ZÜBLIN GROUND AND CIVIL ENGINEERING L.L.C.
GULF TOWERS, OUD METHA ROAD
P.O. BOX: 111556, DUBAI, U.A.E.
PROJECT DATA SHEET
Riyadh Metro Line-6: Mono Piles on Viaduct 6.3
Riyadh, Kingdom of Saudi Arabia
Work Quantities in Total
Foundation Piles Diameter 2,500mm:
• 100 Nos of reinforced bored piles
• Depth of piles between 14 to 33m
• Total drilling length = 2,420.00m
Foundation Piles Diameter 1,200mm:
• 36 Nos of reinforced bored piles
• Depth of piles between 14 to 25m
• Total drilling length = 1,017.00m
Pile testing including dynamic, cross hole
sounding and low strain integrity test
Special Challenges
Space Restrictions due work within road
median and populated areas
Restriction on working hours and concrete
supply
Variable soil conditions i.e. soil and rock.
April 2016
Client
Arriyadh Development Authority (ADA)
Consultant
Riyadh Advanced Metro Project Execution
and Delivery (RAMPED)
Contractor
FAST Consortium LLC
Contract type
Subcontract
Contract Value
US$ 4,700,000.00
Contract Share
100%
Period of Construction
January 2016 – present
Project Description
Execution of mono piles for viaduct 6.3 of
the Riyadh Metro Project Line-6.
Installation of cast in-situ bored reinforced
foundation piles with dia. 1,200mm and
2,500mm including pile testing, excavation
and chipping.
Technology & Geology
Installation of foundation piles by using
rotary drilling rig type BG40 and temporary
casings.
Drilling of 1,200mm and 2,500mm piles
using shorter casings with drilling fluid.
Fabrication and handling of rebar cages on
site.
Casting of reinforced concrete piles using
tremie method.
Quality control by means of sonic logging,
dynamic load test and low strain integrity
test.

More Related Content

What's hot

City Council March 22 - 50th Street & Grape Creek Road Construction
City Council March 22 -  50th Street & Grape Creek Road Construction City Council March 22 -  50th Street & Grape Creek Road Construction
City Council March 22 - 50th Street & Grape Creek Road Construction
City of San Angelo Texas
 
1255 - Roy Hill Port Landside
1255 - Roy Hill Port Landside1255 - Roy Hill Port Landside
1255 - Roy Hill Port Landside
Anthony Jones
 
King Abdullah Road 4 12 07 Presentation
King Abdullah Road 4 12 07 PresentationKing Abdullah Road 4 12 07 Presentation
King Abdullah Road 4 12 07 Presentation
guest2d44ee
 
12632_CSAsphalt_Enfield_Terminal_LR
12632_CSAsphalt_Enfield_Terminal_LR12632_CSAsphalt_Enfield_Terminal_LR
12632_CSAsphalt_Enfield_Terminal_LR
Andrew de Villiers
 
wagdy garas CV 1
wagdy garas CV 1wagdy garas CV 1
wagdy garas CV 1
Wagdy Garas
 
CV Presentation May16
CV Presentation May16CV Presentation May16
CV Presentation May16
Iain Cameron
 
Jamsheer P_CV (1)
Jamsheer P_CV (1)Jamsheer P_CV (1)
Jamsheer P_CV (1)
jamsheer p
 

What's hot (20)

City Council March 22 - 50th Street & Grape Creek Road Construction
City Council March 22 -  50th Street & Grape Creek Road Construction City Council March 22 -  50th Street & Grape Creek Road Construction
City Council March 22 - 50th Street & Grape Creek Road Construction
 
Sea to Ski Higway Improvements Project
Sea to Ski Higway Improvements ProjectSea to Ski Higway Improvements Project
Sea to Ski Higway Improvements Project
 
ALPESH_CV
ALPESH_CVALPESH_CV
ALPESH_CV
 
1255 - Roy Hill Port Landside
1255 - Roy Hill Port Landside1255 - Roy Hill Port Landside
1255 - Roy Hill Port Landside
 
Mohammad Ghayoor Khan CV oil
Mohammad Ghayoor Khan CV oilMohammad Ghayoor Khan CV oil
Mohammad Ghayoor Khan CV oil
 
King Abdullah Road 4 12 07 Presentation
King Abdullah Road 4 12 07 PresentationKing Abdullah Road 4 12 07 Presentation
King Abdullah Road 4 12 07 Presentation
 
12632_CSAsphalt_Enfield_Terminal_LR
12632_CSAsphalt_Enfield_Terminal_LR12632_CSAsphalt_Enfield_Terminal_LR
12632_CSAsphalt_Enfield_Terminal_LR
 
wagdy garas CV 1
wagdy garas CV 1wagdy garas CV 1
wagdy garas CV 1
 
Curriculum Vitae.DOC
Curriculum Vitae.DOCCurriculum Vitae.DOC
Curriculum Vitae.DOC
 
Two-Lift Paving - Pavement Equipment Suppliers
Two-Lift Paving - Pavement Equipment SuppliersTwo-Lift Paving - Pavement Equipment Suppliers
Two-Lift Paving - Pavement Equipment Suppliers
 
Wagenborg times 3
Wagenborg times 3Wagenborg times 3
Wagenborg times 3
 
Shahmeer resum 16 years 22 11-2015
Shahmeer resum 16 years 22 11-2015Shahmeer resum 16 years 22 11-2015
Shahmeer resum 16 years 22 11-2015
 
Shahmeer Resume2-3
Shahmeer Resume2-3Shahmeer Resume2-3
Shahmeer Resume2-3
 
CV Presentation May16
CV Presentation May16CV Presentation May16
CV Presentation May16
 
PACOTECH Parks SOQ
PACOTECH Parks SOQPACOTECH Parks SOQ
PACOTECH Parks SOQ
 
Curriculum vitae
Curriculum vitae Curriculum vitae
Curriculum vitae
 
Jamsheer P_CV (1)
Jamsheer P_CV (1)Jamsheer P_CV (1)
Jamsheer P_CV (1)
 
Paper
PaperPaper
Paper
 
Iain Cameron CV presentation oct14
Iain Cameron CV presentation oct14Iain Cameron CV presentation oct14
Iain Cameron CV presentation oct14
 
Cv mohamed al-jabri - 2018
Cv   mohamed al-jabri - 2018Cv   mohamed al-jabri - 2018
Cv mohamed al-jabri - 2018
 

Viewers also liked (7)

Riyadh metro project presentation 06052015 Final
Riyadh metro project presentation 06052015 FinalRiyadh metro project presentation 06052015 Final
Riyadh metro project presentation 06052015 Final
 
Metro Riyadh
Metro RiyadhMetro Riyadh
Metro Riyadh
 
DEAL KSA - Riyadh
DEAL KSA - RiyadhDEAL KSA - Riyadh
DEAL KSA - Riyadh
 
TENSA KSA - Riyadh
TENSA KSA - RiyadhTENSA KSA - Riyadh
TENSA KSA - Riyadh
 
Case study_Romania_Mihai Bravu
Case study_Romania_Mihai BravuCase study_Romania_Mihai Bravu
Case study_Romania_Mihai Bravu
 
DEAL_ASIA - Kingdom of Saudi Arabia
DEAL_ASIA - Kingdom of Saudi ArabiaDEAL_ASIA - Kingdom of Saudi Arabia
DEAL_ASIA - Kingdom of Saudi Arabia
 
CASE STUDY – ITALY – L’AQUILA – Gagliardi Sardi building
CASE STUDY – ITALY – L’AQUILA – Gagliardi Sardi building CASE STUDY – ITALY – L’AQUILA – Gagliardi Sardi building
CASE STUDY – ITALY – L’AQUILA – Gagliardi Sardi building
 

Similar to Riyadh Metro Viaduct 6.3 (20)

101024 Mafraq_Presentation_Javad_Akhtar
101024 Mafraq_Presentation_Javad_Akhtar101024 Mafraq_Presentation_Javad_Akhtar
101024 Mafraq_Presentation_Javad_Akhtar
 
C V-OSAMA-Revised 2014(PDF)
C V-OSAMA-Revised 2014(PDF)C V-OSAMA-Revised 2014(PDF)
C V-OSAMA-Revised 2014(PDF)
 
Ahmd Mahmoud c.v
Ahmd Mahmoud c.vAhmd Mahmoud c.v
Ahmd Mahmoud c.v
 
ENGLISH
ENGLISH ENGLISH
ENGLISH
 
Muhammad Aamir Javed
Muhammad Aamir JavedMuhammad Aamir Javed
Muhammad Aamir Javed
 
Cv mohamed al-jabri - 2018
Cv   mohamed al-jabri - 2018Cv   mohamed al-jabri - 2018
Cv mohamed al-jabri - 2018
 
AFTAB CURRICULAM VITAE
AFTAB CURRICULAM VITAEAFTAB CURRICULAM VITAE
AFTAB CURRICULAM VITAE
 
CV Mahmoud Farid PM
CV Mahmoud Farid PMCV Mahmoud Farid PM
CV Mahmoud Farid PM
 
Cv m.safdar.2016
Cv m.safdar.2016Cv m.safdar.2016
Cv m.safdar.2016
 
PS-1 SUMMARY NHAI
PS-1 SUMMARY NHAIPS-1 SUMMARY NHAI
PS-1 SUMMARY NHAI
 
Mid term
Mid termMid term
Mid term
 
Wissam chehab's CV
Wissam chehab's CVWissam chehab's CV
Wissam chehab's CV
 
Ahmad Anis STR
Ahmad Anis STRAhmad Anis STR
Ahmad Anis STR
 
Revised Resume
Revised ResumeRevised Resume
Revised Resume
 
ALI FAKHIR IBRAHEEM - C.V
ALI FAKHIR IBRAHEEM -  C.VALI FAKHIR IBRAHEEM -  C.V
ALI FAKHIR IBRAHEEM - C.V
 
Revised Resume MSR
Revised Resume MSRRevised Resume MSR
Revised Resume MSR
 
CV - Ahmed Mounir
CV - Ahmed MounirCV - Ahmed Mounir
CV - Ahmed Mounir
 
flyover internship 2
flyover internship 2flyover internship 2
flyover internship 2
 
CV - Dsouza UPDATED 03-04-2016
CV - Dsouza UPDATED 03-04-2016CV - Dsouza UPDATED 03-04-2016
CV - Dsouza UPDATED 03-04-2016
 
Dcl hdd presentation 9 2-2014
Dcl hdd presentation 9 2-2014Dcl hdd presentation 9 2-2014
Dcl hdd presentation 9 2-2014
 

Riyadh Metro Viaduct 6.3

  • 1. ZÜBLIN GROUND AND CIVIL ENGINEERING L.L.C. GULF TOWERS, OUD METHA ROAD P.O. BOX: 111556, DUBAI, U.A.E. PROJECT DATA SHEET Riyadh Metro Line-6: Mono Piles on Viaduct 6.3 Riyadh, Kingdom of Saudi Arabia Work Quantities in Total Foundation Piles Diameter 2,500mm: • 100 Nos of reinforced bored piles • Depth of piles between 14 to 33m • Total drilling length = 2,420.00m Foundation Piles Diameter 1,200mm: • 36 Nos of reinforced bored piles • Depth of piles between 14 to 25m • Total drilling length = 1,017.00m Pile testing including dynamic, cross hole sounding and low strain integrity test Special Challenges Space Restrictions due work within road median and populated areas Restriction on working hours and concrete supply Variable soil conditions i.e. soil and rock. April 2016 Client Arriyadh Development Authority (ADA) Consultant Riyadh Advanced Metro Project Execution and Delivery (RAMPED) Contractor FAST Consortium LLC Contract type Subcontract Contract Value US$ 4,700,000.00 Contract Share 100% Period of Construction January 2016 – present Project Description Execution of mono piles for viaduct 6.3 of the Riyadh Metro Project Line-6. Installation of cast in-situ bored reinforced foundation piles with dia. 1,200mm and 2,500mm including pile testing, excavation and chipping. Technology & Geology Installation of foundation piles by using rotary drilling rig type BG40 and temporary casings. Drilling of 1,200mm and 2,500mm piles using shorter casings with drilling fluid. Fabrication and handling of rebar cages on site. Casting of reinforced concrete piles using tremie method. Quality control by means of sonic logging, dynamic load test and low strain integrity test.