Crossrail C336 Paddington New Yard
Bored Piling
LONDON , U.K.
Scope of Works
162no. CSP secant piles, 106 no.Batching Plant
LDA piles, 122no. Derailment LDA piles, 74no.
SolThread piles, 77no. Restricted LDA piles
and 51no. restricted access mini-piles.
Introduction
Adjacent to Paddington Station, the redevelopment of
Crossrail’s Western Gateway, Paddington New Yard, is a
site that is steeped with historical interest. On this site the
team uncovered the foundations of Brunel’s’ engine shed
and two brick turntables dating to the 1800s – findings,
which in conjunction with a logistically challenging site,
have led to a complex ground engineering solution being
sought for the project.
Tasked with delivering specialist ground-engineering work
for the construction of derailment walls, bus depot and
batching plant, Crossrail and Costain appointed Bachy
Soletanche to the intricate project to deliver a unique piling
technique following a period of initial testing period.
Working alongside contractor Costain, Bachy installed162
CSP secant piles, 106 Batching Plant LDA piles, 122
Derailment LDA piles, 77 low headroom LDA piles, 74
SolThread piles and 51 restricted access minipiles,
operating in a head room of 5m. The low headroom Soiltek
rig operated in LDA rotary mode and had its mast reduced
to 9.3m to enable it to work safely under the A40 West Way
viaduct with, in places, a height restriction of only 10.36m.
The site team were keen to offer a more sustainable piling
solution, and so their design team proposed an innovative
technique to the project; following ten years of development
SolThread was delivered as a sustainable alternative to
conventional piles. Due to its threaded shape and design
SolThread requires less concrete to build the piles, and
less muck away lorries to remove pile spoil.
Rotary Bored Sol Thread Piles
A648
Secant piling, Rotary Bored piles,
Low Headroom piles, Mini-piles,
and SolThread piles
CLIENT: Crossrail
MAIN CONTRACTOR: Costain
CONSULTING ENGINEER: Capita
DURATION OF WORKS:
www.bacsol.co.uk
Sustainability Innovations
√ 1 Concrete savings using SolThread
threaded piles
√ 2 Reduced pile spoil and lorry movements
A648
“
The SolThread technique also offers financial and
environmental savings, in addition to a reduction in
site traffic and an associated improvement in safety
for road users. The aim of the development of this
innovative technique was the reduction of material
use and lorry movements compared to conventional
rotary piles through the creation of a threaded rotary
bored pile.
The process is based upon standard pile construc-
tion techniques with the addition of a stage to create
the thread on the pile bore. Remote access inspec-
tion techniques, based upon those for inspection of
under ream piles, are used to demonstrate the effec-
tiveness of the threading process, combined with
static load tests to validate the design assumptions.
Specially developed on-board electronic systems en-
able the operator to monitor thread formation and
provide as built record information.
www.bacsol.co.uk
Cased CFA Secant Piled Wall
This patented pile consists of a central core, with a
helical thread formed around this - increasing the
effective geotechnical diameter of the pile by
150mm. A pile with a threaded shaft also offered
increased skin friction compared with an unthread-
ed shaft and therefore increased pile capacity by
40% for the project. These piles form the basis of
the site’s facilities, which on completion will be
home to a concrete batching plant owner, a bus
depot, Crossrail running lines & turn backs, plus
sidings for freight rail operators, DB Schenker.
Low Headroom Rotary Piling under A40
The final phase of our works involved re-
stricted access minipiling. This involved
51no., 600mm diameter piles up to 20m
long and with a working height of only 5m,
underneath a elevated section of the A40
roadway. Some of these piles also includ-
ed I-beams, positioned to a tight verticality
and positional tolerance, for use as King
Posts retaining walls.Remote inspection of pile threads
Restricted Access Minipiles

More Related Content

What's hot

Enter a New Dimension - LOESCHE CCG Plant
Enter a New Dimension - LOESCHE CCG PlantEnter a New Dimension - LOESCHE CCG Plant
Enter a New Dimension - LOESCHE CCG Plant
LOESCHE
 
Veolia case study
Veolia case studyVeolia case study
Veolia case study
Neil Emmott
 
Bid corporate presentation
Bid corporate presentationBid corporate presentation
Bid corporate presentationdlawrence
 
Proj ref lrg_anzacbridge
Proj ref lrg_anzacbridgeProj ref lrg_anzacbridge
Proj ref lrg_anzacbridgeBrett Finucane
 
Cleveland Cascades DCI Sep14
Cleveland Cascades DCI Sep14Cleveland Cascades DCI Sep14
Cleveland Cascades DCI Sep14Brian Thirlwall
 
12632_CSAsphalt_Enfield_Terminal_LR
12632_CSAsphalt_Enfield_Terminal_LR12632_CSAsphalt_Enfield_Terminal_LR
12632_CSAsphalt_Enfield_Terminal_LRAndrew de Villiers
 
1255 - Roy Hill Port Landside
1255 - Roy Hill Port Landside1255 - Roy Hill Port Landside
1255 - Roy Hill Port LandsideAnthony Jones
 
New Presentation Layout 09-09-16 Linkedin
New Presentation Layout 09-09-16 LinkedinNew Presentation Layout 09-09-16 Linkedin
New Presentation Layout 09-09-16 LinkedinDanny Spaans
 
Cc channel lining aberdeen western peripheral route - transport scotland (1)
Cc channel lining   aberdeen western peripheral route - transport scotland (1)Cc channel lining   aberdeen western peripheral route - transport scotland (1)
Cc channel lining aberdeen western peripheral route - transport scotland (1)
Oscar044
 
Cement & Asphalt Market Applications & Innovations
Cement & Asphalt Market Applications & InnovationsCement & Asphalt Market Applications & Innovations
Cement & Asphalt Market Applications & Innovations
Altra Industrial Motion
 
Spectra cs ratts_12.08
Spectra cs ratts_12.08Spectra cs ratts_12.08
Spectra cs ratts_12.08
Meghan Stoneburner
 
Production Buoyancy - Ichthys LNG Project (McDermotts) _ Matrix Composites an...
Production Buoyancy - Ichthys LNG Project (McDermotts) _ Matrix Composites an...Production Buoyancy - Ichthys LNG Project (McDermotts) _ Matrix Composites an...
Production Buoyancy - Ichthys LNG Project (McDermotts) _ Matrix Composites an...Myke P
 
Takraf ipcc 2014_compressed
Takraf ipcc 2014_compressedTakraf ipcc 2014_compressed
Takraf ipcc 2014_compressed
Norbert Neumann
 
Presentación de Egbert Burchardt, Thyssenkrupp
Presentación de Egbert Burchardt, ThyssenkruppPresentación de Egbert Burchardt, Thyssenkrupp
Presentación de Egbert Burchardt, Thyssenkrupp
Voces Mineras
 
Gurit UK - Projects and Case Studies
Gurit UK - Projects and Case StudiesGurit UK - Projects and Case Studies
Gurit UK - Projects and Case StudiesAdam Davison
 
Buttimer Dockside Loaders
Buttimer Dockside LoadersButtimer Dockside Loaders
Buttimer Dockside Loaders
Joseph Cummins
 
Vertical roller grinding mill0601
Vertical roller grinding mill0601Vertical roller grinding mill0601
Vertical roller grinding mill0601
Shanghai Clirik Mahcinery
 
Multiphase Desanding for Upstream Oil & Gas Industry
Multiphase Desanding for Upstream Oil & Gas IndustryMultiphase Desanding for Upstream Oil & Gas Industry
Multiphase Desanding for Upstream Oil & Gas Industry
Hank Rawlins
 

What's hot (20)

Enter a New Dimension - LOESCHE CCG Plant
Enter a New Dimension - LOESCHE CCG PlantEnter a New Dimension - LOESCHE CCG Plant
Enter a New Dimension - LOESCHE CCG Plant
 
Veolia case study
Veolia case studyVeolia case study
Veolia case study
 
Bid corporate presentation
Bid corporate presentationBid corporate presentation
Bid corporate presentation
 
Proj ref lrg_anzacbridge
Proj ref lrg_anzacbridgeProj ref lrg_anzacbridge
Proj ref lrg_anzacbridge
 
Cleveland Cascades DCI Sep14
Cleveland Cascades DCI Sep14Cleveland Cascades DCI Sep14
Cleveland Cascades DCI Sep14
 
12632_CSAsphalt_Enfield_Terminal_LR
12632_CSAsphalt_Enfield_Terminal_LR12632_CSAsphalt_Enfield_Terminal_LR
12632_CSAsphalt_Enfield_Terminal_LR
 
1255 - Roy Hill Port Landside
1255 - Roy Hill Port Landside1255 - Roy Hill Port Landside
1255 - Roy Hill Port Landside
 
New Presentation Layout 09-09-16 Linkedin
New Presentation Layout 09-09-16 LinkedinNew Presentation Layout 09-09-16 Linkedin
New Presentation Layout 09-09-16 Linkedin
 
H3 New Conveyer Logistics
H3 New Conveyer LogisticsH3 New Conveyer Logistics
H3 New Conveyer Logistics
 
Cc channel lining aberdeen western peripheral route - transport scotland (1)
Cc channel lining   aberdeen western peripheral route - transport scotland (1)Cc channel lining   aberdeen western peripheral route - transport scotland (1)
Cc channel lining aberdeen western peripheral route - transport scotland (1)
 
Cement & Asphalt Market Applications & Innovations
Cement & Asphalt Market Applications & InnovationsCement & Asphalt Market Applications & Innovations
Cement & Asphalt Market Applications & Innovations
 
Spectra cs ratts_12.08
Spectra cs ratts_12.08Spectra cs ratts_12.08
Spectra cs ratts_12.08
 
Production Buoyancy - Ichthys LNG Project (McDermotts) _ Matrix Composites an...
Production Buoyancy - Ichthys LNG Project (McDermotts) _ Matrix Composites an...Production Buoyancy - Ichthys LNG Project (McDermotts) _ Matrix Composites an...
Production Buoyancy - Ichthys LNG Project (McDermotts) _ Matrix Composites an...
 
Takraf ipcc 2014_compressed
Takraf ipcc 2014_compressedTakraf ipcc 2014_compressed
Takraf ipcc 2014_compressed
 
Presentación de Egbert Burchardt, Thyssenkrupp
Presentación de Egbert Burchardt, ThyssenkruppPresentación de Egbert Burchardt, Thyssenkrupp
Presentación de Egbert Burchardt, Thyssenkrupp
 
Gurit UK - Projects and Case Studies
Gurit UK - Projects and Case StudiesGurit UK - Projects and Case Studies
Gurit UK - Projects and Case Studies
 
Montrose BLP
Montrose BLPMontrose BLP
Montrose BLP
 
Buttimer Dockside Loaders
Buttimer Dockside LoadersButtimer Dockside Loaders
Buttimer Dockside Loaders
 
Vertical roller grinding mill0601
Vertical roller grinding mill0601Vertical roller grinding mill0601
Vertical roller grinding mill0601
 
Multiphase Desanding for Upstream Oil & Gas Industry
Multiphase Desanding for Upstream Oil & Gas IndustryMultiphase Desanding for Upstream Oil & Gas Industry
Multiphase Desanding for Upstream Oil & Gas Industry
 

Viewers also liked

Carta de demissão temporária
Carta de demissão temporáriaCarta de demissão temporária
Carta de demissão temporária
Edmilson Antonio
 
Integración formas de estudiar el lenguaje
Integración formas de estudiar el lenguajeIntegración formas de estudiar el lenguaje
Integración formas de estudiar el lenguajeLautaro Pacella
 
Ac 3 ano h ii -turma 1 - gabaritada
Ac 3 ano h ii -turma 1 - gabaritadaAc 3 ano h ii -turma 1 - gabaritada
Ac 3 ano h ii -turma 1 - gabaritada
Pérysson Nogueira
 
Proceso de legalizacion de una empresa colombiana
Proceso de legalizacion de una empresa colombianaProceso de legalizacion de una empresa colombiana
Proceso de legalizacion de una empresa colombianadianaloboalvarado
 
Juvenil b
Juvenil bJuvenil b
Juvenil bfbcat
 
Construction project and change order management contemporary affirm
Construction project and change order management contemporary affirmConstruction project and change order management contemporary affirm
Construction project and change order management contemporary affirmIAEME Publication
 
finalSensors2015_SpeakerPresentationPPT_Exergen Global Bram Stelt_DEFINITIEF
finalSensors2015_SpeakerPresentationPPT_Exergen Global Bram Stelt_DEFINITIEFfinalSensors2015_SpeakerPresentationPPT_Exergen Global Bram Stelt_DEFINITIEF
finalSensors2015_SpeakerPresentationPPT_Exergen Global Bram Stelt_DEFINITIEFEllen Minkels
 
Organizaciona transformacija - Kako drustveni mediji razgradjuju korporativnu...
Organizaciona transformacija - Kako drustveni mediji razgradjuju korporativnu...Organizaciona transformacija - Kako drustveni mediji razgradjuju korporativnu...
Organizaciona transformacija - Kako drustveni mediji razgradjuju korporativnu...
Vladimir Vulic
 
Feel Like Being a Hero? Help the Balkans Recover From a Catastrophic Natural ...
Feel Like Being a Hero? Help the Balkans Recover From a Catastrophic Natural ...Feel Like Being a Hero? Help the Balkans Recover From a Catastrophic Natural ...
Feel Like Being a Hero? Help the Balkans Recover From a Catastrophic Natural ...
Vladimir Vulic
 

Viewers also liked (18)

Jet Net (2)
Jet Net (2)Jet Net (2)
Jet Net (2)
 
CARPE_Logo
CARPE_LogoCARPE_Logo
CARPE_Logo
 
Carta de demissão temporária
Carta de demissão temporáriaCarta de demissão temporária
Carta de demissão temporária
 
Integración formas de estudiar el lenguaje
Integración formas de estudiar el lenguajeIntegración formas de estudiar el lenguaje
Integración formas de estudiar el lenguaje
 
DOCUMENTOS
DOCUMENTOSDOCUMENTOS
DOCUMENTOS
 
CV_YI CHUN WANG
CV_YI CHUN WANGCV_YI CHUN WANG
CV_YI CHUN WANG
 
С.Набока
С.НабокаС.Набока
С.Набока
 
Ac 3 ano h ii -turma 1 - gabaritada
Ac 3 ano h ii -turma 1 - gabaritadaAc 3 ano h ii -turma 1 - gabaritada
Ac 3 ano h ii -turma 1 - gabaritada
 
Proceso de legalizacion de una empresa colombiana
Proceso de legalizacion de una empresa colombianaProceso de legalizacion de una empresa colombiana
Proceso de legalizacion de una empresa colombiana
 
Juvenil b
Juvenil bJuvenil b
Juvenil b
 
Presentación1
Presentación1Presentación1
Presentación1
 
Construction project and change order management contemporary affirm
Construction project and change order management contemporary affirmConstruction project and change order management contemporary affirm
Construction project and change order management contemporary affirm
 
finalSensors2015_SpeakerPresentationPPT_Exergen Global Bram Stelt_DEFINITIEF
finalSensors2015_SpeakerPresentationPPT_Exergen Global Bram Stelt_DEFINITIEFfinalSensors2015_SpeakerPresentationPPT_Exergen Global Bram Stelt_DEFINITIEF
finalSensors2015_SpeakerPresentationPPT_Exergen Global Bram Stelt_DEFINITIEF
 
Reaildad e imagen
Reaildad e imagenReaildad e imagen
Reaildad e imagen
 
Organizaciona transformacija - Kako drustveni mediji razgradjuju korporativnu...
Organizaciona transformacija - Kako drustveni mediji razgradjuju korporativnu...Organizaciona transformacija - Kako drustveni mediji razgradjuju korporativnu...
Organizaciona transformacija - Kako drustveni mediji razgradjuju korporativnu...
 
A república populista
A república populistaA república populista
A república populista
 
Forma
FormaForma
Forma
 
Feel Like Being a Hero? Help the Balkans Recover From a Catastrophic Natural ...
Feel Like Being a Hero? Help the Balkans Recover From a Catastrophic Natural ...Feel Like Being a Hero? Help the Balkans Recover From a Catastrophic Natural ...
Feel Like Being a Hero? Help the Balkans Recover From a Catastrophic Natural ...
 

Similar to Crossrail-C336-Paddington-New-Yard

Severn_Trent_Wanlip_Sludge_2014
Severn_Trent_Wanlip_Sludge_2014Severn_Trent_Wanlip_Sludge_2014
Severn_Trent_Wanlip_Sludge_2014Iain McGregor
 
Rong Vo Catia V5 Projects And Fea And Msc Adams Simulations
Rong Vo Catia V5 Projects And Fea And Msc Adams SimulationsRong Vo Catia V5 Projects And Fea And Msc Adams Simulations
Rong Vo Catia V5 Projects And Fea And Msc Adams SimulationsRong Vo
 
CMS DIP Presentation 18
CMS DIP Presentation 18CMS DIP Presentation 18
CMS DIP Presentation 18
presentimage
 
Mining & Aggregate Conveyors Applications & Innovations
Mining & Aggregate Conveyors Applications & InnovationsMining & Aggregate Conveyors Applications & Innovations
Mining & Aggregate Conveyors Applications & Innovations
Altra Industrial Motion
 
Bulk Solids Handling Article
Bulk Solids Handling ArticleBulk Solids Handling Article
Bulk Solids Handling ArticleSachin Ramjee
 
Whitescape Civil Engineering Case Study
Whitescape Civil Engineering Case StudyWhitescape Civil Engineering Case Study
Whitescape Civil Engineering Case Study
Andrew White
 
Stella Maris CCS Introduction - Original Website version.pdf
Stella Maris CCS Introduction - Original Website version.pdfStella Maris CCS Introduction - Original Website version.pdf
Stella Maris CCS Introduction - Original Website version.pdf
srogne
 
Vedam Designs: Solutions for Shallow Water maintenance Dredging
Vedam Designs: Solutions for Shallow Water maintenance DredgingVedam Designs: Solutions for Shallow Water maintenance Dredging
Vedam Designs: Solutions for Shallow Water maintenance Dredging
Vedam design & Techincal Consultancy Pvt Ltd.
 
Portfolio - Theodoros Dragonas - Mechanical Design Engineer
Portfolio - Theodoros Dragonas - Mechanical Design EngineerPortfolio - Theodoros Dragonas - Mechanical Design Engineer
Portfolio - Theodoros Dragonas - Mechanical Design Engineer
Theodoros Dragonas
 
Comparative Study of Different Web Openings in Castellated Beam by Using Ansy...
Comparative Study of Different Web Openings in Castellated Beam by Using Ansy...Comparative Study of Different Web Openings in Castellated Beam by Using Ansy...
Comparative Study of Different Web Openings in Castellated Beam by Using Ansy...
IRJET Journal
 
Birmingham New Street - Final Push
Birmingham New Street - Final PushBirmingham New Street - Final Push
Birmingham New Street - Final PushMarc Johnson
 
hochPPT thesis statement master civil engineering.pptx
hochPPT thesis statement master civil engineering.pptxhochPPT thesis statement master civil engineering.pptx
hochPPT thesis statement master civil engineering.pptx
Zakaria156221
 
Présentation master thesesis in civil department pptx
Présentation master thesesis in civil department pptxPrésentation master thesesis in civil department pptx
Présentation master thesesis in civil department pptx
Zakaria156221
 
King Abdullah Road 4 12 07 Presentation
King Abdullah Road 4 12 07 PresentationKing Abdullah Road 4 12 07 Presentation
King Abdullah Road 4 12 07 Presentationguest2d44ee
 
Materialhandling
MaterialhandlingMaterialhandling
Materialhandling
PRABIR DATTA
 

Similar to Crossrail-C336-Paddington-New-Yard (20)

TRE July 2016 - Stirling
TRE July 2016 - StirlingTRE July 2016 - Stirling
TRE July 2016 - Stirling
 
Severn_Trent_Wanlip_Sludge_2014
Severn_Trent_Wanlip_Sludge_2014Severn_Trent_Wanlip_Sludge_2014
Severn_Trent_Wanlip_Sludge_2014
 
2000_Charleston_cement
2000_Charleston_cement2000_Charleston_cement
2000_Charleston_cement
 
Rong Vo Catia V5 Projects And Fea And Msc Adams Simulations
Rong Vo Catia V5 Projects And Fea And Msc Adams SimulationsRong Vo Catia V5 Projects And Fea And Msc Adams Simulations
Rong Vo Catia V5 Projects And Fea And Msc Adams Simulations
 
CMS DIP Presentation 18
CMS DIP Presentation 18CMS DIP Presentation 18
CMS DIP Presentation 18
 
Mining & Aggregate Conveyors Applications & Innovations
Mining & Aggregate Conveyors Applications & InnovationsMining & Aggregate Conveyors Applications & Innovations
Mining & Aggregate Conveyors Applications & Innovations
 
Bulk Solids Handling Article
Bulk Solids Handling ArticleBulk Solids Handling Article
Bulk Solids Handling Article
 
Whitescape Civil Engineering Case Study
Whitescape Civil Engineering Case StudyWhitescape Civil Engineering Case Study
Whitescape Civil Engineering Case Study
 
Stella Maris CCS Introduction - Original Website version.pdf
Stella Maris CCS Introduction - Original Website version.pdfStella Maris CCS Introduction - Original Website version.pdf
Stella Maris CCS Introduction - Original Website version.pdf
 
Vedam Designs: Solutions for Shallow Water maintenance Dredging
Vedam Designs: Solutions for Shallow Water maintenance DredgingVedam Designs: Solutions for Shallow Water maintenance Dredging
Vedam Designs: Solutions for Shallow Water maintenance Dredging
 
Portfolio - Theodoros Dragonas - Mechanical Design Engineer
Portfolio - Theodoros Dragonas - Mechanical Design EngineerPortfolio - Theodoros Dragonas - Mechanical Design Engineer
Portfolio - Theodoros Dragonas - Mechanical Design Engineer
 
Comparative Study of Different Web Openings in Castellated Beam by Using Ansy...
Comparative Study of Different Web Openings in Castellated Beam by Using Ansy...Comparative Study of Different Web Openings in Castellated Beam by Using Ansy...
Comparative Study of Different Web Openings in Castellated Beam by Using Ansy...
 
Linkedin
LinkedinLinkedin
Linkedin
 
Birmingham New Street - Final Push
Birmingham New Street - Final PushBirmingham New Street - Final Push
Birmingham New Street - Final Push
 
hochPPT thesis statement master civil engineering.pptx
hochPPT thesis statement master civil engineering.pptxhochPPT thesis statement master civil engineering.pptx
hochPPT thesis statement master civil engineering.pptx
 
Présentation master thesesis in civil department pptx
Présentation master thesesis in civil department pptxPrésentation master thesesis in civil department pptx
Présentation master thesesis in civil department pptx
 
SubseaServices
SubseaServicesSubseaServices
SubseaServices
 
EA article -Legacy Way
EA article -Legacy WayEA article -Legacy Way
EA article -Legacy Way
 
King Abdullah Road 4 12 07 Presentation
King Abdullah Road 4 12 07 PresentationKing Abdullah Road 4 12 07 Presentation
King Abdullah Road 4 12 07 Presentation
 
Materialhandling
MaterialhandlingMaterialhandling
Materialhandling
 

Crossrail-C336-Paddington-New-Yard

  • 1. Crossrail C336 Paddington New Yard Bored Piling LONDON , U.K. Scope of Works 162no. CSP secant piles, 106 no.Batching Plant LDA piles, 122no. Derailment LDA piles, 74no. SolThread piles, 77no. Restricted LDA piles and 51no. restricted access mini-piles. Introduction Adjacent to Paddington Station, the redevelopment of Crossrail’s Western Gateway, Paddington New Yard, is a site that is steeped with historical interest. On this site the team uncovered the foundations of Brunel’s’ engine shed and two brick turntables dating to the 1800s – findings, which in conjunction with a logistically challenging site, have led to a complex ground engineering solution being sought for the project. Tasked with delivering specialist ground-engineering work for the construction of derailment walls, bus depot and batching plant, Crossrail and Costain appointed Bachy Soletanche to the intricate project to deliver a unique piling technique following a period of initial testing period. Working alongside contractor Costain, Bachy installed162 CSP secant piles, 106 Batching Plant LDA piles, 122 Derailment LDA piles, 77 low headroom LDA piles, 74 SolThread piles and 51 restricted access minipiles, operating in a head room of 5m. The low headroom Soiltek rig operated in LDA rotary mode and had its mast reduced to 9.3m to enable it to work safely under the A40 West Way viaduct with, in places, a height restriction of only 10.36m. The site team were keen to offer a more sustainable piling solution, and so their design team proposed an innovative technique to the project; following ten years of development SolThread was delivered as a sustainable alternative to conventional piles. Due to its threaded shape and design SolThread requires less concrete to build the piles, and less muck away lorries to remove pile spoil. Rotary Bored Sol Thread Piles A648 Secant piling, Rotary Bored piles, Low Headroom piles, Mini-piles, and SolThread piles CLIENT: Crossrail MAIN CONTRACTOR: Costain CONSULTING ENGINEER: Capita DURATION OF WORKS: www.bacsol.co.uk Sustainability Innovations √ 1 Concrete savings using SolThread threaded piles √ 2 Reduced pile spoil and lorry movements
  • 2. A648 “ The SolThread technique also offers financial and environmental savings, in addition to a reduction in site traffic and an associated improvement in safety for road users. The aim of the development of this innovative technique was the reduction of material use and lorry movements compared to conventional rotary piles through the creation of a threaded rotary bored pile. The process is based upon standard pile construc- tion techniques with the addition of a stage to create the thread on the pile bore. Remote access inspec- tion techniques, based upon those for inspection of under ream piles, are used to demonstrate the effec- tiveness of the threading process, combined with static load tests to validate the design assumptions. Specially developed on-board electronic systems en- able the operator to monitor thread formation and provide as built record information. www.bacsol.co.uk Cased CFA Secant Piled Wall This patented pile consists of a central core, with a helical thread formed around this - increasing the effective geotechnical diameter of the pile by 150mm. A pile with a threaded shaft also offered increased skin friction compared with an unthread- ed shaft and therefore increased pile capacity by 40% for the project. These piles form the basis of the site’s facilities, which on completion will be home to a concrete batching plant owner, a bus depot, Crossrail running lines & turn backs, plus sidings for freight rail operators, DB Schenker. Low Headroom Rotary Piling under A40 The final phase of our works involved re- stricted access minipiling. This involved 51no., 600mm diameter piles up to 20m long and with a working height of only 5m, underneath a elevated section of the A40 roadway. Some of these piles also includ- ed I-beams, positioned to a tight verticality and positional tolerance, for use as King Posts retaining walls.Remote inspection of pile threads Restricted Access Minipiles