1. Geoff Kay : CV- Issue - March 2015 :
Name : Geoffrey Kay
Address : 10 The Chanters, Worsley, Manchester, M28 7XL : England UK.
Tel & Ans : ( +44 ) ( 0 ) 161 799 7142.
Fax & Tel : ( +44 ) ( 0 ) 161 790 1532.
Mobile Phone : ( +44 ) ( 0 ) 7855351830.
Email Address : GeoffKay@dsl.pipex.com or Geoff.Kay@hotmail.com
Nationality : British-English. U.K. - Passport No. 517976905.
Profession : Lead Structural (PDMS/CAD) Designer.
Qualifications : Struct.Tech Eng. ( Part III ) Cert.
Training On Site : Magnox R2 / C2 induction training. / Various Offshore & OnSite
Fabrication Yard Safety induction courses.
Availability : 2 weeks ....................
St John’s Newfoundland Canada : Project - Hebron : Drilling :
Client: RDS / KCAD. ( Drilling Consultants )
Worley Parsons Offices : Notre Dame – West Campus : St Johns :
Position: Lead Contract Senior Structural (PDMS/CAD) Designer.
Duration: Apr 2012– 2014 :
Duties : Responsible for Structural Design Team 50 plus personnel & 3-D model using PDMS 12.1 to design
Drilling Modules DES & DSM & GPK on Project Hebron : DETAIL DESIGN STAGE : Module
installation sequences for Skidding & Jacking : Using Autocad Ver 2012 : Produce reports / general
admin using MS Office. Design Plan and Schedule production to monitor and control Progress of all
deliverables. Attend progress / weekly meetings. Design and Development work for nodal connections to
main modules. Instruct Interviews / recruitment of staff : Run MTO logs. Audit preparation &
Document Number Systems. Distribute work packs. IDC control & interface with Multi – Disciplines.
Checking of Engineering Drawings to a satisfactory standard. Oversee production of Project standards.
USA ( Houston Texas ) : Project - Hebron : Drilling :
Client: RDS / KCAD. ( Drilling Consultants )
Worley Parsons Offices : Energy Corridor : Houston Texas :
Position: Lead Contract Senior Structural (PDMS/CAD) Designer.
Duration: Jan 2011– Mar 2012 :
Duties : Responsible for Structural Design Team 15 plus personnel & 3-D model using PDMS 11.6 to design
Drilling facilities DES & DSM & GPK on Project Hebron : FEED STAGE : Module installation
sequences for Skidding & Jacking : Using Autocad Ver 2012 : Deliver reports / general admin using MS
Office suite 2003. Plan and Schedule production to control Progress of all deliverables. Attend progress /
weekly meetings. Concept Design and Development work for three modules. Audit Preparation.
ENGLAND (UK) : Project – Claire Ridge : Drilling :
Client: RDS London. ( Drilling Consultants ).
4th
/ 5th
Floor , 207 Old Street , London.. Tel: 0207-045-6300. xtn 6379.
Position: Lead Contract Senior Structural (PDMS /CAD) Designer.
Duration: Jan 2010 – Dec 2011.
Duties : Responsible for Structural Design Team 8 plus personnel & 3-D model using PDMS 11.6 to design
Drilling Modules DES & DSM on Project Claire Ridge : Module installation sequences for lift & offshore
cranes. Using Autocad Ver 2007 : All reports / general admin using MS Office suite 2003.
(594f538c-4589-4afc-a0f0-d086b94e86d0-150410001744-conversion-gate01.doc) Page No. 1 of 7. Date. 10/04/2015.
2. MONACO : Project Ohka : FPSO :
Client: Single Buoy Moorings (SBM) Monaco. ( IHC Group )
24 Avenue de Fontvieille, PO Box 199, MC 98007 Monaco Cedex. Tel: 00377 92051500.
Position: Contract Senior Structural (PDMS/CAD) Designer.
Duration: Oct 2008 – Dec 2009.
Duties: Preparation of detail engineering drawings for Topside Modules & Gantry Project Ohka Woodside
Petroleum.Using Autocad 2007 2D. & Modelling via PDMS ver 11.6 Design & Draft.
Conceptual studies to formal fabrication issue. Production of weight reports for both fixed & rotating
parts of design. Liasion between disciplines & co-ordinaton of detailed design. Document control for
Master files & check procedures. Team briefs & control of backup file procedures for computer archives.
Use of EDMS sbm file control system.
ENGLAND (UK) : Project – GVA 7500 & MPF01 : Drilling :
Client: RDS London. ( Drilling Consultants ) / Engineers.
4th
/ 5th
Floor ,207 Old Street, London.. Tel: 0207-045-6300. xtn 6379.
Position: Contract Senior Structural (PDMS /CAD) Designer.
Duration: March 2007 – Oct 2008.
Duties: Responsible for 3-D model using PDMS 11.6 to build Drilling / Mud Mixing / Handling Equipment.
General Main Module Steelwork : Including Drill Floor / Substructure D05, D10, D20, D30, D50 &
Internal Hull Tanks.On FPSO drilling facility. Projects : GVA7500 , MPF01 : Engineering Drawings
using both PDMS Draft & Autocad Ver 2007. All reports / general admin using MS Office suite 2003.
MONACO : Project – Capixaba : FPSO :
Client: Single Buoy Moorings (SBM) Monaco. ( IHC Group )
24 Avenue de Fontvieille, PO Box 199, MC 98007 Monaco Cedex. Tel: 00377 92054402.
Position: Lead Contract Senior Structural (PDMS/CAD) Designer.
Duration: Nov 2004 – March 2007.
Duties: Responsible for Structural Design Team 12 plus personnel & Preparation of detail engineering
drawings
For Turret & Gantry Project Capixaba FPSO Petrobras Brasil. Using Microstation 98SE 2D / 3D &
Autocad 2005 2D. PDMS ver 11.6 Design & Draft.Checking engineering drwgs, co-ordination of design
team. Conceptual studies to formal fabrication issue.Production of weight reports for both fixed &
rotating parts of design. Liasion between disciplines & co-ordinaton of detailed design. Document control
for Master files & check procedures. Team briefs & control of backup file procedures for computer
archives. Use of EDMS sbm file control system.
ENGLAND (UK) : Project – Sakahlin Island Phase II Drilling :
Client: Tri-Ocean Engineering Ltd. Calgary Canada. ( Drilling Section )
Amec Offices Davis House, Croydon, London. Tel: 0208 603 1971.
Position: Contract Senior Structural (PDMS/CAD) Designer.
Duration: April 2004 – Nov 2004.
Duties: Sakahlin Island Phase II Project Drilling Modules Lunskoye & Piltun.
Using PDMS Design & Draft & MS Office. Preparation of G.A. & Engineering design drawings
For Primary, Secondary & Tertiary Structures. Skid Base, BOP Deck, Mezzanine Deck, Drill Floor etc.
Checking Model & Draft Drawings, CCN Control, Clash Checks.
FRANCE : Project – Shah Deniz : Drilling :
Client: KCAD Paris France. ( Drilling Consultants )
Adria Tower, Technip Offices La Defense, Paris, France. Tel: 0033147783950.
Position: Contract Senior Structural (PDMS/CAD) Designer.
Duration: Jan 2003 – December 2003.
Duties: Shah Deniz Project: Drilling Facilities Topsides incorp flush Main Drill Floor.
Using PDMS Design & Draft / Autocad 2002 & MS Office. Full design & development of drill floor
for structural group & 2D draft engineering drwgs. Followed by approx 4 months use of MDS Muti
(594f538c-4589-4afc-a0f0-d086b94e86d0-150410001744-conversion-gate01.doc) Page No. 2 of 7. Date. 10/04/2015.
3. Discipline supports for KCAD support group mainly modification work & full PDMS draft production
drawings within Hull section for Technip structural overspill & drilling topsides. Pipe supports & 2D
extractions from Draft module. Use of autodraft for file production & Automated M.T.O
ENGLAND (UK) : Project – Sakahlin Island : Drilling :
Client: Tri-Ocean Engineering Ltd. Calgary Canada. ( Drilling Consultants )
Amec Offices Davis House, Croydon, London. Tel: 0208 603 2929.
Position: Contract Senior Structural (PDMS/CAD) Designer.
Duration: May 2002 – December 2002.
Duties: Sakahlin Island Phase II Project Drilling Modules Lunskoye & Piltun.
Using PDMS Design & Draft & MS Office.
MONACO : Project – Anenam – White Rose – Brasil : FPSO’s :
Client: Single Buoy Moorings (SBM) Monaco. ( IHC Group )
24 Avenue de Fontvieille, PO Box 199, MC 98007 Monaco Cedex. Tel: 00377 92051500.
Position: Contract Senior Structural (CAD) Designer.
Duration: Nov 2000 – April 2002.
Duties: Preparation of detail engineering drawings for Turret Turntable for Barge hookup / interface., Anenam
Angola.White Rose etc. FPSO Brasil Main Piperack.
Using Microstation 98SE 2D / 3D & Autocad 2000 2D. ( Certified PDMS Training )
ENGLAND (UK) : River Mersey Viaduct Rail Bridge : Civil Constuction :
Client: White Young Green Consultants / Engineers.
Arndale Court , Headingley, Leeds. England. LS6 2UJ. Tel: 0113-278-7111.
Position: Lead Contract Senior Structural (CAD) Designer.
Duration: Jan 2000 – Nov 2000.
Duties: Engineering & Checking of structural drwgs for project River Mersey Viaduct Rail Bridge @
Warrington.
Using Autocad Versions 14 & 2000. 2D & 3D. & MS Office.
NORWAY : Project – Navion 1 : Drilling :
Client: Offshore & Marine A/S. ( Drilling Consultants ) / Engineers.
Strandgaten 147, P.O. Box 425, 4301 Sandnes. Norway. Tel: 0047-51602482.
Position: Lead Contract Senior Structural (CAD) Engineer.
Duration: June 1998 – Nov 1999.
Duties: Responsible for Structural Design Team 10 plus personnel - Re-engineering & Co-ordination of
structural
elements to Drillship Navion 1., formerly named MST Odin.
Using Autocad Ver 14 & MS Office
ENGLAND (UK) : Project – Mittleplate A : Drilling :
Client: RDS London. ( Drilling Consultants ) / Engineers.
Portland House , Portland Street, London.. Tel: 0171-307-9535.
Position: Lead Contract Senior Structural (CAD) Designer.
Duration: December 1997 - June 1998.
Duties: Responsible for Structural Design Team 6 plus personnel & Co-ordination of structural design
steelwork
for the Project Mittleplate - A.
Using Autocad Ver 14. & MS Office.
Project – Sellafield Drypac Plant : Nuclear Plant :
Client: Multi Design Consultants.
Regal House, Duke St, Stockport. Tel: 0161-477-0766. Extn 268.
Position: Lead Contract Senior Structural (CAD) Designer.
(594f538c-4589-4afc-a0f0-d086b94e86d0-150410001744-conversion-gate01.doc) Page No. 3 of 7. Date. 10/04/2015.
4. Duration: September 1996.- December 1997.
Duties: Responsible for Control Management & Co-ordination of structural steelwork drafting team 8 plus
personnel for the Project B.N.F.L. Sellafield Drypac Plant.
Using Autocad Ver 13. & MS Office.
Project – Chek Lap Kok : Hong Kong International Airport : Shipping :
Client: Watson Steel Ltd. Lostock Lane , Lostock , Bolton. Tel: 01204-699999. Extn 257.
Position: Contract Projects Manager / Engineer.
Duration: April 1995. - September 1996.
Duties: Responsible for Control, Management & Co-ordination of Shipping all associated steelwork for Hong
Kong Airportto Chek Lap Kok Island. 17000 MT by sea & air. Management of multi-based operations &
personnel. Using MS Project, Office & Dedicated MTO system.
GERMANY : Project Pro Star 2000 : Drilling :
Client: DEUTAG / BENTEC ( Drilling Engineers )
( Germany ) Bad Bentheim , Northern Germany. Tel:- 010-495-92272475.
Position: Lead Contract Senior Structural (CAD) Designer.
Duration: November 1994.-April 1995.
Duties: Responsible for Structural Design Team 10 plus personnel & Production of Design Engineering Drwgs
&
Shop Fabrication Drwgs for Project NAM-02 PRO-STAR 2000.
Using Autocad Ver 12. & MS Office.
NORWAY : Project Troll : Drilling :
Client: HITEC DRECO A/S (NORWAY) ( Drilling Engineers ) Lagerveien 12c,Forus Vest,Stavanger,
Norway. Tel:- 51-801655.
Position: Lead Contract Senior Structural (CAD) Designer.
Duration: June 1992.-Nov 1994.
Duties: Responsible for Structural Design Team 16 plus personnel & Production of Design Engineering
Drawings
for Troll Drilling Platform.
Using Autocad Versions 11 & 12. Also MS Office.
ENGLAND (UK) : Project CSB Faslane : MOD Submarine Service Base:
Client: Robert Watson Constructional Engineers, Lostock Lane, Lostock, Bolton Tel: 0204-699999.
Position Contract Assistant Projects Engineer
Duration: November 1988 - June 1992
Duties: Variation control re various projects including CSB Faslane Shiplift Package (Clyde Submarine Base)
for
the Ministry of Defence, Liverpool Street Station (Western Trainshed Roof) for British Railways
London.
Kansai International Airport (Osaka Bay Japan) & Charles De Gaulle International Airport Rail Conn
(France). Using Open Plan Network Data Base, Office & Manual Calculations.
NORWAY : Project Gullfaks C : Production Platform : Drilling :
Client: Aker Engineering A/S, N.C. of Stromsteinen, Stavanger, Norway Tel: 04-530500 & Hinna Tel: 04-588020
Position Contract Senior Structural Designer / Embedment Plate Co-ordinator for G.B.S.
Duration March 1986 - October 1988.
Duties Gullfaks "C" Project Engineering drwgs for main mechanical out-fitting of G.B.S. Also follow on
Engineering & as-builts. Using Manual Design & Drafting.
ENGLAND (UK) : Various Projects :
(594f538c-4589-4afc-a0f0-d086b94e86d0-150410001744-conversion-gate01.doc) Page No. 4 of 7. Date. 10/04/2015.
5. Client: Costain Petrocarbon Process, Kings House, Cheadle Hulme Tel: 061-485-8664
Position Contract Senior Structural Design Draughtsman
Duration 6 months
Duties Cold Box Main Frame, G.A. details, vessel support units for cryogenics,
Using Manual Calculations & Manual Drafting.
Client: Redpath Engineering Limited, Hawleys Lane, Warrington Tel: 0925-51122
Position Lead Contract Senior Structural Design Draughtsman
Duration 6 months
Duties Detail drawings of plate girders, node plate girder, box columns for B.P. Offshore South East Forties.
Cutting sketches, material lists, design sketches for weld procedure to tolerances.
Using Manual Calculations & Manual Drafting.
Client: Allot & Lomax, Fairbairn House, Ashton Lane, Sale, Manchester Tel: 061-962-1214
Position Contract Senior Structural Design Draughtsman
Duration 2 years
Duties Heysham Nuclear Power Station, cladding details to administration block, Stage II. Thorp Power
Station
general arrangements of head end, feedpond, west annexe, centre building (schematic + CEP1 + CEP2 +
tender drawings thereof). Using Manual Calculations & Manual Drafting.
AUSTRALIA : Various Projects :
Client: Perth Drafting W.A. Limited, 48 Kishorn Road, Applecross, Perth, Western Australia
Position Contract Senior Structural Design Draughtsman
Duration 9 months
Duties Bunbury Port Alumina Shiploading facilities, North West Shelf project
Using Manual Calculations & Manual Drafting.
Client: Mitchell Cotts Projects Pty Ltd, 6th Floor Scottish Amicable Building, 246 St Georges Terrace Perth
W.A.
Position Contract Senior Structural Design Draughtsman
Duration 5 months
Duties Nepean Ore plant components comprising ore bin & crusher platforms ladders, chutes, hoppers &
conveyors to suit. Preparation of general arrangements of ore crushing systems.
Using Manual Calculations & Manual Drafting.
Client: Mecaid Pty Limited (in house) Suite 3, Broadway Fair, Nedlands, W.A.
Position Contract Senior Structural Design Draughtsman
Duration 8 months
Duties Projects included: Transfer Station for Hamesley Iron, Turbine Building for Worsley Alumina Project.
Extension to Storage warehouse facilities. Using Manual Calculations & Manual Drafting.
ENGLAND (UK) : Various Projects :
Client: Pilkington Brothers, Central Engineering Department (Furnace & Float Glass Departments)
St Helens, Merseyside
Position Contract Structural Design Draughtsman
Duration 1979 - 1981
Duties FR!5 & UK5 On full production work with glass furnaces & float operations & their components,
including
Design work of simple structures. Together with site surveys and erection supervision.
Using Manual Calculations & Manual Drafting.
(594f538c-4589-4afc-a0f0-d086b94e86d0-150410001744-conversion-gate01.doc) Page No. 5 of 7. Date. 10/04/2015.
6. Client: Faircloughs, Material Handling Division, Adlington, Nr. Chorley, Lancs.
Position Contract Structural Design Draughtsman
Duration 6 months
Duties On full production work, covering all aspects of fabricated steel components incl mechanical plant.
Using Manual Calculations & Manual Drafting.
Client: Fluor Great Britain Limited, Fluor House, Chester Road, Trafford Bar, Manchester
Position Staff Structural Designer Grade C
Duration One Year
Duties On full production work with Petro-chemical structures, together with Conceptual design thru
Engineering Design of all associated structural details.Using Manual Calculations & Manual Drafting.
Client: Redpath Dorman Long Limited, Westinghouse Road, Trafford Park, Manchester
Position Staff Structural Design Draughtsman
Duration Four Years
Duties 12 months in Drawing Office Training School, followed by three years on production work in main
drawing office covering all aspects of Structural Engineering. Using Manual Calculations & Manual
Drafting.
Project Experience Summary : Design Engineering & Fabrication Details :
Offshore Drilling – DES / DSM / GPK & Interface
Drill-Ship Design
Offshore Platforms MSF & Modules
FPSO – Modules & Support Grillage
GBS - Outfitting ( MMO )
Offshore Crane Installation sequences
Lifting & Rigging Arrangements
Cofferdam Drilling Facilities
Turret & Turntable Design
Petrochemical Plant Design including cryogenics
Nuclear Power Plant Installation
Mining Installations
Varios Onshore Structures
Deliverable Schedules – Planning & Monitoring
Checking of Project Drawings to a satisfactory standard.
MTO – Structural Elements / Summary per Module
Computer Software Experience :
PDMS Design & Draft
Autocad
Microstation
Microsoft Office Professional, Word, Excel, Outlook,
Powerpoint
Open Planning 6
Microsoft Project Planning
BASIC Programming MS VBasic V6
Blue Voda Web Page design
& various Accounts Packages
Clients: KCAD Aberdeen U.K (Drilling ) Tri-Ocean Engineering Canada ( Drilling )
Rig Design Services London. ( Drilling ) Offshore & Marine A/S Norway. ( Drilling )
B.P. Offshore ( Drilling ) SBM Single Buoy Moorings Monaco ( FPSO )
(594f538c-4589-4afc-a0f0-d086b94e86d0-150410001744-conversion-gate01.doc) Page No. 6 of 7. Date. 10/04/2015.
7. Redpath Engineering Ltd UK ( Offshore ) Marathon Oils U.K. Ltd ( Offshore )
Aker Engineering A/S Norway ( Offshore ) Shell Australia North West Shelf Explorations.
Norwegian Contractors Norway ( Offshore ) Deutag / Bentec Germany. ( Drilling )
Amec / Watson Steel Ltd. UK. Hitec Dreco A/S Norway ( Drilling )
Multi Design Consultants UK. Mitchell Cotts Projects Pty Ltd Australia.
Amec Engineeering UK. Costain Petrocarbon Process UK.
Fluor GB Ltd UK. Redpath Dorman Long Ltd UK.
Pilkington Brothers UK. Allot & Lomax Consultants UK.
Faircloughs UK. White Young Green Consultants UK.
KCAD / Worley Parsons USA ( Drilling ) KCAD Canada Newfoundland ( Drilling )
(594f538c-4589-4afc-a0f0-d086b94e86d0-150410001744-conversion-gate01.doc) Page No. 7 of 7. Date. 10/04/2015.