced our
water and chemical usage by 80% in our cleaning
procedures. It has also increased labor efficiency in
cleaning, as well as reduced the number of injuries on the
job.
 With the VMI technology, supervisors no longer spend large
amounts of time in searching and ordering of parts and
supplies. Commonly used parts and supplies are
automatically restocked several times a week by the vendors.
We have contracts in place for best pricing and are able to
hold minimal levels of stock on our shelves. 28
Cost Reduction Initiatives
 Cross trained movers, painters and carpenters to assist each
other during peak workload demands and integrated to
perform work concurrently at job site
 Increased skill set of painters to do carpeting, floor tile and
ceramic tile work eliminating internal silos
 Eliminated off campus location for building maintenance
 Reduce vehicle count
 Promote centralization and consolidation
29
Zone Management
 We have reduced the vehicle fleet by 10 over the past year
by no longer assigning vehicles to individuals, but rather,
sharing all vehicles across Zones and 3 shifts. By moving
the maintenance techs out into the Zones, vehicles are no
longer needed on a daily basis and instead, vehicles are
shared within the Zone.
 Zone Management has allowed us to right-size to 8
supervisors, a reduction of 3, to provide quality service to
the entire campus. We have 4 Zones, each with 2
supervisors, 2 building maintenance techs, and 2 team
leaders per zone. 30
Zone Management
 This model allows for quick response time to customer
needs, knowledge of buildings and systems, cross coverage,
and familiarity with the needs of the zone occupants. We
are working toward the goal of eliminating duplicate efforts
and duplicate work of campus personnel.
 The flexibility to move staff to accommodate special events
on campus as well as coverage for emergencies. We have
around the clock supervision on campus that allows us to
actively solve problem in the field and deliver swift service.
Zone Management provides one point of contact for all
customers and they become familiar with our employees
and procedures.
31
Campus Services
 Since Centralizing Logistics Services within Campus
Operations from Residence Life and Capital Planning in
May 2014, the total number of closed work orders for the
Logistics Team is 3,841. Or an average of 213 per month!
 Larger pool of resources, providing flexibility and
increasing coverage and stability
 Increased facilities expertise and focus
 Implemented APPA Standards and benchmarks
32
Centralization Cost Savings for BTSU
$-
$100,000
$200,000
$300,000
$400,000
$500,000
$600,000
$700,000
$800,000
$900,000
$1,000,000
2012 Actual 2013 Actual 2014 Actual 2015 Actual 2016 Budget
$
Bowen-Thompson Student Union
Total Personnel Total Operating Expense and Preventative Maintenance
33
After CentralizationBefore
Centralization
34
Sebo Center Entry
Before - July 14, 2014
After - Aug 25, 2014
Mechanical/Electrical and Physical Plant
 Health and Safety Collaboration and Compliance
 Preventative Maintenance Programs include:
Air Handlers (372), Boilers, Chillers (34), HVAC Filters
and Belts, Automatic Doors (154), Elevators (87), Locks
and Latches, Backflow Preventers, Steam Traps, Water
Treatment, Natural Gas, Electrical Distribution, Fire
Alarms, Emergency Generators, Roof Inspections,
Suppression Hoods, Fire Pumps and Sprinkler Systems, &
Intrusion Alarms (147 reduced to 54).
35
Utility Mapping and Energy Management
 Accurately track energy consumption across campus
allowing more precise measurements related to expense
allocations.
 Established locations of all utility metering devices on
campus for electric, water, gas, irrigation, steam
 Mobile devices, tablets, motion devices for technicians to
improve customer service and troubleshoot issue
36
Energy/Demand Response
 Building Automation Systems (BAS) has provided better
monitoring and quicker response to heating and cooling
needs
 Demand response is a way for power companies to shift
electricity usage during peak periods to help prevent a
grid usage overload during summer
 Power companies offer financial incentives to large
portfolio customers
 BGSU has 87 buildings on campus and currently only
44 (54%) of these buildings are operating under BAS
37
Energy Projects
Project Total Project Cost Rebate/Green Fund
Cost to
BGSU
Projected Annual Savings
Estimated
Completion Date
Completed
Demand Response (2015) $0.00 $0.00 $110,000.00 04/15/14
Capacitors (secondary) $4,000.00 $4,000.00 $145,514.52 08/30/12
Campus Operations LED parking lot $9,264.00 $1,000.00 $8,264.00 $1,674.00 03/24/14
Perry Field House LED $59,974.00 $38,900.00 $21,074.00 $13,000.00 07/21/14
Student Recreation Center LED $18,475.00 $18,475.00 $0.00 $2,529.00 08/15/14
Water Deduct Phase 1 of 2 $40,000.00 $40,000.00 $45,000.00 06/20/15
Capacitors (Primary Electric) $25,000.00 $25,000.00 $71,000.00 03/10/15
Ice Arena Lighting $35,000.00 $17,500.00 $17,500.00 $8,500.00 05/18/15
McFall Gallery Lighting Project $10,701.00 $1,000.00 $9,701.00 $2,394.00 05/22/15
Water Deduct Phase 2 of 2 $30,488.00 $30,488.00 $45,000.00 05/01/15
Pub Kitchen HVAC $13,000.00 $13,000.00 07/01/15
Total $245,902.00 $76,875.00 $169,027.00 $444,611.52
38
Sustainability
 Three main goals, introduced spring
semester, 2013
1. Reduction of Emissions (through
efforts with American Colleges &
Universities Presidents Climate
Commitment now referred to as
Climate Leadership Network)
2. Waste Reduction & Resource
Conservation
3. Sustainability Education, Outreach
& Awareness 39
Sustainability Programs
 Internships – Open to all majors
 Orange Bikes (Community Bike-Rental Program)
 Green Office Certification
 Green Game Day/Stadium Waste Reduction; average of ton
of recycling diverted per home game
 Single Stream Recycling, Electronics, batteries, lightbulbs
 Once Upon A Desk (Office supply surplus program)
 re Store “Thrift Store” sales throughout the year
 Friday Night Lights
 When You Move Out, Don’t Throw It Out! 40
Sustainability/Green Fund Projects
 Oaks and Carillon green roof projects, bike racks (EPA grant)
 Green roof bike racks –EPA grant
 Electric vehicle charging stations (Clean Fuels Ohio grant)
 Renewable Energy Feasibility Study/SHP
 Electric vehicles
 Campus Composting program
 Water bottle refilling stations
 Energy-producing cardio equipment
 Energy “Dashboards”
 Since its inception in 2010/11, the Student Green Initiatives Fund has
invested over $450,000 into 40 projects.
 80% + Participation Rate 41
Community Outreach
 Campus Services recently developed a relationship
with Penta Career Center and WCESC and are
currently providing students unpaid internships with
Bowling Green State University Grounds Department.
The Transition to Work programs provides students
“real world” experiences.
42
Summary
 With Centralization, all operational dollars are
dedicated to maintenance and building upkeep.
Decisions are based on data collected, deferred
maintenance, life cycles, and functional needs, rather
than personal/departmental preferences. Real time
data from our work order system supports our
planning. By focusing dollars on the true maintenance
needs of campus, we are able to provide a consistent
level of quality services.
 And it all started with the Admissions Tour! 43
Questions and Comments
44

More Related Content

Similar to Leveraging New Analytics to Change the Conversation around Facilities on Campus

Is Your Facilities Data Fact, Fiction, or Crap? - Creating Facilities Intelli...
Is Your Facilities Data Fact, Fiction, or Crap? - Creating Facilities Intelli...Is Your Facilities Data Fact, Fiction, or Crap? - Creating Facilities Intelli...
Is Your Facilities Data Fact, Fiction, or Crap? - Creating Facilities Intelli...Sightlines
 
Plan More, React Less: Building & Expanding Your Planned Maintenance Program
Plan More, React Less: Building & Expanding Your Planned Maintenance ProgramPlan More, React Less: Building & Expanding Your Planned Maintenance Program
Plan More, React Less: Building & Expanding Your Planned Maintenance ProgramSightlines
 
Out with the Old - Creating a New Paradigm Around the Fate of Your Buildings
Out with the Old - Creating a New Paradigm Around the Fate of Your BuildingsOut with the Old - Creating a New Paradigm Around the Fate of Your Buildings
Out with the Old - Creating a New Paradigm Around the Fate of Your BuildingsEric Nolan
 
Out with the Old - Creating a New Paradigm Around the Fate of Your Buildings
Out with the Old - Creating a New Paradigm Around the Fate of Your BuildingsOut with the Old - Creating a New Paradigm Around the Fate of Your Buildings
Out with the Old - Creating a New Paradigm Around the Fate of Your BuildingsSightlines
 
More with Less: Five Strategies for Facilities Success [MAPPA-CAPPA 2017]
More with Less: Five Strategies for Facilities Success [MAPPA-CAPPA 2017]More with Less: Five Strategies for Facilities Success [MAPPA-CAPPA 2017]
More with Less: Five Strategies for Facilities Success [MAPPA-CAPPA 2017]Sightlines
 
New strategies for attacking deferred maintenance december 2012
New strategies for attacking deferred maintenance december 2012New strategies for attacking deferred maintenance december 2012
New strategies for attacking deferred maintenance december 2012Sightlines
 
Change the Conversation to Address Deferred Maintenance - NACUBO 2015
Change the Conversation to Address Deferred Maintenance - NACUBO 2015Change the Conversation to Address Deferred Maintenance - NACUBO 2015
Change the Conversation to Address Deferred Maintenance - NACUBO 2015Sightlines
 
Don't Leave Your Facilities Needs to Chance - APPA 2015
Don't Leave Your Facilities Needs to Chance - APPA 2015Don't Leave Your Facilities Needs to Chance - APPA 2015
Don't Leave Your Facilities Needs to Chance - APPA 2015Sightlines
 
University of Tennessee Knoxville Facilities Exposed - The Story Behind the F...
University of Tennessee Knoxville Facilities Exposed - The Story Behind the F...University of Tennessee Knoxville Facilities Exposed - The Story Behind the F...
University of Tennessee Knoxville Facilities Exposed - The Story Behind the F...Sightlines
 
Challenges to the Physical Campus: How to Change the Conversation about Facil...
Challenges to the Physical Campus: How to Change the Conversation about Facil...Challenges to the Physical Campus: How to Change the Conversation about Facil...
Challenges to the Physical Campus: How to Change the Conversation about Facil...Sightlines
 
University of Alberta Strategy Presentation
University of Alberta Strategy PresentationUniversity of Alberta Strategy Presentation
University of Alberta Strategy PresentationJoel Gehman
 
From Boiler Room to Board Room: Creating Alignment with Non-Facilities Profes...
From Boiler Room to Board Room: Creating Alignment with Non-Facilities Profes...From Boiler Room to Board Room: Creating Alignment with Non-Facilities Profes...
From Boiler Room to Board Room: Creating Alignment with Non-Facilities Profes...Sightlines
 
The State of Facilities at Midwestern Institutions
The State of Facilities at Midwestern InstitutionsThe State of Facilities at Midwestern Institutions
The State of Facilities at Midwestern InstitutionsSightlines
 
Focusing a Campus Investment Strategy - NCAPPA 2016
Focusing a Campus Investment Strategy - NCAPPA 2016Focusing a Campus Investment Strategy - NCAPPA 2016
Focusing a Campus Investment Strategy - NCAPPA 2016Sightlines
 
Changing the Conversation in Facilities Management - A Step Towards Total Cam...
Changing the Conversation in Facilities Management - A Step Towards Total Cam...Changing the Conversation in Facilities Management - A Step Towards Total Cam...
Changing the Conversation in Facilities Management - A Step Towards Total Cam...Sightlines
 
Changing the Conversation: Making the Case for Funding Deferred Maintenance [...
Changing the Conversation: Making the Case for Funding Deferred Maintenance [...Changing the Conversation: Making the Case for Funding Deferred Maintenance [...
Changing the Conversation: Making the Case for Funding Deferred Maintenance [...Sightlines
 
Doing More with Less: Solutions for Managing Facilities on a Limited Budget
Doing More with Less: Solutions for Managing Facilities on a Limited BudgetDoing More with Less: Solutions for Managing Facilities on a Limited Budget
Doing More with Less: Solutions for Managing Facilities on a Limited BudgetSightlines
 
Taming Deferred Maintenance Before the Roof Caves In (2016 Sightlines NACUBO ...
Taming Deferred Maintenance Before the Roof Caves In (2016 Sightlines NACUBO ...Taming Deferred Maintenance Before the Roof Caves In (2016 Sightlines NACUBO ...
Taming Deferred Maintenance Before the Roof Caves In (2016 Sightlines NACUBO ...Sightlines
 
Simulation of a University Financial System
Simulation of a University Financial SystemSimulation of a University Financial System
Simulation of a University Financial SystemFletcher Lamkin
 

Similar to Leveraging New Analytics to Change the Conversation around Facilities on Campus (20)

Is Your Facilities Data Fact, Fiction, or Crap? - Creating Facilities Intelli...
Is Your Facilities Data Fact, Fiction, or Crap? - Creating Facilities Intelli...Is Your Facilities Data Fact, Fiction, or Crap? - Creating Facilities Intelli...
Is Your Facilities Data Fact, Fiction, or Crap? - Creating Facilities Intelli...
 
Plan More, React Less: Building & Expanding Your Planned Maintenance Program
Plan More, React Less: Building & Expanding Your Planned Maintenance ProgramPlan More, React Less: Building & Expanding Your Planned Maintenance Program
Plan More, React Less: Building & Expanding Your Planned Maintenance Program
 
Out with the Old - Creating a New Paradigm Around the Fate of Your Buildings
Out with the Old - Creating a New Paradigm Around the Fate of Your BuildingsOut with the Old - Creating a New Paradigm Around the Fate of Your Buildings
Out with the Old - Creating a New Paradigm Around the Fate of Your Buildings
 
Out with the Old - Creating a New Paradigm Around the Fate of Your Buildings
Out with the Old - Creating a New Paradigm Around the Fate of Your BuildingsOut with the Old - Creating a New Paradigm Around the Fate of Your Buildings
Out with the Old - Creating a New Paradigm Around the Fate of Your Buildings
 
More with Less: Five Strategies for Facilities Success [MAPPA-CAPPA 2017]
More with Less: Five Strategies for Facilities Success [MAPPA-CAPPA 2017]More with Less: Five Strategies for Facilities Success [MAPPA-CAPPA 2017]
More with Less: Five Strategies for Facilities Success [MAPPA-CAPPA 2017]
 
New strategies for attacking deferred maintenance december 2012
New strategies for attacking deferred maintenance december 2012New strategies for attacking deferred maintenance december 2012
New strategies for attacking deferred maintenance december 2012
 
Change the Conversation to Address Deferred Maintenance - NACUBO 2015
Change the Conversation to Address Deferred Maintenance - NACUBO 2015Change the Conversation to Address Deferred Maintenance - NACUBO 2015
Change the Conversation to Address Deferred Maintenance - NACUBO 2015
 
Don't Leave Your Facilities Needs to Chance - APPA 2015
Don't Leave Your Facilities Needs to Chance - APPA 2015Don't Leave Your Facilities Needs to Chance - APPA 2015
Don't Leave Your Facilities Needs to Chance - APPA 2015
 
University of Tennessee Knoxville Facilities Exposed - The Story Behind the F...
University of Tennessee Knoxville Facilities Exposed - The Story Behind the F...University of Tennessee Knoxville Facilities Exposed - The Story Behind the F...
University of Tennessee Knoxville Facilities Exposed - The Story Behind the F...
 
Challenges to the Physical Campus: How to Change the Conversation about Facil...
Challenges to the Physical Campus: How to Change the Conversation about Facil...Challenges to the Physical Campus: How to Change the Conversation about Facil...
Challenges to the Physical Campus: How to Change the Conversation about Facil...
 
University of Alberta Strategy Presentation
University of Alberta Strategy PresentationUniversity of Alberta Strategy Presentation
University of Alberta Strategy Presentation
 
From Boiler Room to Board Room: Creating Alignment with Non-Facilities Profes...
From Boiler Room to Board Room: Creating Alignment with Non-Facilities Profes...From Boiler Room to Board Room: Creating Alignment with Non-Facilities Profes...
From Boiler Room to Board Room: Creating Alignment with Non-Facilities Profes...
 
The State of Facilities at Midwestern Institutions
The State of Facilities at Midwestern InstitutionsThe State of Facilities at Midwestern Institutions
The State of Facilities at Midwestern Institutions
 
Focusing a Campus Investment Strategy - NCAPPA 2016
Focusing a Campus Investment Strategy - NCAPPA 2016Focusing a Campus Investment Strategy - NCAPPA 2016
Focusing a Campus Investment Strategy - NCAPPA 2016
 
2014 investor presentation august
2014 investor presentation august2014 investor presentation august
2014 investor presentation august
 
Changing the Conversation in Facilities Management - A Step Towards Total Cam...
Changing the Conversation in Facilities Management - A Step Towards Total Cam...Changing the Conversation in Facilities Management - A Step Towards Total Cam...
Changing the Conversation in Facilities Management - A Step Towards Total Cam...
 
Changing the Conversation: Making the Case for Funding Deferred Maintenance [...
Changing the Conversation: Making the Case for Funding Deferred Maintenance [...Changing the Conversation: Making the Case for Funding Deferred Maintenance [...
Changing the Conversation: Making the Case for Funding Deferred Maintenance [...
 
Doing More with Less: Solutions for Managing Facilities on a Limited Budget
Doing More with Less: Solutions for Managing Facilities on a Limited BudgetDoing More with Less: Solutions for Managing Facilities on a Limited Budget
Doing More with Less: Solutions for Managing Facilities on a Limited Budget
 
Taming Deferred Maintenance Before the Roof Caves In (2016 Sightlines NACUBO ...
Taming Deferred Maintenance Before the Roof Caves In (2016 Sightlines NACUBO ...Taming Deferred Maintenance Before the Roof Caves In (2016 Sightlines NACUBO ...
Taming Deferred Maintenance Before the Roof Caves In (2016 Sightlines NACUBO ...
 
Simulation of a University Financial System
Simulation of a University Financial SystemSimulation of a University Financial System
Simulation of a University Financial System
 

More from Sightlines

State of Sustainability in Higher Education 2017
State of Sustainability in Higher Education 2017State of Sustainability in Higher Education 2017
State of Sustainability in Higher Education 2017Sightlines
 
2017 State of Facilities in Higher Education
2017 State of Facilities in Higher Education2017 State of Facilities in Higher Education
2017 State of Facilities in Higher EducationSightlines
 
Put Your Facilities Data to Work: 5 Steps for Strengthening Your Case on Campus
Put Your Facilities Data to Work: 5 Steps for Strengthening Your Case on CampusPut Your Facilities Data to Work: 5 Steps for Strengthening Your Case on Campus
Put Your Facilities Data to Work: 5 Steps for Strengthening Your Case on CampusSightlines
 
Developing the Capital Plan is Only Half the Battle [ERAPPA 2017]
Developing the Capital Plan is Only Half the Battle [ERAPPA 2017]Developing the Capital Plan is Only Half the Battle [ERAPPA 2017]
Developing the Capital Plan is Only Half the Battle [ERAPPA 2017]Sightlines
 
The State of Housing Facilities: Trends & Best Practices [ACUHO-i/APPA 2017]
The State of Housing Facilities: Trends & Best Practices [ACUHO-i/APPA 2017]The State of Housing Facilities: Trends & Best Practices [ACUHO-i/APPA 2017]
The State of Housing Facilities: Trends & Best Practices [ACUHO-i/APPA 2017]Sightlines
 
Making the Case for Campus Sustainability
Making the Case for Campus SustainabilityMaking the Case for Campus Sustainability
Making the Case for Campus SustainabilitySightlines
 
Planning for the Future: Adapting Facilities to Tomorrow's Needs
Planning for the Future: Adapting Facilities to Tomorrow's NeedsPlanning for the Future: Adapting Facilities to Tomorrow's Needs
Planning for the Future: Adapting Facilities to Tomorrow's NeedsSightlines
 
The State of Facilities: Preventing Your Biggest Asset from Becoming Your Big...
The State of Facilities: Preventing Your Biggest Asset from Becoming Your Big...The State of Facilities: Preventing Your Biggest Asset from Becoming Your Big...
The State of Facilities: Preventing Your Biggest Asset from Becoming Your Big...Sightlines
 
Exploring the State of Sustainability in Higher Education 2016
Exploring the State of Sustainability in Higher Education 2016Exploring the State of Sustainability in Higher Education 2016
Exploring the State of Sustainability in Higher Education 2016Sightlines
 
2016 State of Facilities in Higher Education
2016 State of Facilities in Higher Education2016 State of Facilities in Higher Education
2016 State of Facilities in Higher EducationSightlines
 
How UMass is reducing its deferred maintenance backlog
How UMass is reducing its deferred maintenance backlogHow UMass is reducing its deferred maintenance backlog
How UMass is reducing its deferred maintenance backlogSightlines
 
When You Come to a Fork in the Road, Take It: Rutgers & Sightlines ERAPPA 201...
When You Come to a Fork in the Road, Take It: Rutgers & Sightlines ERAPPA 201...When You Come to a Fork in the Road, Take It: Rutgers & Sightlines ERAPPA 201...
When You Come to a Fork in the Road, Take It: Rutgers & Sightlines ERAPPA 201...Sightlines
 
Prepping for the President: Planning Rutgers' 250th Commencement
Prepping for the President: Planning Rutgers' 250th CommencementPrepping for the President: Planning Rutgers' 250th Commencement
Prepping for the President: Planning Rutgers' 250th CommencementSightlines
 
Sightlines Membership Update - The Value of Integration with Gordian
Sightlines Membership Update - The Value of Integration with GordianSightlines Membership Update - The Value of Integration with Gordian
Sightlines Membership Update - The Value of Integration with GordianSightlines
 
Data & Sustainability: How the Right Data Creates Success
Data & Sustainability: How the Right Data Creates SuccessData & Sustainability: How the Right Data Creates Success
Data & Sustainability: How the Right Data Creates SuccessSightlines
 
Creating Alignment with Non-Facilities Professionals - APPA 2016
Creating Alignment with Non-Facilities Professionals - APPA 2016Creating Alignment with Non-Facilities Professionals - APPA 2016
Creating Alignment with Non-Facilities Professionals - APPA 2016Sightlines
 
Don't Leave Your Facilities Needs to Chance: From Game Plan to Master Plan
Don't Leave Your Facilities Needs to Chance: From Game Plan to Master PlanDon't Leave Your Facilities Needs to Chance: From Game Plan to Master Plan
Don't Leave Your Facilities Needs to Chance: From Game Plan to Master PlanSightlines
 
The State of Facilities at Eastern Region Institutions JUNE16
The State of Facilities at Eastern Region Institutions JUNE16The State of Facilities at Eastern Region Institutions JUNE16
The State of Facilities at Eastern Region Institutions JUNE16Sightlines
 
The State of Facilities at Pacific Coast Institutions May2016
The State of Facilities at Pacific Coast Institutions May2016The State of Facilities at Pacific Coast Institutions May2016
The State of Facilities at Pacific Coast Institutions May2016Sightlines
 
How Sightlines Can Change the Conversation on Your Campus
How Sightlines Can Change the Conversation on Your CampusHow Sightlines Can Change the Conversation on Your Campus
How Sightlines Can Change the Conversation on Your CampusSightlines
 

More from Sightlines (20)

State of Sustainability in Higher Education 2017
State of Sustainability in Higher Education 2017State of Sustainability in Higher Education 2017
State of Sustainability in Higher Education 2017
 
2017 State of Facilities in Higher Education
2017 State of Facilities in Higher Education2017 State of Facilities in Higher Education
2017 State of Facilities in Higher Education
 
Put Your Facilities Data to Work: 5 Steps for Strengthening Your Case on Campus
Put Your Facilities Data to Work: 5 Steps for Strengthening Your Case on CampusPut Your Facilities Data to Work: 5 Steps for Strengthening Your Case on Campus
Put Your Facilities Data to Work: 5 Steps for Strengthening Your Case on Campus
 
Developing the Capital Plan is Only Half the Battle [ERAPPA 2017]
Developing the Capital Plan is Only Half the Battle [ERAPPA 2017]Developing the Capital Plan is Only Half the Battle [ERAPPA 2017]
Developing the Capital Plan is Only Half the Battle [ERAPPA 2017]
 
The State of Housing Facilities: Trends & Best Practices [ACUHO-i/APPA 2017]
The State of Housing Facilities: Trends & Best Practices [ACUHO-i/APPA 2017]The State of Housing Facilities: Trends & Best Practices [ACUHO-i/APPA 2017]
The State of Housing Facilities: Trends & Best Practices [ACUHO-i/APPA 2017]
 
Making the Case for Campus Sustainability
Making the Case for Campus SustainabilityMaking the Case for Campus Sustainability
Making the Case for Campus Sustainability
 
Planning for the Future: Adapting Facilities to Tomorrow's Needs
Planning for the Future: Adapting Facilities to Tomorrow's NeedsPlanning for the Future: Adapting Facilities to Tomorrow's Needs
Planning for the Future: Adapting Facilities to Tomorrow's Needs
 
The State of Facilities: Preventing Your Biggest Asset from Becoming Your Big...
The State of Facilities: Preventing Your Biggest Asset from Becoming Your Big...The State of Facilities: Preventing Your Biggest Asset from Becoming Your Big...
The State of Facilities: Preventing Your Biggest Asset from Becoming Your Big...
 
Exploring the State of Sustainability in Higher Education 2016
Exploring the State of Sustainability in Higher Education 2016Exploring the State of Sustainability in Higher Education 2016
Exploring the State of Sustainability in Higher Education 2016
 
2016 State of Facilities in Higher Education
2016 State of Facilities in Higher Education2016 State of Facilities in Higher Education
2016 State of Facilities in Higher Education
 
How UMass is reducing its deferred maintenance backlog
How UMass is reducing its deferred maintenance backlogHow UMass is reducing its deferred maintenance backlog
How UMass is reducing its deferred maintenance backlog
 
When You Come to a Fork in the Road, Take It: Rutgers & Sightlines ERAPPA 201...
When You Come to a Fork in the Road, Take It: Rutgers & Sightlines ERAPPA 201...When You Come to a Fork in the Road, Take It: Rutgers & Sightlines ERAPPA 201...
When You Come to a Fork in the Road, Take It: Rutgers & Sightlines ERAPPA 201...
 
Prepping for the President: Planning Rutgers' 250th Commencement
Prepping for the President: Planning Rutgers' 250th CommencementPrepping for the President: Planning Rutgers' 250th Commencement
Prepping for the President: Planning Rutgers' 250th Commencement
 
Sightlines Membership Update - The Value of Integration with Gordian
Sightlines Membership Update - The Value of Integration with GordianSightlines Membership Update - The Value of Integration with Gordian
Sightlines Membership Update - The Value of Integration with Gordian
 
Data & Sustainability: How the Right Data Creates Success
Data & Sustainability: How the Right Data Creates SuccessData & Sustainability: How the Right Data Creates Success
Data & Sustainability: How the Right Data Creates Success
 
Creating Alignment with Non-Facilities Professionals - APPA 2016
Creating Alignment with Non-Facilities Professionals - APPA 2016Creating Alignment with Non-Facilities Professionals - APPA 2016
Creating Alignment with Non-Facilities Professionals - APPA 2016
 
Don't Leave Your Facilities Needs to Chance: From Game Plan to Master Plan
Don't Leave Your Facilities Needs to Chance: From Game Plan to Master PlanDon't Leave Your Facilities Needs to Chance: From Game Plan to Master Plan
Don't Leave Your Facilities Needs to Chance: From Game Plan to Master Plan
 
The State of Facilities at Eastern Region Institutions JUNE16
The State of Facilities at Eastern Region Institutions JUNE16The State of Facilities at Eastern Region Institutions JUNE16
The State of Facilities at Eastern Region Institutions JUNE16
 
The State of Facilities at Pacific Coast Institutions May2016
The State of Facilities at Pacific Coast Institutions May2016The State of Facilities at Pacific Coast Institutions May2016
The State of Facilities at Pacific Coast Institutions May2016
 
How Sightlines Can Change the Conversation on Your Campus
How Sightlines Can Change the Conversation on Your CampusHow Sightlines Can Change the Conversation on Your Campus
How Sightlines Can Change the Conversation on Your Campus
 

Recently uploaded

Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfLike-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfMr Bounab Samir
 
ROOT CAUSE ANALYSIS PowerPoint Presentation
ROOT CAUSE ANALYSIS PowerPoint PresentationROOT CAUSE ANALYSIS PowerPoint Presentation
ROOT CAUSE ANALYSIS PowerPoint PresentationAadityaSharma884161
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Celine George
 
ACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfSpandanaRallapalli
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPCeline George
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxpboyjonauth
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersSabitha Banu
 
Judging the Relevance and worth of ideas part 2.pptx
Judging the Relevance  and worth of ideas part 2.pptxJudging the Relevance  and worth of ideas part 2.pptx
Judging the Relevance and worth of ideas part 2.pptxSherlyMaeNeri
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxiammrhaywood
 
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfAMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfphamnguyenenglishnb
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...Nguyen Thanh Tu Collection
 
Planning a health career 4th Quarter.pptx
Planning a health career 4th Quarter.pptxPlanning a health career 4th Quarter.pptx
Planning a health career 4th Quarter.pptxLigayaBacuel1
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...JhezDiaz1
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxthorishapillay1
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentInMediaRes1
 
ENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomnelietumpap1
 
What is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPWhat is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPCeline George
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Mark Reed
 

Recently uploaded (20)

Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfLike-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
 
OS-operating systems- ch04 (Threads) ...
OS-operating systems- ch04 (Threads) ...OS-operating systems- ch04 (Threads) ...
OS-operating systems- ch04 (Threads) ...
 
ROOT CAUSE ANALYSIS PowerPoint Presentation
ROOT CAUSE ANALYSIS PowerPoint PresentationROOT CAUSE ANALYSIS PowerPoint Presentation
ROOT CAUSE ANALYSIS PowerPoint Presentation
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17
 
ACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdf
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERP
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptx
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginners
 
Judging the Relevance and worth of ideas part 2.pptx
Judging the Relevance  and worth of ideas part 2.pptxJudging the Relevance  and worth of ideas part 2.pptx
Judging the Relevance and worth of ideas part 2.pptx
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
 
Rapple "Scholarly Communications and the Sustainable Development Goals"
Rapple "Scholarly Communications and the Sustainable Development Goals"Rapple "Scholarly Communications and the Sustainable Development Goals"
Rapple "Scholarly Communications and the Sustainable Development Goals"
 
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfAMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
 
Planning a health career 4th Quarter.pptx
Planning a health career 4th Quarter.pptxPlanning a health career 4th Quarter.pptx
Planning a health career 4th Quarter.pptx
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptx
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media Component
 
ENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choom
 
What is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPWhat is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERP
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)
 

Leveraging New Analytics to Change the Conversation around Facilities on Campus

  • 1. LEVERAGING NEW ANALYTICS TO CHANGE THE CONVERSATION AROUND FACILITIES ON CAMPUS April 28, 2016 Presented by: Dr. Bruce Meyer Assistant VP Campus Operations BGSU Brendon W. Martin Account Manager Sightlines
  • 2. Public Research University Bowling Green, Ohio Sightlines member since 2009 5M Supported GSF 477 Maintained Acres 16,908 Student Headcount Established 1910 2
  • 3. Who Partners with Sightlines? Robust membership includes colleges, universities, consortiums and state systems 3 * U.S. News 2016 Rankings Sightlines is proud to announce that: • 450 colleges and universities are Sightlines clients including over 325 ROPA members. • Consistently over 90% member retention rate • We have clients in over 40 states, the District of Columbia and four Canadian provinces • More than 125 new institutions became Sightlines members since 2013 Sightlines advises state systems in: • Alaska • California • Connecticut • Hawaii • Maine • Massachusetts • Minnesota • Mississippi • Missouri • Nebraska • New Hampshire • New Jersey • Pennsylvania • Texas • West Virginia Serving the Nation’s Leading Institutions: • 70% of the Top 20 Colleges* • 75% of the Top 20 Universities* • 34 Flagship State Universities • 14 of the 14 Big 10 Institutions • 9 of the 12 Ivy Plus Institutions
  • 4. Changing the Conversation A framework for integrated planning 4
  • 5. Why focus on your facilities Physical assets dwarf the institution’s direct financial assets Across higher education, campus replacement values are on average, four times larger than institutional endowments $1.8 Billion – Replacement Value $188.89 Million – 2014 Endowment Value* *As reported in 2015 US News & World Report 5
  • 6. 0% 5% 10% 15% 20% 25% 30% %ofGSF Sightlines Database- Construction Age BGSU Putting Your Campus Building Age in Context 6 Pre-War Built before 1951 Durable construction Older but typically lasts longer Post-War Built from 1951 to 1975 Lower-quality construction Already needing more repairs and renovations Modern Built from 1976 to 1990 Quick-flash construction Low-quality building components Complex Built in 1991 and newer Technically complex spaces Higher-quality, more expensive to maintain & repair Pre-War Post-War Modern Complex The campus age drives the overall risk profile 48% of Space built between 1960 and 1970
  • 7. 5% 5% 4% 24% 30% 18% 32% 33% 30% 40% 32% 48% 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% BGSU - Entire Campus BGSU - E&G BGSU - Aux %ofTotalCampusGSF Campus Age by Category Under 10 10 to 25 25 to 50 Over 50 Auxiliary Space is Older than E&G An evenly distributed age profile is recommended to balance building risk 7 Buildings Under 10 Little work. “Honeymoon” period. Low Risk Buildings 10 to 25 Short life-cycle needs; primarily space renewal. Medium Risk Buildings 25 to 50 Major envelope and mechanical life cycles come due. Higher Risk Buildings over 50 Life cycles of major building components are past due. Failures are possible. Highest risk Weighted Reno. Age 41.6 39.6 43.9
  • 8. 8 Identifying High-Risk Space Lower quality construction paired with aging building components 1.46M 1.45M 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 Pre-War (pre-1950) Post War & Modern (1950-1990) Complex (post-1990) GSF(Millions) BGSU Total GSF by Construction Vintage Under 10 10 to 25 25 to 50 Over 50 Building Constru ct. Year GSF Kreischer Quad 1966 300,000 Harshman Quad 1964 299,924 Jerome Library 1965 194,467 McDonald Quad 1962 191,828 Founders Quad 1956 188,877 Life Science Building 1965 126,335 Examples of High Risk Buildings 60% 40% % of GSF
  • 9. Addressing Deferred Maintenance with Campus Operations Input 9
  • 10. $483 $0 $100 $200 $300 $400 $500 $600 Asset Reinvestment Backlog TotalDollars(Millions) ROPA+ Prediction: Total BGSU Space 10 $290 $145 $48 $0 $100 $200 $300 $400 $500 $600 Total 10 Year Need TotalDollars(Millions) Current Need 10 Year Renewal Need Remaining Need Prediction (Capital Risk) Discovery (Asset Reinvestment)
  • 11. 1% 2% 15% 13% 8% 46% 15% Total Current Need by System Small Building Renovation Roofing Electrical Plumbing Interiors HVAC Building Exteriors Prediction (Capital Risk) Total Current Need by System $290M in current need (items currently in backlog) 11 $290 $145 $48 $0 $100 $200 $300 $400 $500 $600 TotalDollars(Millions) Current Need 10 Year Renewal Need Remaining Need
  • 12. BGSU 10 Year Prediction Chart with Demolitions and Renovations Using Sightlines ROPA+ Modeling, selecting certain buildings decreases deferred maintenance 12 $290 $145 $48 $0 $100 $200 $300 $400 $500 $600 TotalDollars(Millions) Current Need 10 Year Renewal Need Remaining Need $483M $206 $144 $48 $0 $100 $200 $300 $400 $500 $600 Current Need 10 Year Renewal Need Remaining Need Option 2 Demolitions of following buildings: Harshman Quad: FY17 West Hall: FY17 Family & Con: FY17 Johnston Hall: FY17 (Completed) Admin: FY20 (Earliest Date) Psychology Building: FY20 (Earliest Date) Renovations of following buildings: South Hall: FY16 (In-Process) Park Ave WRHS: FY16 (Completed) HHS: FY16 (Completed) Moseley Hall: FY17 (In-Process) University Hall: FY17 (In-Process) Hanna Hall with Addition: FY20 Add New Buildings: Greek Housing: FY16 (In- Process) $398M 18% decrease $85
  • 14. Centralization, Why?  University Initiative  Lower cost using volume discounts  Contractor expertise/licenses  Liability shift  Identify trends and new technology  Planning/scheduling initiatives with customers  Preventative Maintenance schedules  Establish capital plans for future investment  Proactive approach not reactive  Accountability Index shift  Customer can focus on their expertise! 15
  • 15. Support for Centralization SERVICE • Develop automated VMI processes to reduce inventory and provide just in time deliveries with RPS and Grainger • Consistent level of quality service • Active On Site Supervision EXPERTISE • Unified training on equipment, safety, and procedures • Specialized technology for maintenance and custodial • Preventive maintenance programs • Experience management team RESPONSE • Divided campus into 4 zones for round the clock coverage on maintenance and custodial • Ability to move specialized equipment and staff for emergencies and special requests EFFICIENCY • Sharing resources among staff such as equipment, tools, vehicles, and golf carts • Reduced staffing to provide service levels based on customer and building needs • Best pricing on equipment and supplies • Work order system for tracking 16
  • 16. Centralization Update  Bowen Thompson Student Union, 2013 Maintenance and Custodial Services  Rec Wellness (Fieldhouse and Rec Center) 2014 Maintenance and Custodial Services  Intercollegiate Athletics, 2015 Fields, Facilities, Maintenance & Custodial  Logistics, 2014-2015 Consolidated services from Campus Operations, Residence Life and Capital Planning  Ice Arena and Stroh Center, 2016/17 17
  • 17. 3,600,000 3,800,000 4,000,000 4,200,000 4,400,000 4,600,000 4,800,000 5,000,000 5,200,000 0 50 100 150 200 250 300 350 FY08 FY09 FY10 FY11 FY12 FY13 FY14 FY15 FY16 FY17 TotalCampusGSF StaffFTE Campus Operations Staffing compared to GSF Headcount GSF Staff FTE vs. Square Footage Even with added GSF, Staff FTE is lower 18
  • 18. $0.00 $1.00 $2.00 $3.00 $4.00 $5.00 $6.00 $/GSF Facilities Operating Budget Actuals Daily Service Planned Maintenance Utilities Average Operating Budget Actuals BGSU is operating at $0.25/GSF less than peer institutions 19 Peer Average BGSU $5.30 $5.05 6% decrease; $6.6M in cost avoidance ROPA Peers: California University of PA, Indiana University of PA, Kent State University, Miami University of Ohio, Northern Arizona University, University of Cincinnati, University of New Hampshire, University of North Texas, University of Southern Mississippi,, University of Toledo, and Westfield State University
  • 19. $0.00 $0.05 $0.10 $0.15 $0.20 $0.25 $0.30 $0.35 $0.40 $0.45 $0.50 FY11 FY12 FY13 FY14 FY15 $/GSF Planned Maintenance Planned Maintenance Best Practice Planned Maintenance Continues to Increase FY15 PM efforts put BGSU above peer average 20 $0.00 $0.05 $0.10 $0.15 $0.20 $0.25 $0.30 $0.35 $0.40 $0.45 $0.50 $/GSF Planned Maintenance vs Peers Planned Maintenance Peer Average Best Practice Peers Ordered by Tech Rating 2.3% 3.7% 2.8% 3.3% 6.2%ofBudget
  • 20. Centralization Challenges  Budgeting for Programs vs. Facility Needs  Level of expectations increases with transfer  Policies and Procedure may be localized  Subsidized student employment  “Beck and Call” style of management  Budgetary consistency for Auxiliaries  Trouble letting go of former responsibilities 21
  • 21. Admissions Tour  How do we look from a visitors point of view? Students, Parents, Alumni What makes our campus distinctive? First impressions? Restrooms 22
  • 22. Structure and Organizational  Review of all positions, eliminated duplication and increased consolidation/responsibility/accountability  Flattened the organization  Superintendent Positions  Team Leaders  Moved residential hall maintenance to residential hall supervision  Mechanical Room Organization Project for Campus  739 spaces completed  Established four zones throughout campus for building maintenance responsibility in the Academic Buildings and Auxiliaries 23
  • 23. Communication  Weekly Staff Meetings  Directors Meetings  Semester update and communication meetings with the entire team  Meet with the students at the end of each academic summer semester  Supervision training, monthly safety training/compliance and custodial team training and workshops  Training programs each summer related to customer service  Meetings with the City, USG, Faculty Senate 24
  • 24. Communication  Building Representative Meetings each Semester  Capital Planning  Police  Health and Safety  Scheduled meetings with our customer that include Res Life, Rec Wellness, Athletics and BTSU to discuss projects, concerns and areas of opportunities 25
  • 25. Work Order System  BGSU establishes CMMS specs, decision matrix developed by Supply Chain Management Class  Work Order history since 2012 has been consolidated into one database, providing more accurate records of maintenance needs and Customer Transparency  95,000+ Work Orders submitted  Over 2,070 per month  Average of 100 work orders per day 26
  • 26. Work Orders Increased work order reporting has resulted in increased PM identification 27 0 5,000 10,000 15,000 20,000 25,000 #ofWorkOrders # of Work Orders Daily Service PM 0% 1% 2% 3% 4% 5% 6% 7% %ofWorkOrders % of Work Orders that are PM % PM
  • 27. Technology Improvements and VMI  Introduction of microfiber cleaning systems has reduced our water and chemical usage by 80% in our cleaning procedures. It has also increased labor efficiency in cleaning, as well as reduced the number of injuries on the job.  With the VMI technology, supervisors no longer spend large amounts of time in searching and ordering of parts and supplies. Commonly used parts and supplies are automatically restocked several times a week by the vendors. We have contracts in place for best pricing and are able to hold minimal levels of stock on our shelves. 28
  • 28. Cost Reduction Initiatives  Cross trained movers, painters and carpenters to assist each other during peak workload demands and integrated to perform work concurrently at job site  Increased skill set of painters to do carpeting, floor tile and ceramic tile work eliminating internal silos  Eliminated off campus location for building maintenance  Reduce vehicle count  Promote centralization and consolidation 29
  • 29. Zone Management  We have reduced the vehicle fleet by 10 over the past year by no longer assigning vehicles to individuals, but rather, sharing all vehicles across Zones and 3 shifts. By moving the maintenance techs out into the Zones, vehicles are no longer needed on a daily basis and instead, vehicles are shared within the Zone.  Zone Management has allowed us to right-size to 8 supervisors, a reduction of 3, to provide quality service to the entire campus. We have 4 Zones, each with 2 supervisors, 2 building maintenance techs, and 2 team leaders per zone. 30
  • 30. Zone Management  This model allows for quick response time to customer needs, knowledge of buildings and systems, cross coverage, and familiarity with the needs of the zone occupants. We are working toward the goal of eliminating duplicate efforts and duplicate work of campus personnel.  The flexibility to move staff to accommodate special events on campus as well as coverage for emergencies. We have around the clock supervision on campus that allows us to actively solve problem in the field and deliver swift service. Zone Management provides one point of contact for all customers and they become familiar with our employees and procedures. 31
  • 31. Campus Services  Since Centralizing Logistics Services within Campus Operations from Residence Life and Capital Planning in May 2014, the total number of closed work orders for the Logistics Team is 3,841. Or an average of 213 per month!  Larger pool of resources, providing flexibility and increasing coverage and stability  Increased facilities expertise and focus  Implemented APPA Standards and benchmarks 32
  • 32. Centralization Cost Savings for BTSU $- $100,000 $200,000 $300,000 $400,000 $500,000 $600,000 $700,000 $800,000 $900,000 $1,000,000 2012 Actual 2013 Actual 2014 Actual 2015 Actual 2016 Budget $ Bowen-Thompson Student Union Total Personnel Total Operating Expense and Preventative Maintenance 33 After CentralizationBefore Centralization
  • 33. 34 Sebo Center Entry Before - July 14, 2014 After - Aug 25, 2014
  • 34. Mechanical/Electrical and Physical Plant  Health and Safety Collaboration and Compliance  Preventative Maintenance Programs include: Air Handlers (372), Boilers, Chillers (34), HVAC Filters and Belts, Automatic Doors (154), Elevators (87), Locks and Latches, Backflow Preventers, Steam Traps, Water Treatment, Natural Gas, Electrical Distribution, Fire Alarms, Emergency Generators, Roof Inspections, Suppression Hoods, Fire Pumps and Sprinkler Systems, & Intrusion Alarms (147 reduced to 54). 35
  • 35. Utility Mapping and Energy Management  Accurately track energy consumption across campus allowing more precise measurements related to expense allocations.  Established locations of all utility metering devices on campus for electric, water, gas, irrigation, steam  Mobile devices, tablets, motion devices for technicians to improve customer service and troubleshoot issue 36
  • 36. Energy/Demand Response  Building Automation Systems (BAS) has provided better monitoring and quicker response to heating and cooling needs  Demand response is a way for power companies to shift electricity usage during peak periods to help prevent a grid usage overload during summer  Power companies offer financial incentives to large portfolio customers  BGSU has 87 buildings on campus and currently only 44 (54%) of these buildings are operating under BAS 37
  • 37. Energy Projects Project Total Project Cost Rebate/Green Fund Cost to BGSU Projected Annual Savings Estimated Completion Date Completed Demand Response (2015) $0.00 $0.00 $110,000.00 04/15/14 Capacitors (secondary) $4,000.00 $4,000.00 $145,514.52 08/30/12 Campus Operations LED parking lot $9,264.00 $1,000.00 $8,264.00 $1,674.00 03/24/14 Perry Field House LED $59,974.00 $38,900.00 $21,074.00 $13,000.00 07/21/14 Student Recreation Center LED $18,475.00 $18,475.00 $0.00 $2,529.00 08/15/14 Water Deduct Phase 1 of 2 $40,000.00 $40,000.00 $45,000.00 06/20/15 Capacitors (Primary Electric) $25,000.00 $25,000.00 $71,000.00 03/10/15 Ice Arena Lighting $35,000.00 $17,500.00 $17,500.00 $8,500.00 05/18/15 McFall Gallery Lighting Project $10,701.00 $1,000.00 $9,701.00 $2,394.00 05/22/15 Water Deduct Phase 2 of 2 $30,488.00 $30,488.00 $45,000.00 05/01/15 Pub Kitchen HVAC $13,000.00 $13,000.00 07/01/15 Total $245,902.00 $76,875.00 $169,027.00 $444,611.52 38
  • 38. Sustainability  Three main goals, introduced spring semester, 2013 1. Reduction of Emissions (through efforts with American Colleges & Universities Presidents Climate Commitment now referred to as Climate Leadership Network) 2. Waste Reduction & Resource Conservation 3. Sustainability Education, Outreach & Awareness 39
  • 39. Sustainability Programs  Internships – Open to all majors  Orange Bikes (Community Bike-Rental Program)  Green Office Certification  Green Game Day/Stadium Waste Reduction; average of ton of recycling diverted per home game  Single Stream Recycling, Electronics, batteries, lightbulbs  Once Upon A Desk (Office supply surplus program)  re Store “Thrift Store” sales throughout the year  Friday Night Lights  When You Move Out, Don’t Throw It Out! 40
  • 40. Sustainability/Green Fund Projects  Oaks and Carillon green roof projects, bike racks (EPA grant)  Green roof bike racks –EPA grant  Electric vehicle charging stations (Clean Fuels Ohio grant)  Renewable Energy Feasibility Study/SHP  Electric vehicles  Campus Composting program  Water bottle refilling stations  Energy-producing cardio equipment  Energy “Dashboards”  Since its inception in 2010/11, the Student Green Initiatives Fund has invested over $450,000 into 40 projects.  80% + Participation Rate 41
  • 41. Community Outreach  Campus Services recently developed a relationship with Penta Career Center and WCESC and are currently providing students unpaid internships with Bowling Green State University Grounds Department. The Transition to Work programs provides students “real world” experiences. 42
  • 42. Summary  With Centralization, all operational dollars are dedicated to maintenance and building upkeep. Decisions are based on data collected, deferred maintenance, life cycles, and functional needs, rather than personal/departmental preferences. Real time data from our work order system supports our planning. By focusing dollars on the true maintenance needs of campus, we are able to provide a consistent level of quality services.  And it all started with the Admissions Tour! 43

Editor's Notes

  1. At America’s colleges and universities, physical plant assets are typically worth four to five times the value of financial assets. Despite the importance of these assets to the institutions, most schools do not have tools to measure and monitor facilities with the same rigor as endowment assets. Without the ability to make the most informed decisions, deferred maintenance continues to grow and initiatives to increase preventative maintenance are often delayed. In this presentation, you will learn how Bowling Green State University has used comparative data and predictive analytics to make courageous decisions about the future of their campus. They are able to empirically analyze the effect of demolition and renovation of certain buildings and project the impact of future capital requirements and deferred maintenance. In addition, you will see how peer benchmarking and best-practice analysis helped to make the case for centralizing multiple facilities organizations on campus and creating large savings over a five year period. Join Dr. Bruce A. Meyer, Assistant VP Campus Operations, Bowling Green State University, and Brendon Martin of Sightlines to learn how BGSU has effectively utilized data analytics to strategically pick the right projects and increase effectiveness of operational dollars.
  2. FTE comes from BGSU Fact book for Fall 2015
  3. updated
  4. Different than capital presentation slides?
  5. Last 3 years only