This document provides an overview of Bilad Al-Duha, an Iraqi mechanical contractor. It includes sections on the company history, organization chart, goals, scope of services, equipment, network, activities, project experiences and photos. Bilad Al-Duha has over 800 employees across Iraq and Dubai and provides construction services to the oil, gas and power industries, including pipeline installation, tank construction, and engineering services. The document highlights several past projects and Bilad Al-Duha's capabilities and equipment for mechanical construction activities.
2. CONENTS
2
INTRODUCTION
COMPANY HISTORY
ORGANIZATION CHART
COMPANY GOAL
VISION/MISSION
SCOPE OF SERVICE
EMPLOYEE DETAILS
OWN EQUIPMENT LIST
GLOBAL NETWORK
MAJOR ACTIVITIES
PROJECT EXPERIENCES
PROJECTS PHOTO GALLERY
CERTIFICATE
3. Bilad Al-Duha is the leading Iraqi Mechanical Contractor
providing Construction Services to the Iraqi Oil & Gas ,
Power and industry field as well as overseas country. In
support of its construction activities the Company also
provides engineering and procurement services
including full EPC for small to medium size projects.
With offices in Baghdad, Ahdab, Basrah and Dubai and
its experienced international staff the company has the
capability to perform any pipeline, tank, piping, steel
structure and mechanical installation project in
accordance with international standards. Bilad is ISO
certified and ranks number 1 as Iraqi mechanical
contractor for the Petroleum Industry.
We provide all inclusive mechanical services to our local
Iraqi and growing international client. This includes non
destructive testing and cathodic protection, as required.
As a hard money contractor we own all of our
construction equipment and are in the process to expand
our capability by constructing a full service mechanical
workshop in Basrah.
Over
800 employees
in BADC
INTRODUCTION
3
4. Company history
2008
Started pipe line
construction business
with Petrochina
Company
Established
2011
Opened Missan
Branch office
Carried out Tank
Construction work for
Missan Oil Project
2012
Opened Baghdad
office
Started Tank and pipe
line fabrication
workshop
2013
Established
Corporate office
in Dubai and
Branch office in
Basra
ENI Zubair Tank & Lukoil
Pipe line project
2015
ENI & SHELL Zubair
piping and pipe line &
Zubair DGS PJT
4
5. Organization Chart
5
President
Mr. Haider Younis
Vice President
Mr. Nohwoo Park
Project Management
Mr. Maher Nermann
Mr. Alifuhat
Procurement
Mr. OlegGrugorchak
Logistic
Mr. Ahmed Wahab
Iraq/Iran Project
UAE/ Oman Project
CIS Area Project
Finance
Ms. Paula Harfouche
Admin.
Ms.Mary Jeann
QA/QC
Mr.AlexChaichenko
HRAccount
GA
7. Vision/Mission
Vision
Be an excellent “ EPC Service provider ”
to create greater values to our clients.
Mission
Maintain positive growth of the company
together with our clients offering them the
best quality, technology and service.
7
10. Own Equipment list
MAIN EQUIPMENTS AND MACHINERIES
Description NOS.
AUTOMATIC WELDING MACHINE(Vertical & Horizantal) 14
BOOM TYPE WELDING MACHINE 15
SIDE BOOM 45
BOOM TRUCK 5
BOOMLIFT 15
CUTTING MACHINE 5
JACK FOR TANK ERECTION 156
WELDING MACHINE – VARIOUS PROCEESS 245
FORKLIFT – FROM 3 TON TO 10 TON 9
MOBILE CRANE – FROM 15 TON TO 100 TON 18
OVERHEAD CRANES – FROM 2 TON TO 15 TON 6
PAINT MACHINES 12
PIPE BENDING MACHINE 7
PIPE BEVELLING MACHINES 35
PLASMA CNC CUTTING MACHINE 2
PLATE BENDING & ROLLING MACHINE (W:3.5m) 3
PLATE BEVELING MACHINE 4
PORTABLE SAND BLASTING MACHINE 10
PRESS MACHINE 6
PROFILE BENDING MACHINE 2
TRAILER 17
TRUCK 12
VEHICLES 69
10
12. Major Activities
Pipe line construction
Tank Construction
Tank Fabrication
Process Skid and Piping spool
Fabrication
Steel structure work
Equipment Installation
Piping erection
12
14. TRUNK AND FLOW LINE CONSTRUCTION
CAPABILITIES
•Pre-construction activities
•Trenching
•Stringing
•Bending
•Welding
•Non-destructive testing
•Heat shrinkable sleeves
•Lowering-in
•Backfilling
•Hydrotesting
•Start-up activities
•Valve stations erection
•Thrust Boring
•Horizontal Directional Drilling
•Cathodic Protection
•Fiber Optic Cable Installation
Major Activity
14
15. TANK CONSTRUCTION
CAPABILITIES
•Crude storage
•Water storage
•Natural gas storage
•Floating roof
•Fixed roof
SPECIALIZED SERVICES
•Plate Fabrication
•All related civil
works
•Associated piping
works
Major Activity
15
16. TANK FABRICATION
Bilad Al-Duha is your one-stop resource for all your
Tank fabrication needs. It includes plate material
procurement as per the code requirement.
Bilad Al-Duha owns a mechanical fabrication shop
with all the required equipment for plate cutting,
rolling, beveling and welding.
We build and erect tanks according to API 650, API
620 and API 12D standards.
Major Activity
Capability : 1000 ton/Month
16
17. PROCESS SKID AND PIPE SPOOL FABRICATION
Bilad Al-Duha is your one-stop
resource for all your process skid
and pipe spool fabricating needs.
Bilad Al-Duha owns a mechanical
fabrication shop with all required
equipment for process skids and
pipe spool fabrication.
Major Activity
17
18. STRUCTURAL STEEL WORKS
CAPABILITIES
•Structural Steel Supply
•Structural Steel Fabrication
•Structural Steel Installation
•Structural Steel Drafting and
Design
•Safe erection
•Works at Heights
Major Activity
18
21. Project experiences
21
Start Finish
Nasiriya
Basra Gas
Pipeline
Oil
Pipeline
Company
24” and 36” Water Pipeline Carbon Steel
in Ahdeb Oil Field
(20) km
B1 of EXL 2 and 3, 72 km Crude Oil Pipline
10'' and 72 km Gas
Pipeline 16''
Iraq
48'' Hdd Pipline Crosing Shat Al
Arab
7 HDD Crossings, 1200 m Each
Water
Resources
Company/NS
CC
2010 2012 26,000,000
CNPCC/CPEC
C
2008 12,000,000Iraq 40 km Gas Pipeline of 42” dia
South Oil
Company
SOC
2008
Iraq WS2 Pipeline
CNPCC/CPEC
C
2010 2011
4,500,000
Iraq
3 Nos. of 2000 m3
Diesel Tanks-Fixed
Roof Type
Steel structure : 2,900ton
Piping : 85,000DI
Samawa
Refinery
2008Samawa Refinery
Kut Depot extension
Ahdleb Oil Field Pipeline Phase 1
Ahdleb Oil Field Pipeline Phase2
2009 15,000,000
Iraq
2 Nos. of 10000 m3
Gasoline Storage
Tanks-Carbon Steel-Floating Roof Type.
Piping Network 6”, 8” and 12” dia.
2010 2011 12,000,000
27,000,000
Iraq B2 of EXL 3 32 km Gas Pipeline 16''
CNPCC/CPEC
C
9,000,000
2008 2009
Iraq
Contract
Value
(USD)
Project
DurationCountry Title Project Brief Client
2010 2011
22. Project experiences
22
Start Finish
Iraq Majnoon Oil Field
Construction of 30 km 20'' Pipline
Piping erection: 70,00DI
Steel structureerection : 2,540ton
Equipment : 900ton
SHELL/CPP 2011 2012 16,000,000
Iraq Baqouba Gas Pipeline
32” Gas Pipeline from Naft Khana to
Mansouriya Power Plant Station (40) km
IGC 2011 2012 33,000,000
Iraq Karbala Power Plant Station
8 Fixed Roof Tanks (size 2000 m3) With
Two Units and Network
Tankage area Piping erection: 55,500DI
Steel structure erection: 2,500ton
BETA 2011 2012 14,000,000
Iraq Stell Structure
Superstructure (Steel) Pipe Rack Inside
CPF
Steel Structure erection :3,000ton
CNPCC/CPEC
C
2011 2012 3,600,000
Country Title Project Brief Client
Project
Duration
53,000,000Iraq 6” Flow Line and 16” Trunk Line 120km
CNPCC/CPEC
C
2011
Contract
Value
(USD)
2012FSF Pipeline
2012 3,500,000Diwaniya Power Plant Station STXIraq 8 Fixed Roof Tanks (size 2500 m3) 2011
23. Project experiences
23
Start Finish
Iraq Garraf CPF
Piping erection : 75,450DI
Steel structure erection : 2,700ton
Equipment erection : 3,200ton
Weatherford,
Petronas
2012 2012 12,000,000
104 km 48” Pipeline Construction
(E&I Works, OHL, Telecom Systems)
Water Lukoil
Crossings for The West Middle East
Qurna Field (2nd Phase)
Iraq
Fao Terminal. Crude Oil Loading
Farm
Piping erection : 45,000DI
Leighton
Offshore /
South Oil
Company
2014 2014 5,000,000
Iraq
Zubair IPF’s & Interconnection
Piping
Pipeline Rehabilitation Project included
extensive E&I Works
Basrah Gas
Company
2015 15,000,000
Iraq Zubair new DGS Project Tank erection work(7Nos, 1600 ton)
Samsung
Engineering
2016 4,730,000
2013 30,000,000
Iraq
4x5000 m3
Floating Roof Tanks at Mussaib
Power Plant
Steel structur: 4,500ton
Piping erection: 56,500DI
BOP equipment erection: 750ton
15,000,000
Iraq 104 km 48” Pipeline Construction
Techno
engineering
2012
Mussaib Power Plant Project
Country Title Project Brief Client
Project
Duration
8,500,000
Contract
Value
(USD)
Iraq
850 m Water Canal Crossing, 42'' Pipe by
Open Cut.
2013 2014
Ministry of
Electricity
2012 2013