SlideShare a Scribd company logo
DELIVERING THE FUTURE
OF COMPOSITE SOLUTIONS
©Ainhoa Sanchez/Volvo Ocean Race
GURIT: OFFICIAL COMPOSITE MATERIALS SUPPLIER OF THE VOLVO OCEAN RACE 2014/5
Gurit composite materials will be used for the repair and maintenance of the VOR 65 fleet during one of the world's toughest sailing events. With 11 ports,
38,739 nautical miles to be covered, it really does not get tougher than this.
LA FERRARI – FERRARI’S MOST AMBITIOUS PROJECT FEATURING GURIT’S CLASS-A CBS SYSTEM
LaFerrari represents Ferrari’s most ambitious project yet; to push the boundaries of technology on a road car, drawing together the finest expression of the
marque’s technical capabilities in both GT and Formula 1 engineering. Through close cooperation between Gurit and Ferrari, Gurit’s Class-A CBS system was
selected for the front and rear fenders of this prestigious vehicle.
WRIGHTBUS ‘NEW BUS FOR LONDON’
During 2008, the newly elected Mayor of London, Boris Johnson, introduced a new double-decker bus for London (NBfL). The rear end of the bus exterior
(behind the rear wheels) and the hop-on, hop-off platform are built with Gurit’s composite materials. Gurit manufactured the prototype parts for durability
and fatigue testing and has now moved into series production.
OUT OF THE STRONG CAME FORTH SWEETNESS
Our brief from Derwent was simple, to propose an artwork for the atrium of the Angel Building that might also provide an opportunity for public seating and
interaction. The piece is made from carbon fibre which is both very strong and lightweight. The piece is 22 metres high and narrows to 100mm diameter at
the midpoint, and 25mm at the tip.
SKYe SH09 – NEW HELICOPTER CONCEPT USING COMPOSITE MATERIALS
On November 28, 2013, the prototype of an entirely new helicopter concept saw its official roll-out in Switzerland. SKYe SH09 immediately met with great
interest. Rethinking helicopters required a novel approach to building materials, resulting in the SKYe SH09 almost entirely built using composite materials,
including key prepreg supplier, Gurit.
Image courtesy of PCT
CARKEEK 60 ‘ICHI BAN’ NEXT GENERATION 60’ RACE BOAT
Ichi Ban is the next generation of sleek new 60’ racing boat, built by Premier Composite Technologies (PCT), and designed by Shaun Carkeek, this C60 is a
new breed of ultra-light displacement race boat. Gurit were able to call on over 30 years of experience with engineering of cutting edge race boats to get a
head start in the engineering of the boat, and combined this with working closely with the design and build team to develop the structure of this boat.
AL HARAMAIN HIGH SPEED RAIL – COMPOSITE STATION ROOFS
The Haramain High Speed Rail project is a new high speed rail line in Saudi Arabia, running between the holy cities of Makkah and Medinah. Gurit and
Premier Composite Technologies worked closely with the design team during the concept and tender design stages of the roof to develop the concept of
using FRP panels in the station roof. The weight of the composite is approximately 720 tonnes, which makes the station roof one of the most extensive uses
of advanced composites in the architectural industry.
‘DRAGON WINGS’ LIFTING BRIDGE OVER RHYL HARBOUR
Gurit was contracted to carry out the detailed engineering of the bridge decks. The decks are very slender, partially for aesthetic reasons, but also to ensure
that the inshore lifeboat would have sufficient headroom to pass under the lowered bridge at all tide levels. Gurit made extensive use of finite element
analysis to carry out transient dynamic analysis of the bridge.
VSKCORRINALDI CARBON FIBRE MOTOR BIKE BODY KITS
The exclusive motor bike body kits manufactured by Vskcorrinaldi are a great example of visual carbon fibre giving their motor bikes a completely new look.
Vskcorrinaldi relies on Gurit’s Ampreg 21, an epoxy wet laminating system with non-pigmented resin and hardeners, and SP 115, a clear epoxy wet
laminating system that gives the final structure a characteristic, transparent violet-blue glow.
MAKKAH CLOCK TOWER
The central tower of the Abraj-al Bait development in Makkah, KSA, features FRP composite materials and structural engineering Gurit. Gurit worked closely
with the tower top designers, SL-Rasch (Stuttgart, Germany), to carry out the structural engineering of the composite tower top cladding, clock hands, and
the 23m diameter crescent, a self-supportive FRP composite structure which is located at the top of the building.
HETARIOS – THE PANAMAX KETCH PROJECT
For four years Gurit worked with Baltic Yachts on the Panamax Ketch project. This included the supply of composite materials and a large structural
engineering design consultancy project. It is the largest and most challenging project ever undertaken by all those involved. The boat, named “Hetairos”, was
launched in May 2011, and handed over in July 2011

More Related Content

What's hot

Crossrail-C336-Paddington-New-Yard
Crossrail-C336-Paddington-New-YardCrossrail-C336-Paddington-New-Yard
Crossrail-C336-Paddington-New-Yard
Sean O'Shea BSc (Hons)
 
Scott LinkedIn
Scott LinkedInScott LinkedIn
Scott LinkedIn
scottmacbet
 
WORLD CARGO NEWS
WORLD CARGO NEWS WORLD CARGO NEWS
WORLD CARGO NEWS
Cláudio Carneiro
 
Tow Lift Cerification
Tow Lift CerificationTow Lift Cerification
Tow Lift Cerification
Alex Mitchell
 
3. Railway Strategies - July 2012
3. Railway Strategies - July 20123. Railway Strategies - July 2012
3. Railway Strategies - July 2012
Gordon Suthorn CEng MICE
 
(7) bharath benz trucks ppt hari master piece
(7) bharath benz trucks ppt hari master piece(7) bharath benz trucks ppt hari master piece
(7) bharath benz trucks ppt hari master piece
HariMasterpiece
 
H3 New Conveyer Logistics
H3 New Conveyer LogisticsH3 New Conveyer Logistics
H3 New Conveyer Logistics
Prosenjit Bhattacharya
 
Franna History Brochure
Franna History BrochureFranna History Brochure
Franna History Brochure
John A. Pavone, E.M.B.A.
 
Alstom Fauns and Unipwer
Alstom Fauns and UnipwerAlstom Fauns and Unipwer
Alstom Fauns and Unipwer
T C
 
Khalifa Port & Industrial Zone
Khalifa Port & Industrial ZoneKhalifa Port & Industrial Zone
Khalifa Port & Industrial Zone
Falco Ziehl
 
C&N Intro
C&N IntroC&N Intro
C&N Intro
MartinH1964
 
New NICOLAS Side Girder Deck
New NICOLAS Side Girder DeckNew NICOLAS Side Girder Deck
New NICOLAS Side Girder Deck
athmedia
 
TANA RAILWAY BRIDGE
TANA RAILWAY BRIDGETANA RAILWAY BRIDGE
TANA RAILWAY BRIDGE
Andrew Kago
 
The Next Steps in Creating Export Capacity
The Next Steps in Creating Export CapacityThe Next Steps in Creating Export Capacity
The Next Steps in Creating Export Capacity
Tristan Wiggill
 
Porsche 918 Spyder finishes production - News Release
Porsche 918 Spyder finishes production - News ReleasePorsche 918 Spyder finishes production - News Release
Porsche 918 Spyder finishes production - News Release
RushLane
 
CSRE UK Approach Linkedin Feb11
CSRE UK Approach Linkedin Feb11CSRE UK Approach Linkedin Feb11
CSRE UK Approach Linkedin Feb11
David Shipley
 
BELL B60D
BELL B60DBELL B60D
BELL B60D
Hamy Tejeda
 
Saudi arabia railway organisation visit to transnet iron ore line saldanha
Saudi arabia railway organisation visit to transnet iron ore line saldanhaSaudi arabia railway organisation visit to transnet iron ore line saldanha
Saudi arabia railway organisation visit to transnet iron ore line saldanha
Transnet Port Terminals
 
July 28, 2015 Study Session Presentation- Expressway Tunnel
July 28, 2015 Study Session Presentation- Expressway TunnelJuly 28, 2015 Study Session Presentation- Expressway Tunnel
July 28, 2015 Study Session Presentation- Expressway Tunnel
City of Corona
 
Sany mining equipment series
Sany mining equipment seriesSany mining equipment series
Sany mining equipment series
QIJIA LIAO(廖启佳)
 

What's hot (20)

Crossrail-C336-Paddington-New-Yard
Crossrail-C336-Paddington-New-YardCrossrail-C336-Paddington-New-Yard
Crossrail-C336-Paddington-New-Yard
 
Scott LinkedIn
Scott LinkedInScott LinkedIn
Scott LinkedIn
 
WORLD CARGO NEWS
WORLD CARGO NEWS WORLD CARGO NEWS
WORLD CARGO NEWS
 
Tow Lift Cerification
Tow Lift CerificationTow Lift Cerification
Tow Lift Cerification
 
3. Railway Strategies - July 2012
3. Railway Strategies - July 20123. Railway Strategies - July 2012
3. Railway Strategies - July 2012
 
(7) bharath benz trucks ppt hari master piece
(7) bharath benz trucks ppt hari master piece(7) bharath benz trucks ppt hari master piece
(7) bharath benz trucks ppt hari master piece
 
H3 New Conveyer Logistics
H3 New Conveyer LogisticsH3 New Conveyer Logistics
H3 New Conveyer Logistics
 
Franna History Brochure
Franna History BrochureFranna History Brochure
Franna History Brochure
 
Alstom Fauns and Unipwer
Alstom Fauns and UnipwerAlstom Fauns and Unipwer
Alstom Fauns and Unipwer
 
Khalifa Port & Industrial Zone
Khalifa Port & Industrial ZoneKhalifa Port & Industrial Zone
Khalifa Port & Industrial Zone
 
C&N Intro
C&N IntroC&N Intro
C&N Intro
 
New NICOLAS Side Girder Deck
New NICOLAS Side Girder DeckNew NICOLAS Side Girder Deck
New NICOLAS Side Girder Deck
 
TANA RAILWAY BRIDGE
TANA RAILWAY BRIDGETANA RAILWAY BRIDGE
TANA RAILWAY BRIDGE
 
The Next Steps in Creating Export Capacity
The Next Steps in Creating Export CapacityThe Next Steps in Creating Export Capacity
The Next Steps in Creating Export Capacity
 
Porsche 918 Spyder finishes production - News Release
Porsche 918 Spyder finishes production - News ReleasePorsche 918 Spyder finishes production - News Release
Porsche 918 Spyder finishes production - News Release
 
CSRE UK Approach Linkedin Feb11
CSRE UK Approach Linkedin Feb11CSRE UK Approach Linkedin Feb11
CSRE UK Approach Linkedin Feb11
 
BELL B60D
BELL B60DBELL B60D
BELL B60D
 
Saudi arabia railway organisation visit to transnet iron ore line saldanha
Saudi arabia railway organisation visit to transnet iron ore line saldanhaSaudi arabia railway organisation visit to transnet iron ore line saldanha
Saudi arabia railway organisation visit to transnet iron ore line saldanha
 
July 28, 2015 Study Session Presentation- Expressway Tunnel
July 28, 2015 Study Session Presentation- Expressway TunnelJuly 28, 2015 Study Session Presentation- Expressway Tunnel
July 28, 2015 Study Session Presentation- Expressway Tunnel
 
Sany mining equipment series
Sany mining equipment seriesSany mining equipment series
Sany mining equipment series
 

Similar to Gurit UK - Projects and Case Studies

1. Rail Infrastructure - August 2014
1. Rail Infrastructure - August 20141. Rail Infrastructure - August 2014
1. Rail Infrastructure - August 2014
Gordon Suthorn CEng MICE
 
Capability Presentation 2010
Capability Presentation 2010Capability Presentation 2010
Capability Presentation 2010
glenoldfield
 
Cardiff Racing February Newsletter
Cardiff Racing February NewsletterCardiff Racing February Newsletter
Cardiff Racing February Newsletter
Emkay Plastics
 
Viking_Grace_ENG_web
Viking_Grace_ENG_webViking_Grace_ENG_web
Viking_Grace_ENG_web
Marko Mannila
 
Highway
HighwayHighway
Highway
Si Gibson
 
2015 Excellence in Infrastructure Submissions
2015 Excellence in Infrastructure Submissions2015 Excellence in Infrastructure Submissions
2015 Excellence in Infrastructure Submissions
Autodesk AEC
 
270' Orucoglu Yacht & Marine Construction Miss Tor 270 - New Construction
270' Orucoglu Yacht & Marine Construction Miss Tor 270 - New Construction270' Orucoglu Yacht & Marine Construction Miss Tor 270 - New Construction
270' Orucoglu Yacht & Marine Construction Miss Tor 270 - New Construction
Robert Denison
 
Design, Development, and Fabrication of a Mini-Hovercraft
Design, Development, and Fabrication of a Mini-HovercraftDesign, Development, and Fabrication of a Mini-Hovercraft
Design, Development, and Fabrication of a Mini-Hovercraft
IRJET Journal
 
CHITTARANJANLOCOMOTIVES WORKS
CHITTARANJANLOCOMOTIVES WORKSCHITTARANJANLOCOMOTIVES WORKS
CHITTARANJANLOCOMOTIVES WORKS
Kanhaiya Kumar
 
Cardiff Racing Update 2015
Cardiff Racing Update 2015Cardiff Racing Update 2015
Cardiff Racing Update 2015
Emkay Plastics
 
Smart forfour adapted for the railway tracks
Smart forfour adapted for the railway tracksSmart forfour adapted for the railway tracks
Smart forfour adapted for the railway tracks
RushLane
 
2015 excellence-infrastructure-summary-slides-en
2015 excellence-infrastructure-summary-slides-en2015 excellence-infrastructure-summary-slides-en
2015 excellence-infrastructure-summary-slides-en
Teresa Elliott
 
project report about brun standard company ltd
project report  about brun standard company ltdproject report  about brun standard company ltd
project report about brun standard company ltd
subhajit dutta
 
@Ev background coop
@Ev background coop@Ev background coop
@Ev background coop
Paul K. Park
 
Role of composites in automobile industry
Role of composites in automobile industryRole of composites in automobile industry
Role of composites in automobile industry
Pushpajeet .
 
Newsletter September 2008
Newsletter September 2008Newsletter September 2008
Newsletter September 2008
gsgalbraith
 
Hyper
HyperHyper
GBI (PM-2) Final
GBI (PM-2) FinalGBI (PM-2) Final
GBI (PM-2) Final
Korry Downey
 
CFD_salesmaterial_261215
CFD_salesmaterial_261215CFD_salesmaterial_261215
CFD_salesmaterial_261215
Stig Staghøj Knudsen
 
The Industrialist: Trends & Innovations - July 2023
The Industrialist: Trends & Innovations - July 2023The Industrialist: Trends & Innovations - July 2023
The Industrialist: Trends & Innovations - July 2023
accenture
 

Similar to Gurit UK - Projects and Case Studies (20)

1. Rail Infrastructure - August 2014
1. Rail Infrastructure - August 20141. Rail Infrastructure - August 2014
1. Rail Infrastructure - August 2014
 
Capability Presentation 2010
Capability Presentation 2010Capability Presentation 2010
Capability Presentation 2010
 
Cardiff Racing February Newsletter
Cardiff Racing February NewsletterCardiff Racing February Newsletter
Cardiff Racing February Newsletter
 
Viking_Grace_ENG_web
Viking_Grace_ENG_webViking_Grace_ENG_web
Viking_Grace_ENG_web
 
Highway
HighwayHighway
Highway
 
2015 Excellence in Infrastructure Submissions
2015 Excellence in Infrastructure Submissions2015 Excellence in Infrastructure Submissions
2015 Excellence in Infrastructure Submissions
 
270' Orucoglu Yacht & Marine Construction Miss Tor 270 - New Construction
270' Orucoglu Yacht & Marine Construction Miss Tor 270 - New Construction270' Orucoglu Yacht & Marine Construction Miss Tor 270 - New Construction
270' Orucoglu Yacht & Marine Construction Miss Tor 270 - New Construction
 
Design, Development, and Fabrication of a Mini-Hovercraft
Design, Development, and Fabrication of a Mini-HovercraftDesign, Development, and Fabrication of a Mini-Hovercraft
Design, Development, and Fabrication of a Mini-Hovercraft
 
CHITTARANJANLOCOMOTIVES WORKS
CHITTARANJANLOCOMOTIVES WORKSCHITTARANJANLOCOMOTIVES WORKS
CHITTARANJANLOCOMOTIVES WORKS
 
Cardiff Racing Update 2015
Cardiff Racing Update 2015Cardiff Racing Update 2015
Cardiff Racing Update 2015
 
Smart forfour adapted for the railway tracks
Smart forfour adapted for the railway tracksSmart forfour adapted for the railway tracks
Smart forfour adapted for the railway tracks
 
2015 excellence-infrastructure-summary-slides-en
2015 excellence-infrastructure-summary-slides-en2015 excellence-infrastructure-summary-slides-en
2015 excellence-infrastructure-summary-slides-en
 
project report about brun standard company ltd
project report  about brun standard company ltdproject report  about brun standard company ltd
project report about brun standard company ltd
 
@Ev background coop
@Ev background coop@Ev background coop
@Ev background coop
 
Role of composites in automobile industry
Role of composites in automobile industryRole of composites in automobile industry
Role of composites in automobile industry
 
Newsletter September 2008
Newsletter September 2008Newsletter September 2008
Newsletter September 2008
 
Hyper
HyperHyper
Hyper
 
GBI (PM-2) Final
GBI (PM-2) FinalGBI (PM-2) Final
GBI (PM-2) Final
 
CFD_salesmaterial_261215
CFD_salesmaterial_261215CFD_salesmaterial_261215
CFD_salesmaterial_261215
 
The Industrialist: Trends & Innovations - July 2023
The Industrialist: Trends & Innovations - July 2023The Industrialist: Trends & Innovations - July 2023
The Industrialist: Trends & Innovations - July 2023
 

Gurit UK - Projects and Case Studies

  • 1. DELIVERING THE FUTURE OF COMPOSITE SOLUTIONS
  • 2. ©Ainhoa Sanchez/Volvo Ocean Race GURIT: OFFICIAL COMPOSITE MATERIALS SUPPLIER OF THE VOLVO OCEAN RACE 2014/5 Gurit composite materials will be used for the repair and maintenance of the VOR 65 fleet during one of the world's toughest sailing events. With 11 ports, 38,739 nautical miles to be covered, it really does not get tougher than this.
  • 3. LA FERRARI – FERRARI’S MOST AMBITIOUS PROJECT FEATURING GURIT’S CLASS-A CBS SYSTEM LaFerrari represents Ferrari’s most ambitious project yet; to push the boundaries of technology on a road car, drawing together the finest expression of the marque’s technical capabilities in both GT and Formula 1 engineering. Through close cooperation between Gurit and Ferrari, Gurit’s Class-A CBS system was selected for the front and rear fenders of this prestigious vehicle.
  • 4. WRIGHTBUS ‘NEW BUS FOR LONDON’ During 2008, the newly elected Mayor of London, Boris Johnson, introduced a new double-decker bus for London (NBfL). The rear end of the bus exterior (behind the rear wheels) and the hop-on, hop-off platform are built with Gurit’s composite materials. Gurit manufactured the prototype parts for durability and fatigue testing and has now moved into series production.
  • 5. OUT OF THE STRONG CAME FORTH SWEETNESS Our brief from Derwent was simple, to propose an artwork for the atrium of the Angel Building that might also provide an opportunity for public seating and interaction. The piece is made from carbon fibre which is both very strong and lightweight. The piece is 22 metres high and narrows to 100mm diameter at the midpoint, and 25mm at the tip.
  • 6. SKYe SH09 – NEW HELICOPTER CONCEPT USING COMPOSITE MATERIALS On November 28, 2013, the prototype of an entirely new helicopter concept saw its official roll-out in Switzerland. SKYe SH09 immediately met with great interest. Rethinking helicopters required a novel approach to building materials, resulting in the SKYe SH09 almost entirely built using composite materials, including key prepreg supplier, Gurit.
  • 7. Image courtesy of PCT CARKEEK 60 ‘ICHI BAN’ NEXT GENERATION 60’ RACE BOAT Ichi Ban is the next generation of sleek new 60’ racing boat, built by Premier Composite Technologies (PCT), and designed by Shaun Carkeek, this C60 is a new breed of ultra-light displacement race boat. Gurit were able to call on over 30 years of experience with engineering of cutting edge race boats to get a head start in the engineering of the boat, and combined this with working closely with the design and build team to develop the structure of this boat.
  • 8. AL HARAMAIN HIGH SPEED RAIL – COMPOSITE STATION ROOFS The Haramain High Speed Rail project is a new high speed rail line in Saudi Arabia, running between the holy cities of Makkah and Medinah. Gurit and Premier Composite Technologies worked closely with the design team during the concept and tender design stages of the roof to develop the concept of using FRP panels in the station roof. The weight of the composite is approximately 720 tonnes, which makes the station roof one of the most extensive uses of advanced composites in the architectural industry.
  • 9. ‘DRAGON WINGS’ LIFTING BRIDGE OVER RHYL HARBOUR Gurit was contracted to carry out the detailed engineering of the bridge decks. The decks are very slender, partially for aesthetic reasons, but also to ensure that the inshore lifeboat would have sufficient headroom to pass under the lowered bridge at all tide levels. Gurit made extensive use of finite element analysis to carry out transient dynamic analysis of the bridge.
  • 10. VSKCORRINALDI CARBON FIBRE MOTOR BIKE BODY KITS The exclusive motor bike body kits manufactured by Vskcorrinaldi are a great example of visual carbon fibre giving their motor bikes a completely new look. Vskcorrinaldi relies on Gurit’s Ampreg 21, an epoxy wet laminating system with non-pigmented resin and hardeners, and SP 115, a clear epoxy wet laminating system that gives the final structure a characteristic, transparent violet-blue glow.
  • 11. MAKKAH CLOCK TOWER The central tower of the Abraj-al Bait development in Makkah, KSA, features FRP composite materials and structural engineering Gurit. Gurit worked closely with the tower top designers, SL-Rasch (Stuttgart, Germany), to carry out the structural engineering of the composite tower top cladding, clock hands, and the 23m diameter crescent, a self-supportive FRP composite structure which is located at the top of the building.
  • 12. HETARIOS – THE PANAMAX KETCH PROJECT For four years Gurit worked with Baltic Yachts on the Panamax Ketch project. This included the supply of composite materials and a large structural engineering design consultancy project. It is the largest and most challenging project ever undertaken by all those involved. The boat, named “Hetairos”, was launched in May 2011, and handed over in July 2011