Professional Summary
Mr. Dallas is a Senior Project Manager who specialized in leading and advancing highly visible change
initiatives. He has managed projects throughout the full SDLC from initiation/planning through
implementation and post-implementation support. His expertise includes schedule, budgets, resources,
issues, risks, reporting, and communication. He possesses critical skills in project management,
business and financial analysis, and business process re-engineering. JD has lead technical projects in
an Agile as well as Waterfall environments ensuring client satisfaction.
Experience
March 2014 - Aug 2014JP Morgan Chase Sr.
Project Manager
• Managed upgrades and installations of virtual and physical servers, domains and
hardware in the US and Internationally Budgets of $.5 – $.6 Million.
• Simultaneous Projects In-flight resulting in multiple on-time Business Required Date
deliveries
• Utilized MS Project 2012 for Project Planning
• Engineered full project lifecycle from Forecasting through Implementation and Close
out.
• Coordinated Deliveries and Data Center lock-outs and down-time for builds
Omnicare 2011 – 2014 Sr.
Program/Project Manager
Managed upgrades across 234 pharmacies, 11,000 computers and annual budgets of $5 – $6
Million.
• Planned and implemented the re-engineering of Desktop Management at Omnicare.
• Led key executive discussions to obtain an agreed approach.
• Wrote and implemented a RFP to solidify a 3rd party vendor to rollout the execution
of desktop distribution
• Coordinated with executives a rollout staging plan for company wide distribution
• Built and managed the execution of a detailed project plan.
• Performed weekly project reporting to management such as project charter
• Led stakeholder management, User Acceptance Testing, and Project Documentation
then successfully completed the planning stages of the effort to transition into the
infrastructure’s support teams.
• This project involved business analysis, first article testing, schedule management,
deployment management, budgeting, purchasing, bidder evaluation.
2009 – 2011Zenith Systems Enterprise
Project Manager
• Managed deployment of Data/Electrical/Video Projects – K-12 Environments.
• Project Specifications - Designed and bid voice video and data systems
• Experience with Bidding, Contracts, Change Orders, Proposals
• Led and scheduled weekly construction and Project Meetings
• Beta Testing, Test Plans and Testing Management
• Project Tracking Matrix manager – stakeholders, changes, quality
Budgets $1 - $3 Million
Sept 2014 - PresentTotal Systems Integration
Sr. Project Manager
• In-field Technology Installation Project Management - School Districts and Construction sites
• Simultaneous Projects In-flight resulting in multiple on-time Business Required Date deliveries
• Utilize MS Project 2012, Project Server, MS Excel for Project Planning
• Sales and Upgrades direct to Customers - HP, Cisco, Motorola, Etc.
• Coordinate Deliveries and And Construction Meetings
2006 – 2009Nationwide
Application Support Specialist
• IT and Application Support Specialist for Investment Applications
• Managed daily ops of Critical Systems and systems teams
• Daily operations manager for Informatica Administration
• Daily operations manager for CRIMS Investment Management
• Bloomberg Administration Manager
• Led and scheduled weekly construction and Project Meetings
• Led daily Critical Systems Troubleshooting and Monitoring System and
Processes Documentation
• Manager of Department-wide Financial Reporting and Disclosure
2004 – 2005Newcome Electronic
Systems Project Manager
• Fiber Optic Backbone and Horizonal Copper Phases of Enterprise Network Upgrade
Design and Installation at Riverside Methodist Hospital/McConnell Heart Hospital
• Project meetings
• Design
• Installation
• Management of Installation Crew/Scheduling
• Inventory flow, ordering and storage
• Testing, labeling, and documentation
• Change orders, Field Work Orders
• Blueprints/as-builts
• Fireproofing NEC Codes/NFPA Codes
• Collaboration and Coordination with Multiple Subcontractors and crews
1997 - 2003Total Systems Integration,
Inc. Project Manager
• Project: Kent State University ATM Network
• Led a $23M technology installation at a major Ohio University (Kent State)
o 110 Buildings
o 7 Regional Campuses
o Fiber/Copper Wan/Lan Deployment
• Led all sub-contractor crews and collaborated on as-builts.
• Produced final documentation, blueprints, testing and certification of Network.
• Conducted project status meetings, created contracts, change orders, bulletins and
other legal documents.
• Scheduled and held weekly project meetings, producing official minutes and all
documentation including Field Orders, Inventory Flow, Installation Matrix and
Schedule, Final sign-off on all sub-projects.
• Project: NorthEast Ohio UPS Distribution Network
o Installation of new data network throughout 17 UPS Facilities
o New security network installation in all 17 UPS Facilities
o $13 Million budget
• In-House:
• Managed staff of 6 engineers as well as oversaw large- and small- scale design and
installation.
• Designed campus LANS/WANS, voice/video/data infrastructure systems.
• Engineered and managed installation of integrated multi-media and broadband
systems consisting of digital, analog and IP sources across single and multiple
networks.
1994 - 1995Burkey and Associates
Project Manager
• Managed In-house Division and Installation Projects.
• Designed and installed of data/telecom systems, Campus-wide LAN/WAN design and
implementation.
• Manager of Structured Wiring Division at $20 Million annual firm resulting in
increased divisional profits – overall divisional sales led directly to
company’s upsizing and move to larger headquarters.
• Managed an inventory flow $1 Million monthly.
1992 - 1994McHale US Connect Project Manager
• Led $15 million design and installation of St. Luke’s Hospital Network Project.
• Designed horizontal structured wiring systems for multiple campus buildings in a
token ring application/hospital environment.
• Designed and oversaw installation of Backbone connectivity.
• Managed installation and construction of Network Management System (NMS)
connecting all.
• Led all sub-contractor crews and collaborated on as-builts.
• Produced final documentation, blueprints, testing and certification of Network.
• Scheduled and held weekly project meetings, producing official minutes and all
documentation including Field Orders, Inventory Flow, Installation Matrix and
Schedule, Final sign-off on all sub-projects.
• Wrote project manuals and project design/installation Specifications.
Competencies
Experience Areas: Professional Consulting, Budget Management,
Business Analysis, Project Estimation, Project Charter
Business Requirements Gathering, Use Case
Development, User Interface Design, Test Plan, Test
Case Development,
Agile, Waterfall, PMBOK
MS Project, MS Visio, MS Office Suite
Methodologies:
Project Tools:
Certification: Siemens Systems Installation, Siemens Systems Design,
Project 2010, MS Server 2013, Cisco Cert., HP Cert,
PMBOK Training
Education
B.S. of Administration
The Ohio State University

More Related Content

What's hot

Robert Elder - Resume - Jan 2016
Robert Elder - Resume - Jan 2016Robert Elder - Resume - Jan 2016
Robert Elder - Resume - Jan 2016Robert Elder
 
Devon Blaylock Revised Resume
Devon Blaylock Revised ResumeDevon Blaylock Revised Resume
Devon Blaylock Revised ResumeDevon Blaylock
 
Steve Sottile Seasoned IT Mgr 1
Steve Sottile Seasoned IT Mgr 1Steve Sottile Seasoned IT Mgr 1
Steve Sottile Seasoned IT Mgr 1Steve Sottile
 
Peter Allen Resume
Peter Allen ResumePeter Allen Resume
Peter Allen ResumePeter Allen
 
David Martin Resume
David Martin ResumeDavid Martin Resume
David Martin Resume
David Martin M.S., PMP
 
KHudson Resume
KHudson ResumeKHudson Resume
KHudson ResumeKen Hudson
 
WL - Long_Oct 2016
WL -  Long_Oct 2016WL -  Long_Oct 2016
WL - Long_Oct 2016Will Loyal
 
Solve It Labs Offshore Project Management
Solve It Labs Offshore Project ManagementSolve It Labs Offshore Project Management
Solve It Labs Offshore Project Management
Rafael Sultanov
 
Angela.Jackson.2016
Angela.Jackson.2016Angela.Jackson.2016
Angela.Jackson.2016
Angela Jackson
 
VISHAL KESWANI -May 2015
VISHAL KESWANI -May 2015VISHAL KESWANI -May 2015
VISHAL KESWANI -May 2015Vishal Keswani
 
Mk Dobbs 2010 Resume
Mk Dobbs 2010 ResumeMk Dobbs 2010 Resume
Mk Dobbs 2010 ResumemkDobbs
 

What's hot (20)

Resume
ResumeResume
Resume
 
Robert Elder - Resume - Jan 2016
Robert Elder - Resume - Jan 2016Robert Elder - Resume - Jan 2016
Robert Elder - Resume - Jan 2016
 
Devon Blaylock Revised Resume
Devon Blaylock Revised ResumeDevon Blaylock Revised Resume
Devon Blaylock Revised Resume
 
Steve Sottile Seasoned IT Mgr 1
Steve Sottile Seasoned IT Mgr 1Steve Sottile Seasoned IT Mgr 1
Steve Sottile Seasoned IT Mgr 1
 
Gilbert_Benitez_Jr
Gilbert_Benitez_JrGilbert_Benitez_Jr
Gilbert_Benitez_Jr
 
Peter Allen Resume
Peter Allen ResumePeter Allen Resume
Peter Allen Resume
 
Kevin Sherrard resume
Kevin Sherrard resumeKevin Sherrard resume
Kevin Sherrard resume
 
David Martin Resume
David Martin ResumeDavid Martin Resume
David Martin Resume
 
KHudson Resume
KHudson ResumeKHudson Resume
KHudson Resume
 
WL - Long_Oct 2016
WL -  Long_Oct 2016WL -  Long_Oct 2016
WL - Long_Oct 2016
 
CV-Peter-Sterckx
CV-Peter-SterckxCV-Peter-Sterckx
CV-Peter-Sterckx
 
David Martin_PM_1_15_16
David Martin_PM_1_15_16David Martin_PM_1_15_16
David Martin_PM_1_15_16
 
Solve It Labs Offshore Project Management
Solve It Labs Offshore Project ManagementSolve It Labs Offshore Project Management
Solve It Labs Offshore Project Management
 
Shannon Mays 2016
Shannon Mays 2016Shannon Mays 2016
Shannon Mays 2016
 
Chris Kuntz Resume Clorox SM
Chris Kuntz Resume Clorox SMChris Kuntz Resume Clorox SM
Chris Kuntz Resume Clorox SM
 
Resume
ResumeResume
Resume
 
Khan Afsar_17 May 2016
Khan Afsar_17 May 2016Khan Afsar_17 May 2016
Khan Afsar_17 May 2016
 
Angela.Jackson.2016
Angela.Jackson.2016Angela.Jackson.2016
Angela.Jackson.2016
 
VISHAL KESWANI -May 2015
VISHAL KESWANI -May 2015VISHAL KESWANI -May 2015
VISHAL KESWANI -May 2015
 
Mk Dobbs 2010 Resume
Mk Dobbs 2010 ResumeMk Dobbs 2010 Resume
Mk Dobbs 2010 Resume
 

Viewers also liked

Hitzel b1-b2 je t'aime
Hitzel b1-b2 je t'aimeHitzel b1-b2 je t'aime
Hitzel b1-b2 je t'aimecris03glu
 
Resume
ResumeResume
01 conceito e história
01 conceito e história01 conceito e história
01 conceito e história
Marlon David Domingos
 
RIT SG Funding Requests
RIT SG Funding RequestsRIT SG Funding Requests
RIT SG Funding Requests
Clubs@RIT
 
Triangulo de Talentos Painel espm 2016_2
Triangulo de Talentos Painel espm 2016_2Triangulo de Talentos Painel espm 2016_2
Triangulo de Talentos Painel espm 2016_2
Fábio Giordani
 
obras temporales
obras temporalesobras temporales
obras temporales
Luis Manuel Rodríguez
 
Ecological aspects of Mob Grazing 2012
Ecological aspects of Mob Grazing 2012Ecological aspects of Mob Grazing 2012
Ecological aspects of Mob Grazing 2012
GVPN
 
Romanian history from 1945 - 2015.pptx
Romanian history from 1945 - 2015.pptxRomanian history from 1945 - 2015.pptx
Romanian history from 1945 - 2015.pptx
Daniela Macadon
 
1 6 презентация perfecta
1 6 презентация perfecta1 6 презентация perfecta
1 6 презентация perfecta
kolesikmixer
 
5 презентация modena collection
5 презентация  modena collection5 презентация  modena collection
5 презентация modena collection
kolesikmixer
 

Viewers also liked (11)

Hitzel b1-b2 je t'aime
Hitzel b1-b2 je t'aimeHitzel b1-b2 je t'aime
Hitzel b1-b2 je t'aime
 
Resume
ResumeResume
Resume
 
01 conceito e história
01 conceito e história01 conceito e história
01 conceito e história
 
RIT SG Funding Requests
RIT SG Funding RequestsRIT SG Funding Requests
RIT SG Funding Requests
 
Quotes
QuotesQuotes
Quotes
 
Triangulo de Talentos Painel espm 2016_2
Triangulo de Talentos Painel espm 2016_2Triangulo de Talentos Painel espm 2016_2
Triangulo de Talentos Painel espm 2016_2
 
obras temporales
obras temporalesobras temporales
obras temporales
 
Ecological aspects of Mob Grazing 2012
Ecological aspects of Mob Grazing 2012Ecological aspects of Mob Grazing 2012
Ecological aspects of Mob Grazing 2012
 
Romanian history from 1945 - 2015.pptx
Romanian history from 1945 - 2015.pptxRomanian history from 1945 - 2015.pptx
Romanian history from 1945 - 2015.pptx
 
1 6 презентация perfecta
1 6 презентация perfecta1 6 презентация perfecta
1 6 презентация perfecta
 
5 презентация modena collection
5 презентация  modena collection5 презентация  modena collection
5 презентация modena collection
 

Similar to James_Dallas_2015_Resume

Gary Marshall Updated Resume
Gary Marshall Updated ResumeGary Marshall Updated Resume
Gary Marshall Updated ResumeGary Marshall
 
Victor Holderby - Project Manger
Victor Holderby - Project MangerVictor Holderby - Project Manger
Victor Holderby - Project MangerVictor Holderby
 
Rebecca Selinger 2016 PMP Resume
Rebecca Selinger 2016 PMP Resume  Rebecca Selinger 2016 PMP Resume
Rebecca Selinger 2016 PMP Resume Rebecca Selinger
 
Resume JOYCE CONRAD_0416CRM
Resume JOYCE CONRAD_0416CRMResume JOYCE CONRAD_0416CRM
Resume JOYCE CONRAD_0416CRMJoyce Conrad
 
Renee w foland_resume_09_2012b
Renee w foland_resume_09_2012bRenee w foland_resume_09_2012b
Renee w foland_resume_09_2012bRenee_Foland
 
Yves Juste Proj Manager 2016
Yves Juste Proj Manager 2016Yves Juste Proj Manager 2016
Yves Juste Proj Manager 2016
TBC Corporation
 
Copyright of leeza n. singh
Copyright of leeza n. singhCopyright of leeza n. singh
Copyright of leeza n. singh
Leeza Singh
 
Linked In Profile Resume
Linked In Profile ResumeLinked In Profile Resume
Linked In Profile ResumeMelissa Gilmore
 
SW Development and Infrastructure Resume
SW Development and Infrastructure ResumeSW Development and Infrastructure Resume
SW Development and Infrastructure ResumeRamenaBall
 
SW Development and Infrastructure Resume
SW Development and Infrastructure  ResumeSW Development and Infrastructure  Resume
SW Development and Infrastructure ResumeRamenaBall
 
Stewart Deb June2009
Stewart Deb June2009Stewart Deb June2009
Stewart Deb June2009
dstewart015
 
John marquart enterprise project manager
John marquart   enterprise project managerJohn marquart   enterprise project manager
John marquart enterprise project managerJohn Marquart
 
2016 Michael Wilson Resume
2016 Michael Wilson Resume2016 Michael Wilson Resume
2016 Michael Wilson Resume
Michael Wilson
 

Similar to James_Dallas_2015_Resume (20)

ResumeGoogleNDO
ResumeGoogleNDOResumeGoogleNDO
ResumeGoogleNDO
 
Gary Marshall Updated Resume
Gary Marshall Updated ResumeGary Marshall Updated Resume
Gary Marshall Updated Resume
 
Tami_Strickland 8May15
Tami_Strickland 8May15Tami_Strickland 8May15
Tami_Strickland 8May15
 
Victor Holderby - Project Manger
Victor Holderby - Project MangerVictor Holderby - Project Manger
Victor Holderby - Project Manger
 
Rebecca Selinger 2016 PMP Resume
Rebecca Selinger 2016 PMP Resume  Rebecca Selinger 2016 PMP Resume
Rebecca Selinger 2016 PMP Resume
 
H Akhtar Resume 2016 PM
H Akhtar Resume 2016 PMH Akhtar Resume 2016 PM
H Akhtar Resume 2016 PM
 
Feula_2015_PMOv8
Feula_2015_PMOv8Feula_2015_PMOv8
Feula_2015_PMOv8
 
Resume JOYCE CONRAD_0416CRM
Resume JOYCE CONRAD_0416CRMResume JOYCE CONRAD_0416CRM
Resume JOYCE CONRAD_0416CRM
 
Humayun Akhtar Resume
Humayun Akhtar ResumeHumayun Akhtar Resume
Humayun Akhtar Resume
 
Renee w foland_resume_09_2012b
Renee w foland_resume_09_2012bRenee w foland_resume_09_2012b
Renee w foland_resume_09_2012b
 
ROBERTSON JAMES RESUME
ROBERTSON JAMES RESUMEROBERTSON JAMES RESUME
ROBERTSON JAMES RESUME
 
PMartinez Resume
PMartinez ResumePMartinez Resume
PMartinez Resume
 
Yves Juste Proj Manager 2016
Yves Juste Proj Manager 2016Yves Juste Proj Manager 2016
Yves Juste Proj Manager 2016
 
Copyright of leeza n. singh
Copyright of leeza n. singhCopyright of leeza n. singh
Copyright of leeza n. singh
 
Linked In Profile Resume
Linked In Profile ResumeLinked In Profile Resume
Linked In Profile Resume
 
SW Development and Infrastructure Resume
SW Development and Infrastructure ResumeSW Development and Infrastructure Resume
SW Development and Infrastructure Resume
 
SW Development and Infrastructure Resume
SW Development and Infrastructure  ResumeSW Development and Infrastructure  Resume
SW Development and Infrastructure Resume
 
Stewart Deb June2009
Stewart Deb June2009Stewart Deb June2009
Stewart Deb June2009
 
John marquart enterprise project manager
John marquart   enterprise project managerJohn marquart   enterprise project manager
John marquart enterprise project manager
 
2016 Michael Wilson Resume
2016 Michael Wilson Resume2016 Michael Wilson Resume
2016 Michael Wilson Resume
 

James_Dallas_2015_Resume

  • 1. JD Dallas 614-218-7346 jddallas2222@yahoo.com Professional Summary Mr. Dallas is a Senior Project Manager who specialized in leading and advancing highly visible change initiatives. He has managed projects throughout the full SDLC from initiation/planning through implementation and post-implementation support. His expertise includes schedule, budgets, resources, issues, risks, reporting, and communication. He possesses critical skills in project management, business and financial analysis, and business process re-engineering. JD has lead technical projects in an Agile as well as Waterfall environments ensuring client satisfaction. Experience March 2014 - Aug 2014JP Morgan Chase Sr. Project Manager • Managed upgrades and installations of virtual and physical servers, domains and hardware in the US and Internationally Budgets of $.5 – $.6 Million. • Simultaneous Projects In-flight resulting in multiple on-time Business Required Date deliveries • Utilized MS Project 2012 for Project Planning • Engineered full project lifecycle from Forecasting through Implementation and Close out. • Coordinated Deliveries and Data Center lock-outs and down-time for builds Omnicare 2011 – 2014 Sr. Program/Project Manager Managed upgrades across 234 pharmacies, 11,000 computers and annual budgets of $5 – $6 Million. • Planned and implemented the re-engineering of Desktop Management at Omnicare. • Led key executive discussions to obtain an agreed approach. • Wrote and implemented a RFP to solidify a 3rd party vendor to rollout the execution of desktop distribution • Coordinated with executives a rollout staging plan for company wide distribution • Built and managed the execution of a detailed project plan. • Performed weekly project reporting to management such as project charter • Led stakeholder management, User Acceptance Testing, and Project Documentation then successfully completed the planning stages of the effort to transition into the infrastructure’s support teams. • This project involved business analysis, first article testing, schedule management, deployment management, budgeting, purchasing, bidder evaluation. 2009 – 2011Zenith Systems Enterprise Project Manager • Managed deployment of Data/Electrical/Video Projects – K-12 Environments. • Project Specifications - Designed and bid voice video and data systems • Experience with Bidding, Contracts, Change Orders, Proposals • Led and scheduled weekly construction and Project Meetings • Beta Testing, Test Plans and Testing Management • Project Tracking Matrix manager – stakeholders, changes, quality Budgets $1 - $3 Million Sept 2014 - PresentTotal Systems Integration Sr. Project Manager • In-field Technology Installation Project Management - School Districts and Construction sites • Simultaneous Projects In-flight resulting in multiple on-time Business Required Date deliveries • Utilize MS Project 2012, Project Server, MS Excel for Project Planning • Sales and Upgrades direct to Customers - HP, Cisco, Motorola, Etc. • Coordinate Deliveries and And Construction Meetings
  • 2. 2006 – 2009Nationwide Application Support Specialist • IT and Application Support Specialist for Investment Applications • Managed daily ops of Critical Systems and systems teams • Daily operations manager for Informatica Administration • Daily operations manager for CRIMS Investment Management • Bloomberg Administration Manager • Led and scheduled weekly construction and Project Meetings • Led daily Critical Systems Troubleshooting and Monitoring System and Processes Documentation • Manager of Department-wide Financial Reporting and Disclosure 2004 – 2005Newcome Electronic Systems Project Manager • Fiber Optic Backbone and Horizonal Copper Phases of Enterprise Network Upgrade Design and Installation at Riverside Methodist Hospital/McConnell Heart Hospital • Project meetings • Design • Installation • Management of Installation Crew/Scheduling • Inventory flow, ordering and storage • Testing, labeling, and documentation • Change orders, Field Work Orders • Blueprints/as-builts • Fireproofing NEC Codes/NFPA Codes • Collaboration and Coordination with Multiple Subcontractors and crews 1997 - 2003Total Systems Integration, Inc. Project Manager • Project: Kent State University ATM Network • Led a $23M technology installation at a major Ohio University (Kent State) o 110 Buildings o 7 Regional Campuses o Fiber/Copper Wan/Lan Deployment • Led all sub-contractor crews and collaborated on as-builts. • Produced final documentation, blueprints, testing and certification of Network. • Conducted project status meetings, created contracts, change orders, bulletins and other legal documents. • Scheduled and held weekly project meetings, producing official minutes and all documentation including Field Orders, Inventory Flow, Installation Matrix and Schedule, Final sign-off on all sub-projects. • Project: NorthEast Ohio UPS Distribution Network o Installation of new data network throughout 17 UPS Facilities o New security network installation in all 17 UPS Facilities o $13 Million budget • In-House: • Managed staff of 6 engineers as well as oversaw large- and small- scale design and installation. • Designed campus LANS/WANS, voice/video/data infrastructure systems. • Engineered and managed installation of integrated multi-media and broadband systems consisting of digital, analog and IP sources across single and multiple networks.
  • 3. 1994 - 1995Burkey and Associates Project Manager • Managed In-house Division and Installation Projects. • Designed and installed of data/telecom systems, Campus-wide LAN/WAN design and implementation. • Manager of Structured Wiring Division at $20 Million annual firm resulting in increased divisional profits – overall divisional sales led directly to company’s upsizing and move to larger headquarters. • Managed an inventory flow $1 Million monthly. 1992 - 1994McHale US Connect Project Manager • Led $15 million design and installation of St. Luke’s Hospital Network Project. • Designed horizontal structured wiring systems for multiple campus buildings in a token ring application/hospital environment. • Designed and oversaw installation of Backbone connectivity. • Managed installation and construction of Network Management System (NMS) connecting all. • Led all sub-contractor crews and collaborated on as-builts. • Produced final documentation, blueprints, testing and certification of Network. • Scheduled and held weekly project meetings, producing official minutes and all documentation including Field Orders, Inventory Flow, Installation Matrix and Schedule, Final sign-off on all sub-projects. • Wrote project manuals and project design/installation Specifications. Competencies Experience Areas: Professional Consulting, Budget Management, Business Analysis, Project Estimation, Project Charter Business Requirements Gathering, Use Case Development, User Interface Design, Test Plan, Test Case Development, Agile, Waterfall, PMBOK MS Project, MS Visio, MS Office Suite Methodologies: Project Tools: Certification: Siemens Systems Installation, Siemens Systems Design, Project 2010, MS Server 2013, Cisco Cert., HP Cert, PMBOK Training Education B.S. of Administration The Ohio State University