Participative River Basin Management Planning
NPD SC Meeting
4 July 2018
European Union Water Initiative plus
for Eastern Partnership
Presentation of key issues by Yannick POCHON and Yunona VIDENINA
(IOWater); EU member state consortium (Austria, France)
Progress and feedback on:
1. River Basin Management Planning for Integrated Water
Resources Management (IWRM)
2. Stakeholders participation mechanisms at different
basin scales & Awareness rising as key for
implementation
3. Data sharing as base for knowledge development and
integration
2
 Support River Basin Management Planning process based on WFD
• Assessment of the current status for WFD implementation without delaying
the adoption of the first interim RBMPs based on WFD requirements
• Support and capacity building for the development of a RBMP in Kura River
Basin upstream Mingachevir dam by responsible institutions integrating
targeted improvement
 Support coordination in transboundary river basins
RBM Plan Implementation
 Pilot test on measures implementation in synergy with other projects
Planning&implementing for IWRM:
RBM Plan development
ÇHİP-nın İşlənib
Hazırlanması üçün
Pilot Hövzə
ÇHİP-nın
Transsərhəd
Uyğunlaşdırılması
Progress AZ – Participative
RBM planning
5
• Assessment of the needs and identification of priorities in implementation of the
RBMPs (Assessment report, March 2018)
• Development of new pilot RBMP for the Kura basin district upstream Mingachevir
dam - Tendering and contracts for national consultants:
• ToR for development of the RBMP for the Kura basin upstream Mingachevir dam
(contracting in process)
• Draft web-mapping and meta-data catalogue established for water data
• Starting Communication and stakeholders mobilisation (Gabirry-Ganikh) and
structuring of communication strategy
• Workshops:
• Data management for IWRM (September 28-29, 2017)
• RBM planning (November 28-29, 2017)
• Workplan 2018 agreed
What would be the advantages of synchronising the RBMP in
Kura River Basin upstream Mingachevir dam with the Alazani-
Iory RBMP in Georgia?
How to develop and improve transboundary harmonisation using
exiting mechanisms and agreements?
How to link with National Water Strategy, organisational and
methodology developments ?
Feedback and Discussion
 Stakeholder Involvement (RBMP & Transboundary aspects)
 Development, regular update and implementation of a communication strategy
for RBM Planning and the project visibility
 Awareness rising in relation to main issues of the RBMP
2. Stakeholder Involvement and
communication
Progress AZ – Participative
RBM planning
8
•Stakeholder analysis and assessment of stakeholder
involvement and public participation mechanisms
•Starting Communication and stakeholders mobilisation
(Gabirry-Ganikh) and structuring of communication strategy
•Draft communication strategy and plan for the upstream
Kura river basin (July 2018)
•Active cooperation with synergistic projects in the water
sector (ENPI SEIS II, GEF / UNDP Kura, etc.) with regards of
stakeholder mobilisation
Aim and expected outcomes of
the Communicatin Strategy and action plan for
the upstream Kura river basin
The Communication Strategy aims to support the adoption and implementation of
the RBMP, raising awareness and mobilizing different inter-sectorial stakeholders.
The Strategy intends to reach:
• Improved and more efficient communication, involvement of the stakeholders
and the public in the development and implementation of RBMP,
• More effective and meaningful sustainable structures and mechanisms
established for stakeholder involvement and public participation in the
development and implementation of RBMP
• Informed, improved and more transparent decision-making in the development
and implementation of RBMP in the upstream Kura river basin, through
communication, public participation and multi-stakeholder collaboration.
Target groups
Communication channels and tools
Basin
stakeholder
meetings/
workshops
Information on
objectives, approach,
methodo, output
PCBC
Information /
training
Main water
issues
July 2018 Jan –Feb 2019
Time table
& workplan.
Basin Characterisation
Pressure/ Impacts/
Status
Mid- End -2019
Draft RBMP
1 1 1 1
Dec.2018
TS
RBMP development
Capacity building =>Stakeholder
Involvement => Public Consultations
Significant
issues
Communication
documents
CA
TS
Draft
PoM and
RBMP
CA
Env.object. &
monitoring
PoM and
RBMP Final RBMP
Early 2020 Mid- 2020
1
Thematic
Summary
Consultation
Analysis
BC BC BC
PC PC
Public
consultation
Basin Council meeting Public consultation meeting
Basin dialogue platforms:
Basin councils/committees
Moldova
Belarus
France
What is possible interaction between National Water Council
and basin councils?
How to make sustainable the basin dialogue platforms (Basin
council)?
How to integrate the stakeholder/ public participation in the
RBM Plan development and further implementation process?
Feedback and Discussion
 To improve the data/information management, the proposal is to:
• Support organisational aspects for an efficient water data
management (data management policy development, agreements for
data exchanges, support to metadata production, on-line server
management organisation, etc.)
• Support information production for the pilot River Basin Management
Plan development
 Pilot activities coordinated with water cadastre development
 Support to equipment facilitating project objectives
• hardware or software for water cadastre and/or for partners producing data to
facilitate data exchanges and access
3. Data Management
15
Data management
Tasks of contractors :
-To collect the necessary datasets at the level of the producers;
-To work with the data producers in order that the dataset provided are described on
line into the metadata catalogue made available by the project;
-To copy the raw data made available by each producer on the FTP made available by
the project.
The corresponding expected results can be formulated as follow:
-All datasets used are described in English and in Russian (at least) into the metadata
catalogue;
-All raw dataset used are available on FTP.
The letter of request for data should include the obligation that the data producer
provides the corresponding metadata sheet fulfilled.
16
Metadata catalogue
How to make sure we take benefit from the pilot basin experience
to strengthen data management at national level ?
Who to improve data exchanges ?
What is the cost of not sharing data ?
Feedback and Discussion
Thank you for your attention!
Open for comments and questions
Please feel free to contact the EUWI+ team:
IOWater, France: y.pochon@oieau.fr and y.videnina@oieau.fr

Participative River Basin Management Planning by Yannick POCHON and Yunona VIDENINA (IOWater); EU member state consortium (Austria, France)

  • 1.
    Participative River BasinManagement Planning NPD SC Meeting 4 July 2018 European Union Water Initiative plus for Eastern Partnership Presentation of key issues by Yannick POCHON and Yunona VIDENINA (IOWater); EU member state consortium (Austria, France)
  • 2.
    Progress and feedbackon: 1. River Basin Management Planning for Integrated Water Resources Management (IWRM) 2. Stakeholders participation mechanisms at different basin scales & Awareness rising as key for implementation 3. Data sharing as base for knowledge development and integration 2
  • 3.
     Support RiverBasin Management Planning process based on WFD • Assessment of the current status for WFD implementation without delaying the adoption of the first interim RBMPs based on WFD requirements • Support and capacity building for the development of a RBMP in Kura River Basin upstream Mingachevir dam by responsible institutions integrating targeted improvement  Support coordination in transboundary river basins RBM Plan Implementation  Pilot test on measures implementation in synergy with other projects Planning&implementing for IWRM: RBM Plan development
  • 4.
    ÇHİP-nın İşlənib Hazırlanması üçün PilotHövzə ÇHİP-nın Transsərhəd Uyğunlaşdırılması
  • 5.
    Progress AZ –Participative RBM planning 5 • Assessment of the needs and identification of priorities in implementation of the RBMPs (Assessment report, March 2018) • Development of new pilot RBMP for the Kura basin district upstream Mingachevir dam - Tendering and contracts for national consultants: • ToR for development of the RBMP for the Kura basin upstream Mingachevir dam (contracting in process) • Draft web-mapping and meta-data catalogue established for water data • Starting Communication and stakeholders mobilisation (Gabirry-Ganikh) and structuring of communication strategy • Workshops: • Data management for IWRM (September 28-29, 2017) • RBM planning (November 28-29, 2017) • Workplan 2018 agreed
  • 6.
    What would bethe advantages of synchronising the RBMP in Kura River Basin upstream Mingachevir dam with the Alazani- Iory RBMP in Georgia? How to develop and improve transboundary harmonisation using exiting mechanisms and agreements? How to link with National Water Strategy, organisational and methodology developments ? Feedback and Discussion
  • 7.
     Stakeholder Involvement(RBMP & Transboundary aspects)  Development, regular update and implementation of a communication strategy for RBM Planning and the project visibility  Awareness rising in relation to main issues of the RBMP 2. Stakeholder Involvement and communication
  • 8.
    Progress AZ –Participative RBM planning 8 •Stakeholder analysis and assessment of stakeholder involvement and public participation mechanisms •Starting Communication and stakeholders mobilisation (Gabirry-Ganikh) and structuring of communication strategy •Draft communication strategy and plan for the upstream Kura river basin (July 2018) •Active cooperation with synergistic projects in the water sector (ENPI SEIS II, GEF / UNDP Kura, etc.) with regards of stakeholder mobilisation
  • 9.
    Aim and expectedoutcomes of the Communicatin Strategy and action plan for the upstream Kura river basin The Communication Strategy aims to support the adoption and implementation of the RBMP, raising awareness and mobilizing different inter-sectorial stakeholders. The Strategy intends to reach: • Improved and more efficient communication, involvement of the stakeholders and the public in the development and implementation of RBMP, • More effective and meaningful sustainable structures and mechanisms established for stakeholder involvement and public participation in the development and implementation of RBMP • Informed, improved and more transparent decision-making in the development and implementation of RBMP in the upstream Kura river basin, through communication, public participation and multi-stakeholder collaboration.
  • 10.
  • 11.
    Basin stakeholder meetings/ workshops Information on objectives, approach, methodo,output PCBC Information / training Main water issues July 2018 Jan –Feb 2019 Time table & workplan. Basin Characterisation Pressure/ Impacts/ Status Mid- End -2019 Draft RBMP 1 1 1 1 Dec.2018 TS RBMP development Capacity building =>Stakeholder Involvement => Public Consultations Significant issues Communication documents CA TS Draft PoM and RBMP CA Env.object. & monitoring PoM and RBMP Final RBMP Early 2020 Mid- 2020 1 Thematic Summary Consultation Analysis BC BC BC PC PC Public consultation Basin Council meeting Public consultation meeting
  • 12.
    Basin dialogue platforms: Basincouncils/committees Moldova Belarus France
  • 13.
    What is possibleinteraction between National Water Council and basin councils? How to make sustainable the basin dialogue platforms (Basin council)? How to integrate the stakeholder/ public participation in the RBM Plan development and further implementation process? Feedback and Discussion
  • 14.
     To improvethe data/information management, the proposal is to: • Support organisational aspects for an efficient water data management (data management policy development, agreements for data exchanges, support to metadata production, on-line server management organisation, etc.) • Support information production for the pilot River Basin Management Plan development  Pilot activities coordinated with water cadastre development  Support to equipment facilitating project objectives • hardware or software for water cadastre and/or for partners producing data to facilitate data exchanges and access 3. Data Management
  • 15.
  • 16.
    Data management Tasks ofcontractors : -To collect the necessary datasets at the level of the producers; -To work with the data producers in order that the dataset provided are described on line into the metadata catalogue made available by the project; -To copy the raw data made available by each producer on the FTP made available by the project. The corresponding expected results can be formulated as follow: -All datasets used are described in English and in Russian (at least) into the metadata catalogue; -All raw dataset used are available on FTP. The letter of request for data should include the obligation that the data producer provides the corresponding metadata sheet fulfilled. 16
  • 17.
  • 18.
    How to makesure we take benefit from the pilot basin experience to strengthen data management at national level ? Who to improve data exchanges ? What is the cost of not sharing data ? Feedback and Discussion
  • 19.
    Thank you foryour attention! Open for comments and questions Please feel free to contact the EUWI+ team: IOWater, France: y.pochon@oieau.fr and y.videnina@oieau.fr