Copper North Mining - Corporate Presentation - October 22, 2015coppernorthmining
Copper North Mining Corp. (TSX.V:COL) is a Canadian mining exploration and development company, spun out from Western Copper Corporation (TSX:WRN) in October 2011. Copper North's key asset is the Carmacks Copper Project, located in the Yukon Territory, Canada. Carmacks is permitted for construction and will produce 30 million pounds of cathode copper per year. The project is being re-engineered as a copper-gold-silver leach operation. A Preliminary Economic Assessment was completed in May 2014 and indicates that the addition of gold and silver recovery provides a positive improvement in project economics. A second phase of engineering work is in progress to evaluate opportunities to further improve operations and reduce capital and operating costs. The company intends to resume exploration of the Carmacks deposits to increase mineral resources for inclusion in the mine plan, and expansion of mine life.
The Company has also recently acquired the Thor property, immediately south of the Kemess Mine in north central British Columbia. Thor provides Copper North with an attractive exploration and discovery opportunity adjacent a major dormant mine-mill complex. An exploration program, including drilling of porphyry copper-gold targets, is planned for summer 2015.
Copper North also holds the high-grade Redstone property located in the Northwest Territories, Canada.
Copper North Mining - Corporate Presentation - October 22, 2015coppernorthmining
Copper North Mining Corp. (TSX.V:COL) is a Canadian mining exploration and development company, spun out from Western Copper Corporation (TSX:WRN) in October 2011. Copper North's key asset is the Carmacks Copper Project, located in the Yukon Territory, Canada. Carmacks is permitted for construction and will produce 30 million pounds of cathode copper per year. The project is being re-engineered as a copper-gold-silver leach operation. A Preliminary Economic Assessment was completed in May 2014 and indicates that the addition of gold and silver recovery provides a positive improvement in project economics. A second phase of engineering work is in progress to evaluate opportunities to further improve operations and reduce capital and operating costs. The company intends to resume exploration of the Carmacks deposits to increase mineral resources for inclusion in the mine plan, and expansion of mine life.
The Company has also recently acquired the Thor property, immediately south of the Kemess Mine in north central British Columbia. Thor provides Copper North with an attractive exploration and discovery opportunity adjacent a major dormant mine-mill complex. An exploration program, including drilling of porphyry copper-gold targets, is planned for summer 2015.
Copper North also holds the high-grade Redstone property located in the Northwest Territories, Canada.
Speaker: Patsy Cane, Visitor Services Manager, Museum of East Anglian Life
This session is for anyone who needs to achieve great marketing delivery on a
shoestring budget. Hear how the Museum of East Anglian Life has increased its visitor
numbers and successfully engaged with new audiences – and all on the tiniest
of budgets.
Speaker: Led by Penny Mills, Director of Client Services, Audiences London - So you’ve got them hooked - now how do you keep relationships with visitors going? Join us to discover how cultural organisations have deepened relationships with a wide range of visitors, through ambassador programmes, membership schemes,
events, interpretation and more.
Speakers: Alistair Raphael, Head of Arts, Royal Parks in Conversation with Helen Ball, Head of Engagement Services, Audiences London - How do you include young people’s voices in a large scale event? This session looks in
detail at the lessons from FUSE, The Royal Parks’ multi-art form festival in Kensington
Gardens last summer. FUSE was co-programmed with a panel of 12 young people
aged between 13-21 years. This session will describe the learning from the project
and cover broader principles behind engaging and maintaining relationships with
young people.
Protecting Open Innovation with the Defensive Patent LicenseOSCON Byrum
The Defensive Patent License (DPL) is a new legal mechanism to protect innovators by creating a patent network that is committed to defense and "de-weaponizing" patents. It draws from the theories and values of F/OSS licensing to create obligations that "travel with the patent"--preventing troll from taking over open technologies and pulling them out of the public domain.
How to use twitter to grow your businessAndrea Vahl
Are you having trouble understanding how you should be using Twitter for your business? Do you need a solid base of Twitter knowledge so you can lay out your marketing strategy? Find out how and get my e-book: www.andreavahl.com/twitterbook
Southern Gold | ASX:SAU | RIS2014 Broken Hill Investor PresentationSymposium
Southern Gold ASX:SAU - Investor presentation delivered at the 4th annual Resources Investment Symposium held in Broken Hill NSW Australia, 26-28 May 2014.
During the 3 days of October 24-26, 2013, Rambler Metals and Mining conducted an investor road show to present the company to financial professionals and professional investors in Toronto and Montreal. Here is one of those presentations, made by CEO George Ogilvie during a lunch held in Montreal on Friday, October 26.
Discover the innovative and creative projects that highlight my journey throu...dylandmeas
Discover the innovative and creative projects that highlight my journey through Full Sail University. Below, you’ll find a collection of my work showcasing my skills and expertise in digital marketing, event planning, and media production.
Unveiling the Secrets How Does Generative AI Work.pdfSam H
At its core, generative artificial intelligence relies on the concept of generative models, which serve as engines that churn out entirely new data resembling their training data. It is like a sculptor who has studied so many forms found in nature and then uses this knowledge to create sculptures from his imagination that have never been seen before anywhere else. If taken to cyberspace, gans work almost the same way.
Falcon stands out as a top-tier P2P Invoice Discounting platform in India, bridging esteemed blue-chip companies and eager investors. Our goal is to transform the investment landscape in India by establishing a comprehensive destination for borrowers and investors with diverse profiles and needs, all while minimizing risk. What sets Falcon apart is the elimination of intermediaries such as commercial banks and depository institutions, allowing investors to enjoy higher yields.
Premium MEAN Stack Development Solutions for Modern BusinessesSynapseIndia
Stay ahead of the curve with our premium MEAN Stack Development Solutions. Our expert developers utilize MongoDB, Express.js, AngularJS, and Node.js to create modern and responsive web applications. Trust us for cutting-edge solutions that drive your business growth and success.
Know more: https://www.synapseindia.com/technology/mean-stack-development-company.html
India Orthopedic Devices Market: Unlocking Growth Secrets, Trends and Develop...Kumar Satyam
According to TechSci Research report, “India Orthopedic Devices Market -Industry Size, Share, Trends, Competition Forecast & Opportunities, 2030”, the India Orthopedic Devices Market stood at USD 1,280.54 Million in 2024 and is anticipated to grow with a CAGR of 7.84% in the forecast period, 2026-2030F. The India Orthopedic Devices Market is being driven by several factors. The most prominent ones include an increase in the elderly population, who are more prone to orthopedic conditions such as osteoporosis and arthritis. Moreover, the rise in sports injuries and road accidents are also contributing to the demand for orthopedic devices. Advances in technology and the introduction of innovative implants and prosthetics have further propelled the market growth. Additionally, government initiatives aimed at improving healthcare infrastructure and the increasing prevalence of lifestyle diseases have led to an upward trend in orthopedic surgeries, thereby fueling the market demand for these devices.
Accpac to QuickBooks Conversion Navigating the Transition with Online Account...PaulBryant58
This article provides a comprehensive guide on how to
effectively manage the convert Accpac to QuickBooks , with a particular focus on utilizing online accounting services to streamline the process.
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...BBPMedia1
Grote partijen zijn al een tijdje onderweg met retail media. Ondertussen worden in dit domein ook de kansen zichtbaar voor andere spelers in de markt. Maar met die kansen ontstaan ook vragen: Zelf retail media worden of erop adverteren? In welke fase van de funnel past het en hoe integreer je het in een mediaplan? Wat is nu precies het verschil met marketplaces en Programmatic ads? In dit half uur beslechten we de dilemma's en krijg je antwoorden op wanneer het voor jou tijd is om de volgende stap te zetten.
Improving profitability for small businessBen Wann
In this comprehensive presentation, we will explore strategies and practical tips for enhancing profitability in small businesses. Tailored to meet the unique challenges faced by small enterprises, this session covers various aspects that directly impact the bottom line. Attendees will learn how to optimize operational efficiency, manage expenses, and increase revenue through innovative marketing and customer engagement techniques.
What are the main advantages of using HR recruiter services.pdfHumanResourceDimensi1
HR recruiter services offer top talents to companies according to their specific needs. They handle all recruitment tasks from job posting to onboarding and help companies concentrate on their business growth. With their expertise and years of experience, they streamline the hiring process and save time and resources for the company.
Affordable Stationery Printing Services in Jaipur | Navpack n PrintNavpack & Print
Looking for professional printing services in Jaipur? Navpack n Print offers high-quality and affordable stationery printing for all your business needs. Stand out with custom stationery designs and fast turnaround times. Contact us today for a quote!
Enterprise Excellence is Inclusive Excellence.pdfKaiNexus
Enterprise excellence and inclusive excellence are closely linked, and real-world challenges have shown that both are essential to the success of any organization. To achieve enterprise excellence, organizations must focus on improving their operations and processes while creating an inclusive environment that engages everyone. In this interactive session, the facilitator will highlight commonly established business practices and how they limit our ability to engage everyone every day. More importantly, though, participants will likely gain increased awareness of what we can do differently to maximize enterprise excellence through deliberate inclusion.
What is Enterprise Excellence?
Enterprise Excellence is a holistic approach that's aimed at achieving world-class performance across all aspects of the organization.
What might I learn?
A way to engage all in creating Inclusive Excellence. Lessons from the US military and their parallels to the story of Harry Potter. How belt systems and CI teams can destroy inclusive practices. How leadership language invites people to the party. There are three things leaders can do to engage everyone every day: maximizing psychological safety to create environments where folks learn, contribute, and challenge the status quo.
Who might benefit? Anyone and everyone leading folks from the shop floor to top floor.
Dr. William Harvey is a seasoned Operations Leader with extensive experience in chemical processing, manufacturing, and operations management. At Michelman, he currently oversees multiple sites, leading teams in strategic planning and coaching/practicing continuous improvement. William is set to start his eighth year of teaching at the University of Cincinnati where he teaches marketing, finance, and management. William holds various certifications in change management, quality, leadership, operational excellence, team building, and DiSC, among others.
1. Lake Shore Gold Corp.
TSX & NYSE MKT : LSG
www.lsgold.com
Approaching A Major
Turning Point
July 2013
2. 2
Information included in this presentation relating to the Company's expected production levels, production growth, costs, cash flows, economic
returns, exploration activities, potential for increasing resources, project expenditures and business plans are "forward-looking statements" or
"forward-looking information" within the meaning of certain securities laws, including under the provisions of Canadian provincial securities laws
and under the United States Private Securities Litigation Reform Act of 1995 and are referred to herein as "forward-looking statements." The
Company does not intend, and does not assume any obligation, to update these forward-looking statements. These forward-looking statements
represent management's best judgment based on current facts and assumptions that management considers reasonable, including that operating
and capital plans will not be disrupted by issues such as mechanical failure, unavailability of parts, labour disturbances, interruption in
transportation or utilities, or adverse weather conditions, that there are no material unanticipated variations in budgeted costs, that contractors will
complete projects according to schedule, and that actual mineralization on properties will be consistent with models and will not be less than
identified mineral reserves. The Company makes no representation that reasonable business people in possession of the same information would
reach the same conclusions. Forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause the
actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements
expressed or implied by the forward-looking statements. In particular, delays in development or mining and fluctuations in the price of gold or in
currency markets could prevent the Company from achieving its targets. Readers should not place undue reliance on forward-looking statements.
More information about risks and uncertainties affecting the Company and its business is available in the Company's most recent Annual
Information Form and other regulatory filings with the Canadian Securities Administrators, which are posted on sedar at www.sedar.com, or the
Company’s most recent Annual Report on Form 40-F and other regulatory filings with the Securities and Exchange Commission.
QUALITY CONTROL
Lake Shore Gold has a quality control program to ensure best practices in the sampling and analysis of drill core. A total of three Quality Control
samples consisting of 1 blank, 1 certified standard and 1 reject duplicate are inserted into groups of 20 drill core samples. The blanks and the
certified standards are checked to be within acceptable limits prior to being accepted into the GEMS SQL database. Routine assays have been
completed using a standard fire assay with a 30-gram aliquot. For samples that return a value greater than three grams per tonne gold on
exploration projects and greater than 10 gpt at the Timmins mine and Thunder Creek underground project, the remaining pulp is taken and fire
assayed with a gravimetric finish. Select zones with visible gold are typically tested by pulp metallic analysis on some projects. NQ size drill core is
saw cut and half the drill core is sampled in standard intervals. The remaining half of the core is stored in a secure location. The drill core is
transported in security-sealed bags for preparation at ALS Chemex Prep Lab located in Timmins, Ontario, and the pulps shipped to ALS Chemex
Assay Laboratory in Vancouver, B.C. ALS Chemex is an ISO 9001-2000 registered laboratory preparing for ISO 17025 certification.
QUALIFIED PERSON
Scientific and technical information contained in this presentation has been reviewed and approved by Dan Gagnon, P.Geo., Executive Vice-
President, Operations, and Natasha Vaz, P.Eng., Director of Technical Services & Project Evaluation, both of whom are employees of Lake Shore
Gold Corp., and “qualified persons” as defined by National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”).
Forward Looking Statements
3. 3
Dome
Hollinger
McIntyre
Hoyle
Pond
Destor Porcupine Fault
Pipestone Fault
Fenn-Gib
M&I resources: 1.3M oz
Inferred resources: 0.8M oz
Pamour
Timmins
Timmins West Complex
Reserves: 0.8M oz
M&I resources(1): 1.2M oz
Inferred resources: 1.2M oz
Bell Creek Complex
Reserves: 0.1M oz
M&I resources(1): 0.9M oz
Inferred resources: 1.1M oz
Three Multi-Million Ounce Au Complexes in Timmins
(1) Resources inclusive of reserves. A review of tonnes and
grades is available in the Appendix
(2) Examples of Forward Looking Information
LSG – A Growing Gold Producer
Two operating mines with a central
milling facility
0.9M oz in reserves, with a large
resource base
2013(2):
On track for at least 40% production
growth (120-135,000 oz)
Cash costs of US$800-US$875/oz
Capital investment of $90M
4. 4
Construction of Timmins Operations to 3,000 tpd nearly complete
Commissioning of mill expansion to commence later this month
Development of Timmins West and Bell Creek mines well
advanced
By early September
Production to reach at least 140,000 oz on annual basis
Cash costs to improve to approx. US$700/oz
Capital requirements to fall off dramatically
Positioned for net free cash flow in Q4/13 at current gold price
(C$1,320 per ounce)
(1) Examples of forward-looking information
Approaching a Major Turning Point(1)
5. 5
Record quarterly performance in Q2/13
Gold production: 30,800 oz
Gold poured: 31,800 oz
Mill throughput averaged 2,540 tpd, 2,800 tpd over last 3 weeks of
June
Average grade of 4.3 gpt (3.8 gpt in April, 4.5 gpt in May and 4.6
gpt in June)
YTD production of 54,000 oz at average grade of 4.1 gpt
Positioned for significantly higher production in H2/13
Q2/13 – Solid Performance, Improving Results
7. Timmins West Mine
New, world-class mine along western extension of Timmins Camp
Ramping up to full production
Low-cost producer in region
Significant opportunities for exploration and resource expansion
Bell Creek Mine
• Historic producer with new, large gold zone discovered at depth
• Current reserve supports production of >20k oz Au/year for 5
years with potential for expansion
• Multiple exploration targets for expansion and new discoveries
Bell Creek Mill
• Conventional gold mill circuit with crushing and grinding, gravity
and leaching, followed by CIP process
• Excellent operating performance with better than 95% recovery
• Completing Phase 2 expansion to 3,000 tpd in Q3/13
7
Key Assets Provide Solid Foundation(1)
(1) Examples of forward-looking information
8. Timmins West Mine
Underground mine with two deposits – Timmins
Deposit and Thunder Creek Deposit
Exceptional infrastructure, well trained workforce
support efficient operations and growth
Gold production of 64,177 ounces in 2012
Q2/13 production of 24,100 ounces (177,900 tonnes
@ 4.4 gpt) (42,700 oz @ 4.1 gpt YTD)
2013 production focused on Porphyry and Rusk zones
between 660 & 765 levels at Thunder Creek and UM
Zone between 670 & 790 levels at Timmins Deposit
(1) Resources inclusive of reserves
(2) Example of Forward Looking Statements
8
Reserves (ounces)(1) 798,000
Av. grade (gpt) 5.2
M&I resource (ounces) (includes reserves) 1,061,000
Av. grade (gpt) 5.5
Inferred resources (ounces) 615,000
Av. grade (gpt) 5.4
Full production (‘000s ounces/yr) >140,000(2)
Cash cost/oz (full production) <US$700(2)
(1) A review of tonnes and grades is available in the Appendix.
(2) Examples of Forward Looking Statements
9. 9
Thunder Creek
Stock
650 Level
200 Level
300 Level
730 Level
TW Shaft Ramp
RuskShearZone
Holmer
Shear Zone
Thunder Creek
Rusk
Timmins Mine
deposit
0 400
meters
East-west
Shear Zone
D3 shear zone
Syenite,
monzonite
Pyroxenite
(AIC)
Turbidites,
felsic volcanic
Mafic
volcanics
AB
A
B
Rusk Zones
Porphyry Zones
Timmins Deposit
Focus between 790
to 950 levels
New drill platforms
on 750 and 790
Mineralized
structure
intersected at
2,400 m depth
Mineralization extended along strike and to 2,400 m depth
1,200 Level
Thunder Creek
2012 drilling results confirm
core to mineralization and
identifies 50m west extension
of Rusk Zone at 765 Level
2013 to continue focus on
infill and explore along strike
Timmins Mine
Results confirm
continuity of UM1,
UM5 & intersects high-
grades o/s resource
Key target between
650 and 790 levels
Timmins West Mine – A Mine Built for Growth
11. Bell Creek Mine – Production & Growth
(1) Resources inclusive of reserves
(2) Example of Forward Looking Stements
11
Production Supports Evaluation of Deep Zone
Initial reserves (ounces)(2) 129,000
Av. grade (gpt) 4.2
M&I resource (ounces) (includes reserves) 710,000
Av. grade (gpt) 4.7
Inferred resources (ounces) 904,000
Av. grade (gpt) 4.6
Underground mine with five years of reserves
Gold production of 21,605 ozs in 2012
6,700 ounces (53,000 tonnes @ 4.2 gpt) in Q2/13
(11,300 oz @ 4.2 gpt YTD)
Current production supports evaluation of high-
potential deep zone
Potential to substantially grow production by
deepening shaft
Ramp to be advanced to 685 Level in 2013,
production focused on North A Zone between 525 &
625 levels(1)
Deep
Zone
Potential
shaft
extension
Shaft
(1) Examples of Forward Looking Statements
(2) A review of tonnes and grades is available in the Appendix.
12. 12
Bell Creek Mill – 50% Expansion Project
SAG Mill Building
New Thickener
New CIL Tanks
Crusher
Truck Dump
6,000 tonne
Ore bin
2,500 tpd plant consisting of a crushing circuit, two-stage grinding circuit with gravity
recovery, followed by pre-oxidation and cyanidation of the slurry with CIP and CIL recovery
Exceptional operational & metallurgical performance with better than 95% recovery
Expansion to 3,000 tpd nearly complete, commissioning to start in late July (to reach 3,000 tpd by
early September)(1)
Potential expansion to 5,500 tpd to support future production increases from Timmins West and
Bell Creek incorporated in current infrastructure
Crushing and grinding capabilities already at this level
(1) Examples of Forward Looking Statements
15. Timmins West Complex
Both deposits at Timmins West Mine open for expansion
Gold River Trend has >1M oz in resource, limited drilling in many areas
144 property covers 4 km trend southwest of Timmins West Mine
15
Outstanding Exploration Potential
Bell Creek Complex
Significant potential for growth at Bell Creek Mine
Initial resources established at Vogel and Marlhill
Additional exploration targets with limited or no drilling
Fenn-Gib
Advanced exploration stage project
Large, near-surface, potential open-pitable resource
Major extensions announced, new targets discovered
16. 16
(1) Examples of forward-looking information
(2) Resources inclusive of reserves
Lake Shore Gold – Poised for Value Creation(1)
At least 60% growth between 2012 and 2014 –
potential for more
Estimated cash costs of US$700/oz by Q4/13
@ 3.2M oz M&I resources(2) and @ 3.5M oz
Inferred resources with potential for much more
Improving operating costs
Full pipeline of projects &
exploration properties
Strong production growth
Capital investment to decline dramatically
starting in Q3/13
Declining capital
requirements
Positioned for Net Free Cash Flow in Q4/13
18. 18
(1)
Timmins
101
11
11
66 Rouyn-Noranda
Kirkland
Lake
Timmins
Cochrane
Hoyle Pond
GoldcorpBell Creek
Lake Shore Gold
Fenn-Gib
Lake Shore Gold
Gold River
Lake Shore Gold
Timmins West
Lake Shore Gold
O N TA R I O Q U E B E C
Casa Berardi
Hecla
Detour Lake
Detour
Val-d’Or
Canadian Malartic
Osisko
Casa Berardi JV
LSG/AurizonBlakelock/Burntbush
Lake Shore Gold
Little Abitibi
Lake Shore Gold
Abitibi Greenstone Belt
Over 200M ozs Au of mined
and current resources
Favourable geology
Supportive government
policies
Good infrastructure
Highly skilled labour force
High safety & environmental
standards
Casa Berardi JV
LSG/Aurizon
Lake Shore Gold land position
Dome
Goldcorp
Pamour
Goldcorp
Hollinger
McIntyre
640 km2 in One of the World’s Great Gold Districts
19. 19
LSG – Reserves and Resources
Measured & Indicated(1) Tonnes Au Grade (g/t) Contained Ounces
Timmins West Mine 5,978,000 5.5 1,061,000
Gold River 690,000 5.3 117,000
Bell Creek Mine 4,685,000 4.7 710,000
Vogel 2,219,000 1.75(2) 125,000
Marlhill 395,000 4.5 57,000
Fenn Gib 40,800,000 0.99(2) 1,300,000
Total 3,245,000
Inferred Tonnes Au Grade (g/t) Contained Ounces
Timmins West Mine 3,549,000 5.4 615,000
Gold River 5,273,000 6.1 1,028,000
Bell Creek Mine 6,080,000 4.6 904,000
Vogel 1,459,000 3.60(3) 169,000
Fenn-Gib 24,500,000 0.95(2) 750,000
Total 3,466,000
(1) Resources are inclusive of reserves
(2) Open-pit resources
(3) Combination of underground and open-pit resources
Probable Reserves Tonnes Au Grade (g/t) Contained Ounces
Timmins West Mine 4,811,000 5.2 798,000
Bell Creek Mine 960,000 4.2 129,000
20. 2,000 Lv
Timmins DepositThunder Creek144
TC – 144 Trend
UM and FW structures extended
to 2,400 m
6 kms
Timmins West Mine
20
Exploration Potential – Timmins West Complex
1,000 Lv
500 Lv
22. 22
MH – Marlhill Project
VG – Vogel Project
Bell Creek Mine
WM – Wetmore Project
MH
VG
Hoyle Pond
MineWM
Key Projects
Bell Creek Mine Marlhill
Vogel
Hoyle Pond
Mine
Wetmore
Bell Creek Complex
Large Resource base, large underexplored land position
23. 23
Fenn-Gib Resources
Potential large-scale, open-pit
project
Excellent opportunity to
increase existing resources
Significant potential along
strike and at depth given
limited drilling beyond the 300
meter level
Contained silver ounces in the
deposit, which are not factored
into the resource estimate,
may provide further value
Category Tonnes Grade (g / t) Contained Gold (k oz)
Indicated 40,800,000 0.99 1,300
Inferred 24,500,000 0.95 750
Total 65,300,000 0.98 2,050
Fenn-Gib – Pit Outline
Fenn-Gib
24. 24
Current Resource Pit (>2.0M oz)
1.2M oz Starter Pit
New Pit Outline based
on most recent drilling
1.72 gpt/48.8m
1.03 gpt/81.4m
1.02 gpt/190.5m
1.01 gpt/52.5m
1.01 gpt/22.1m
1.63 gpt/60.4m
0.67 gpt/121.5mPotential Westerly
Pit Expansion into
untested gap
Opportunities – Fenn-Gib