SlideShare a Scribd company logo
Infraworks Services Pty Ltd ABN 30 133 681 053
26 Bosci Road, Ingleburn, NSW, 2565 PO Box 454, Ingleburn, 2565
P (02) 9672 3422 F (02) 8324 6403
E info@inrail.com.au W www.infraworksrail.com.au
Safety Alert Fatigue Management
All workers must be aware and be accountable when it comes to managing their fatigue whilst at work.
Failure to do so could have an impact on your employment with Infraworks and may also lead to restrictions
placed on your Safeworking qualifications by the network operator.
This directive comes as a result of 2 instances where workers have accepted shifts with full knowledge that
Infraworks Fatigue rules will be breached.
This act or failure to act is not only a serious breach of Network Rules but exposes yourself and those
around you to significant risk.
The breaches mentioned above both involved inadequate rest breaks between shifts.
It is important to know what to do when presented with these situations.
For emergency call outs or shift extensions that impact your fatigue, you must consult with Infraworks Safe
Work Manager, WHSE Manager or Operations Manager to gain approval.
If an allocation has been assigned to you that impacts on your fatigue you must contact Infraworks
Allocations to organise alternative arrangements.
Simply accepting these shifts with the knowledge that you will be breaching fatigue is not acceptable.
The following Infraworks Fatigue parameters must be complied with per PO113 Infraworks Fatigue
Management procedure.
Maximum shift length 12 hours *
Rest period between shifts 12 hours
Maximum number of shifts 12 in 14 days/day shifts
Maximum number of consecutive day shifts 12
Maximum number of consecutive night shifts 4 x 12 hours, 5 x 10 hours, 6 x 8 hours
Maximum number of consecutive 12-hour shifts 4
Maximum number of consecutive โ€œon callโ€ shifts 7 in 14 days
Any breach of these rules must be immediately escalated to either the Safe Working Manager, WHSE Manager or
Operations Manager
* in an emergency situation shifts may be extended beyond 12 hours subject to a risk assessment and management
approval
WHS Manager shall monitor fatigue via the FAID System, electronic timesheets shall produce daily reports
to determine any breaches of fatigue that may occur.
Workers are encouraged to contact Infraworks if they are feeling the effects of fatigue and/or complete the
Fatigue Self-Assessment Tool on your App.
Regards
Infraworks Management
17th April 2019

More Related Content

Similar to Infraworks fatigue management alert 2019

Cd and-power-disaster-recovery-plan
Cd and-power-disaster-recovery-planCd and-power-disaster-recovery-plan
Cd and-power-disaster-recovery-plan
gotpowerinc
ย 
Facility Protective Engineering
Facility Protective EngineeringFacility Protective Engineering
Facility Protective Engineering
Levi Zeigler
ย 
Induction v2.3
Induction v2.3 Induction v2.3
Induction v2.3
Garry Pepper
ย 
Underground Cable Strikes - Best Practice Guidelines For Construction Compani...
Underground Cable Strikes - Best Practice Guidelines For Construction Compani...Underground Cable Strikes - Best Practice Guidelines For Construction Compani...
Underground Cable Strikes - Best Practice Guidelines For Construction Compani...
Thorne & Derrick International
ย 
Fatigue Prevention
Fatigue PreventionFatigue Prevention
Fatigue Prevention
ss
ย 
IW7 - Site Induction Rev3.doc
IW7 - Site Induction Rev3.docIW7 - Site Induction Rev3.doc
IW7 - Site Induction Rev3.doc
John Gibso
ย 
Infraworks Induction v2.3
Infraworks Induction v2.3 Infraworks Induction v2.3
Infraworks Induction v2.3
Garry Pepper
ย 
Insurance Risk
Insurance RiskInsurance Risk
Insurance RiskHafeez Farooq
ย 
Mastering disaster e book Telehouse
Mastering disaster e book TelehouseMastering disaster e book Telehouse
Mastering disaster e book Telehouse
Telehouse
ย 
Mandatory Pre-Start Completion Signed
Mandatory Pre-Start Completion SignedMandatory Pre-Start Completion Signed
Mandatory Pre-Start Completion Signed
Garry Pepper
ย 
IHSA046.pdf
IHSA046.pdfIHSA046.pdf
IHSA046.pdf
AlexSandroBorgesPere
ย 
Mastering disaster a data center checklist
Mastering disaster a data center checklistMastering disaster a data center checklist
Mastering disaster a data center checklist
Chris Wick
ย 
Kaiwera Downs Wind Farm Induction presentation Rev 4.ppt
Kaiwera Downs Wind Farm Induction presentation Rev 4.pptKaiwera Downs Wind Farm Induction presentation Rev 4.ppt
Kaiwera Downs Wind Farm Induction presentation Rev 4.ppt
ErselKizilay1
ย 
Panduit Lockout Tagout For Workplace Electrical Safety - 'Why do I Need Locko...
Panduit Lockout Tagout For Workplace Electrical Safety - 'Why do I Need Locko...Panduit Lockout Tagout For Workplace Electrical Safety - 'Why do I Need Locko...
Panduit Lockout Tagout For Workplace Electrical Safety - 'Why do I Need Locko...
Thorne & Derrick International
ย 
Top7ReasonsPreventativeMaintenanceCity
Top7ReasonsPreventativeMaintenanceCityTop7ReasonsPreventativeMaintenanceCity
Top7ReasonsPreventativeMaintenanceCityAlecia Flahiff
ย 
3310 Basic Usuari
3310 Basic Usuari3310 Basic Usuari
3310 Basic Usuariguesta629a81
ย 
Moving Towards Predicitve Maintenance.
Moving Towards Predicitve Maintenance.Moving Towards Predicitve Maintenance.
Moving Towards Predicitve Maintenance.Eric Miller
ย 
Written Programs.pdf
Written Programs.pdfWritten Programs.pdf
Written Programs.pdf
John Gibso
ย 
Emergency Power Planner
Emergency Power PlannerEmergency Power Planner
Emergency Power PlannerLyndon Schultz
ย 
Key Features of an Effective Permit to Work System
Key Features of an Effective Permit to Work SystemKey Features of an Effective Permit to Work System
Key Features of an Effective Permit to Work System
Harry George
ย 

Similar to Infraworks fatigue management alert 2019 (20)

Cd and-power-disaster-recovery-plan
Cd and-power-disaster-recovery-planCd and-power-disaster-recovery-plan
Cd and-power-disaster-recovery-plan
ย 
Facility Protective Engineering
Facility Protective EngineeringFacility Protective Engineering
Facility Protective Engineering
ย 
Induction v2.3
Induction v2.3 Induction v2.3
Induction v2.3
ย 
Underground Cable Strikes - Best Practice Guidelines For Construction Compani...
Underground Cable Strikes - Best Practice Guidelines For Construction Compani...Underground Cable Strikes - Best Practice Guidelines For Construction Compani...
Underground Cable Strikes - Best Practice Guidelines For Construction Compani...
ย 
Fatigue Prevention
Fatigue PreventionFatigue Prevention
Fatigue Prevention
ย 
IW7 - Site Induction Rev3.doc
IW7 - Site Induction Rev3.docIW7 - Site Induction Rev3.doc
IW7 - Site Induction Rev3.doc
ย 
Infraworks Induction v2.3
Infraworks Induction v2.3 Infraworks Induction v2.3
Infraworks Induction v2.3
ย 
Insurance Risk
Insurance RiskInsurance Risk
Insurance Risk
ย 
Mastering disaster e book Telehouse
Mastering disaster e book TelehouseMastering disaster e book Telehouse
Mastering disaster e book Telehouse
ย 
Mandatory Pre-Start Completion Signed
Mandatory Pre-Start Completion SignedMandatory Pre-Start Completion Signed
Mandatory Pre-Start Completion Signed
ย 
IHSA046.pdf
IHSA046.pdfIHSA046.pdf
IHSA046.pdf
ย 
Mastering disaster a data center checklist
Mastering disaster a data center checklistMastering disaster a data center checklist
Mastering disaster a data center checklist
ย 
Kaiwera Downs Wind Farm Induction presentation Rev 4.ppt
Kaiwera Downs Wind Farm Induction presentation Rev 4.pptKaiwera Downs Wind Farm Induction presentation Rev 4.ppt
Kaiwera Downs Wind Farm Induction presentation Rev 4.ppt
ย 
Panduit Lockout Tagout For Workplace Electrical Safety - 'Why do I Need Locko...
Panduit Lockout Tagout For Workplace Electrical Safety - 'Why do I Need Locko...Panduit Lockout Tagout For Workplace Electrical Safety - 'Why do I Need Locko...
Panduit Lockout Tagout For Workplace Electrical Safety - 'Why do I Need Locko...
ย 
Top7ReasonsPreventativeMaintenanceCity
Top7ReasonsPreventativeMaintenanceCityTop7ReasonsPreventativeMaintenanceCity
Top7ReasonsPreventativeMaintenanceCity
ย 
3310 Basic Usuari
3310 Basic Usuari3310 Basic Usuari
3310 Basic Usuari
ย 
Moving Towards Predicitve Maintenance.
Moving Towards Predicitve Maintenance.Moving Towards Predicitve Maintenance.
Moving Towards Predicitve Maintenance.
ย 
Written Programs.pdf
Written Programs.pdfWritten Programs.pdf
Written Programs.pdf
ย 
Emergency Power Planner
Emergency Power PlannerEmergency Power Planner
Emergency Power Planner
ย 
Key Features of an Effective Permit to Work System
Key Features of an Effective Permit to Work SystemKey Features of an Effective Permit to Work System
Key Features of an Effective Permit to Work System
ย 

More from Garry Pepper

September 2019 amendments flyer
September 2019 amendments flyerSeptember 2019 amendments flyer
September 2019 amendments flyer
Garry Pepper
ย 
Safe tracks 2019 08-network rules amendments
Safe tracks 2019 08-network rules amendmentsSafe tracks 2019 08-network rules amendments
Safe tracks 2019 08-network rules amendments
Garry Pepper
ย 
Laha memo
Laha memoLaha memo
Laha memo
Garry Pepper
ย 
Infraworks social media policy v1.0
Infraworks social media policy v1.0Infraworks social media policy v1.0
Infraworks social media policy v1.0
Garry Pepper
ย 
Safe notice 2019 003
Safe notice 2019 003Safe notice 2019 003
Safe notice 2019 003
Garry Pepper
ย 
Artc safety alert no. 112
Artc safety alert no. 112Artc safety alert no. 112
Artc safety alert no. 112
Garry Pepper
ย 
Safe notice permanent 009
Safe notice permanent 009Safe notice permanent 009
Safe notice permanent 009
Garry Pepper
ย 
Changes to css script for toa
Changes to css script for toaChanges to css script for toa
Changes to css script for toa
Garry Pepper
ย 
Safe tracks july 07
Safe tracks july 07Safe tracks july 07
Safe tracks july 07
Garry Pepper
ย 
S afe notice 193 194 204
S afe notice 193 194 204S afe notice 193 194 204
S afe notice 193 194 204
Garry Pepper
ย 
Plumbers sydney water work completions memo
Plumbers sydney water work completions memoPlumbers sydney water work completions memo
Plumbers sydney water work completions memo
Garry Pepper
ย 
Lessons learnt electrical incident penrith wrp july 2019
Lessons learnt electrical incident penrith wrp july 2019Lessons learnt electrical incident penrith wrp july 2019
Lessons learnt electrical incident penrith wrp july 2019
Garry Pepper
ย 
Alert riw transition from pegasus to mta
Alert riw transition from pegasus to mtaAlert riw transition from pegasus to mta
Alert riw transition from pegasus to mta
Garry Pepper
ย 
Safe notice 192 191
Safe notice 192 191Safe notice 192 191
Safe notice 192 191
Garry Pepper
ย 
Safe notice telegram 1027
Safe notice telegram 1027Safe notice telegram 1027
Safe notice telegram 1027
Garry Pepper
ย 
Safe notice 178 189 206
Safe notice 178 189 206Safe notice 178 189 206
Safe notice 178 189 206
Garry Pepper
ย 
Safe notice permanent 008 2019
Safe notice permanent 008 2019Safe notice permanent 008 2019
Safe notice permanent 008 2019
Garry Pepper
ย 
Reminder to vote EA
Reminder to vote EAReminder to vote EA
Reminder to vote EA
Garry Pepper
ย 
Safe notice 160 231 176 175
Safe notice 160 231 176 175Safe notice 160 231 176 175
Safe notice 160 231 176 175
Garry Pepper
ย 
Safe notice permanent 007
Safe notice permanent 007Safe notice permanent 007
Safe notice permanent 007
Garry Pepper
ย 

More from Garry Pepper (20)

September 2019 amendments flyer
September 2019 amendments flyerSeptember 2019 amendments flyer
September 2019 amendments flyer
ย 
Safe tracks 2019 08-network rules amendments
Safe tracks 2019 08-network rules amendmentsSafe tracks 2019 08-network rules amendments
Safe tracks 2019 08-network rules amendments
ย 
Laha memo
Laha memoLaha memo
Laha memo
ย 
Infraworks social media policy v1.0
Infraworks social media policy v1.0Infraworks social media policy v1.0
Infraworks social media policy v1.0
ย 
Safe notice 2019 003
Safe notice 2019 003Safe notice 2019 003
Safe notice 2019 003
ย 
Artc safety alert no. 112
Artc safety alert no. 112Artc safety alert no. 112
Artc safety alert no. 112
ย 
Safe notice permanent 009
Safe notice permanent 009Safe notice permanent 009
Safe notice permanent 009
ย 
Changes to css script for toa
Changes to css script for toaChanges to css script for toa
Changes to css script for toa
ย 
Safe tracks july 07
Safe tracks july 07Safe tracks july 07
Safe tracks july 07
ย 
S afe notice 193 194 204
S afe notice 193 194 204S afe notice 193 194 204
S afe notice 193 194 204
ย 
Plumbers sydney water work completions memo
Plumbers sydney water work completions memoPlumbers sydney water work completions memo
Plumbers sydney water work completions memo
ย 
Lessons learnt electrical incident penrith wrp july 2019
Lessons learnt electrical incident penrith wrp july 2019Lessons learnt electrical incident penrith wrp july 2019
Lessons learnt electrical incident penrith wrp july 2019
ย 
Alert riw transition from pegasus to mta
Alert riw transition from pegasus to mtaAlert riw transition from pegasus to mta
Alert riw transition from pegasus to mta
ย 
Safe notice 192 191
Safe notice 192 191Safe notice 192 191
Safe notice 192 191
ย 
Safe notice telegram 1027
Safe notice telegram 1027Safe notice telegram 1027
Safe notice telegram 1027
ย 
Safe notice 178 189 206
Safe notice 178 189 206Safe notice 178 189 206
Safe notice 178 189 206
ย 
Safe notice permanent 008 2019
Safe notice permanent 008 2019Safe notice permanent 008 2019
Safe notice permanent 008 2019
ย 
Reminder to vote EA
Reminder to vote EAReminder to vote EA
Reminder to vote EA
ย 
Safe notice 160 231 176 175
Safe notice 160 231 176 175Safe notice 160 231 176 175
Safe notice 160 231 176 175
ย 
Safe notice permanent 007
Safe notice permanent 007Safe notice permanent 007
Safe notice permanent 007
ย 

Recently uploaded

20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf
tjcomstrang
ย 
BeMetals Presentation_May_22_2024 .pdf
BeMetals Presentation_May_22_2024   .pdfBeMetals Presentation_May_22_2024   .pdf
BeMetals Presentation_May_22_2024 .pdf
DerekIwanaka1
ย 
Project File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdfProject File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdf
RajPriye
ย 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
LR1709MUSIC
ย 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Lviv Startup Club
ย 
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujaratโ€™s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujaratโ€™s DholeraTata Group Dials Taiwan for Its Chipmaking Ambition in Gujaratโ€™s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujaratโ€™s Dholera
Avirahi City Dholera
ย 
Search Disrupted Googleโ€™s Leaked Documents Rock the SEO World.pdf
Search Disrupted Googleโ€™s Leaked Documents Rock the SEO World.pdfSearch Disrupted Googleโ€™s Leaked Documents Rock the SEO World.pdf
Search Disrupted Googleโ€™s Leaked Documents Rock the SEO World.pdf
Arihant Webtech Pvt. Ltd
ย 
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-indiafalcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
Falcon Invoice Discounting
ย 
Exploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social DreamingExploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social Dreaming
Nicola Wreford-Howard
ย 
Improving profitability for small business
Improving profitability for small businessImproving profitability for small business
Improving profitability for small business
Ben Wann
ย 
The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...
awaisafdar
ย 
Attending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learnersAttending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learners
Erika906060
ย 
Digital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and TemplatesDigital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and Templates
Aurelien Domont, MBA
ย 
5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer
ofm712785
ย 
The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...
Adam Smith
ย 
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdfikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
agatadrynko
ย 
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
BBPMedia1
ย 
Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111
zoyaansari11365
ย 
Enterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdfEnterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdf
KaiNexus
ย 
LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
Lital Barkan
ย 

Recently uploaded (20)

20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf
ย 
BeMetals Presentation_May_22_2024 .pdf
BeMetals Presentation_May_22_2024   .pdfBeMetals Presentation_May_22_2024   .pdf
BeMetals Presentation_May_22_2024 .pdf
ย 
Project File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdfProject File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdf
ย 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
ย 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
ย 
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujaratโ€™s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujaratโ€™s DholeraTata Group Dials Taiwan for Its Chipmaking Ambition in Gujaratโ€™s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujaratโ€™s Dholera
ย 
Search Disrupted Googleโ€™s Leaked Documents Rock the SEO World.pdf
Search Disrupted Googleโ€™s Leaked Documents Rock the SEO World.pdfSearch Disrupted Googleโ€™s Leaked Documents Rock the SEO World.pdf
Search Disrupted Googleโ€™s Leaked Documents Rock the SEO World.pdf
ย 
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-indiafalcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
ย 
Exploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social DreamingExploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social Dreaming
ย 
Improving profitability for small business
Improving profitability for small businessImproving profitability for small business
Improving profitability for small business
ย 
The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...
ย 
Attending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learnersAttending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learners
ย 
Digital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and TemplatesDigital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and Templates
ย 
5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer
ย 
The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...
ย 
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdfikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
ย 
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
ย 
Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111
ย 
Enterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdfEnterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdf
ย 
LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
ย 

Infraworks fatigue management alert 2019

  • 1. Infraworks Services Pty Ltd ABN 30 133 681 053 26 Bosci Road, Ingleburn, NSW, 2565 PO Box 454, Ingleburn, 2565 P (02) 9672 3422 F (02) 8324 6403 E info@inrail.com.au W www.infraworksrail.com.au Safety Alert Fatigue Management All workers must be aware and be accountable when it comes to managing their fatigue whilst at work. Failure to do so could have an impact on your employment with Infraworks and may also lead to restrictions placed on your Safeworking qualifications by the network operator. This directive comes as a result of 2 instances where workers have accepted shifts with full knowledge that Infraworks Fatigue rules will be breached. This act or failure to act is not only a serious breach of Network Rules but exposes yourself and those around you to significant risk. The breaches mentioned above both involved inadequate rest breaks between shifts. It is important to know what to do when presented with these situations. For emergency call outs or shift extensions that impact your fatigue, you must consult with Infraworks Safe Work Manager, WHSE Manager or Operations Manager to gain approval. If an allocation has been assigned to you that impacts on your fatigue you must contact Infraworks Allocations to organise alternative arrangements. Simply accepting these shifts with the knowledge that you will be breaching fatigue is not acceptable. The following Infraworks Fatigue parameters must be complied with per PO113 Infraworks Fatigue Management procedure. Maximum shift length 12 hours * Rest period between shifts 12 hours Maximum number of shifts 12 in 14 days/day shifts Maximum number of consecutive day shifts 12 Maximum number of consecutive night shifts 4 x 12 hours, 5 x 10 hours, 6 x 8 hours Maximum number of consecutive 12-hour shifts 4 Maximum number of consecutive โ€œon callโ€ shifts 7 in 14 days Any breach of these rules must be immediately escalated to either the Safe Working Manager, WHSE Manager or Operations Manager * in an emergency situation shifts may be extended beyond 12 hours subject to a risk assessment and management approval WHS Manager shall monitor fatigue via the FAID System, electronic timesheets shall produce daily reports to determine any breaches of fatigue that may occur. Workers are encouraged to contact Infraworks if they are feeling the effects of fatigue and/or complete the Fatigue Self-Assessment Tool on your App. Regards Infraworks Management 17th April 2019