SlideShare a Scribd company logo
1 of 44
Download to read offline
Guide to becoming
LEED accredited
EXAM PREPARATION
SILVER
PLATINUM
GOLD
SHADI ABOU SAMRA
OUTLINE
01
WHAT IS LEED ?
02
WHY GREEN BUILDINGS ?
03
LEED building CERTIFICATION
04
HOW TO BECOME ACCREDITED
registration process
05
LCA VS LCC
06
LEED CATEGORIES
07
10 PRACTICE QUESTIONS
08
TRIPLE BOTTOM LINE
SHADI ABOU SAMRA
WHY GREEN BUILDINGS?
01
Simply, to reduce the impact on the environment
SHADI ABOU SAMRA
MATERIALS
Construction materials use/
waste a lot of natural resources.
CONSTRUCTION
Has high negative
environmental impact on land.
INDOOR POLLUTION
Excessive chemical usage
indoors.
WATER USAGE
High water consumption by
building occupants.
ENERGY USAGE
Buildings consume a lot of
energy, emitting CO2.
SHADI ABOU SAMRA
BUILDING EFFICIENCY IS ONE OF THE MOST affordable ways to cut emissions
SHADI ABOU SAMRA
Leadership in Energy and Environmental Design
A green building certification program used worldwide.
What is leed?
02
SHADI ABOU SAMRA
SUSTAINABILITY
EVALUATION METHOD
RATING FOR BUILDINGS
SHADI ABOU SAMRA
ACCREDITATION CERTIFICATION
CERTIFIED SILVER GOLD PLATINUM
SHADI ABOU SAMRA
accreditation
03
SHADI ABOU SAMRA
No requirement
Must complete 15 continuing education
(ce) hours every 2 years
Green Associate demonstrates the
candidate’s knowledge in green design,
construction and development.
TIER -1
Ce hours can be earned by working on a leed project or watching accredited courses
SHADI ABOU SAMRA
LEED GREEN ASSOCIATE IS REQUIRED
Must complete 30 continuing education (ce) hours
every 2 years
LEED Associate Professional signifies an advanced
depth of knowledge in green building practices and
specialization in a particular LEED Rating.
TIER -2
SHADI ABOU SAMRA
Leed ap IS requireD
Candidates can be self nominated or
nominated by a peer.
Possess a LEED AP credential for 8 years.
Document 10 years of green building
experience.
TIER -3
SHADI ABOU SAMRA
How to achieve the
accreditation ?
SHADI ABOU SAMRA
STEP 2 : REGISTER FOR THE EXAM
1. BROWSE TO USGBC WEBSITE (HTTPS://USGBC.ORG)
2. GO TO CREDENTIALS, CHOOSE LEED GREEN ASSOCIATE
3. CREATE AN ACCOUNT
4. REGISTER THROUGH PAYMENT, DISCOUNT FOR STUDENTS
STEP 3 : CHOOSE A DATE
1. GO TO PROMETRIC WEBSITE (PROMETRIC.COM/GBCI)
2. INPUT YOUR USGBC ID (SENT AFTER PAYMENT REGISTRATION)
3. LOCATE A TEST CENTER (ACCORDING TO YOUR LOCATION)
4. CHOOSE DATE AND TIME
STEP 1: PREPARE FOR THE EXAM
1. LEARN ALL REQUIRED MATERIAL FOR THE TARGETED ACCREDITATION
2. STUDY THROUGH FLASHCARDS TO REFRESH AND GO THROUGH ALL KEY TERMS
3. TAKE ON PRACTICE TESTS TO ASSESS YOUR SCORE
SHADI ABOU SAMRA
EXAM SPECIFICATIONS
2 HOURS
MULTIPLE CHOICE
100 QUESTIONS
PASSING GRADE 170 / 200
SHADI ABOU SAMRA
Building
certification
CERTIFIED silver
gold platinum
04
SHADI ABOU SAMRA
100 - POINT SCALE (+10 BONUS)
CERTIFIED
40 - 49 POINTS
SILVER GOLD PLATINUM
50 - 59 POINTS 60- 79 POINTS 80+ POINTS
SHADI ABOU SAMRA
Leed CATEGORIES
05
SHADI ABOU SAMRA
INTEGRATIVE
PROCESS
LOCATION AND
TRANSPORTATION
SUSTAINABLE SITES WATER EFFICIENCY
ENERGY AND
ATMOSPHERE
MATERIALS AND
RESOURCES
INDOOR
ENVIRONMENTAL
QUALITY
INNOVATION
REGIONAL
PRIORITY
SHADI ABOU SAMRA
How ?
Through a Charette
A workshop with all main team members of the
design team, before schematic design begins.
ARCHITECT, ENGINEERS, COMMISSIONING AUTHORITY, MAIN
CONTRACTOR, BUILDING USERS...
DECISION MAKING
70% of decisions associated with Environmental
impacts are made during the first 10% of the
design process!
INTEGRATIVE PROCESS
TO ACHIEVE synergy throughout the
design and construction process.
SHADI ABOU SAMRA
LEED FOR NEIGHBORHOOD DEVELOPMENT LOCATION
Sensitive land protection
high priority site
surrounding density and diverse uses
access to quality transit
bicycle facilities
reduced parking footprint
green vehicles
Location and
transportation
Connectability to public transportation,
use of alternative transportation modes
SHADI ABOU SAMRA
CONSTRUCTION ACTIVITY POLLUTION PREVENTION
SITE ASSESSMENT
SITE DEVELOPMENT - PROTECT OR RESTORE HABITAT
OPEN SPACE
RAINWATER MANAGEMENT
HEAT ISLAND REDUCTION
LIGHT POLLUTION REDUCTION
Sustainable sites
to ensure a project's site environment is respected,
from planning to construction to management.
SHADI ABOU SAMRA
WATER EFFICIENCY
OUTDOOR WATER USE REDUCTION
INDOOR WATER USE REDUCTION
BUILDING LEVEL WATER METERING
OUTDOOR WATER USE REDUCTION
INDOOR WATER USE REDUCTION
COOLING TOWER WATER USE
BUILDING LEVEL WATER METERING
to encourage smarter use of water, inside and out.
SHADI ABOU SAMRA
Energy and
atmosphere
FUNDAMENTAL COMMISSIONING OF BUILDING ENERGY
MINIMUM ENERGY PERFORMANCE
FUNDAMENTAL REFRIGERANT MANAGEMENT
OPTIMIZE ENERGY PERFORMANCE
ENHANCED COMMISSIONING
ENHANCED REFRIGERANT MANAGEMENT
MEASUREMENT AND VERIFICATION
GREEN POWER
to minimize the use of fossil fuels
SHADI ABOU SAMRA
MATERIALS AND
RESOURCES
storage and collection of recyclables
construction & demolition waste management
building life cycle impact reduction
environmental product declarations (epd)
sourcing of raw materials
material ingredients
to improve the outcomes related to manufacture,
transport, installation and disposal of materials
SHADI ABOU SAMRA
INDOOR ENVIRONMENTAL
QUALITY
Minimum indoor air quality performance
Environmental tobacco smoke control
Enhanced indoor air quality strategies
Low-emitting materials
Construction indoor air quality management plan
Indoor air quality assessment
Thermal comfort
Interior lighting
Daylight
Quality views
Acoustic performance
protect human health, improve quality of life, and
reduce stress and potential injuries
SHADI ABOU SAMRA
INNOVATION
Innovation
Leed accredited professional
incorporate innovative and sustainable features
that go above and beyond the LEED Rating System
SHADI ABOU SAMRA
REGIONAL PRIORITY
Credits specific to the
project location
Regional priority: specific credit
credits that address geographically specific
environmental, social AND public health priorities.
SHADI ABOU SAMRA
Life cycle
assessment
Life cycle
cost
06
vs
SHADI ABOU SAMRA
LIFE CYCLE ASSESSMENT
A METHODOLOGY FOR assessing OR
EVALUATING THE environmental
impacts OF A PRODUCT OR SERVICE.
With all the stages of the life cycle
FROM Cradle to grave analysis.
lca
RAW MATERIAL
EXTRACTION
MANUFACTURING
TRANSPORTATION
USE
END OF LIFE
LIFE CYCLE ANALYSIS OR LCA
SHADI ABOU SAMRA
LIFE CYCLE cost
Cost of Green buildings and advantages of
investing in more efficient building
products/systems.
EXPENSES INCLUDED IN THE ANALYSIS:
● INITIAL COSTS (DESIGN AND CONSTRUCTION)
● HARD COSTS ( EX: BRICKS)
● SOFT COSTS (PERMIT FEES, LEGAL,INSURANCE)
● OPERATING COSTS (ENERGY, WATER, UTILITIES)
● MAINTENANCE, REPAIR AND REPLACEMENT
LCC
SERVICE
COSTS
MAINTENANCE
COSTS
OPERATING
COSTS
DISPOSAL
COSTS
INITIAL
COSTS
SHADI ABOU SAMRA
TRIPLE BOTTOM LINE
PEOPLE
PLANET
PROFIT
07
A business concept that pushes firms to
measure their social and environmental
impact, in addition to their financial
performance. Rather than focusing only
on profit.
SHADI ABOU SAMRA
JUST LIKE THE OFFICIAL EXAM
10 Practice questions
08
SHADI ABOU SAMRA
A. Linear
B. Multistage
C. Integrative
D. Tiered
01 GREEN BUILDINGs EMPHASIZES USING WHAT TYPE OF DESIGN PROCESS?
SHADI ABOU SAMRA
A. Economic Prosperity, Environmental Stewardship, And Social Responsibility
B. Economic Theory, Cultural Agendas, And Global Variety
C. Energy Efficiency, Water Efficiency, And Indoor Environmental Quality
D. Government Standards, Building Codes, And Building Practices
02
WHAT ARE THE THREE DIMENSIONS OF SUSTAINABILITY OFTEN
DESCRIBED AS THE TRIPLE BOTTOM LINE OR THE THREE-LEGGED STOOL?
SHADI ABOU SAMRA
A. Balance Of Natural Cycles Such As The Hydrologic Cycle
B. Environmental Aspects And Potential Impacts Of A Given Product
C. Lifespan Of A Building And Its Components
D. Environmental Systems Affected Over The Life Of A Building
03 LIFE-CYCLE ASSESSMENT IS USED TO DETERMINE THE ___?
SHADI ABOU SAMRA
A. Predesign
B. Schematic Design
C. Design Development
D. Construction Documents
E. Construction
04
WHEN IS THE BEST TIME TO INCORPORATE AN INTEGRATIVE APPROACH
FOR A BUILDING PROJECT?
SHADI ABOU SAMRA
A. Conserve Natural Resources
B. Reduce Solid Waste
C. Improve Air And Water Quality
D. Enhance And Protect Ecosystems And Biodiversity
E. All Of The Above
05
Which of the following is an environmental benefit of green
buildings?
SHADI ABOU SAMRA
A. Achieving The Highest Leed Rating Possible
B. Maximizing Opportunities For Integrated, Cost-Effective Green Design And Construction
Strategies
C. Reducing Costs Over Traditional Construction Practices
D. Obtaining Local, State, And Federal Incentives For A Green Design And Construction Strategies
06 What is the primary benefit of an integrated process?
SHADI ABOU SAMRA
A. Civil Engineer Consulting Fee
B. Rental Of A Dumpster
C. Down Payment On The Property
D. Purchase Of Some Steel
07
Which of the following would be classified as a soft
construction cost?
SHADI ABOU SAMRA
A. Durability analysis
B. Soft cost
C. Life cycle costing
D. Hard cost
E. Life cycle analysis
08
What term refers to the investigation and valuation of the
environmental impacts of a given product or service caused or
necessitated by its existence?
SHADI ABOU SAMRA
09
How does a life cycle assessment(LCA) differ from life cycle
costing(LCC)?
A. LCA is cradle-to-cradle while LCC is not
B. LCA does not take into account economic performance while LCC does
C. LCA does not take into account economic environmental performance while LCC does
D. LCA takes into account economic performance while LCC does not
SHADI ABOU SAMRA
10
Sustainable design strategies are effectively implemented
only by using?
A. Incremental approach
B. Whole building approach
C. Flexible approach
D. Conventional approach
SHADI ABOU SAMRA
Guide to becoming leed accredited
COMPLETEd
NEXT > COMPLETE LEED TRAINING
SHADI ABOU SAMRA

More Related Content

Similar to LEED Exam Prep

Sustainable Design Part Five: Assessment Systems
Sustainable Design Part Five: Assessment SystemsSustainable Design Part Five: Assessment Systems
Sustainable Design Part Five: Assessment SystemsTerri Meyer Boake
 
Introduction to IGBC Green Factory Rating System_January 2015
Introduction to IGBC Green Factory Rating System_January 2015Introduction to IGBC Green Factory Rating System_January 2015
Introduction to IGBC Green Factory Rating System_January 2015Godrej Green Building Consultancy
 
Business Case for Green Development in Middle East
Business Case for Green Development in Middle EastBusiness Case for Green Development in Middle East
Business Case for Green Development in Middle EastJerry Yudelson
 
July2013 ghnyc -alternatives to leed
July2013 ghnyc -alternatives to leedJuly2013 ghnyc -alternatives to leed
July2013 ghnyc -alternatives to leedGreenHomeNYC
 
Leed v4-view-from-mep-seats-140429
Leed v4-view-from-mep-seats-140429Leed v4-view-from-mep-seats-140429
Leed v4-view-from-mep-seats-140429Scott Bowman
 
July2013 ghnyc -alternatives to leed-7-17-13
July2013 ghnyc -alternatives to leed-7-17-13July2013 ghnyc -alternatives to leed-7-17-13
July2013 ghnyc -alternatives to leed-7-17-13GreenHomeNYC
 
Business Case for Green Buildings
Business Case for Green Buildings Business Case for Green Buildings
Business Case for Green Buildings Ibrahim Al-Hudhaif
 
Presentation on IGBC Green service Buildings Rating System
Presentation on IGBC Green service Buildings Rating SystemPresentation on IGBC Green service Buildings Rating System
Presentation on IGBC Green service Buildings Rating SystemIGBC Green Building Congress
 
Kn Series Leed Certification 6 15 09
Kn Series Leed Certification 6 15 09Kn Series Leed Certification 6 15 09
Kn Series Leed Certification 6 15 09tkeesee
 
Get An Attractive Score in USGBC LEED Green Associate Certification Exam
Get An Attractive Score in USGBC LEED Green Associate Certification ExamGet An Attractive Score in USGBC LEED Green Associate Certification Exam
Get An Attractive Score in USGBC LEED Green Associate Certification ExamMeghna Arora
 
Hotelaria sustentável
Hotelaria sustentávelHotelaria sustentável
Hotelaria sustentávelGabriela Otto
 
Sustainable Aviation - Cleaner, Quieter , Smarter
Sustainable Aviation - Cleaner, Quieter , Smarter  Sustainable Aviation - Cleaner, Quieter , Smarter
Sustainable Aviation - Cleaner, Quieter , Smarter Akshaykumar More
 
Mr Raghupathy - Green Buillding - CleanTech SIG Mumbai
Mr Raghupathy - Green Buillding - CleanTech SIG MumbaiMr Raghupathy - Green Buillding - CleanTech SIG Mumbai
Mr Raghupathy - Green Buillding - CleanTech SIG Mumbaimaggax
 

Similar to LEED Exam Prep (20)

Sustainable Design Part Five: Assessment Systems
Sustainable Design Part Five: Assessment SystemsSustainable Design Part Five: Assessment Systems
Sustainable Design Part Five: Assessment Systems
 
Introduction to IGBC Green Factory Rating System_January 2015
Introduction to IGBC Green Factory Rating System_January 2015Introduction to IGBC Green Factory Rating System_January 2015
Introduction to IGBC Green Factory Rating System_January 2015
 
Green Brochure
Green BrochureGreen Brochure
Green Brochure
 
Business Case for Green Development in Middle East
Business Case for Green Development in Middle EastBusiness Case for Green Development in Middle East
Business Case for Green Development in Middle East
 
Leed Green Associate Study Slides
Leed Green Associate Study SlidesLeed Green Associate Study Slides
Leed Green Associate Study Slides
 
July2013 ghnyc -alternatives to leed
July2013 ghnyc -alternatives to leedJuly2013 ghnyc -alternatives to leed
July2013 ghnyc -alternatives to leed
 
Leed v4-view-from-mep-seats-140429
Leed v4-view-from-mep-seats-140429Leed v4-view-from-mep-seats-140429
Leed v4-view-from-mep-seats-140429
 
Why Build Green?
Why Build Green?Why Build Green?
Why Build Green?
 
July2013 ghnyc -alternatives to leed-7-17-13
July2013 ghnyc -alternatives to leed-7-17-13July2013 ghnyc -alternatives to leed-7-17-13
July2013 ghnyc -alternatives to leed-7-17-13
 
Usgbc intro
Usgbc introUsgbc intro
Usgbc intro
 
Business Case for Green Buildings
Business Case for Green Buildings Business Case for Green Buildings
Business Case for Green Buildings
 
Presentation on IGBC Green service Buildings Rating System
Presentation on IGBC Green service Buildings Rating SystemPresentation on IGBC Green service Buildings Rating System
Presentation on IGBC Green service Buildings Rating System
 
Kn Series Leed Certification 6 15 09
Kn Series Leed Certification 6 15 09Kn Series Leed Certification 6 15 09
Kn Series Leed Certification 6 15 09
 
Get An Attractive Score in USGBC LEED Green Associate Certification Exam
Get An Attractive Score in USGBC LEED Green Associate Certification ExamGet An Attractive Score in USGBC LEED Green Associate Certification Exam
Get An Attractive Score in USGBC LEED Green Associate Certification Exam
 
Hotelaria sustentável
Hotelaria sustentávelHotelaria sustentável
Hotelaria sustentável
 
Sustainable Aviation - Cleaner, Quieter , Smarter
Sustainable Aviation - Cleaner, Quieter , Smarter  Sustainable Aviation - Cleaner, Quieter , Smarter
Sustainable Aviation - Cleaner, Quieter , Smarter
 
Green building rating system
Green building rating systemGreen building rating system
Green building rating system
 
Indian green league intro
Indian green league   introIndian green league   intro
Indian green league intro
 
Mr Raghupathy - Green Buillding - CleanTech SIG Mumbai
Mr Raghupathy - Green Buillding - CleanTech SIG MumbaiMr Raghupathy - Green Buillding - CleanTech SIG Mumbai
Mr Raghupathy - Green Buillding - CleanTech SIG Mumbai
 
Green
GreenGreen
Green
 

Recently uploaded

Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application ) Sakshi Ghasle
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpinRaunakKeshri1
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeThiyagu K
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppCeline George
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionSafetyChain Software
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxRoyAbrique
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991RKavithamani
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactPECB
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxpboyjonauth
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3JemimahLaneBuaron
 

Recently uploaded (20)

Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application )
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpin
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website App
 
Staff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSDStaff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSD
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory Inspection
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptx
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3
 

LEED Exam Prep

  • 1. Guide to becoming LEED accredited EXAM PREPARATION SILVER PLATINUM GOLD SHADI ABOU SAMRA
  • 2. OUTLINE 01 WHAT IS LEED ? 02 WHY GREEN BUILDINGS ? 03 LEED building CERTIFICATION 04 HOW TO BECOME ACCREDITED registration process 05 LCA VS LCC 06 LEED CATEGORIES 07 10 PRACTICE QUESTIONS 08 TRIPLE BOTTOM LINE SHADI ABOU SAMRA
  • 3. WHY GREEN BUILDINGS? 01 Simply, to reduce the impact on the environment SHADI ABOU SAMRA
  • 4. MATERIALS Construction materials use/ waste a lot of natural resources. CONSTRUCTION Has high negative environmental impact on land. INDOOR POLLUTION Excessive chemical usage indoors. WATER USAGE High water consumption by building occupants. ENERGY USAGE Buildings consume a lot of energy, emitting CO2. SHADI ABOU SAMRA
  • 5. BUILDING EFFICIENCY IS ONE OF THE MOST affordable ways to cut emissions SHADI ABOU SAMRA
  • 6. Leadership in Energy and Environmental Design A green building certification program used worldwide. What is leed? 02 SHADI ABOU SAMRA
  • 7. SUSTAINABILITY EVALUATION METHOD RATING FOR BUILDINGS SHADI ABOU SAMRA
  • 8. ACCREDITATION CERTIFICATION CERTIFIED SILVER GOLD PLATINUM SHADI ABOU SAMRA
  • 10. No requirement Must complete 15 continuing education (ce) hours every 2 years Green Associate demonstrates the candidate’s knowledge in green design, construction and development. TIER -1 Ce hours can be earned by working on a leed project or watching accredited courses SHADI ABOU SAMRA
  • 11. LEED GREEN ASSOCIATE IS REQUIRED Must complete 30 continuing education (ce) hours every 2 years LEED Associate Professional signifies an advanced depth of knowledge in green building practices and specialization in a particular LEED Rating. TIER -2 SHADI ABOU SAMRA
  • 12. Leed ap IS requireD Candidates can be self nominated or nominated by a peer. Possess a LEED AP credential for 8 years. Document 10 years of green building experience. TIER -3 SHADI ABOU SAMRA
  • 13. How to achieve the accreditation ? SHADI ABOU SAMRA
  • 14. STEP 2 : REGISTER FOR THE EXAM 1. BROWSE TO USGBC WEBSITE (HTTPS://USGBC.ORG) 2. GO TO CREDENTIALS, CHOOSE LEED GREEN ASSOCIATE 3. CREATE AN ACCOUNT 4. REGISTER THROUGH PAYMENT, DISCOUNT FOR STUDENTS STEP 3 : CHOOSE A DATE 1. GO TO PROMETRIC WEBSITE (PROMETRIC.COM/GBCI) 2. INPUT YOUR USGBC ID (SENT AFTER PAYMENT REGISTRATION) 3. LOCATE A TEST CENTER (ACCORDING TO YOUR LOCATION) 4. CHOOSE DATE AND TIME STEP 1: PREPARE FOR THE EXAM 1. LEARN ALL REQUIRED MATERIAL FOR THE TARGETED ACCREDITATION 2. STUDY THROUGH FLASHCARDS TO REFRESH AND GO THROUGH ALL KEY TERMS 3. TAKE ON PRACTICE TESTS TO ASSESS YOUR SCORE SHADI ABOU SAMRA
  • 15. EXAM SPECIFICATIONS 2 HOURS MULTIPLE CHOICE 100 QUESTIONS PASSING GRADE 170 / 200 SHADI ABOU SAMRA
  • 17. 100 - POINT SCALE (+10 BONUS) CERTIFIED 40 - 49 POINTS SILVER GOLD PLATINUM 50 - 59 POINTS 60- 79 POINTS 80+ POINTS SHADI ABOU SAMRA
  • 19. INTEGRATIVE PROCESS LOCATION AND TRANSPORTATION SUSTAINABLE SITES WATER EFFICIENCY ENERGY AND ATMOSPHERE MATERIALS AND RESOURCES INDOOR ENVIRONMENTAL QUALITY INNOVATION REGIONAL PRIORITY SHADI ABOU SAMRA
  • 20. How ? Through a Charette A workshop with all main team members of the design team, before schematic design begins. ARCHITECT, ENGINEERS, COMMISSIONING AUTHORITY, MAIN CONTRACTOR, BUILDING USERS... DECISION MAKING 70% of decisions associated with Environmental impacts are made during the first 10% of the design process! INTEGRATIVE PROCESS TO ACHIEVE synergy throughout the design and construction process. SHADI ABOU SAMRA
  • 21. LEED FOR NEIGHBORHOOD DEVELOPMENT LOCATION Sensitive land protection high priority site surrounding density and diverse uses access to quality transit bicycle facilities reduced parking footprint green vehicles Location and transportation Connectability to public transportation, use of alternative transportation modes SHADI ABOU SAMRA
  • 22. CONSTRUCTION ACTIVITY POLLUTION PREVENTION SITE ASSESSMENT SITE DEVELOPMENT - PROTECT OR RESTORE HABITAT OPEN SPACE RAINWATER MANAGEMENT HEAT ISLAND REDUCTION LIGHT POLLUTION REDUCTION Sustainable sites to ensure a project's site environment is respected, from planning to construction to management. SHADI ABOU SAMRA
  • 23. WATER EFFICIENCY OUTDOOR WATER USE REDUCTION INDOOR WATER USE REDUCTION BUILDING LEVEL WATER METERING OUTDOOR WATER USE REDUCTION INDOOR WATER USE REDUCTION COOLING TOWER WATER USE BUILDING LEVEL WATER METERING to encourage smarter use of water, inside and out. SHADI ABOU SAMRA
  • 24. Energy and atmosphere FUNDAMENTAL COMMISSIONING OF BUILDING ENERGY MINIMUM ENERGY PERFORMANCE FUNDAMENTAL REFRIGERANT MANAGEMENT OPTIMIZE ENERGY PERFORMANCE ENHANCED COMMISSIONING ENHANCED REFRIGERANT MANAGEMENT MEASUREMENT AND VERIFICATION GREEN POWER to minimize the use of fossil fuels SHADI ABOU SAMRA
  • 25. MATERIALS AND RESOURCES storage and collection of recyclables construction & demolition waste management building life cycle impact reduction environmental product declarations (epd) sourcing of raw materials material ingredients to improve the outcomes related to manufacture, transport, installation and disposal of materials SHADI ABOU SAMRA
  • 26. INDOOR ENVIRONMENTAL QUALITY Minimum indoor air quality performance Environmental tobacco smoke control Enhanced indoor air quality strategies Low-emitting materials Construction indoor air quality management plan Indoor air quality assessment Thermal comfort Interior lighting Daylight Quality views Acoustic performance protect human health, improve quality of life, and reduce stress and potential injuries SHADI ABOU SAMRA
  • 27. INNOVATION Innovation Leed accredited professional incorporate innovative and sustainable features that go above and beyond the LEED Rating System SHADI ABOU SAMRA
  • 28. REGIONAL PRIORITY Credits specific to the project location Regional priority: specific credit credits that address geographically specific environmental, social AND public health priorities. SHADI ABOU SAMRA
  • 30. LIFE CYCLE ASSESSMENT A METHODOLOGY FOR assessing OR EVALUATING THE environmental impacts OF A PRODUCT OR SERVICE. With all the stages of the life cycle FROM Cradle to grave analysis. lca RAW MATERIAL EXTRACTION MANUFACTURING TRANSPORTATION USE END OF LIFE LIFE CYCLE ANALYSIS OR LCA SHADI ABOU SAMRA
  • 31. LIFE CYCLE cost Cost of Green buildings and advantages of investing in more efficient building products/systems. EXPENSES INCLUDED IN THE ANALYSIS: ● INITIAL COSTS (DESIGN AND CONSTRUCTION) ● HARD COSTS ( EX: BRICKS) ● SOFT COSTS (PERMIT FEES, LEGAL,INSURANCE) ● OPERATING COSTS (ENERGY, WATER, UTILITIES) ● MAINTENANCE, REPAIR AND REPLACEMENT LCC SERVICE COSTS MAINTENANCE COSTS OPERATING COSTS DISPOSAL COSTS INITIAL COSTS SHADI ABOU SAMRA
  • 32. TRIPLE BOTTOM LINE PEOPLE PLANET PROFIT 07 A business concept that pushes firms to measure their social and environmental impact, in addition to their financial performance. Rather than focusing only on profit. SHADI ABOU SAMRA
  • 33. JUST LIKE THE OFFICIAL EXAM 10 Practice questions 08 SHADI ABOU SAMRA
  • 34. A. Linear B. Multistage C. Integrative D. Tiered 01 GREEN BUILDINGs EMPHASIZES USING WHAT TYPE OF DESIGN PROCESS? SHADI ABOU SAMRA
  • 35. A. Economic Prosperity, Environmental Stewardship, And Social Responsibility B. Economic Theory, Cultural Agendas, And Global Variety C. Energy Efficiency, Water Efficiency, And Indoor Environmental Quality D. Government Standards, Building Codes, And Building Practices 02 WHAT ARE THE THREE DIMENSIONS OF SUSTAINABILITY OFTEN DESCRIBED AS THE TRIPLE BOTTOM LINE OR THE THREE-LEGGED STOOL? SHADI ABOU SAMRA
  • 36. A. Balance Of Natural Cycles Such As The Hydrologic Cycle B. Environmental Aspects And Potential Impacts Of A Given Product C. Lifespan Of A Building And Its Components D. Environmental Systems Affected Over The Life Of A Building 03 LIFE-CYCLE ASSESSMENT IS USED TO DETERMINE THE ___? SHADI ABOU SAMRA
  • 37. A. Predesign B. Schematic Design C. Design Development D. Construction Documents E. Construction 04 WHEN IS THE BEST TIME TO INCORPORATE AN INTEGRATIVE APPROACH FOR A BUILDING PROJECT? SHADI ABOU SAMRA
  • 38. A. Conserve Natural Resources B. Reduce Solid Waste C. Improve Air And Water Quality D. Enhance And Protect Ecosystems And Biodiversity E. All Of The Above 05 Which of the following is an environmental benefit of green buildings? SHADI ABOU SAMRA
  • 39. A. Achieving The Highest Leed Rating Possible B. Maximizing Opportunities For Integrated, Cost-Effective Green Design And Construction Strategies C. Reducing Costs Over Traditional Construction Practices D. Obtaining Local, State, And Federal Incentives For A Green Design And Construction Strategies 06 What is the primary benefit of an integrated process? SHADI ABOU SAMRA
  • 40. A. Civil Engineer Consulting Fee B. Rental Of A Dumpster C. Down Payment On The Property D. Purchase Of Some Steel 07 Which of the following would be classified as a soft construction cost? SHADI ABOU SAMRA
  • 41. A. Durability analysis B. Soft cost C. Life cycle costing D. Hard cost E. Life cycle analysis 08 What term refers to the investigation and valuation of the environmental impacts of a given product or service caused or necessitated by its existence? SHADI ABOU SAMRA
  • 42. 09 How does a life cycle assessment(LCA) differ from life cycle costing(LCC)? A. LCA is cradle-to-cradle while LCC is not B. LCA does not take into account economic performance while LCC does C. LCA does not take into account economic environmental performance while LCC does D. LCA takes into account economic performance while LCC does not SHADI ABOU SAMRA
  • 43. 10 Sustainable design strategies are effectively implemented only by using? A. Incremental approach B. Whole building approach C. Flexible approach D. Conventional approach SHADI ABOU SAMRA
  • 44. Guide to becoming leed accredited COMPLETEd NEXT > COMPLETE LEED TRAINING SHADI ABOU SAMRA