MATERIALS REQUIRED FOR DIFFERENT ITEMS OF WORK 
Quantity 
Sr. 
no.  Particulars 
per 100 
Cft  per 100 Cu m 
1  Bricks 
9"x47"x3" or 200 x 100x 100 mm)  1350 nos  50,000 nos 
2  Dry mortar for Brick work ­ 30 %  30 Cft  30 Cu m 
3  Stone for rubble masonry­ 125 %  125 Cft  125 Cu m 
4  Dry mortar for Brick work ­ 42 %  42 Cft  42 m3 
5  Bricks for brick ballast for Lime Concrete  1050 nos  37000 nos 
6  Brick bats for brick ballast  105 Cft  105 Cu m 
7  Brick ballast for lime Concrete  100 Cft  100 Cu m 
8  Dry mortar for lime concrete in foundations  35 Cft  35 Cu m 
9  Do for roof terracing ­ 45 %  45 Cft  45 Cu m 
10  Materials for cement concrete 1:2:4 
Ballast of grit ­ 88 %  88 Cft  83 Cu m 
Sand ­ 44%  44 Cft  44 Cu m 
Cement ­ 22 %  22 Cft  22 Cu m 
17.5 
bags  630 bags 
11  Bricks for R B Work  1200 nos  42000 nos 
12  Dry mortar for R. B. Work ­ 45 %  45 Cft  45 Cu m 
No.  Particulars  Lot/Unit  Lot / Unit 
13  Reinforcement Quantity 
a)  Footing  4 Ib/Cft  64 kg/Cu m 
b)  R. C. C. Steps 4 ft long  15 Ib/Cft  7 Kg/ Cu m 
c)  Beams  8 Ib/Cft 
130.00 Kg/Cu 
m 
d)  Lintel  7 Ib/Cft 
115.00 Kg/ Cu 
m 
e) Roof Slab 4 1/2" 
1.6 Ib/ 
Sft  8.00 kg/ sq m 
f)  Roof Slab 5 1/2" 
2.0 Ib/ 
Sft  10.00 Kg/ sq m 
g) Balcony Slab 5 1/2" 
2.75 
Ib/Sft  14.00 Kg/ sq m 
h) Chajjas 
1.60 
Ib/Sft  8 Kg/sqft 
i)  Column 
8.00 
Ib/Cft  130 kg/ Cu m 
Reinforcement quantities are only approximate and vary 
as per design 
14  Material for 25 mm (1") C.C. 1:2:4 floor 
a)  Stone grit  8 Cft  2.4 Cu m 
b)  Sand  4 Cft  1.2 Cu m 
c)  Cement  2.5 Cft  0.8m3 
(2 bags)  for % Sq.M) 
15  Dry mortar for 12 mm plaster  6 Cft  6 Cu m 
16  Dry mortar for pointing Brick work  2 Cft  2 Cu m 
17  Lime for white washing 1 coat  0.65 kg  6.5 kg
18  Dry Distemper 1st coat  0.65 kg  6.5 kg 
19  Dry distemper 2nd coat  0.5 kg  5 kg 
20  Snowcem 1st coat  3 kg  30 kg 
21  Snowcem 2nd coat  2 kg  20 kg 
22  Readymade paint for 1 coat  1/2 gal  10 ltrs 
23  Paint (stiff) for painting 1 coat  1 kg  10 kgs 
24  Bricks for half brick wall  500 nos  5000 nos 
25  Dry mortar for above  12 Cft  3.2 Cu m 
26  Bricks (9" x 4 1/2" x 3") for brick on edge floor  350 nos  3500 nos 
27  Dry mortar for above  8 Cft  2.25 cu m 
28  Bricks (9" x 4 1/2" x 3")for honeycomb wall  350 nos  3500 nos 
29  Dry mortar for above  8 Cft  2.25 cu m 
30  Materials for 3/4" (20 mm) D.P.C. in 1:2 cm 
a)  Sand  6 Cft  1.80 Cu m 
b)  Cement  2.5 bags  27 bags 
c)  Composeal or Impermo 1 kg per bag of cement  2.5 kg  27 kg 
31  Materials for 1" (25 mm) D. P. C. in 
Cement concrete 1:1 1/2:3 
a) Stone grit  8 Cft  2.25 cu m 
b) Sand coarse  4 Cft  1.12 cu m 
c) cement  27 Cft  0.75 cu m 
2 1/4 
bags  22 1/2 bags 
Composeal or impermo 1 kg/ bag of cement  2 2/3 kg  22 1/2 kg 
32  Bitumen or Asphalt for painting on DPC on roof 
1st coat  15 kg  150 kg 
2nd coat  10 kg  100 kg 
33  C.G. I sheet for roof  128 stf  128 sq m 
34  A.C. Sheet corrugated for roof  115 stf  115 sq m 
35  Timber for panelled door shutter ­ 40 mm  15 cft  4.5 cu.m 
36  Timber for battoned door shutter ­ 40 mm  13 cft  4.0 cu.m 
37 
Timber for partly panelled and glazed shutter ­ 40 mm 
thick  11 cft  3.0 cu.m 
38  Timber for fully glazed shutter ­ 40 mm thick  8 cft  2.0 cu.m 
39  Binding Wire  15 kg/ton  15 per kg ton

More Related Content

What's hot

Special Concretes
Special Concretes Special Concretes
Special Concretes
GAURAV. H .TANDON
 
HIGHWAY CONSTRUCTION MATERIAL & PRACTICE
HIGHWAY  CONSTRUCTION  MATERIAL  &  PRACTICEHIGHWAY  CONSTRUCTION  MATERIAL  &  PRACTICE
HIGHWAY CONSTRUCTION MATERIAL & PRACTICE
Fresher Thinking
 
Pervious concrete
Pervious concretePervious concrete
Pervious concrete
Abhishek Gupta
 
Rate analysis
Rate analysisRate analysis
Rate analysis
DhavalMithaiwala
 
Repair and Rehabilitation
Repair and RehabilitationRepair and Rehabilitation
Repair and Rehabilitation
GAURAV. H .TANDON
 
Roadwork
RoadworkRoadwork
Roadwork
Rajiva Gupta
 
Rate analysis and costing - Estimation, Costing and Valuation Engineering
Rate analysis and costing - Estimation, Costing and Valuation EngineeringRate analysis and costing - Estimation, Costing and Valuation Engineering
Rate analysis and costing - Estimation, Costing and Valuation Engineering
Shanmugasundaram N
 
Aggregate - coarse aggregates, testing & limits
Aggregate - coarse aggregates, testing & limitsAggregate - coarse aggregates, testing & limits
Aggregate - coarse aggregates, testing & limits
lalitha moorthy
 
Pervious concrete
Pervious concretePervious concrete
Pervious concrete
Aglaia Connect
 
Labour Contract Work Rates – Miscellaneous Works (Residential & Commercial P...
Labour Contract Work Rates – Miscellaneous  Works (Residential & Commercial P...Labour Contract Work Rates – Miscellaneous  Works (Residential & Commercial P...
Labour Contract Work Rates – Miscellaneous Works (Residential & Commercial P...
SSudhaVelan
 
EQS - RATE ANALYSIS.pdf
EQS -  RATE ANALYSIS.pdfEQS -  RATE ANALYSIS.pdf
EQS - RATE ANALYSIS.pdf
GovindarajuluBadana
 
Benkelman beam
Benkelman beamBenkelman beam
Benkelman beam
Priyansh Singh
 
Effect of Polypropylene Fiber In Concrete
Effect of Polypropylene Fiber In ConcreteEffect of Polypropylene Fiber In Concrete
Effect of Polypropylene Fiber In Concrete
Charanjiv Singh
 
Benkelman beam deflection studies
Benkelman beam deflection studiesBenkelman beam deflection studies
Benkelman beam deflection studies
vikasravekar
 
civil datas for estimate
civil datas for estimatecivil datas for estimate
civil datas for estimate
alwin prabakar
 
Mix design-ppt
Mix design-pptMix design-ppt
Mix design-ppt
narasimha reddy
 
RMC Plant and its components, Testing and Design Mix
RMC Plant and its components, Testing and Design MixRMC Plant and its components, Testing and Design Mix
RMC Plant and its components, Testing and Design Mix
Abhimanyu Saraswat
 
Construction planning & management
Construction planning & managementConstruction planning & management
Construction planning & management
Manit Agarwal
 
Study of design of the flexible pavements ppt
Study of design of the flexible pavements pptStudy of design of the flexible pavements ppt
Study of design of the flexible pavements ppt
Shaik Asif Ahmed
 
Mode of measurement, rules for deduction of plastering & brickwork
Mode of measurement, rules for deduction of plastering & brickworkMode of measurement, rules for deduction of plastering & brickwork
Mode of measurement, rules for deduction of plastering & brickwork
AshwiniChaudhari13
 

What's hot (20)

Special Concretes
Special Concretes Special Concretes
Special Concretes
 
HIGHWAY CONSTRUCTION MATERIAL & PRACTICE
HIGHWAY  CONSTRUCTION  MATERIAL  &  PRACTICEHIGHWAY  CONSTRUCTION  MATERIAL  &  PRACTICE
HIGHWAY CONSTRUCTION MATERIAL & PRACTICE
 
Pervious concrete
Pervious concretePervious concrete
Pervious concrete
 
Rate analysis
Rate analysisRate analysis
Rate analysis
 
Repair and Rehabilitation
Repair and RehabilitationRepair and Rehabilitation
Repair and Rehabilitation
 
Roadwork
RoadworkRoadwork
Roadwork
 
Rate analysis and costing - Estimation, Costing and Valuation Engineering
Rate analysis and costing - Estimation, Costing and Valuation EngineeringRate analysis and costing - Estimation, Costing and Valuation Engineering
Rate analysis and costing - Estimation, Costing and Valuation Engineering
 
Aggregate - coarse aggregates, testing & limits
Aggregate - coarse aggregates, testing & limitsAggregate - coarse aggregates, testing & limits
Aggregate - coarse aggregates, testing & limits
 
Pervious concrete
Pervious concretePervious concrete
Pervious concrete
 
Labour Contract Work Rates – Miscellaneous Works (Residential & Commercial P...
Labour Contract Work Rates – Miscellaneous  Works (Residential & Commercial P...Labour Contract Work Rates – Miscellaneous  Works (Residential & Commercial P...
Labour Contract Work Rates – Miscellaneous Works (Residential & Commercial P...
 
EQS - RATE ANALYSIS.pdf
EQS -  RATE ANALYSIS.pdfEQS -  RATE ANALYSIS.pdf
EQS - RATE ANALYSIS.pdf
 
Benkelman beam
Benkelman beamBenkelman beam
Benkelman beam
 
Effect of Polypropylene Fiber In Concrete
Effect of Polypropylene Fiber In ConcreteEffect of Polypropylene Fiber In Concrete
Effect of Polypropylene Fiber In Concrete
 
Benkelman beam deflection studies
Benkelman beam deflection studiesBenkelman beam deflection studies
Benkelman beam deflection studies
 
civil datas for estimate
civil datas for estimatecivil datas for estimate
civil datas for estimate
 
Mix design-ppt
Mix design-pptMix design-ppt
Mix design-ppt
 
RMC Plant and its components, Testing and Design Mix
RMC Plant and its components, Testing and Design MixRMC Plant and its components, Testing and Design Mix
RMC Plant and its components, Testing and Design Mix
 
Construction planning & management
Construction planning & managementConstruction planning & management
Construction planning & management
 
Study of design of the flexible pavements ppt
Study of design of the flexible pavements pptStudy of design of the flexible pavements ppt
Study of design of the flexible pavements ppt
 
Mode of measurement, rules for deduction of plastering & brickwork
Mode of measurement, rules for deduction of plastering & brickworkMode of measurement, rules for deduction of plastering & brickwork
Mode of measurement, rules for deduction of plastering & brickwork
 

Similar to Material required for different items of civil building works

New Microsoft PowerPoint Presentation.pptx
New Microsoft PowerPoint Presentation.pptxNew Microsoft PowerPoint Presentation.pptx
New Microsoft PowerPoint Presentation.pptx
QAQCGCC
 
Civil standard notes
Civil standard notesCivil standard notes
Civil standard notes
manu287448
 
Civil book
Civil bookCivil book
Civil guide
Civil guideCivil guide
Civil guide
Mubi Khan
 
Materials%20required%20for%20different%20items%20of%20work
Materials%20required%20for%20different%20items%20of%20workMaterials%20required%20for%20different%20items%20of%20work
Materials%20required%20for%20different%20items%20of%20workAnu Bhadauria
 
Quantity notes by engineer saqb imran
Quantity notes by engineer saqb imranQuantity notes by engineer saqb imran
Quantity notes by engineer saqb imran
Saqib Imran
 
Quantity notes by engineer saqib imran
Quantity notes by engineer saqib imranQuantity notes by engineer saqib imran
Quantity notes by engineer saqib imran
Saqib Imran
 
bmc 1.pdf
bmc 1.pdfbmc 1.pdf
bmc 1.pdf
ssuserf257141
 
97170708 estimate-of-material-and-labor
97170708 estimate-of-material-and-labor97170708 estimate-of-material-and-labor
97170708 estimate-of-material-and-laborimaduddin91
 
72747160 estimation
72747160 estimation72747160 estimation
72747160 estimationimaduddin91
 
geopolymer concrete
geopolymer concretegeopolymer concrete
geopolymer concrete
swapnil wanjari
 
Ratesanalysis for Material and Labor
Ratesanalysis for Material and LaborRatesanalysis for Material and Labor
Ratesanalysis for Material and Labor
Nagoorkani Majeed
 
QUANTITY SURVEYING PORTFOLIO.pptx
QUANTITY SURVEYING PORTFOLIO.pptxQUANTITY SURVEYING PORTFOLIO.pptx
QUANTITY SURVEYING PORTFOLIO.pptx
RajnishKumar916873
 
REPLACEMENT OF BRICKS WITH PLASTIC BOTTLE IN MANARYSO NEW Monit.pptx
REPLACEMENT OF BRICKS WITH PLASTIC BOTTLE  IN MANARYSO NEW Monit.pptxREPLACEMENT OF BRICKS WITH PLASTIC BOTTLE  IN MANARYSO NEW Monit.pptx
REPLACEMENT OF BRICKS WITH PLASTIC BOTTLE IN MANARYSO NEW Monit.pptx
MonitMIstry1
 
Intro. to management lecture 06
Intro. to management lecture 06Intro. to management lecture 06
Intro. to management lecture 06
Haitham Sharnouby
 
80623277 cost-estimator
80623277 cost-estimator80623277 cost-estimator
80623277 cost-estimatorimaduddin91
 
Farm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdf
Farm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdfFarm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdf
Farm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdf
Avin Kharel
 
cm lab report.docx
cm lab  report.docxcm lab  report.docx
cm lab report.docx
yonasdawit4
 

Similar to Material required for different items of civil building works (20)

New Microsoft PowerPoint Presentation.pptx
New Microsoft PowerPoint Presentation.pptxNew Microsoft PowerPoint Presentation.pptx
New Microsoft PowerPoint Presentation.pptx
 
Estimation
Estimation    Estimation
Estimation
 
Civil standard notes
Civil standard notesCivil standard notes
Civil standard notes
 
Civil book
Civil bookCivil book
Civil book
 
Civil guide
Civil guideCivil guide
Civil guide
 
Materials%20required%20for%20different%20items%20of%20work
Materials%20required%20for%20different%20items%20of%20workMaterials%20required%20for%20different%20items%20of%20work
Materials%20required%20for%20different%20items%20of%20work
 
Quantity notes by engineer saqb imran
Quantity notes by engineer saqb imranQuantity notes by engineer saqb imran
Quantity notes by engineer saqb imran
 
Quantity notes by engineer saqib imran
Quantity notes by engineer saqib imranQuantity notes by engineer saqib imran
Quantity notes by engineer saqib imran
 
bmc 1.pdf
bmc 1.pdfbmc 1.pdf
bmc 1.pdf
 
97170708 estimate-of-material-and-labor
97170708 estimate-of-material-and-labor97170708 estimate-of-material-and-labor
97170708 estimate-of-material-and-labor
 
72747160 estimation
72747160 estimation72747160 estimation
72747160 estimation
 
geopolymer concrete
geopolymer concretegeopolymer concrete
geopolymer concrete
 
Ratesanalysis for Material and Labor
Ratesanalysis for Material and LaborRatesanalysis for Material and Labor
Ratesanalysis for Material and Labor
 
QUANTITY SURVEYING PORTFOLIO.pptx
QUANTITY SURVEYING PORTFOLIO.pptxQUANTITY SURVEYING PORTFOLIO.pptx
QUANTITY SURVEYING PORTFOLIO.pptx
 
REPLACEMENT OF BRICKS WITH PLASTIC BOTTLE IN MANARYSO NEW Monit.pptx
REPLACEMENT OF BRICKS WITH PLASTIC BOTTLE  IN MANARYSO NEW Monit.pptxREPLACEMENT OF BRICKS WITH PLASTIC BOTTLE  IN MANARYSO NEW Monit.pptx
REPLACEMENT OF BRICKS WITH PLASTIC BOTTLE IN MANARYSO NEW Monit.pptx
 
Construction materials
Construction materialsConstruction materials
Construction materials
 
Intro. to management lecture 06
Intro. to management lecture 06Intro. to management lecture 06
Intro. to management lecture 06
 
80623277 cost-estimator
80623277 cost-estimator80623277 cost-estimator
80623277 cost-estimator
 
Farm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdf
Farm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdfFarm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdf
Farm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdf
 
cm lab report.docx
cm lab  report.docxcm lab  report.docx
cm lab report.docx
 

More from ALI HYDER GADHI

National Fund for Mohenjodaro , its status, functions and detail of deposits
National Fund for Mohenjodaro , its status,    functions and detail of deposits National Fund for Mohenjodaro , its status,    functions and detail of deposits
National Fund for Mohenjodaro , its status, functions and detail of deposits
ALI HYDER GADHI
 
Conservation methods 13 2-2013
Conservation methods 13 2-2013Conservation methods 13 2-2013
Conservation methods 13 2-2013
ALI HYDER GADHI
 
General Contract Conditions as incorporated by SPPRA /PPPRA
General Contract Conditions as incorporated by SPPRA /PPPRA General Contract Conditions as incorporated by SPPRA /PPPRA
General Contract Conditions as incorporated by SPPRA /PPPRA
ALI HYDER GADHI
 
Monsoon Preparations Survey for Archaeological Ruins Mohenjodaro
 Monsoon Preparations Survey for  Archaeological Ruins Mohenjodaro  Monsoon Preparations Survey for  Archaeological Ruins Mohenjodaro
Monsoon Preparations Survey for Archaeological Ruins Mohenjodaro
ALI HYDER GADHI
 
Urban renewal, conservation & regeneration of arabic cities
Urban renewal, conservation & regeneration of arabic citiesUrban renewal, conservation & regeneration of arabic cities
Urban renewal, conservation & regeneration of arabic citiesALI HYDER GADHI
 
Conservation and revitalization of historic buildings
Conservation and revitalization of historic buildingsConservation and revitalization of historic buildings
Conservation and revitalization of historic buildingsALI HYDER GADHI
 
Mohen jo Daro Indus valley by ALI HYDER GADHI BALOCH
Mohen jo Daro  Indus valley by ALI HYDER GADHI BALOCH Mohen jo Daro  Indus valley by ALI HYDER GADHI BALOCH
Mohen jo Daro Indus valley by ALI HYDER GADHI BALOCH ALI HYDER GADHI
 
Emergency Measures adopted before monsoon, during and after rainfall at World...
Emergency Measures adopted before monsoon, during and after rainfall at World...Emergency Measures adopted before monsoon, during and after rainfall at World...
Emergency Measures adopted before monsoon, during and after rainfall at World...
ALI HYDER GADHI
 
History of Conservation and Preservation of Cultural Property
 History of Conservation and Preservation of Cultural Property  History of Conservation and Preservation of Cultural Property
History of Conservation and Preservation of Cultural Property ALI HYDER GADHI
 
2nd day presentation mohanlal
2nd day presentation   mohanlal2nd day presentation   mohanlal
2nd day presentation mohanlal
ALI HYDER GADHI
 
Conservation terminologies for site and monuments
Conservation terminologies for site and monumentsConservation terminologies for site and monuments
Conservation terminologies for site and monumentsALI HYDER GADHI
 

More from ALI HYDER GADHI (12)

National Fund for Mohenjodaro , its status, functions and detail of deposits
National Fund for Mohenjodaro , its status,    functions and detail of deposits National Fund for Mohenjodaro , its status,    functions and detail of deposits
National Fund for Mohenjodaro , its status, functions and detail of deposits
 
Conservation methods 13 2-2013
Conservation methods 13 2-2013Conservation methods 13 2-2013
Conservation methods 13 2-2013
 
General Contract Conditions as incorporated by SPPRA /PPPRA
General Contract Conditions as incorporated by SPPRA /PPPRA General Contract Conditions as incorporated by SPPRA /PPPRA
General Contract Conditions as incorporated by SPPRA /PPPRA
 
Monsoon Preparations Survey for Archaeological Ruins Mohenjodaro
 Monsoon Preparations Survey for  Archaeological Ruins Mohenjodaro  Monsoon Preparations Survey for  Archaeological Ruins Mohenjodaro
Monsoon Preparations Survey for Archaeological Ruins Mohenjodaro
 
Urban renewal, conservation & regeneration of arabic cities
Urban renewal, conservation & regeneration of arabic citiesUrban renewal, conservation & regeneration of arabic cities
Urban renewal, conservation & regeneration of arabic cities
 
Conservation and revitalization of historic buildings
Conservation and revitalization of historic buildingsConservation and revitalization of historic buildings
Conservation and revitalization of historic buildings
 
Mohen jo Daro Indus valley by ALI HYDER GADHI BALOCH
Mohen jo Daro  Indus valley by ALI HYDER GADHI BALOCH Mohen jo Daro  Indus valley by ALI HYDER GADHI BALOCH
Mohen jo Daro Indus valley by ALI HYDER GADHI BALOCH
 
Emergency Measures adopted before monsoon, during and after rainfall at World...
Emergency Measures adopted before monsoon, during and after rainfall at World...Emergency Measures adopted before monsoon, during and after rainfall at World...
Emergency Measures adopted before monsoon, during and after rainfall at World...
 
History of Conservation and Preservation of Cultural Property
 History of Conservation and Preservation of Cultural Property  History of Conservation and Preservation of Cultural Property
History of Conservation and Preservation of Cultural Property
 
2nd day presentation mohanlal
2nd day presentation   mohanlal2nd day presentation   mohanlal
2nd day presentation mohanlal
 
Group a workshop on c h
Group a workshop on c hGroup a workshop on c h
Group a workshop on c h
 
Conservation terminologies for site and monuments
Conservation terminologies for site and monumentsConservation terminologies for site and monuments
Conservation terminologies for site and monuments
 

Recently uploaded

一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
ydteq
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
Jayaprasanna4
 
English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
BrazilAccount1
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
manasideore6
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
WENKENLI1
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
SupreethSP4
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
seandesed
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
AafreenAbuthahir2
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
R&R Consult
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
AhmedHussein950959
 

Recently uploaded (20)

一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
 
English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 

Material required for different items of civil building works

  • 1. MATERIALS REQUIRED FOR DIFFERENT ITEMS OF WORK  Quantity  Sr.  no.  Particulars  per 100  Cft  per 100 Cu m  1  Bricks  9"x47"x3" or 200 x 100x 100 mm)  1350 nos  50,000 nos  2  Dry mortar for Brick work ­ 30 %  30 Cft  30 Cu m  3  Stone for rubble masonry­ 125 %  125 Cft  125 Cu m  4  Dry mortar for Brick work ­ 42 %  42 Cft  42 m3  5  Bricks for brick ballast for Lime Concrete  1050 nos  37000 nos  6  Brick bats for brick ballast  105 Cft  105 Cu m  7  Brick ballast for lime Concrete  100 Cft  100 Cu m  8  Dry mortar for lime concrete in foundations  35 Cft  35 Cu m  9  Do for roof terracing ­ 45 %  45 Cft  45 Cu m  10  Materials for cement concrete 1:2:4  Ballast of grit ­ 88 %  88 Cft  83 Cu m  Sand ­ 44%  44 Cft  44 Cu m  Cement ­ 22 %  22 Cft  22 Cu m  17.5  bags  630 bags  11  Bricks for R B Work  1200 nos  42000 nos  12  Dry mortar for R. B. Work ­ 45 %  45 Cft  45 Cu m  No.  Particulars  Lot/Unit  Lot / Unit  13  Reinforcement Quantity  a)  Footing  4 Ib/Cft  64 kg/Cu m  b)  R. C. C. Steps 4 ft long  15 Ib/Cft  7 Kg/ Cu m  c)  Beams  8 Ib/Cft  130.00 Kg/Cu  m  d)  Lintel  7 Ib/Cft  115.00 Kg/ Cu  m  e) Roof Slab 4 1/2"  1.6 Ib/  Sft  8.00 kg/ sq m  f)  Roof Slab 5 1/2"  2.0 Ib/  Sft  10.00 Kg/ sq m  g) Balcony Slab 5 1/2"  2.75  Ib/Sft  14.00 Kg/ sq m  h) Chajjas  1.60  Ib/Sft  8 Kg/sqft  i)  Column  8.00  Ib/Cft  130 kg/ Cu m  Reinforcement quantities are only approximate and vary  as per design  14  Material for 25 mm (1") C.C. 1:2:4 floor  a)  Stone grit  8 Cft  2.4 Cu m  b)  Sand  4 Cft  1.2 Cu m  c)  Cement  2.5 Cft  0.8m3  (2 bags)  for % Sq.M)  15  Dry mortar for 12 mm plaster  6 Cft  6 Cu m  16  Dry mortar for pointing Brick work  2 Cft  2 Cu m  17  Lime for white washing 1 coat  0.65 kg  6.5 kg
  • 2. 18  Dry Distemper 1st coat  0.65 kg  6.5 kg  19  Dry distemper 2nd coat  0.5 kg  5 kg  20  Snowcem 1st coat  3 kg  30 kg  21  Snowcem 2nd coat  2 kg  20 kg  22  Readymade paint for 1 coat  1/2 gal  10 ltrs  23  Paint (stiff) for painting 1 coat  1 kg  10 kgs  24  Bricks for half brick wall  500 nos  5000 nos  25  Dry mortar for above  12 Cft  3.2 Cu m  26  Bricks (9" x 4 1/2" x 3") for brick on edge floor  350 nos  3500 nos  27  Dry mortar for above  8 Cft  2.25 cu m  28  Bricks (9" x 4 1/2" x 3")for honeycomb wall  350 nos  3500 nos  29  Dry mortar for above  8 Cft  2.25 cu m  30  Materials for 3/4" (20 mm) D.P.C. in 1:2 cm  a)  Sand  6 Cft  1.80 Cu m  b)  Cement  2.5 bags  27 bags  c)  Composeal or Impermo 1 kg per bag of cement  2.5 kg  27 kg  31  Materials for 1" (25 mm) D. P. C. in  Cement concrete 1:1 1/2:3  a) Stone grit  8 Cft  2.25 cu m  b) Sand coarse  4 Cft  1.12 cu m  c) cement  27 Cft  0.75 cu m  2 1/4  bags  22 1/2 bags  Composeal or impermo 1 kg/ bag of cement  2 2/3 kg  22 1/2 kg  32  Bitumen or Asphalt for painting on DPC on roof  1st coat  15 kg  150 kg  2nd coat  10 kg  100 kg  33  C.G. I sheet for roof  128 stf  128 sq m  34  A.C. Sheet corrugated for roof  115 stf  115 sq m  35  Timber for panelled door shutter ­ 40 mm  15 cft  4.5 cu.m  36  Timber for battoned door shutter ­ 40 mm  13 cft  4.0 cu.m  37  Timber for partly panelled and glazed shutter ­ 40 mm  thick  11 cft  3.0 cu.m  38  Timber for fully glazed shutter ­ 40 mm thick  8 cft  2.0 cu.m  39  Binding Wire  15 kg/ton  15 per kg ton