The document is an introduction to petroleum engineering authored by John R. Fanchi and Richard L. Christiansen, covering essential concepts, practices, and technologies in the field. It includes topics such as reservoir management, petroleum economics, well drilling, and production performance, along with various activities and exercises for further learning. The content aims to provide a foundational understanding of petroleum engineering for students and professionals alike.