Nirmal_Kumar_Sinha - Sr. Quality cum Material Expert
1. (APPENDIX B-5) N.H.A.I –APPROVED C.V ( 90%+PRESENT PROJECT DURATION COMPLETED)
Sr. Quality cum Material Expert – Nirmal Kumar Sinha
PROPOSED POSITION : SENIOR QUALITY CUM MATERIAL EXPERT
NAME OF THE FIRM : RODIC CONSULTANTS PVT. LTD.
NAME OF THE STAFF
CONTACT NO : Nirmal Kumar Sinha
08713839108/ 07051200574
PROFESSION : Civil Engineering
DATE OF BIRTH : 4th
May 1963
YEARS WITH FIRM/ENTITY 6 YEAR 11 Month
FATHER NAME Late - K.K.SRIVASTAVA NATIONALITY: Indian
MEMBERSHIP OF PROFESSIONAL SOCIETIES:
• Member, Indian Roads Congress
DETAILED TASKS ASSIGNED :
Organize laboratory
Review material sources
Review Mix Designs
Review Mix Design for concrete mix
Prepare testing program
Organize administration and introduce reporting and recording system
materials as well as concreting works of major and Minor Bridges and Culverts as per Indian Standards. His spectrum of experience in
includes field and laboratory testing for Embankment, G.S.B., W.M.M., D.B.M. B.C., D.L.C. & P.Q.C. etc. He is well conversant with
various National and international construction standards like IRC, MORTH, AASHTO and has obtained in-depth and
extensive experience on bituminous and non-bituminous mix designs. He has also been involved in setting up of field quality
control laboratories, and has been responsible for the monitoring and calibration of hot mix plant, batching plant and other construction
equipment and instruments, selection of borrow pit sites for the construction of embankment and subgrade and job mix formula for the
bituminous works. He is also well versed in preparation of concrete mix design of all Grade of concrete. He has Associated with
Quality Assurance Programme in Tunnel Projects in Construction Supervision using Modern Technology.
Some of his Relevant Projects are:
• Construction Supervision of Improvement/Upgradation of Roads in Uttara khand (USRIP Project-2); Package-1, length: 274.10
Km 2-lane Roads in the Districts of Almora, Bageshwar, Pithoragarh, Champawat, Nainital and Udhamsingh Nagar, Funded by
ADB.
• Construction Supervision for 2 /4 laning of Gujrat state road Project total length 65 Km.
• Construction of Tehri Dam Project, Tunnel Length: 3.48 Km, (13.4mt dia to 8.64mt finished dia) and 723 mts deep surge shaft.
Inspection shafts of Diversion Tunnels at Tehri Dam Project, Hilly Terrain Project.
• Construction and Supervision of Nathpa Jhakri Power Project. It includes construction of 67.5M High Concrete Gravity Dam on
River Sutlej at Nathpa an underground Desilting arrangement (525MX27MX17M), Head Race Tunnel length: 27 Km, 10.15m dia
on the Left Bank of River Sutlej and underground Power House at Jhakri with an installed capacity of 1500MW(6X250MW). Hilly
Terrain Project.
• Rehabilitation and Up gradation of 4-laning and strengthening of the existing two lanes of Matura to Agra Section of NH-2 in
Uttar Pradesh (OECF Funded under FIDIC Conditions).
• Widening and Strengthening of 2-laning of Chainpur – Pathgacha road project in Gumla, length: 35 Km in the state of Bihar.
Funded by: World Bank.
Page | 1
2. (APPENDIX B-5) N.H.A.I –APPROVED C.V ( 90%+PRESENT PROJECT DURATION COMPLETED)
Sr. Quality cum Material Expert – Nirmal Kumar Sinha
EMPLOYMENT RECORD:
July 2011 to Till Date
VSL India Pvt. Ltd., Chennai, India.
QSE
SMEC INDIA PVT. LTD. & RODIC CONSULTANTS PVT. LTD.
Project Names Rehabilitation, Strengthening and Four Laning of Quazigund to Banihal Section From Km
189.350 to Km 204.700 of N,H1A , Including 2-Tunnels (2-Lane) of 0.69 Km & 8.45 Km Length on
NH-1A, on DBFOT( Annuity) basis, in the State of Jammu & Kashmir
Location Jammu & Kashmir
Duration March 2012 onwards
Client NHAI
Position SR. QUALITY CUM MATERIAL EXPERT
Activities Performed • Checking and verifying the Safety Plan of the Tunnel construction as submitted by Concessionaire
• Implementation of the Safety Plan during construction
• Monitoring the safety related works during the construction period.
• Conducting safety audit of tunnel and highways.
• Attending Safety meeting with client and concessionaire.
• Investigating and reporting all the incident/accident.
• Preparing weekly and monthly safety report.
• Liasoning with clients, concessionaire and number of subcontractors to ensure seamless
operations
Dec 2009 to till date
RODIC CONSULTANTS PVT. LTD.
Sr. Quality cum Material
Expert
Project Name : Consultancy Services for Construction Supervision of Improvement / Upgradation of
Roads in Uttarakhand (USRIP Project-2); Package-1, length: 274.10 Km 2-lane Roads
in the Districts of Almora, Bageshwar, Pithoragarh, Champawat, Nainital and
Udhamsingh Nagar; Hilly Terrain Project; Funded by ADB. (Dec 2009 to 30 jun 2011 )
Location : Uttarakhand
Duration : 1 Year 4 Months
Client : PWD, Govt. of Uttarakhand
Main Project Features : Total Length: 274.10 Km, Lane: 2; Project Cost: Rs. 215 Crores
Position : Senior Quality cum Material Expert
Activities Performed : • Check adequacy and suitability of plants, equipment and operations and check
field and laboratory equipment provision for quality control of Material and Mix design of
Asphalt, Concrete and WMM, GSB and Earth Works. Assist Team Leader on quality
certification. Approval of Materials from borrows area and scheduling of test.
• Study of contractor's Work Programme, develop quality Control manual and
Quality Control Programme and responsible for Quality control during Construction.
Responsible for Quality Control aspect during Construction work including inspection of
the field laboratories of Contractors and Supervision of setting up of WMM Plant and
Bituminous mixing Plants of the Contractor so as to ensure that specified requirements
for such equipments are fully met.
• Responsible for overall functioning of Material Testing Laboratory.
• Review the test results of bore holes, query and borrow area material to find out
their strength characteristics and suitability for using them in Construction
• Association with Quality Control Program in using Modern Technology.
Nov 2006 to Dec 2009 Feedback Ventures Pvt. Ltd. Sr. Quality cum Material Expert
Project Name : Construction Supervision for 2 /4 laning of Gujrat state road Project total length 65
Km.
Location : Gujrat
Page | 2
3. (APPENDIX B-5) N.H.A.I –APPROVED C.V ( 90%+PRESENT PROJECT DURATION COMPLETED)
Sr. Quality cum Material Expert – Nirmal Kumar Sinha
Duration : 3 Years 2 Months
Client : PWD State Gujrat
Main Project Features : Tunnel Length: 65 Km Lane 2/4
Position : Sr. Quality cum Material Expert
Activities Performed : • Check adequacy and suitability of plants, equipment and operations and check
field and laboratory equipment provision for quality control of Material and Mix design of
Asphalt, Concrete and WMM, GSB and Earth Works. Assist Team Leader on quality
certification. Approval of Materials from borrows area and scheduling of test.
• Study of contractor's Work Programme, develop quality control manual and
Quality Control Programme and responsible for Quality Assurance during
Construction. Responsible for Quality Control aspect during Construction work including
inspection of the field laboratories of Contractors and Supervision of setting up of WMM
Plant and Bituminous mixing Plants of the Contractor so as to ensure that specified
requirements for such equipments are fully met.
• Responsible for overall functioning of Material Testing Laboratory.
• Review the test results of bore holes, query and borrow area material to find out
their strength characteristics and suitability for using them in Construction
• Association with Quality Control Program in using Modern Technology.
Sept. 2002 to Nov 2006 Jai Prakash Industries Ltd.
Sr. Quality cum Material
Expert
Project Name : Construction and Supervision of Tehri Dam Project, Tunnel Length: 3.48 Km, (13.4mt
dia to 8.64mt finished dia) and 723 mts deep surge shaft. Inspection shafts of
Diversion Tunnels at Tehri Dam Project, Hilly Terrain Project.
Location : Uttarakhand
Duration : 4 Years 2 Months
Client : Tehri Hydro Development Corporation
Main Project Features : Total Length of Tunnel: 3.48 Km, 13.4mt dia to 8.64mt finished dia) and 723 mts deep
surge shaft.
Position : Sr. Quality cum Material Expert
Activities Performed : • Installation of laboratory at site and ensure that suitable testing equipment is available
at laboratory, calibration of equipments and monitoring their performance regularly.
• Selections of suitable borrow areas for construction of embankment and sub-grade.
• Review the Material Testing result at laboratory and oversee the Quality of work
executed at site.
• Monitoring of concrete and bituminous works at site and calibration of hot mix plant.
• Checking the suitability of construction Material, conducting various test at different
stage of the project as per requirement and specifications.
• Reviewing the Designing Job mix formula for G.S.B, W.M.M., D.B.M., BC, etc as per
specification.
• Preparation of Quality Control and Quality Control Report and assist in preparing
monthly progress report.
• Associated with Quality Control Program in using Modern Technology.
April 1997 to Aug 2002 Continental Construction Ltd.
Senior Quality cum Material
Expert
Project Name : Construction and Supervision of Nathpa Jhakri Power Project. It includes
construction of 67.5M High Concrete Gravity Dam on River Sutlej at Nathpa an
underground Desilting arrangement (525MX27MX17M), Head Race Tunnel length: 27
Km, 10.15m dia on the Left Bank of River Sutlej and underground Power House at
Jhakri with an installed capacity of 1500MW(6X250MW). Hilly Terrain Project.
Location : Shimla and Kinnaur
Page | 3
4. (APPENDIX B-5) N.H.A.I –APPROVED C.V ( 90%+PRESENT PROJECT DURATION COMPLETED)
Sr. Quality cum Material Expert – Nirmal Kumar Sinha
Duration : 5 Years 4 Months
Client : Nathpa-Jhakri Power Project Ltd.
Main Project Features : 67.5M High Concrete Gravity Dam on River Sutlej at Nathpa an underground Desilting
arrangement (525MX27MX17M), Head Race Tunnel length: 27 Km, 10.15m dia on the
Left Bank of River Sutlej and underground Power House at Jhakri.
Position : Senior Quality cum Material Expert
Activities Performed : • Installation of laboratory at site and ensure that suitable testing equipment is available
at laboratory, calibration of equipments and monitoring their performance regularly.
• Selections of suitable borrow areas for construction of embankment and sub-grade.
• Review the Material Testing result at laboratory and oversee the Quality of work
executed at site.
• Monitoring of concrete and bituminous works at site and calibration of hot mix plant.
• Checking the suitability of construction Material, conducting various test at different
stage of the project as per requirement and specifications.
• Reviewing the Designing Job mix formula for G.S.B, W.M.M., D.B.M., BC, etc as per
specification.
• Preparation of Quality Control and Quality Control Report and assist in preparing
monthly progress report.
• Associated with Quality Control Program in using Modern Technology.
Jun 1993 to Mar 1997 Progressive Constructions Ltd. Quality cum Material Engineer
Project Name : Rehabilitation and Upgradation of 4-laning and strengthening of the existing two
lanes of Matura to Agra Section of NH-2 in Uttar Pradesh (OECF Funded under FIDIC
Conditions)
Location : Uttar Pradesh
Duration : 3 Year 9 Months
Client : PWD, Govt. of Uttar Pradesh
Main Project Features : Total Length: 61 Km, Lane: 4
Position : Quality cum Material Engineer
Activities Performed : • Installation of laboratory at site and ensure that suitable testing equipment is available
at laboratory, calibration of equipments and monitoring their performance regularly.
• Selections of suitable borrow areas for construction of embankment and sub-grade.
• Review the Material Testing result at laboratory and oversee the Quality of work
executed at site.
• Monitoring of concrete and bituminous works at site and calibration of hot mix plant.
• Checking the suitability of construction Material, conducting various test at different
stage of the project as per requirement and specifications.
• Reviewing the Designing Job mix formula for G.S.B, W.M.M., D.B.M., BC, etc as per
specification.
• Preparation of Quality Control Report and assist in preparing monthly progress report.
• Associated with Quality Control Program in using Modern Technology
Jan 1991 to Jun 1993 Vijeta Construction Ltd. Quality cum Material Engineer
Project Name : Widening and Strengthening of 2-laning of Chainpur – Pathgacha road project in
Gumla, length: 35 Km in the state of Bihar. Funded by: World Bank.
Location : Bihar
Duration : 2 Years 5 Months
Client : PWD, Govt. of Bihar
Main Project Features : Length: 35 Km, Lane: 2;
Position : Quality cum Material Engineer
Page | 4
5. (APPENDIX B-5) N.H.A.I –APPROVED C.V ( 90%+PRESENT PROJECT DURATION COMPLETED)
Sr. Quality cum Material Expert – Nirmal Kumar Sinha
Activities Performed : Responsible for Installation of laboratory at site, and checking laboratory equipments.
Selections of borrow area for construction of embankment and sub-grade. Reviewing the
material and approving them. Monitoring the quality control & quality assurance and
checking at site, arrangement of reinforcement. Also responsible for site testing activities like
soil, aggregate, cement, Bitumen, steel, etc as per IRC and MORT&H specifications.
Preparation of mix design as per requirement, Job mix of B.M, S.D.B.C, and overall quality
control of the road & Bridge. Preparing Quality Control test reports.
LANGUAGES :
Speaking Reading Writing
English Excellent Excellent Excellent
Hindi Excellent Excellent Excellent
Summary of Qualification & Experience vis-à-vis the requirements as per TOR
Requirements as per TOR
(Enclosure-B)
Possessed
by the Staff
Member
Break-up of experience
Brief Description of Project Man-months
provided
Graduate in Civil Engineering B.Sc. (Civil
Engineering)
Construction Supervision of Improvement / Upgradation of
Roads in Uttarakhand (USRIP Project-2); Package-1, length:
274.10 Km 2-lane Roads in the Districts of Almora,
Bageshwar, Pithoragarh, Champawat, Nainital and
Udhamsingh Nagar - Funded by ADB. (Dec 2009 to till Date)
1 Year 4 Months
Post Graduation in Geotechnical
Engineering / Soil Machanics &
Foundation Engineering
(Preferred :)
NA Construction Supervision for 2 /4 laning of Gujrat state road
Project total length 65 Km.
3 Years 2 Months
Exp. in Similar Capacity (at least
7 years)
13 Years
10 Months
Construction of Tehri Dam Project, Tunnel Length: 3.48 Km,
(13.4mt dia to 8.64mt finished dia) and 723 mts deep surge
shaft. Inspection shafts of Diversion Tunnels at Tehri Dam
Project, Hilly Terrain Project.
4 Years 2 Months
Experience in Similar capacity
for major Tunnel Projects
2 Nos. Construction and Supervision of Nathpa Jhakri Power
Project. It includes construction of 67.5M High Concrete
Gravity Dam on River Sutlej at Nathpa an underground
Desilting arrangement (525MX27MX17M), Head Race
Tunnel length: 27 Km, 10.15m dia on the Left Bank of River
Sutlej and underground Power House at Jhakri with an
installed capacity of 1500MW(6X250MW). Hilly Terrain
Project.
5 Years 4 Months
Association to quality assurance
programmes in using modern
technology.
17 Years
7 Months
Rehabilitation and Upgradation of 4-laning and strengthening
of the existing two lanes of Matura to Agra Section of NH-2
in Uttar Pradesh (OECF Funded under FIDIC Conditions).
3 Years 9 Months
Widening and Strengthening of 2-laning of Chainpur –
Pathgacha road project in Gumla, length: 35 Km in the state
of Bihar. Funded by: World Bank.
2 Years 5 Months
CERTIFICATION BY THE CONDIDATE :
I, the undersigned (Nirmal Kumar Sinha, Rodic Consultants Pvt. Ltd., H-78, 1st
Floor, Sector-63, Noida-201307, Tel: 0120-4615500)
undertake that this CV correctly describes myself, my qualifications and my experience and NHAI would be at liberty to debar me if any
information given in the CV, in particular the Summary of Qualification & Experience vis-à-vis the requirements as per TOR is found
incorrect. I further undertake that I have neither been debarred by NHAI nor left any assignment with the consultants engaged by
NHAI/contracting firm (Rodic Consultants Pvt. Ltd.), for any continuing work of NHAI without completing my assignment. I will be available
Page | 5
6. (APPENDIX B-5) N.H.A.I –APPROVED C.V ( 90%+PRESENT PROJECT DURATION COMPLETED)
Sr. Quality cum Material Expert – Nirmal Kumar Sinha
for the entire duration of the current project “Independent Engineer Services for 4 laning of Quazigund to Banihal section from Km
189.350 to km 204.700 of NH 1A including 2 tunnels (2 lane) of 0.69 km and 8.45 km length on NH-1A on BOT (Annuity) basis
in the State of Jammu & Kashmir. Package no. IE/NHDP- Phase-II/BOT/II/J&K)”. if I leave this assignment in the middle of the work,
NHAI would be at liberty to debar me from taking any assignment in any of the NHAI works for an appropriate period of time to be decided
by NHAI. I have no objection if my services are extended by NHAI for this work in future.
For Key Personnel intermittent inputs, add the following:
I further certify that I am associated with the following assignments as on date (as on 7 days prior to due date for submission of proposals)
including those for which LOA has been received by the firm and the inputs in these assignments shall not affect the work of the current
assignment.
Name of
Assignment
Client Date of LOA Likely start
(Month/ Year)
Likely end
(Month/ Year)
Total input of the
person (man-
months)
NA
NOTE: CVs of Key Personnel having intermittent inputs will be considered only if the assignments on hand as on 7 days before due
date of proposal including those for which LOA has been received from the Client do not exceed 3 (three).
______________________________________________________ Date: 27 .11.2013
Day/Month/Year
CERTIFICATION BY THE FIRM:
The undersigned on behalf of (Rodic Consultants Pvt. Ltd. certify that Nirmal Kumar, H-78, 1st
Floor, Sector-63, Noida-201307, Tel: 0120-
4615500) to the best of our knowledge has neither been debarred by NHAI nor left his assignment with any other consulting firm engaged
by NHAI / contracting firm (firm to be supervised now) for the ongoing projects. We understand that if the information about leaving the
past assignment is know to NHAI, NHAI would be at liberty to remove the personnel from the present assignment and debar him for an
appropriate period to be decided by NHAI.
____Nirmal kumar sinha__________________________________________________ Date: 03 / 01 / 2017
Signature of Staff Member and Authorized Representative of the firm]
Page | 6
7. (APPENDIX B-5) N.H.A.I –APPROVED C.V ( 90%+PRESENT PROJECT DURATION COMPLETED)
Sr. Quality cum Material Expert – Nirmal Kumar Sinha
for the entire duration of the current project “Independent Engineer Services for 4 laning of Quazigund to Banihal section from Km
189.350 to km 204.700 of NH 1A including 2 tunnels (2 lane) of 0.69 km and 8.45 km length on NH-1A on BOT (Annuity) basis
in the State of Jammu & Kashmir. Package no. IE/NHDP- Phase-II/BOT/II/J&K)”. if I leave this assignment in the middle of the work,
NHAI would be at liberty to debar me from taking any assignment in any of the NHAI works for an appropriate period of time to be decided
by NHAI. I have no objection if my services are extended by NHAI for this work in future.
For Key Personnel intermittent inputs, add the following:
I further certify that I am associated with the following assignments as on date (as on 7 days prior to due date for submission of proposals)
including those for which LOA has been received by the firm and the inputs in these assignments shall not affect the work of the current
assignment.
Name of
Assignment
Client Date of LOA Likely start
(Month/ Year)
Likely end
(Month/ Year)
Total input of the
person (man-
months)
NA
NOTE: CVs of Key Personnel having intermittent inputs will be considered only if the assignments on hand as on 7 days before due
date of proposal including those for which LOA has been received from the Client do not exceed 3 (three).
______________________________________________________ Date: 27 .11.2013
Day/Month/Year
CERTIFICATION BY THE FIRM:
The undersigned on behalf of (Rodic Consultants Pvt. Ltd. certify that Nirmal Kumar, H-78, 1st
Floor, Sector-63, Noida-201307, Tel: 0120-
4615500) to the best of our knowledge has neither been debarred by NHAI nor left his assignment with any other consulting firm engaged
by NHAI / contracting firm (firm to be supervised now) for the ongoing projects. We understand that if the information about leaving the
past assignment is know to NHAI, NHAI would be at liberty to remove the personnel from the present assignment and debar him for an
appropriate period to be decided by NHAI.
____Nirmal kumar sinha__________________________________________________ Date: 03 / 01 / 2017
Signature of Staff Member and Authorized Representative of the firm]
Page | 6