OUTLINE 
1. Background of the study 
2. Objectives of the study 
3. Methodology 
4. Key findings 
5. Priority actions 
6. Key messages & Recommendations for ANBO
1. Background of the study 
 Africa Water Vision 2025 (2000) 
 “An Africa where there is an equitable and sustainable use and 
management of water resources for poverty alleviation, socioeconomic 
development, regional cooperation, and the environment”. 
 Framework of Action organized under 4 categories of measures: (i) 
Strengthening governance of water resources, (ii) Improving water 
wisdom, (iii) Meeting urgent water needs, (iv) Strengthening the 
investment base for the desired water future 
 AMCOW (2002) 
 Mission: To provide political leadership, policy direction, and advocacy 
for the protection, management, and wise utilization of all Africa’s 
water resources for sustainable social, economic, and environmental 
development. 
 Workplan 2014-2016: 7 main themes out of which 4 have strong or 
direct linkages with the study: (i) Managing WR, (ii) Governance & 
management, (iii) Financing, (iv) Education, Knowledge & Capacity 
development
1. Background of the study (cont’d) 
 ANBO (2002) 
 Objective: To enhance transboundary water resources management 
(TWRM) in Africa through the promotion of IWRM at the level of 
river/lake/aquifer basins 
 2007: Statutes revized with a revitalized mandate; ANBO is designated 
as a sub-committee of AMCOW in matters relating to TWRM 
 SITWA Project (2012) 
 Overall objective: To strengthen regional cooperation at the political, 
economic and stakeholder level for sustainable management of TWR 
 Specific objectives: 
i. To support the development of lake/river basin organizations as 
catalysts for policy & institutional development, knowledge & 
information management & capacity development on TWMD. 
ii.To provide technical assistance to the L/RBOs (through the RECs & 
their member states) to develop IWRM Strategies and Plans in the 
river basins where they are not yet developed, & to implement plans 
where they exist.
1. Background of the study (cont’d) 
SITWA 
12-16 
AWV 2025 
(TWRM) 
AMCOW 
ANBO 
Institutional 
WP 14-16 
Operational Outcomes
2. Objectives of the study 
Expected major outputs: Purpose: Overall goal: 
To contribute to 
the preparation of 
a long term ANBO 
program focusing 
on the current 
situation and needs 
of L/RBOs 
regarding the 
IWRM planning in 
the African L/RBOs 
Identification of gaps for which 
ANBO could provide useful services 
Assessment of the needs of L/RBOs 
for improving or completing the 
existing IWRM planning 
frameworks 
Identification of priority support 
services/actions which could be 
provided by ANBO in the scope of 
its mandate 
Proposal of an action plan of 5 
years (2015-2019) for ANBO based 
on the identified gaps/needs 
To identify priority 
actions and present 
a 5-year detailed 
program, within 
ANBO’s mandate 
and SITWA’s 
objectives
2. Objectives of the study (Cont’d) 
What is an IRBM plan? 
 A plan for management & development of WR in the basin 
 Aim at hydrological, ecologic, economic, & social integration in the 
context of river basin realities 
 Basin plan provides the basis of the L/RBO annual work plan 
Water management objective through the plan: 
 Synthesize technical & social priorities for the basin & act as a basis 
for action & accountability to stakeholders 
 Take into account impacts of other sectors on the WR & 
consequences of WM decisions on other economic sectors 
Basin planning: 
 Management of WR is about competing & conflicting interests/ 
viewpoints 
 Basin planning promotes dialogue, negotiation, & participation 
mechanisms, resulting in transparent decision making
3. Methodology 
A 3-step methodology 
Review of the current 
situation 
1 
 Consultation workshop 
 Identification & Review of relevant 
documentation 
 Discussion with some ANBO members 
Identification of gaps & 
2 Assessment of the needs 
 Gaps from IWRM planning processes 
 Deficiences & weaknesses of L/RBOs 
 Needs for improving/completing 
existing IWRM planning frameworks 
3 Identification of priority actions 
 Analyse of ANBO’s mandate 
regarding IWRM planning 
 Identification of detailed 
possible actions from ANBO 
 Identification of priority 
actions, budget & timeframe
3. Methodology (Cont’d) 
Motivate 
Implement Design
4. Key findings 
MAJOR GAPS MAIN NEEDS 
A- Preparation of IWRM planning 
Lack of strong 
cooperation, holistic 
vision & strategic 
planning 
Encourage full involvment of all countries & strengthen 
political awareness for transboundary cooperation: 
• Development of a long term vision 
• Development of a strategy for joint management of shared 
WR 
• Increasing political awareness of “inaction costs” & 
strengthening capacity 
Lack of coordination 
between basin-wide 
IWRM planning 
frameworks & regional 
or sectoral planning 
processes 
Develop cooperation, partnerships & synergies between 
L/RBOs & regional institutions (i.e. RECs): 
• Development & strengthening regional policies & 
institutional frameworks 
• Strengthening institutional coordination in the region & at 
country level 
Key issues of 
transboundary 
cooperation not 
adequately addressed 
for problem solving 
Develop strategies & joint activities in integrated & 
coordinated manner with regional bodies: 
• Strengthening existing L/RBOs & promoting new ones 
• Development of water governance capacity & instruments
4. Key findings (Cont’d) 
MAJOR GAPS MAIN NEEDS 
B- Development of IWRM plans 
Weak institutional 
coordination & 
limited mechanisms 
& platforms for 
stakeholder 
participation 
Improvement of institutional coordination & enhancing 
stakeholder & civil society organizations’ participation: 
• Strengthening consultation mechanisms that are inclusive, 
including good gender balance 
• Development of institutional arrangements that define roles & 
responsibilities of key actors 
Lack of sound basin 
water & related 
resources 
data & information 
Production & integration of all aspects of basin data & 
information: 
• Strengthening transboundary water monitoring networks & 
development of a sustainable water information systems 
• Strengthening capacity to produce, organize & share data & 
information 
• Improvement of knowledge of groundwater & aquifer systems, 
including groundwater ecosystem linkages & dependencies 
• Development of sustainable basin-wide flood warning systems 
• Development of environmental indicators (quantitative, 
qualitative, biological) to ensure ecological balance 
• Strengthening research, collaboration of research institutions
4. Key findings (Cont’d) 
MAJOR GAPS MAIN NEEDS 
B- Development of IWRM plans (Cont’d) 
Inadequate or lack of 
capacity at all levels, thus 
impairing IWRM planning 
Capacity building, raising awareness & ownership: 
• Including capacity development needs in IRBM plans 
• Training of national & L/RBOs officers on key issues of 
transboundary challenges & joint IWRM planning 
• Informing on existing legal instruments to enhance the 
understanding of transboundary legal setting 
• Promoting decision-making supporting tools & 
strengthening capacity to maximize benefits of 
cooperation 
• Building technical capacity on economic optimization, 
budgeting & planning 
• Development of broad knowledge, specifically on 
integration of groundwater management, infrastructural 
development & Climate Change adaptation measures into 
the IRBM planning 
• Development of public information program & promoting 
tools to raise awareness & trust among a broad range of 
stakeholders
4. Key findings (Cont’d) 
MAJOR GAPS MAIN NEEDS 
C- Implementation of IWRM plans 
Limited institutional 
arrangements & 
capacities as well as 
fragmented institutional 
setups 
Institutional development for effective & efficient 
implementation: 
• Enhancing coordination at all levels among countries & 
coordination between institutions in the country 
• Setting up efficient institutional frameworks & capacity to 
ensure operational links with countries 
• Strengthening institutional capacities to deal with various 
implementation functions 
Insufficient financial 
resources to secure 
implementation of 
existing IWRM plans & 
inadequate investments 
Resources mobilization: 
• Enhancing capacity to access to finance & to raise more funds 
• Increasing both public & private partnership & networking to 
support & strengthening implementation 
• Strengthening capacity of L/RBOs to develop bankable actions 
• Allocation of adequate resources for the participation of the civil 
society to ensure good level of ownership 
• Promoting existing IWRM plans at all levels of fora for broader 
support they need for successful implementation
4. Key findings (Cont’d) 
MAJOR GAPS MAIN NEEDS 
C- Implementation of IWRM plans (Cont’d) 
Lack of knowledge on 
the sustainable 
management of the 
basin 
M&E systems to openly assess whether or not the basin is being 
managed sustainably 
• Setting up efficient monitoring & auditing process, & 
development of reliable knowledge on the overall 
management of the basin 
• Development & promoting robust M&E & performance 
indicators systems (governance & technical) 
• Setting up metrology systems on quantitative & qualitative 
issues of WR to assess if the implementation of agreed actions 
is achieving the goals & objectives set by States
5. Priority actions 
Component / Main actions 
Nb of main 
actions 
Nb of 
activities 
Estimated 
budget (€) 
1. Governance framework : Policies, 
Legislation/Regulations, Institutions, Management 
3 10 1 305 000 
1.1. Development and strengthening regional policy 
and legal frameworks 
1.2. Fostering institutional coordination and joint 
activities 
1.3. Strengthening of coordinated management of 
water resources 
2. Knowledge management, Capacity building 3 11 1 200 000 
2.1. Knowledge development and management 
2.2. Development of sustainable information systems 
2.3. Capacity development / Capacity building
5. Priority actions (Cont’d) 
Category 
Nb of main 
actions 
Nb of 
activities 
Estimated 
budget (€) 
3. M&E, Follow-up, Reporting, Adaptive 
management 
2 4 600 000 
3.1. Development of M&E, Follow-up and Reporting 
systems 
3.2. Strengthening and promotion of Adaptive 
management tools 
4. Participation, Awareness, Trust, Ownership 2 4 535 000 
4.1. Enhancement of Stakeholder participation 
4.2. Strengthening Awareness, Trust and Ownership 
TOTAL 10 29 3 640 000
6. Key messages & Recommendations for ANBO 
1. Link IWRM planning to other regional initiatives or processes of integrated approach 
in transboundary water management. 
2. Work with stakeholders to adapt IWRM principles to on-the-ground & institutional 
realities; Embed learning strategies in actions to capture evidence on what works for 
scaling up. 
3. In the final design of the 5-year program regarding IWRM planning for the L/RBOs, 
ANBO, AMCOW, RECs & L/RBOs should consult so as to avoid overlap & to be 
effective. 
4. Not all L/RBOs or RECs require the same support from ANBO. Therefore there is a 
need to set criteria and modalities to get ANBO support which will depend on the 
mandate; The demand-driven approach may apply. 
5. Need to consolidate the 3 action programs (IWRM planning, Infrastructure 
development, Adaptation to climate change), as they may overlap to some extend & 
to fully realize optimization. 
6. Set up a flexible & operational implementation framework of the 5-year program, & 
involve the very key partners of ANBO & L/RBOs.
END 
Thank you for your attention!

More Related Content

What's hot

Strategic Environmental Assessment
Strategic Environmental Assessment Strategic Environmental Assessment
Strategic Environmental Assessment Kinza Irshad
 
Regional solution for integrated land and water management -Workshop 1 - CP m...
Regional solution for integrated land and water management -Workshop 1 - CP m...Regional solution for integrated land and water management -Workshop 1 - CP m...
Regional solution for integrated land and water management -Workshop 1 - CP m...Global Water Partnership
 
11.3.3 Experiencing on enhancing institutional arrangements and support for t...
11.3.3 Experiencing on enhancing institutional arrangements and support for t...11.3.3 Experiencing on enhancing institutional arrangements and support for t...
11.3.3 Experiencing on enhancing institutional arrangements and support for t...NAP Events
 
A landscape approach to rainwater management in Ethiopia: Nile 5 – coordinat...
A landscape approach to rainwater management in Ethiopia:  Nile 5 – coordinat...A landscape approach to rainwater management in Ethiopia:  Nile 5 – coordinat...
A landscape approach to rainwater management in Ethiopia: Nile 5 – coordinat...ILRI
 
Nap expo 2015 session 1 LEG
Nap expo 2015 session 1 LEGNap expo 2015 session 1 LEG
Nap expo 2015 session 1 LEGNAP Events
 
Paris Declaration on Aid Effectiveness; WHO role in promoting aid effectiveness
Paris Declaration on Aid Effectiveness; WHO role in promoting aid effectivenessParis Declaration on Aid Effectiveness; WHO role in promoting aid effectiveness
Paris Declaration on Aid Effectiveness; WHO role in promoting aid effectivenessDr. Vachagan Harutyunyan
 
Governance and Financing for the Mediterranean Water Sector
Governance and Financing for the Mediterranean Water SectorGovernance and Financing for the Mediterranean Water Sector
Governance and Financing for the Mediterranean Water SectorGlobal Water Partnership
 
Short introduction nap ag for posting final
Short introduction nap ag for posting finalShort introduction nap ag for posting final
Short introduction nap ag for posting finalNAP Events
 
Nap gsp support to developing countries for posting
Nap gsp support to developing countries for postingNap gsp support to developing countries for posting
Nap gsp support to developing countries for postingNAP Events
 
Plenary adaptation corfee morlot&mullan dvpt cooperation ccxg gf-sep2014
Plenary adaptation corfee morlot&mullan dvpt cooperation ccxg gf-sep2014Plenary adaptation corfee morlot&mullan dvpt cooperation ccxg gf-sep2014
Plenary adaptation corfee morlot&mullan dvpt cooperation ccxg gf-sep2014OECD Environment
 
Mole xxiii conference presentation on swa-budget assessmnt
Mole xxiii conference   presentation on swa-budget assessmntMole xxiii conference   presentation on swa-budget assessmnt
Mole xxiii conference presentation on swa-budget assessmntconiwas
 
Paris Declaration on Aid Effectiveness
Paris Declaration on Aid EffectivenessParis Declaration on Aid Effectiveness
Paris Declaration on Aid Effectivenessed gbargaye
 

What's hot (20)

2015 ReSAKSS Conference – Day 3- Paul Guthiga
2015 ReSAKSS Conference – Day 3- Paul Guthiga2015 ReSAKSS Conference – Day 3- Paul Guthiga
2015 ReSAKSS Conference – Day 3- Paul Guthiga
 
Strategic Environmental Assessment
Strategic Environmental Assessment Strategic Environmental Assessment
Strategic Environmental Assessment
 
2015 ReSAKSS Conference – Day 1 - Elliot Mghenyi
2015 ReSAKSS Conference – Day 1 - Elliot Mghenyi2015 ReSAKSS Conference – Day 1 - Elliot Mghenyi
2015 ReSAKSS Conference – Day 1 - Elliot Mghenyi
 
2015 ReSAKSS Conference – Day 3 - Godfrey Bahiigwa
2015 ReSAKSS Conference – Day 3 - Godfrey Bahiigwa2015 ReSAKSS Conference – Day 3 - Godfrey Bahiigwa
2015 ReSAKSS Conference – Day 3 - Godfrey Bahiigwa
 
Regional solution for integrated land and water management -Workshop 1 - CP m...
Regional solution for integrated land and water management -Workshop 1 - CP m...Regional solution for integrated land and water management -Workshop 1 - CP m...
Regional solution for integrated land and water management -Workshop 1 - CP m...
 
NAP-GSP Cambodia Stocktaking Mission Debriefing
NAP-GSP Cambodia Stocktaking Mission DebriefingNAP-GSP Cambodia Stocktaking Mission Debriefing
NAP-GSP Cambodia Stocktaking Mission Debriefing
 
11.3.3 Experiencing on enhancing institutional arrangements and support for t...
11.3.3 Experiencing on enhancing institutional arrangements and support for t...11.3.3 Experiencing on enhancing institutional arrangements and support for t...
11.3.3 Experiencing on enhancing institutional arrangements and support for t...
 
A landscape approach to rainwater management in Ethiopia: Nile 5 – coordinat...
A landscape approach to rainwater management in Ethiopia:  Nile 5 – coordinat...A landscape approach to rainwater management in Ethiopia:  Nile 5 – coordinat...
A landscape approach to rainwater management in Ethiopia: Nile 5 – coordinat...
 
Nap expo 2015 session 1 LEG
Nap expo 2015 session 1 LEGNap expo 2015 session 1 LEG
Nap expo 2015 session 1 LEG
 
Paris Declaration on Aid Effectiveness; WHO role in promoting aid effectiveness
Paris Declaration on Aid Effectiveness; WHO role in promoting aid effectivenessParis Declaration on Aid Effectiveness; WHO role in promoting aid effectiveness
Paris Declaration on Aid Effectiveness; WHO role in promoting aid effectiveness
 
2015 ReSAKSS Conference – Day 3- Paul Guthiga
2015 ReSAKSS Conference – Day 3- Paul Guthiga2015 ReSAKSS Conference – Day 3- Paul Guthiga
2015 ReSAKSS Conference – Day 3- Paul Guthiga
 
Governance and Financing for the Mediterranean Water Sector
Governance and Financing for the Mediterranean Water SectorGovernance and Financing for the Mediterranean Water Sector
Governance and Financing for the Mediterranean Water Sector
 
Short introduction nap ag for posting final
Short introduction nap ag for posting finalShort introduction nap ag for posting final
Short introduction nap ag for posting final
 
Nap gsp support to developing countries for posting
Nap gsp support to developing countries for postingNap gsp support to developing countries for posting
Nap gsp support to developing countries for posting
 
Plenary adaptation corfee morlot&mullan dvpt cooperation ccxg gf-sep2014
Plenary adaptation corfee morlot&mullan dvpt cooperation ccxg gf-sep2014Plenary adaptation corfee morlot&mullan dvpt cooperation ccxg gf-sep2014
Plenary adaptation corfee morlot&mullan dvpt cooperation ccxg gf-sep2014
 
NAP-GSP - Niger Mission Debriefing
NAP-GSP - Niger Mission DebriefingNAP-GSP - Niger Mission Debriefing
NAP-GSP - Niger Mission Debriefing
 
2015 ReSAKSS Conference – Day 3 - Godfrey Bahiigwa
2015 ReSAKSS Conference – Day 3 - Godfrey Bahiigwa2015 ReSAKSS Conference – Day 3 - Godfrey Bahiigwa
2015 ReSAKSS Conference – Day 3 - Godfrey Bahiigwa
 
WACDEP Global Coordination Investment
WACDEP Global Coordination InvestmentWACDEP Global Coordination Investment
WACDEP Global Coordination Investment
 
Mole xxiii conference presentation on swa-budget assessmnt
Mole xxiii conference   presentation on swa-budget assessmntMole xxiii conference   presentation on swa-budget assessmnt
Mole xxiii conference presentation on swa-budget assessmnt
 
Paris Declaration on Aid Effectiveness
Paris Declaration on Aid EffectivenessParis Declaration on Aid Effectiveness
Paris Declaration on Aid Effectiveness
 

Viewers also liked

Session SDM - kdwsp Sustainabilty experience presentation
Session SDM - kdwsp Sustainabilty experience presentationSession SDM - kdwsp Sustainabilty experience presentation
Session SDM - kdwsp Sustainabilty experience presentationIRC
 
Nile Basin water productivity: Developing a shared vision for livestock produ...
Nile Basin water productivity: Developing a shared vision for livestock produ...Nile Basin water productivity: Developing a shared vision for livestock produ...
Nile Basin water productivity: Developing a shared vision for livestock produ...ILRI
 
Promoting Community-Based Adaptation in Uganda; experiences, lessons, emergin...
Promoting Community-Based Adaptation in Uganda; experiences, lessons, emergin...Promoting Community-Based Adaptation in Uganda; experiences, lessons, emergin...
Promoting Community-Based Adaptation in Uganda; experiences, lessons, emergin...Dr. Joshua Zake
 
Institutional aspects of slum sanitation: implication of multiple actors
Institutional aspects of slum sanitation: implication of multiple actorsInstitutional aspects of slum sanitation: implication of multiple actors
Institutional aspects of slum sanitation: implication of multiple actorsInternational WaterCentre
 
Hydrological reconnaissance for rural water projects using free online inform...
Hydrological reconnaissance for rural water projects using free online inform...Hydrological reconnaissance for rural water projects using free online inform...
Hydrological reconnaissance for rural water projects using free online inform...SamSamWater Foundation
 
Managerial skills and success of Small-scale entrepreneurs in Kampala Uganda
Managerial skills and success of Small-scale entrepreneurs in Kampala UgandaManagerial skills and success of Small-scale entrepreneurs in Kampala Uganda
Managerial skills and success of Small-scale entrepreneurs in Kampala UgandaMuhammad Kibuuka
 
ILRI/BMZ safe food, fair food
 ILRI/BMZ safe food, fair food ILRI/BMZ safe food, fair food
ILRI/BMZ safe food, fair foodILRI
 
A lean and flexible BRT concept - the Kampala case
A lean and flexible BRT concept - the Kampala caseA lean and flexible BRT concept - the Kampala case
A lean and flexible BRT concept - the Kampala caseEric Trel
 
Integrating local and scientific knowledge: an opportunity for addressing prod
Integrating local and scientific knowledge: an opportunity for addressing prodIntegrating local and scientific knowledge: an opportunity for addressing prod
Integrating local and scientific knowledge: an opportunity for addressing prodDr. Joshua Zake
 
Occurrence of Salmonella spp. in flies and foodstuff from pork butcheries in ...
Occurrence of Salmonella spp. in flies and foodstuff from pork butcheries in ...Occurrence of Salmonella spp. in flies and foodstuff from pork butcheries in ...
Occurrence of Salmonella spp. in flies and foodstuff from pork butcheries in ...ILRI
 
Relationship management in downstream supply chain a predictor of performance...
Relationship management in downstream supply chain a predictor of performance...Relationship management in downstream supply chain a predictor of performance...
Relationship management in downstream supply chain a predictor of performance...Kalinzi Charles
 
Antimicrobial resistance of Salmonella enterica in pork and vegetable serving...
Antimicrobial resistance of Salmonella enterica in pork and vegetable serving...Antimicrobial resistance of Salmonella enterica in pork and vegetable serving...
Antimicrobial resistance of Salmonella enterica in pork and vegetable serving...ILRI
 
Introducing the Workshop on in-depth smallholder pig value chain assessment a...
Introducing the Workshop on in-depth smallholder pig value chain assessment a...Introducing the Workshop on in-depth smallholder pig value chain assessment a...
Introducing the Workshop on in-depth smallholder pig value chain assessment a...ILRI
 
Kampala City the Pearl of Africa
Kampala City the Pearl of AfricaKampala City the Pearl of Africa
Kampala City the Pearl of AfricaYus Kawoya-Kasumba
 
Communicating evaluation findings: challenges and opportunities
Communicating evaluation findings: challenges and opportunitiesCommunicating evaluation findings: challenges and opportunities
Communicating evaluation findings: challenges and opportunitiesGlenn O'Neil
 
KEYNOTE - Moriarty Kampala Uganda symposium
KEYNOTE - Moriarty Kampala Uganda symposiumKEYNOTE - Moriarty Kampala Uganda symposium
KEYNOTE - Moriarty Kampala Uganda symposiumIRC
 
Session Governance - Denis Zoungrana decentrlised systems bf
Session Governance - Denis Zoungrana decentrlised systems bfSession Governance - Denis Zoungrana decentrlised systems bf
Session Governance - Denis Zoungrana decentrlised systems bfIRC
 
Practicing Environmental Managers' Organization (PEMO)
Practicing Environmental Managers' Organization (PEMO)Practicing Environmental Managers' Organization (PEMO)
Practicing Environmental Managers' Organization (PEMO)Robert Ddamulira
 

Viewers also liked (20)

Session SDM - kdwsp Sustainabilty experience presentation
Session SDM - kdwsp Sustainabilty experience presentationSession SDM - kdwsp Sustainabilty experience presentation
Session SDM - kdwsp Sustainabilty experience presentation
 
Nile Basin water productivity: Developing a shared vision for livestock produ...
Nile Basin water productivity: Developing a shared vision for livestock produ...Nile Basin water productivity: Developing a shared vision for livestock produ...
Nile Basin water productivity: Developing a shared vision for livestock produ...
 
RAHIM
RAHIMRAHIM
RAHIM
 
Promoting Community-Based Adaptation in Uganda; experiences, lessons, emergin...
Promoting Community-Based Adaptation in Uganda; experiences, lessons, emergin...Promoting Community-Based Adaptation in Uganda; experiences, lessons, emergin...
Promoting Community-Based Adaptation in Uganda; experiences, lessons, emergin...
 
Institutional aspects of slum sanitation: implication of multiple actors
Institutional aspects of slum sanitation: implication of multiple actorsInstitutional aspects of slum sanitation: implication of multiple actors
Institutional aspects of slum sanitation: implication of multiple actors
 
Hydrological reconnaissance for rural water projects using free online inform...
Hydrological reconnaissance for rural water projects using free online inform...Hydrological reconnaissance for rural water projects using free online inform...
Hydrological reconnaissance for rural water projects using free online inform...
 
Managerial skills and success of Small-scale entrepreneurs in Kampala Uganda
Managerial skills and success of Small-scale entrepreneurs in Kampala UgandaManagerial skills and success of Small-scale entrepreneurs in Kampala Uganda
Managerial skills and success of Small-scale entrepreneurs in Kampala Uganda
 
ILRI/BMZ safe food, fair food
 ILRI/BMZ safe food, fair food ILRI/BMZ safe food, fair food
ILRI/BMZ safe food, fair food
 
A lean and flexible BRT concept - the Kampala case
A lean and flexible BRT concept - the Kampala caseA lean and flexible BRT concept - the Kampala case
A lean and flexible BRT concept - the Kampala case
 
Integrating local and scientific knowledge: an opportunity for addressing prod
Integrating local and scientific knowledge: an opportunity for addressing prodIntegrating local and scientific knowledge: an opportunity for addressing prod
Integrating local and scientific knowledge: an opportunity for addressing prod
 
Research to Policy project Inception workshop - Presentations from Day 2
Research to Policy project Inception workshop - Presentations from Day 2Research to Policy project Inception workshop - Presentations from Day 2
Research to Policy project Inception workshop - Presentations from Day 2
 
Occurrence of Salmonella spp. in flies and foodstuff from pork butcheries in ...
Occurrence of Salmonella spp. in flies and foodstuff from pork butcheries in ...Occurrence of Salmonella spp. in flies and foodstuff from pork butcheries in ...
Occurrence of Salmonella spp. in flies and foodstuff from pork butcheries in ...
 
Relationship management in downstream supply chain a predictor of performance...
Relationship management in downstream supply chain a predictor of performance...Relationship management in downstream supply chain a predictor of performance...
Relationship management in downstream supply chain a predictor of performance...
 
Antimicrobial resistance of Salmonella enterica in pork and vegetable serving...
Antimicrobial resistance of Salmonella enterica in pork and vegetable serving...Antimicrobial resistance of Salmonella enterica in pork and vegetable serving...
Antimicrobial resistance of Salmonella enterica in pork and vegetable serving...
 
Introducing the Workshop on in-depth smallholder pig value chain assessment a...
Introducing the Workshop on in-depth smallholder pig value chain assessment a...Introducing the Workshop on in-depth smallholder pig value chain assessment a...
Introducing the Workshop on in-depth smallholder pig value chain assessment a...
 
Kampala City the Pearl of Africa
Kampala City the Pearl of AfricaKampala City the Pearl of Africa
Kampala City the Pearl of Africa
 
Communicating evaluation findings: challenges and opportunities
Communicating evaluation findings: challenges and opportunitiesCommunicating evaluation findings: challenges and opportunities
Communicating evaluation findings: challenges and opportunities
 
KEYNOTE - Moriarty Kampala Uganda symposium
KEYNOTE - Moriarty Kampala Uganda symposiumKEYNOTE - Moriarty Kampala Uganda symposium
KEYNOTE - Moriarty Kampala Uganda symposium
 
Session Governance - Denis Zoungrana decentrlised systems bf
Session Governance - Denis Zoungrana decentrlised systems bfSession Governance - Denis Zoungrana decentrlised systems bf
Session Governance - Denis Zoungrana decentrlised systems bf
 
Practicing Environmental Managers' Organization (PEMO)
Practicing Environmental Managers' Organization (PEMO)Practicing Environmental Managers' Organization (PEMO)
Practicing Environmental Managers' Organization (PEMO)
 

Similar to IWRM Planning

Sharing, networking, capacity building
Sharing, networking, capacity buildingSharing, networking, capacity building
Sharing, networking, capacity buildinggroundwatercop
 
Session Harmonization 3c - Minta kampala seminar 2010
Session Harmonization 3c - Minta kampala seminar 2010Session Harmonization 3c - Minta kampala seminar 2010
Session Harmonization 3c - Minta kampala seminar 2010IRC
 
Nile Basin Development Challenge: Brief overview
Nile Basin Development Challenge:  Brief overview Nile Basin Development Challenge:  Brief overview
Nile Basin Development Challenge: Brief overview ILRI
 
Role of Stakeholder Engagement in Integrated Water Management (A GEF Internat...
Role of Stakeholder Engagement in Integrated Water Management (A GEF Internat...Role of Stakeholder Engagement in Integrated Water Management (A GEF Internat...
Role of Stakeholder Engagement in Integrated Water Management (A GEF Internat...Iwl Pcu
 
Knowledge and awareness WP7 and Capacity development WP6_steven downey_28 aug
Knowledge and awareness WP7 and Capacity development WP6_steven downey_28 augKnowledge and awareness WP7 and Capacity development WP6_steven downey_28 aug
Knowledge and awareness WP7 and Capacity development WP6_steven downey_28 augGlobal Water Partnership
 
Key findings, lessons learned and next steps for TrackFin
Key findings, lessons learned and next steps for TrackFinKey findings, lessons learned and next steps for TrackFin
Key findings, lessons learned and next steps for TrackFinTrackFin
 
Sector planning-strategies-and-their-implementation-water for all
Sector planning-strategies-and-their-implementation-water for allSector planning-strategies-and-their-implementation-water for all
Sector planning-strategies-and-their-implementation-water for allAicha Chorak Franky
 
Andrew Takawira, GWP Africa, Integrated approaches to planning and implementa...
Andrew Takawira, GWP Africa, Integrated approaches to planning and implementa...Andrew Takawira, GWP Africa, Integrated approaches to planning and implementa...
Andrew Takawira, GWP Africa, Integrated approaches to planning and implementa...NAPExpo 2014
 
Workshop WCP_WACDEP CAM_carolina carías_1 sep
Workshop WCP_WACDEP CAM_carolina carías_1 sepWorkshop WCP_WACDEP CAM_carolina carías_1 sep
Workshop WCP_WACDEP CAM_carolina carías_1 sepGlobal Water Partnership
 
JAR review presentation
JAR review presentationJAR review presentation
JAR review presentationict4devwg
 
The Replication Component (Guglielmi)
The Replication Component (Guglielmi)The Replication Component (Guglielmi)
The Replication Component (Guglielmi)Iwl Pcu
 
2014-2016 work programmes thematic programmes and the knowledge chain_john me...
2014-2016 work programmes thematic programmes and the knowledge chain_john me...2014-2016 work programmes thematic programmes and the knowledge chain_john me...
2014-2016 work programmes thematic programmes and the knowledge chain_john me...Global Water Partnership
 
Findings Relevant to the GEF IW Learn Confernce
Findings Relevant to the GEF IW Learn ConfernceFindings Relevant to the GEF IW Learn Confernce
Findings Relevant to the GEF IW Learn ConfernceIwl Pcu
 
Addressing Climate Change through IWRM to boost national development in Centr...
Addressing Climate Change through IWRM to boost national development in Centr...Addressing Climate Change through IWRM to boost national development in Centr...
Addressing Climate Change through IWRM to boost national development in Centr...Global Water Partnership
 
India addressing the other water ciris
India addressing the other water cirisIndia addressing the other water ciris
India addressing the other water cirisVeettal Kurian
 

Similar to IWRM Planning (20)

Outline water financing
Outline water financingOutline water financing
Outline water financing
 
AMCOW AFRICA’s Groundwater DVELOPMENT Programme: For Water Security and Resil...
AMCOW AFRICA’s Groundwater DVELOPMENT Programme: For Water Security and Resil...AMCOW AFRICA’s Groundwater DVELOPMENT Programme: For Water Security and Resil...
AMCOW AFRICA’s Groundwater DVELOPMENT Programme: For Water Security and Resil...
 
Sharing, networking, capacity building
Sharing, networking, capacity buildingSharing, networking, capacity building
Sharing, networking, capacity building
 
Session Harmonization 3c - Minta kampala seminar 2010
Session Harmonization 3c - Minta kampala seminar 2010Session Harmonization 3c - Minta kampala seminar 2010
Session Harmonization 3c - Minta kampala seminar 2010
 
Nile Basin Development Challenge: Brief overview
Nile Basin Development Challenge:  Brief overview Nile Basin Development Challenge:  Brief overview
Nile Basin Development Challenge: Brief overview
 
Role of Stakeholder Engagement in Integrated Water Management (A GEF Internat...
Role of Stakeholder Engagement in Integrated Water Management (A GEF Internat...Role of Stakeholder Engagement in Integrated Water Management (A GEF Internat...
Role of Stakeholder Engagement in Integrated Water Management (A GEF Internat...
 
Knowledge and awareness WP7 and Capacity development WP6_steven downey_28 aug
Knowledge and awareness WP7 and Capacity development WP6_steven downey_28 augKnowledge and awareness WP7 and Capacity development WP6_steven downey_28 aug
Knowledge and awareness WP7 and Capacity development WP6_steven downey_28 aug
 
Rhetoric versus realities: An assessment of rainwater management planning and...
Rhetoric versus realities: An assessment of rainwater management planning and...Rhetoric versus realities: An assessment of rainwater management planning and...
Rhetoric versus realities: An assessment of rainwater management planning and...
 
Key findings, lessons learned and next steps for TrackFin
Key findings, lessons learned and next steps for TrackFinKey findings, lessons learned and next steps for TrackFin
Key findings, lessons learned and next steps for TrackFin
 
Sector planning-strategies-and-their-implementation-water for all
Sector planning-strategies-and-their-implementation-water for allSector planning-strategies-and-their-implementation-water for all
Sector planning-strategies-and-their-implementation-water for all
 
Andrew Takawira, GWP Africa, Integrated approaches to planning and implementa...
Andrew Takawira, GWP Africa, Integrated approaches to planning and implementa...Andrew Takawira, GWP Africa, Integrated approaches to planning and implementa...
Andrew Takawira, GWP Africa, Integrated approaches to planning and implementa...
 
Workshop WCP_WACDEP CAM_carolina carías_1 sep
Workshop WCP_WACDEP CAM_carolina carías_1 sepWorkshop WCP_WACDEP CAM_carolina carías_1 sep
Workshop WCP_WACDEP CAM_carolina carías_1 sep
 
Participative River Basin Management Planning by Yannick POCHON and Yunona VI...
Participative River Basin Management Planning by Yannick POCHON and Yunona VI...Participative River Basin Management Planning by Yannick POCHON and Yunona VI...
Participative River Basin Management Planning by Yannick POCHON and Yunona VI...
 
JAR review presentation
JAR review presentationJAR review presentation
JAR review presentation
 
The Replication Component (Guglielmi)
The Replication Component (Guglielmi)The Replication Component (Guglielmi)
The Replication Component (Guglielmi)
 
Uganda - NAP Climate Change Adaptation Experiences
Uganda  - NAP Climate Change Adaptation ExperiencesUganda  - NAP Climate Change Adaptation Experiences
Uganda - NAP Climate Change Adaptation Experiences
 
2014-2016 work programmes thematic programmes and the knowledge chain_john me...
2014-2016 work programmes thematic programmes and the knowledge chain_john me...2014-2016 work programmes thematic programmes and the knowledge chain_john me...
2014-2016 work programmes thematic programmes and the knowledge chain_john me...
 
Findings Relevant to the GEF IW Learn Confernce
Findings Relevant to the GEF IW Learn ConfernceFindings Relevant to the GEF IW Learn Confernce
Findings Relevant to the GEF IW Learn Confernce
 
Addressing Climate Change through IWRM to boost national development in Centr...
Addressing Climate Change through IWRM to boost national development in Centr...Addressing Climate Change through IWRM to boost national development in Centr...
Addressing Climate Change through IWRM to boost national development in Centr...
 
India addressing the other water ciris
India addressing the other water cirisIndia addressing the other water ciris
India addressing the other water ciris
 

Recently uploaded

Call Girls Service AECS Layout Just Call 7001305949 Enjoy College Girls Service
Call Girls Service AECS Layout Just Call 7001305949 Enjoy College Girls ServiceCall Girls Service AECS Layout Just Call 7001305949 Enjoy College Girls Service
Call Girls Service AECS Layout Just Call 7001305949 Enjoy College Girls Servicenarwatsonia7
 
call girls in Laxmi Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Laxmi Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in Laxmi Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Laxmi Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️saminamagar
 
call girls in sector 22 Gurgaon 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in sector 22 Gurgaon  🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in sector 22 Gurgaon  🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in sector 22 Gurgaon 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️saminamagar
 
call girls in Narela DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Narela DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in Narela DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Narela DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️saminamagar
 
Action Toolkit - Earth Day 2024 - April 22nd.
Action Toolkit - Earth Day 2024 - April 22nd.Action Toolkit - Earth Day 2024 - April 22nd.
Action Toolkit - Earth Day 2024 - April 22nd.Christina Parmionova
 
call girls in DLF Phase 1 gurgaon 🔝 >༒9540349809 🔝 genuine Escort Service 🔝...
call girls in DLF Phase 1  gurgaon  🔝 >༒9540349809 🔝 genuine Escort Service 🔝...call girls in DLF Phase 1  gurgaon  🔝 >༒9540349809 🔝 genuine Escort Service 🔝...
call girls in DLF Phase 1 gurgaon 🔝 >༒9540349809 🔝 genuine Escort Service 🔝...saminamagar
 
Panet vs.Plastics - Earth Day 2024 - 22 APRIL
Panet vs.Plastics - Earth Day 2024 - 22 APRILPanet vs.Plastics - Earth Day 2024 - 22 APRIL
Panet vs.Plastics - Earth Day 2024 - 22 APRILChristina Parmionova
 
Monastic-Supremacy-in-the-Philippines-_20240328_092725_0000.pdf
Monastic-Supremacy-in-the-Philippines-_20240328_092725_0000.pdfMonastic-Supremacy-in-the-Philippines-_20240328_092725_0000.pdf
Monastic-Supremacy-in-the-Philippines-_20240328_092725_0000.pdfCharlynTorres1
 
productionpost-productiondiary-240320114322-5004daf6.pptx
productionpost-productiondiary-240320114322-5004daf6.pptxproductionpost-productiondiary-240320114322-5004daf6.pptx
productionpost-productiondiary-240320114322-5004daf6.pptxHenryBriggs2
 
Premium Call Girls Btm Layout - 7001305949 Escorts Service with Real Photos a...
Premium Call Girls Btm Layout - 7001305949 Escorts Service with Real Photos a...Premium Call Girls Btm Layout - 7001305949 Escorts Service with Real Photos a...
Premium Call Girls Btm Layout - 7001305949 Escorts Service with Real Photos a...narwatsonia7
 
Yellow is My Favorite Color By Annabelle.pdf
Yellow is My Favorite Color By Annabelle.pdfYellow is My Favorite Color By Annabelle.pdf
Yellow is My Favorite Color By Annabelle.pdfAmir Saranga
 
2024: The FAR, Federal Acquisition Regulations - Part 27
2024: The FAR, Federal Acquisition Regulations - Part 272024: The FAR, Federal Acquisition Regulations - Part 27
2024: The FAR, Federal Acquisition Regulations - Part 27JSchaus & Associates
 
Club of Rome: Eco-nomics for an Ecological Civilization
Club of Rome: Eco-nomics for an Ecological CivilizationClub of Rome: Eco-nomics for an Ecological Civilization
Club of Rome: Eco-nomics for an Ecological CivilizationEnergy for One World
 
Angels_EDProgrammes & Services 2024.pptx
Angels_EDProgrammes & Services 2024.pptxAngels_EDProgrammes & Services 2024.pptx
Angels_EDProgrammes & Services 2024.pptxLizelle Coombs
 
call girls in Punjabi Bagh DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Punjabi Bagh DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in Punjabi Bagh DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Punjabi Bagh DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️saminamagar
 
history of 1935 philippine constitution.pptx
history of 1935 philippine constitution.pptxhistory of 1935 philippine constitution.pptx
history of 1935 philippine constitution.pptxhellokittymaearciaga
 
WORLD CREATIVITY AND INNOVATION DAY 2024.
WORLD CREATIVITY AND INNOVATION DAY 2024.WORLD CREATIVITY AND INNOVATION DAY 2024.
WORLD CREATIVITY AND INNOVATION DAY 2024.Christina Parmionova
 
call girls in West Patel Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service ...
call girls in West Patel Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service ...call girls in West Patel Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service ...
call girls in West Patel Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service ...saminamagar
 

Recently uploaded (20)

Call Girls Service AECS Layout Just Call 7001305949 Enjoy College Girls Service
Call Girls Service AECS Layout Just Call 7001305949 Enjoy College Girls ServiceCall Girls Service AECS Layout Just Call 7001305949 Enjoy College Girls Service
Call Girls Service AECS Layout Just Call 7001305949 Enjoy College Girls Service
 
call girls in Laxmi Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Laxmi Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in Laxmi Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Laxmi Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
 
call girls in sector 22 Gurgaon 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in sector 22 Gurgaon  🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in sector 22 Gurgaon  🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in sector 22 Gurgaon 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
 
call girls in Narela DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Narela DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in Narela DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Narela DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
 
Hot Sexy call girls in Palam Vihar🔝 9953056974 🔝 escort Service
Hot Sexy call girls in Palam Vihar🔝 9953056974 🔝 escort ServiceHot Sexy call girls in Palam Vihar🔝 9953056974 🔝 escort Service
Hot Sexy call girls in Palam Vihar🔝 9953056974 🔝 escort Service
 
Action Toolkit - Earth Day 2024 - April 22nd.
Action Toolkit - Earth Day 2024 - April 22nd.Action Toolkit - Earth Day 2024 - April 22nd.
Action Toolkit - Earth Day 2024 - April 22nd.
 
call girls in DLF Phase 1 gurgaon 🔝 >༒9540349809 🔝 genuine Escort Service 🔝...
call girls in DLF Phase 1  gurgaon  🔝 >༒9540349809 🔝 genuine Escort Service 🔝...call girls in DLF Phase 1  gurgaon  🔝 >༒9540349809 🔝 genuine Escort Service 🔝...
call girls in DLF Phase 1 gurgaon 🔝 >༒9540349809 🔝 genuine Escort Service 🔝...
 
Panet vs.Plastics - Earth Day 2024 - 22 APRIL
Panet vs.Plastics - Earth Day 2024 - 22 APRILPanet vs.Plastics - Earth Day 2024 - 22 APRIL
Panet vs.Plastics - Earth Day 2024 - 22 APRIL
 
Monastic-Supremacy-in-the-Philippines-_20240328_092725_0000.pdf
Monastic-Supremacy-in-the-Philippines-_20240328_092725_0000.pdfMonastic-Supremacy-in-the-Philippines-_20240328_092725_0000.pdf
Monastic-Supremacy-in-the-Philippines-_20240328_092725_0000.pdf
 
productionpost-productiondiary-240320114322-5004daf6.pptx
productionpost-productiondiary-240320114322-5004daf6.pptxproductionpost-productiondiary-240320114322-5004daf6.pptx
productionpost-productiondiary-240320114322-5004daf6.pptx
 
Premium Call Girls Btm Layout - 7001305949 Escorts Service with Real Photos a...
Premium Call Girls Btm Layout - 7001305949 Escorts Service with Real Photos a...Premium Call Girls Btm Layout - 7001305949 Escorts Service with Real Photos a...
Premium Call Girls Btm Layout - 7001305949 Escorts Service with Real Photos a...
 
Yellow is My Favorite Color By Annabelle.pdf
Yellow is My Favorite Color By Annabelle.pdfYellow is My Favorite Color By Annabelle.pdf
Yellow is My Favorite Color By Annabelle.pdf
 
2024: The FAR, Federal Acquisition Regulations - Part 27
2024: The FAR, Federal Acquisition Regulations - Part 272024: The FAR, Federal Acquisition Regulations - Part 27
2024: The FAR, Federal Acquisition Regulations - Part 27
 
Club of Rome: Eco-nomics for an Ecological Civilization
Club of Rome: Eco-nomics for an Ecological CivilizationClub of Rome: Eco-nomics for an Ecological Civilization
Club of Rome: Eco-nomics for an Ecological Civilization
 
Angels_EDProgrammes & Services 2024.pptx
Angels_EDProgrammes & Services 2024.pptxAngels_EDProgrammes & Services 2024.pptx
Angels_EDProgrammes & Services 2024.pptx
 
9953330565 Low Rate Call Girls In Adarsh Nagar Delhi NCR
9953330565 Low Rate Call Girls In Adarsh Nagar Delhi NCR9953330565 Low Rate Call Girls In Adarsh Nagar Delhi NCR
9953330565 Low Rate Call Girls In Adarsh Nagar Delhi NCR
 
call girls in Punjabi Bagh DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Punjabi Bagh DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in Punjabi Bagh DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Punjabi Bagh DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
 
history of 1935 philippine constitution.pptx
history of 1935 philippine constitution.pptxhistory of 1935 philippine constitution.pptx
history of 1935 philippine constitution.pptx
 
WORLD CREATIVITY AND INNOVATION DAY 2024.
WORLD CREATIVITY AND INNOVATION DAY 2024.WORLD CREATIVITY AND INNOVATION DAY 2024.
WORLD CREATIVITY AND INNOVATION DAY 2024.
 
call girls in West Patel Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service ...
call girls in West Patel Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service ...call girls in West Patel Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service ...
call girls in West Patel Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service ...
 

IWRM Planning

  • 1. ANBO/RAOB STRENGTHENING THE INSTITUTIONS FOR TRANSBOUNDARY WATER MANAGEMENT IN AFRICA (SITWA) Validation Workshop Speke Resort, Munyonyo - Kampala/Uganda September 11 – 12, 2014 IWRM Planning in the African L/RBOs By Ousmane S. DIALLO, Consultant IWRM
  • 2. OUTLINE 1. Background of the study 2. Objectives of the study 3. Methodology 4. Key findings 5. Priority actions 6. Key messages & Recommendations for ANBO
  • 3. 1. Background of the study  Africa Water Vision 2025 (2000)  “An Africa where there is an equitable and sustainable use and management of water resources for poverty alleviation, socioeconomic development, regional cooperation, and the environment”.  Framework of Action organized under 4 categories of measures: (i) Strengthening governance of water resources, (ii) Improving water wisdom, (iii) Meeting urgent water needs, (iv) Strengthening the investment base for the desired water future  AMCOW (2002)  Mission: To provide political leadership, policy direction, and advocacy for the protection, management, and wise utilization of all Africa’s water resources for sustainable social, economic, and environmental development.  Workplan 2014-2016: 7 main themes out of which 4 have strong or direct linkages with the study: (i) Managing WR, (ii) Governance & management, (iii) Financing, (iv) Education, Knowledge & Capacity development
  • 4. 1. Background of the study (cont’d)  ANBO (2002)  Objective: To enhance transboundary water resources management (TWRM) in Africa through the promotion of IWRM at the level of river/lake/aquifer basins  2007: Statutes revized with a revitalized mandate; ANBO is designated as a sub-committee of AMCOW in matters relating to TWRM  SITWA Project (2012)  Overall objective: To strengthen regional cooperation at the political, economic and stakeholder level for sustainable management of TWR  Specific objectives: i. To support the development of lake/river basin organizations as catalysts for policy & institutional development, knowledge & information management & capacity development on TWMD. ii.To provide technical assistance to the L/RBOs (through the RECs & their member states) to develop IWRM Strategies and Plans in the river basins where they are not yet developed, & to implement plans where they exist.
  • 5. 1. Background of the study (cont’d) SITWA 12-16 AWV 2025 (TWRM) AMCOW ANBO Institutional WP 14-16 Operational Outcomes
  • 6. 2. Objectives of the study Expected major outputs: Purpose: Overall goal: To contribute to the preparation of a long term ANBO program focusing on the current situation and needs of L/RBOs regarding the IWRM planning in the African L/RBOs Identification of gaps for which ANBO could provide useful services Assessment of the needs of L/RBOs for improving or completing the existing IWRM planning frameworks Identification of priority support services/actions which could be provided by ANBO in the scope of its mandate Proposal of an action plan of 5 years (2015-2019) for ANBO based on the identified gaps/needs To identify priority actions and present a 5-year detailed program, within ANBO’s mandate and SITWA’s objectives
  • 7. 2. Objectives of the study (Cont’d) What is an IRBM plan?  A plan for management & development of WR in the basin  Aim at hydrological, ecologic, economic, & social integration in the context of river basin realities  Basin plan provides the basis of the L/RBO annual work plan Water management objective through the plan:  Synthesize technical & social priorities for the basin & act as a basis for action & accountability to stakeholders  Take into account impacts of other sectors on the WR & consequences of WM decisions on other economic sectors Basin planning:  Management of WR is about competing & conflicting interests/ viewpoints  Basin planning promotes dialogue, negotiation, & participation mechanisms, resulting in transparent decision making
  • 8. 3. Methodology A 3-step methodology Review of the current situation 1  Consultation workshop  Identification & Review of relevant documentation  Discussion with some ANBO members Identification of gaps & 2 Assessment of the needs  Gaps from IWRM planning processes  Deficiences & weaknesses of L/RBOs  Needs for improving/completing existing IWRM planning frameworks 3 Identification of priority actions  Analyse of ANBO’s mandate regarding IWRM planning  Identification of detailed possible actions from ANBO  Identification of priority actions, budget & timeframe
  • 9. 3. Methodology (Cont’d) Motivate Implement Design
  • 10. 4. Key findings MAJOR GAPS MAIN NEEDS A- Preparation of IWRM planning Lack of strong cooperation, holistic vision & strategic planning Encourage full involvment of all countries & strengthen political awareness for transboundary cooperation: • Development of a long term vision • Development of a strategy for joint management of shared WR • Increasing political awareness of “inaction costs” & strengthening capacity Lack of coordination between basin-wide IWRM planning frameworks & regional or sectoral planning processes Develop cooperation, partnerships & synergies between L/RBOs & regional institutions (i.e. RECs): • Development & strengthening regional policies & institutional frameworks • Strengthening institutional coordination in the region & at country level Key issues of transboundary cooperation not adequately addressed for problem solving Develop strategies & joint activities in integrated & coordinated manner with regional bodies: • Strengthening existing L/RBOs & promoting new ones • Development of water governance capacity & instruments
  • 11. 4. Key findings (Cont’d) MAJOR GAPS MAIN NEEDS B- Development of IWRM plans Weak institutional coordination & limited mechanisms & platforms for stakeholder participation Improvement of institutional coordination & enhancing stakeholder & civil society organizations’ participation: • Strengthening consultation mechanisms that are inclusive, including good gender balance • Development of institutional arrangements that define roles & responsibilities of key actors Lack of sound basin water & related resources data & information Production & integration of all aspects of basin data & information: • Strengthening transboundary water monitoring networks & development of a sustainable water information systems • Strengthening capacity to produce, organize & share data & information • Improvement of knowledge of groundwater & aquifer systems, including groundwater ecosystem linkages & dependencies • Development of sustainable basin-wide flood warning systems • Development of environmental indicators (quantitative, qualitative, biological) to ensure ecological balance • Strengthening research, collaboration of research institutions
  • 12. 4. Key findings (Cont’d) MAJOR GAPS MAIN NEEDS B- Development of IWRM plans (Cont’d) Inadequate or lack of capacity at all levels, thus impairing IWRM planning Capacity building, raising awareness & ownership: • Including capacity development needs in IRBM plans • Training of national & L/RBOs officers on key issues of transboundary challenges & joint IWRM planning • Informing on existing legal instruments to enhance the understanding of transboundary legal setting • Promoting decision-making supporting tools & strengthening capacity to maximize benefits of cooperation • Building technical capacity on economic optimization, budgeting & planning • Development of broad knowledge, specifically on integration of groundwater management, infrastructural development & Climate Change adaptation measures into the IRBM planning • Development of public information program & promoting tools to raise awareness & trust among a broad range of stakeholders
  • 13. 4. Key findings (Cont’d) MAJOR GAPS MAIN NEEDS C- Implementation of IWRM plans Limited institutional arrangements & capacities as well as fragmented institutional setups Institutional development for effective & efficient implementation: • Enhancing coordination at all levels among countries & coordination between institutions in the country • Setting up efficient institutional frameworks & capacity to ensure operational links with countries • Strengthening institutional capacities to deal with various implementation functions Insufficient financial resources to secure implementation of existing IWRM plans & inadequate investments Resources mobilization: • Enhancing capacity to access to finance & to raise more funds • Increasing both public & private partnership & networking to support & strengthening implementation • Strengthening capacity of L/RBOs to develop bankable actions • Allocation of adequate resources for the participation of the civil society to ensure good level of ownership • Promoting existing IWRM plans at all levels of fora for broader support they need for successful implementation
  • 14. 4. Key findings (Cont’d) MAJOR GAPS MAIN NEEDS C- Implementation of IWRM plans (Cont’d) Lack of knowledge on the sustainable management of the basin M&E systems to openly assess whether or not the basin is being managed sustainably • Setting up efficient monitoring & auditing process, & development of reliable knowledge on the overall management of the basin • Development & promoting robust M&E & performance indicators systems (governance & technical) • Setting up metrology systems on quantitative & qualitative issues of WR to assess if the implementation of agreed actions is achieving the goals & objectives set by States
  • 15. 5. Priority actions Component / Main actions Nb of main actions Nb of activities Estimated budget (€) 1. Governance framework : Policies, Legislation/Regulations, Institutions, Management 3 10 1 305 000 1.1. Development and strengthening regional policy and legal frameworks 1.2. Fostering institutional coordination and joint activities 1.3. Strengthening of coordinated management of water resources 2. Knowledge management, Capacity building 3 11 1 200 000 2.1. Knowledge development and management 2.2. Development of sustainable information systems 2.3. Capacity development / Capacity building
  • 16. 5. Priority actions (Cont’d) Category Nb of main actions Nb of activities Estimated budget (€) 3. M&E, Follow-up, Reporting, Adaptive management 2 4 600 000 3.1. Development of M&E, Follow-up and Reporting systems 3.2. Strengthening and promotion of Adaptive management tools 4. Participation, Awareness, Trust, Ownership 2 4 535 000 4.1. Enhancement of Stakeholder participation 4.2. Strengthening Awareness, Trust and Ownership TOTAL 10 29 3 640 000
  • 17. 6. Key messages & Recommendations for ANBO 1. Link IWRM planning to other regional initiatives or processes of integrated approach in transboundary water management. 2. Work with stakeholders to adapt IWRM principles to on-the-ground & institutional realities; Embed learning strategies in actions to capture evidence on what works for scaling up. 3. In the final design of the 5-year program regarding IWRM planning for the L/RBOs, ANBO, AMCOW, RECs & L/RBOs should consult so as to avoid overlap & to be effective. 4. Not all L/RBOs or RECs require the same support from ANBO. Therefore there is a need to set criteria and modalities to get ANBO support which will depend on the mandate; The demand-driven approach may apply. 5. Need to consolidate the 3 action programs (IWRM planning, Infrastructure development, Adaptation to climate change), as they may overlap to some extend & to fully realize optimization. 6. Set up a flexible & operational implementation framework of the 5-year program, & involve the very key partners of ANBO & L/RBOs.