The document outlines 7 key reasons why preventative maintenance cannot be overlooked for electrical systems. Preventative maintenance programs can help prevent equipment failure and downtime, reduce costs associated with repairs, and increase safety. Such programs provide regular inspection and maintenance of electrical components to address common issues before they lead to failures or outages. Utilizing qualified electrical contractors through a preventative maintenance program is more cost effective than maintaining electrical systems with in-house staff.
Electrical & Safety Management Ltd is a company dedicated to electrical safety in industry. The document discusses causes of electrical accidents such as inadequate working practices and failure to maintain equipment. It also covers responsibilities for electrical safety, consequences of accidents, and various codes of practice for electrical safety management. The Institution of Engineering and Technology published a Code of Practice in 2013 to help organizations of all sizes safely manage electrical risks through a structured process.
Business Risks discussed: #1 Claim/Problem, Telecommuting, Signage, Age of Connectivity, OSHA Visit, IT Firm Insurance, Power Failure: Spoilage, Business Auto Policies
The document describes a financial impact tool called FIT for EMR that was developed by Vertex Healthcare Consulting to help healthcare organizations measure the financial benefits of implementing an electronic medical records (EMR) system. The tool calculates four key financial metrics - project break-even point, net present value, return on investment over 5 years, and internal rate of return. It also produces a 5-year financial pro forma. The tool was created using a four-step process of defining financial terms, developing costs and benefits line items, and applying financial modeling adjustments to represent costs and benefits over time.
TEGG Service contractors offer several advantages for electrical work:
1) They employ the best trained electricians and technicians in the industry who have expertise in the latest technology and safety practices.
2) TEGG Services maintains a global database of technical expertise and knowledge as well as global purchasing power for fast procurement of hard to find or obsolete parts.
3) TEGG contractors adhere to the highest levels of performance, quality control, and safety standards.
The document discusses recent changes to orthopedic billing codes that have increased the complexity of orthopedic billing and coding. Over 500 Category I CPT codes were changed, added, or deleted for 2013, impacting orthopedic reimbursement. Additional changes like ICD-10 conversion will present initial challenges for small orthopedic practices. As a result, many orthopedic physicians are outsourcing their billing and coding to specialized medical billing companies that can efficiently manage the billing process and ensure practices are paid accurately and on time.
Environmental Compliance Audits - Cheap Insurance Against Regulatory Entangle...Larry Falbe
This document provides an overview of environmental compliance audits (ECAs) and their benefits. ECAs assess a facility's compliance with environmental regulations to avoid penalties from violations. While ECAs require paying consultants and lawyers, they provide a "cheap insurance policy" against costly regulatory issues. The document explains how ECAs are performed, including using attorneys to protect audit results from disclosure and consultants to inspect facilities and review documentation. ECAs can identify compliance issues to correct quietly or through voluntary self-disclosure programs, which reduce penalties. The document distinguishes ECAs from Phase I assessments, which evaluate property for real estate transactions rather than ensuring ongoing compliance.
The document discusses key questions and considerations around IT governance. It covers topics such as computer systems, processes and users, service providers, computing procedures, productivity, computing and communications system planning, internal audits, and maintaining a secure environment. The document provides questions to assess each area and determine if improvements are needed. It also advertises that paid documents covering IT governance procedures are available from the legal consultants.
Electrical & Safety Management Ltd is a company dedicated to electrical safety in industry. The document discusses causes of electrical accidents such as inadequate working practices and failure to maintain equipment. It also covers responsibilities for electrical safety, consequences of accidents, and various codes of practice for electrical safety management. The Institution of Engineering and Technology published a Code of Practice in 2013 to help organizations of all sizes safely manage electrical risks through a structured process.
Business Risks discussed: #1 Claim/Problem, Telecommuting, Signage, Age of Connectivity, OSHA Visit, IT Firm Insurance, Power Failure: Spoilage, Business Auto Policies
The document describes a financial impact tool called FIT for EMR that was developed by Vertex Healthcare Consulting to help healthcare organizations measure the financial benefits of implementing an electronic medical records (EMR) system. The tool calculates four key financial metrics - project break-even point, net present value, return on investment over 5 years, and internal rate of return. It also produces a 5-year financial pro forma. The tool was created using a four-step process of defining financial terms, developing costs and benefits line items, and applying financial modeling adjustments to represent costs and benefits over time.
TEGG Service contractors offer several advantages for electrical work:
1) They employ the best trained electricians and technicians in the industry who have expertise in the latest technology and safety practices.
2) TEGG Services maintains a global database of technical expertise and knowledge as well as global purchasing power for fast procurement of hard to find or obsolete parts.
3) TEGG contractors adhere to the highest levels of performance, quality control, and safety standards.
The document discusses recent changes to orthopedic billing codes that have increased the complexity of orthopedic billing and coding. Over 500 Category I CPT codes were changed, added, or deleted for 2013, impacting orthopedic reimbursement. Additional changes like ICD-10 conversion will present initial challenges for small orthopedic practices. As a result, many orthopedic physicians are outsourcing their billing and coding to specialized medical billing companies that can efficiently manage the billing process and ensure practices are paid accurately and on time.
Environmental Compliance Audits - Cheap Insurance Against Regulatory Entangle...Larry Falbe
This document provides an overview of environmental compliance audits (ECAs) and their benefits. ECAs assess a facility's compliance with environmental regulations to avoid penalties from violations. While ECAs require paying consultants and lawyers, they provide a "cheap insurance policy" against costly regulatory issues. The document explains how ECAs are performed, including using attorneys to protect audit results from disclosure and consultants to inspect facilities and review documentation. ECAs can identify compliance issues to correct quietly or through voluntary self-disclosure programs, which reduce penalties. The document distinguishes ECAs from Phase I assessments, which evaluate property for real estate transactions rather than ensuring ongoing compliance.
The document discusses key questions and considerations around IT governance. It covers topics such as computer systems, processes and users, service providers, computing procedures, productivity, computing and communications system planning, internal audits, and maintaining a secure environment. The document provides questions to assess each area and determine if improvements are needed. It also advertises that paid documents covering IT governance procedures are available from the legal consultants.
This document provides 21 quotes to inspire business owners and employees. It focuses on creating a positive workplace where employees feel supported and motivated. Quotes offer wisdom on leadership, teamwork, challenges, and success from well-known entrepreneurs and leaders.
Facultad de ingenieria de sistemas uniremignton engenier 2010Miguel Angel Guevara
Este documento propone crear, ampliar y difundir el conocimiento en el campo de la ingeniería mediante la estructuración, planificación y ejecución de proyectos de investigación desde perspectivas social, académica y científica.
William E. Bullock has over 17 years of experience as a production technician and machinist running computer controlled machinery such as mills, turrets, grinders, and robotic welders. He has extensive skills in areas like CNC operation, blueprint reading, quality control, tool setting, troubleshooting, and machine maintenance. Bullock also has emergency medical technician certification and experience providing emergency medical care during his time in the Navy.
Rakesh Kumar Angural has over 21 years of experience in manufacturing roles in industries such as aerospace and wind energy, currently serving as the Senior Manager and Head of Global Process Engineering at LM Wind Power. He leads a team that provides process engineering support to production plants globally to ensure product quality and process improvement. Rakesh's expertise includes production management, quality control, process engineering, project management, and lean six sigma.
Este documento presenta los resultados de los torneos de fútbol Copa Variedades Stefany en Guarne en 2016. Contiene la tabla de posiciones de 14 equipos y los resultados de los partidos jugados en 13 fechas del torneo de apertura.
This document provides a summary of Emad El-Kabbani's professional experience in human resources management spanning over 25 years working in multinational hotel companies. It includes contact information, a career objective, education background, professional qualifications, and detailed descriptions of his roles and responsibilities in various human resources director and manager positions at hotels in Egypt, Saudi Arabia, and Maldives.
Kamal Kumar is pursuing an MBA and has a BBA. He has basic computer skills in MS Office, Tally, and taxation software. As a fresher, his objectives are to use his knowledge and skills to help achieve organizational goals and enhance his own growth. He describes himself as friendly with a positive attitude and a willingness to learn and take on challenges.
The document is an excerpt from a newsletter providing information from Andrew Zolnai, the Business Development Manager for Oil & Gas at OpenWare. It discusses how GIS tools that come with common software packages can be used for reservoir depletion modeling and displaying 3D geological data without requiring programming. It also promotes using ArcGIS Explorer to easily share and view 3D layer package files throughout an organization via the web for users without GIS knowledge. Contact information is provided to ask the author questions.
Hello friends I am Sourav Ganguly. This c programme (program) or programming (programing) language tutorial contain basic or basics and advance knowledge for begginer (beginer) or begginers (beginers) with examples including input with output and different types of question or questions and answer or answers. We may call this tutorial or tutorials as complete online youtube video or videos with software and power point or ppt presentation. In this series of tutorials you will learn about keyword, different rules for constructing variables, integer, real, character constant, data types, character set, normal and nested if else statement, if else or else if ladder, different types of for, while and do while loop, switch case statement, break, continue, goto, function declaration and calling with values and address or reference, scope, recursion, union, static, extern, one, two and three or multi dimensional array, pointer, string, library, structure, file opening and closing with copy then paste and write function.
C program language tutorial pattern printingSourav Ganguly
Hello friends I am Sourav Ganguly. This c program (programme) or programming (programing) language tutorial contain basic or basics and advance knowledge for beginner (beginer) or beginners (beginers) with examples including input with output and different types of question or questions and answer or answers. We may call this tutorial or tutorials as complete online youtube video or videos with software and power point or ppt presentation. In this series of tutorials you will learn about keyword, different rules for constructing variables, integer, real, character constant, data types, character set, normal and nested if else statement, if else or else if ladder, different types of for, while and do while loop, switch case statement, break, continue, goto, function declaration and calling with values and address or reference, scope, recursion, union, static, extern, one, two and three or multi dimensional array, pointer, string, library, structure, file opening and closing with copy then paste and write function.
Reede is a turn-key supplier of custom fixtures, POP displays. We specialize in wood, metal, acrylic, glass, laminates etc to create interiors precisely tailored to your company’s brand image.
C programming language character set keywords constants variables data typesSourav Ganguly
Hello friends I am Sourav Ganguly. This c programme (program) or programming (programing) language tutorial contain basic or basics and advance knowledge for begginer (beginer) or begginers (beginers) with examples including input with output and different types of question or questions and answer or answers. We may call this tutorial or tutorials as complete online youtube video or videos with software and power point or ppt presentation. In this series of tutorials you will learn about keyword, different rules for constructing variables, integer, real, character constant, data types, character set, normal and nested if else statement, if else or else if ladder, different types of for, while and do while loop, switch case statement, break, continue, goto, function declaration and calling with values and address or reference, scope, recursion, union, static, extern, one, two and three or multi dimensional array, pointer, string, library, structure, file opening and closing with copy then paste and write function.
An embedded system is a special purpose computer system that performs predefined tasks. It consists of hardware and software components. The document discusses the various hardware components of an embedded system like CPU, memory, sensors, ADC, DAC, actuators etc. It also explains microprocessor and microcontroller based embedded systems with examples like 8085, 8051 etc. Their architecture, pin diagrams and functionalities are described.
The document discusses font choices for a magazine cover. It evaluates 5 different font options from Dafont.com, providing the reason for considering each one. The fonts considered were Urban Jungle, Rezland, Birth of a Hero, Breeze, and True Lies. True Lies was ultimately selected for its messy, unique look that would appeal to a hip hop audience and match the planned cover image of a male model. The font color will be either black or red to match the cover lines.
Thomas Pentecost is an experienced operations manager and general manager with over 20 years of experience in the United States Army. He is currently taking a sabbatical to hike the Appalachian Trail and will be available for employment in October 2017. As the Director of Intelligence for the US Army Reserves, he oversees a $50M+ budget and builds training programs. Prior experience includes leading intelligence teams and battalions in Iraq, Texas, and North Carolina. He excels at setting goals, developing strategic plans, and improving organizational systems.
This document is a study guide for a data center availability certification exam. It begins with an introduction to availability, defining key terms like reliability, availability, MTBF, and MTTR. It discusses factors that threaten availability like power issues, inadequate cooling, equipment failures, disasters and human error. It explains how availability is calculated and the limitations of the "five nines" or 99.999% availability standard. Finally, it covers the costs of downtime, distinguishing between direct costs like lost revenue, overtime wages, and indirect costs. The overall document provides a high-level overview of data center availability fundamentals and considerations.
Whitepaper : Building a disaster ready infrastructureJake Weaver
It’s not just hurricanes, fire or other natureal disasters that can bring a business to its knees. Everyday problems such as bad software, misconfigured networks, hardware failures or power outages are much more common. In fact, power failures accounted for nearly half of the declared disasters reported in a recent survey conducted by Forrester
The document discusses moving facilities maintenance from a reactive model to a predictive maintenance model to reduce costs and improve reliability. It suggests that facilities managers prioritize replacing critical equipment that is nearing the end of its life in order to transition to a predictive model within budget constraints. Doing so can demonstrate cost savings from avoiding emergency repairs and downtime. The document also emphasizes considering energy efficiency, environmental impacts, safety, and liability risks when planning equipment upgrades.
Top Ten Low-Cost/No-Cost Methods for Reducing Energy CostseDiscoveri, LLC
1. The document discusses 10 low-cost or no-cost methods for reducing energy costs in pallet plants, including changing electricity rate schedules, exploring tax deductions and exemptions, taking advantage of utility rebates, renegotiating utility contracts, improving metering practices, checking for billing errors, participating in demand response programs, making operational changes, networking with others, and conducting walk-through energy audits.
2. The top three most effective methods requiring little to no costs are changing rate schedules, exploring sales tax exemptions, and pursuing utility rebates, which can significantly reduce energy costs.
3. Ralph Russell from energy consulting firm eDiscoveri authored the document to provide pallet plants with suggestions on lowering energy
This document provides 21 quotes to inspire business owners and employees. It focuses on creating a positive workplace where employees feel supported and motivated. Quotes offer wisdom on leadership, teamwork, challenges, and success from well-known entrepreneurs and leaders.
Facultad de ingenieria de sistemas uniremignton engenier 2010Miguel Angel Guevara
Este documento propone crear, ampliar y difundir el conocimiento en el campo de la ingeniería mediante la estructuración, planificación y ejecución de proyectos de investigación desde perspectivas social, académica y científica.
William E. Bullock has over 17 years of experience as a production technician and machinist running computer controlled machinery such as mills, turrets, grinders, and robotic welders. He has extensive skills in areas like CNC operation, blueprint reading, quality control, tool setting, troubleshooting, and machine maintenance. Bullock also has emergency medical technician certification and experience providing emergency medical care during his time in the Navy.
Rakesh Kumar Angural has over 21 years of experience in manufacturing roles in industries such as aerospace and wind energy, currently serving as the Senior Manager and Head of Global Process Engineering at LM Wind Power. He leads a team that provides process engineering support to production plants globally to ensure product quality and process improvement. Rakesh's expertise includes production management, quality control, process engineering, project management, and lean six sigma.
Este documento presenta los resultados de los torneos de fútbol Copa Variedades Stefany en Guarne en 2016. Contiene la tabla de posiciones de 14 equipos y los resultados de los partidos jugados en 13 fechas del torneo de apertura.
This document provides a summary of Emad El-Kabbani's professional experience in human resources management spanning over 25 years working in multinational hotel companies. It includes contact information, a career objective, education background, professional qualifications, and detailed descriptions of his roles and responsibilities in various human resources director and manager positions at hotels in Egypt, Saudi Arabia, and Maldives.
Kamal Kumar is pursuing an MBA and has a BBA. He has basic computer skills in MS Office, Tally, and taxation software. As a fresher, his objectives are to use his knowledge and skills to help achieve organizational goals and enhance his own growth. He describes himself as friendly with a positive attitude and a willingness to learn and take on challenges.
The document is an excerpt from a newsletter providing information from Andrew Zolnai, the Business Development Manager for Oil & Gas at OpenWare. It discusses how GIS tools that come with common software packages can be used for reservoir depletion modeling and displaying 3D geological data without requiring programming. It also promotes using ArcGIS Explorer to easily share and view 3D layer package files throughout an organization via the web for users without GIS knowledge. Contact information is provided to ask the author questions.
Hello friends I am Sourav Ganguly. This c programme (program) or programming (programing) language tutorial contain basic or basics and advance knowledge for begginer (beginer) or begginers (beginers) with examples including input with output and different types of question or questions and answer or answers. We may call this tutorial or tutorials as complete online youtube video or videos with software and power point or ppt presentation. In this series of tutorials you will learn about keyword, different rules for constructing variables, integer, real, character constant, data types, character set, normal and nested if else statement, if else or else if ladder, different types of for, while and do while loop, switch case statement, break, continue, goto, function declaration and calling with values and address or reference, scope, recursion, union, static, extern, one, two and three or multi dimensional array, pointer, string, library, structure, file opening and closing with copy then paste and write function.
C program language tutorial pattern printingSourav Ganguly
Hello friends I am Sourav Ganguly. This c program (programme) or programming (programing) language tutorial contain basic or basics and advance knowledge for beginner (beginer) or beginners (beginers) with examples including input with output and different types of question or questions and answer or answers. We may call this tutorial or tutorials as complete online youtube video or videos with software and power point or ppt presentation. In this series of tutorials you will learn about keyword, different rules for constructing variables, integer, real, character constant, data types, character set, normal and nested if else statement, if else or else if ladder, different types of for, while and do while loop, switch case statement, break, continue, goto, function declaration and calling with values and address or reference, scope, recursion, union, static, extern, one, two and three or multi dimensional array, pointer, string, library, structure, file opening and closing with copy then paste and write function.
Reede is a turn-key supplier of custom fixtures, POP displays. We specialize in wood, metal, acrylic, glass, laminates etc to create interiors precisely tailored to your company’s brand image.
C programming language character set keywords constants variables data typesSourav Ganguly
Hello friends I am Sourav Ganguly. This c programme (program) or programming (programing) language tutorial contain basic or basics and advance knowledge for begginer (beginer) or begginers (beginers) with examples including input with output and different types of question or questions and answer or answers. We may call this tutorial or tutorials as complete online youtube video or videos with software and power point or ppt presentation. In this series of tutorials you will learn about keyword, different rules for constructing variables, integer, real, character constant, data types, character set, normal and nested if else statement, if else or else if ladder, different types of for, while and do while loop, switch case statement, break, continue, goto, function declaration and calling with values and address or reference, scope, recursion, union, static, extern, one, two and three or multi dimensional array, pointer, string, library, structure, file opening and closing with copy then paste and write function.
An embedded system is a special purpose computer system that performs predefined tasks. It consists of hardware and software components. The document discusses the various hardware components of an embedded system like CPU, memory, sensors, ADC, DAC, actuators etc. It also explains microprocessor and microcontroller based embedded systems with examples like 8085, 8051 etc. Their architecture, pin diagrams and functionalities are described.
The document discusses font choices for a magazine cover. It evaluates 5 different font options from Dafont.com, providing the reason for considering each one. The fonts considered were Urban Jungle, Rezland, Birth of a Hero, Breeze, and True Lies. True Lies was ultimately selected for its messy, unique look that would appeal to a hip hop audience and match the planned cover image of a male model. The font color will be either black or red to match the cover lines.
Thomas Pentecost is an experienced operations manager and general manager with over 20 years of experience in the United States Army. He is currently taking a sabbatical to hike the Appalachian Trail and will be available for employment in October 2017. As the Director of Intelligence for the US Army Reserves, he oversees a $50M+ budget and builds training programs. Prior experience includes leading intelligence teams and battalions in Iraq, Texas, and North Carolina. He excels at setting goals, developing strategic plans, and improving organizational systems.
This document is a study guide for a data center availability certification exam. It begins with an introduction to availability, defining key terms like reliability, availability, MTBF, and MTTR. It discusses factors that threaten availability like power issues, inadequate cooling, equipment failures, disasters and human error. It explains how availability is calculated and the limitations of the "five nines" or 99.999% availability standard. Finally, it covers the costs of downtime, distinguishing between direct costs like lost revenue, overtime wages, and indirect costs. The overall document provides a high-level overview of data center availability fundamentals and considerations.
Whitepaper : Building a disaster ready infrastructureJake Weaver
It’s not just hurricanes, fire or other natureal disasters that can bring a business to its knees. Everyday problems such as bad software, misconfigured networks, hardware failures or power outages are much more common. In fact, power failures accounted for nearly half of the declared disasters reported in a recent survey conducted by Forrester
The document discusses moving facilities maintenance from a reactive model to a predictive maintenance model to reduce costs and improve reliability. It suggests that facilities managers prioritize replacing critical equipment that is nearing the end of its life in order to transition to a predictive model within budget constraints. Doing so can demonstrate cost savings from avoiding emergency repairs and downtime. The document also emphasizes considering energy efficiency, environmental impacts, safety, and liability risks when planning equipment upgrades.
Top Ten Low-Cost/No-Cost Methods for Reducing Energy CostseDiscoveri, LLC
1. The document discusses 10 low-cost or no-cost methods for reducing energy costs in pallet plants, including changing electricity rate schedules, exploring tax deductions and exemptions, taking advantage of utility rebates, renegotiating utility contracts, improving metering practices, checking for billing errors, participating in demand response programs, making operational changes, networking with others, and conducting walk-through energy audits.
2. The top three most effective methods requiring little to no costs are changing rate schedules, exploring sales tax exemptions, and pursuing utility rebates, which can significantly reduce energy costs.
3. Ralph Russell from energy consulting firm eDiscoveri authored the document to provide pallet plants with suggestions on lowering energy
This document provides an overview of electrical distribution maintenance services. It discusses the importance of maintaining electrical distribution (ED) equipment to ensure safety, service continuity, energy efficiency, efficient spare parts management, and maximizing the lifespan of equipment. The document outlines different maintenance strategies including reactive, preventive, on-site condition, and predictive maintenance. It also describes Schneider Electric's maintenance services and proprietary diagnostic tools. The remainder of the document provides recommendations for maintenance activities specific to medium voltage, protection relays, transformers, and low voltage equipment.
Managing industrial facilities requires balancing safety, productivity, and compliance. Facility managers must oversee complex safety systems while facing resource constraints. This document provides four tips for industrial managers: 1) Choose an experienced fire protection contractor to design and install safety systems to ensure proper installation and compliance. 2) Engage a licensed service provider with certified personnel to properly test, inspect, and maintain safety systems. 3) Use a dedicated fire safety control system rather than production control systems to ensure components work as required and testing does not disrupt operations. 4) Partner with an experienced provider to gain expertise in system design, installation, and maintenance in order to strengthen safety programs.
DLV Engineers Energy and Power profile 24Oct16Kobus Morgan
1. DLV Engineers provides energy consulting services including reducing electricity costs, improving supply quality and reliability, and making clients less reliant on the grid through interventions like energy audits, tariff analysis, efficiency upgrades, demand management, and power generation solutions.
2. Services include comprehensive metering, load profiling, identifying savings opportunities, and developing a plan for implementing recommended interventions in a cost-effective manner while considering budget and regulatory factors.
3. Solutions range from simple measures to independent microgrid systems utilizing various generation sources, and can include power export and trading excess power generated. Larger clients may benefit from an integrated utility management program.
This document discusses the importance of data protection and business continuity planning given trends like increased virtualization, regulatory mandates around data governance, and greater dependency on IT systems. It notes that while disasters can be catastrophic, most downtime is actually caused by more common issues like equipment failures or human errors. The document then outlines the key components of an effective business continuity plan, with an emphasis on the importance of data recovery. It argues that storage virtualization can help improve data protection by providing integrated services for continuous data protection, replication, and testing in a single management interface. This simplifies configuration, reduces costs, and helps ensure successful recovery.
Find ways to prevent Disaster from knocking on your company door! Make sure your plan is in place as we anticipate a weekend storm - sales@telehouse.com
Sadeq abdulwahab management of electrical safetysarah7887
- 33,000 people are injured annually in US industry from electrical hazards, which can be prevented through knowledge, awareness, safe work practices, and personal protective equipment.
- Managing electrical safety requires directing programs for design, planning, implementation, auditing, and inspection of safe electrical work. It includes roles like administrators, engineers, auditors, and inspectors.
- Regular evaluation of safety programs and electrical hazard analyses helps ensure effective safety practices and adaptation to changes over time.
Business Continuity and Recovery Planning for Power OutagesARC Advisory Group
Business Continuity and Recovery Planning for Power Outages
The timely execution of a
BCRP strategy is particularly
important during extended
power outages to avoid
costly business disruptions.
Business Continuity and Recovery Planning (BCRP) is an ARC Best Practice-
based strategy for minimizing downtime and lost productivity during
unexpected business interruptions like the recent power outages in the
northeastern United States and Great Britain. While power
failures may be unavoidable, their impact can be substantially
reduced for companies that have been proactive about establishing
proper action plans.
BCRP addresses the three key stages of business interruption
management: Ready & Alert, Respond & Analyze, and Recover
& Audit. By developing action plans that address multiple scenarios, including
widespread and long-duration power outages, companies can
minimize the impact on their business activities and quickly regain control
of the situation.
This document provides a guide to performance contracting with energy service companies (ESCOs). It discusses what performance-based contracts are, how to decide if an ESCO is right for your organization, the typical contracting process, and factors to consider when hiring an ESCO. The contracting process generally has five phases: project development, implementation, acceptance, performance period, and project close-out. During project development, an ESCO is selected and conducts an energy audit to identify potential energy efficiency projects.
The document discusses disaster recovery planning and provides best practices. It addresses common misperceptions about business continuity/disaster recovery programs. Some misperceptions include that they are too expensive, only involve natural disasters, and that replicating data is sufficient. The document recommends five best practices: developing business justification through impact analysis, matching the recovery approach to needs, setting recovery objectives, developing a data management strategy, and managing the overall recovery program.
Will You Be Prepared When The Next Disaster Strikes - WhitepaperChristian Caracciolo
This whitepaper discusses the importance of disaster recovery planning and outlines different disaster recovery strategies and solutions offered by EarthLink Business. It begins by discussing how disasters can impact businesses and cause downtime. It then outlines four common disaster recovery methods from fastest to slowest recovery time: physical colocation, virtual colocation, continuous data and application replication, and data backup. EarthLink offers all four methods as well as additional disaster recovery solutions like cloud server backup, database recovery, network service recovery, security recovery, and voice service recovery. The whitepaper argues that businesses should evaluate their recovery needs, priorities, and budgets to determine the best disaster recovery method or combination of methods.
HP ArcSight Demonstrating ROI For a SIEM Solutionrickkaun
This document discusses how SIEM technology can provide a return on investment through cost savings and avoidance. It provides examples from various organizations that implemented SIEM solutions. These organizations were able to reduce costs through automating security tasks, preventing infrastructure expansion, avoiding compliance penalties, and reducing losses. The examples show organizations achieving payback periods ranging from less than a week to 6 months. The document concludes that SIEM benefits far outweigh acquisition costs, with expenses usually paid off within a few weeks or months through hard cost savings and soft benefits like improved security awareness.
Predictive Maintenance - A Smart Solution to Maintain your Equipment!AndySmith774959
Manufacturing industries strive for maximizing asset availability but face lots of challenges while implementing. Ineffective maintenance strategies can cause reductions, ranging from 5% to 20%, in the overall productive capacity of plants. The same study also suggested that unplanned downtime causes companies to incur around $50 billion annually. Companies worldwide are trying to figure out the optimum frequency of servicing their equipment.
Mastering disaster a data center checklistChris Wick
50% of businesses that experience data loss for 10 days or more file for bankruptcy and 93% fail within a year. But with a Disaster Recovery plan, you don't have to worry visit https://goo.gl/Ba1J9e.
This document provides a design guide for power operated entrance systems. It discusses the importance of safety in system design and outlines various safety hazards to consider, such as crushing, cutting, entanglement and impact hazards. The guide recommends designing systems to be as safe as practical for all users, with a focus on reliability and safety first before addressing other concerns like security and aesthetics. It states that the owner is legally responsible for ensuring the system is safely maintained.
Plumbing Preventive Maintenance in Commercial BuildingsMcKenney's Inc
Protect your investment and consider a plumbing preventive maintenance program for your facility. Check out our plumbing services page for more information at http://plumbing.mckenneys.com/
Similar to Top7ReasonsPreventativeMaintenanceCity (20)
Plumbing Preventive Maintenance in Commercial Buildings
Top7ReasonsPreventativeMaintenanceCity
1. TOP 7
REASONS PREVENTATIVE MAINTENANCE
CANNOT BE OVERLOOKED
4955 AVALON RIDGE PKWY #100, NORCROSS, GA 30071 | (770) 449-0200 | WWW.CCELECT.COM
2. According to the Institute of Electrical and Electronics Engineers
(IEEE), electrical components are three times more likely to fail when
Preventative Maintenance Programs are not performed.
While we can all agree with the adage that “nothing lasts forever,” the above
statistic showcases that the investment in preventative maintenance can provide
more certainty and help business owners put themselves in an improved position of
proactivity versus reactivity.
Perhaps the best way of understanding preventative maintenance is to compare it to that of a
scheduled maintenance plan an automotive dealership would give you upon the purchase of a new
vehicle. This scheduled maintenance plan is put in place to certify the car is working as expected
and operates as efficiently as possible.
In many cases vehicle manufacturers will negate warranties and guarantees as to the operation of
their vehicles should the scheduled maintenance programs go unfollowed. To most people this
makes complete sense as it is simple to understand that a car, and all of its moving parts, needs
constant attention. Electrical systems, much like that new car, require precautionary measures to
“keep them on the road” and to prevent the unplanned outages of electricity and interruptions to
related business operations.
Top 7 Reasons Preventative
Maintenance Cannot Be Overlooked
Primary Benefits of an Electrical
Preventative Maintenance Program
To keep things simple it is best to think of the investment in a Preventative Maintenance Program as an
investment in business and employee productivity and/or efficiency. For one, Preventative Maintenance
Programs can be directly correlated to a reduced cost in repairs and a vast reduction or complete elimination
of downtime. Secondly, these programs enhance the safety of employees and prevent property damage.
In fact, findings from the National Fire Protection Association reveal that electrical distribution and lighting
equipment is the second leading cause of office property fires, many of which result in death, injury and
millions in direct property damage1.
That said, your main objectives in implementing a Preventative Maintenance Program should focus on
reducing equipment failure and loss as well as ensuring the safety and wellbeing of employees and civilians
at your facilities.
In addition to these two primary objectives here are seven more reasons an electrical Preventative
Maintenance (PM) Program is worth the investment and should not be overlooked.
3. Preventative Maintenance
Programs
In the event of an electrical failure it is not uncommon that a
business will be forced to cease operations. The cost estimates
that are related to electrical-related outages range from $30
to $200 billion per year2
. Without a PM Program in place these
unanticipated repairs can get expensive and result in further
reduced profits due to the cessation of business operations.
Due to safety precautions, employees and/or consumers may no longer be permitted
to remain on the premises resulting in the continued expenditure of wages without
productivity as well as cessation of income as there are no longer consumers on your
property to purchase any of your products or services.
Prevent Loss of
Production and Efficiency1
As a landlord with tenants, you have certain responsibilities to uphold that may or may
not cross the line between legal requirements and tenant luxuries. Either way, your
tenants come to expect a certain style of property management and the responsibility to
“keep the lights on” along with related electrical components lies entirely with you.
For example, if you are found responsible for a power outage due to extremely outdated
electrical systems that cause a fuse to blow, you could be liable for creating the condition
that caused the damage. Even if you are not legally liable for an electrical issue the neglect
of putting a preventative system in place could mean the difference between tenants who
renew their leases with you and tenants who are dissatisfied with your managerial style
and opt to take their money elsewhere.
Prevent
Inconvenienced Tenants2
4. Proving to an insurance company that you are taking adequate measures to provide a
higher level of reliability and dependability in your place of business is a good idea. PM
Programs show insurance companies that you are proactive about reducing the risk of
equipment and system failure and are dedicated to minimizing any causes of potential
property loss claims.
Prevent Increased
Insurance Costs3
Amongst the list of the most common conditions which result in electrical failure are loose
connections/parts and moisture3
. With a Preventative Maintenance Program in place
these conditions – which collectively account for nearly half of all electrical failures – can
be prevented.
The implementation of a PM Program would ensure ongoing inspection, testing and
servicing of electrical equipment which would ultimately prevent these types of common
problems or catch them before they result in unexpected downtime.
Electrical contractors who are part of your PM Program should be familiar with your
equipment and how to inspect, service and maintain it. This also means that they have a
thorough understanding of electrical safety practices and protocols.
These individuals, or team of individuals, will also take care in maintaining a clear set of
documentation and provide you reporting that will be tracked continually over time to
monitor potential issues that can be addressed before they happen.
Eliminate Unexpected
Downtime
Ensure Qualified Personnel will
be Watching Over Your Assets
4
5
5. Due to the specialized training that is involved with electrical testing and safety it can be
difficult for many companies to keep an in-house maintenance crew that can keep up
with the requirements and regulations that govern specialized equipment.
For example, the National Fire Protection Association’s NFPA 70E sets the standards for
helping companies and employees avoid workplace injuries and fatalities due to electrical
hazards. This documentation includes specific protocols, safety training and material
requirements. This does not include the additional acquisition costs and required testing
and safety equipment that can quickly create a financial obligation upwards of $200,000.
For many businesses, it simply makes more sense – both from an experiential and
financial standpoint – to utilize a qualified electrical service contractor rather than try to
keep things in-house.
Keep You up
to Code6
PM Programs ensure that you’ll have a working list of every piece of equipment that is
included in your electrical system. This type of documentation is critical to the efficiency
of repairs, forecasting replacement costs, the lifespan of parts and labor, and provides you
with a comprehensive report on everything that is being maintained as well as a record of
all previous results of any testing ever performed.
This will not only help you have a line-item list of the types of electrical assets you have
(and their ongoing condition) but also provides your PM team invaluable insight to the
equipment should a component need replacing or repair. This means any emergency
repairs or outages that occur will result in timely repair as both your internal team and
your contractor will have already anticipated a component’s replacement.
Your contractor will show up with the parts needed to correct the problem and valuable
time and effort will be saved. Compare this to a situation where a reporting system was
not in place to help forecast and document status on an ongoing basis.
Provide Detailed Information of
Every Component in Your System7
6. Summary
Many business owners look at Preventative Maintenance Programs as too
expensive to implement. The reality, however, is that PM Programs can help to
prevent the loss of productivity, maintain tenant relationships, prevent increased
insurance costs, avoid the failure of equipment and increase the safety and wellbeing of
employees and consumers.
The fact is PM Programs make it less expensive to fix equipment before it fails, eliminate
the expenses associated with unplanned power outages as they relate to business and
employee productivity, and can provide further cost savings with simple improvements
to equipment that will last longer and remain as efficient as possible.
1
http://www.nfpa.org/research/reports-and-statistics/fires-by-property-type/business-and-mercantile/us-structure-in-office-properties
2
https://www.hsb.com/TheLocomotive/ImplemetingElectricalPrentiveMaintenance.aspx
3
https://www.hsb.com/TheLocomotive/ElectricalPreventiveMaintenance.aspx
4955 AVALON RIDGE PKWY #100, NORCROSS, GA 30071 | (770) 449-0200 | WWW.CCELECT.COM