This document provides a summary of Arundas's professional experience and qualifications. He has over 8 years of experience managing MEP projects for hospitals, hotels, and other buildings. His responsibilities have included project planning, installation and commissioning of HVAC, plumbing, electrical, and other building systems. He is proficient in various engineering standards and codes.
A Competent Mechanical Engineer, seeking middle level assignments in Piping Engineering / Commissioning & Pre-Commissioning with an organisation of repute, preferably in Oil & Gas/ Petrochemicals industry Refinery, Chemical Plants.
A Competent Mechanical Engineer, seeking middle level assignments in Piping Engineering / Commissioning & Pre-Commissioning with an organisation of repute, preferably in Oil & Gas/ Petrochemicals industry Refinery, Chemical Plants.
2016 ATEA presentation - what are beginning teachers looking for online?nickkelly
2016 ATEA presentation on TeachConnect (www.teachconnect.edu.au) about how to design an online platform of teachers. More details at www.nickkellyresearch.com and references included.
What are beginning teachers looking for online? The TeachConnect story (and what can be learnt from it).
TeachConnect is a platform to support pre-service secondary maths and science teachers through their professional experience and into the profession. It has been developed over four years as a design-based research project and now has over 500 users across Queensland.
This presentation aims to share everything that we have discovered during this journey. It contributes a discussion of :
- the unrealised potential for online support for pre-service and early career teachers (to augment rather than replace existing support)
- the design principles for online communities of teachers that have been developed through analysis of existing platforms and multiple iterations of TeachConnect development with input from participants
- the design of the engagement strategy for involving all stakeholders within the state education system, with a particular focus upon the development of the online group and peer mentoring program
- real-world impacts and discussion of future steps
Finally, the presentation describes how the open-source platform could be used in other states. The work can be understood as a contribution to the vision of an online platform that is as useful as possible for pre-service and early career teachers. In summary, we believe this will continue to be achieved through: (i) widespread collaboration between universities, government and accreditation bodies; (ii) ongoing participant-led design and redesign; and (iii) convergence, for maximising benefits of a large community whilst retaining the benefits of enclosed spaces where deep reflection can occur.
আমার সাত বছরের কালেকশন ... এই বিশাল কালেকশন গড়ে তলার জন্য আমকে অসংখ্য ফাইল (যেমনঃ সফটওয়্যার, বই ও টিউটোরিয়াল ) ডাউনলোড করতে হয়েছে , এবং তা ইন্সটল করে চেক করে দেখতে হয়েছে ফুল ভার্সন কিনা এবং সফটওয়্যার দিয়ে কি কি করা তা দেখতে হয়েছে ...যদি কাজের মনে না হয় তাহলে ডিলেট … আর যদি প্রয়োজন মনে হয় তাহলে ওই সফটওয়্যারের হোম পেইজে গিয়ে এর কোন আপডেট ভার্সন বের হয়েছে কিনা এবং বের হলে তার ভাইরাস বিহীন ক্রাক ও প্যাঁচ খুজে বের করতে হয়েছে …
আর এক একটা ই-বুক খুজতে আমাকে কি পরিমান কষ্ট করতে হয়েছে কত ওয়েব সাইট যে ঘুরতে হয়েছে তা বলে বুঝানো যাবে না ………।
এভাবে সময়ের সাথে সাথে আমার সংগ্রহ করা সফটওয়্যার ও বই গুলোর এর একটা বিশাল কালেকশন গড়ে উঠে… আমার কাছে এখন প্রায় ৫০ জিবি মত ই-বুই বা বই আছে । এর মধ্যে শুধু বাংলা ই বুক আছে ১০ জিবি এর মত যা সংখ্যায় ২৫০০+ । আর সফটওয়্যার আছে প্রায় ৩০০ জিবি এর মত যার প্রত্যেকটা ফুল ভার্সন ও ভাইরাস মুক্ত । এবং এর প্রত্যেকটা সফটওয়্যারের কার্যপ্রণালী আমার নখদর্পণে। আমি আমার কালেকশনের ক্ষেত্রে একটাই কথা বলতে পারি … আপনি আমার কোন কালেকশনে ডিলিট করার মত কোন ফাইল খুজে পাবেন না …
আর অডিও ও ভিডিও মিউজিক গানের কথা নাই বললাম … আমার কাছে এত গান আছে যা দিয়ে একটা এফএম চ্যানেল খুলে ফেলা যাবে …
একসময় চিন্তা করলাম আমার এত বিশাল সংগ্রহ দিয়ে আমি কি করব ? আমি মরে গেলেই সব শেষ আমার কাছের কিছু মানুষ তা পাবে …
তাই চিন্তা করলাম এই সংগ্রহ গুলো সাধারন মানুষের কাছে স্প্রেড করে দিতে হবে …।
এতে করে সবার কষ্ট ,সময় ও মেগাবাইট বাঁচবে …
সবচেয়ে বড় কথা হলো এই গুলো আপনাদের অনেক উপকারেও আসবে …
একটা কথা মনে রাখবেন
“আমার ই-বুক গুলো বাদে অন্য সব ফাইল হতো আপনি নেটে খোজা খুজি করে পাবেন … কিন্তু আপনাকেও আমার মত সময় ও নেট এমবি নষ্ট করতে হবে কিন্তু আপনাদ
Senior Supervisor Piping & Mechanical
Piping &Pipe Line Fabrication/Erection&/ Hydro test /Mechanical Completion Pre-Commissioning
I have around17+, years ‘work experience I have done three years diploma inMechanical engineering,
I have worked as a Piping supervisor in Oil, Gas, power plant & Petro-chemical.
I am extremely committed to as an electromechanical engineer/manager with the ability to take on responsibility , good communication skill, fast learner, able to work alone or as part of the team, able to throw myself whole –heartedly into project.
Since 1995, I have been working on industrial systems. But after 1996 have been dealing major international Project which factory , underground/metro construction projects. That is why my skills include ability to manage projects on factory, underground/metro, mass transit in all phases from planning to designing, construction and operation and asset managements(assembling, maintenance, breakdown etc.). Also recent achievements have included designed for many different type of stations electromechanical and rail systems which the supervision of the Rail Systems Contractor site installation activities at Maintenance Depot, both Stabling Yards, Stations, Tunnels, Elevated and At-Grade
Professional experience also includes acting as a leader or a flexible team member for all multi-disciplinary engineering works include short term contracts ,re- organized work to increase efficiency & productivity .
Finally I am a positive, well-motivated person who strives to encourage colleague and others who works with me.
Thank you,
Best regards,
New Explore Careers and College Majors 2024.pdfDr. Mary Askew
Explore Careers and College Majors is a new online, interactive, self-guided career, major and college planning system.
The career system works on all devices!
For more Information, go to https://bit.ly/3SW5w8W
The Impact of Artificial Intelligence on Modern Society.pdfssuser3e63fc
Just a game Assignment 3
1. What has made Louis Vuitton's business model successful in the Japanese luxury market?
2. What are the opportunities and challenges for Louis Vuitton in Japan?
3. What are the specifics of the Japanese fashion luxury market?
4. How did Louis Vuitton enter into the Japanese market originally? What were the other entry strategies it adopted later to strengthen its presence?
5. Will Louis Vuitton have any new challenges arise due to the global financial crisis? How does it overcome the new challenges?Assignment 3
1. What has made Louis Vuitton's business model successful in the Japanese luxury market?
2. What are the opportunities and challenges for Louis Vuitton in Japan?
3. What are the specifics of the Japanese fashion luxury market?
4. How did Louis Vuitton enter into the Japanese market originally? What were the other entry strategies it adopted later to strengthen its presence?
5. Will Louis Vuitton have any new challenges arise due to the global financial crisis? How does it overcome the new challenges?Assignment 3
1. What has made Louis Vuitton's business model successful in the Japanese luxury market?
2. What are the opportunities and challenges for Louis Vuitton in Japan?
3. What are the specifics of the Japanese fashion luxury market?
4. How did Louis Vuitton enter into the Japanese market originally? What were the other entry strategies it adopted later to strengthen its presence?
5. Will Louis Vuitton have any new challenges arise due to the global financial crisis? How does it overcome the new challenges?
Want to move your career forward? Looking to build your leadership skills while helping others learn, grow, and improve their skills? Seeking someone who can guide you in achieving these goals?
You can accomplish this through a mentoring partnership. Learn more about the PMISSC Mentoring Program, where you’ll discover the incredible benefits of becoming a mentor or mentee. This program is designed to foster professional growth, enhance skills, and build a strong network within the project management community. Whether you're looking to share your expertise or seeking guidance to advance your career, the PMI Mentoring Program offers valuable opportunities for personal and professional development.
Watch this to learn:
* Overview of the PMISSC Mentoring Program: Mission, vision, and objectives.
* Benefits for Volunteer Mentors: Professional development, networking, personal satisfaction, and recognition.
* Advantages for Mentees: Career advancement, skill development, networking, and confidence building.
* Program Structure and Expectations: Mentor-mentee matching process, program phases, and time commitment.
* Success Stories and Testimonials: Inspiring examples from past participants.
* How to Get Involved: Steps to participate and resources available for support throughout the program.
Learn how you can make a difference in the project management community and take the next step in your professional journey.
About Hector Del Castillo
Hector is VP of Professional Development at the PMI Silver Spring Chapter, and CEO of Bold PM. He's a mid-market growth product executive and changemaker. He works with mid-market product-driven software executives to solve their biggest growth problems. He scales product growth, optimizes ops and builds loyal customers. He has reduced customer churn 33%, and boosted sales 47% for clients. He makes a significant impact by building and launching world-changing AI-powered products. If you're looking for an engaging and inspiring speaker to spark creativity and innovation within your organization, set up an appointment to discuss your specific needs and identify a suitable topic to inspire your audience at your next corporate conference, symposium, executive summit, or planning retreat.
About PMI Silver Spring Chapter
We are a branch of the Project Management Institute. We offer a platform for project management professionals in Silver Spring, MD, and the DC/Baltimore metro area. Monthly meetings facilitate networking, knowledge sharing, and professional development. For event details, visit pmissc.org.
This comprehensive program covers essential aspects of performance marketing, growth strategies, and tactics, such as search engine optimization (SEO), pay-per-click (PPC) advertising, content marketing, social media marketing, and more
Brand Identity For A Sportscaster Project and Portfolio I
Arun das latest resume
1. ARUNDAS.D
Mechanical Engineer
Contact Nos.: 00966549443641/ 00914792437883
E-Mail: arundasarunodayam@yahoo.com
Seeking assignments in MEP Project Engineering and Management with an organization of high
repute
preferably in Construction (EPC) industry
PROFILE SUMMARY
• A performance driven professional with 08 plus years of hand own experience in:
~ MEP Projects Execution & Management in Hospitals, Hotels, Factories, Warehouses, High rise and
residential building construction projects.
~ Project planning through MS project Gantt chart.
~ Preparation, execution & monitoring, testing and commissioning of all MEP systems like HVAC ,Plumbing.
(drainage ,water supply, chiller piping, pumps & Firefighting), FM 200 ,Air Sampling system, Medical Gas ,BMS,
Complete Electrical & Low Current systems as per compliance with the plan, shop drawing, specification, standards
and schedule.
~ Project Reporting , Site Co-ordination, Client Meeting-Presentation and Team Supervision.
~ Hospitals and Hotels Engineering (MEP and civil) standards.
~ Medical Engineering standards for various medical projects like radiology,laboratories,operation theatres,morgue etc.
~ Post & Pre Installation for Health care equipments like MRI SCAN,CT SCAN, X-RAY and ultrasound machineries
including installation, testing and commissioning of all required MEP systems and sub-systems.
~ Facility management, Operation and maintenance, Maintenance operation policies & procedures.
~ Shop drawing and As built preparation in Auto cad ,its submittal and obtaining client/consultant approval.
~ Sub contractor, vendor, Contractor bills and Manpower management.
~ Raising of purchase orders, purchase requisitions.
~ Detailed Quantity Calculations for BOQ/Tender, BOM, Invoicing, Estimation, Budgeting, Costing, Measurements of work,
Extra Items with Rate Analysis & Deviation Etc..
~ Review and Check shop Drawings, Technical Bid Analysis, and Specifications, Prepare and Monitor Engineering
Documents
~ Assisting in the formulation, strict implementation, monitoring and reporting of safety Rules & standards in the project
sites.
~ Preparing technical proposals, its submittal and obtaining client/consultant approval.
~ Material Procurement, Sub Contracts management, Sub contracts agreement, Price negotiations.
~ Documentation (Project related ,Administration, ISO, EMS and OHSAS).
• Sound exposure in HVAC standards like ASHRAE, SMACNA. Plumbing codes like NFPA, IPC & Electrical code (NEC).
• Sound exposure in Plumbing pipes selection and its sizing, Medical gas Plumbing fixtures & equipment selection (pumps,
valves etc.), Irrigation system, water features, Centralized water heater system, drainage and water supply network.
• Sound exposure in Fire fighting sprinkler system, FM200, Automatic co2 extinguisher, Air sampling system, Fire extinguisher
cylinders.
• Sound exposure in Installation, testing and commissioning of various pipe like galvanized steel, black steel, stainless steel,
copper, u PVC, c PVC, PVC, PPR, HDPE, LDPE pipes and relevant joints like rubber ring, solvent, welded joints and fittings.
• Sound exposure in HVAC heat load calculation, HVAC equipment selection, Duct materials selection and Duct sizing.
• Adept in DX & chilled water systems, FCU's, AHU's, Air and water cooled Chillers, Cooling towers, Heat exchangers Package
roof top units, Exhaust Fans, VRF air conditioning system, Desert coolers and its electrical systems and requirement.
2. • Sound exposure in Electrical power load calculation and all Electrical systems installations like installation of EMT, RSC and
pvc conduits, Bus Bar with tap offs cable trays and ladders, feeder cables, panel boards, MCC panels, electrical MDB'S,
Earthing & lightning arrestor systems, Lighting and power system Wiring with looping and home run.
• Sound exposure in low current systems like Matv, Cctv, BMS, Public address, Master Clock, Data and telephone network
Systems (network switches, patch panels, Fiber optic cables, MDF's, IDF's).
• Deft in preparing daily work plans and ensuring that PTW and safety measures for better HSE are completed before
the start.
• Track record of targeting zero safety violation of team members, in terms of PPE and other works carried out at site.
• Sound exposure in OHSAS, ISO&TS environment, fire and safety and Environment management system (EMS).
• Proficient in swiftly completing up projects with competent cross-functional skills and ensuring on time deliverables within
pre-set cost parameters.
• Track record of developing operations & maintenance procedures to increase the efficiency and accordingly implementing
standards and ensuring adherence to quality standards through in-process checks.
• An effective communicator, proactive planner & negotiator with strong analytical, problem solving, strong communication
skills and organizational abilities.
• Instrumental in maintenance of the rotary and static equipments.
• Adept in fasteners, fittings, piping, pumps, valves, Hydraulic and pneumatic systems.
CORE COMPETENCIES
• Analyzing project requirements and reviewing all the project proposals wherein mapping requirements of manpower/
materials resources in which ensuring cost effective execution as per schedule.
• Capability to Handle Multiple Projects.
• Investigation and Resolution of Field-initiated Questions Pertaining To Design and Engineering.
• During installation resolve the conflicts between different systems and make as built drawing with the approval of the
consultant before the installation to avoid any discrepancies.
• Liaising with Consultants/Clients for Materials and drawings Submissions(RFA) and approvals.
• Ensuring that inspection request (RFI) are raised for the consultant and the client inspection and coordinate for inspection.
• Perform all MEP site activities and coordinate with construction, structure, engineering and architecture departments during
installation of electrical and mechanical systems to ensure quality, compliance and execution of works according to the
Consultant and Work Owner expectations in most economical manner.
• Performing Pre/ Post installation audit at site with final Drawings.
• Developing project baselines while monitoring and controlling projects with respect to cost, resource deployment, time over-
runs and quality compliance to ensure its satisfactory execution.
• Anchoring erection & commissioning of equipments and ensured completion of project in minimum turnaround time with
effective resource utilization to maximize the output.
• Ensuring timeliness in schedule and maintaining a punch list of to-do and accomplished work.
• Identifying areas of obstruction/ breakdown and taking steps to rectify the equipments through application of troubleshooting
tools.
• Well versed with Scheduled maintenance (TBM) and condition based maintenance (CBM) Tools and activities.
WORK EXPERIENCE
Since Jun’11 Dani Ellia Building Solutions, Riyadh, Kingdom of Saudi Arabia
Projects Engineer (MEP Division)
Key Result Areas:
• Planning and ensuring mechanical and electrical installation as per approved drawings and material approvals.
3. • Supervising day-to-day site operations.
• Preparation, execution & monitoring, testing and commissioning of all MEP systems as per compliance with
the plan, shop drawing, specification, standards and schedule.
• Ensuring timeliness in schedule and maintaining a punch list of to-do and accomplished work.
• Developing the Bill of Materials for the completion of works.
• Project Reporting, , Site Co-ordination, Client Meeting-Presentation and Team Supervision.
• Quantity Calculations for BOQ/Tender, Invoicing, Estimation, Budgeting, Costing, Measurements of work, Extra Items with
Rate Analysis & Deviation Etc.
• Receive quotations, classify, compare and negotiate.
• Monitor consumption of material with respect to the ordered materials.
• Maintaining a system of documentation for monitoring the productivity of teams.
• Ensuring that inspection request (RFI) are raised for the consultant and the client inspection
• Liaising with Consultants for Materials Submissions and approvals (RFA).
• Ensuring that approved method statements are available explaining the method statements to the foreman and charge
hand while maintaining proper documentation for records.
• Testing and commissioning of all MEP systems like HVAC, Plumbing, Electrical, Low current systems.
• Handling QHSE and EHS audits and documents.
• Efficiently worked in coordination:
o For obtaining ISO, EMS And OHSAS Certifications.
o With various departments of hospitals like engineering, infection control etc.
to ensure that project is in line with hospital standards.
o With vendors and sub-contractors.
o With major clients as SEIMENS HEALTH CARE LTD and GE HEALTH CARE LTD & is aware of their
systems , Standards, policies and procedures.
• Played a key role in:
o Preparation and submission of shop drawings, as built drawings and O&M manuals.
o Preparation of documents and coordinate for main vendor/subcontractor audits. Handling of QHSE and EHS audits
and documents.
Highlight:
• Successfully received 2 Awards as Best Project Engineer for completing the projects on time at King Fahad Medical City,
Prince Sultan Military Medical City and AL-Batal Design.
PREVIOUS WORK EXPERIENCE
19 Sep 2010 to 30 May 2011 with SRF Limited, Chennai
Senior Executive in Mechanical Maintenance (Tyre Cord Dipping Plant) & Projects
Key Result Areas:
• Facility management, Operation and maintenance, carrying out Maintenance operation as per policies & procedures.
• Carried out:
o Erection and commissioning of new machines (Engineering projects).
o Operations and maintenance of static and rotary equipments, Conveyor systems, Air compressors, Pumps, D.G
sets, Boilers, Blowers. Hydraulic and pneumatic systems, hydraulic and pneumatic DCV and cylinders, heat
exchangers, cooling towers, chillers, Fire Fighting Systems, AHU system, Electric hoists, Hydraulic lifting
equipment’s, Electric forklifts, Gearboxes, etc.
o Scheduled maintenance (TBM) and condition based maintenance (CBM) activities.
o LPG handling (loading/ unloading, storage in LPG bullets).
4. • Managed and analyzed (why why analysis) of all breakdowns and initiate corrective actions.
• Played a key role in:
o Arranging of spares.
o Coordinating and carrying out scheduled maintenance (TBM) and condition based maintenance (CBM) activities.
o Managing, Coordination of TQM activities.
• Ensured effective machine failure diagnosis and statistics with coordination of TQM activities.
• Gained practical experience in OHSAS, ISO&TS environment.
1 Sep’08 to 17 Aug’10 with MRF Tyres Limited, Arkonam (Tamil Nadu)
Mechanical Engineer(Jr. Executive) - Engineering Department
Key Result Areas:
• Facility management, Operation and maintenance, carrying out Maintenance operation as per policies & procedures.
• Handled Erection and commissioning of all machineries required for tyre manufacturing (Engineering projects), Operation
and maintenance of tyre manufacturing machineries, Conveyor systems, Pumps, Air compressors, D.G sets, Boilers,
Hydraulic and pneumatic systems, heat exchangers, cooling towers, chillers, Fire Hydrants, HVAC system, Electric hoists,
Hydraulic lifting equipments, Diesel forklifts, Gearboxes etc.
• Handled shifts, Effective initialization and utilization of Manpower.
• Played a key role in:
o Arranging of spares.
o Coordinating and carrying out scheduled maintenance (TBM) and condition based maintenance (CBM) activities.
o Managing, Coordination of TPM activities.
• Gained practical experience in OHSAS, ISO&TS environment, fire and safety and Environment management system (EMS).
• Effective initialization and utilization of Manpower.
Highlight:
• Played a stellar role in implementing procedures like maintenance cost reduction, achieving zero breakdowns, maintenance
time reduction(MTTR) and reduction of time between failure (MTBF) wherein attained a reward for the same as a part of
continual improvement program.
1 May’06 to 30 Aug’08 with CII Gaurdian International Ltd., Cochin (SEZ)
Mechanical Engineer (Utility &Maintenance Department)
Key Result Areas:
• Facility management, Operation and maintenance, carrying out Maintenance operation as per policies & procedures.
• Played a key role in:
o Arranging of spares.
o Coordinating and carrying out scheduled maintenance (TBM) and condition based maintenance (CBM) activities.
• Gained practical experience in OHSAS, ISO&TS environment, fire and safety and Environment management system (EMS).
• Coordinating and carrying out scheduled maintenance (TBM) and condition based maintenance (CBM) activities.
TRAININGS
• Successfully attended various trainings on:
o TPM, Occupational Health & Safety (OHSAS )in 2008 and 2009 and TQM in the year 2011.
o ISO,EMS,5S, Kaizen and Lean Manufacturing techniques in 2007.
KNOWLEDGE PURVIEW
• Professional Software like AutoCAD, MS Project, Carrier HAP heat load calculation, MS Office.
• Well versed with Electrical, Plumbing (drainage, water supply and fire fighting), HVAC and Civil Drawings.
5. • ASHRAE, SMACNA, SASO (Saudi Arabian standards), IPC, NFPA, NEC codes.
• HVAC Cooling Load Calculation (by manual calculation and HAP software), Duct designing using ductilator.
• Electrical Load calculation and selection of wires and cables, MCCB and Circuit breakers, Lighting and power systems.
• civil works like sub and super civil structure, dry and wet Gypsum ceilings and partitions, Flooring, False ceiling ,Interior
decorations, aluminum and structural steel fabrication.
• Communication and networking system, BAS (Building automation system), BMS (Building Management Systems).
ACADEMIC DETAILS
2006 BE in Mechanical Engineering from Mailam Engineering College, Mailam, (Anna University, Chennai) with 78%.
Pursuing MBA (Part Time) in Operations and Management from ISBM, Cochin.
IT SKILLS
Platforms: DOS, Windows, Linux.
Tools: MS office, MS project AutoCAD, SAP, ERP, Oracle 11 I, Microsoft outlook and LAN Environment.
PERSONAL DETAILS
Date of Birth: 10
th
March, 1985
Contact Address: C/O K.Devadasan, Arunodayam (H), Kappil Mekku, Krishnapuram P.O., Kayamkulam, Alleppey Dist.
Kerala,PIN Code - 690533
Languages Known: English, Hindi, Malayalam, Tamil and Arabic
Passport Number : F 9495223
Driving License Holding : valid Indian and Saudi Arabian
I do hereby confirm that the information furnished is true to the best of my knowledge and belief.
ARUN DAS.D
REFER TO ANNEXURE FOR PROJECTS EXECUTED
ANNEXURE
6. PROJECTS EXECUTED
At Dani Ellia Building Solutions, Riyadh, Kingdom of Saudi Arabia
Title: King Fahad Medical City
Role: MEP Project Engineer
Responsibilities:
• Handled all the post/pre-installation works required for the installation of GE and SEIMENS Made MRI Scan Machines.
• Project Reporting , Site Co-ordination, Client Meeting-Presentation and Team Supervision.
• Supervising day-to-day site operations.
• Ensure that all installations are as per hospital standards and MRI machine requirements.
• Liaised with client, GE, SEIMENS and consultant (RAD Planning - USA) for the work quality
• Ensuring timeliness in schedule and maintaining a punch list of to-do and accomplished work.
• Coordinate with hospital to ensure the hospital standards in various streams.
• Handled installation of:
o Installation, testing and commissioning of Systems like medical gas, drainage and water supply system, Fire
fighting system, chilled water systems with necessary piping for MRI magnets, plumbing, AHU, DX type chiller, pre-
insulated duct system, exhaust and fresh air fans.
o Fire fighting sprinkler system, FM 200 system, Air sampling system.
o Complete electrification works like cabling, cable termination, lighting and power, earthing and lightning protection
o Low power systems like data, telephone, public address system(PAS),Master clock system, Intercom system.
• Handled testing and commissioning of all MEP systems.
• Carried out safety assurance and audits in coordination with SEIMENS, GE and Hospital.
• Ensured effective preparation of:
o BOQ ,BOM, bills.
o supplier enquiry, Receive supplier quotations and negotiation.
o RFI, RFA and Project handover reports.
o Snag list and Correction.
Title: Prince Sultan Military Medical City
Role: MEP Project Engineer
Responsibilities:
• Liaised with client, GE, and consultant (RMAE Planning ) for the work quality.
• Handled all the post/pre-installation works required for the installation of GE MRI & CT Scan Machines.
• Project Reporting , Site Co-ordination, Client Meeting-Presentation and Team Supervision.
• Supervising day-to-day site operations.
• Carried out safety assurance and audits in coordination with GE and Hospital.
• Ensuring timeliness in schedule and maintaining a punch list of to-do and accomplished work.
• Handled all the pre-installation works required for the installation of GE Made MRI Scan Machines, CT SCAN machines and
ultrasound machines to ensure that all installations are as per hospital standards and MRI machine requirements.
• Handled installation of:
o Installation, testing and commissioning of Systems like medical gas, drainage and water supply system, Fire
fighting system, chilled water systems with necessary piping for MRI magnets, plumbing, AHU, Roof top packaged
units, pre-insulated and sheet metal duct system, exhaust and fresh air fans.
o Fire-fighting sprinkler system, fm200 system, Air sampling system.
o Complete electrification like cabling, cable termination, lighting and power, earthing and lightning protection.
7. o Low power systems like data,telephone,public address system(PAS),centralized clock system, intercom system.
o Systems like BMS,AIR SAMPLING DETECTION SYSTEM, HONEYWELL FIRE ALARM SYSTEMS.
• Ensured effective preparation of:
o BOQ, BOM, bills.
o supplier enquiry, Receive supplier quotations and negotiation.
o RFI, RFA and Project handover reports.
Title: Inter Continental Hotel in Riyadh:
Role: MEP Project Engineer
Responsibilities:
• Supervising day-to-day site operations.
• Preparation, execution & monitoring, testing and commissioning of all MEP systems like HVAC ,Plumbing (drainage ,
water supply, chiller piping, irrigation & Firefighting), FM 200 ,BMS, Complete Electrical & Low Current systems
as per compliance with the plan, shop drawing, specification, standards and schedule.
• Project Reporting , Site Co-ordination, Client Meeting-Presentation and Team Supervision.
• Shop drawing and As built preparation in Auto cad ,its submittal and obtaining client/consultant approval.
• Sub contractor, vendor, Contractor bills and Manpower management.
• Detailed Quantity Calculations for BOQ/Tender, BOM, Invoicing, Estimation, Budgeting, Costing, Measurements of work,
Extra Items with Rate Analysis & Deviation Etc..
• Review and Check shop Drawings, Technical Bid Analysis, and Specifications, Prepare and Monitor Engineering
Documents.
• Assisting in the formulation, strict implementation, monitoring and reporting of safety Rules & standards in the project sites.
• Sub contractor, vendor, Contractor bills and Manpower management.
• Material Procurement, Sub Contracts management, Sub contracts agreement, Price negotiations.
• During installation resolve the conflicts between different systems and make as built drawing with
the approval of the consultant before the installation to avoid any discrepancies.
• Handling of material and drawing submission (RFA).
• Raising of inspection request (RFI) and coordinate with client/consultant for site inspection.
Title: Marriot Courtyard Hotel - Olaya, Riyadh, Saudi Arabia
Role: MEP Project Engineer
Responsibilities:
• Handled installation, testing and commissioning of all MEP systems like chilled water system, air cooled system, AHU, HVAC
ducts, fad, various types of exhaust, smoke and fresh air fans, complete fire fighting systems and plumbing including
drainage and domestic water supply systems.
• Complete electrification like cabling, cable termination, lighting and power, earthing and lightning protection.
• Project Reporting , Site Co-ordination, Client Meeting-Presentation and Team Supervision.
• Supervising day-to-day site operations.
• Handled Installation, Testing and Commissioning of complete electrical systems like Lighting Systems, Panel Boards, Smoke
Detectors, Fire Alarm System, CCTV, Pas, Intercom System and BMS System.
• Ensuring timeliness in schedule and maintaining a punch list of to-do and accomplished work.
• Ensured effective preparation of:
o BOQ, bills, and supplier enquiry and negotiation.
8. o RFI, RFA and Project handover reports
• Liaised with consultants and clients.
Title: MSD office at Wassel Tower - Riyadh, Saudi Arabia
Role: MEP Project Engineer
Responsibilities:
• Project Reporting , Site Co-ordination, Client Meeting-Presentation and Team Supervision.
• Supervising day-to-day site operations.
• Handled the installation, testing and commissioning of chilled water systemand necessary pipings, AHU, HVAC Ducts, FAD,
Exhaust Fans, fire fighting systems and other utilities.
• Complete electrification like cabling, cable termination, lighting and power, earthing and lightning protection.
• Liaised with consultants (Global Office Solutions-Riyadh).
• Handled complete electrification works, smoke detectors, fire alarms.
• Carried out supplier enquiry and negotiation.
Title: Saudi Aramco - Dammam, Saudi Arabia
Role: MEP Project Engineer
Responsibilities:
• Project Reporting , Site Co-ordination, Client Meeting-Presentation and Team Supervision.
• Supervising day-to-day site operations.
• Efficiently designed, installed, tested and commissioned exhaust system including ducts and fans for TMEIC inverters.
• Ensured effective preparation of BOQ, bills, quotations.
• Carried out supplier enquiry and negotiation, Safety assurance and audits.
• Ensuring timeliness in schedule and maintaining a punch list of to-do and accomplished work.
• Managed preparation and submission of O&M manuals.
• Preparation of RFI, RFA and Project handover reports.
• Testing and commissioning of all MEP systems.
• Ensured effective preparation of:
o BOQ, bills, and supplier enquiry and negotiation.
o RFI, RFA and Project handover reports.
Title: Saudi Investment Bank (SIB) Office – Riyadh, Saudi Arabia
Role: MEP Project Engineer
Responsibilities:
• Managed erection and commissioning of MEP works like HVAC system, firefighting system, exhaust and FAD’S and
Plumbing including Drainage and domestic water supply systems other utilities.
• Complete electrification like cabling, cable termination, lighting and power, earthing and lightning protection.
• Project Reporting , Site Co-ordination, Client Meeting-Presentation and Team Supervision.
• Supervising day-to-day site operations.
• Preparation of BOQ, bills.
• Ensuring timeliness in schedule and maintaining a punch list of to-do and accomplished work.
• Supplier enquiry and negotiation. SAFETY assurance and audits.
• Preparation and submission of O&M manuals and preparation of RFI, RFA and Project handover reports
• Testing and commissioning of all MEP systems.
• Ensured effective preparation of:
o BOQ, bills, and supplier enquiry and negotiation.
9. o RFI, RFA and Project handover reports.
Title: AL-Batal Design Factory - Furniture Factory in Riyadh:
Role: MEP Project Engineer
Responsibilities:
• Project Reporting , Site Co-ordination, Client Meeting-Presentation and Team Supervision.
• Supervising day-to-day site operations.
• Carried out project management of complete electrical, plumbing and HVAC works.
• Handled erection and commissioning of:
o Industrial coolers, chillers, chiller piping and package units with ducts, exhaust fans and cooling towers, handled
testing and balancing of all HVAC systems.
o Complete fire fighting systems.
o Complete drainage system and domestic water supply system.
o Complete electrification like cabling, cable termination, lighting and power, earthing and lightning protection.
• Managed complete electrification of factory including installation, testing and commissioning of lighting systems, panel
boards, busbar, data and telephone system, CCTV, public address system, fire alarms and smoke etectors, earthing and
lightning protection systems.
• Handled installation, testing and commissioning of compressors and diesel generator set.
• Ensuring timeliness in schedule and maintaining a punch list of to-do and accomplished work.
• Ensured effective preparation of BOQ, bills, and supplier enquiry and negotiation RFI, RFA and Project handover reports.
10. o RFI, RFA and Project handover reports.
Title: AL-Batal Design Factory - Furniture Factory in Riyadh:
Role: MEP Project Engineer
Responsibilities:
• Project Reporting , Site Co-ordination, Client Meeting-Presentation and Team Supervision.
• Supervising day-to-day site operations.
• Carried out project management of complete electrical, plumbing and HVAC works.
• Handled erection and commissioning of:
o Industrial coolers, chillers, chiller piping and package units with ducts, exhaust fans and cooling towers, handled
testing and balancing of all HVAC systems.
o Complete fire fighting systems.
o Complete drainage system and domestic water supply system.
o Complete electrification like cabling, cable termination, lighting and power, earthing and lightning protection.
• Managed complete electrification of factory including installation, testing and commissioning of lighting systems, panel
boards, busbar, data and telephone system, CCTV, public address system, fire alarms and smoke etectors, earthing and
lightning protection systems.
• Handled installation, testing and commissioning of compressors and diesel generator set.
• Ensuring timeliness in schedule and maintaining a punch list of to-do and accomplished work.