A presentation I delivered in Tianjin, China at the SPE international conference in 2012. The paper titled: Innovation of Coal Seam Gas Well-Construction Process in Australia: Lessons Learned, Successful Practices, Areas of Improvement.
This document provides cost projections for three redevelopment options for Sparrows Point Country Club, ranging from $4.7 million to $1.8 million. Option A involves constructing a new 18-hole championship golf course, 9-hole course, and facilities. Option B involves constructing a new 18-hole course, 5-hole course, and facilities. Option C involves constructing a new 18-hole course, new driving range, facilities, and tennis courts. The cost projections include items like tree removal, course construction, cart paths, irrigation, landscaping, and permits.
The document discusses VA/VE (value analysis/value engineering) support provided by Hero Motors (HM) to optimize design and processes, increase efficiency, improve customer satisfaction, and enhance profitability. It outlines HM's VA/VE implementation process and provides examples of design optimization, testing facilities, process optimization, and cost savings achieved through modifications to transmission and housing components.
The document discusses rotations in geometry. It defines a rotation as turning a figure about a fixed center point called the center of rotation. The angle of rotation is measured from the center of rotation to a point and its image after rotating. Rules for rotating figures about the origin by 90, 180, and 270 degrees are given. Rotation matrices for rotating by 90, 180, 270, and 360 degrees are presented. The document states that a rotation is an isometry according to the Rotation Theorem. Homework problems from page 602 numbers 4 through 20 are assigned with the even problems selected.
The document summarizes the financial and operational performance of PT Hantong Precision Manufacturing Batam in the first half of 2010. Key points include:
- Cost savings increased each month from November 2009 to April 2010 in areas like reducing scrap costs, line non-conformances, and consumables. Floor profit also increased.
- Sales and order targets were mostly met for SOT, quality, and RTY performance. Some issues were noted and corrective actions outlined.
- Initiatives on clean production, self-quality processes, TPM, and new projects increased productivity and flexibility.
Vortex generators were installed on over 500 turbines in 2014 to study their effects on reliability and performance. Trials showed that VGs provided production gains compared to unmodified turbines, though the gains were small and validation is challenging. VGs were found to positively impact airflow attachment along turbine blades to reduce stall effects. Testing also indicated that VGs may impact wind sensor readings on nacelles.
This document appears to be a record of training courses and assessments completed by an individual. It includes over 50 entries listing the name of the training or assessment, the date it was completed, and usually additional details. The trainings cover a wide range of topics including maintenance, publications, inventory management, parts management, and customer service.
This document summarizes a presentation on blade reliability from a wind turbine operator. It discusses the operator's fleet of over 3000 turbines across the US, and provides data on reported blade damage over 7 years. The top damage types - lightning, leading edge erosion, cracks and gel coat damage - account for 80% of reported issues. While 94% of damage is deemed repairable, damage to carbon spars and large structural cracks are less likely to be repaired. The presentation concludes with goals to improve data reporting, develop better lightning protection, and evaluate repair techniques for large cracks and carbon spars.
The document summarizes savings achieved from various projects in 2016. It lists 24 projects that realized cost savings through either cost cutting or cost avoidance efforts. The projects achieved a total savings of over $5 million, representing 3.53% of the total projected costs of over $143 million. The document provides details on the projected costs, savings amounts, and percentage saved for each individual project.
This document provides cost projections for three redevelopment options for Sparrows Point Country Club, ranging from $4.7 million to $1.8 million. Option A involves constructing a new 18-hole championship golf course, 9-hole course, and facilities. Option B involves constructing a new 18-hole course, 5-hole course, and facilities. Option C involves constructing a new 18-hole course, new driving range, facilities, and tennis courts. The cost projections include items like tree removal, course construction, cart paths, irrigation, landscaping, and permits.
The document discusses VA/VE (value analysis/value engineering) support provided by Hero Motors (HM) to optimize design and processes, increase efficiency, improve customer satisfaction, and enhance profitability. It outlines HM's VA/VE implementation process and provides examples of design optimization, testing facilities, process optimization, and cost savings achieved through modifications to transmission and housing components.
The document discusses rotations in geometry. It defines a rotation as turning a figure about a fixed center point called the center of rotation. The angle of rotation is measured from the center of rotation to a point and its image after rotating. Rules for rotating figures about the origin by 90, 180, and 270 degrees are given. Rotation matrices for rotating by 90, 180, 270, and 360 degrees are presented. The document states that a rotation is an isometry according to the Rotation Theorem. Homework problems from page 602 numbers 4 through 20 are assigned with the even problems selected.
The document summarizes the financial and operational performance of PT Hantong Precision Manufacturing Batam in the first half of 2010. Key points include:
- Cost savings increased each month from November 2009 to April 2010 in areas like reducing scrap costs, line non-conformances, and consumables. Floor profit also increased.
- Sales and order targets were mostly met for SOT, quality, and RTY performance. Some issues were noted and corrective actions outlined.
- Initiatives on clean production, self-quality processes, TPM, and new projects increased productivity and flexibility.
Vortex generators were installed on over 500 turbines in 2014 to study their effects on reliability and performance. Trials showed that VGs provided production gains compared to unmodified turbines, though the gains were small and validation is challenging. VGs were found to positively impact airflow attachment along turbine blades to reduce stall effects. Testing also indicated that VGs may impact wind sensor readings on nacelles.
This document appears to be a record of training courses and assessments completed by an individual. It includes over 50 entries listing the name of the training or assessment, the date it was completed, and usually additional details. The trainings cover a wide range of topics including maintenance, publications, inventory management, parts management, and customer service.
This document summarizes a presentation on blade reliability from a wind turbine operator. It discusses the operator's fleet of over 3000 turbines across the US, and provides data on reported blade damage over 7 years. The top damage types - lightning, leading edge erosion, cracks and gel coat damage - account for 80% of reported issues. While 94% of damage is deemed repairable, damage to carbon spars and large structural cracks are less likely to be repaired. The presentation concludes with goals to improve data reporting, develop better lightning protection, and evaluate repair techniques for large cracks and carbon spars.
The document summarizes savings achieved from various projects in 2016. It lists 24 projects that realized cost savings through either cost cutting or cost avoidance efforts. The projects achieved a total savings of over $5 million, representing 3.53% of the total projected costs of over $143 million. The document provides details on the projected costs, savings amounts, and percentage saved for each individual project.
Siemens discusses reducing the cost of wind energy through rotor research and development. They describe validation methods like structural testing, wind tunnel testing, and field testing of blades. These include measuring loads, acoustics, oil flow visualization, and aeroelastic deflections. Siemens collaborates with research institutions on a test turbine to validate models and further areas of research interest like materials, modeling, soiling, airfoil analysis methods, aeroacoustics, and turbulence modeling.
This document contains details and drawings for a skylight project including:
- Revision dates and descriptions from 2015 showing the design was issued for approval and site.
- Drawings labeled "Western Courtyard Skylight GA Showing Tension Rods" and "Western Courtyard Skylight 3D View" depicting structural components.
- Technical details like thread types, material codes, and dimensions for skylight tension rod assemblies.
This document discusses reducing downtime on bottling lines at LeVecke Corporation. It defines the scope of the project using a SIPOC diagram. Metrics collected in March showed 11 hours of downtime costing $3,400. Root causes of downtime included issues with pallets like irregular sizes and protruding nails. Solutions implemented included reminding pallet suppliers of requirements, training fork lift operators to inspect pallets, and developing a pallet inspection process. Run charts and control plans were created to monitor progress.
This document summarizes savings achieved from various capital expenditure and operating expenditure projects in 2015. It lists the project name and category, planned spend, savings goal, and actual savings amount and percentage for each project. In total, it reports $120.7 million in total planned project spend, with savings goals of $8.77 million and actual savings of $12.96 million, representing 11% of total planned project spend.
Utilizing Predictive Modeling for Bearing Supplier Decision MakingSentient Science
Machinery OEMs often have to choose between different bearing suppliers when designing a new device. Although the same bearing model from different suppliers may have the same external form factor and load rating, there are often differences in internal geometry, material quality, and surface treatment from one supplier to another that will cause the performance and expected life to vary in the field.
These slides will outline Sentient Science’s approach towards measuring and quantifying these hidden bearing parameters. We show how we combine material, geometry, and surface treatment metrics into high-fidelity predictive models which we use to help OEMs decide which bearing supplier to choose for their application.
The ARAC project is on schedule and within budget. Design was completed in August 2016 and construction bids were received in September 2016. Construction is scheduled to begin in October 2016 and be completed by August 2017. The project is funded through a $5 million DEAAG grant with contributions from Fort Hood and the Killeen Economic Development Corporation. As of September 2016, $478,690 had been expended on design work contracts with Garver and KAYA Associates, leaving a remaining balance of $4.7 million. An update was provided on supplemental agreements to the Garver design contract to accommodate additional requirements and modifications.
Extend gearbox life with new components and methods 2015.04.21Sentient Science
Sentient Science hosted three different solution providers to discuss their approaches for life extension of wind turbine gearboxes. They will show their unique materials, torque dampener, and components and how these contribute to making wind turbine gearboxes last longer. The DigitalClone lifing model can take these benefits into account to validate the benefits.
Austin 7 friction damper New discs 16.4 plus 1 turn to 5 turns preloadAdrian Ward
The document appears to be test results from dynamic suspension testing software. It includes graphs of displacement, force, velocity, and average force over time for an Austin 7 material test. The test recorded data from 5 runs, including peak forces and average temperature for each run. Notes provide details on the material and preload used for each run, such as testing an old disc, new material, oiled wood, and wood with preload.
The document discusses a ground-based inspection system called SABRE that uses infrared imaging, acoustic analysis, and phase imaging to detect defects in operating wind turbine blades from the ground. SABRE can identify issues like cracks, delaminations, and lightning strikes. It was tested by EPRI and Digital Wind Systems to provide a cheaper, faster alternative to current blade inspection methods to improve maintenance and reduce costs for the wind energy industry.
Project Ascension involves the design and testing of a small rocket carrying a payload to 3,000 feet altitude. A subscale test rocket was successfully flown, reaching an altitude of 3,314 feet. Key features include a payload containment device, piston parachute deployment system, and dual recovery system. An autonomous ground support equipment was also designed using servos to position a camera for payload inspection.
Glencore Coal Assets Australia has grown to be the largest coal producer in Australia with open cut and underground mines spread throughout NSW and Queensland. Glencore has very high regard for engineering and has sponsored the development of statutory mechanical engineers in NSW for more than a decade. This presentation looks at where Glencore stands in relation to safety and engineering, how this is managed within Glencore Coal, and some of the key challenges, direction and lessons.
This document summarizes a presentation by Clean Marine AS on their exhaust gas cleaning system. Some key points:
- Clean Marine AS is a pioneering company in exhaust gas cleaning systems (EGCS) with over 20 employees and USD 20 million invested in development.
- They have a proven EGCS technology and a contract to install systems on two Samsung/AET shuttle tankers delivering in late 2014 and early 2015.
- With new sulfur regulations coming into effect from 2015, EGCS presents a viable option for vessels to continue using less expensive high-sulfur fuel and avoid costly low-sulfur fuel.
Demonstration on How to Extend the Life a 1.5MW Class GearboxSentient Science
Sentient Science demonstrate it’s computational prognostics and life extension solution for the GE 1.5MW class gearbox with a discussion regarding up-tower component replacement options, impact of up-rating on gearbox life, and general failure rates off warranty.
Aim Directional Record Run Midland County, TexasParker Hooks
Successfully drilled from spud (Includes Surface Hole) to
total depth (TD) in 15.20 days.
One run in intermediate section, 5669’ in 90.89hrs
Drilled Curve Section in under 24hrs (20hr Curve)
Drilled 10,345’ Lateral Section in 4.08 Days (98hrs)
This document discusses challenges and solutions for measuring the performance of vortex generators on wind turbines. It outlines two methods for assessing performance: 1) comparing power curves with and without vortex generators, and 2) comparing the active power relationship between a test turbine using vortex generators and a control turbine. The analysis seeks to closely match the inflow conditions for test and control periods to isolate the effects of the vortex generators while accounting for seasonal and turbulence intensity variations. Preliminary results suggest a potential 1-2% increase in energy capture with vortex generators.
The document summarizes lessons learned from recent wind turbine blade failures over the past 4 years. It identifies the main causes of blade failures as manufacturing defects, progressive damage, excessive loads from system dynamics or environmental conditions, and distortion of blade sections. To address these issues, it recommends improving non-destructive inspection techniques, manufacturing quality control, analytical tools for assessing site conditions and resonant phenomena, and lightning protection system design standards. The overall goal is to eliminate manufacturing defects as a cause of failures and move blades into the distant background as a risk for turbine operations.
The operator was preparing to drill a well where low-gravity solids (LGS) had previously caused expensive problems in offset wells. M-I SWACO recommended using their new RHE-USE process to remove LGS and improve drilling efficiency. When applied in a 5,049-ft interval, the RHE-USE process saved an estimated $163,282 by reducing dilution needs and allowing reuse of drilling fluid. It also improved drilling performance by lowering downhole temperatures and reducing bit wear.
Project Performance Measurement Earned Value A StarterSimonRobertson
The document discusses earned value management (EVM) and its implementation in Microsoft Project. EVM allows measuring a project's schedule and cost performance by comparing the planned, earned, and actual values. Key benefits include having an accurate project status, ability to proactively make corrections, and managing stakeholder expectations. The document outlines how to set up EVM in MS Project, including adding columns to track planned value, earned value, actual cost, schedule and cost variances, and performance indexes. Examples of information tables and charts for tracking and reporting EVM measures are also provided.
Andrew Chant\'s CanWEA O & M Presentationmtingle
ORTECH Power provides operations and maintenance services for wind farms. This presentation discusses estimating operations and maintenance (O&M) costs after warranty expiration. It finds that planned maintenance can significantly reduce costs compared to reactive maintenance by catching issues early. Estimates show a facility with 50 turbines could save over $25 million over 20 years with planned maintenance. However, larger newer turbine models pose challenges due to limited operating experience. The presentation provides a framework for analyzing O&M costs and risks over a wind farm's lifetime.
EOG Resources 4Q 2015 Quarterly Presentation Investor RelationsMichelle Smith
EOG Resources provides key information about its operations and financial results. It has over 3,200 premium well locations with over 2 billion barrels of oil equivalent of resource potential. EOG reduced capital spending 44% year-over-year while maintaining flat US oil production in 2015. It aims to generate at least 30% returns on investment at $40/barrel oil from its shifting focus to premium locations with over 10 years of sustainable inventory growth.
Siemens discusses reducing the cost of wind energy through rotor research and development. They describe validation methods like structural testing, wind tunnel testing, and field testing of blades. These include measuring loads, acoustics, oil flow visualization, and aeroelastic deflections. Siemens collaborates with research institutions on a test turbine to validate models and further areas of research interest like materials, modeling, soiling, airfoil analysis methods, aeroacoustics, and turbulence modeling.
This document contains details and drawings for a skylight project including:
- Revision dates and descriptions from 2015 showing the design was issued for approval and site.
- Drawings labeled "Western Courtyard Skylight GA Showing Tension Rods" and "Western Courtyard Skylight 3D View" depicting structural components.
- Technical details like thread types, material codes, and dimensions for skylight tension rod assemblies.
This document discusses reducing downtime on bottling lines at LeVecke Corporation. It defines the scope of the project using a SIPOC diagram. Metrics collected in March showed 11 hours of downtime costing $3,400. Root causes of downtime included issues with pallets like irregular sizes and protruding nails. Solutions implemented included reminding pallet suppliers of requirements, training fork lift operators to inspect pallets, and developing a pallet inspection process. Run charts and control plans were created to monitor progress.
This document summarizes savings achieved from various capital expenditure and operating expenditure projects in 2015. It lists the project name and category, planned spend, savings goal, and actual savings amount and percentage for each project. In total, it reports $120.7 million in total planned project spend, with savings goals of $8.77 million and actual savings of $12.96 million, representing 11% of total planned project spend.
Utilizing Predictive Modeling for Bearing Supplier Decision MakingSentient Science
Machinery OEMs often have to choose between different bearing suppliers when designing a new device. Although the same bearing model from different suppliers may have the same external form factor and load rating, there are often differences in internal geometry, material quality, and surface treatment from one supplier to another that will cause the performance and expected life to vary in the field.
These slides will outline Sentient Science’s approach towards measuring and quantifying these hidden bearing parameters. We show how we combine material, geometry, and surface treatment metrics into high-fidelity predictive models which we use to help OEMs decide which bearing supplier to choose for their application.
The ARAC project is on schedule and within budget. Design was completed in August 2016 and construction bids were received in September 2016. Construction is scheduled to begin in October 2016 and be completed by August 2017. The project is funded through a $5 million DEAAG grant with contributions from Fort Hood and the Killeen Economic Development Corporation. As of September 2016, $478,690 had been expended on design work contracts with Garver and KAYA Associates, leaving a remaining balance of $4.7 million. An update was provided on supplemental agreements to the Garver design contract to accommodate additional requirements and modifications.
Extend gearbox life with new components and methods 2015.04.21Sentient Science
Sentient Science hosted three different solution providers to discuss their approaches for life extension of wind turbine gearboxes. They will show their unique materials, torque dampener, and components and how these contribute to making wind turbine gearboxes last longer. The DigitalClone lifing model can take these benefits into account to validate the benefits.
Austin 7 friction damper New discs 16.4 plus 1 turn to 5 turns preloadAdrian Ward
The document appears to be test results from dynamic suspension testing software. It includes graphs of displacement, force, velocity, and average force over time for an Austin 7 material test. The test recorded data from 5 runs, including peak forces and average temperature for each run. Notes provide details on the material and preload used for each run, such as testing an old disc, new material, oiled wood, and wood with preload.
The document discusses a ground-based inspection system called SABRE that uses infrared imaging, acoustic analysis, and phase imaging to detect defects in operating wind turbine blades from the ground. SABRE can identify issues like cracks, delaminations, and lightning strikes. It was tested by EPRI and Digital Wind Systems to provide a cheaper, faster alternative to current blade inspection methods to improve maintenance and reduce costs for the wind energy industry.
Project Ascension involves the design and testing of a small rocket carrying a payload to 3,000 feet altitude. A subscale test rocket was successfully flown, reaching an altitude of 3,314 feet. Key features include a payload containment device, piston parachute deployment system, and dual recovery system. An autonomous ground support equipment was also designed using servos to position a camera for payload inspection.
Glencore Coal Assets Australia has grown to be the largest coal producer in Australia with open cut and underground mines spread throughout NSW and Queensland. Glencore has very high regard for engineering and has sponsored the development of statutory mechanical engineers in NSW for more than a decade. This presentation looks at where Glencore stands in relation to safety and engineering, how this is managed within Glencore Coal, and some of the key challenges, direction and lessons.
This document summarizes a presentation by Clean Marine AS on their exhaust gas cleaning system. Some key points:
- Clean Marine AS is a pioneering company in exhaust gas cleaning systems (EGCS) with over 20 employees and USD 20 million invested in development.
- They have a proven EGCS technology and a contract to install systems on two Samsung/AET shuttle tankers delivering in late 2014 and early 2015.
- With new sulfur regulations coming into effect from 2015, EGCS presents a viable option for vessels to continue using less expensive high-sulfur fuel and avoid costly low-sulfur fuel.
Demonstration on How to Extend the Life a 1.5MW Class GearboxSentient Science
Sentient Science demonstrate it’s computational prognostics and life extension solution for the GE 1.5MW class gearbox with a discussion regarding up-tower component replacement options, impact of up-rating on gearbox life, and general failure rates off warranty.
Aim Directional Record Run Midland County, TexasParker Hooks
Successfully drilled from spud (Includes Surface Hole) to
total depth (TD) in 15.20 days.
One run in intermediate section, 5669’ in 90.89hrs
Drilled Curve Section in under 24hrs (20hr Curve)
Drilled 10,345’ Lateral Section in 4.08 Days (98hrs)
This document discusses challenges and solutions for measuring the performance of vortex generators on wind turbines. It outlines two methods for assessing performance: 1) comparing power curves with and without vortex generators, and 2) comparing the active power relationship between a test turbine using vortex generators and a control turbine. The analysis seeks to closely match the inflow conditions for test and control periods to isolate the effects of the vortex generators while accounting for seasonal and turbulence intensity variations. Preliminary results suggest a potential 1-2% increase in energy capture with vortex generators.
The document summarizes lessons learned from recent wind turbine blade failures over the past 4 years. It identifies the main causes of blade failures as manufacturing defects, progressive damage, excessive loads from system dynamics or environmental conditions, and distortion of blade sections. To address these issues, it recommends improving non-destructive inspection techniques, manufacturing quality control, analytical tools for assessing site conditions and resonant phenomena, and lightning protection system design standards. The overall goal is to eliminate manufacturing defects as a cause of failures and move blades into the distant background as a risk for turbine operations.
The operator was preparing to drill a well where low-gravity solids (LGS) had previously caused expensive problems in offset wells. M-I SWACO recommended using their new RHE-USE process to remove LGS and improve drilling efficiency. When applied in a 5,049-ft interval, the RHE-USE process saved an estimated $163,282 by reducing dilution needs and allowing reuse of drilling fluid. It also improved drilling performance by lowering downhole temperatures and reducing bit wear.
Project Performance Measurement Earned Value A StarterSimonRobertson
The document discusses earned value management (EVM) and its implementation in Microsoft Project. EVM allows measuring a project's schedule and cost performance by comparing the planned, earned, and actual values. Key benefits include having an accurate project status, ability to proactively make corrections, and managing stakeholder expectations. The document outlines how to set up EVM in MS Project, including adding columns to track planned value, earned value, actual cost, schedule and cost variances, and performance indexes. Examples of information tables and charts for tracking and reporting EVM measures are also provided.
Andrew Chant\'s CanWEA O & M Presentationmtingle
ORTECH Power provides operations and maintenance services for wind farms. This presentation discusses estimating operations and maintenance (O&M) costs after warranty expiration. It finds that planned maintenance can significantly reduce costs compared to reactive maintenance by catching issues early. Estimates show a facility with 50 turbines could save over $25 million over 20 years with planned maintenance. However, larger newer turbine models pose challenges due to limited operating experience. The presentation provides a framework for analyzing O&M costs and risks over a wind farm's lifetime.
EOG Resources 4Q 2015 Quarterly Presentation Investor RelationsMichelle Smith
EOG Resources provides key information about its operations and financial results. It has over 3,200 premium well locations with over 2 billion barrels of oil equivalent of resource potential. EOG reduced capital spending 44% year-over-year while maintaining flat US oil production in 2015. It aims to generate at least 30% returns on investment at $40/barrel oil from its shifting focus to premium locations with over 10 years of sustainable inventory growth.
A short presentation on Project Controls in a Mining Environment. There are some obvious errors, as time to compile was a bit limited, but you should get the general idea.
SandRidge Energy Q1 2017 Earnings PresentationSandRidgeIR
The document is an earnings presentation for SandRidge Energy's first quarter of 2017. It summarizes the company's operational and financial results for Q1, including production of 4.0 MMBoe, adjusted EBITDA of $56 million, and capital expenditures of $41 million. It discusses the company's three project areas - NW STACK, North Park Niobrara, and Mississippian - and plans for continued delineation and development across the portfolio in 2017.
The presentation contain an example for project planning using the Primavera P6. It starts from the contract wiring, tendering and management. Then a planning process is followed.
This document provides an overview of SISCO, a Saudi-owned construction company. It details SISCO's areas of business in oil, gas, and industrial construction projects. The company has 2000 employees, 700 pieces of equipment, and facilities in major Saudi cities. Notable past clients include Saudi Aramco, SABIC, and other major Saudi industrial firms. The document outlines SISCO's resources and capabilities, highlights past project experience, describes contract features for a SABIC general construction services agreement, shows an organizational chart and work flow diagram, and provides a mobilization plan for additional resources. It concludes by requesting feedback from the client.
Mr. Chainarong Jirapong has worked in several engineering roles since 2007 including assistance engineering, field electrical engineering, technical engineering, and currently as a sales engineer. As a sales engineer, his responsibilities include searching for new clients, calculating quotations, negotiating contracts, offering after-sales support, and meeting sales targets. Some of his key achievements include winning projects for Skyonic Capitol Skymine in Texas and Esterification-Emery in Malaysia by providing over 200 valve sets totaling over $1.5 million. He has also won projects in Qatar, Thailand, and several others by supplying valves. His key to success is building relationships with customers.
Vinothmathialagan is a mechanical engineer with 9 years of experience in the oil and gas industry. He is currently a maintenance planning engineer in Kuwait and has previously held roles as a planning engineer in Kuwait, Abu Dhabi, and Saudi Arabia. His experience includes planning maintenance activities such as shutdowns, managing projects, and handling static equipment. He has skills in planning, scheduling, procurement, and using software like Primavera P6 and SAP.
This document contains the resume of Muhammad Jamil, who is seeking a position as an Instrument Supervisor. He has over 15 years of experience in instrumentation and has worked on numerous oil and gas projects in Abu Dhabi and Saudi Arabia. Jamil has a diploma in instrumentation engineering and relevant technical skills. He is proficient in his duties as an instrumentation supervisor and has excellent documentation and communication skills.
This document contains the resume of Muhammad Jamil, who is seeking a position as an Instrument Supervisor. He has over 15 years of experience in instrumentation and has worked on numerous oil and gas projects in Abu Dhabi and Saudi Arabia. Jamil has a diploma in instrumentation engineering and relevant technical skills. He is proficient in his duties as an instrumentation supervisor and has experience working for major clients like ADMA-OPCO, ADGAS, ZADCO, and GASCO.
The document outlines the business plan for Division/VAC Services for 2022. In 2021, sales figures totaled $3.145 million, with major milestones including contracts from Oxy and a 5-year maintenance agreement. The 2022 sales target is $6 million from trading sales and $1.65 million from VAC services. The action plan focuses on client visits, site surveys, exploring new industries, and an aggressive pricing strategy. Major projects for 2022 include projects with contractors and a potential long-term contract with PDO. Threats include uncompetitive pricing and a lack of special equipment at VAC.
Your company has acquired a 50% interest in offshore oil blocks in Angola, West Africa. Initial exploratory drilling in block 10 found light oil reserves producing 2,500 bbl/day. Additional wells in block 24 further proved the reserves. The blocks contain multiple underwater oil structures that will require development. You must formulate a development plan, selecting from alternatives like fixed platforms, floating production vessels, or subsea wells. Your plan should include well numbers and locations, production forecast, facility design, costs and schedule and economic evaluation to determine the best option.
This document provides information on the proposed construction of a new 2-story office building and site improvements at ABC International's regional headquarters complex. Key details include the site location, existing conditions, proposed building and site plans, construction costs and schedule, sustainable design features, and safety plans. Lewis General Contractors provides a comprehensive proposal and presentation for the estimated $1.7 million project planned to take 8 3/4 months to complete.
This document outlines the ultrasonic testing (UT) inspection plan and procedures for an industrial project. It includes:
1. A review of UT personnel qualifications and certification requirements.
2. Calibration and verification requirements for UT equipment and mock-ups using calibration blocks.
3. In-process inspection tasks like verifying UT techniques and procedures, evaluating UT reports, and ensuring NDE process control including repairs.
4. It specifies the use of SAIC checklists and database entry for UT inspection results, as outlined in the Saudi Aramco engineering standards.
This document discusses drilling economics and optimization techniques. It covers topics such as drilling cost prediction, authorization for expenditure (AFE), drilling optimization techniques including drilling cost equations and breakeven calculations, and decision making using expected value calculations. Examples are provided for calculating cost per foot, determining breakeven points, and evaluating decisions using expected values.
The document discusses NovX21's low energy and cost process for recycling precious metal groups (PGMs) from spent autocatalysts. It describes NovX21's technology as having a recovery rate over 97% and average recovery of 3,500 grams per ton of catalysts. The economics of NovX21's planned 200-ton per year facility show potential for $29 million in annual revenues, 35% gross margin, and a nine month payback period on $8 million capital expenditures.
Roberto S. Guloy has over 20 years of experience in utilities equipment operation and maintenance including refrigeration plants, boiler plants, and HVAC systems. He has worked as a refrigeration and HVAC engineer, industrial services operator, boiler house staff, and in boiler and waste water treatment plant operation and maintenance. His experience also includes mechanical site engineering roles for installation, inspection, and commissioning of projects. He has a bachelor's degree in mechanical engineering and is a registered mechanical engineer in the Philippines.
Similar to Innovation of Coal Seam Gas Well-Construction Process in Australia: (20)
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...IJECEIAES
Medical image analysis has witnessed significant advancements with deep learning techniques. In the domain of brain tumor segmentation, the ability to
precisely delineate tumor boundaries from magnetic resonance imaging (MRI)
scans holds profound implications for diagnosis. This study presents an ensemble convolutional neural network (CNN) with transfer learning, integrating
the state-of-the-art Deeplabv3+ architecture with the ResNet18 backbone. The
model is rigorously trained and evaluated, exhibiting remarkable performance
metrics, including an impressive global accuracy of 99.286%, a high-class accuracy of 82.191%, a mean intersection over union (IoU) of 79.900%, a weighted
IoU of 98.620%, and a Boundary F1 (BF) score of 83.303%. Notably, a detailed comparative analysis with existing methods showcases the superiority of
our proposed model. These findings underscore the model’s competence in precise brain tumor localization, underscoring its potential to revolutionize medical
image analysis and enhance healthcare outcomes. This research paves the way
for future exploration and optimization of advanced CNN models in medical
imaging, emphasizing addressing false positives and resource efficiency.
Batteries -Introduction – Types of Batteries – discharging and charging of battery - characteristics of battery –battery rating- various tests on battery- – Primary battery: silver button cell- Secondary battery :Ni-Cd battery-modern battery: lithium ion battery-maintenance of batteries-choices of batteries for electric vehicle applications.
Fuel Cells: Introduction- importance and classification of fuel cells - description, principle, components, applications of fuel cells: H2-O2 fuel cell, alkaline fuel cell, molten carbonate fuel cell and direct methanol fuel cells.
Introduction- e - waste – definition - sources of e-waste– hazardous substances in e-waste - effects of e-waste on environment and human health- need for e-waste management– e-waste handling rules - waste minimization techniques for managing e-waste – recycling of e-waste - disposal treatment methods of e- waste – mechanism of extraction of precious metal from leaching solution-global Scenario of E-waste – E-waste in India- case studies.
Comparative analysis between traditional aquaponics and reconstructed aquapon...bijceesjournal
The aquaponic system of planting is a method that does not require soil usage. It is a method that only needs water, fish, lava rocks (a substitute for soil), and plants. Aquaponic systems are sustainable and environmentally friendly. Its use not only helps to plant in small spaces but also helps reduce artificial chemical use and minimizes excess water use, as aquaponics consumes 90% less water than soil-based gardening. The study applied a descriptive and experimental design to assess and compare conventional and reconstructed aquaponic methods for reproducing tomatoes. The researchers created an observation checklist to determine the significant factors of the study. The study aims to determine the significant difference between traditional aquaponics and reconstructed aquaponics systems propagating tomatoes in terms of height, weight, girth, and number of fruits. The reconstructed aquaponics system’s higher growth yield results in a much more nourished crop than the traditional aquaponics system. It is superior in its number of fruits, height, weight, and girth measurement. Moreover, the reconstructed aquaponics system is proven to eliminate all the hindrances present in the traditional aquaponics system, which are overcrowding of fish, algae growth, pest problems, contaminated water, and dead fish.
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024Sinan KOZAK
Sinan from the Delivery Hero mobile infrastructure engineering team shares a deep dive into performance acceleration with Gradle build cache optimizations. Sinan shares their journey into solving complex build-cache problems that affect Gradle builds. By understanding the challenges and solutions found in our journey, we aim to demonstrate the possibilities for faster builds. The case study reveals how overlapping outputs and cache misconfigurations led to significant increases in build times, especially as the project scaled up with numerous modules using Paparazzi tests. The journey from diagnosing to defeating cache issues offers invaluable lessons on maintaining cache integrity without sacrificing functionality.
The CBC machine is a common diagnostic tool used by doctors to measure a patient's red blood cell count, white blood cell count and platelet count. The machine uses a small sample of the patient's blood, which is then placed into special tubes and analyzed. The results of the analysis are then displayed on a screen for the doctor to review. The CBC machine is an important tool for diagnosing various conditions, such as anemia, infection and leukemia. It can also help to monitor a patient's response to treatment.
Literature Review Basics and Understanding Reference Management.pptxDr Ramhari Poudyal
Three-day training on academic research focuses on analytical tools at United Technical College, supported by the University Grant Commission, Nepal. 24-26 May 2024
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODELgerogepatton
As digital technology becomes more deeply embedded in power systems, protecting the communication
networks of Smart Grids (SG) has emerged as a critical concern. Distributed Network Protocol 3 (DNP3)
represents a multi-tiered application layer protocol extensively utilized in Supervisory Control and Data
Acquisition (SCADA)-based smart grids to facilitate real-time data gathering and control functionalities.
Robust Intrusion Detection Systems (IDS) are necessary for early threat detection and mitigation because
of the interconnection of these networks, which makes them vulnerable to a variety of cyberattacks. To
solve this issue, this paper develops a hybrid Deep Learning (DL) model specifically designed for intrusion
detection in smart grids. The proposed approach is a combination of the Convolutional Neural Network
(CNN) and the Long-Short-Term Memory algorithms (LSTM). We employed a recent intrusion detection
dataset (DNP3), which focuses on unauthorized commands and Denial of Service (DoS) cyberattacks, to
train and test our model. The results of our experiments show that our CNN-LSTM method is much better
at finding smart grid intrusions than other deep learning algorithms used for classification. In addition,
our proposed approach improves accuracy, precision, recall, and F1 score, achieving a high detection
accuracy rate of 99.50%.
International Conference on NLP, Artificial Intelligence, Machine Learning an...gerogepatton
International Conference on NLP, Artificial Intelligence, Machine Learning and Applications (NLAIM 2024) offers a premier global platform for exchanging insights and findings in the theory, methodology, and applications of NLP, Artificial Intelligence, Machine Learning, and their applications. The conference seeks substantial contributions across all key domains of NLP, Artificial Intelligence, Machine Learning, and their practical applications, aiming to foster both theoretical advancements and real-world implementations. With a focus on facilitating collaboration between researchers and practitioners from academia and industry, the conference serves as a nexus for sharing the latest developments in the field.
Advanced control scheme of doubly fed induction generator for wind turbine us...IJECEIAES
This paper describes a speed control device for generating electrical energy on an electricity network based on the doubly fed induction generator (DFIG) used for wind power conversion systems. At first, a double-fed induction generator model was constructed. A control law is formulated to govern the flow of energy between the stator of a DFIG and the energy network using three types of controllers: proportional integral (PI), sliding mode controller (SMC) and second order sliding mode controller (SOSMC). Their different results in terms of power reference tracking, reaction to unexpected speed fluctuations, sensitivity to perturbations, and resilience against machine parameter alterations are compared. MATLAB/Simulink was used to conduct the simulations for the preceding study. Multiple simulations have shown very satisfying results, and the investigations demonstrate the efficacy and power-enhancing capabilities of the suggested control system.
Advanced control scheme of doubly fed induction generator for wind turbine us...
Innovation of Coal Seam Gas Well-Construction Process in Australia:
1. SPE-156930-PP
Innovation of Coal Seam Gas Well-Construction Process in Australia:
Lessons Learned, Successful Practices, Areas of Improvement
Thomas Bennett
3. Overview
• Fit for purpose rigs
• Standardization of well designs and equipment
• Vendor alignment and incentivized performance
• Problems associated with innovation
•Well design evolution and the need to optimize gas recovery
• The importance of being a learning organization
7. Vendor Alignment
Drilling Contractor: Performance Drilling
Rig Name: PD Rig-01
Well Name: AEW-1
Target Well Times (Spud to Release):
AFE Time (hours) 280
DWOP Time (hours) 235
BIC Time (hours) 210
Incentive Rate ($/hr) 600
Average POB 7
Shifts / day 2
NB: Bonus payble to each crewmember is an estimate assuming a constant POB. The final amount will be depend on the total
CREW PERFORMANCE INCENTIVE POSTER
Arrow Energy has established an performance incentive scheme to recognize
the performance of Arrow's contractor personnel working on the well site.
The total payment available under this scheme is dependant on:
- HSE performance (no incidents and number of safety observations
- Well Quality (linked to criteria on the Well Performance Poster)
- Days/hours ahead of target time (AFE / DWOP / BIC)
The graphs below show the expected bonus payout, assuming all HSE and
Well Quality criteria are met, versus the actual number of days (from spud to
rig release) required to drill the specified well.
$0
$20,000
$40,000
$60,000
$80,000
$100,000
$120,000
$140,000
$160,000
7.0 7.5 8.0 8.5 9.0 9.5 10.0 10.5 11.0 11.5 12.0
Totalbonuspayabletocrews
Days on Well (Spud to Release)
Total Bonus Payable to Crew
Performance DrillingWell Name:
PD Rig-01
AEW-1
$0
$500
$1,000
$1,500
$2,000
$2,500
$3,000
7.0 7.5 8.0 8.5 9.0 9.5 10.0 10.5 11.0 11.5 12.0
Totalbonuspayabletocrews
Days on Well (Spud to Release)
Bonus Payable to Each Crewmember per day on POB
Performance DrillingWell Name:
PD Rig-01
AEW-1
0
200
400
600
800
1000
1200
1400
0 100 200 300 400 500 600
Depth(m)
Time (Hours)
Depth vs. Time
AFE
Actual
Rig Estimate
1
Welcome and thankyou for taking the time to join me for my presentation: Innovation of Coal Seam Gas Well-Construction Process in Australia: Lessons Learned, Successful Practices, Areas of Improvement
2
I would like to start by telling you a little about Arrow Energy.
Arrow is a 50/50 joint venture company owned by Royal Dutch Shell and a subsidiary of PetroChina (CNPC). Arrow Energy’s activities cover a broad spectrum of Coal Seam Gas activities ranging from exploration to production, transportation and electricity generation.
Arrow Energy currently produces gas from fields in the Surat Basin in south east Queensland and the Bowen Basin in central Queensland. With about 600 production wells across these fields.
This presentation will hopefully give you a better understanding of where we currently are and how we plan to move forward
3.
Innovation will be a key requirement for Arrow Energy to succeed in the CSG business in Australia. Innovation in the basis of well design, and the technical challenges associated with driving continuous improvement, will become increasingly important as a lever to drive improvement in CSG in Australia.
Many innovations have occurred over the last two decades since the first CSG producing well was drilled in 1988 in Queensland. These successes will now need to be supplemented by a further step-change in performance to satisfy the needs of an LNG export scheme.
I will cover the following major topics
The need for fit for purpose rigs
Standardization of well designs and equipment
Vendor alignment and incentivized performance
Problems associated with innovation
Well design evolution
And lastly The importance of being a learning organization.
4
Successful Practices and current well designs
As you have already seen Arrow Energy’s portfolio is divided between the Surat and Bowen Basins. The Surat Basin is more permeable and produces more gas and therefore water.
The Bowen Basin has lower permeability making gas and water production harder requiring more innovative well designs.
Arrow Energy’s current production well designs can be broken down into two classifications, vertical and horizontal.
Vertical production wells drilled in the Surat Basin are commingled with up to 22 seams being under reamed and screened out with pre-slotted liner hanger and external-casing packers. These have been successful in the past, producing large amounts of gas.
Horizontal production wells, Surface to Inseam wells are drilled horizontally and intersect a vertical well. Arrow Energy began drilling SIS wells in 2001 with the first production SIS in 2003.
The advantage of the SIS well design is that the same production methodology used by single vertical well can be used to dewater the entire lateral. This is carried out by a down hole progressive cavity pump. Water is pumped out through the tubing lowering the water head to cause the methane to desorb from the surface of the coal.
I will now move onto the 6 major areas of improvement
5.
The need for fit for purpose rigs which meet well design criteria and well safety requirements.
Previously, wells have been designed around the available rig capacity instead of contracting the correct rig based on well design. This leads to the use of rigs which are not large enough to drill wells to API standards, this includes the hole sizes and the range of casing.
As Arrow Energy moves forward, given the larger economies of scale available, it will indeed have the work available to source the appropriate rigs required to construct API compliant wells which was not possible in the past.
Well Control
Historically the only barrier utilized was the primary barrier in conjunction with a diverter. The primary barrier was a near water KCL brine used to avoid formation damage while still providing a light overbalance. From a reputation and safety standpoint well-control has become the standard across the industry. DEEDI the government body responsible for over seeing CSG drilling has aligned to the API regulation to make it mandatory for all CSG drilling operations to have at least an annular blow out preventers.
There are currently no industry standards relating to the arrangement of well-control equipment, how much redundancy is needed based. Current CSG rig substructure height and equipment inventory limit the options.
6.
Standardization of well designs and equipment
Arrow has previously used API 5LB Line Pipe as the casing of choice. This was originally chosen as a supply of affordable OTCG casing was not available in Australia. Line pipe is more commonly used on the surface. The casing is pressure tested and regarded as fit-for-purpose for CSG wells.
This initial saving forced the use of irregular sized pipe which, although inexpensive, required custom products to be manufactured including under reamers, screens, and packers. As casing sizes and designs become aligned to oil and gas standards we will have the ability to use more off the shelf equipment.
As the standards for well designs improve we must still maintain the low cost, high volume drilling that makes CSG economically viable.
The ability to change casing requirements is directly related to the capacity of the rigs, these two go hand in hand
7.
Vendor alignment which includes incentivized performance to meet company targets will be essential to meet our company goals. The graph on the bottom right shows an example of this financial incentive.
Working with Vendors on Drilling the Well on Paper and After Action Reviews has already began to show improvements in drilling performance. By talking with the rig crew we can discuss the drilling operation in detail, and start thinking about performance before we start drilling. The Time Depth curve on the top left shows the variation in expected time between the Plan, AFE, and the Crew.
8.
Problems associated with innovation and difficulties of implementation in short time frames. This including the need to try concepts and be willing to accept that sometimes the trials will fail as part of the learning process.
Technology trials have an inherent level of risk as there is no guarantee they will provide the results required in the short time frame available. There are many factors which contribute to the success of a well.
Problems associated with innovation and difficulties of implementation in short time frames are expected. The need to try concepts and be willing to accept failure as part of the learning process is required.
Trials will therefore need to be commissioned in order to reduce the risk of a concept as much as reasonably practicable prior to moving into development phase.
As Arrow Energy approaches its Final Investment Decision we will need to accept that the final well design may not be decided on and well trials may continue into the delivery stages.
The learnings we will be able to gain from trialing well design will be key to future successes.
9.
Well design evolution and the need to optimize gas recovery.
Pad Drilling (Surat Basin)
The majority of Arrow Energy’s coal seams have Total Vertical Depths of less than 900 m and as shallow as 200 m. These shallow depths create a problem when planning well spacing for gas drainage. The optimum spacing required for vertical wells is between 700 and 1200 meters.
The traditional single well spacing is shown on the left. To minimize this impact and cost it is possible to achieve the same gas drainage area by drilling many wells from a single surface location as shown on the right. These wells do not need to be complicated directional wells
Laterals Wells (Bowen Basin)
To reduce the Unit Technical Costs of these wells and improving safety and minimizing surface locations, there will be a need to trial new well design configurations. This includes removing the vertical from the SIS and increasing inseam length.
10.
The importance of being a learning organization.
Training and education will play a large role in the future of drilling in Australia. Arrow Energy is able to utilize Shell’s distance learning package to bring drilling supervisors and engineers up to international oil and gas standards.
In addition to the formal classes Arrow Energy has hired experienced coaches to drive individual performance and on the job development. This training will improve supervision and planning and reducing the potential for costly mistakes.
11.
The Australian CSG industry is transitioning from exploration to designing and executing viable economic field development. The industry is expected to experience rapid growth over the next few years.
These increases in productivity will not be possible if current operations are scaled up, innovation of the well construction process will need to be implemented. Much of the early success will likely be obtained from the transfer of benchmark practices, where relevant, from the more mature global oil and gas industry. However, given the lower cost margins and economics of CSG, this knowledge transfer will need to be coupled with innovative application and new approaches.
12.
I would like to thank
Arrow Energy
CNPC
Shell
IADC
SPE
Questions?