This document discusses problems that can occur during bored pile construction. It covers issues with excavating the pile borehole such as overbreak and water ingress. Problems with designing and lowering the pile reinforcement cage are described. Placement of concrete is discussed, including using a tremie pipe and delays between batches. Extracting temporary casing and pile construction in soft soil is also covered.
EXCAVATION FOR FOUNDATION - Methods & Temporary Earth Retaining StructuresShivananda Roy
Generally excavation means to loosen and take out materials leaving space above or below ground. Sometimes in civil engineering term earthwork is used which include back-filling with new or original materials to voids, spreading and leveling over an area.
EXCAVATION FOR FOUNDATION - Methods & Temporary Earth Retaining StructuresShivananda Roy
Generally excavation means to loosen and take out materials leaving space above or below ground. Sometimes in civil engineering term earthwork is used which include back-filling with new or original materials to voids, spreading and leveling over an area.
Pile foundation are essential in case where SBC is low or the load coming from superstructure is too heavy,
Topics covered includes Materials used for making piles, Type of piles, load transfer mechanism, factors affecting selection of piles, Installation methods, load carrying capacity of piles, different load tests performed and the behavior of piles as a group.
this presentation describes in details the sinking operation of well foundations in different conditions and situations. the content here is suitable only for basic knowledge and educational purposes.
special concrete and high performance concreteErankajKumar
GROUTING OF CONCRETE, advantage ofGrouting,Characteristics of Grouting, GUNTING OF
CONCRETE, Application of Guniting, Properties of Guniting, advantage and disadvantage of Guniting, UNDERWATER CONCRETING, Properties of underwater concrete, METHODS OF UNDERWATER CONCRETE, advantage and disadvantage of underwater concrete, HOT WEATHERING CONCRETE, precautions, COLD WEATHER CONCRETING, PUMPABLE CONCRETE, Requirements of Mix Design for Pumpable Concrete, Ready Mixed Concrete RMC, Types of Ready Mixed Concrete, advantage and disadvantage of ready mixed concrete, introduction in High performance concrete HPC, selection of materials, behaviour of fresh high performance concrete HPC , behaviour of Hardened High performance concrete HPC when to use High performance concrete HPC , application of HPC , Advantage of HPC , Limitations of HPC
Pile foundation are essential in case where SBC is low or the load coming from superstructure is too heavy,
Topics covered includes Materials used for making piles, Type of piles, load transfer mechanism, factors affecting selection of piles, Installation methods, load carrying capacity of piles, different load tests performed and the behavior of piles as a group.
this presentation describes in details the sinking operation of well foundations in different conditions and situations. the content here is suitable only for basic knowledge and educational purposes.
special concrete and high performance concreteErankajKumar
GROUTING OF CONCRETE, advantage ofGrouting,Characteristics of Grouting, GUNTING OF
CONCRETE, Application of Guniting, Properties of Guniting, advantage and disadvantage of Guniting, UNDERWATER CONCRETING, Properties of underwater concrete, METHODS OF UNDERWATER CONCRETE, advantage and disadvantage of underwater concrete, HOT WEATHERING CONCRETE, precautions, COLD WEATHER CONCRETING, PUMPABLE CONCRETE, Requirements of Mix Design for Pumpable Concrete, Ready Mixed Concrete RMC, Types of Ready Mixed Concrete, advantage and disadvantage of ready mixed concrete, introduction in High performance concrete HPC, selection of materials, behaviour of fresh high performance concrete HPC , behaviour of Hardened High performance concrete HPC when to use High performance concrete HPC , application of HPC , Advantage of HPC , Limitations of HPC
Presentation describes important designing parameters, reasons for formwork failures and prevention of such failures. It also touches upon remedial measures.
Exploring the risk factors associated with peb projects in lahore.Rizwan Khurram
The construction industry is more exposed to risk than other industry. If the risk is not handled properly it may causes the poor performance on the industry. The Scale of building projects is large in nature and having large amount of investment. Wastage of any resource influence is high loss in project. All the losses are associated with risk factors. In Pakistan, only few researches have been done so far in this area. Thus this study needs focus of risk management in field of construction projects. We conclude from study that financial issue, skillful workers, shortage and inaccurate design are significant risk factors affecting the projects. Contractors are responsible for risk linked with machinery, material and quality related issues. While clients are responsible for the risk associated with scope of work. Study concludes that good coordination and communication between stakeholders and proper drawings works are key factors to control the project.
three phase of change,management of complex change,organizational change, Kotter eight steps, Bullock and batten, planned change,machine political organism, beckhar and harris change formula organism, kotter eight step with example
introduction to change management, what is change,categories of change, why change,organizational change,reaction of change,lewins theory, philosphy of change.
11. 1.5 EFFECT OF W/T In dry drilling of borehole ingress of small quantity of water from sides of the borehole reduces the Skin Friction and from the bottom of borehole reduces the End Bearing. In this condition concreting should be carried out with Tremmie Pipe otherwise segregation of concrete may occur as shown in Fig. SEGREGATION OF CONCRETE
22. 3.4 PROBLEMS IN SOFT GROUND In soft ground having undrained shear strength less than 15kn/m 2 causing the squeezing of the pile section near the head because lateral pressure of soil is more than the lateral pressure of concrete as shown in Fig. SQUEEZING OF THE PILE SECTION
23. CONCLUSIONS Full time supervision of pile construction should be carried out by an experienced Engineer which gives us the designed pile capacity