SlideShare a Scribd company logo
1 of 35
Download to read offline
Bilad Al-Duha PRESENTATION
June 2016
1
CONENTS
2
 INTRODUCTION
 COMPANY HISTORY
 ORGANIZATION CHART
 COMPANY GOAL
 VISION/MISSION
 SCOPE OF SERVICE
 EMPLOYEE DETAILS
 OWN EQUIPMENT LIST
 GLOBAL NETWORK
 MAJOR ACTIVITIES
 PROJECT EXPERIENCES
 PROJECTS PHOTO GALLERY
 CERTIFICATE
Bilad Al-Duha is the leading Iraqi Mechanical Contractor
providing Construction Services to the Iraqi Oil & Gas ,
Power and industry field as well as overseas country. In
support of its construction activities the Company also
provides engineering and procurement services
including full EPC for small to medium size projects.
With offices in Baghdad, Ahdab, Basrah and Dubai and
its experienced international staff the company has the
capability to perform any pipeline, tank, piping, steel
structure and mechanical installation project in
accordance with international standards. Bilad is ISO
certified and ranks number 1 as Iraqi mechanical
contractor for the Petroleum Industry.
We provide all inclusive mechanical services to our local
Iraqi and growing international client. This includes non
destructive testing and cathodic protection, as required.
As a hard money contractor we own all of our
construction equipment and are in the process to expand
our capability by constructing a full service mechanical
workshop in Basrah.
Over
800 employees
in BADC
INTRODUCTION
3
Company history
2008
Started pipe line
construction business
with Petrochina
Company
Established
2011
Opened Missan
Branch office
Carried out Tank
Construction work for
Missan Oil Project
2012
Opened Baghdad
office
Started Tank and pipe
line fabrication
workshop
2013
Established
Corporate office
in Dubai and
Branch office in
Basra
ENI Zubair Tank & Lukoil
Pipe line project
2015
ENI & SHELL Zubair
piping and pipe line &
Zubair DGS PJT
4
Organization Chart
5
President
Mr. Haider Younis
Vice President
Mr. Nohwoo Park
Project Management
Mr. Maher Nermann
Mr. Alifuhat
Procurement
Mr. OlegGrugorchak
Logistic
Mr. Ahmed Wahab
Iraq/Iran Project
UAE/ Oman Project
CIS Area Project
Finance
Ms. Paula Harfouche
Admin.
Ms.Mary Jeann
QA/QC
Mr.AlexChaichenko
HRAccount
GA
Company Goal
Client Satisfaction/ Growth together with Client
Strong
Teamwork
Vertical
Integration
Continuous
Progression
6
Vision/Mission
Vision
Be an excellent “ EPC Service provider ”
to create greater values to our clients.
Mission
Maintain positive growth of the company
together with our clients offering them the
best quality, technology and service.
7
Scope of Service
Engineering
Procurement
Construction
Onshore Oil, Gas and water pipe line
Oil Refineries
Gas plant
Petrochemical Plants
Industrial plants
Water and Sewage treatment plants
Storage Tanks
8
Employees Details
CATEGORY NOS. REMARK
Management 5 • Managing Director/Senior Management
Permanent
Employees
Management Staff 15 • Managers, Sr. Engineer, Engineers, Officers
Project management 19 • Sr. Engineer, Engineers, Officers
Tendering Dept. 5 • Sr. Engineer, Engineers, Officers
Planning Dept. 4 • Sr. Engineer, Engineers, Officers
HSE 15
• Health, Safety, Environment
- Sr. Engineer, Engineers, Officers
QA/QC 10
• Quality Assurance/Quality Control –
Sr. Engineer, Engineers, Officers
Field Personnel 745
• Site engineers, Foreman, Labour’s Mechanic
al, Electricians, Welders, Scaffolding Workers
, Operators, Helpers
Total 818
9
Own Equipment list
MAIN EQUIPMENTS AND MACHINERIES
Description NOS.
AUTOMATIC WELDING MACHINE(Vertical & Horizantal) 14
BOOM TYPE WELDING MACHINE 15
SIDE BOOM 45
BOOM TRUCK 5
BOOMLIFT 15
CUTTING MACHINE 5
JACK FOR TANK ERECTION 156
WELDING MACHINE – VARIOUS PROCEESS 245
FORKLIFT – FROM 3 TON TO 10 TON 9
MOBILE CRANE – FROM 15 TON TO 100 TON 18
OVERHEAD CRANES – FROM 2 TON TO 15 TON 6
PAINT MACHINES 12
PIPE BENDING MACHINE 7
PIPE BEVELLING MACHINES 35
PLASMA CNC CUTTING MACHINE 2
PLATE BENDING & ROLLING MACHINE (W:3.5m) 3
PLATE BEVELING MACHINE 4
PORTABLE SAND BLASTING MACHINE 10
PRESS MACHINE 6
PROFILE BENDING MACHINE 2
TRAILER 17
TRUCK 12
VEHICLES 69
10
Global Network
BRANCH OFFICES
Iran/ Oman(Under process)
HEADQUARTERS
Dubai
COUNTRY OFFICES
Iraq
WORKSHOPS
Iraq
11
Major Activities
Pipe line construction
Tank Construction
Tank Fabrication
Process Skid and Piping spool
Fabrication
Steel structure work
Equipment Installation
Piping erection
12
PIPELINE CONSTRUCTION
CAPABILITIES
•Pipe line 8" - 56"
•Trunk Lines
•Flow lines
•Piping 1" - 8“
•Horizontal Directional
Drilling
•Hot Tapping & Stoppling
Major Activity
13
TRUNK AND FLOW LINE CONSTRUCTION
CAPABILITIES
•Pre-construction activities
•Trenching
•Stringing
•Bending
•Welding
•Non-destructive testing
•Heat shrinkable sleeves
•Lowering-in
•Backfilling
•Hydrotesting
•Start-up activities
•Valve stations erection
•Thrust Boring
•Horizontal Directional Drilling
•Cathodic Protection
•Fiber Optic Cable Installation
Major Activity
14
TANK CONSTRUCTION
CAPABILITIES
•Crude storage
•Water storage
•Natural gas storage
•Floating roof
•Fixed roof
SPECIALIZED SERVICES
•Plate Fabrication
•All related civil
works
•Associated piping
works
Major Activity
15
TANK FABRICATION
Bilad Al-Duha is your one-stop resource for all your
Tank fabrication needs. It includes plate material
procurement as per the code requirement.
Bilad Al-Duha owns a mechanical fabrication shop
with all the required equipment for plate cutting,
rolling, beveling and welding.
We build and erect tanks according to API 650, API
620 and API 12D standards.
Major Activity
Capability : 1000 ton/Month
16
PROCESS SKID AND PIPE SPOOL FABRICATION
Bilad Al-Duha is your one-stop
resource for all your process skid
and pipe spool fabricating needs.
Bilad Al-Duha owns a mechanical
fabrication shop with all required
equipment for process skids and
pipe spool fabrication.
Major Activity
17
STRUCTURAL STEEL WORKS
CAPABILITIES
•Structural Steel Supply
•Structural Steel Fabrication
•Structural Steel Installation
•Structural Steel Drafting and
Design
•Safe erection
•Works at Heights
Major Activity
18
CAPABILITIES
•Equipment Lifting
•Equipment
Installation
•Tie-In
Major Activity
19
EQUIPMENT INSTALLATION
CAPABILITIES
•AG - Carbon Steel
•AG - Stainless Steel
•AG - Low Alloy Steel
•AG – Duplex Stainless
Steel
•AG - Galvanized
Major Activity
20
PIPING ERECTION
Project experiences
21
Start Finish
Nasiriya
Basra Gas
Pipeline
Oil
Pipeline
Company
24” and 36” Water Pipeline Carbon Steel
in Ahdeb Oil Field
(20) km
B1 of EXL 2 and 3, 72 km Crude Oil Pipline
10'' and 72 km Gas
Pipeline 16''
Iraq
48'' Hdd Pipline Crosing Shat Al
Arab
7 HDD Crossings, 1200 m Each
Water
Resources
Company/NS
CC
2010 2012 26,000,000
CNPCC/CPEC
C
2008 12,000,000Iraq 40 km Gas Pipeline of 42” dia
South Oil
Company
SOC
2008
Iraq WS2 Pipeline
CNPCC/CPEC
C
2010 2011
4,500,000
Iraq
3 Nos. of 2000 m3
Diesel Tanks-Fixed
Roof Type
Steel structure : 2,900ton
Piping : 85,000DI
Samawa
Refinery
2008Samawa Refinery
Kut Depot extension
Ahdleb Oil Field Pipeline Phase 1
Ahdleb Oil Field Pipeline Phase2
2009 15,000,000
Iraq
2 Nos. of 10000 m3
Gasoline Storage
Tanks-Carbon Steel-Floating Roof Type.
Piping Network 6”, 8” and 12” dia.
2010 2011 12,000,000
27,000,000
Iraq B2 of EXL 3 32 km Gas Pipeline 16''
CNPCC/CPEC
C
9,000,000
2008 2009
Iraq
Contract
Value
(USD)
Project
DurationCountry Title Project Brief Client
2010 2011
Project experiences
22
Start Finish
Iraq Majnoon Oil Field
Construction of 30 km 20'' Pipline
Piping erection: 70,00DI
Steel structureerection : 2,540ton
Equipment : 900ton
SHELL/CPP 2011 2012 16,000,000
Iraq Baqouba Gas Pipeline
32” Gas Pipeline from Naft Khana to
Mansouriya Power Plant Station (40) km
IGC 2011 2012 33,000,000
Iraq Karbala Power Plant Station
8 Fixed Roof Tanks (size 2000 m3) With
Two Units and Network
Tankage area Piping erection: 55,500DI
Steel structure erection: 2,500ton
BETA 2011 2012 14,000,000
Iraq Stell Structure
Superstructure (Steel) Pipe Rack Inside
CPF
Steel Structure erection :3,000ton
CNPCC/CPEC
C
2011 2012 3,600,000
Country Title Project Brief Client
Project
Duration
53,000,000Iraq 6” Flow Line and 16” Trunk Line 120km
CNPCC/CPEC
C
2011
Contract
Value
(USD)
2012FSF Pipeline
2012 3,500,000Diwaniya Power Plant Station STXIraq 8 Fixed Roof Tanks (size 2500 m3) 2011
Project experiences
23
Start Finish
Iraq Garraf CPF
Piping erection : 75,450DI
Steel structure erection : 2,700ton
Equipment erection : 3,200ton
Weatherford,
Petronas
2012 2012 12,000,000
104 km 48” Pipeline Construction
(E&I Works, OHL, Telecom Systems)
Water Lukoil
Crossings for The West Middle East
Qurna Field (2nd Phase)
Iraq
Fao Terminal. Crude Oil Loading
Farm
Piping erection : 45,000DI
Leighton
Offshore /
South Oil
Company
2014 2014 5,000,000
Iraq
Zubair IPF’s & Interconnection
Piping
Pipeline Rehabilitation Project included
extensive E&I Works
Basrah Gas
Company
2015 15,000,000
Iraq Zubair new DGS Project Tank erection work(7Nos, 1600 ton)
Samsung
Engineering
2016 4,730,000
2013 30,000,000
Iraq
4x5000 m3
Floating Roof Tanks at Mussaib
Power Plant
Steel structur: 4,500ton
Piping erection: 56,500DI
BOP equipment erection: 750ton
15,000,000
Iraq 104 km 48” Pipeline Construction
Techno
engineering
2012
Mussaib Power Plant Project
Country Title Project Brief Client
Project
Duration
8,500,000
Contract
Value
(USD)
Iraq
850 m Water Canal Crossing, 42'' Pipe by
Open Cut.
2013 2014
Ministry of
Electricity
2012 2013
Major Current Client
24
Projects Photo Gallery
25
1.Hammar Project
Tank erection
26
2.Missan Oil project
Tank erection
27
3. Diwaniyah Power plant Project
Tank erection
28
4. Musayyib Power plant Project
Tank erection
29
5. Ahdleb Oil Field PipelineProject
Pipe line
30
6. Zubair IPF’s & Interconnection Piping project
Pipe line
31
7. Water crossings for west Qurna field Project
Pipe line
32
8. Zubair New DGS Project
Tank erection by Hydraulic jack equipment
33
34
Certificate
Thank you
35

More Related Content

What's hot

Hisham Resume ( CV )
Hisham Resume ( CV )Hisham Resume ( CV )
Hisham Resume ( CV )Hisham Hegab
 
Mohammad Taher_QA-QC Piping-Welding
Mohammad Taher_QA-QC Piping-WeldingMohammad Taher_QA-QC Piping-Welding
Mohammad Taher_QA-QC Piping-WeldingMohammad Taher
 
Jijo's resume ( qc inspector )doc
Jijo's resume ( qc inspector )docJijo's resume ( qc inspector )doc
Jijo's resume ( qc inspector )docJIJO ANTONY
 
Turnarounds for process plants/ Industry Services
Turnarounds for process plants/ Industry ServicesTurnarounds for process plants/ Industry Services
Turnarounds for process plants/ Industry Servicesraghunathan janarthanan
 
Sr. QA/QC Mechanical Engineer
Sr. QA/QC Mechanical EngineerSr. QA/QC Mechanical Engineer
Sr. QA/QC Mechanical Engineerahmedsgs
 
Mohamed farouk portfolio
Mohamed farouk portfolioMohamed farouk portfolio
Mohamed farouk portfolioMohamed Farouk
 
(QA_QC Welding,piping engineer
(QA_QC  Welding,piping engineer(QA_QC  Welding,piping engineer
(QA_QC Welding,piping engineerAhmed Hamdy
 
A.youssef_c.v.2014.doc-2(3)
A.youssef_c.v.2014.doc-2(3)A.youssef_c.v.2014.doc-2(3)
A.youssef_c.v.2014.doc-2(3)Ahmed Youssef
 
CV Abd. Hadi Ahmad
CV Abd. Hadi AhmadCV Abd. Hadi Ahmad
CV Abd. Hadi AhmadAhmad Hadi
 
Ramy Emad C.V Project Engineer
Ramy Emad C.V Project EngineerRamy Emad C.V Project Engineer
Ramy Emad C.V Project EngineerRamy Emad
 
Resume Sivakumar SKTJ
Resume Sivakumar SKTJResume Sivakumar SKTJ
Resume Sivakumar SKTJSiva Kumar
 

What's hot (20)

Qa QC SEPL NOV 2017
Qa QC SEPL NOV  2017Qa QC SEPL NOV  2017
Qa QC SEPL NOV 2017
 
company profile
company profilecompany profile
company profile
 
Hisham Resume ( CV )
Hisham Resume ( CV )Hisham Resume ( CV )
Hisham Resume ( CV )
 
Mohammad Taher_QA-QC Piping-Welding
Mohammad Taher_QA-QC Piping-WeldingMohammad Taher_QA-QC Piping-Welding
Mohammad Taher_QA-QC Piping-Welding
 
Hisham.cv
Hisham.cvHisham.cv
Hisham.cv
 
SUNDAR CV.
SUNDAR CV.SUNDAR CV.
SUNDAR CV.
 
Jijo's resume ( qc inspector )doc
Jijo's resume ( qc inspector )docJijo's resume ( qc inspector )doc
Jijo's resume ( qc inspector )doc
 
GEC presentation
GEC  presentationGEC  presentation
GEC presentation
 
Projects Annex
Projects AnnexProjects Annex
Projects Annex
 
Turnarounds for process plants/ Industry Services
Turnarounds for process plants/ Industry ServicesTurnarounds for process plants/ Industry Services
Turnarounds for process plants/ Industry Services
 
Sr. QA/QC Mechanical Engineer
Sr. QA/QC Mechanical EngineerSr. QA/QC Mechanical Engineer
Sr. QA/QC Mechanical Engineer
 
Mohamed farouk portfolio
Mohamed farouk portfolioMohamed farouk portfolio
Mohamed farouk portfolio
 
(QA_QC Welding,piping engineer
(QA_QC  Welding,piping engineer(QA_QC  Welding,piping engineer
(QA_QC Welding,piping engineer
 
QA QC MECH ENGG
QA QC MECH ENGGQA QC MECH ENGG
QA QC MECH ENGG
 
A.youssef_c.v.2014.doc-2(3)
A.youssef_c.v.2014.doc-2(3)A.youssef_c.v.2014.doc-2(3)
A.youssef_c.v.2014.doc-2(3)
 
CV Abd. Hadi Ahmad
CV Abd. Hadi AhmadCV Abd. Hadi Ahmad
CV Abd. Hadi Ahmad
 
Ramy Emad C.V Project Engineer
Ramy Emad C.V Project EngineerRamy Emad C.V Project Engineer
Ramy Emad C.V Project Engineer
 
srini cv latest
srini cv latestsrini cv latest
srini cv latest
 
brochure pss
brochure pssbrochure pss
brochure pss
 
Resume Sivakumar SKTJ
Resume Sivakumar SKTJResume Sivakumar SKTJ
Resume Sivakumar SKTJ
 

Viewers also liked

Welding map shell plate (condesete loading tank)
Welding map shell plate (condesete loading tank)Welding map shell plate (condesete loading tank)
Welding map shell plate (condesete loading tank)ZULKAR NAIN
 
Tank Erection Sequence
Tank Erection SequenceTank Erection Sequence
Tank Erection SequenceDeepu Rajan
 
C.v Ari Sulayman Yassin Update 9 7 15
C.v Ari Sulayman Yassin Update 9 7 15C.v Ari Sulayman Yassin Update 9 7 15
C.v Ari Sulayman Yassin Update 9 7 15Ary Barwary
 
CV-Saad Khattab aljboury-HSE manger 2015
CV-Saad Khattab aljboury-HSE manger 2015CV-Saad Khattab aljboury-HSE manger 2015
CV-Saad Khattab aljboury-HSE manger 2015Saad khattab
 
Fabrication&erection sequence proposal
Fabrication&erection sequence proposalFabrication&erection sequence proposal
Fabrication&erection sequence proposalM. Nailes Jhondava
 
D-001 Tank General Assembly
D-001 Tank General AssemblyD-001 Tank General Assembly
D-001 Tank General AssemblyWafik Zakhary
 
D-005 Iso Container Frame
D-005 Iso Container FrameD-005 Iso Container Frame
D-005 Iso Container FrameWafik Zakhary
 
I3M 2013 – EMSS Conference - Pipe Spool Fabrication Simulation Model
I3M 2013 – EMSS Conference - Pipe Spool Fabrication Simulation ModelI3M 2013 – EMSS Conference - Pipe Spool Fabrication Simulation Model
I3M 2013 – EMSS Conference - Pipe Spool Fabrication Simulation ModelCCT International
 
QICL Large Storage Tank Site Erection Capabilities
QICL Large Storage Tank Site Erection CapabilitiesQICL Large Storage Tank Site Erection Capabilities
QICL Large Storage Tank Site Erection CapabilitiesYAMCO-LUBRICANT.COM.
 
Bs 2594 specification for carbon steel welded horizontal cylindrical storage ...
Bs 2594 specification for carbon steel welded horizontal cylindrical storage ...Bs 2594 specification for carbon steel welded horizontal cylindrical storage ...
Bs 2594 specification for carbon steel welded horizontal cylindrical storage ...Rashid Guliyev
 
Introduction to Storage Tanks
Introduction to Storage TanksIntroduction to Storage Tanks
Introduction to Storage TanksAnkur Sharma
 

Viewers also liked (14)

Welding map shell plate (condesete loading tank)
Welding map shell plate (condesete loading tank)Welding map shell plate (condesete loading tank)
Welding map shell plate (condesete loading tank)
 
Tank Erection Sequence
Tank Erection SequenceTank Erection Sequence
Tank Erection Sequence
 
C.v Ari Sulayman Yassin Update 9 7 15
C.v Ari Sulayman Yassin Update 9 7 15C.v Ari Sulayman Yassin Update 9 7 15
C.v Ari Sulayman Yassin Update 9 7 15
 
CV-Saad Khattab aljboury-HSE manger 2015
CV-Saad Khattab aljboury-HSE manger 2015CV-Saad Khattab aljboury-HSE manger 2015
CV-Saad Khattab aljboury-HSE manger 2015
 
Fabrication&erection sequence proposal
Fabrication&erection sequence proposalFabrication&erection sequence proposal
Fabrication&erection sequence proposal
 
D-001 Tank General Assembly
D-001 Tank General AssemblyD-001 Tank General Assembly
D-001 Tank General Assembly
 
D-005 Iso Container Frame
D-005 Iso Container FrameD-005 Iso Container Frame
D-005 Iso Container Frame
 
I3M 2013 – EMSS Conference - Pipe Spool Fabrication Simulation Model
I3M 2013 – EMSS Conference - Pipe Spool Fabrication Simulation ModelI3M 2013 – EMSS Conference - Pipe Spool Fabrication Simulation Model
I3M 2013 – EMSS Conference - Pipe Spool Fabrication Simulation Model
 
QICL Large Storage Tank Site Erection Capabilities
QICL Large Storage Tank Site Erection CapabilitiesQICL Large Storage Tank Site Erection Capabilities
QICL Large Storage Tank Site Erection Capabilities
 
Haetham Resume
Haetham ResumeHaetham Resume
Haetham Resume
 
Bs 2594 specification for carbon steel welded horizontal cylindrical storage ...
Bs 2594 specification for carbon steel welded horizontal cylindrical storage ...Bs 2594 specification for carbon steel welded horizontal cylindrical storage ...
Bs 2594 specification for carbon steel welded horizontal cylindrical storage ...
 
Hse inspection presentation
Hse inspection presentationHse inspection presentation
Hse inspection presentation
 
Tank design - word
Tank design - wordTank design - word
Tank design - word
 
Introduction to Storage Tanks
Introduction to Storage TanksIntroduction to Storage Tanks
Introduction to Storage Tanks
 

Similar to PQ Presentation(BADC) - Rev2

SIDDHITECH ENGINEERING PVT. LTD ( SEPL) Profile.........
SIDDHITECH ENGINEERING PVT. LTD ( SEPL)  Profile.........SIDDHITECH ENGINEERING PVT. LTD ( SEPL)  Profile.........
SIDDHITECH ENGINEERING PVT. LTD ( SEPL) Profile.........yogeshpokharkar
 
Resume Waqas Farooq (Project Engineer)
Resume Waqas Farooq (Project Engineer)Resume Waqas Farooq (Project Engineer)
Resume Waqas Farooq (Project Engineer)Waqas Farooq, PMP®
 
CV. Mechincal Engineer
CV. Mechincal EngineerCV. Mechincal Engineer
CV. Mechincal EngineerAhmad Hassan
 
ELBAYRAK Catalog_EN_R0 - Copy
ELBAYRAK Catalog_EN_R0 - CopyELBAYRAK Catalog_EN_R0 - Copy
ELBAYRAK Catalog_EN_R0 - CopyMuneer Agha
 
Mohamed Ahmed (2008)
Mohamed Ahmed  (2008)Mohamed Ahmed  (2008)
Mohamed Ahmed (2008)Mohamed Ahmed
 
Yaghmour pre qualification profile
Yaghmour pre qualification profileYaghmour pre qualification profile
Yaghmour pre qualification profileAli M. Azahrani
 
Discovery prsnt 260x200_4+4_eng_create2021
Discovery prsnt 260x200_4+4_eng_create2021Discovery prsnt 260x200_4+4_eng_create2021
Discovery prsnt 260x200_4+4_eng_create2021VitaKrasulya
 
Discovery prsnt 260x200_4+4_eng_create2021_compressed
Discovery prsnt 260x200_4+4_eng_create2021_compressedDiscovery prsnt 260x200_4+4_eng_create2021_compressed
Discovery prsnt 260x200_4+4_eng_create2021_compressedVitaKrasulya
 
Hydrocarbon Industry EPC Solutions & Services
Hydrocarbon Industry EPC Solutions & ServicesHydrocarbon Industry EPC Solutions & Services
Hydrocarbon Industry EPC Solutions & ServicesNuberg Engineering
 
Hydrogen Peroxide Plant - TASNIM Chemical Complex, Bangladesh
Hydrogen Peroxide Plant - TASNIM Chemical Complex, Bangladesh Hydrogen Peroxide Plant - TASNIM Chemical Complex, Bangladesh
Hydrogen Peroxide Plant - TASNIM Chemical Complex, Bangladesh Nuberg Engineering
 
SSCPL Profile
SSCPL ProfileSSCPL Profile
SSCPL ProfileAP Murthy
 
Nuberg oil and gas sector epc services
Nuberg oil and gas sector epc servicesNuberg oil and gas sector epc services
Nuberg oil and gas sector epc servicesSachin Tyagi
 
Amal modular yard rev03 20150921 -pdf
Amal modular yard rev03 20150921 -pdfAmal modular yard rev03 20150921 -pdf
Amal modular yard rev03 20150921 -pdfTiago Alvarez
 
A-Babtain Corporate-Email.ppt
A-Babtain Corporate-Email.pptA-Babtain Corporate-Email.ppt
A-Babtain Corporate-Email.pptkahayami
 

Similar to PQ Presentation(BADC) - Rev2 (20)

Sanriya Brochure FP
Sanriya Brochure FPSanriya Brochure FP
Sanriya Brochure FP
 
SIDDHITECH ENGINEERING PVT. LTD ( SEPL) Profile.........
SIDDHITECH ENGINEERING PVT. LTD ( SEPL)  Profile.........SIDDHITECH ENGINEERING PVT. LTD ( SEPL)  Profile.........
SIDDHITECH ENGINEERING PVT. LTD ( SEPL) Profile.........
 
Resume Waqas Farooq (Project Engineer)
Resume Waqas Farooq (Project Engineer)Resume Waqas Farooq (Project Engineer)
Resume Waqas Farooq (Project Engineer)
 
CV. Mechincal Engineer
CV. Mechincal EngineerCV. Mechincal Engineer
CV. Mechincal Engineer
 
ELBAYRAK Catalog_EN_R0 - Copy
ELBAYRAK Catalog_EN_R0 - CopyELBAYRAK Catalog_EN_R0 - Copy
ELBAYRAK Catalog_EN_R0 - Copy
 
Mohamed Ahmed (2008)
Mohamed Ahmed  (2008)Mohamed Ahmed  (2008)
Mohamed Ahmed (2008)
 
Mahmoud Ahmed ElbadawyCV
Mahmoud Ahmed ElbadawyCVMahmoud Ahmed ElbadawyCV
Mahmoud Ahmed ElbadawyCV
 
mmd cv1
mmd cv1mmd cv1
mmd cv1
 
Case Cold Company- profile
Case Cold Company- profileCase Cold Company- profile
Case Cold Company- profile
 
Yaghmour pre qualification profile
Yaghmour pre qualification profileYaghmour pre qualification profile
Yaghmour pre qualification profile
 
Discovery prsnt 260x200_4+4_eng_create2021
Discovery prsnt 260x200_4+4_eng_create2021Discovery prsnt 260x200_4+4_eng_create2021
Discovery prsnt 260x200_4+4_eng_create2021
 
Discovery prsnt 260x200_4+4_eng_create2021_compressed
Discovery prsnt 260x200_4+4_eng_create2021_compressedDiscovery prsnt 260x200_4+4_eng_create2021_compressed
Discovery prsnt 260x200_4+4_eng_create2021_compressed
 
Hydrocarbon Industry EPC Solutions & Services
Hydrocarbon Industry EPC Solutions & ServicesHydrocarbon Industry EPC Solutions & Services
Hydrocarbon Industry EPC Solutions & Services
 
Hydrogen Peroxide Plant - TASNIM Chemical Complex, Bangladesh
Hydrogen Peroxide Plant - TASNIM Chemical Complex, Bangladesh Hydrogen Peroxide Plant - TASNIM Chemical Complex, Bangladesh
Hydrogen Peroxide Plant - TASNIM Chemical Complex, Bangladesh
 
CV - Senior QAQC Engineer-Civil
CV - Senior QAQC Engineer-CivilCV - Senior QAQC Engineer-Civil
CV - Senior QAQC Engineer-Civil
 
SSCPL Profile
SSCPL ProfileSSCPL Profile
SSCPL Profile
 
Nuberg oil and gas sector epc services
Nuberg oil and gas sector epc servicesNuberg oil and gas sector epc services
Nuberg oil and gas sector epc services
 
Amal modular yard rev03 20150921 -pdf
Amal modular yard rev03 20150921 -pdfAmal modular yard rev03 20150921 -pdf
Amal modular yard rev03 20150921 -pdf
 
A-Babtain Corporate-Email.ppt
A-Babtain Corporate-Email.pptA-Babtain Corporate-Email.ppt
A-Babtain Corporate-Email.ppt
 
Nuberg Company Profile
Nuberg Company ProfileNuberg Company Profile
Nuberg Company Profile
 

PQ Presentation(BADC) - Rev2

  • 2. CONENTS 2  INTRODUCTION  COMPANY HISTORY  ORGANIZATION CHART  COMPANY GOAL  VISION/MISSION  SCOPE OF SERVICE  EMPLOYEE DETAILS  OWN EQUIPMENT LIST  GLOBAL NETWORK  MAJOR ACTIVITIES  PROJECT EXPERIENCES  PROJECTS PHOTO GALLERY  CERTIFICATE
  • 3. Bilad Al-Duha is the leading Iraqi Mechanical Contractor providing Construction Services to the Iraqi Oil & Gas , Power and industry field as well as overseas country. In support of its construction activities the Company also provides engineering and procurement services including full EPC for small to medium size projects. With offices in Baghdad, Ahdab, Basrah and Dubai and its experienced international staff the company has the capability to perform any pipeline, tank, piping, steel structure and mechanical installation project in accordance with international standards. Bilad is ISO certified and ranks number 1 as Iraqi mechanical contractor for the Petroleum Industry. We provide all inclusive mechanical services to our local Iraqi and growing international client. This includes non destructive testing and cathodic protection, as required. As a hard money contractor we own all of our construction equipment and are in the process to expand our capability by constructing a full service mechanical workshop in Basrah. Over 800 employees in BADC INTRODUCTION 3
  • 4. Company history 2008 Started pipe line construction business with Petrochina Company Established 2011 Opened Missan Branch office Carried out Tank Construction work for Missan Oil Project 2012 Opened Baghdad office Started Tank and pipe line fabrication workshop 2013 Established Corporate office in Dubai and Branch office in Basra ENI Zubair Tank & Lukoil Pipe line project 2015 ENI & SHELL Zubair piping and pipe line & Zubair DGS PJT 4
  • 5. Organization Chart 5 President Mr. Haider Younis Vice President Mr. Nohwoo Park Project Management Mr. Maher Nermann Mr. Alifuhat Procurement Mr. OlegGrugorchak Logistic Mr. Ahmed Wahab Iraq/Iran Project UAE/ Oman Project CIS Area Project Finance Ms. Paula Harfouche Admin. Ms.Mary Jeann QA/QC Mr.AlexChaichenko HRAccount GA
  • 6. Company Goal Client Satisfaction/ Growth together with Client Strong Teamwork Vertical Integration Continuous Progression 6
  • 7. Vision/Mission Vision Be an excellent “ EPC Service provider ” to create greater values to our clients. Mission Maintain positive growth of the company together with our clients offering them the best quality, technology and service. 7
  • 8. Scope of Service Engineering Procurement Construction Onshore Oil, Gas and water pipe line Oil Refineries Gas plant Petrochemical Plants Industrial plants Water and Sewage treatment plants Storage Tanks 8
  • 9. Employees Details CATEGORY NOS. REMARK Management 5 • Managing Director/Senior Management Permanent Employees Management Staff 15 • Managers, Sr. Engineer, Engineers, Officers Project management 19 • Sr. Engineer, Engineers, Officers Tendering Dept. 5 • Sr. Engineer, Engineers, Officers Planning Dept. 4 • Sr. Engineer, Engineers, Officers HSE 15 • Health, Safety, Environment - Sr. Engineer, Engineers, Officers QA/QC 10 • Quality Assurance/Quality Control – Sr. Engineer, Engineers, Officers Field Personnel 745 • Site engineers, Foreman, Labour’s Mechanic al, Electricians, Welders, Scaffolding Workers , Operators, Helpers Total 818 9
  • 10. Own Equipment list MAIN EQUIPMENTS AND MACHINERIES Description NOS. AUTOMATIC WELDING MACHINE(Vertical & Horizantal) 14 BOOM TYPE WELDING MACHINE 15 SIDE BOOM 45 BOOM TRUCK 5 BOOMLIFT 15 CUTTING MACHINE 5 JACK FOR TANK ERECTION 156 WELDING MACHINE – VARIOUS PROCEESS 245 FORKLIFT – FROM 3 TON TO 10 TON 9 MOBILE CRANE – FROM 15 TON TO 100 TON 18 OVERHEAD CRANES – FROM 2 TON TO 15 TON 6 PAINT MACHINES 12 PIPE BENDING MACHINE 7 PIPE BEVELLING MACHINES 35 PLASMA CNC CUTTING MACHINE 2 PLATE BENDING & ROLLING MACHINE (W:3.5m) 3 PLATE BEVELING MACHINE 4 PORTABLE SAND BLASTING MACHINE 10 PRESS MACHINE 6 PROFILE BENDING MACHINE 2 TRAILER 17 TRUCK 12 VEHICLES 69 10
  • 11. Global Network BRANCH OFFICES Iran/ Oman(Under process) HEADQUARTERS Dubai COUNTRY OFFICES Iraq WORKSHOPS Iraq 11
  • 12. Major Activities Pipe line construction Tank Construction Tank Fabrication Process Skid and Piping spool Fabrication Steel structure work Equipment Installation Piping erection 12
  • 13. PIPELINE CONSTRUCTION CAPABILITIES •Pipe line 8" - 56" •Trunk Lines •Flow lines •Piping 1" - 8“ •Horizontal Directional Drilling •Hot Tapping & Stoppling Major Activity 13
  • 14. TRUNK AND FLOW LINE CONSTRUCTION CAPABILITIES •Pre-construction activities •Trenching •Stringing •Bending •Welding •Non-destructive testing •Heat shrinkable sleeves •Lowering-in •Backfilling •Hydrotesting •Start-up activities •Valve stations erection •Thrust Boring •Horizontal Directional Drilling •Cathodic Protection •Fiber Optic Cable Installation Major Activity 14
  • 15. TANK CONSTRUCTION CAPABILITIES •Crude storage •Water storage •Natural gas storage •Floating roof •Fixed roof SPECIALIZED SERVICES •Plate Fabrication •All related civil works •Associated piping works Major Activity 15
  • 16. TANK FABRICATION Bilad Al-Duha is your one-stop resource for all your Tank fabrication needs. It includes plate material procurement as per the code requirement. Bilad Al-Duha owns a mechanical fabrication shop with all the required equipment for plate cutting, rolling, beveling and welding. We build and erect tanks according to API 650, API 620 and API 12D standards. Major Activity Capability : 1000 ton/Month 16
  • 17. PROCESS SKID AND PIPE SPOOL FABRICATION Bilad Al-Duha is your one-stop resource for all your process skid and pipe spool fabricating needs. Bilad Al-Duha owns a mechanical fabrication shop with all required equipment for process skids and pipe spool fabrication. Major Activity 17
  • 18. STRUCTURAL STEEL WORKS CAPABILITIES •Structural Steel Supply •Structural Steel Fabrication •Structural Steel Installation •Structural Steel Drafting and Design •Safe erection •Works at Heights Major Activity 18
  • 20. CAPABILITIES •AG - Carbon Steel •AG - Stainless Steel •AG - Low Alloy Steel •AG – Duplex Stainless Steel •AG - Galvanized Major Activity 20 PIPING ERECTION
  • 21. Project experiences 21 Start Finish Nasiriya Basra Gas Pipeline Oil Pipeline Company 24” and 36” Water Pipeline Carbon Steel in Ahdeb Oil Field (20) km B1 of EXL 2 and 3, 72 km Crude Oil Pipline 10'' and 72 km Gas Pipeline 16'' Iraq 48'' Hdd Pipline Crosing Shat Al Arab 7 HDD Crossings, 1200 m Each Water Resources Company/NS CC 2010 2012 26,000,000 CNPCC/CPEC C 2008 12,000,000Iraq 40 km Gas Pipeline of 42” dia South Oil Company SOC 2008 Iraq WS2 Pipeline CNPCC/CPEC C 2010 2011 4,500,000 Iraq 3 Nos. of 2000 m3 Diesel Tanks-Fixed Roof Type Steel structure : 2,900ton Piping : 85,000DI Samawa Refinery 2008Samawa Refinery Kut Depot extension Ahdleb Oil Field Pipeline Phase 1 Ahdleb Oil Field Pipeline Phase2 2009 15,000,000 Iraq 2 Nos. of 10000 m3 Gasoline Storage Tanks-Carbon Steel-Floating Roof Type. Piping Network 6”, 8” and 12” dia. 2010 2011 12,000,000 27,000,000 Iraq B2 of EXL 3 32 km Gas Pipeline 16'' CNPCC/CPEC C 9,000,000 2008 2009 Iraq Contract Value (USD) Project DurationCountry Title Project Brief Client 2010 2011
  • 22. Project experiences 22 Start Finish Iraq Majnoon Oil Field Construction of 30 km 20'' Pipline Piping erection: 70,00DI Steel structureerection : 2,540ton Equipment : 900ton SHELL/CPP 2011 2012 16,000,000 Iraq Baqouba Gas Pipeline 32” Gas Pipeline from Naft Khana to Mansouriya Power Plant Station (40) km IGC 2011 2012 33,000,000 Iraq Karbala Power Plant Station 8 Fixed Roof Tanks (size 2000 m3) With Two Units and Network Tankage area Piping erection: 55,500DI Steel structure erection: 2,500ton BETA 2011 2012 14,000,000 Iraq Stell Structure Superstructure (Steel) Pipe Rack Inside CPF Steel Structure erection :3,000ton CNPCC/CPEC C 2011 2012 3,600,000 Country Title Project Brief Client Project Duration 53,000,000Iraq 6” Flow Line and 16” Trunk Line 120km CNPCC/CPEC C 2011 Contract Value (USD) 2012FSF Pipeline 2012 3,500,000Diwaniya Power Plant Station STXIraq 8 Fixed Roof Tanks (size 2500 m3) 2011
  • 23. Project experiences 23 Start Finish Iraq Garraf CPF Piping erection : 75,450DI Steel structure erection : 2,700ton Equipment erection : 3,200ton Weatherford, Petronas 2012 2012 12,000,000 104 km 48” Pipeline Construction (E&I Works, OHL, Telecom Systems) Water Lukoil Crossings for The West Middle East Qurna Field (2nd Phase) Iraq Fao Terminal. Crude Oil Loading Farm Piping erection : 45,000DI Leighton Offshore / South Oil Company 2014 2014 5,000,000 Iraq Zubair IPF’s & Interconnection Piping Pipeline Rehabilitation Project included extensive E&I Works Basrah Gas Company 2015 15,000,000 Iraq Zubair new DGS Project Tank erection work(7Nos, 1600 ton) Samsung Engineering 2016 4,730,000 2013 30,000,000 Iraq 4x5000 m3 Floating Roof Tanks at Mussaib Power Plant Steel structur: 4,500ton Piping erection: 56,500DI BOP equipment erection: 750ton 15,000,000 Iraq 104 km 48” Pipeline Construction Techno engineering 2012 Mussaib Power Plant Project Country Title Project Brief Client Project Duration 8,500,000 Contract Value (USD) Iraq 850 m Water Canal Crossing, 42'' Pipe by Open Cut. 2013 2014 Ministry of Electricity 2012 2013
  • 28. 3. Diwaniyah Power plant Project Tank erection 28
  • 29. 4. Musayyib Power plant Project Tank erection 29
  • 30. 5. Ahdleb Oil Field PipelineProject Pipe line 30
  • 31. 6. Zubair IPF’s & Interconnection Piping project Pipe line 31
  • 32. 7. Water crossings for west Qurna field Project Pipe line 32
  • 33. 8. Zubair New DGS Project Tank erection by Hydraulic jack equipment 33