PROBLEMS IN BORED PILE  CONSTRUCTION  ,[object Object],[object Object],[object Object]
SCOPE 1. EXCAVATION OF PILE BORE 2. DESIGN AND LOWERING OF PILE REINFORCEMENT 3. CONCRETING THE PILE
TABLE OF CONTENTS ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
2.DESIGN AND LOWERING OF PILE  REINFORCEMENT 2.1 DESIGN OF PILE REINFORCEMENT   2.2 LOWERING OF PILE REINFORCEMENT
3. CONCRETING THE PILE BORE 3.1 QUALITY OF CONCRETE 3.2 PLACING OF CONCRETE 3.3 EXTRACTING TEMPORAEY CASING 3.4 PROBLEMS IN SOFT GROUND
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
WET DRILLING  BY REVERSE ROTARY
[object Object],[object Object],[object Object],[object Object],[object Object]
OVER BREAK
  1.4 BASE OF BOREHOLE ,[object Object],[object Object],[object Object],[object Object],[object Object]
1.5 EFFECT OF W/T In dry drilling of borehole ingress of small quantity of water from sides of the borehole reduces the Skin Friction and from the bottom of borehole reduces the End Bearing. In this condition concreting should be carried out with Tremmie Pipe otherwise segregation of concrete may occur as shown in Fig. SEGREGATION OF CONCRETE
2. DESIGN & LOWERING OF PILE  REINFORCEMENT  ,[object Object],[object Object],[object Object],[object Object],[object Object]
SPACING DRAGS DOWNWARD
2.2 LOWERING OF PILE REINFORCEMENT ,[object Object],[object Object]
LAP OF CAGE
3. CONCRETING THE PILE Concreting of cost-in-situ piles is a special operation and it requires considerable skill and correct concrete mix design. ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
SLUMP TEST
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
OVERFLOW OF CONCRETE
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
CONDUCTOR PIPE
3.4 PROBLEMS IN SOFT GROUND In soft ground having undrained shear strength less than 15kn/m 2  causing the squeezing of the pile section near the head because lateral pressure of soil is more than the lateral pressure of concrete as shown in Fig.  SQUEEZING OF THE PILE SECTION
CONCLUSIONS Full time supervision of pile construction should be carried out by an experienced Engineer which gives us the designed pile capacity
THANKS THANKS THANKS
ANY QUESTION?

More Related Content

What's hot

PHC pile Installation methods
PHC  pile Installation methodsPHC  pile Installation methods
PHC pile Installation methods
Halim Rahman
 
Cofferdam
CofferdamCofferdam
Cofferdam
Shashank Namdeo
 
Bearing capacity of Soil
Bearing capacity of SoilBearing capacity of Soil
Bearing capacity of Soil
Pirpasha Ujede
 
Pile foundations
Pile foundationsPile foundations
Pile foundations
Riya Trivedi
 
Foundation and its types
Foundation and its typesFoundation and its types
Foundation and its types
Satish Kambaliya
 
Deep excavations
Deep excavationsDeep excavations
Deep excavations
Bhargava Ram
 
Under water concrete
Under water concreteUnder water concrete
Under water concrete
Muftah Aljoat
 
Coffer dam and its type
Coffer dam and its typeCoffer dam and its type
Coffer dam and its type
Gaurang Kakadiya
 
BALANCED CANTILEVER BRIDGE
BALANCED CANTILEVER BRIDGEBALANCED CANTILEVER BRIDGE
BALANCED CANTILEVER BRIDGE
srinivas cnu
 
Driven & Bored Piles
Driven & Bored PilesDriven & Bored Piles
Driven & Bored PilesAhmed Zanaty
 
Sinking of well foundation
Sinking of well foundationSinking of well foundation
Sinking of well foundation
Sourabh Jain
 
Presentation1 integrity problems of concrete piles-emergency
Presentation1 integrity problems of concrete piles-emergencyPresentation1 integrity problems of concrete piles-emergency
Presentation1 integrity problems of concrete piles-emergency
Super Arc Consultant
 
Spun pile
Spun pileSpun pile
Spun pile
Wen Crystal
 
Underpinning
UnderpinningUnderpinning
Underpinning
YingHongKang
 
Pile Foundations
Pile FoundationsPile Foundations
Pile Foundations
VARANASI RAMA RAO
 
Settlement of piles
Settlement of pilesSettlement of piles
Settlement of piles
Latif Hyder Wadho
 
Well Foundation
Well FoundationWell Foundation
Well Foundation
Dave Chinmyee
 
Pile integrity test
Pile integrity testPile integrity test
Pile integrity test
Sabna Thilakan
 
Bearing Capacity of Shallow Foundation
Bearing Capacity of Shallow FoundationBearing Capacity of Shallow Foundation
Bearing Capacity of Shallow Foundation
Arbaz Kazi
 

What's hot (20)

PHC pile Installation methods
PHC  pile Installation methodsPHC  pile Installation methods
PHC pile Installation methods
 
Cofferdam
CofferdamCofferdam
Cofferdam
 
Bearing capacity of Soil
Bearing capacity of SoilBearing capacity of Soil
Bearing capacity of Soil
 
Pile foundations
Pile foundationsPile foundations
Pile foundations
 
Foundation and its types
Foundation and its typesFoundation and its types
Foundation and its types
 
Deep excavations
Deep excavationsDeep excavations
Deep excavations
 
DMC Piling
DMC PilingDMC Piling
DMC Piling
 
Under water concrete
Under water concreteUnder water concrete
Under water concrete
 
Coffer dam and its type
Coffer dam and its typeCoffer dam and its type
Coffer dam and its type
 
BALANCED CANTILEVER BRIDGE
BALANCED CANTILEVER BRIDGEBALANCED CANTILEVER BRIDGE
BALANCED CANTILEVER BRIDGE
 
Driven & Bored Piles
Driven & Bored PilesDriven & Bored Piles
Driven & Bored Piles
 
Sinking of well foundation
Sinking of well foundationSinking of well foundation
Sinking of well foundation
 
Presentation1 integrity problems of concrete piles-emergency
Presentation1 integrity problems of concrete piles-emergencyPresentation1 integrity problems of concrete piles-emergency
Presentation1 integrity problems of concrete piles-emergency
 
Spun pile
Spun pileSpun pile
Spun pile
 
Underpinning
UnderpinningUnderpinning
Underpinning
 
Pile Foundations
Pile FoundationsPile Foundations
Pile Foundations
 
Settlement of piles
Settlement of pilesSettlement of piles
Settlement of piles
 
Well Foundation
Well FoundationWell Foundation
Well Foundation
 
Pile integrity test
Pile integrity testPile integrity test
Pile integrity test
 
Bearing Capacity of Shallow Foundation
Bearing Capacity of Shallow FoundationBearing Capacity of Shallow Foundation
Bearing Capacity of Shallow Foundation
 

Similar to Problem in bored pile

special concrete and high performance concrete
special concrete and high performance concretespecial concrete and high performance concrete
special concrete and high performance concrete
ErankajKumar
 
Cementation
CementationCementation
Cementation
Dictor Omien
 
Concrete
ConcreteConcrete
Concrete
Sameer Nawab
 
Abrasion, erotion and cavitation
Abrasion, erotion and cavitationAbrasion, erotion and cavitation
Abrasion, erotion and cavitation
Chetan1357
 
Concrete
ConcreteConcrete
Concrete
Nour Salo
 
Concrete- Classification,Properties and Testing
Concrete- Classification,Properties and TestingConcrete- Classification,Properties and Testing
Concrete- Classification,Properties and Testing
Rishabh Lala
 
Crack repair in building construction
Crack repair in building constructionCrack repair in building construction
Crack repair in building construction
Kiran Hadiya
 
Workability of Concrete.ppt
Workability of Concrete.pptWorkability of Concrete.ppt
Workability of Concrete.ppt
Raju S
 
Asif2 CONSTRUCTION_OF_RIGID_PAVEMENT.pptx
Asif2 CONSTRUCTION_OF_RIGID_PAVEMENT.pptxAsif2 CONSTRUCTION_OF_RIGID_PAVEMENT.pptx
Asif2 CONSTRUCTION_OF_RIGID_PAVEMENT.pptx
sfQyoom
 
Types of failure in rigid pavements
Types of failure in rigid pavementsTypes of failure in rigid pavements
Types of failure in rigid pavements
Aglaia Connect
 
Formwork failures and remedial measures
Formwork failures and remedial measuresFormwork failures and remedial measures
Formwork failures and remedial measures
sabnisajit
 
Distress of concrete structures & their repair techniques
Distress of concrete structures & their repair techniquesDistress of concrete structures & their repair techniques
Distress of concrete structures & their repair techniquesZaid Ansari
 
NAT Paper Final Version-Matt Jabbari-011414
NAT Paper Final Version-Matt Jabbari-011414NAT Paper Final Version-Matt Jabbari-011414
NAT Paper Final Version-Matt Jabbari-011414Matt Jabbari
 
Nat paper final version matt jabbari-011414
Nat paper final version matt jabbari-011414Nat paper final version matt jabbari-011414
Nat paper final version matt jabbari-011414Matt Jabbari
 
Shakshi Joshi.pptx
Shakshi Joshi.pptxShakshi Joshi.pptx
Shakshi Joshi.pptx
MOHAMMADADNANSAMI1
 

Similar to Problem in bored pile (20)

special concrete and high performance concrete
special concrete and high performance concretespecial concrete and high performance concrete
special concrete and high performance concrete
 
Cementation
CementationCementation
Cementation
 
Cip
CipCip
Cip
 
Concrete
ConcreteConcrete
Concrete
 
Abrasion, erotion and cavitation
Abrasion, erotion and cavitationAbrasion, erotion and cavitation
Abrasion, erotion and cavitation
 
Concrete
ConcreteConcrete
Concrete
 
CONCRETE
CONCRETECONCRETE
CONCRETE
 
Concrete- Classification,Properties and Testing
Concrete- Classification,Properties and TestingConcrete- Classification,Properties and Testing
Concrete- Classification,Properties and Testing
 
Microtunel Construction / Secant Pile
Microtunel Construction / Secant PileMicrotunel Construction / Secant Pile
Microtunel Construction / Secant Pile
 
Unit one
Unit oneUnit one
Unit one
 
Workability of Concrete.ppt
Workability of Concrete.pptWorkability of Concrete.ppt
Workability of Concrete.ppt
 
Crack repair in building construction
Crack repair in building constructionCrack repair in building construction
Crack repair in building construction
 
Workability of Concrete.ppt
Workability of Concrete.pptWorkability of Concrete.ppt
Workability of Concrete.ppt
 
Asif2 CONSTRUCTION_OF_RIGID_PAVEMENT.pptx
Asif2 CONSTRUCTION_OF_RIGID_PAVEMENT.pptxAsif2 CONSTRUCTION_OF_RIGID_PAVEMENT.pptx
Asif2 CONSTRUCTION_OF_RIGID_PAVEMENT.pptx
 
Types of failure in rigid pavements
Types of failure in rigid pavementsTypes of failure in rigid pavements
Types of failure in rigid pavements
 
Formwork failures and remedial measures
Formwork failures and remedial measuresFormwork failures and remedial measures
Formwork failures and remedial measures
 
Distress of concrete structures & their repair techniques
Distress of concrete structures & their repair techniquesDistress of concrete structures & their repair techniques
Distress of concrete structures & their repair techniques
 
NAT Paper Final Version-Matt Jabbari-011414
NAT Paper Final Version-Matt Jabbari-011414NAT Paper Final Version-Matt Jabbari-011414
NAT Paper Final Version-Matt Jabbari-011414
 
Nat paper final version matt jabbari-011414
Nat paper final version matt jabbari-011414Nat paper final version matt jabbari-011414
Nat paper final version matt jabbari-011414
 
Shakshi Joshi.pptx
Shakshi Joshi.pptxShakshi Joshi.pptx
Shakshi Joshi.pptx
 

More from Rizwan Khurram

Exploring the risk factors associated with peb projects in lahore.
Exploring the risk factors associated with peb projects in lahore.Exploring the risk factors associated with peb projects in lahore.
Exploring the risk factors associated with peb projects in lahore.
Rizwan Khurram
 
Information Technology Project Management - part 11
Information Technology Project Management - part 11Information Technology Project Management - part 11
Information Technology Project Management - part 11Rizwan Khurram
 
Information Technology Project Management - part 10
Information Technology Project Management - part 10Information Technology Project Management - part 10
Information Technology Project Management - part 10Rizwan Khurram
 
Information Technology Project Management - part 09
Information Technology Project Management - part 09Information Technology Project Management - part 09
Information Technology Project Management - part 09Rizwan Khurram
 
Information Technology Project Management - part 08
Information Technology Project Management - part  08Information Technology Project Management - part  08
Information Technology Project Management - part 08Rizwan Khurram
 
Information Technology Project Management - part 07
Information Technology Project Management - part 07Information Technology Project Management - part 07
Information Technology Project Management - part 07
Rizwan Khurram
 
Information Technology Project Management - part 05
Information Technology Project Management - part 05Information Technology Project Management - part 05
Information Technology Project Management - part 05Rizwan Khurram
 
Information Technology Project Management - part 04
Information Technology Project Management - part 04Information Technology Project Management - part 04
Information Technology Project Management - part 04Rizwan Khurram
 
Information Technology Project Management - part 02
Information Technology Project Management - part 02Information Technology Project Management - part 02
Information Technology Project Management - part 02Rizwan Khurram
 
Information Technology Project Management - part 01
Information Technology Project Management - part 01Information Technology Project Management - part 01
Information Technology Project Management - part 01Rizwan Khurram
 
Information Technology Project Management - part 12
Information Technology Project Management - part 12Information Technology Project Management - part 12
Information Technology Project Management - part 12
Rizwan Khurram
 
Strategic Delivery of Change Management
Strategic Delivery of Change Management Strategic Delivery of Change Management
Strategic Delivery of Change Management Rizwan Khurram
 
Strategic Delivery of Change Management
Strategic Delivery of Change Management Strategic Delivery of Change Management
Strategic Delivery of Change Management Rizwan Khurram
 
Strategic Delivery of Change Management
Strategic Delivery of Change Management Strategic Delivery of Change Management
Strategic Delivery of Change Management
Rizwan Khurram
 
Strategic Delivery of Change Management
Strategic Delivery of Change Management Strategic Delivery of Change Management
Strategic Delivery of Change Management
Rizwan Khurram
 
Strategic Delivery of Change Management
Strategic Delivery of Change Management Strategic Delivery of Change Management
Strategic Delivery of Change Management
Rizwan Khurram
 
Strategic Delivery of Change Management
Strategic Delivery of Change Management Strategic Delivery of Change Management
Strategic Delivery of Change Management
Rizwan Khurram
 
Strategic Delivery of Change Management
Strategic Delivery of Change Management Strategic Delivery of Change Management
Strategic Delivery of Change Management
Rizwan Khurram
 
Total employee involvement
Total employee involvementTotal employee involvement
Total employee involvementRizwan Khurram
 

More from Rizwan Khurram (20)

Exploring the risk factors associated with peb projects in lahore.
Exploring the risk factors associated with peb projects in lahore.Exploring the risk factors associated with peb projects in lahore.
Exploring the risk factors associated with peb projects in lahore.
 
Information Technology Project Management - part 11
Information Technology Project Management - part 11Information Technology Project Management - part 11
Information Technology Project Management - part 11
 
Information Technology Project Management - part 10
Information Technology Project Management - part 10Information Technology Project Management - part 10
Information Technology Project Management - part 10
 
Information Technology Project Management - part 09
Information Technology Project Management - part 09Information Technology Project Management - part 09
Information Technology Project Management - part 09
 
Information Technology Project Management - part 08
Information Technology Project Management - part  08Information Technology Project Management - part  08
Information Technology Project Management - part 08
 
Information Technology Project Management - part 07
Information Technology Project Management - part 07Information Technology Project Management - part 07
Information Technology Project Management - part 07
 
Information Technology Project Management - part 05
Information Technology Project Management - part 05Information Technology Project Management - part 05
Information Technology Project Management - part 05
 
Information Technology Project Management - part 04
Information Technology Project Management - part 04Information Technology Project Management - part 04
Information Technology Project Management - part 04
 
Information Technology Project Management - part 02
Information Technology Project Management - part 02Information Technology Project Management - part 02
Information Technology Project Management - part 02
 
Information Technology Project Management - part 01
Information Technology Project Management - part 01Information Technology Project Management - part 01
Information Technology Project Management - part 01
 
Information Technology Project Management - part 12
Information Technology Project Management - part 12Information Technology Project Management - part 12
Information Technology Project Management - part 12
 
Strategic Delivery of Change Management
Strategic Delivery of Change Management Strategic Delivery of Change Management
Strategic Delivery of Change Management
 
Strategic Delivery of Change Management
Strategic Delivery of Change Management Strategic Delivery of Change Management
Strategic Delivery of Change Management
 
Strategic Delivery of Change Management
Strategic Delivery of Change Management Strategic Delivery of Change Management
Strategic Delivery of Change Management
 
Strategic Delivery of Change Management
Strategic Delivery of Change Management Strategic Delivery of Change Management
Strategic Delivery of Change Management
 
Strategic Delivery of Change Management
Strategic Delivery of Change Management Strategic Delivery of Change Management
Strategic Delivery of Change Management
 
Strategic Delivery of Change Management
Strategic Delivery of Change Management Strategic Delivery of Change Management
Strategic Delivery of Change Management
 
Strategic Delivery of Change Management
Strategic Delivery of Change Management Strategic Delivery of Change Management
Strategic Delivery of Change Management
 
Vision and mission
Vision and missionVision and mission
Vision and mission
 
Total employee involvement
Total employee involvementTotal employee involvement
Total employee involvement
 

Problem in bored pile

  • 1.
  • 2. SCOPE 1. EXCAVATION OF PILE BORE 2. DESIGN AND LOWERING OF PILE REINFORCEMENT 3. CONCRETING THE PILE
  • 3.
  • 4. 2.DESIGN AND LOWERING OF PILE REINFORCEMENT 2.1 DESIGN OF PILE REINFORCEMENT 2.2 LOWERING OF PILE REINFORCEMENT
  • 5. 3. CONCRETING THE PILE BORE 3.1 QUALITY OF CONCRETE 3.2 PLACING OF CONCRETE 3.3 EXTRACTING TEMPORAEY CASING 3.4 PROBLEMS IN SOFT GROUND
  • 6.
  • 7. WET DRILLING BY REVERSE ROTARY
  • 8.
  • 10.
  • 11. 1.5 EFFECT OF W/T In dry drilling of borehole ingress of small quantity of water from sides of the borehole reduces the Skin Friction and from the bottom of borehole reduces the End Bearing. In this condition concreting should be carried out with Tremmie Pipe otherwise segregation of concrete may occur as shown in Fig. SEGREGATION OF CONCRETE
  • 12.
  • 14.
  • 16.
  • 18.
  • 20.
  • 22. 3.4 PROBLEMS IN SOFT GROUND In soft ground having undrained shear strength less than 15kn/m 2 causing the squeezing of the pile section near the head because lateral pressure of soil is more than the lateral pressure of concrete as shown in Fig. SQUEEZING OF THE PILE SECTION
  • 23. CONCLUSIONS Full time supervision of pile construction should be carried out by an experienced Engineer which gives us the designed pile capacity