This document provides project details for the ADT Polymer Packing Plant at Khalifa Port in Abu Dhabi, United Arab Emirates. The project involved installing 74 piles of varying lengths between 15-18 meters deep and conducting load testing. Special challenges included working in a congested site near an existing warehouse. The contractor, Züblin Construction LLC, was awarded a 100% subcontract worth AED 875,000 to complete the piling work between May and June 2014.