1. Subject: INSTRUMENT SUPERVISOR
Oil / Gas offshore
NAME: MUHAMMAD JAMIL
Mobile No:0092-3036646211
0092-3027300515
0092-3057908244
Email:jamil7446@gmail.com
Email: Jamil38@live.com
CAREEROBJECTIVE:
With enthusiasm forachievement, Iwould prefer to serve an outstanding and expanding
organization, whichprovides job satisfaction and caters to my career prospect and utilize my skills to
achieve organizational goals.
PROFESSIONALSUMMARY:
I workedSupervisor at Control Contracting & Trading Co, CCTC (Oil & Gas )
Abu Dhabi- Since Feb, 2014 to 30-11-2015
JOPET WELIndustrial Company (Ship & Jack-UpRig) Abu Dhabi for1 Yrs.
Served as E&I Supervisor in Descon, Das Island, and UAE for3 Yrs.
Served as E&I Supervisor in CCC, KSA for2 Yrs.
Served as Boiler Operator, Rainbow Industry, Pakistan for8 Months
Served as Supervisor, Pakistan Petroleum Limited, Pakistan for6 Month
Served as Supervisor, SNGPL,and Pakistan for 3 Yrs.
Served as Supervisor, PakArab Fertilizer, Pakistan 1 Yrs.
Excellent communication skills and computer knowledge.
ACADEMIC PROFILE
Diploma Associate Engineer – Instrumentation Engineering, 2002
Apprentice Course –Instrumentation, 2005
SNGPL, Multan
ProvisionalCertificate in DCS & PLC,2003
TTC, Multan
Certificate in Machinist, GVI, Multan, 2001
Diploma in Computer Introductory Course, 1999
AMIT, Multan
Secondary School Certificate, 1998
GHS Samijabad, Multan
TECHNICALSKILLS
Operating Systems : Windows NT, 2007
MicrosoftApplications : MS Word,MS Excel
HSE Inductions/ Trainings
HSE Induction from Control Contracting (CCTC) Offshore Oil & Gas- Abu Dhabi U.A.E.
2. HSE Induction (Work at Height, Confined Space Work, H2S Environment) From DESCON
Engineering, MEPI TECHNIP, ADGAS at Das Island (Offshore) Abu Dhabi (U.A.E).
HSE induction from Descon Engineering /LINDE-ADNOC
HSE Induction from Descon Engineering /GASCO-
HSE Induction & H2S from CCC/SAUDI ARAMCO
EMPLOYMENT HISTORY:
INSTRUMENTATIONSUPERVISOR:Control Contracting&TradingCo.AbuDhabi
SinceFeb, 2014to 30-11-2015
Projects:
1. EPCWork foraccommodation Das Island-P330 (Client: ADGAS)
2. EPCWork forWHT ElectrificationZCSC/ZWSC Offshore(Client: ADMA-OPCO)
3. UMM AL DALKH FACILITIESINSTALATIONOF ELETRICALSUBMERSIBLE
PUMPSATWHP 07 & 15 (Client: ZADCO)
INSTRUMENTATIONSUPERVISOR: JOPET WELIndustrial Company(Ship& Jack-UpRig)
1. JOPET WEL -71 for Ship- Abu Dhabi
Installation and repair maintenance & modification
2. JOPET WEL -80 for Ship- Abu Dhabi
Installation and repair maintenance & modification
3. JOPET WEL -300 for Jack-Up Rig- Abu Dhabi
o As a Co-ordinate
INSTRUMENTATIONSUPERVISOR:DesconEngineering AbuDhabi -09.10.2009to 25.08.2011
Projects:
4. OAG-1 Project Das Island (Client: Technip/ADGAS)
5. Nitrogen Air Separation Plant Mirfa Client: LINDE/ADNOC)
6. IGD-5 ProjectHabshan (Client: GASCO)
INSTRUMENTATIONSUPERVISOR:CCC Saudi Arabia-26.12.2006TO25.12.2008
Projects:
1. K.G.P Project (Client: Technip/Saudi Aramco)
INSTRUMENTATIONSUPERVISOR:CCC SaudiArabia-23.09.2006TO25.12.2006
Projects:
2. K.P.F Project (Client: Eni/Saudi Aramco)
3. JOB DESCRIPTION:
Checking Documents & Drawings:
o Receive, check and follow the Engineering Documents and Drawings as received from the Site
Engineer
o HART and Field Foundation Instrument, P&ID, Instrument Layout, Hook Up Drawing, Single
Line Diagram etc. to be considered for installation activities
o Comment regarding any discrepancy/clashes of the services in the drawings related to site
condition prior to start of work
Material Receiving:
o Check material as received at site as per the Engineering Documents
o Notify if any discrepancy in receipt of the Materials
o To make sure that Material are stored safely and secured prior to installation
Calibration:
o Calibration of Instruments prior to installation as per Project requirement
o Instruments such as Flow Transmitter, Pressure Transmitter, Level Transmitter etc. to be
Calibrated prior to installation
Installation Activity:
o Installation of Instruments, JBs, IR Panels, PLC and DCS Panels etc. as per Approved drawings
o Installation of Instrumentation Cable
o Glanding & Termination of Instruments
Coordination of Testing & Pre-Commissioning:
o Loop Testing
o Functional Testing
o Pre-Commissioning
Documentation:
o Marking Red Mark Up for changes in Documents and Drawings as per final site preparation
and submit to QC Engineer for review
o Assist in submission of Documents and Drawings
Maintenance:
o Monitor Functionality of Installed Instruments as per Project Specification
o Provide support and maintenance of Installed Instruments and other Instrumentation accessories
as per Project Specification
MAJORCLIENTS:
1. ADMA-OPCO,2015
2. ADGAS, 2011 & 2014
3. ZADCO, 2014
4. GASCO, 2011
5. ADNOC, 2010
6. SAUDI ARAMCO, 2006 & 2008
4. HonorsandAccomplishments:
Summary:
Proficientin delivering duty Instrumentation Supervisor.
Excellent in documentation and Computer Application.
Good communication and Inter personal skills.
Able to workas a part of a team and also as an individual.
A Positive approach towards problem solving giving time limitations and efficiency thehighest
priority.
Have potential to take up responsibilities courageously and faithfully.
Good understanding of International Standards and Practicesfor WorkCulture.
Personal Data:
Name : Muhammad Jamil
Father`s Name : Mr. ABDUR RASHID
Date of Birth : 01st April, 1981
Nationality : Pakistan
Marital Status : Married
Languages : English, Hindi, Urdu,
Passport No : AQ8204112 (Expiry Date 10.08.2016)
Driving License : PakistanDrivingLicense