This document provides a summary of 8th grade science topics from a biblical perspective. Each topic includes 1-3 bible verses that relate to the science concepts and 3-5 bullet points summarizing the key ideas. The topics covered include matter, atoms and the periodic table, chemical bonds, chemical reactions, acids and bases, energy, thermal energy, motion, forces, magnetism, electricity, sound, and light.