1. OBJECTIVES:
To pursue an opportunity which would help me utilizing my experience and put research-
oriented efforts in achieving cost effective goals for a dynamic organization having global
outlook.
PROFILE SUMMARY:
Having more than 14 years working experience of more than ten different construction
projects.
Management communication & Reporting.
Experience of team Management.
Preparation and laying of Water pipeline for underground.
If laying pipeline under the road then use concrete under the pipe.
Piping engineering and design for the project and assembling entire responsibility for
execution.
Inspection of form work before pouring of Concrete check rebar and spacing.
Inspection of concrete before pouring applied quality test on site.
Checking of approved plan.
Preparation of pipe stress analysis specification.
Experience of initiating, planning, executing, controlling and managing project operations.
Monitor construction activates to ensure that the work progress in a manner.
Supervision and inspection for civil work ,concrete, structure, foundation and etc.
Experience of operations planning with the engagement of all stakeholders.
Inspection of all type of material like aggregate, cement, bituminous, pipe, mechanical means
and etc.
Experience of quality monitoring & control procedures implementations
Experience of health & safety instructions & programs application on site.
Experience of project key performance management
Experience to align the activities with external & internal stakeholder to ensure project
progress on track as per decided strategies & technical standards.
Experience of inspection in-progress work & technical advising to ensure conformity with
standard specifications & quality.
Experience of reviewing & feedback about shop drawings to deliver work as per standards &
specifications.
Preparation of daily, weekly and monthly report.
Supervision and Monitoring of Soil Specification Test.
Supervision and Monitoring of CBR.
Experience of Roads & Civil Works, Sewerage Line, Underground Waterline & Chambers,
Earthworks, De-watering, Shoring Works, Manholes, Weir boxes, Junction boxes,
Interconnection waterline, Building Construction Work Projects and etc.
Eng Imran Khalil
Cell No:00966582878763
:00923212499837
E-mail: imran0378@yahoo.com
Skype :innocent_iqyan
2. PROFESSIONAL EXPERIENCE:
1- Al Fanar Construction ( 30 March 2015 to till )
Client: Saudi Electricity Company
Consultant : Hyundai
Position: QA/QC ENGINEER
2- Rabya Agriculture Company (April 2012 to May 2013)
Client : Aramco Project (Saudi Arabia) : Monument
Position : Civil Engineer
3- Jeddah Municipality Project, Saudi Arabia MTMM Consultant
(July 2009 – Feb 2012 )
Position - Site Engineer-Road & Civil Works
4- Shaheen Builders- Pakistan (Nov 2005– June 2009)
Position - Construction Engineer
5- Khalil Associates- Pakistan (December 1997– July 2005)
Position- Construction Engineer
PROFESSIONAL & ACADEMIC QUALIFICATION
B-Tech Honors in Civil Engineering (1st Division), 2006
Dadabhoy Institute of Higher Education Karachi, Pakistan
B-Tech Pass in Civil Engineering (1st Division), 2004
Dadabhoy Institute of Higher Education Karachi, Pakistan.
Diploma in Associate Engineering in Civil (1st Division), 1996
Jinnah Polytechnic College Karachi, Pakistan
COMPUTER SKILLS:
Auto Cad 2007 (2D/3D) Drafting tool
Microsoft Project Management
MS Excel, MS Project, MS Word, MS Access, Power point
Research & Development ( Internet Searching & browsing )
Primavera (P6)
PROFESSIONAL TRAININGS & COURSES:
Quality Management training from City District Government Karachi.
Working at height training
Working in a confined space training
Working in Incident Injury free
3. Lifting Study
General safety training
OTHER SKILLS:
Can read, speak & write English as well as Urdu
Light Vehicle Saudi Driving License
PERSONAL INFORMATION:
Father’s Name Khalil Ahmed
National ID Card Number
Date of Birth
42101-1216206-1
31-10-1974
Passport Number
BX4112061- Valid Up to
2020
Marital Status Married
Contact
Valid Driving License of Saudi Arabia
00966582878763
Professional History
AL FANAR CONSTRUCTION (30 March 2015 to Till)
I have been worked on multiple storied Building, Power Plant & Substation as a
QA/QC Engineer Multiple stored Building works comprises Piling, Foundation, Excavation
Earthwork, Sewerage system, sewage line, Concrete and all kind of civil works etc.
Construction of ( Central Control Building ) CCB
Construction of CPP Building
Chillar Plant Building
Gas Cylinder Building
Forwarding Building
Construction of 132/13.8 KV Substation
Underground pipline, Electrical Mainhole & Duck Bank
Substation 132/13.8 KV
.Rabya Agriculture Company (April 2012 to May 2013)
I have been worked on Monument for Rabya Agriculture Company as a Civil Engineer.
Monument works comprises Roads, De watering, lean Concrete, Excavation, Earthwork,
Sewerage system, and all kind of civil works etc.
4. Responsibilities:
Initiating, planning, executing, controlling and managing project operations, quality
monitoring and quality control procedures, application of health and safety programs.
Experience in C.B.R.
Preparation and laying of pipeline for underground.
If laying pipeline under the road then use concrete under the pipe.
Preparation of pipe stress analysis specification.
Effective implement of Project Quality Plan (PQP) Inspection and testing plan (ITP).
Follow up of approvals form related department preparation of procedural documents
i.e construction methodologist, shop drawing, Request for Inspection (RFI)
Collect of surface and sub surface data i.e location of utility lines by excavation for
test pits.
Inspection of form work before pouring of Concrete check rebar and spacing.
Inspection of concrete before pouring applied quality test on site.
Checking of approved plan.
Monitor construction activate to ensure that the work progress in manner.
Supervision and inspection for civil work, concrete, structure, foundation and etc.
Notifying the demand and supply status of the project needs to the Higher
Management.
Check and view the plan and specification for the proper construction and quality
implementation at job site perform pre-inspection to ensure that all installed material
are within the standard in conformance to applicable drawings specs.
Undertaking and specification technical site surveys.
Lead of construction team in close cooperation with the Sub Contractor in assembling
the project requirement.
Preparation of Agenda & minutes of weekly and monthly meeting.
Preparation of daily, weekly and monthly report.
Review shop drawing and make sure work is deliver up to the set standards and
specification.
Jeddah Municipality Project, Saudi Arabia (From July 2009 –to Feb 2012)
I have worked on different project of road department for Jeddah Municipality with the
Company Muhammad Turki Mot McDonald (MTMM) Consultant, which is situated in
Jeddah Saudi Arabia. Road Department works comprises of POTHOLE SETTLEMENT,
SCAREFYING, and DEMAGES OF Roads, Curbstone, Tiles, Flowerbed, and Roundabout,
Interlock, and all kind of civil works etc.
Responsibilities:
Initiating, planning, executing, controlling and managing project operations, quality
monitoring and quality control procedures, application of health and safety programs,
liaison with contractor to ensure work technicalities, strategies and progress tracking.
5. Leads the construction team, in close cooperation with the contractor, in assembling
and controlling the project requirements.
Calculate of damages due to natural disaster i.e Flood, Torrential rain.
Discusses and reviews with Contractors the project Key Performance Indicators.
Inspects work in progress to ensure conformity with specifications and quality
requirements, and provides technical advice to resolve problems.
Preparation of Agenda & minutes of weekly and monthly meeting.
Preparation of daily, weekly and monthly report.
Preparation and Monitoring of progress plan by physical accomplishment and cost.
Review shop drawing and make sure work is deliver up to the set standards and
specification.
Plan project operation with the satisfaction of Jeddah Municipality Engineer and own
management.
Shaheen Builders- Pakistan (From Nov 2005– June 2009)
Company Profile: Established since 1982, has been working in the field of Building Works &
Roads, Culvert, Sewerage and underground water pipe lines works.
Projects:
Sewerage and water pipe line at Gulberg F.b.area Karachi, Pakistan.
Underground water pipe line at Site area Karachi, Pakistan
Zulfiqar avenue building at North Karachi, Pakistan.
Crossing culvert at Nusrat Bhutto colony North Nazimabad Karachi, Pakistan.
Construction of road for Karachi Municipality Project , Gulburg town Karachi, Pakistan
Responsibilities:
Coordinate, planning, supervision and monitor the various activities of work force,
and ensure that work is delivered up to the set standards and Time.
Planning & Provision of Resources and Manpower with respect to the BOQ.
Preparation of Daily, Weekly and Monthly Plan.
Preparation of three weeks looks ahead program.
Preparation of Efficiency Report of Supervisor and Machinery.
Coordination of Material with the Commercial Department.
Coordination with QA/QC department.
Preparation of Construction highlights for the day.
Review drawing and calculate material and then arrange material and resources.
Maintain information on backlog jobs pending due to the resource unavailability and
follows up the concern departments to expedite work Reviews requirement of
manpower, resources and materials.
Develop computer based schedules, analysis.& other regular reports
Reporting all activities to the Construction Manager (Shaheen Builders).
6. Khalil Associates- Pakistan (From December 1997– July 2005)
Company Profile: Khalil Associates is working for Karachi City District Government and
Karachi Water and sewerage board (KWSB).Khalil Associates is approved contractor for
CDGK and also registered in Pakistan Engineering Council.
PROJECTS:
Maintenance and Road Works in Gulberg Town Karachi.
Construction and Maintenance of Road works in North Nazimabad town Karachi.
Construction of Roads and Civil works in Site Town Karachi.
Maintenance of Road at Gulshan-e- Iqbal Karachi.
Responsibilities:
Supervision and Monitoring of work at Site
Daily, Weekly and Monthly Report Generation for our own office.
Coordination of Material with supplier according to the given specification.
Manage and assist team members to establish and achieve timeline.
Monitoring of Field Density Test (FDT), Core Test, Marshal Test, Marshal Loose
Stability Test.
Estimation of Bitumen percentage, gradation / extraction, Marshal Stability Test.
Revision and modification of shop drawings as per site requirement.
Preparation of mobilization plan.
Preparation of procurement plan.
Preparation of project Efficiency Report.