SlideShare a Scribd company logo
With more than 60 year of experience, HAREKET has opened its MENA (Middle East and North
Africa) office in JAFZA (Jebel Ali Free Zone) Dubai according to its global vision. Accelerated its
investments in the bay area by adding CC2800 and CC6800 Crawler Crane, SPMT and THP trucks to
the 10,000 m2 machinery park
www.hareket.com quarterly magazine January - February - March 2018 / Year 7 Issue 27
MAGAZINE
HAREKET launched MENA office in Dubai
Jebel Ali Free
Zone (South),
Plot No. S10505,
P.O. Box - 263438
Dubai /
United Arab
Emirates
2018 / issue 27
2
RailCars of Seyrantepe
subway has been transported
H
AREKET, successfully completed the transportation of
68 RailCar within the scope of Seyrantepe Metro Project.
The cars belonging to the Hyundai Rotem were taken
from Adapazarı and transported to Seyrantepe Metro
Station. While Liebherr LTM1200 and Demag AC200
mobile cranes were used during unloading process of the cars, which
were delivered by putting down on the rails, and the transports were
performed with Faymonville 4x6 axle trailers The works had started
in May 2017 and completed in February 2018.
İMTİYAZ SAHİBİ
AHMET ALTUNKUM
SORUMLU YAZI İŞLERİ MÜDÜRÜ
DUYGU SEVINÇ SEVİN
EDİTÖR
EREN CERCİZ
YAYINA HAZIRLAYAN
APA YAYINCILIK
BASKI
Oksijen Basım
Seyrantepe Mah. İbrahim Karaoğlanoğlu Cad. Altuntaş Apt. No: 35 D: 3
Kağıthane / İSTANBUL
Oksijen Basım Sertifika No: 40379
Basım Tarihi: Mart 2018
HAREKET PROJE TAŞIMACILIĞI VE YÜK MÜHENDİSLİĞİ A.Ş.
Eyüp Sultan Mah. Sekmen Caddesi No:28 Sancaktepe - İSTANBUL
Tel: 0 216 311 41 41 Fax: 0 216 311 41 45
Yayın Türü: Yaygın süreli, üç ayda bir yayınlanır. HAREKET’Lİ
GÜNDEM gazetesi, dahili ve harici dağıtım içindir; parayla
satılamaz.
KÜNYE
H
AREKET is putting
its mark on many
important projects,
and one of them,
it performed
transportation of 6 vessel trailers
for Uzmanlar Gemi. 33M x 9m x
17m sized trailers weighing 660
tonnes were transported from the
Başiskele Free Zone to the pool
at Uzmar Shipyard. During the
transportation, HAREKET used
2x16 axle SPMT flatbed trailers
and 2xPPUs and it also used a
400 tonnes crawler crane. While
the first transports started in
March 2018, the last transport was
carried out in June.
Tug boat
transportation
completed
successfully
2018 / issue 27
3
Installation of wind turbines owned
by Çorum Municipality were performed
H
AREKET put its signature under many Wind Power Plant
Projects realized in Turkey and It completed installation
works by performing transportation of four LT 80 model
1000 kW wind turbines and HH65M wind power plant
from Bandırma to Çorum. Liebherr LTM1750,
Liebherr LTM 1500, Tadano Faun 200 model mobile cranes were used
in the installation phase of the project, while a total of 10 extension
trailers, which their number of axles varying from 4 to 8, were
preferred for transportation. The works which started in November
2017 were completed in February 2018 without any problems.
Heat exchanger
installation
operation in Baku
We continue
to perform
yacht transports
H
AREKET is continuing to take part in many important
projects, and it carried out the lifting operation of Heat
Exchanger for Worley Parson Company for in order to
increase the capacity of MEG unit in Sangachal Terminal
located in Azerbaijan. Heat Exchanger with dimensions
3mx 3mx2.6m and weighted 24 tons, is transported from Alfa Laval
in France to Baku. It is lifted by using Liebherr LTM1750 mobile
crane. The security measures were kept at maximum because the
operation was carried out at active plant area. The project started in
March 2018 and planned to be completed in April.
H
AREKET completed transportation of four boats
weighing 220 tonnes. The boats with a size of
32m x 8m x 11,6m were taken from Numarine
Hangar located in Gebze Organized Industrial Zone
and moved to Tuzla RMK shipyard. While 16 axes
SPMT flatbed trailer and + 1 PPU were used for transportation,
400-tonnes crawler crane was preferred for lifting the boats.
Transports that started in 2016 were performed in different
time periods and the last boat was delivered to Tuzla RMK
shipyard in May 2016.
2018 / issue 27
4
HAREKET left its mark on
Europe’s iconic building
G
are de Mons, which is one of the iconic buildings of Belgium and constructed by the world-renowned architect / engineer
Santiago Calatrava, is gaining new face with HAREKET. Undertaken horizontal scrolling of steel gallery structure weighing
5000 tonnes in total and it proved how high is the capacity of Turkish Companies in the special projects HAREKET carried out
a total of 26,6 m towing operations of Gare De Mons railway station weighing 5000 tonnes in total, which was approximately
2000 tonnes and 16 m in the first stage, and 2400 tonnes and 10.6 m in the second stage. 4 pieces of 200 tonnes of strand
jack were used as equipment in in-site horizontal pulling process. The most difficult part of the project was ongoing operations of the
train station during the works. Therefore, HAREKET presented a special solution for the project. Mounted parts in the north-west section
of the station were passed over the operational train lines through the sleds on the temporary towers assembled between the train lines.
It was shifted horizontally in the south-east direction in several stages. In this way, daily operations of the train station have continued
without interruption. The first phase of the project was completed in June 2017, and the second phase was completed successfully in
May 2018.

More Related Content

What's hot

BT_TatuanuiCaseStudy_F
BT_TatuanuiCaseStudy_FBT_TatuanuiCaseStudy_F
BT_TatuanuiCaseStudy_Fphilip dobson
 
Session 3 - Michael Berna Indiana Logistics Summit 2012
Session 3 - Michael Berna Indiana Logistics Summit 2012Session 3 - Michael Berna Indiana Logistics Summit 2012
Session 3 - Michael Berna Indiana Logistics Summit 2012Fred Davidson
 
Fama group shipyards past projects.at.22.26.23.001.e
Fama group shipyards past projects.at.22.26.23.001.eFama group shipyards past projects.at.22.26.23.001.e
Fama group shipyards past projects.at.22.26.23.001.eandreastzortzis
 
Stephen Groombridge-CV-1 (1)
Stephen Groombridge-CV-1 (1)Stephen Groombridge-CV-1 (1)
Stephen Groombridge-CV-1 (1)Steve Groombridge
 
ABB EPC_General Presentation_March 15
ABB EPC_General Presentation_March 15ABB EPC_General Presentation_March 15
ABB EPC_General Presentation_March 15Antonio Biasiolo
 
Cleveland Cascades DCI Sep14
Cleveland Cascades DCI Sep14Cleveland Cascades DCI Sep14
Cleveland Cascades DCI Sep14Brian Thirlwall
 
New Zealand DEMM Magazine editorial2. docx
New Zealand DEMM Magazine editorial2. docxNew Zealand DEMM Magazine editorial2. docx
New Zealand DEMM Magazine editorial2. docxPeter de Ryk
 
Raytec Presentation1
Raytec Presentation1Raytec Presentation1
Raytec Presentation1raytec
 
Tow Lift Cerification
Tow Lift CerificationTow Lift Cerification
Tow Lift CerificationAlex Mitchell
 
Jiri Rychecky_biografy_info2013
Jiri Rychecky_biografy_info2013Jiri Rychecky_biografy_info2013
Jiri Rychecky_biografy_info2013Jiří Rychecký
 
PowerLogistics Asia 2014 - – Geographical Importance for Shipping, Kadukanna...
PowerLogistics Asia 2014 -  – Geographical Importance for Shipping, Kadukanna...PowerLogistics Asia 2014 -  – Geographical Importance for Shipping, Kadukanna...
PowerLogistics Asia 2014 - – Geographical Importance for Shipping, Kadukanna...
PowerLift Events
 
JohnJ.Vekony(Apr2016)
JohnJ.Vekony(Apr2016)JohnJ.Vekony(Apr2016)
JohnJ.Vekony(Apr2016)John Vekony
 
Khalifa Port & Industrial Zone
Khalifa Port & Industrial ZoneKhalifa Port & Industrial Zone
Khalifa Port & Industrial ZoneFalco Ziehl
 

What's hot (19)

BT_TatuanuiCaseStudy_F
BT_TatuanuiCaseStudy_FBT_TatuanuiCaseStudy_F
BT_TatuanuiCaseStudy_F
 
Session 3 - Michael Berna Indiana Logistics Summit 2012
Session 3 - Michael Berna Indiana Logistics Summit 2012Session 3 - Michael Berna Indiana Logistics Summit 2012
Session 3 - Michael Berna Indiana Logistics Summit 2012
 
Fama group shipyards past projects.at.22.26.23.001.e
Fama group shipyards past projects.at.22.26.23.001.eFama group shipyards past projects.at.22.26.23.001.e
Fama group shipyards past projects.at.22.26.23.001.e
 
H3 New Conveyer Logistics
H3 New Conveyer LogisticsH3 New Conveyer Logistics
H3 New Conveyer Logistics
 
Stephen Groombridge-CV-1 (1)
Stephen Groombridge-CV-1 (1)Stephen Groombridge-CV-1 (1)
Stephen Groombridge-CV-1 (1)
 
ABB EPC_General Presentation_March 15
ABB EPC_General Presentation_March 15ABB EPC_General Presentation_March 15
ABB EPC_General Presentation_March 15
 
Cleveland Cascades DCI Sep14
Cleveland Cascades DCI Sep14Cleveland Cascades DCI Sep14
Cleveland Cascades DCI Sep14
 
New Zealand DEMM Magazine editorial2. docx
New Zealand DEMM Magazine editorial2. docxNew Zealand DEMM Magazine editorial2. docx
New Zealand DEMM Magazine editorial2. docx
 
Raytec Presentation1
Raytec Presentation1Raytec Presentation1
Raytec Presentation1
 
Tow Lift Cerification
Tow Lift CerificationTow Lift Cerification
Tow Lift Cerification
 
Jiri Rychecky_biografy_info2013
Jiri Rychecky_biografy_info2013Jiri Rychecky_biografy_info2013
Jiri Rychecky_biografy_info2013
 
PowerLogistics Asia 2014 - – Geographical Importance for Shipping, Kadukanna...
PowerLogistics Asia 2014 -  – Geographical Importance for Shipping, Kadukanna...PowerLogistics Asia 2014 -  – Geographical Importance for Shipping, Kadukanna...
PowerLogistics Asia 2014 - – Geographical Importance for Shipping, Kadukanna...
 
JohnJ.Vekony(Apr2016)
JohnJ.Vekony(Apr2016)JohnJ.Vekony(Apr2016)
JohnJ.Vekony(Apr2016)
 
Deep Energy Description
Deep Energy DescriptionDeep Energy Description
Deep Energy Description
 
Khalifa Port & Industrial Zone
Khalifa Port & Industrial ZoneKhalifa Port & Industrial Zone
Khalifa Port & Industrial Zone
 
MERAJ UL HUDA CV
MERAJ UL HUDA CVMERAJ UL HUDA CV
MERAJ UL HUDA CV
 
Rashid_Resume (2)
Rashid_Resume (2)Rashid_Resume (2)
Rashid_Resume (2)
 
Resume Pages
Resume PagesResume Pages
Resume Pages
 
CURRICULUM VITAE
CURRICULUM   VITAECURRICULUM   VITAE
CURRICULUM VITAE
 

Similar to Hareket Magazine 27. issue-2018- English

Hareket Magazine 25. issue-2017- English
Hareket Magazine 25. issue-2017- EnglishHareket Magazine 25. issue-2017- English
Hareket Magazine 25. issue-2017- English
Hareket
 
Nicolas vehicles transport
Nicolas vehicles transportNicolas vehicles transport
Nicolas vehicles transport
athmedia
 
Bouygues Travaux Publics_Corporate Presentation
Bouygues Travaux Publics_Corporate PresentationBouygues Travaux Publics_Corporate Presentation
Bouygues Travaux Publics_Corporate Presentation
Pierre HUBERT
 
URETIMPARK LIFTING HOISTING TRANSPORTING
URETIMPARK LIFTING HOISTING TRANSPORTINGURETIMPARK LIFTING HOISTING TRANSPORTING
URETIMPARK LIFTING HOISTING TRANSPORTING
tacettin ünlü
 
Mo utilizado en la fabricación de gruas
Mo utilizado en la fabricación de gruasMo utilizado en la fabricación de gruas
Mo utilizado en la fabricación de gruas
Daniel García
 
Alp transit euro-t&l-oct13-bro-s
Alp transit euro-t&l-oct13-bro-sAlp transit euro-t&l-oct13-bro-s
Alp transit euro-t&l-oct13-bro-s
Abi Abagun
 
Alp transit euro-t&l-oct13-bro-s
Alp transit euro-t&l-oct13-bro-sAlp transit euro-t&l-oct13-bro-s
Alp transit euro-t&l-oct13-bro-sAbi Abagun
 
Status of Cambodian Railway- July, 2015
Status of Cambodian Railway- July, 2015Status of Cambodian Railway- July, 2015
Status of Cambodian Railway- July, 2015
Sok-Tharath CHREUNG
 
Corporate Profile | Ärk Global
Corporate Profile | Ärk Global Corporate Profile | Ärk Global
Corporate Profile | Ärk Global
Ärk Global
 
Design and fabrication of car parking system th esis
Design and fabrication of car parking system th esisDesign and fabrication of car parking system th esis
Design and fabrication of car parking system th esis
ankit chauhan
 
Presentation on Millau viaduct
Presentation on Millau viaductPresentation on Millau viaduct
Presentation on Millau viaduct
Jayanta Sen
 
Atkins' tunnelling projects
Atkins' tunnelling projectsAtkins' tunnelling projects
Atkins' tunnelling projects
Atkins
 
Him cableways - An Introduction
Him cableways - An IntroductionHim cableways - An Introduction
Him cableways - An Introduction
Tuneer Garga
 
Drill Rig Transportation
Drill Rig TransportationDrill Rig Transportation
Drill Rig Transportation
CEA Project Logistics
 
The Millau Viaduct Project - An Engineering Marvel
The Millau Viaduct Project - An Engineering MarvelThe Millau Viaduct Project - An Engineering Marvel
The Millau Viaduct Project - An Engineering Marvel
Shivam Sood
 
focus-on-major-new-lp-gas-facilities-around-the-globe
focus-on-major-new-lp-gas-facilities-around-the-globefocus-on-major-new-lp-gas-facilities-around-the-globe
focus-on-major-new-lp-gas-facilities-around-the-globeKlaus Gohra
 

Similar to Hareket Magazine 27. issue-2018- English (20)

Hareket Magazine 25. issue-2017- English
Hareket Magazine 25. issue-2017- EnglishHareket Magazine 25. issue-2017- English
Hareket Magazine 25. issue-2017- English
 
WORLD CARGO NEWS
WORLD CARGO NEWS WORLD CARGO NEWS
WORLD CARGO NEWS
 
Nicolas vehicles transport
Nicolas vehicles transportNicolas vehicles transport
Nicolas vehicles transport
 
Wagenborg times 3
Wagenborg times 3Wagenborg times 3
Wagenborg times 3
 
laos-tj-2016
laos-tj-2016laos-tj-2016
laos-tj-2016
 
Bouygues Travaux Publics_Corporate Presentation
Bouygues Travaux Publics_Corporate PresentationBouygues Travaux Publics_Corporate Presentation
Bouygues Travaux Publics_Corporate Presentation
 
URETIMPARK LIFTING HOISTING TRANSPORTING
URETIMPARK LIFTING HOISTING TRANSPORTINGURETIMPARK LIFTING HOISTING TRANSPORTING
URETIMPARK LIFTING HOISTING TRANSPORTING
 
Mo utilizado en la fabricación de gruas
Mo utilizado en la fabricación de gruasMo utilizado en la fabricación de gruas
Mo utilizado en la fabricación de gruas
 
Alp transit euro-t&l-oct13-bro-s
Alp transit euro-t&l-oct13-bro-sAlp transit euro-t&l-oct13-bro-s
Alp transit euro-t&l-oct13-bro-s
 
Alp transit euro-t&l-oct13-bro-s
Alp transit euro-t&l-oct13-bro-sAlp transit euro-t&l-oct13-bro-s
Alp transit euro-t&l-oct13-bro-s
 
Status of Cambodian Railway- July, 2015
Status of Cambodian Railway- July, 2015Status of Cambodian Railway- July, 2015
Status of Cambodian Railway- July, 2015
 
Corporate Profile | Ärk Global
Corporate Profile | Ärk Global Corporate Profile | Ärk Global
Corporate Profile | Ärk Global
 
Ismailia TUNNELS
Ismailia TUNNELSIsmailia TUNNELS
Ismailia TUNNELS
 
Design and fabrication of car parking system th esis
Design and fabrication of car parking system th esisDesign and fabrication of car parking system th esis
Design and fabrication of car parking system th esis
 
Presentation on Millau viaduct
Presentation on Millau viaductPresentation on Millau viaduct
Presentation on Millau viaduct
 
Atkins' tunnelling projects
Atkins' tunnelling projectsAtkins' tunnelling projects
Atkins' tunnelling projects
 
Him cableways - An Introduction
Him cableways - An IntroductionHim cableways - An Introduction
Him cableways - An Introduction
 
Drill Rig Transportation
Drill Rig TransportationDrill Rig Transportation
Drill Rig Transportation
 
The Millau Viaduct Project - An Engineering Marvel
The Millau Viaduct Project - An Engineering MarvelThe Millau Viaduct Project - An Engineering Marvel
The Millau Viaduct Project - An Engineering Marvel
 
focus-on-major-new-lp-gas-facilities-around-the-globe
focus-on-major-new-lp-gas-facilities-around-the-globefocus-on-major-new-lp-gas-facilities-around-the-globe
focus-on-major-new-lp-gas-facilities-around-the-globe
 

More from Hareket

Hareket Magazine 33. issue-2019- English
Hareket Magazine 33. issue-2019- EnglishHareket Magazine 33. issue-2019- English
Hareket Magazine 33. issue-2019- English
Hareket
 
Hareketli gündem 33. sayı-2019 -Türkçe
Hareketli gündem 33. sayı-2019 -TürkçeHareketli gündem 33. sayı-2019 -Türkçe
Hareketli gündem 33. sayı-2019 -Türkçe
Hareket
 
Hareketli gündem 29. sayı-2018 -Türkçe
Hareketli gündem 29. sayı-2018 -TürkçeHareketli gündem 29. sayı-2018 -Türkçe
Hareketli gündem 29. sayı-2018 -Türkçe
Hareket
 
Hareketli gündem 28. sayı-2018 -Türkçe
Hareketli gündem 28. sayı-2018 -TürkçeHareketli gündem 28. sayı-2018 -Türkçe
Hareketli gündem 28. sayı-2018 -Türkçe
Hareket
 
Hareketli gündem 27. sayı-2018 -Türkçe
Hareketli gündem 27. sayı-2018 -TürkçeHareketli gündem 27. sayı-2018 -Türkçe
Hareketli gündem 27. sayı-2018 -Türkçe
Hareket
 
Hareketli gündem 26. sayı-2017 -Türkçe
Hareketli gündem 26. sayı-2017 -TürkçeHareketli gündem 26. sayı-2017 -Türkçe
Hareketli gündem 26. sayı-2017 -Türkçe
Hareket
 
Hareketli gündem 25. sayı -Türkçe
Hareketli gündem 25. sayı -TürkçeHareketli gündem 25. sayı -Türkçe
Hareketli gündem 25. sayı -Türkçe
Hareket
 
Hareket Magazine-24-2017
Hareket Magazine-24-2017Hareket Magazine-24-2017
Hareket Magazine-24-2017
Hareket
 
Hareket Magazine 23-2017
Hareket Magazine 23-2017Hareket Magazine 23-2017
Hareket Magazine 23-2017
Hareket
 
Hareket magazine 22-2017
Hareket magazine 22-2017Hareket magazine 22-2017
Hareket magazine 22-2017
Hareket
 
Hareket magazine 21-2016
Hareket magazine 21-2016Hareket magazine 21-2016
Hareket magazine 21-2016
Hareket
 
Hareket Magazine-20-2016
Hareket Magazine-20-2016Hareket Magazine-20-2016
Hareket Magazine-20-2016
Hareket
 
Hareket Magazine-19-2016
Hareket Magazine-19-2016Hareket Magazine-19-2016
Hareket Magazine-19-2016
Hareket
 
Hareket Magazine-18-2016
Hareket Magazine-18-2016Hareket Magazine-18-2016
Hareket Magazine-18-2016
Hareket
 
Hareket Magazine-17-2015
Hareket Magazine-17-2015Hareket Magazine-17-2015
Hareket Magazine-17-2015
Hareket
 
Hareket Magazine-16-2015
Hareket Magazine-16-2015Hareket Magazine-16-2015
Hareket Magazine-16-2015
Hareket
 
Hareket Magazine 15-2015
Hareket Magazine 15-2015Hareket Magazine 15-2015
Hareket Magazine 15-2015
Hareket
 
Hareket magazine-13-2014
Hareket magazine-13-2014Hareket magazine-13-2014
Hareket magazine-13-2014
Hareket
 
Hareket Magazine 12.
Hareket  Magazine 12.Hareket  Magazine 12.
Hareket Magazine 12.
Hareket
 

More from Hareket (19)

Hareket Magazine 33. issue-2019- English
Hareket Magazine 33. issue-2019- EnglishHareket Magazine 33. issue-2019- English
Hareket Magazine 33. issue-2019- English
 
Hareketli gündem 33. sayı-2019 -Türkçe
Hareketli gündem 33. sayı-2019 -TürkçeHareketli gündem 33. sayı-2019 -Türkçe
Hareketli gündem 33. sayı-2019 -Türkçe
 
Hareketli gündem 29. sayı-2018 -Türkçe
Hareketli gündem 29. sayı-2018 -TürkçeHareketli gündem 29. sayı-2018 -Türkçe
Hareketli gündem 29. sayı-2018 -Türkçe
 
Hareketli gündem 28. sayı-2018 -Türkçe
Hareketli gündem 28. sayı-2018 -TürkçeHareketli gündem 28. sayı-2018 -Türkçe
Hareketli gündem 28. sayı-2018 -Türkçe
 
Hareketli gündem 27. sayı-2018 -Türkçe
Hareketli gündem 27. sayı-2018 -TürkçeHareketli gündem 27. sayı-2018 -Türkçe
Hareketli gündem 27. sayı-2018 -Türkçe
 
Hareketli gündem 26. sayı-2017 -Türkçe
Hareketli gündem 26. sayı-2017 -TürkçeHareketli gündem 26. sayı-2017 -Türkçe
Hareketli gündem 26. sayı-2017 -Türkçe
 
Hareketli gündem 25. sayı -Türkçe
Hareketli gündem 25. sayı -TürkçeHareketli gündem 25. sayı -Türkçe
Hareketli gündem 25. sayı -Türkçe
 
Hareket Magazine-24-2017
Hareket Magazine-24-2017Hareket Magazine-24-2017
Hareket Magazine-24-2017
 
Hareket Magazine 23-2017
Hareket Magazine 23-2017Hareket Magazine 23-2017
Hareket Magazine 23-2017
 
Hareket magazine 22-2017
Hareket magazine 22-2017Hareket magazine 22-2017
Hareket magazine 22-2017
 
Hareket magazine 21-2016
Hareket magazine 21-2016Hareket magazine 21-2016
Hareket magazine 21-2016
 
Hareket Magazine-20-2016
Hareket Magazine-20-2016Hareket Magazine-20-2016
Hareket Magazine-20-2016
 
Hareket Magazine-19-2016
Hareket Magazine-19-2016Hareket Magazine-19-2016
Hareket Magazine-19-2016
 
Hareket Magazine-18-2016
Hareket Magazine-18-2016Hareket Magazine-18-2016
Hareket Magazine-18-2016
 
Hareket Magazine-17-2015
Hareket Magazine-17-2015Hareket Magazine-17-2015
Hareket Magazine-17-2015
 
Hareket Magazine-16-2015
Hareket Magazine-16-2015Hareket Magazine-16-2015
Hareket Magazine-16-2015
 
Hareket Magazine 15-2015
Hareket Magazine 15-2015Hareket Magazine 15-2015
Hareket Magazine 15-2015
 
Hareket magazine-13-2014
Hareket magazine-13-2014Hareket magazine-13-2014
Hareket magazine-13-2014
 
Hareket Magazine 12.
Hareket  Magazine 12.Hareket  Magazine 12.
Hareket Magazine 12.
 

Recently uploaded

ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdfModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
fisherameliaisabella
 
Attending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learnersAttending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learners
Erika906060
 
ENTREPRENEURSHIP TRAINING.ppt for graduating class (1).ppt
ENTREPRENEURSHIP TRAINING.ppt for graduating class (1).pptENTREPRENEURSHIP TRAINING.ppt for graduating class (1).ppt
ENTREPRENEURSHIP TRAINING.ppt for graduating class (1).ppt
zechu97
 
The-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic managementThe-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic management
Bojamma2
 
LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
Lital Barkan
 
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
taqyed
 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Lviv Startup Club
 
Business Valuation Principles for Entrepreneurs
Business Valuation Principles for EntrepreneursBusiness Valuation Principles for Entrepreneurs
Business Valuation Principles for Entrepreneurs
Ben Wann
 
amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05
marketing317746
 
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdfikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
agatadrynko
 
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptxCADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
fakeloginn69
 
Premium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern BusinessesPremium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern Businesses
SynapseIndia
 
Brand Analysis for an artist named Struan
Brand Analysis for an artist named StruanBrand Analysis for an artist named Struan
Brand Analysis for an artist named Struan
sarahvanessa51503
 
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-indiafalcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
Falcon Invoice Discounting
 
anas about venice for grade 6f about venice
anas about venice for grade 6f about veniceanas about venice for grade 6f about venice
anas about venice for grade 6f about venice
anasabutalha2013
 
What is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdfWhat is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdf
seoforlegalpillers
 
Sustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & EconomySustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & Economy
Operational Excellence Consulting
 
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s DholeraTata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Avirahi City Dholera
 
The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...
awaisafdar
 
Exploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social DreamingExploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social Dreaming
Nicola Wreford-Howard
 

Recently uploaded (20)

ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdfModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
 
Attending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learnersAttending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learners
 
ENTREPRENEURSHIP TRAINING.ppt for graduating class (1).ppt
ENTREPRENEURSHIP TRAINING.ppt for graduating class (1).pptENTREPRENEURSHIP TRAINING.ppt for graduating class (1).ppt
ENTREPRENEURSHIP TRAINING.ppt for graduating class (1).ppt
 
The-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic managementThe-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic management
 
LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
 
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
 
Business Valuation Principles for Entrepreneurs
Business Valuation Principles for EntrepreneursBusiness Valuation Principles for Entrepreneurs
Business Valuation Principles for Entrepreneurs
 
amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05
 
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdfikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
 
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptxCADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
 
Premium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern BusinessesPremium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern Businesses
 
Brand Analysis for an artist named Struan
Brand Analysis for an artist named StruanBrand Analysis for an artist named Struan
Brand Analysis for an artist named Struan
 
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-indiafalcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
 
anas about venice for grade 6f about venice
anas about venice for grade 6f about veniceanas about venice for grade 6f about venice
anas about venice for grade 6f about venice
 
What is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdfWhat is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdf
 
Sustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & EconomySustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & Economy
 
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s DholeraTata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
 
The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...
 
Exploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social DreamingExploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social Dreaming
 

Hareket Magazine 27. issue-2018- English

  • 1. With more than 60 year of experience, HAREKET has opened its MENA (Middle East and North Africa) office in JAFZA (Jebel Ali Free Zone) Dubai according to its global vision. Accelerated its investments in the bay area by adding CC2800 and CC6800 Crawler Crane, SPMT and THP trucks to the 10,000 m2 machinery park www.hareket.com quarterly magazine January - February - March 2018 / Year 7 Issue 27 MAGAZINE HAREKET launched MENA office in Dubai Jebel Ali Free Zone (South), Plot No. S10505, P.O. Box - 263438 Dubai / United Arab Emirates
  • 2. 2018 / issue 27 2 RailCars of Seyrantepe subway has been transported H AREKET, successfully completed the transportation of 68 RailCar within the scope of Seyrantepe Metro Project. The cars belonging to the Hyundai Rotem were taken from Adapazarı and transported to Seyrantepe Metro Station. While Liebherr LTM1200 and Demag AC200 mobile cranes were used during unloading process of the cars, which were delivered by putting down on the rails, and the transports were performed with Faymonville 4x6 axle trailers The works had started in May 2017 and completed in February 2018. İMTİYAZ SAHİBİ AHMET ALTUNKUM SORUMLU YAZI İŞLERİ MÜDÜRÜ DUYGU SEVINÇ SEVİN EDİTÖR EREN CERCİZ YAYINA HAZIRLAYAN APA YAYINCILIK BASKI Oksijen Basım Seyrantepe Mah. İbrahim Karaoğlanoğlu Cad. Altuntaş Apt. No: 35 D: 3 Kağıthane / İSTANBUL Oksijen Basım Sertifika No: 40379 Basım Tarihi: Mart 2018 HAREKET PROJE TAŞIMACILIĞI VE YÜK MÜHENDİSLİĞİ A.Ş. Eyüp Sultan Mah. Sekmen Caddesi No:28 Sancaktepe - İSTANBUL Tel: 0 216 311 41 41 Fax: 0 216 311 41 45 Yayın Türü: Yaygın süreli, üç ayda bir yayınlanır. HAREKET’Lİ GÜNDEM gazetesi, dahili ve harici dağıtım içindir; parayla satılamaz. KÜNYE H AREKET is putting its mark on many important projects, and one of them, it performed transportation of 6 vessel trailers for Uzmanlar Gemi. 33M x 9m x 17m sized trailers weighing 660 tonnes were transported from the Başiskele Free Zone to the pool at Uzmar Shipyard. During the transportation, HAREKET used 2x16 axle SPMT flatbed trailers and 2xPPUs and it also used a 400 tonnes crawler crane. While the first transports started in March 2018, the last transport was carried out in June. Tug boat transportation completed successfully
  • 3. 2018 / issue 27 3 Installation of wind turbines owned by Çorum Municipality were performed H AREKET put its signature under many Wind Power Plant Projects realized in Turkey and It completed installation works by performing transportation of four LT 80 model 1000 kW wind turbines and HH65M wind power plant from Bandırma to Çorum. Liebherr LTM1750, Liebherr LTM 1500, Tadano Faun 200 model mobile cranes were used in the installation phase of the project, while a total of 10 extension trailers, which their number of axles varying from 4 to 8, were preferred for transportation. The works which started in November 2017 were completed in February 2018 without any problems. Heat exchanger installation operation in Baku We continue to perform yacht transports H AREKET is continuing to take part in many important projects, and it carried out the lifting operation of Heat Exchanger for Worley Parson Company for in order to increase the capacity of MEG unit in Sangachal Terminal located in Azerbaijan. Heat Exchanger with dimensions 3mx 3mx2.6m and weighted 24 tons, is transported from Alfa Laval in France to Baku. It is lifted by using Liebherr LTM1750 mobile crane. The security measures were kept at maximum because the operation was carried out at active plant area. The project started in March 2018 and planned to be completed in April. H AREKET completed transportation of four boats weighing 220 tonnes. The boats with a size of 32m x 8m x 11,6m were taken from Numarine Hangar located in Gebze Organized Industrial Zone and moved to Tuzla RMK shipyard. While 16 axes SPMT flatbed trailer and + 1 PPU were used for transportation, 400-tonnes crawler crane was preferred for lifting the boats. Transports that started in 2016 were performed in different time periods and the last boat was delivered to Tuzla RMK shipyard in May 2016.
  • 4. 2018 / issue 27 4 HAREKET left its mark on Europe’s iconic building G are de Mons, which is one of the iconic buildings of Belgium and constructed by the world-renowned architect / engineer Santiago Calatrava, is gaining new face with HAREKET. Undertaken horizontal scrolling of steel gallery structure weighing 5000 tonnes in total and it proved how high is the capacity of Turkish Companies in the special projects HAREKET carried out a total of 26,6 m towing operations of Gare De Mons railway station weighing 5000 tonnes in total, which was approximately 2000 tonnes and 16 m in the first stage, and 2400 tonnes and 10.6 m in the second stage. 4 pieces of 200 tonnes of strand jack were used as equipment in in-site horizontal pulling process. The most difficult part of the project was ongoing operations of the train station during the works. Therefore, HAREKET presented a special solution for the project. Mounted parts in the north-west section of the station were passed over the operational train lines through the sleds on the temporary towers assembled between the train lines. It was shifted horizontally in the south-east direction in several stages. In this way, daily operations of the train station have continued without interruption. The first phase of the project was completed in June 2017, and the second phase was completed successfully in May 2018.