SlideShare a Scribd company logo
Path to
                   Production




Near- Term Production
Timmins, Ontario
TSX-V : SGX                     Aug-Sept 2012
                                  September 2012
Path to Production




Forward Looking Statements
Statements made in this presentation, other than those concerning historical information, should be
considered forward-looking statements which are subject to various risks and uncertainties. Such
forward-looking statements are made based on management’s belief as well as assumptions made by,
and information currently available to, management.

The Company’s actual results may differ materially from the results anticipated in such forward-looking
statements as a result of a variety of factors. Additional information concerning factors that could cause
actual results to materially differ from those in such forward-looking statements is contained in the
Company’s filings with the securities and regulatory authorities.




Note: All currencies are in Canadian dollars unless otherwise noted




                                                                                                         1
Path to Production


CORPORATE VISION
 Sage Gold’s short term plans are to develop production on their existing
 resource to generate cash flow to fund further exploration and potentially
 develop a leading gold mining company in a world class mining camp.

CORPORATE STRUCTURE
 •   Shares O/S: 83.4 million
 •   Shares F/D: 116.2 million
 •   Current price: $0.09
 •   52 week high/low: $0.21/$0.045
 •   Market Cap: C$ 7.5 million
 •   Average Strike Price of Warrants/Options: $0.31
 •   Proceeds from Warrants/Options: $10.1 million

     Exchange Symbol: TSX.V – SGX
                      OTC – SGGDF (USA)
                                                                              2
Path to Production


Sage Gold Advantage
  1. Near Term Production – Clavos Deposit
           •   Sage Gold has access to SAS’s mill in the area and is able to move into production
               quickly and cost effectively - will generate strong cash flow for the company

  2. Blue Sky Potential – Clavos Deposit
              Open at depth and on multiple directions along strike
              Management will focus on continuing to increase resources

  3. Pre-production Financing in Place
              $1.5M debt facility with Waterton Global Value L.P
              Right of first refusal on Production financing

  4. Strong Strategic Partnerships
              Clavos Property - Sage and St Andrew Goldfields JV partners (60%-40%)
              Providing low cost access to mine and mill
              Established infrastructure with $46 million spent on underground development

  5. Experienced Management Team

  6. New NI43-101 Resource Estimate and PEA in Q4 2012
                                                                                                3
Path to Production



Clavos Deposit - Highlights
 Located in the prolific Timmins Mining camp and close geographically (20kms) to
  Goldcorp’s (TSX-G) high grade Hoyle Pond mine which has produced more than 2.4
  M ozs since 1985 and is still in operation.

 Existing infrastructure in place including underground ramp access to the 300m
  level, underground levels developed every 25m, power to site, surface ventilation
  system, water management system.

 Prior gold resource for Clavos reported by SAS in October 2006. The resource was
  calculated by Roscoe Postle & Associates (RPA) and comprises 37,000 gold ozs,
  143,000 tons @ 8.07 g/t Au in M&I and 110,300 gold ozs.; 529,000 tons @ 6.5 g/t
  Au in Inferred ( assays cut to 60g/t)

 Suite of Permits in place

 Clavos is also located 10kms from the Brigus Gold mill in Stock Township.


                                                                                      4
Path to Production


Near Term Production Plans                            Clavos Deposit
                                                      Timmins, Ontario

Q4 -2012


   New Resource Estimate
   Scoping study (PEA)

Q1- 2013

   Production Decision and Project Financing
   Dewater and Rehab. Mine
   Underground and Surface Drilling
   Start of initial production

2014 - Commercial Production



                                                                    5
Path to Production

                                                                    CLAVOS DEPOSIT
Existing Timmins Gold Projects                                       Timmins, Ontario
Clavos Property - In Good Company
   Advanced Projects
        • Lakeshore Gold
                  → Timmins Mine now in production
                  → Current resources of 1.87M oz Au

        • Goldcorp
                  → Hollinger Open Pit Scheduled for production by 3Q’12
                  → Current resources 900,000 oz Au


   Near-Term Production Potential

        •   Sage Gold (Clavos)
        •   Lakeshore Gold (Bell Creek, Vogel)
        •   St. Andrew Goldfields (Taylor)
        •   SGX Resources (Tully)
        •   Lexam - VG Gold - (Paymaster West)

                                                                                  6
Path to Production

                                                                  CLAVOS DEPOSIT
                                                                   Timmins, Ontario

Existing
Clavos



                                                                            OPEN

                                                                 OPEN
                                                                          960 Zone

                                                   Sediment
                       OPEN                        Zone



                                     4.5 KM strike length


      Ultramafic   Graphitic Argillite      Sediment Gold Zone

                                                                                   7
Path to Production

                                                   CLAVOS DEPOSIT
                                                    Timmins, Ontario
Underground Drill Core Photos
                         A-B: Photos from hole CL252-13, 63.1-
  A                      64.3m, illustrating stylolitic white quartz veining
                         with visible gold from a stylolitic quartz vein
                         system with chlorite-carbonate-pyrite altered
                         wallrock slivers that is consistent in style with
                         the en echelon vein arrays.

                         Photos A and B are close-ups of stylolitic
                         ribboned chlorite-rich bands in the system
                         partially zone shown in B, containing multiple
  B                      grains and blebs of native gold. Note
                         aggregates of pale grey Fe-carbonate in lower
                         left portion of photo B.

                         The vein system occurs adjacent to a narrow
                         grey porphyry dyke.

                         594.88 gpt Au (17.35 opt) over
                         1.2m (uncut)

                                                                               8
Path to Production


Timmins Gold Camps                  CLAVOS DEPOSIT
                                     Timmins, Ontario




                                                  9
Path to Production

                                                              CLAVOS DEPOSIT
Blue Sky Potential                                             Timmins, Ontario

 Highlights :

 Data compilation complete consisting of 150,000m of historical surface drilling
  and 40,000m of historical U/G drilling - 9000m+ (SGX) drilled in 2011-2012 –
  960 zone plus existing Clavos deposit

 3D Geological model of all mineralized zones

 Internal capital expenditure estimates

 Open at depth and along strike

 Exploration upside - new alteration zone north of the 960 zone
                        - Clavos and 960 zones untested at depth
                        - potential to more than triple the resource

                                                                                10
Path to Production

                                                         CLAVOS DEPOSIT
Strategic Partnerships                                    Timmins, Ontario



  Joint Venture Partnership completed August 2012 with St
   Andrew Goldfields (SAS) for the Clavos Deposit in Timmins

  Sage fully vested with 60% ownership in Clavos

  Existing infrastructure in place
           SAS $46 million spent for underground development
           Underground ramp access to the 300 metre level
           Existing buildings and settling ponds
           Revision to Closure plan

  New Resource estimate underway by RPA

                                                                       11
Path to Production

                                                                                                             CLAVOS DEPOSIT
Strategic Partnerships                                                                                        Timmins, Ontario


                                       2006 Resource – Mine Only

 Category                       Tonnes                    Uncut Grade                      Cut Grade                     Total Ounces

 Total M&I                     143,000                    10.27                           8.07 (60g/t)                 37,100 (cut)
                                                               47,200 (uncut)
__________________________________________________________________________
 Total Inferred                529,000                      6.70                          6.49 (60g/t)               110,300 (cut)
                                                                                                                     114,000 (uncut)
__________________________________________________________________________
 Note: The 2006 resources are estimated at a cut-off grade of 4 g/t Au, high gold assays are cut to 60g/t Au, minimal horizontal
 thickness of 1.5 metres and an average long-term gold price of US$500 per ounce was used.




                                                                                                                                       12
Path to Production


BOARD OF DIRECTORS

                        Mr. Mars is an independent consultant specializing in mine financing and analysis with over 30 years of experience in the
Patrick J. Mars         investment industry. Mr. Mars has acted as Chairman, CEO, or Director for several public-traded mining companies and is
Chairman and Director   currently Director of Aura Minerals, Carpathian Gold, Selwyn Resources and Yamana Gold.


                        Mr. Bojtos is a professional engineer with extensive experience in mineral development and production. Since 1996
Peter Bojtos            following a successful career as CEO of several companies, Mr. Bojtos serves on mining company boards as an
Director                independent Director.



                        Mr. Robertson is a Certified Financial Planner. He has worked in the financial industry for the past twenty years, and
Gary Robertson          presently serves on the board of several private companies as well as on the board of six Canadian junior gold mining
Director                companies.



Joe Baylis              Mr. Baylis brings over 23 years of domestic and international mining industry experience to the Company. Mr. Baylis
Director                graduated with an LLB from the University of Western Ontario and is a member of the Law Society of Upper Canada.




 Sandy Chim             Mr. Chim is an international business executive. He is the President and CEO of Century Iron Mines Corp. (TSX-FER), a
                        director of Augyva Mining Resources Inc. (TSX.V-AUV) and non executive director of Prosperity Minerals Holdings Limited.
 Director
                        Mr.Chim resides in Kowloon, SAR, Hong Kong, PRC.



Hua Bai                 Mr. Bai is a Beijing, China businessman. He has investment and commercial experiences covering various fields in China
Director                and Vancouver. With more than 20 years of business activities, he has established an extensive business network in
                        China. Mr.Bai is currently the President of Earnlead Investments Inc., Sino Water Holdings Inc., and has held such
                        positions since May 2011. He is a director for Century Iron Mines Corporation (TSX.V-FER).



                                                                                                                                                 13
Path to Production

MANAGEMENT and CONSULTANTS
Management
                               Mr. Lees is a founder and past director of TVX Gold Inc., a significant gold producer in North and South America,
 C. Nigel Lees                 which merged into Kinross Gold, listed on the TSX and the New York Stock Exchange. Mr. Lees has over 30 years
 President, CEO and Director   experience in the Canadian investment industry and is currently a Director of several publicly traded mining companies
                               including Yamana Gold.

                               Mr. Love is a geologist who has been involved in mineral exploration in Canada and was part of the world class Hemlo
William D. Love                discovery team. He was also an institutional equity salesperson in London, England, for a Canadian brokerage firm.
VP and Business Development    Mr. Love has spent the last fifteen years as a venture capitalist and a corporate finance specialist in a variety of
                               resource and technology companies.

Ron Reed                       Mr. Reed is a CGA with an MBA ( Finance) from the NY Institute of Technology. He has more than 20 years of senior
Chief Financial Officer        experience in implementing financial business strategies and has been involved in more than 15 acquisition and
                               divesture transactions. Since 2009 he has been providing CFO services in the mining sector.
Michael Skutezky
Secretary and Legal Counsel    Mr.Skutezky was Assistant General Counsel of Royal Bank for 25 years focused on International Project financing
                               based in Montreal and Toronto, in addition to working in Eastern Europe with Canadian Law Firms. He has recently
                               formed his own professional corporation for the practice of law and is the principal of Rhodes Capital Corporation.

Consultants
Peter Hubacheck                Mr. Peter Hubacheck is a consulting geologist and President of W. A. Hubacheck Consultants Ltd. He has over 35
                               years of experience as a project geologist, exploration manager and Qualified Person for the purposes of NI 43-101,
P.Geo, QP
                               with experience in the exploration for gold, silver, base metals, uranium and diamonds in Canada and the USA. He
                               holds a Mining Technologist (1974) diploma from the Haileybury School of Mines and Technology, Haileybury, Ontario
                               and a B.A.Sc. (Geol. Eng. 1977) degree from the South Dakota School of Mines and Technology, Rapid City, South
                               Dakota.

Bob Ritchie                    Mr. Ritchie is a Professional Engineer with over 40 years of experience in mine management and development,
                               feasibility studies and mine construction. He has worked with several mining companies including Goldcorp, Noranda
Mining Engineer
                               Mines and St. Andrew Goldfields. He was responsible for the construction of the Stock (now Brigus Gold) Mill which is
                               10 kms from the Clavos mine. Mr. Ritchie is a graduate of the Michigan Technological University with a Bachelor of
                               Science in Geology Engineering. He is also a Qualified Person (QP) as defined by NI43-101.


                               Peter de la Plante                                                    Avrom Howard
                               Abitibi 70                                                            M.Sc, FGA, P.Geo                                14
Path to Production


Why Invest in Sage Gold
   Compliant Resources
       •   Established resource to fast track production


   Near Term Production
       •   Milling Contract in process with the St. Andrews Mill to deliver ore

   Pre-production financing in place
       •   Waterton is potential production financing partner

   Low Capex / Fast Payback

   Strong potential to increase tonnage through further in-fill and exploration drilling

   Strategic acquisitions being evaluated to augment the company's resources and
    production potential

   Ideal Market Timing
      • Low market capitalization

                                                                                        15
Path to Production


Sage Exploration Properties
  Beardmore Geraldton Gold Camp

                       Joint Venture Potential

 • Properties - Onaman - Lynx Deposit, NI43-101 compliant resource
                 Paint Lake (adjacent to Brookbank Gold Deposit)
                 Jacobus (Cu/Ni),
                 Clist Lake (Au)

 • Infrastructure in place - Road, Rail, Power
 • Underexplored; Potential for large gold deposits - i.e. Red Lake
 • Option agreement - MetalCorp (70% interest) in Solomon’s Pillars

 • Ongoing negotiations with potential joint venture partners.
                                                                      16
Path to Production

Onaman                                                            LYNX DEPOSIT
                                                              Beardmore, Ontario

                                 Lynx NI43-101 Open Pit Resource 485,000
                                 tonnes 2.1 % Cu, 45.3 g Ag/T, 0.70 g Au/T
                                 at 1% Cu cut off




            Lynx NI43-101 Resource
            1.936 million tonnes, 1.44% Cu
            39.6 g Ag/T, 0.58 g Au/T

  Yellow = .5% Cu x 3 metres – Cut Off                        Red = 1% Cu x 3 metres
                                                                                       17
Path to Production



Contact Information

Sage Gold Inc.                       Investor Cubed Inc.
365 Bay Street, Suite 500            67 Yonge St., Suite 1000
Toronto, ON M5H 2V1                  Toronto, ON M5E 2J8
Tel.: 416 204-3170                   Tel.: 1-888-258-3323
Fax: 416 260-2243                    Fax: 416 363-7977
info@sagegoldinc.com                 info@investor3.ca
Mike O’Brien –                       Neil Simon
Communications Manager;
Investor Relations




                                                                18

More Related Content

What's hot

Gold Investment Symposium 2012 - Company presentation - Cerro Resources
Gold Investment Symposium 2012 - Company presentation - Cerro ResourcesGold Investment Symposium 2012 - Company presentation - Cerro Resources
Gold Investment Symposium 2012 - Company presentation - Cerro Resources
Symposium
 
49 North Resource Conference
49 North Resource Conference49 North Resource Conference
49 North Resource Conference
Lake Shore Gold
 
TD Securities Mining Conference January 24, 2012
TD Securities Mining Conference January 24, 2012TD Securities Mining Conference January 24, 2012
TD Securities Mining Conference January 24, 2012Lake Shore Gold
 
BMO Conference Presentation February 29 2012
BMO Conference Presentation February 29 2012BMO Conference Presentation February 29 2012
BMO Conference Presentation February 29 2012
Lake Shore Gold
 
Cayden Resources (TSX.V: CYD) - Brochure
Cayden Resources (TSX.V: CYD) - Brochure Cayden Resources (TSX.V: CYD) - Brochure
Cayden Resources (TSX.V: CYD) - Brochure
Viral Network Inc
 
Third quater conferance call
Third quater conferance callThird quater conferance call
Third quater conferance callLake Shore Gold
 
Alexis Minerals October 2011 (english)
Alexis Minerals October 2011 (english)Alexis Minerals October 2011 (english)
Alexis Minerals October 2011 (english)QMX Gold Corporation
 
Hawthorne Gold Corporate Presentation April 2010
Hawthorne Gold Corporate Presentation April 2010Hawthorne Gold Corporate Presentation April 2010
Hawthorne Gold Corporate Presentation April 2010
Adnet Communications
 
Oag presentation jan q1 2013
Oag presentation jan q1 2013Oag presentation jan q1 2013
Oag presentation jan q1 2013OremexSilver
 
Hawthorne Gold Corporate Presentation May 2010
Hawthorne Gold Corporate Presentation May 2010Hawthorne Gold Corporate Presentation May 2010
Hawthorne Gold Corporate Presentation May 2010Adnet Communications
 
Primero egf presentation print
Primero egf presentation printPrimero egf presentation print
Primero egf presentation printprimero_mining
 
Industrial Alliance Securities: Orocan Resource Corp.
Industrial Alliance Securities: Orocan Resource Corp.Industrial Alliance Securities: Orocan Resource Corp.
Industrial Alliance Securities: Orocan Resource Corp.
Graphite Graphite
 
Primero corporate presentation may final
Primero corporate presentation may finalPrimero corporate presentation may final
Primero corporate presentation may finalprimero_mining
 
Hawthorne Gold Corporate Presentation May 2010
Hawthorne Gold Corporate Presentation May 2010Hawthorne Gold Corporate Presentation May 2010
Hawthorne Gold Corporate Presentation May 2010Adnet Communications
 
Presentation June 2012
Presentation June 2012Presentation June 2012
Presentation June 2012OremexSilver
 
LSG Scotia Conference 2011_11_29
LSG Scotia Conference 2011_11_29LSG Scotia Conference 2011_11_29
LSG Scotia Conference 2011_11_29Lake Shore Gold
 
Primero corporate presentation january 2012 rev
Primero corporate presentation january 2012 revPrimero corporate presentation january 2012 rev
Primero corporate presentation january 2012 revprimero_mining
 

What's hot (18)

Gold Investment Symposium 2012 - Company presentation - Cerro Resources
Gold Investment Symposium 2012 - Company presentation - Cerro ResourcesGold Investment Symposium 2012 - Company presentation - Cerro Resources
Gold Investment Symposium 2012 - Company presentation - Cerro Resources
 
49 North Resource Conference
49 North Resource Conference49 North Resource Conference
49 North Resource Conference
 
TD Securities Mining Conference January 24, 2012
TD Securities Mining Conference January 24, 2012TD Securities Mining Conference January 24, 2012
TD Securities Mining Conference January 24, 2012
 
BMO Conference Presentation February 29 2012
BMO Conference Presentation February 29 2012BMO Conference Presentation February 29 2012
BMO Conference Presentation February 29 2012
 
Cayden Resources (TSX.V: CYD) - Brochure
Cayden Resources (TSX.V: CYD) - Brochure Cayden Resources (TSX.V: CYD) - Brochure
Cayden Resources (TSX.V: CYD) - Brochure
 
Third quater conferance call
Third quater conferance callThird quater conferance call
Third quater conferance call
 
Alexis Minerals October 2011 (english)
Alexis Minerals October 2011 (english)Alexis Minerals October 2011 (english)
Alexis Minerals October 2011 (english)
 
2012 Presentation
2012 Presentation2012 Presentation
2012 Presentation
 
Hawthorne Gold Corporate Presentation April 2010
Hawthorne Gold Corporate Presentation April 2010Hawthorne Gold Corporate Presentation April 2010
Hawthorne Gold Corporate Presentation April 2010
 
Oag presentation jan q1 2013
Oag presentation jan q1 2013Oag presentation jan q1 2013
Oag presentation jan q1 2013
 
Hawthorne Gold Corporate Presentation May 2010
Hawthorne Gold Corporate Presentation May 2010Hawthorne Gold Corporate Presentation May 2010
Hawthorne Gold Corporate Presentation May 2010
 
Primero egf presentation print
Primero egf presentation printPrimero egf presentation print
Primero egf presentation print
 
Industrial Alliance Securities: Orocan Resource Corp.
Industrial Alliance Securities: Orocan Resource Corp.Industrial Alliance Securities: Orocan Resource Corp.
Industrial Alliance Securities: Orocan Resource Corp.
 
Primero corporate presentation may final
Primero corporate presentation may finalPrimero corporate presentation may final
Primero corporate presentation may final
 
Hawthorne Gold Corporate Presentation May 2010
Hawthorne Gold Corporate Presentation May 2010Hawthorne Gold Corporate Presentation May 2010
Hawthorne Gold Corporate Presentation May 2010
 
Presentation June 2012
Presentation June 2012Presentation June 2012
Presentation June 2012
 
LSG Scotia Conference 2011_11_29
LSG Scotia Conference 2011_11_29LSG Scotia Conference 2011_11_29
LSG Scotia Conference 2011_11_29
 
Primero corporate presentation january 2012 rev
Primero corporate presentation january 2012 revPrimero corporate presentation january 2012 rev
Primero corporate presentation january 2012 rev
 

Viewers also liked

Chico's Investor Presentation April 2016
Chico's Investor Presentation April 2016Chico's Investor Presentation April 2016
Chico's Investor Presentation April 2016
chicosfasinvestor
 
Chico's Investor Presentation June 2016
Chico's Investor Presentation June 2016Chico's Investor Presentation June 2016
Chico's Investor Presentation June 2016
chicosfasinvestor
 
Chico's fas investor presentation 6.21.16
Chico's fas investor presentation 6.21.16Chico's fas investor presentation 6.21.16
Chico's fas investor presentation 6.21.16
chicosfasinvestor
 
Chico's FAS Investor Presentation
Chico's FAS Investor Presentation Chico's FAS Investor Presentation
Chico's FAS Investor Presentation
chicosfasinvestor
 
Nemus Investor Presentation Feb 2017
Nemus Investor Presentation Feb 2017 Nemus Investor Presentation Feb 2017
Nemus Investor Presentation Feb 2017
nemusbio
 
Investor presentation december 2013
Investor presentation   december 2013Investor presentation   december 2013
Investor presentation december 2013Intact
 
An Introduction to the Investor Advisory Service (Handout)
An Introduction to the Investor Advisory Service (Handout)An Introduction to the Investor Advisory Service (Handout)
An Introduction to the Investor Advisory Service (Handout)
Doug Gerlach
 
Trupanion Investor Presentation - August 2016
Trupanion Investor Presentation - August 2016Trupanion Investor Presentation - August 2016
Trupanion Investor Presentation - August 2016
trupanion
 
Investor relations
Investor relationsInvestor relations
Investor relations
Mithilesh Trivedi
 
Trupanion June Investor Presentation
Trupanion June Investor PresentationTrupanion June Investor Presentation
Trupanion June Investor Presentation
trupanion
 
Trupanion investor presentation - September 2016
Trupanion investor presentation - September 2016Trupanion investor presentation - September 2016
Trupanion investor presentation - September 2016
trupanion
 
Marathon Petroleum Corp. 2015 Analyst & Investor Day - Dec 3, 2015
Marathon Petroleum Corp. 2015 Analyst & Investor Day - Dec 3, 2015Marathon Petroleum Corp. 2015 Analyst & Investor Day - Dec 3, 2015
Marathon Petroleum Corp. 2015 Analyst & Investor Day - Dec 3, 2015
Marcellus Drilling News
 
The Power Of The Influencer
The Power Of The InfluencerThe Power Of The Influencer
The Power Of The Influencer
Michael Kearnon, Docs Elite
 
Venture Capital and Cleantech: The Wrong Model for Energy Innovation
Venture Capital and Cleantech: The Wrong Model for Energy InnovationVenture Capital and Cleantech: The Wrong Model for Energy Innovation
Venture Capital and Cleantech: The Wrong Model for Energy Innovation
TBJ Investments, LLC
 
Investor deck for website 5-16-14 v4
Investor deck for website 5-16-14 v4Investor deck for website 5-16-14 v4
Investor deck for website 5-16-14 v4InvestorSymantec
 
Symantec investor presentation august 2014
Symantec investor presentation august 2014Symantec investor presentation august 2014
Symantec investor presentation august 2014
InvestorSymantec
 
Direct Insite Investor Presentation 2013
Direct Insite Investor Presentation 2013 Direct Insite Investor Presentation 2013
Direct Insite Investor Presentation 2013 Company Spotlight
 
Amg investor presentation may 2012
Amg   investor presentation may 2012Amg   investor presentation may 2012
Amg investor presentation may 2012jdiluzio
 
Investor Presentation - September 2014
Investor Presentation - September 2014Investor Presentation - September 2014
Investor Presentation - September 2014
Sagegold
 

Viewers also liked (20)

Chico's Investor Presentation April 2016
Chico's Investor Presentation April 2016Chico's Investor Presentation April 2016
Chico's Investor Presentation April 2016
 
Chico's Investor Presentation June 2016
Chico's Investor Presentation June 2016Chico's Investor Presentation June 2016
Chico's Investor Presentation June 2016
 
Chico's fas investor presentation 6.21.16
Chico's fas investor presentation 6.21.16Chico's fas investor presentation 6.21.16
Chico's fas investor presentation 6.21.16
 
Chico's FAS Investor Presentation
Chico's FAS Investor Presentation Chico's FAS Investor Presentation
Chico's FAS Investor Presentation
 
Nemus Investor Presentation Feb 2017
Nemus Investor Presentation Feb 2017 Nemus Investor Presentation Feb 2017
Nemus Investor Presentation Feb 2017
 
Investor presentation december 2013
Investor presentation   december 2013Investor presentation   december 2013
Investor presentation december 2013
 
An Introduction to the Investor Advisory Service (Handout)
An Introduction to the Investor Advisory Service (Handout)An Introduction to the Investor Advisory Service (Handout)
An Introduction to the Investor Advisory Service (Handout)
 
Trupanion Investor Presentation - August 2016
Trupanion Investor Presentation - August 2016Trupanion Investor Presentation - August 2016
Trupanion Investor Presentation - August 2016
 
Investor relations
Investor relationsInvestor relations
Investor relations
 
Trupanion June Investor Presentation
Trupanion June Investor PresentationTrupanion June Investor Presentation
Trupanion June Investor Presentation
 
Investor presentation November 2013
Investor presentation November 2013Investor presentation November 2013
Investor presentation November 2013
 
Trupanion investor presentation - September 2016
Trupanion investor presentation - September 2016Trupanion investor presentation - September 2016
Trupanion investor presentation - September 2016
 
Marathon Petroleum Corp. 2015 Analyst & Investor Day - Dec 3, 2015
Marathon Petroleum Corp. 2015 Analyst & Investor Day - Dec 3, 2015Marathon Petroleum Corp. 2015 Analyst & Investor Day - Dec 3, 2015
Marathon Petroleum Corp. 2015 Analyst & Investor Day - Dec 3, 2015
 
The Power Of The Influencer
The Power Of The InfluencerThe Power Of The Influencer
The Power Of The Influencer
 
Venture Capital and Cleantech: The Wrong Model for Energy Innovation
Venture Capital and Cleantech: The Wrong Model for Energy InnovationVenture Capital and Cleantech: The Wrong Model for Energy Innovation
Venture Capital and Cleantech: The Wrong Model for Energy Innovation
 
Investor deck for website 5-16-14 v4
Investor deck for website 5-16-14 v4Investor deck for website 5-16-14 v4
Investor deck for website 5-16-14 v4
 
Symantec investor presentation august 2014
Symantec investor presentation august 2014Symantec investor presentation august 2014
Symantec investor presentation august 2014
 
Direct Insite Investor Presentation 2013
Direct Insite Investor Presentation 2013 Direct Insite Investor Presentation 2013
Direct Insite Investor Presentation 2013
 
Amg investor presentation may 2012
Amg   investor presentation may 2012Amg   investor presentation may 2012
Amg investor presentation may 2012
 
Investor Presentation - September 2014
Investor Presentation - September 2014Investor Presentation - September 2014
Investor Presentation - September 2014
 

Similar to Investor Presentation September 2012

Investor Presentation Aug-Sept 2012
Investor Presentation Aug-Sept 2012Investor Presentation Aug-Sept 2012
Investor Presentation Aug-Sept 2012Sagegold
 
Investor Presentation August 2011
Investor Presentation August 2011Investor Presentation August 2011
Investor Presentation August 2011Sagegold
 
Sage february 2012.v5_ppt
Sage february 2012.v5_pptSage february 2012.v5_ppt
Sage february 2012.v5_pptSagegold
 
Denver Gold Forum
Denver Gold ForumDenver Gold Forum
Denver Gold Forum
Lake Shore Gold
 
Annual & Special meeting
Annual & Special meetingAnnual & Special meeting
Annual & Special meeting
Lake Shore Gold
 
Marketing Presentation
Marketing PresentationMarketing Presentation
Marketing Presentation
Lake Shore Gold
 
Miranda Gold's Willow Creek Project
Miranda Gold's Willow Creek ProjectMiranda Gold's Willow Creek Project
Miranda Gold's Willow Creek Project
Adnet Communications
 
U.S. Silver and Gold Corporate Presentation - August 2012
U.S. Silver and Gold Corporate Presentation - August 2012U.S. Silver and Gold Corporate Presentation - August 2012
U.S. Silver and Gold Corporate Presentation - August 2012ussilver
 
Bank of America Merrill Lynch Canada Mining Conference
Bank of America Merrill Lynch Canada Mining ConferenceBank of America Merrill Lynch Canada Mining Conference
Bank of America Merrill Lynch Canada Mining Conference
Lake Shore Gold
 
Ximen Mining reveals striking drill core observations ahead of assays
Ximen Mining reveals striking drill core observations ahead of assaysXimen Mining reveals striking drill core observations ahead of assays
Ximen Mining reveals striking drill core observations ahead of assays
Stephan Bogner
 
Investor Presentation February 2012
Investor Presentation February 2012Investor Presentation February 2012
Investor Presentation February 2012Crocodile Gold
 
Seafield Resources Ltd - June 2012
Seafield Resources Ltd - June 2012Seafield Resources Ltd - June 2012
Seafield Resources Ltd - June 2012
sffresources
 
Cortona Resources- Resources & Energy Symposium 2012
Cortona Resources- Resources & Energy Symposium 2012Cortona Resources- Resources & Energy Symposium 2012
Cortona Resources- Resources & Energy Symposium 2012Symposium
 
Presentation: Taseko Mines (April 2011)
Presentation: Taseko Mines (April 2011)Presentation: Taseko Mines (April 2011)
Presentation: Taseko Mines (April 2011)
Rocky Mountain Rare Metal Belt
 
Third Quater 10 November 2011 Conferance Call
Third Quater 10 November 2011 Conferance CallThird Quater 10 November 2011 Conferance Call
Third Quater 10 November 2011 Conferance CallLake Shore Gold
 
Denver Gold Forum presentation
Denver Gold Forum presentationDenver Gold Forum presentation
Denver Gold Forum presentation
Lake Shore Gold
 
Crocodile Gold November 2011
Crocodile Gold November 2011Crocodile Gold November 2011
Crocodile Gold November 2011Crocodile Gold
 
Investor Presentation | Niuminco Group (ASX:NIU) | Gold Investment Symposium ...
Investor Presentation | Niuminco Group (ASX:NIU) | Gold Investment Symposium ...Investor Presentation | Niuminco Group (ASX:NIU) | Gold Investment Symposium ...
Investor Presentation | Niuminco Group (ASX:NIU) | Gold Investment Symposium ...
Symposium
 
Scotia Capital Mining Conference November 29, 2011
Scotia Capital Mining Conference November 29, 2011Scotia Capital Mining Conference November 29, 2011
Scotia Capital Mining Conference November 29, 2011Lake Shore Gold
 
Lsg scotiaconference 2011_11_29
Lsg scotiaconference 2011_11_29Lsg scotiaconference 2011_11_29
Lsg scotiaconference 2011_11_29Lake Shore Gold
 

Similar to Investor Presentation September 2012 (20)

Investor Presentation Aug-Sept 2012
Investor Presentation Aug-Sept 2012Investor Presentation Aug-Sept 2012
Investor Presentation Aug-Sept 2012
 
Investor Presentation August 2011
Investor Presentation August 2011Investor Presentation August 2011
Investor Presentation August 2011
 
Sage february 2012.v5_ppt
Sage february 2012.v5_pptSage february 2012.v5_ppt
Sage february 2012.v5_ppt
 
Denver Gold Forum
Denver Gold ForumDenver Gold Forum
Denver Gold Forum
 
Annual & Special meeting
Annual & Special meetingAnnual & Special meeting
Annual & Special meeting
 
Marketing Presentation
Marketing PresentationMarketing Presentation
Marketing Presentation
 
Miranda Gold's Willow Creek Project
Miranda Gold's Willow Creek ProjectMiranda Gold's Willow Creek Project
Miranda Gold's Willow Creek Project
 
U.S. Silver and Gold Corporate Presentation - August 2012
U.S. Silver and Gold Corporate Presentation - August 2012U.S. Silver and Gold Corporate Presentation - August 2012
U.S. Silver and Gold Corporate Presentation - August 2012
 
Bank of America Merrill Lynch Canada Mining Conference
Bank of America Merrill Lynch Canada Mining ConferenceBank of America Merrill Lynch Canada Mining Conference
Bank of America Merrill Lynch Canada Mining Conference
 
Ximen Mining reveals striking drill core observations ahead of assays
Ximen Mining reveals striking drill core observations ahead of assaysXimen Mining reveals striking drill core observations ahead of assays
Ximen Mining reveals striking drill core observations ahead of assays
 
Investor Presentation February 2012
Investor Presentation February 2012Investor Presentation February 2012
Investor Presentation February 2012
 
Seafield Resources Ltd - June 2012
Seafield Resources Ltd - June 2012Seafield Resources Ltd - June 2012
Seafield Resources Ltd - June 2012
 
Cortona Resources- Resources & Energy Symposium 2012
Cortona Resources- Resources & Energy Symposium 2012Cortona Resources- Resources & Energy Symposium 2012
Cortona Resources- Resources & Energy Symposium 2012
 
Presentation: Taseko Mines (April 2011)
Presentation: Taseko Mines (April 2011)Presentation: Taseko Mines (April 2011)
Presentation: Taseko Mines (April 2011)
 
Third Quater 10 November 2011 Conferance Call
Third Quater 10 November 2011 Conferance CallThird Quater 10 November 2011 Conferance Call
Third Quater 10 November 2011 Conferance Call
 
Denver Gold Forum presentation
Denver Gold Forum presentationDenver Gold Forum presentation
Denver Gold Forum presentation
 
Crocodile Gold November 2011
Crocodile Gold November 2011Crocodile Gold November 2011
Crocodile Gold November 2011
 
Investor Presentation | Niuminco Group (ASX:NIU) | Gold Investment Symposium ...
Investor Presentation | Niuminco Group (ASX:NIU) | Gold Investment Symposium ...Investor Presentation | Niuminco Group (ASX:NIU) | Gold Investment Symposium ...
Investor Presentation | Niuminco Group (ASX:NIU) | Gold Investment Symposium ...
 
Scotia Capital Mining Conference November 29, 2011
Scotia Capital Mining Conference November 29, 2011Scotia Capital Mining Conference November 29, 2011
Scotia Capital Mining Conference November 29, 2011
 
Lsg scotiaconference 2011_11_29
Lsg scotiaconference 2011_11_29Lsg scotiaconference 2011_11_29
Lsg scotiaconference 2011_11_29
 

More from Sagegold

Sage corporate presentation june 2016
Sage corporate presentation   june 2016Sage corporate presentation   june 2016
Sage corporate presentation june 2016
Sagegold
 
Sage corporate presentation june 2016
Sage corporate presentation   june 2016Sage corporate presentation   june 2016
Sage corporate presentation june 2016
Sagegold
 
Sage corporate presentation march 2016
Sage corporate presentation   march 2016Sage corporate presentation   march 2016
Sage corporate presentation march 2016
Sagegold
 
Sage corporate presentation 18 nov2015 (3)
Sage corporate presentation   18 nov2015 (3)Sage corporate presentation   18 nov2015 (3)
Sage corporate presentation 18 nov2015 (3)
Sagegold
 
Corporate Presentation - October 2015
Corporate Presentation - October 2015Corporate Presentation - October 2015
Corporate Presentation - October 2015
Sagegold
 
Sage Presentation August 2015
Sage Presentation August 2015Sage Presentation August 2015
Sage Presentation August 2015
Sagegold
 
Investor Presentation March 2015
Investor Presentation March 2015Investor Presentation March 2015
Investor Presentation March 2015
Sagegold
 
Investor Presentation February 2015
Investor Presentation February 2015Investor Presentation February 2015
Investor Presentation February 2015
Sagegold
 
Investor Presentation October 2014
Investor Presentation October 2014Investor Presentation October 2014
Investor Presentation October 2014
Sagegold
 
Sage May 2014 investor presentation
Sage May 2014 investor presentationSage May 2014 investor presentation
Sage May 2014 investor presentationSagegold
 
Sage march 2014 investor presentation
Sage march 2014 investor presentationSage march 2014 investor presentation
Sage march 2014 investor presentationSagegold
 
Sage feb 2014 investor presentation
Sage feb 2014 investor presentationSage feb 2014 investor presentation
Sage feb 2014 investor presentationSagegold
 
Investor Presentation August 2013
Investor Presentation August 2013Investor Presentation August 2013
Investor Presentation August 2013
Sagegold
 
Sage june 2013__investor_presentation
Sage june 2013__investor_presentationSage june 2013__investor_presentation
Sage june 2013__investor_presentationSagegold
 
Sage april 2013__investor_presentation
Sage april 2013__investor_presentationSage april 2013__investor_presentation
Sage april 2013__investor_presentationSagegold
 
Sage march 2013 investor presentation current
Sage march 2013 investor presentation currentSage march 2013 investor presentation current
Sage march 2013 investor presentation currentSagegold
 
Investor Presentation May 2011
Investor Presentation May 2011Investor Presentation May 2011
Investor Presentation May 2011Sagegold
 
SageGold March 2011
SageGold March 2011SageGold March 2011
SageGold March 2011Sagegold
 
Sage march 2011_current
Sage march 2011_currentSage march 2011_current
Sage march 2011_currentSagegold
 

More from Sagegold (19)

Sage corporate presentation june 2016
Sage corporate presentation   june 2016Sage corporate presentation   june 2016
Sage corporate presentation june 2016
 
Sage corporate presentation june 2016
Sage corporate presentation   june 2016Sage corporate presentation   june 2016
Sage corporate presentation june 2016
 
Sage corporate presentation march 2016
Sage corporate presentation   march 2016Sage corporate presentation   march 2016
Sage corporate presentation march 2016
 
Sage corporate presentation 18 nov2015 (3)
Sage corporate presentation   18 nov2015 (3)Sage corporate presentation   18 nov2015 (3)
Sage corporate presentation 18 nov2015 (3)
 
Corporate Presentation - October 2015
Corporate Presentation - October 2015Corporate Presentation - October 2015
Corporate Presentation - October 2015
 
Sage Presentation August 2015
Sage Presentation August 2015Sage Presentation August 2015
Sage Presentation August 2015
 
Investor Presentation March 2015
Investor Presentation March 2015Investor Presentation March 2015
Investor Presentation March 2015
 
Investor Presentation February 2015
Investor Presentation February 2015Investor Presentation February 2015
Investor Presentation February 2015
 
Investor Presentation October 2014
Investor Presentation October 2014Investor Presentation October 2014
Investor Presentation October 2014
 
Sage May 2014 investor presentation
Sage May 2014 investor presentationSage May 2014 investor presentation
Sage May 2014 investor presentation
 
Sage march 2014 investor presentation
Sage march 2014 investor presentationSage march 2014 investor presentation
Sage march 2014 investor presentation
 
Sage feb 2014 investor presentation
Sage feb 2014 investor presentationSage feb 2014 investor presentation
Sage feb 2014 investor presentation
 
Investor Presentation August 2013
Investor Presentation August 2013Investor Presentation August 2013
Investor Presentation August 2013
 
Sage june 2013__investor_presentation
Sage june 2013__investor_presentationSage june 2013__investor_presentation
Sage june 2013__investor_presentation
 
Sage april 2013__investor_presentation
Sage april 2013__investor_presentationSage april 2013__investor_presentation
Sage april 2013__investor_presentation
 
Sage march 2013 investor presentation current
Sage march 2013 investor presentation currentSage march 2013 investor presentation current
Sage march 2013 investor presentation current
 
Investor Presentation May 2011
Investor Presentation May 2011Investor Presentation May 2011
Investor Presentation May 2011
 
SageGold March 2011
SageGold March 2011SageGold March 2011
SageGold March 2011
 
Sage march 2011_current
Sage march 2011_currentSage march 2011_current
Sage march 2011_current
 

Investor Presentation September 2012

  • 1. Path to Production Near- Term Production Timmins, Ontario TSX-V : SGX Aug-Sept 2012 September 2012
  • 2. Path to Production Forward Looking Statements Statements made in this presentation, other than those concerning historical information, should be considered forward-looking statements which are subject to various risks and uncertainties. Such forward-looking statements are made based on management’s belief as well as assumptions made by, and information currently available to, management. The Company’s actual results may differ materially from the results anticipated in such forward-looking statements as a result of a variety of factors. Additional information concerning factors that could cause actual results to materially differ from those in such forward-looking statements is contained in the Company’s filings with the securities and regulatory authorities. Note: All currencies are in Canadian dollars unless otherwise noted 1
  • 3. Path to Production CORPORATE VISION Sage Gold’s short term plans are to develop production on their existing resource to generate cash flow to fund further exploration and potentially develop a leading gold mining company in a world class mining camp. CORPORATE STRUCTURE • Shares O/S: 83.4 million • Shares F/D: 116.2 million • Current price: $0.09 • 52 week high/low: $0.21/$0.045 • Market Cap: C$ 7.5 million • Average Strike Price of Warrants/Options: $0.31 • Proceeds from Warrants/Options: $10.1 million Exchange Symbol: TSX.V – SGX OTC – SGGDF (USA) 2
  • 4. Path to Production Sage Gold Advantage 1. Near Term Production – Clavos Deposit • Sage Gold has access to SAS’s mill in the area and is able to move into production quickly and cost effectively - will generate strong cash flow for the company 2. Blue Sky Potential – Clavos Deposit  Open at depth and on multiple directions along strike  Management will focus on continuing to increase resources 3. Pre-production Financing in Place  $1.5M debt facility with Waterton Global Value L.P  Right of first refusal on Production financing 4. Strong Strategic Partnerships  Clavos Property - Sage and St Andrew Goldfields JV partners (60%-40%)  Providing low cost access to mine and mill  Established infrastructure with $46 million spent on underground development 5. Experienced Management Team 6. New NI43-101 Resource Estimate and PEA in Q4 2012 3
  • 5. Path to Production Clavos Deposit - Highlights  Located in the prolific Timmins Mining camp and close geographically (20kms) to Goldcorp’s (TSX-G) high grade Hoyle Pond mine which has produced more than 2.4 M ozs since 1985 and is still in operation.  Existing infrastructure in place including underground ramp access to the 300m level, underground levels developed every 25m, power to site, surface ventilation system, water management system.  Prior gold resource for Clavos reported by SAS in October 2006. The resource was calculated by Roscoe Postle & Associates (RPA) and comprises 37,000 gold ozs, 143,000 tons @ 8.07 g/t Au in M&I and 110,300 gold ozs.; 529,000 tons @ 6.5 g/t Au in Inferred ( assays cut to 60g/t)  Suite of Permits in place  Clavos is also located 10kms from the Brigus Gold mill in Stock Township. 4
  • 6. Path to Production Near Term Production Plans Clavos Deposit Timmins, Ontario Q4 -2012  New Resource Estimate  Scoping study (PEA) Q1- 2013  Production Decision and Project Financing  Dewater and Rehab. Mine  Underground and Surface Drilling  Start of initial production 2014 - Commercial Production 5
  • 7. Path to Production CLAVOS DEPOSIT Existing Timmins Gold Projects Timmins, Ontario Clavos Property - In Good Company Advanced Projects • Lakeshore Gold → Timmins Mine now in production → Current resources of 1.87M oz Au • Goldcorp → Hollinger Open Pit Scheduled for production by 3Q’12 → Current resources 900,000 oz Au Near-Term Production Potential • Sage Gold (Clavos) • Lakeshore Gold (Bell Creek, Vogel) • St. Andrew Goldfields (Taylor) • SGX Resources (Tully) • Lexam - VG Gold - (Paymaster West) 6
  • 8. Path to Production CLAVOS DEPOSIT Timmins, Ontario Existing Clavos OPEN OPEN 960 Zone Sediment OPEN Zone  4.5 KM strike length Ultramafic Graphitic Argillite Sediment Gold Zone 7
  • 9. Path to Production CLAVOS DEPOSIT Timmins, Ontario Underground Drill Core Photos A-B: Photos from hole CL252-13, 63.1- A 64.3m, illustrating stylolitic white quartz veining with visible gold from a stylolitic quartz vein system with chlorite-carbonate-pyrite altered wallrock slivers that is consistent in style with the en echelon vein arrays. Photos A and B are close-ups of stylolitic ribboned chlorite-rich bands in the system partially zone shown in B, containing multiple B grains and blebs of native gold. Note aggregates of pale grey Fe-carbonate in lower left portion of photo B. The vein system occurs adjacent to a narrow grey porphyry dyke. 594.88 gpt Au (17.35 opt) over 1.2m (uncut) 8
  • 10. Path to Production Timmins Gold Camps CLAVOS DEPOSIT Timmins, Ontario 9
  • 11. Path to Production CLAVOS DEPOSIT Blue Sky Potential Timmins, Ontario Highlights :  Data compilation complete consisting of 150,000m of historical surface drilling and 40,000m of historical U/G drilling - 9000m+ (SGX) drilled in 2011-2012 – 960 zone plus existing Clavos deposit  3D Geological model of all mineralized zones  Internal capital expenditure estimates  Open at depth and along strike  Exploration upside - new alteration zone north of the 960 zone - Clavos and 960 zones untested at depth - potential to more than triple the resource 10
  • 12. Path to Production CLAVOS DEPOSIT Strategic Partnerships Timmins, Ontario  Joint Venture Partnership completed August 2012 with St Andrew Goldfields (SAS) for the Clavos Deposit in Timmins  Sage fully vested with 60% ownership in Clavos  Existing infrastructure in place  SAS $46 million spent for underground development  Underground ramp access to the 300 metre level  Existing buildings and settling ponds  Revision to Closure plan  New Resource estimate underway by RPA 11
  • 13. Path to Production CLAVOS DEPOSIT Strategic Partnerships Timmins, Ontario 2006 Resource – Mine Only Category Tonnes Uncut Grade Cut Grade Total Ounces Total M&I 143,000 10.27 8.07 (60g/t) 37,100 (cut) 47,200 (uncut) __________________________________________________________________________ Total Inferred 529,000 6.70 6.49 (60g/t) 110,300 (cut) 114,000 (uncut) __________________________________________________________________________ Note: The 2006 resources are estimated at a cut-off grade of 4 g/t Au, high gold assays are cut to 60g/t Au, minimal horizontal thickness of 1.5 metres and an average long-term gold price of US$500 per ounce was used. 12
  • 14. Path to Production BOARD OF DIRECTORS Mr. Mars is an independent consultant specializing in mine financing and analysis with over 30 years of experience in the Patrick J. Mars investment industry. Mr. Mars has acted as Chairman, CEO, or Director for several public-traded mining companies and is Chairman and Director currently Director of Aura Minerals, Carpathian Gold, Selwyn Resources and Yamana Gold. Mr. Bojtos is a professional engineer with extensive experience in mineral development and production. Since 1996 Peter Bojtos following a successful career as CEO of several companies, Mr. Bojtos serves on mining company boards as an Director independent Director. Mr. Robertson is a Certified Financial Planner. He has worked in the financial industry for the past twenty years, and Gary Robertson presently serves on the board of several private companies as well as on the board of six Canadian junior gold mining Director companies. Joe Baylis Mr. Baylis brings over 23 years of domestic and international mining industry experience to the Company. Mr. Baylis Director graduated with an LLB from the University of Western Ontario and is a member of the Law Society of Upper Canada. Sandy Chim Mr. Chim is an international business executive. He is the President and CEO of Century Iron Mines Corp. (TSX-FER), a director of Augyva Mining Resources Inc. (TSX.V-AUV) and non executive director of Prosperity Minerals Holdings Limited. Director Mr.Chim resides in Kowloon, SAR, Hong Kong, PRC. Hua Bai Mr. Bai is a Beijing, China businessman. He has investment and commercial experiences covering various fields in China Director and Vancouver. With more than 20 years of business activities, he has established an extensive business network in China. Mr.Bai is currently the President of Earnlead Investments Inc., Sino Water Holdings Inc., and has held such positions since May 2011. He is a director for Century Iron Mines Corporation (TSX.V-FER). 13
  • 15. Path to Production MANAGEMENT and CONSULTANTS Management Mr. Lees is a founder and past director of TVX Gold Inc., a significant gold producer in North and South America, C. Nigel Lees which merged into Kinross Gold, listed on the TSX and the New York Stock Exchange. Mr. Lees has over 30 years President, CEO and Director experience in the Canadian investment industry and is currently a Director of several publicly traded mining companies including Yamana Gold. Mr. Love is a geologist who has been involved in mineral exploration in Canada and was part of the world class Hemlo William D. Love discovery team. He was also an institutional equity salesperson in London, England, for a Canadian brokerage firm. VP and Business Development Mr. Love has spent the last fifteen years as a venture capitalist and a corporate finance specialist in a variety of resource and technology companies. Ron Reed Mr. Reed is a CGA with an MBA ( Finance) from the NY Institute of Technology. He has more than 20 years of senior Chief Financial Officer experience in implementing financial business strategies and has been involved in more than 15 acquisition and divesture transactions. Since 2009 he has been providing CFO services in the mining sector. Michael Skutezky Secretary and Legal Counsel Mr.Skutezky was Assistant General Counsel of Royal Bank for 25 years focused on International Project financing based in Montreal and Toronto, in addition to working in Eastern Europe with Canadian Law Firms. He has recently formed his own professional corporation for the practice of law and is the principal of Rhodes Capital Corporation. Consultants Peter Hubacheck Mr. Peter Hubacheck is a consulting geologist and President of W. A. Hubacheck Consultants Ltd. He has over 35 years of experience as a project geologist, exploration manager and Qualified Person for the purposes of NI 43-101, P.Geo, QP with experience in the exploration for gold, silver, base metals, uranium and diamonds in Canada and the USA. He holds a Mining Technologist (1974) diploma from the Haileybury School of Mines and Technology, Haileybury, Ontario and a B.A.Sc. (Geol. Eng. 1977) degree from the South Dakota School of Mines and Technology, Rapid City, South Dakota. Bob Ritchie Mr. Ritchie is a Professional Engineer with over 40 years of experience in mine management and development, feasibility studies and mine construction. He has worked with several mining companies including Goldcorp, Noranda Mining Engineer Mines and St. Andrew Goldfields. He was responsible for the construction of the Stock (now Brigus Gold) Mill which is 10 kms from the Clavos mine. Mr. Ritchie is a graduate of the Michigan Technological University with a Bachelor of Science in Geology Engineering. He is also a Qualified Person (QP) as defined by NI43-101. Peter de la Plante Avrom Howard Abitibi 70 M.Sc, FGA, P.Geo 14
  • 16. Path to Production Why Invest in Sage Gold  Compliant Resources • Established resource to fast track production  Near Term Production • Milling Contract in process with the St. Andrews Mill to deliver ore  Pre-production financing in place • Waterton is potential production financing partner  Low Capex / Fast Payback  Strong potential to increase tonnage through further in-fill and exploration drilling  Strategic acquisitions being evaluated to augment the company's resources and production potential  Ideal Market Timing • Low market capitalization 15
  • 17. Path to Production Sage Exploration Properties Beardmore Geraldton Gold Camp Joint Venture Potential • Properties - Onaman - Lynx Deposit, NI43-101 compliant resource Paint Lake (adjacent to Brookbank Gold Deposit) Jacobus (Cu/Ni), Clist Lake (Au) • Infrastructure in place - Road, Rail, Power • Underexplored; Potential for large gold deposits - i.e. Red Lake • Option agreement - MetalCorp (70% interest) in Solomon’s Pillars • Ongoing negotiations with potential joint venture partners. 16
  • 18. Path to Production Onaman LYNX DEPOSIT Beardmore, Ontario Lynx NI43-101 Open Pit Resource 485,000 tonnes 2.1 % Cu, 45.3 g Ag/T, 0.70 g Au/T at 1% Cu cut off Lynx NI43-101 Resource 1.936 million tonnes, 1.44% Cu 39.6 g Ag/T, 0.58 g Au/T Yellow = .5% Cu x 3 metres – Cut Off Red = 1% Cu x 3 metres 17
  • 19. Path to Production Contact Information Sage Gold Inc. Investor Cubed Inc. 365 Bay Street, Suite 500 67 Yonge St., Suite 1000 Toronto, ON M5H 2V1 Toronto, ON M5E 2J8 Tel.: 416 204-3170 Tel.: 1-888-258-3323 Fax: 416 260-2243 Fax: 416 363-7977 info@sagegoldinc.com info@investor3.ca Mike O’Brien – Neil Simon Communications Manager; Investor Relations 18