A dynamic, team spirited and performance driven engineering
professional with an extraordinary blend of leadership and
learning ability. Recognized for keen ability to communicate team
members to enhance strategic goals and bottom line objectives
CORE COMPETENCIES
• Cognizant with all technical and practical aspects of Construction
• Self-Motivated and Hard Worker
• Ability to work under deadline and pressure
• Team work and Multidimensional work
• Innovative and Creative
EDUCATIONAL BACKGROUND
• MASTER IN CONSTRUCTION ENGINEERING MANAGEMENT (CIVIL) JUN-2016
(NED University of Engineering & Technology)
• POSTGRADUTE CERTIFICATE COURSE IN EARTHQUAKE ENGINEERING
(NED University of Engineering & Technology) (JUL-2013 to DEC-2013)
• BACHELORS IN CIVIL ENGINEERING DEC-2011
(NED University of Engineering & Technology)
PRFESSIONAL SOFTWARES
• Working Knowledge of MS Office, MS Project 2010
• Working Knowledge of Primavera
• Working Knowledge of AutoCAD
• Working Knowledge of Seismic Softwares Seismostruct and
Seismosignal
PROFESSIONAL DEVELOPMENT
CURRENT POSITION
ASSISTANT RESIDENT ENGINEER (July-2016 to Present)
& PROJECT SITE ENGINEER (July-2015 to July-2016)
TurkPak International (Pvt) Ltd ____ Consultant
Project: Construction of Coal, Clinker and Cement Terminal at Port
Qasim, Karachi. (PIBT)
Cost: Rs.12.50 Billion
Client: Pakistan International Bulk Terminal (PIBT)
Contractor: China Harbor Engineering Company (CHEC)
Projects is located at Port Qasim, Karachi. Work is comprises of Construction of
Administration Building, Power House, Sub Stations, Gate Houses, workshop
Building, Pump Houses and Water Tanks. 560 m Piled-Slab Jetty, 2445 m Trestle
Bridge, 10000 MT Cement Silos,Terminal yard facilities and infrastructure work at Area
about 265,000 sq. meters
M.Engg.(Construction Management)
B.E(Civil Engineering)
FATHER’S NAME
MUHAMMAD SAEED KHAN
DATE OF BIRTH
11TH
JANUARY, 1989
LANGUAGES
Urdu: Speaking, Reading & Writing
English:Speaking, Reading & Writing
GSM
+92-333-2588466
E-MAIL
afzalsaeed.ned@gmail.com
POSTAL ADDRESS
F-59/6, STREET G-1, AGRA TAJ
COLONY, KARACHI.
NATIOANALITY
PAKISTANI
RESPONSIBILITIES
• Supervising multiple project activities on site such as steel tubular piles,
Precast piles and bored piles
• Ensure quality of work for construction of Trestle Bridge, Port Jetty, Silos,
Terminal yard, infrastructure and building construction work as per design
drawing and specifications
• Timely resolved technical aspect of the work to ensure smooth construction
work
• Construction contracts and claims
• Review as built drawings for project and Running Bills of contractor
• Coordinate with project stakeholders
• Managing and Lead the site construction team
EMPLOYMENT HISTORY
SITE ENGINEER (SEP-2013 to Jul-2015)
China Harbor Engineering Company Ltd. ___ Contractor
PROJECT: Pakistan Deep Water Container Terminal (Quay Wall
Construction work)
Cost: Rs.18.0 Billion
Client: South Asia Pakistan Terminal(SAPT),Karachi Port Trust(KPT)
Contractor: China Harbor Engineering Company (CHEC)
Project is located at keamari Groyne near Karachi Port Trust(KPT).Work includes
construction of 1761 m long Quay wall,crane beam and anchors beams with supports
of bored piling work,precast facing unit along with tie supports for quay wall
RESPONSIBILITIES
• Supervised multiple project activities on site as Piling work, Tie rod
installation, construction of Coping Beam with installation of fenders,
bollards, access ladders and embedded parts.
• Prepare Shop Drawings and site progress reports.
• Site planning, management, monitoring and controlling.
• Ensure timely execution of work according to sea tide table.
• Resolving & reporting discrepancies in drawings and any technical
problem faced during execution work.
• Dealing with subcontractors and other influencing agencies
SITE ENGINEER (Feb-2012 to Aug,2013)
AL SHAFI ENTERPRISES ____ Contractor
Project is located at IBA University Karachi. Work include construction of IBA
Visiting Faculty Hostel Building (G+2 story)
PAKISTAN ENGINEERING
COUNCIL (PEC)
INSTITUITON OF ENGINEERS
PAKISTAN (IEP)
Project Management Institute
KEY EXPERIENCE
Quay Wall Construction
Jetty Construction
Trestle Bridge
Piling Work
Building Structure
Power House Building
Sewage Treatment Plant
RCC Water Tanks
Silos Construction
Asphalt Pavement Road
Infrastructure Work
Design Technicalities
As Built Drawings
Operation & Maintenance work
Survey Work
KEY SKILLS
Project Delivery Management
Project Planning and
Management
Leading and Supervision
Project Procurement
Inception and Feasibility Analysis
FIDIC Contracts and Claims
IPC’s and VO’s
Site Management
Project Coordination &
Correspondence
RESPONSIBILITIES
• Supervising multiple project activities on site such as steel tubular piles,
Precast piles and bored piles
• Ensure quality of work for construction of Trestle Bridge, Port Jetty, Silos,
Terminal yard, infrastructure and building construction work as per design
drawing and specifications
• Timely resolved technical aspect of the work to ensure smooth construction
work
• Construction contracts and claims
• Review as built drawings for project and Running Bills of contractor
• Coordinate with project stakeholders
• Managing and Lead the site construction team
EMPLOYMENT HISTORY
SITE ENGINEER (SEP-2013 to Jul-2015)
China Harbor Engineering Company Ltd. ___ Contractor
PROJECT: Pakistan Deep Water Container Terminal (Quay Wall
Construction work)
Cost: Rs.18.0 Billion
Client: South Asia Pakistan Terminal(SAPT),Karachi Port Trust(KPT)
Contractor: China Harbor Engineering Company (CHEC)
Project is located at keamari Groyne near Karachi Port Trust(KPT).Work includes
construction of 1761 m long Quay wall,crane beam and anchors beams with supports
of bored piling work,precast facing unit along with tie supports for quay wall
RESPONSIBILITIES
• Supervised multiple project activities on site as Piling work, Tie rod
installation, construction of Coping Beam with installation of fenders,
bollards, access ladders and embedded parts.
• Prepare Shop Drawings and site progress reports.
• Site planning, management, monitoring and controlling.
• Ensure timely execution of work according to sea tide table.
• Resolving & reporting discrepancies in drawings and any technical
problem faced during execution work.
• Dealing with subcontractors and other influencing agencies
SITE ENGINEER (Feb-2012 to Aug,2013)
AL SHAFI ENTERPRISES ____ Contractor
Project is located at IBA University Karachi. Work include construction of IBA
Visiting Faculty Hostel Building (G+2 story)
PAKISTAN ENGINEERING
COUNCIL (PEC)
INSTITUITON OF ENGINEERS
PAKISTAN (IEP)
Project Management Institute
KEY EXPERIENCE
Quay Wall Construction
Jetty Construction
Trestle Bridge
Piling Work
Building Structure
Power House Building
Sewage Treatment Plant
RCC Water Tanks
Silos Construction
Asphalt Pavement Road
Infrastructure Work
Design Technicalities
As Built Drawings
Operation & Maintenance work
Survey Work
KEY SKILLS
Project Delivery Management
Project Planning and
Management
Leading and Supervision
Project Procurement
Inception and Feasibility Analysis
FIDIC Contracts and Claims
IPC’s and VO’s
Site Management
Project Coordination &
Correspondence

Civil Engineer CV

  • 1.
    A dynamic, teamspirited and performance driven engineering professional with an extraordinary blend of leadership and learning ability. Recognized for keen ability to communicate team members to enhance strategic goals and bottom line objectives CORE COMPETENCIES • Cognizant with all technical and practical aspects of Construction • Self-Motivated and Hard Worker • Ability to work under deadline and pressure • Team work and Multidimensional work • Innovative and Creative EDUCATIONAL BACKGROUND • MASTER IN CONSTRUCTION ENGINEERING MANAGEMENT (CIVIL) JUN-2016 (NED University of Engineering & Technology) • POSTGRADUTE CERTIFICATE COURSE IN EARTHQUAKE ENGINEERING (NED University of Engineering & Technology) (JUL-2013 to DEC-2013) • BACHELORS IN CIVIL ENGINEERING DEC-2011 (NED University of Engineering & Technology) PRFESSIONAL SOFTWARES • Working Knowledge of MS Office, MS Project 2010 • Working Knowledge of Primavera • Working Knowledge of AutoCAD • Working Knowledge of Seismic Softwares Seismostruct and Seismosignal PROFESSIONAL DEVELOPMENT CURRENT POSITION ASSISTANT RESIDENT ENGINEER (July-2016 to Present) & PROJECT SITE ENGINEER (July-2015 to July-2016) TurkPak International (Pvt) Ltd ____ Consultant Project: Construction of Coal, Clinker and Cement Terminal at Port Qasim, Karachi. (PIBT) Cost: Rs.12.50 Billion Client: Pakistan International Bulk Terminal (PIBT) Contractor: China Harbor Engineering Company (CHEC) Projects is located at Port Qasim, Karachi. Work is comprises of Construction of Administration Building, Power House, Sub Stations, Gate Houses, workshop Building, Pump Houses and Water Tanks. 560 m Piled-Slab Jetty, 2445 m Trestle Bridge, 10000 MT Cement Silos,Terminal yard facilities and infrastructure work at Area about 265,000 sq. meters M.Engg.(Construction Management) B.E(Civil Engineering) FATHER’S NAME MUHAMMAD SAEED KHAN DATE OF BIRTH 11TH JANUARY, 1989 LANGUAGES Urdu: Speaking, Reading & Writing English:Speaking, Reading & Writing GSM +92-333-2588466 E-MAIL afzalsaeed.ned@gmail.com POSTAL ADDRESS F-59/6, STREET G-1, AGRA TAJ COLONY, KARACHI. NATIOANALITY PAKISTANI
  • 2.
    RESPONSIBILITIES • Supervising multipleproject activities on site such as steel tubular piles, Precast piles and bored piles • Ensure quality of work for construction of Trestle Bridge, Port Jetty, Silos, Terminal yard, infrastructure and building construction work as per design drawing and specifications • Timely resolved technical aspect of the work to ensure smooth construction work • Construction contracts and claims • Review as built drawings for project and Running Bills of contractor • Coordinate with project stakeholders • Managing and Lead the site construction team EMPLOYMENT HISTORY SITE ENGINEER (SEP-2013 to Jul-2015) China Harbor Engineering Company Ltd. ___ Contractor PROJECT: Pakistan Deep Water Container Terminal (Quay Wall Construction work) Cost: Rs.18.0 Billion Client: South Asia Pakistan Terminal(SAPT),Karachi Port Trust(KPT) Contractor: China Harbor Engineering Company (CHEC) Project is located at keamari Groyne near Karachi Port Trust(KPT).Work includes construction of 1761 m long Quay wall,crane beam and anchors beams with supports of bored piling work,precast facing unit along with tie supports for quay wall RESPONSIBILITIES • Supervised multiple project activities on site as Piling work, Tie rod installation, construction of Coping Beam with installation of fenders, bollards, access ladders and embedded parts. • Prepare Shop Drawings and site progress reports. • Site planning, management, monitoring and controlling. • Ensure timely execution of work according to sea tide table. • Resolving & reporting discrepancies in drawings and any technical problem faced during execution work. • Dealing with subcontractors and other influencing agencies SITE ENGINEER (Feb-2012 to Aug,2013) AL SHAFI ENTERPRISES ____ Contractor Project is located at IBA University Karachi. Work include construction of IBA Visiting Faculty Hostel Building (G+2 story) PAKISTAN ENGINEERING COUNCIL (PEC) INSTITUITON OF ENGINEERS PAKISTAN (IEP) Project Management Institute KEY EXPERIENCE Quay Wall Construction Jetty Construction Trestle Bridge Piling Work Building Structure Power House Building Sewage Treatment Plant RCC Water Tanks Silos Construction Asphalt Pavement Road Infrastructure Work Design Technicalities As Built Drawings Operation & Maintenance work Survey Work KEY SKILLS Project Delivery Management Project Planning and Management Leading and Supervision Project Procurement Inception and Feasibility Analysis FIDIC Contracts and Claims IPC’s and VO’s Site Management Project Coordination & Correspondence
  • 3.
    RESPONSIBILITIES • Supervising multipleproject activities on site such as steel tubular piles, Precast piles and bored piles • Ensure quality of work for construction of Trestle Bridge, Port Jetty, Silos, Terminal yard, infrastructure and building construction work as per design drawing and specifications • Timely resolved technical aspect of the work to ensure smooth construction work • Construction contracts and claims • Review as built drawings for project and Running Bills of contractor • Coordinate with project stakeholders • Managing and Lead the site construction team EMPLOYMENT HISTORY SITE ENGINEER (SEP-2013 to Jul-2015) China Harbor Engineering Company Ltd. ___ Contractor PROJECT: Pakistan Deep Water Container Terminal (Quay Wall Construction work) Cost: Rs.18.0 Billion Client: South Asia Pakistan Terminal(SAPT),Karachi Port Trust(KPT) Contractor: China Harbor Engineering Company (CHEC) Project is located at keamari Groyne near Karachi Port Trust(KPT).Work includes construction of 1761 m long Quay wall,crane beam and anchors beams with supports of bored piling work,precast facing unit along with tie supports for quay wall RESPONSIBILITIES • Supervised multiple project activities on site as Piling work, Tie rod installation, construction of Coping Beam with installation of fenders, bollards, access ladders and embedded parts. • Prepare Shop Drawings and site progress reports. • Site planning, management, monitoring and controlling. • Ensure timely execution of work according to sea tide table. • Resolving & reporting discrepancies in drawings and any technical problem faced during execution work. • Dealing with subcontractors and other influencing agencies SITE ENGINEER (Feb-2012 to Aug,2013) AL SHAFI ENTERPRISES ____ Contractor Project is located at IBA University Karachi. Work include construction of IBA Visiting Faculty Hostel Building (G+2 story) PAKISTAN ENGINEERING COUNCIL (PEC) INSTITUITON OF ENGINEERS PAKISTAN (IEP) Project Management Institute KEY EXPERIENCE Quay Wall Construction Jetty Construction Trestle Bridge Piling Work Building Structure Power House Building Sewage Treatment Plant RCC Water Tanks Silos Construction Asphalt Pavement Road Infrastructure Work Design Technicalities As Built Drawings Operation & Maintenance work Survey Work KEY SKILLS Project Delivery Management Project Planning and Management Leading and Supervision Project Procurement Inception and Feasibility Analysis FIDIC Contracts and Claims IPC’s and VO’s Site Management Project Coordination & Correspondence