1. MURUGESAN VELUSAMY
74. FIRST STREET, DAE TOWNSHIP, KALPAKKAM=603102
Tamil Nadu. INDIA
Mobile no: 8098719798
E-mail: murgi_velu@yahoo.com
murgijessi@gmail.com
Objective
♦ Seeking a challenging position in Construction Engineering & Project Engineering, in industrial &
infrastructure & Building construction firm Executions, Planning & Construction to render the
possessed skills
♦ SKILLS
• Project Management • Civil Construction Site Management • Resource Management • Relationship
Management • Project Planning & Control •Bill of Quantity & Billing & Planning & Contract •
Operations Management • Scheduling • Material Management • Tendering Bill of Quantity &
Contracting - Rate analysis • Team Management.QA/QC Specification & Quality Assurance.
Project Tracking Management.
Experience Summary
• 19 years’ experience in civil constructions in Railway Track laying, Construction of major bridges,
Industrial Pre-engineered steel structures, Railway station buildings & Roads, bridges , laying of
under water drainage works ,laying Highway Roads(Bahrain Roads Directorate)&Construction
Residential Buildings, Villas(Annai velu Pvt Co) .
• My core expertise centres on Construction like Industrial, Infrastructure, Building construction
• Execution with Quality Assurance and Quality Control, Planning, Project Monitoring and Progress
Review. Contractor billing and Rate Analysis of Quantity according to actual job and approved
rate or market rate. Rate Analysis according PWD and CPWD Rate and MES Rate schedule rate.
• I have execution knowledge across heavy Industrial Rcc work, heavy infrastructure
construction
• Precast erections Slab, I Girder, Box Girder, Pier Cap, U Girder and its fixing. Formwork &
scaffolding work for diaphragm beam, Pier, Earth work for pile cap utility etc.
Personal Details
• Date of Birth - 02nd
April 1966
• Sex - Male
• Marital Status - Married
• Nationality - Indian
• Passport -
Academic
♦ Trained in Staad pro v8i
♦ Master of Technology (M.Tech in Structural Engg) from IIT Madras in 2000
Bachelor of Engineering (B.E.) in Civil from Madurai Kamaraj University Madurai in 1983-87
♦ Higher Secondary Examination from TN H.S.E. with 73% in 1983.
♦ Secondary Examination from TN S.S.L.C. with 69% in 1981.
Page 1 of 6
2. Technical Skills
• Pilling work- Bored pile (up to 1200mm diameter) under major bridges in Gauge Conversion works for railway
Track. Pile testing, pile concreting.
RCC Mass Concreting- Abutment, Pile cap, piling work for railway bridges.
RCC raft foundation, well foundation etc. piers pile cap work, bow string arch bridges in gauge conversion
rail work.
I Girder, box girder, composite girder for super structure for railway bridges.
RCC Frame Structure- Residential & commercial building, Pump house, Compressor House, bridge
piers and piles caps work in railway track and Rail station Buildings,
Planning & Billing –Contract or billing ,Rate analysis, Bill of quantity, Quantity Survey, Tendering
Document, Specification analysis rate schedule analysis for back to back contracting, according, rate
schedule SR .
Geotechnical Investigation- NDT, SAND REPLACEMENT TEST PLATE LOAD TEST.all test related Rcc and soil.
Site Management- Design of temporary structure & false work (Staging & Scaffolding), Barricading, Road sign
board fixing.
Career Profile
Organisation Period Designation
Annai Velu Builders, Madurai. 2014(Mar) – Till Date Project Manager
Southern Railway (Govt of India) 2010(Apr)-2013(Dec) Senior Section Engineer
Habib Ali Awachi Ltd, Bahrain 2008(Feb) -2009(Dec) Project Engineer
Southern Railway (Govt of India) 1993(June)-2007(Dec) Section Engineer
Project Title 1 Construction of residential buildings and villas at Madurai (Annai Velu Builders
Pvt Ltd.)
Client Indivuvals
Company Annai Velu Pvt.Ltd.
Responsibilities • Coordination among Owner, Client, Consultant for acquiring land(Execution Section)
• Continuous progress review (Weekly) to forecast the upcoming activities, resources
requirement (like man power, plant involvement, machineries requirement etc.)
• Preparing layout plan and required house plan and structural drawings.
• monitoring labour and supervisor output and quality and quantity control
• Inspection for activities (survey, pre & post concrete supervision) with a team of junior
engineers.
Page 2 of 6
3. Planning Execution activity with regular construction methods.
Recourse planning ,Work management planning for achieving monthly
target
• Work schedule preparations for achieving weekly targets
Duration March2014 – PRESENT
Role Project Manager
Project Title 2 Gauge Conversion works of MG to BG from Chennai Beach to Tambaram
Client Govt of India
Company SOUTHERN RAILWAY
Responsibilities • Coordination among Contractor, Client, Consultant (Execution Section)
• Continuous progress review (Monthly) to forecast the upcoming activities, resources
requirement (like release of GAD drawings, man power, plant involvement, machineries
requirement etc.)
• Analysis to find out lag and lead time for different activities to achieve different
milestones and identification of parallel activities to minimize the lag.
• Civil QA & OC at site
• Designing and review of different temporary, Building slab, and plate load test.
• Inspection for activities (survey, pre & post concrete supervision) with a team of junior
engineers.
Functional Area • MINOR/MAJOR BRIDGE FOUNDATION /piling work/PILE CAP
RCC/COLUMN RCC WORK- Supervision at pile cap work and column piers work
and piers cap work work rcc work M35 TO M45 utility verification, survey site
investigation, shifting
• Rcc raft- Supervision at & its Pcc Rcc box minor bridge cast in situ
RENFORCEMENT- BBS guiding & planning the reinforcement fixing
Approved GAD of Minor bridge, RUB,. Road diversion plan its approval,
Ground improvement for minor bridge and major bridge, with soil test.
• Formwork & executions planning- for minor bridge
• Collect drawing, making contractor bills, equipment planning etc .
• QA&QC- plate load test, sand replacement test slump test SPT test, Plate
load test for ground.
• Material requirement and labour planning
• Work schedule preparations
• Utility survey shifting soil & site investigation survey, alignment
checking etc.
Duration April 2010 – Dec 2013
Role Senior Section Engineer
Page 3 of 6
4. Project Title 3 Laying of avenue highway roads, providing storm water drainage works at Galali
and Improve ments to Highway Road between Bustain And Bahrain Airport.
Client Roads Directorate , Kingdom Of Bahrain
Company HABIB ALI AWACHI WLL, Bahrain.
Responsibilities • Coordination among Contractor, Client, Consultant (Execution Section)
• Continuous progress review (Weekly) to forecast the upcoming activities, resources
requirement (like release of approved drawings, man power, plant involvement,
machineries requirement etc.)
• Civil QA & OC at site
• Inspection for activities (survey, pre & post concrete supervision) with a team of senior
foremen and land surveyors
Functional Area • Excavation work/laying protection PCC/laying of UPVC pipes for storm
water drainage.
STORM WATER DRAINAGE- Pipe laying ,Connecting Road gullies at road
ends
• Removing existing Road surface
• Laying road base for sub grade surface etc.
• QA&QC- sub grade load test coordinating with directorate etc.
• Work management planning according to directorate norms.
• Preparation of bill according to BOQ and codes.
• Preparing monthly programme using MS PROJECT
Duration Feb,2008 – Dec 2009
Role Project Engineer
Project Title 4 Gauge Conversion works of MG to BG from Villupuram to Pondicherry
Client Govt of India
Company SOUTHERN RAILWAY
Responsibilities • Coordination among Contractor, Client, Consultant (Execution Section)
• Continuous progress review (Weekly) to forecast the upcoming activities, resources
requirement (like release of GAD drawings, man power, plant involvement, machineries
requirement etc.)
• Analysis to find out lag and lead time for different activities to achieve different
milestones and identification of parallel activities to minimize the lag.
• Civil QA & OC at site
• Designing and review of different temporary, Building slab, and plate load test.
• Inspection for activities (survey, pre & post concrete supervision) with a team of junior
engineers.
Page 4 of 6
5. Functional Area • PILE CAP RCC/COLUMN RCC WORK- Supervision at pile cap work and
PIERSCAP AND PIER and Portal structure AND STATION WORK OF
RAIL work rcc work M35 TO M60
• Rcc raft- Supervision at & its Pcc like pile cap & pile,
RENFORCEMENT- Planning the reinforcement fixing of pier And pier cap
• Formwork & executions planning- for pile cap, pier, pier cap Pranav
shutter.
• Collect drawing, making contractor bills, equipment planning etc .
• QA&QC- plate load test, sand replacement test slump test making work
method
• Work management planning for concreting according city traffic
• Work schedule preparations according site condition.
Duration Mar,2003 – Dec2007
Role Section engineer
Project Title 5 Doubling of track works from Chengal pet to Tindivanam
Client Govt of India
Company SOUTHERN RAILWAY
Responsibilities • Coordination among Contractor, Client, Consultant (Execution Section)
• Continuous progress review (Weekly) to forecast the upcoming activities, resources
requirement (like release of GAD drawings, man power, plant involvement, machineries
requirement etc.)
• Time frame analysis to find out lag and lead time for different activities to achieve
different milestones and identification of parallel activities to minimize the lag.
• Civil QA & OC at site
• Designing and review of different temporary, Building slab, and plate load test.
• Inspection for activities (survey, pre & post concrete supervision) with a team of junior
engineers.
Functional Area • Main embankment- Supervision development earth cutting filling gravel filling wbm
filling etc
• Formwork & execution’s planning & Precast Erection like I Girder and slab
for ship lift platform over the sea and its concreting diaphragm wall etc.
• Collect drawing, making contractor bills, equipment planning etc .
• QA&QC- plate load test, sand replacement test slump test etc.
• Work management planning for precast erection of Girder and slab for
pier lift.
• Work schedule preparations For Concreting of pier lift foundation.in
Duration Mar,1999 – Feb 2003
Role Section Engineer
Page 5 of 6
6. Project Title 6 Additional line works of MG to BG from Chennai Egmore to Tambaram
Client
Govt of India
Company
SOUTHERN RAILWAY
Responsibilities • Coordination among Contractor, Client, Consultant (Design Section)
• Continuous progress review (Weekly) to forecast the upcoming activities, resources
requirement (like release of GAD drawings, man power, plant involvement, machineries
requirement etc.)
• Time frame analysis to find out lag and lead time for different activities to achieve
different milestones and identification of parallel activities to minimize the lag.
• Civil QA & OC at site
• Designing and review of different temporary structure , Building slab, Inspection for
activities (survey, pre & post concrete supervision) with a team of junior engineers.
Functional Area • EARH WORK- Sand cutting filling at 300mm layer for embankment and compaction
• Temporary structure- Supervision at initial setting structure like cabin, office building,
Batching plant structure.
• Precast erections- Supervision at 3km precast boundary wall within 60 days
• Hanging scaffolding Supervision of all terminal hanging scaffold activities.
Gradation of CA & FA, Compressive strength, Setting time & Consistency of cement,
Compressive strength of Concrete, Compaction testing of Soil, NDT witness, QC
documentation etc.
• Reconciliations- Progress review, monitoring making bills , meeting with client
Duration May1996 – Mar,1999
Role Section Engineer
Project Title 7 Gauge Conversion works of MG to BG from Bangalore to Hubli
Client
Govt of India
Company
SOUTHERN RAILWAY
Responsibilities • Coordination with Client , Contractor and Design consultant
• Follow and Implementation of International Safety Norms
• Preparation and modification of as built drawings
• Inspection of activities (Survey, Pre & Post concreting supervision)
Functional Area • Earth work embankment planning- work planning according schedule
• Making arrangement planning- Site supervision with progress review, resource
planning for different activity of construction raft, pile foundation, client
checking
• Execution management at site level as Form work,Rcc ,for Industrial construction
insert palate,staging,raft foundation, alignment for major bridge align ment
Duration June 1993- May, 1996
Role Section Engineer
Soft Skill
♦ Operating Platform- Windows 98,2000, NT, Vista window 7
♦ Packages- MS Office, Working knowledge, internet uses. Excel MS Project,
Present Packages
♦ Rs.5.0 lac per annum with accommodation, Conveyance, Health Insurances
♦ Notice period- 10- days for joining
Expected Packages
♦ Negotiable. No Family accommodation is required, Conveyance, Health Insurances & Group Linked Medical claim
Scheme and other facilities as per company rules.
Page 6 of 6