Green buildings are designed to reduce environmental impact through energy efficiency and sustainable materials. A feasibility study found the proposed IRICEN administrative building could achieve LEED India Platinum certification, the highest rating, with 61 points. Key aspects like alternative transportation, reduced site disturbance, stormwater management and heat island reduction were identified as achievable credits. The building's orientation, insulation, renewable energy and water recycling strategies positioned it well for high performance green building certification.