The document summarizes a stormwater management and floodplain analysis project for the Kerry Centre development in Beloit, WI. It discusses relocating a portion of Spring Brook to accommodate the development while ensuring flood risks are not increased. Hydraulic modeling was used to analyze the 10-year and 100-year floodplains and ensure elevations and velocities would not be impacted by the relocation. The project also included stormwater management facilities like detention basins to control runoff from the site.