Job Applied For: -Mechanical Installation and Commissioning Engineer
Dear Sir,
It is with great interest that I am forwarding my CV/Resume for your consideration.
My record of academic achievements and professional career history, demonstrates attributes that make me a valuable employee.
CV/Resume is enclosed to provide you with details of my skills and accomplishments, but I am certain that a personal interview would more fully reveal my desire and ability to contribute to organization.
Kindly note that currently I am employed with the POYRY Switzerland Saudi Arabia.
Thank you for your time and consideration.
Thank You
BEST REGARD’S
Mohammed Umar Faruque
+91-7677298427
Casing Wear: Causes, Prediction and Preventionpvisoftware
Casing wear creates more serious problems for operators due to its potential catastrophic incidents such as oil spills, blow outs or loss of the well. Check out the this white paper to see how the casing wear model is applied in the software, as well as casing wear preventive measures, and more.
Job Applied For: -Mechanical Installation and Commissioning Engineer
Dear Sir,
It is with great interest that I am forwarding my CV/Resume for your consideration.
My record of academic achievements and professional career history, demonstrates attributes that make me a valuable employee.
CV/Resume is enclosed to provide you with details of my skills and accomplishments, but I am certain that a personal interview would more fully reveal my desire and ability to contribute to organization.
Kindly note that currently I am employed with the POYRY Switzerland Saudi Arabia.
Thank you for your time and consideration.
Thank You
BEST REGARD’S
Mohammed Umar Faruque
+91-7677298427
Casing Wear: Causes, Prediction and Preventionpvisoftware
Casing wear creates more serious problems for operators due to its potential catastrophic incidents such as oil spills, blow outs or loss of the well. Check out the this white paper to see how the casing wear model is applied in the software, as well as casing wear preventive measures, and more.
Schlumberger - Drilling and Measurement Segment - Internship PresentationZorays Solar Pakistan
I learnt about all the Drilling and Measurement equipment and procedures. During the internship period, I had to survey few technical modules which were specific to Drilling and Measurment segment, which included
• an introduction to Drilling & Measurment segment and its core services
• interpretation of Direction & Inclination terminologies
• learning of Telemetry procedures and working of Measurement While Drilling tools
• understanding of Surface System structure.
FMS Layout for Manufacturing of Marine GearsSomesh Saurabh
This is a complete presentation on Manufacturing and FMS layout for Marine Gears which are Helical, Spiral Bevel and Conical Bevel. It includes manufacturing, heat treatment process, FMS and testing also.
Schlumberger - Drilling and Measurement Segment - Internship PresentationZorays Solar Pakistan
I learnt about all the Drilling and Measurement equipment and procedures. During the internship period, I had to survey few technical modules which were specific to Drilling and Measurment segment, which included
• an introduction to Drilling & Measurment segment and its core services
• interpretation of Direction & Inclination terminologies
• learning of Telemetry procedures and working of Measurement While Drilling tools
• understanding of Surface System structure.
FMS Layout for Manufacturing of Marine GearsSomesh Saurabh
This is a complete presentation on Manufacturing and FMS layout for Marine Gears which are Helical, Spiral Bevel and Conical Bevel. It includes manufacturing, heat treatment process, FMS and testing also.
Innovation of Coal Seam Gas Well-Construction Process in Australia:Thomas Bennett
A presentation I delivered in Tianjin, China at the SPE international conference in 2012. The paper titled: Innovation of Coal Seam Gas Well-Construction Process in Australia: Lessons Learned, Successful Practices, Areas of Improvement.
IJRET : International Journal of Research in Engineering and Technology is an international peer reviewed, online journal published by eSAT Publishing House for the enhancement of research in various disciplines of Engineering and Technology. The aim and scope of the journal is to provide an academic medium and an important reference for the advancement and dissemination of research results that support high-level learning, teaching and research in the fields of Engineering and Technology. We bring together Scientists, Academician, Field Engineers, Scholars and Students of related fields of Engineering and Technology
International Journal of Engineering Research and Applications (IJERA) is an open access online peer reviewed international journal that publishes research and review articles in the fields of Computer Science, Neural Networks, Electrical Engineering, Software Engineering, Information Technology, Mechanical Engineering, Chemical Engineering, Plastic Engineering, Food Technology, Textile Engineering, Nano Technology & science, Power Electronics, Electronics & Communication Engineering, Computational mathematics, Image processing, Civil Engineering, Structural Engineering, Environmental Engineering, VLSI Testing & Low Power VLSI Design etc.
On the occasion of CII 1000 Visionary SME Programme Launch on 17th July 2013 in New Delhi, Pravesh Srivastava, Group President for Excellence in Manufacturing and Education, Anand Automotive Limited shared the success story. With learnings from VSME we have started our own "SSI Sahastra SME Institute". Under the leadership of Mr Deep Anand we have dedicated team of more than 150 managers and 250 engineers to transform our tier 2 companies in 3 years. We will also help other companies through CII to develop their SME's to achieve the target of 1000 SME's in next 3 years.
For more information, please contact p.girish@cii.in
Similar to PRODUCTION OPTIMIZATION USING SURFACTANT STIMULATION HUFF & PUFF AND CONTINUES INJECTION (20)
Operations Geology include duties and responsibilities with respect to data management, well planning, subsurface hazard identification and mitigation, contractor selection and management, HSE, data acquisition planning. During the well execution phase, monitoring of coring, wireline logging, geosteering, and pore pressure evaluation. Post well duties including end of well reporting, data distribution and archiving.
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdffxintegritypublishin
Advancements in technology unveil a myriad of electrical and electronic breakthroughs geared towards efficiently harnessing limited resources to meet human energy demands. The optimization of hybrid solar PV panels and pumped hydro energy supply systems plays a pivotal role in utilizing natural resources effectively. This initiative not only benefits humanity but also fosters environmental sustainability. The study investigated the design optimization of these hybrid systems, focusing on understanding solar radiation patterns, identifying geographical influences on solar radiation, formulating a mathematical model for system optimization, and determining the optimal configuration of PV panels and pumped hydro storage. Through a comparative analysis approach and eight weeks of data collection, the study addressed key research questions related to solar radiation patterns and optimal system design. The findings highlighted regions with heightened solar radiation levels, showcasing substantial potential for power generation and emphasizing the system's efficiency. Optimizing system design significantly boosted power generation, promoted renewable energy utilization, and enhanced energy storage capacity. The study underscored the benefits of optimizing hybrid solar PV panels and pumped hydro energy supply systems for sustainable energy usage. Optimizing the design of solar PV panels and pumped hydro energy supply systems as examined across diverse climatic conditions in a developing country, not only enhances power generation but also improves the integration of renewable energy sources and boosts energy storage capacities, particularly beneficial for less economically prosperous regions. Additionally, the study provides valuable insights for advancing energy research in economically viable areas. Recommendations included conducting site-specific assessments, utilizing advanced modeling tools, implementing regular maintenance protocols, and enhancing communication among system components.
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxR&R Consult
CFD analysis is incredibly effective at solving mysteries and improving the performance of complex systems!
Here's a great example: At a large natural gas-fired power plant, where they use waste heat to generate steam and energy, they were puzzled that their boiler wasn't producing as much steam as expected.
R&R and Tetra Engineering Group Inc. were asked to solve the issue with reduced steam production.
An inspection had shown that a significant amount of hot flue gas was bypassing the boiler tubes, where the heat was supposed to be transferred.
R&R Consult conducted a CFD analysis, which revealed that 6.3% of the flue gas was bypassing the boiler tubes without transferring heat. The analysis also showed that the flue gas was instead being directed along the sides of the boiler and between the modules that were supposed to capture the heat. This was the cause of the reduced performance.
Based on our results, Tetra Engineering installed covering plates to reduce the bypass flow. This improved the boiler's performance and increased electricity production.
It is always satisfying when we can help solve complex challenges like this. Do your systems also need a check-up or optimization? Give us a call!
Work done in cooperation with James Malloy and David Moelling from Tetra Engineering.
More examples of our work https://www.r-r-consult.dk/en/cases-en/
Saudi Arabia stands as a titan in the global energy landscape, renowned for its abundant oil and gas resources. It's the largest exporter of petroleum and holds some of the world's most significant reserves. Let's delve into the top 10 oil and gas projects shaping Saudi Arabia's energy future in 2024.
Hierarchical Digital Twin of a Naval Power SystemKerry Sado
A hierarchical digital twin of a Naval DC power system has been developed and experimentally verified. Similar to other state-of-the-art digital twins, this technology creates a digital replica of the physical system executed in real-time or faster, which can modify hardware controls. However, its advantage stems from distributing computational efforts by utilizing a hierarchical structure composed of lower-level digital twin blocks and a higher-level system digital twin. Each digital twin block is associated with a physical subsystem of the hardware and communicates with a singular system digital twin, which creates a system-level response. By extracting information from each level of the hierarchy, power system controls of the hardware were reconfigured autonomously. This hierarchical digital twin development offers several advantages over other digital twins, particularly in the field of naval power systems. The hierarchical structure allows for greater computational efficiency and scalability while the ability to autonomously reconfigure hardware controls offers increased flexibility and responsiveness. The hierarchical decomposition and models utilized were well aligned with the physical twin, as indicated by the maximum deviations between the developed digital twin hierarchy and the hardware.
Student information management system project report ii.pdfKamal Acharya
Our project explains about the student management. This project mainly explains the various actions related to student details. This project shows some ease in adding, editing and deleting the student details. It also provides a less time consuming process for viewing, adding, editing and deleting the marks of the students.
3. EXECUTIVE SUMMARY
PRODUCTION OPTIMIZATION USING SURFACTANT STIMULATION HUFF & PUFF
AND CONTINUES INJECTION (O field – South Sumatera basin)
The purpose Surfactant Stimulation Huff & Puff and Continues Injection using
SeMAR Technology is to Enhance Oil Production and Recovery by Stimulating the
Reservoir Behavior and Performance, Situation of Reservoir Surrounding the Oil
Wellbore as Condition of Mature Oil Production & Recovery. Huff and Puff is a process
of injecting surfactant solution into a well, and then allowed to stand (soaking) sometime
after it was produced again. So Huff & Puff was injecting chemicals into a well and
produce at the same well.
The Candidate wells are divided into two types of methods, namely the
stimulation of huff & puff which are some for reopening wells and continues injection are
for the current injector wells. Subsurface Evaluation of recent Reopening wells, that the
wells as canditate for Surfactan Stimulation by Huff & Puff or continues Injection has
been performed. There are 23 wells of Reopening wells & 4 or 5 wells of waste water
injection as pressure maintenance.
Based on the historical performance & the average production of the wells
in The O field, for each well to be stimulated either with surfactan huff & puff or
continues injection is expected to produce a minimum gain of 6 bopd. The production
forecast of all wells with the assumption that The Operator conducted 2 (two)
Stimulation Surfactant job per month, it shall finished all the wells in the month of 14th
that production will reach minimum 119 BOPD in the 1st
year and average 125 BOPD in
the 2nd
year also peak production gain will reach minimum 138 BOPD in the month 15th
.
(Figure -1).
In order Field Development and maximize the production, mainly ongoing / continues
Evaluation related to full scale EOR then there are some activity should be conducted
as follows:
1. Laboratory Test from sample on area block fault and layer of the wells (Table-1),
the same area block fault and layer with different wells should be have the same
result.
2. Consult with the provider for the result laboratory recommendation for SeMAR
stimulation by huff & puff and continues injection planning and execution
(including the facility unit and budget). Additional facility unit will be suggested by
Facility engineer, Civil Engineer, and Process engineer.
3. Monitor and evaluate the program by huff & puff and continues injection result.
4. Other Activity that support optimizing the Production of The O Field related with
SeMAR Technology (Stimulating the Reservoir Behavior and Performance).
6. i
FOREWORD
This Book ‘PRODUCTION OPTIMIZATION USING SURFACTANT
STIMULATION HUFF & PUFF AND CONTINUES INJECTION (O field – South
Sumatera basin)’ is an evaluation that was developed based on the idea of ‘Proposal
Evaluation of Chemical EOR Potential for O Field (SeMAR / SurPlus)’ and related with
the Result of Reopening Activity of some wells that was low influx or high water as
candidate wells to be stimulated.
The surfactant stimulation of candidate wells are divided into two types of
methods, namely the stimulation of huff & puff (for some reopening wells) and continues
injection (for the current injector wells). Subsurface Evaluation of recent Reopening
wells, that the wells as canditate for Surfactan Stimulation by Huff & Puff or continues
Injection has been performed. There are 23 wells of Reopening wells & 4 or 5 wells of
waste water injection as pressure maintenance.
Huff and Puff is a process of injecting surfactant solution into a well, and then
allowed to stand (soaking) sometime after it was produced again. So Huff & Puff was
injecting chemicals into a well and produce at the same well. Production optimization
using surfactant stimulation Huff & Puff shall rental facility unit but continues injection
using existing gathering station at injector wells. For proper engineering practices
should be suggested by Facility engineer, Civil Engineer, and Process engineer.
Based on the historical performance & the average production of the wells in O
field, for each well to be stimulated either with huff & puff or continues injection is
expected to produce a minimum gain of 6 BOPD. The production forecast of all wells
with the assumption that The O field Operator conducted 2 (two) Stimulation Surfactant
job per month, it shall finished all the wells in the month of 14th
that production will reach
minimum 119 BOPD in the 1st
year and average 125 BOPD in the 2nd
year also peak
production gain will reach minimum 138 BOPD in the month 15th
.
The purpose of compiling this book is to provide simple alternative method or
work in Evaluating Subsurface reservoir for Production optimization, and the data used
with different name with Original data and the exact location is untold. Suggestions and
constructive criticism is expected in the preparation of the next book.
ANDI ANRIANSYAH
7. ii
TABLE OF CONTENTS
FOREWORD ....................................................................................................................... ¡
TABLE OF CONTENTS ..................................................................................................... ¡ ¡
1 INTRODUCTION .............................................................................................................1
1.1 The O field Location .................................................................................................1
1.2 Regional Geology.....................................................................................................1
2 GEOLOGY OF THE O FIELD ..........................................................................................7
2.1 Stratigraphy and Structure........................................................................................7
2.2 Reservoir description................................................................................................9
2.3 Production history...................................................................................................12
3 SURFACTANT STIMULATION HUFF & PUFF AND CONTINUES INJECTION .............13
3.1 Reservoir Screening...............................................................................................14
3.1.a. Pattern Area and well Selection.................................................................14
3.1.b. Summary Data Initial Screening................................................................15
3.1.c. Verification of Reserves........ ....................................................................17
3.2 Subsurface Analysis Candidate wells…………………………………………………..18
3.2.a. Reopening wells........................................................................................18
3.2.b. water injection wells...................................................................................41
3.3 Laboratory Test.......................................................................................................47
3.3.a. Fluid properties Test..................................................................................47
3.3.b. SeMAR Screening -Phase Behavior Test..................................................47
3.3.c. SeMAR Screening -Spontaneous Imbibition Test......................................47
3.3.d. Mixture Viscosity Test ………………………...............................................47
3.4 Surface Facility……………………….........................................................................47
3.4.a. Stimulation Huff & Puff...............................................................................48
3.4.b. Continues Injection.....................................................................................49
4 FORECAST PRODUCTION .........................................................................................50
5. CONCLUSION & RECOMENDATION............................................................................52
5.1 Conclusion .............................................................................................................52
5.2 Recomendation ......................................................................................................52
REFERENCES ..................................................................................................................54
APPENDIX
Well Correlation of Candidate Wells for Surfactant Stimulation...................................... A
Reserve Estimation of Candidate Wells for Surfactant Stimulation................................ B
Well Diagram & Well History of Candidate Wells for Surfactant Stimulation .................C
Proposal Evaluation of Chemical EOR Potential for O Field..........................................D
9. ABOUT THE WRITER
Having more than 10 years of work experiences in Oil and
Gas Industry both exploration and development such as
Bandarjaya / Lampung III Project (at PT. Harpindo Mitra
Kharisama), Reevaluation of Diski Oil field - North Sumatra
basin (at TAC PEP – PKDP), and Preliminary Fractured
evaluation some oil fields (at PT. OPAC Barata-Kejora Gas
Bumi Mandiri), Evaluation for Klamono Block - Salawati Basin
and Evaluation for Tebat Agung Block - South Sumatera Basin (at Trada Petroleum Pte.
Ltd.), Operation of Kampung Minyak oilfield (at KSO Pertamina EP – PKM) and
Formation Evaluation of Tsimororo Field - Madagascar (at Lemigas), J1J3 Oil Fields -
NW Java basin (at ECC).
He was graduated from Institute Technology of Bandung, Geology Engineering
Department in 2006 as S.T. (Sarjana Teknik) or Bachelor degree in Geology. Before that
He was graduated from SMUN 2 Cimahi (Senior High School) in 2001, and from SLTPN
9 Cimahi (Junior High School) in 1998, also graduated from SDN KIHAPIT I (Elementary
school) in 1995.