This document provides a summary of amendments made to Network Rules, Procedures, and Forms related to rail safety in Australia. Key changes include:
- Expanding responsibilities of Protection Officers and adding requirements for coordinated worksites.
- Adding new rules for working in the Danger Zone using Signal Key Switch Blocking and prescribing rules for this method.
- Clarifying instructions for identifying worksite locations, protecting worksites near possession limits, and requirements for using different work authority types.
- Introducing new forms and restructuring some existing forms to make them easier to compile and reflect other changes.
Multi Link Generates Savings For UtilitiesScott Shelton
Multi-Link devices have been an integral part of substation communications for over 15 years. Thousands of our devices are used by over 100 electric and gas utility companies to provide reliable communications with meters, power quality monitors, and relays.
Synopsis: A discussion of the requirements for next generation network management identified in RFC 3535 which lead to the development of NETCONF and YANG.
Multi Link Generates Savings For UtilitiesScott Shelton
Multi-Link devices have been an integral part of substation communications for over 15 years. Thousands of our devices are used by over 100 electric and gas utility companies to provide reliable communications with meters, power quality monitors, and relays.
Synopsis: A discussion of the requirements for next generation network management identified in RFC 3535 which lead to the development of NETCONF and YANG.
Point-to-point (PTP) wireless connections have many use cases including linking buildings on university campus, creating connections between offshore oil rigs, and eliminating the need to pull fiber cable between buildings on opposite sides of a busy road. This guide will help you select the right hardware platform (including both the AOS-based AP-175 and Aruba¹s new AirMesh products; Choose appropriate antennas and accessories; Identify and overcome some of the most common outdoor installation challenges; Set up and configure the Aruba solution.
To learn more, visit us at http://www.arubanetworks.com/wlan. Join the discussion at https://community.arubanetworks.com
지브라 MP6000, 2D 고정식 바코드스캐너는 거의 모든 인쇄 또는 휴대폰, 태블릿PC 화면의 1D 또는 2D 바코드를 사실상 놀라운 속도로 모든 상황에서 캡처 할 수 있습니다.
놀라운 스캔 성능
지브라의 업계에서 입증된 선도적인 이미징 기술을 사용하면 오늘날 사용 가능한 어떤 레이저 바이옵틱 스캐너보다 빠른 속도로 바코드를 스캔할 수 있습니다.
각종 바코드 캡처
어떤 종류의 1D 및 2D 바코드라도 자동으로 판독/평가할 수 있습니다.
종이 라벨에 인쇄되어 손상되었든, 플라스틱 고객카드나 기프트카드에 인쇄되어 있든, 휴대전화 화면에 표시되어 있든 상관 없습니다.
탁월한 신뢰성, 비용 및 총소유비용(TCO) 절감
고장 및 유지 관리 비용을 최소화할 수 있습니다. 스캔 엔진에 작동 부품이 없으므로 전력 소비량이 최소 30% 감소하고 정전용량형 버튼도 마모되는 일이 없습니다.
매장 및 고객 요구 사항에 맞게 맞춤 가능
6개 포트가 있으므로 스케일, 고객이 휴대전화나 고객카드의 바코드를 스캔할 수 있는 고객 스캐너(Customer Side Scanner), 핸드헬드 스캐너, EAS 기기 등과 같은 새로운 기능을 손쉽게 추가할 수 있을 뿐만 아니라, RFID와 같은 미래의 요구 사항에 맞게 확장도 가능합니다.
탁월한 관리 기능
보완적 관리 소프트웨어를 사용하면 스캐너, 스케일, 연결된 모든 주변 기기를 비롯해 전체 스캐너 솔루션을 원격으로 관리할 수 있습니다.
사파이어 유리
수평 스캔 창에 업계 최고의 유리를 사용하여 긁히지 않고 마모나 훼손에도 취약하지 않습니다.
통합 EAS 지원
현재 사용 중인 Checkpoint® 또는 Sensormatic® 시스템을 지원하므로 업그레이드하느라 별도의 시간 및 비용이 들지 않습니다.
초 저소음
레이저 스캐너와 달리 모터 소음이 없는 MP6000은 매우 조용하여 POS 환경을 개선시켜 줍니다.
사용 편의성
전방향 스캔 및 6면 720° 커버리지 영역을 지원하므로 신속하게 스캔하고 정확하게 계산을 마칠 수 있습니다.
고객측 스캐너(옵션)
고객이 자신의 고객카드, 쿠폰, 충동 구매 품목 및 휴대전화에 표시된 바코드를 동시에 스캔할 수 있습니다.
손쉬운 설치
기존 계산대에 잘 맞습니다.
3개의 프로그래밍 버튼
푸시버튼을 사용해 광범위한 POS 프로세스를 간소화하여 처리량을 향상시켜 줍니다.
PHYSICAL CHARACTERISTICS
Dimensions :
Long scanner and scanner/scale :
20 in. L x 11.5 in. W x 4.00 in. D x 5.00 in. H / 507 mm L x 292 mm W x 102 mm D x 128 mm H
Medium scanner and scanner/scale : 15.7 in. L x 11.5 in. W x 4.00 in. D x 5.00 in. H / 399 mm L x 292 mm W x 102 mm D x 128 mm H
Short scanner : 13.9 in. L x 11.5 in. W x 4.00 in. D x 5.00 in. H / 353 mm L x 292 mm W x 102 mm D x 128 mm H
Weight :
Long scanner : 15.2 lb./6.9 kg
Long scanner/scale : 18.3 lb./8.3 kg
Medium scanner : 13.0 lb./5.9 kg
Medium scanner/scale : 16.2 lb./7.4 kg
Short scanner : 12.0 lb/5.4 kg
Scale :
30 lb. in 0.01 lb. increments/15 kg in 5 g increments
Maximum static weight: 300 lb./136 kg
Scale can be added after scanner installation (most countries)
Single-cable and dual-cable protocols
Compatible with Mettler and Bizerba price computational scales
Options :
0-12 lb. in 0.005 lb. increments and 12-30 lb. in 0.01 lb. increments
0-6 kg in 2 g increments and 6-15 kg in 5 g increments
Single-head and dual head remote scale displays
Dual heads rotate throug 290° for widest viewing angles on the market
Horizontal Glass : Sapphire; integrated Produce Lift Bar
User Interface :
Soft touch capacitive pads (no buttons to break or wear out)
Wide, centrally located two-color decode/ information bar (clear for cashiers and self-checkout users)
Beeper: adjustable volume and beep tones
Three programmable buttons
Ports :
One shared POS port for USB/RS-232/ IBM RS-485
Three USB peripheral ports
Two powered RS-232 peripheral ports
Checkpoint interlock port
Remote scale display port
>하이온아이티
주소 : 서울 금천구 가산디지털2로 165, 1304호 (백상스타타워2차)
대표번호 : 02-2038-0018 / 이메일 : hion@hionit.com
홈페이지 : http://hionsmart.com
As you might know, EASA will change some of its regulations on technical records. The changes will have significant impact on the usage of MRO software and will be applicable to all countries and their operators having a cooperation with EASA
Transmission Line Conductor Asset Health Assessment with Non-Contact Monitori...Power System Operation
Transmission line asset managers are facing increasing challenges associated with aging transmission lines and are tasked with the decisions on how to maintain and replace conductors currently in service. This decision-making process requires reliable long-term and up-to-date information on the state and condition of the conductors but currently, most asset managers lack such information. New remote sensing technology developed by LineVision is able to collect previously unavailable rich datasets of information on transmission line conductors. These datasets enabled the development of an Asset Health Module (AHM) which creates an asset digital twin, integrating both historical and real-time data from the target transmission line in order to compute its baseline Asset Health and detect changes over time. These inputs include high-temperature cycling, extreme sag and blowout forces, galloping events and their intensity, precipitation loads from icing, and other events the conductor experiences during its lifetime which will impact asset health. Without monitoring equipment many of these damaging events will go unnoticed unless they cause catastrophic failures which can be dangerous, cause forced service interruptions, and take months or years to repair. The Asset Health Module integrates engineering specifications such as the design information collected, as-built, and real-time field measurements obtained via a remote monitoring system. Based these inputs, an extensive proprietary model determines the operating conditions and the asset health of the transmission line conductor.
Siemens s7 300-400-simatic net - ncm for industrial ethernetDien Ha The
Siemens ,
Catalog Thiết Bị Điện Siemens , Catalog Thiết Tự Động
Catalog Phụ Kiện Siemens , Catalog Phụ Kiện,
Catalog Siemens , Catalog,
https://www.dienhathe.com,
Chi tiết các sản phẩm khác của Siemens tại https://dienhathe.com
Xem thêm các Catalog khác của Siemens tại https://dienhathe.info
Để nhận báo giá sản phẩm Siemens vui lòng gọi: 0907.764.966
Real-life demands and examples of management and control in disaggregated opt...Adtran
At OFC 2023, Stephan Neidlinger discussed managing disaggregated transport systems, exploring the challenges of managing and controlling disaggregated optical transport, and sharing insights into real-life use cases.
Point-to-point (PTP) wireless connections have many use cases including linking buildings on university campus, creating connections between offshore oil rigs, and eliminating the need to pull fiber cable between buildings on opposite sides of a busy road. This guide will help you select the right hardware platform (including both the AOS-based AP-175 and Aruba¹s new AirMesh products; Choose appropriate antennas and accessories; Identify and overcome some of the most common outdoor installation challenges; Set up and configure the Aruba solution.
To learn more, visit us at http://www.arubanetworks.com/wlan. Join the discussion at https://community.arubanetworks.com
지브라 MP6000, 2D 고정식 바코드스캐너는 거의 모든 인쇄 또는 휴대폰, 태블릿PC 화면의 1D 또는 2D 바코드를 사실상 놀라운 속도로 모든 상황에서 캡처 할 수 있습니다.
놀라운 스캔 성능
지브라의 업계에서 입증된 선도적인 이미징 기술을 사용하면 오늘날 사용 가능한 어떤 레이저 바이옵틱 스캐너보다 빠른 속도로 바코드를 스캔할 수 있습니다.
각종 바코드 캡처
어떤 종류의 1D 및 2D 바코드라도 자동으로 판독/평가할 수 있습니다.
종이 라벨에 인쇄되어 손상되었든, 플라스틱 고객카드나 기프트카드에 인쇄되어 있든, 휴대전화 화면에 표시되어 있든 상관 없습니다.
탁월한 신뢰성, 비용 및 총소유비용(TCO) 절감
고장 및 유지 관리 비용을 최소화할 수 있습니다. 스캔 엔진에 작동 부품이 없으므로 전력 소비량이 최소 30% 감소하고 정전용량형 버튼도 마모되는 일이 없습니다.
매장 및 고객 요구 사항에 맞게 맞춤 가능
6개 포트가 있으므로 스케일, 고객이 휴대전화나 고객카드의 바코드를 스캔할 수 있는 고객 스캐너(Customer Side Scanner), 핸드헬드 스캐너, EAS 기기 등과 같은 새로운 기능을 손쉽게 추가할 수 있을 뿐만 아니라, RFID와 같은 미래의 요구 사항에 맞게 확장도 가능합니다.
탁월한 관리 기능
보완적 관리 소프트웨어를 사용하면 스캐너, 스케일, 연결된 모든 주변 기기를 비롯해 전체 스캐너 솔루션을 원격으로 관리할 수 있습니다.
사파이어 유리
수평 스캔 창에 업계 최고의 유리를 사용하여 긁히지 않고 마모나 훼손에도 취약하지 않습니다.
통합 EAS 지원
현재 사용 중인 Checkpoint® 또는 Sensormatic® 시스템을 지원하므로 업그레이드하느라 별도의 시간 및 비용이 들지 않습니다.
초 저소음
레이저 스캐너와 달리 모터 소음이 없는 MP6000은 매우 조용하여 POS 환경을 개선시켜 줍니다.
사용 편의성
전방향 스캔 및 6면 720° 커버리지 영역을 지원하므로 신속하게 스캔하고 정확하게 계산을 마칠 수 있습니다.
고객측 스캐너(옵션)
고객이 자신의 고객카드, 쿠폰, 충동 구매 품목 및 휴대전화에 표시된 바코드를 동시에 스캔할 수 있습니다.
손쉬운 설치
기존 계산대에 잘 맞습니다.
3개의 프로그래밍 버튼
푸시버튼을 사용해 광범위한 POS 프로세스를 간소화하여 처리량을 향상시켜 줍니다.
PHYSICAL CHARACTERISTICS
Dimensions :
Long scanner and scanner/scale :
20 in. L x 11.5 in. W x 4.00 in. D x 5.00 in. H / 507 mm L x 292 mm W x 102 mm D x 128 mm H
Medium scanner and scanner/scale : 15.7 in. L x 11.5 in. W x 4.00 in. D x 5.00 in. H / 399 mm L x 292 mm W x 102 mm D x 128 mm H
Short scanner : 13.9 in. L x 11.5 in. W x 4.00 in. D x 5.00 in. H / 353 mm L x 292 mm W x 102 mm D x 128 mm H
Weight :
Long scanner : 15.2 lb./6.9 kg
Long scanner/scale : 18.3 lb./8.3 kg
Medium scanner : 13.0 lb./5.9 kg
Medium scanner/scale : 16.2 lb./7.4 kg
Short scanner : 12.0 lb/5.4 kg
Scale :
30 lb. in 0.01 lb. increments/15 kg in 5 g increments
Maximum static weight: 300 lb./136 kg
Scale can be added after scanner installation (most countries)
Single-cable and dual-cable protocols
Compatible with Mettler and Bizerba price computational scales
Options :
0-12 lb. in 0.005 lb. increments and 12-30 lb. in 0.01 lb. increments
0-6 kg in 2 g increments and 6-15 kg in 5 g increments
Single-head and dual head remote scale displays
Dual heads rotate throug 290° for widest viewing angles on the market
Horizontal Glass : Sapphire; integrated Produce Lift Bar
User Interface :
Soft touch capacitive pads (no buttons to break or wear out)
Wide, centrally located two-color decode/ information bar (clear for cashiers and self-checkout users)
Beeper: adjustable volume and beep tones
Three programmable buttons
Ports :
One shared POS port for USB/RS-232/ IBM RS-485
Three USB peripheral ports
Two powered RS-232 peripheral ports
Checkpoint interlock port
Remote scale display port
>하이온아이티
주소 : 서울 금천구 가산디지털2로 165, 1304호 (백상스타타워2차)
대표번호 : 02-2038-0018 / 이메일 : hion@hionit.com
홈페이지 : http://hionsmart.com
As you might know, EASA will change some of its regulations on technical records. The changes will have significant impact on the usage of MRO software and will be applicable to all countries and their operators having a cooperation with EASA
Transmission Line Conductor Asset Health Assessment with Non-Contact Monitori...Power System Operation
Transmission line asset managers are facing increasing challenges associated with aging transmission lines and are tasked with the decisions on how to maintain and replace conductors currently in service. This decision-making process requires reliable long-term and up-to-date information on the state and condition of the conductors but currently, most asset managers lack such information. New remote sensing technology developed by LineVision is able to collect previously unavailable rich datasets of information on transmission line conductors. These datasets enabled the development of an Asset Health Module (AHM) which creates an asset digital twin, integrating both historical and real-time data from the target transmission line in order to compute its baseline Asset Health and detect changes over time. These inputs include high-temperature cycling, extreme sag and blowout forces, galloping events and their intensity, precipitation loads from icing, and other events the conductor experiences during its lifetime which will impact asset health. Without monitoring equipment many of these damaging events will go unnoticed unless they cause catastrophic failures which can be dangerous, cause forced service interruptions, and take months or years to repair. The Asset Health Module integrates engineering specifications such as the design information collected, as-built, and real-time field measurements obtained via a remote monitoring system. Based these inputs, an extensive proprietary model determines the operating conditions and the asset health of the transmission line conductor.
Siemens s7 300-400-simatic net - ncm for industrial ethernetDien Ha The
Siemens ,
Catalog Thiết Bị Điện Siemens , Catalog Thiết Tự Động
Catalog Phụ Kiện Siemens , Catalog Phụ Kiện,
Catalog Siemens , Catalog,
https://www.dienhathe.com,
Chi tiết các sản phẩm khác của Siemens tại https://dienhathe.com
Xem thêm các Catalog khác của Siemens tại https://dienhathe.info
Để nhận báo giá sản phẩm Siemens vui lòng gọi: 0907.764.966
Real-life demands and examples of management and control in disaggregated opt...Adtran
At OFC 2023, Stephan Neidlinger discussed managing disaggregated transport systems, exploring the challenges of managing and controlling disaggregated optical transport, and sharing insights into real-life use cases.
Digital Transformation and IT Strategy Toolkit and TemplatesAurelien Domont, MBA
This Digital Transformation and IT Strategy Toolkit was created by ex-McKinsey, Deloitte and BCG Management Consultants, after more than 5,000 hours of work. It is considered the world's best & most comprehensive Digital Transformation and IT Strategy Toolkit. It includes all the Frameworks, Best Practices & Templates required to successfully undertake the Digital Transformation of your organization and define a robust IT Strategy.
Editable Toolkit to help you reuse our content: 700 Powerpoint slides | 35 Excel sheets | 84 minutes of Video training
This PowerPoint presentation is only a small preview of our Toolkits. For more details, visit www.domontconsulting.com
What are the main advantages of using HR recruiter services.pdfHumanResourceDimensi1
HR recruiter services offer top talents to companies according to their specific needs. They handle all recruitment tasks from job posting to onboarding and help companies concentrate on their business growth. With their expertise and years of experience, they streamline the hiring process and save time and resources for the company.
VAT Registration Outlined In UAE: Benefits and Requirementsuae taxgpt
Vat Registration is a legal obligation for businesses meeting the threshold requirement, helping companies avoid fines and ramifications. Contact now!
https://viralsocialtrends.com/vat-registration-outlined-in-uae/
Business Valuation Principles for EntrepreneursBen Wann
This insightful presentation is designed to equip entrepreneurs with the essential knowledge and tools needed to accurately value their businesses. Understanding business valuation is crucial for making informed decisions, whether you're seeking investment, planning to sell, or simply want to gauge your company's worth.
Unveiling the Secrets How Does Generative AI Work.pdfSam H
At its core, generative artificial intelligence relies on the concept of generative models, which serve as engines that churn out entirely new data resembling their training data. It is like a sculptor who has studied so many forms found in nature and then uses this knowledge to create sculptures from his imagination that have never been seen before anywhere else. If taken to cyberspace, gans work almost the same way.
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...BBPMedia1
Marvin neemt je in deze presentatie mee in de voordelen van non-endemic advertising op retail media netwerken. Hij brengt ook de uitdagingen in beeld die de markt op dit moment heeft op het gebied van retail media voor niet-leveranciers.
Retail media wordt gezien als het nieuwe advertising-medium en ook mediabureaus richten massaal retail media-afdelingen op. Merken die niet in de betreffende winkel liggen staan ook nog niet in de rij om op de retail media netwerken te adverteren. Marvin belicht de uitdagingen die er zijn om echt aansluiting te vinden op die markt van non-endemic advertising.
Memorandum Of Association Constitution of Company.pptseri bangash
www.seribangash.com
A Memorandum of Association (MOA) is a legal document that outlines the fundamental principles and objectives upon which a company operates. It serves as the company's charter or constitution and defines the scope of its activities. Here's a detailed note on the MOA:
Contents of Memorandum of Association:
Name Clause: This clause states the name of the company, which should end with words like "Limited" or "Ltd." for a public limited company and "Private Limited" or "Pvt. Ltd." for a private limited company.
https://seribangash.com/article-of-association-is-legal-doc-of-company/
Registered Office Clause: It specifies the location where the company's registered office is situated. This office is where all official communications and notices are sent.
Objective Clause: This clause delineates the main objectives for which the company is formed. It's important to define these objectives clearly, as the company cannot undertake activities beyond those mentioned in this clause.
www.seribangash.com
Liability Clause: It outlines the extent of liability of the company's members. In the case of companies limited by shares, the liability of members is limited to the amount unpaid on their shares. For companies limited by guarantee, members' liability is limited to the amount they undertake to contribute if the company is wound up.
https://seribangash.com/promotors-is-person-conceived-formation-company/
Capital Clause: This clause specifies the authorized capital of the company, i.e., the maximum amount of share capital the company is authorized to issue. It also mentions the division of this capital into shares and their respective nominal value.
Association Clause: It simply states that the subscribers wish to form a company and agree to become members of it, in accordance with the terms of the MOA.
Importance of Memorandum of Association:
Legal Requirement: The MOA is a legal requirement for the formation of a company. It must be filed with the Registrar of Companies during the incorporation process.
Constitutional Document: It serves as the company's constitutional document, defining its scope, powers, and limitations.
Protection of Members: It protects the interests of the company's members by clearly defining the objectives and limiting their liability.
External Communication: It provides clarity to external parties, such as investors, creditors, and regulatory authorities, regarding the company's objectives and powers.
https://seribangash.com/difference-public-and-private-company-law/
Binding Authority: The company and its members are bound by the provisions of the MOA. Any action taken beyond its scope may be considered ultra vires (beyond the powers) of the company and therefore void.
Amendment of MOA:
While the MOA lays down the company's fundamental principles, it is not entirely immutable. It can be amended, but only under specific circumstances and in compliance with legal procedures. Amendments typically require shareholder
[Note: This is a partial preview. To download this presentation, visit:
https://www.oeconsulting.com.sg/training-presentations]
Sustainability has become an increasingly critical topic as the world recognizes the need to protect our planet and its resources for future generations. Sustainability means meeting our current needs without compromising the ability of future generations to meet theirs. It involves long-term planning and consideration of the consequences of our actions. The goal is to create strategies that ensure the long-term viability of People, Planet, and Profit.
Leading companies such as Nike, Toyota, and Siemens are prioritizing sustainable innovation in their business models, setting an example for others to follow. In this Sustainability training presentation, you will learn key concepts, principles, and practices of sustainability applicable across industries. This training aims to create awareness and educate employees, senior executives, consultants, and other key stakeholders, including investors, policymakers, and supply chain partners, on the importance and implementation of sustainability.
LEARNING OBJECTIVES
1. Develop a comprehensive understanding of the fundamental principles and concepts that form the foundation of sustainability within corporate environments.
2. Explore the sustainability implementation model, focusing on effective measures and reporting strategies to track and communicate sustainability efforts.
3. Identify and define best practices and critical success factors essential for achieving sustainability goals within organizations.
CONTENTS
1. Introduction and Key Concepts of Sustainability
2. Principles and Practices of Sustainability
3. Measures and Reporting in Sustainability
4. Sustainability Implementation & Best Practices
To download the complete presentation, visit: https://www.oeconsulting.com.sg/training-presentations
"𝑩𝑬𝑮𝑼𝑵 𝑾𝑰𝑻𝑯 𝑻𝑱 𝑰𝑺 𝑯𝑨𝑳𝑭 𝑫𝑶𝑵𝑬"
𝐓𝐉 𝐂𝐨𝐦𝐬 (𝐓𝐉 𝐂𝐨𝐦𝐦𝐮𝐧𝐢𝐜𝐚𝐭𝐢𝐨𝐧𝐬) is a professional event agency that includes experts in the event-organizing market in Vietnam, Korea, and ASEAN countries. We provide unlimited types of events from Music concerts, Fan meetings, and Culture festivals to Corporate events, Internal company events, Golf tournaments, MICE events, and Exhibitions.
𝐓𝐉 𝐂𝐨𝐦𝐬 provides unlimited package services including such as Event organizing, Event planning, Event production, Manpower, PR marketing, Design 2D/3D, VIP protocols, Interpreter agency, etc.
Sports events - Golf competitions/billiards competitions/company sports events: dynamic and challenging
⭐ 𝐅𝐞𝐚𝐭𝐮𝐫𝐞𝐝 𝐩𝐫𝐨𝐣𝐞𝐜𝐭𝐬:
➢ 2024 BAEKHYUN [Lonsdaleite] IN HO CHI MINH
➢ SUPER JUNIOR-L.S.S. THE SHOW : Th3ee Guys in HO CHI MINH
➢FreenBecky 1st Fan Meeting in Vietnam
➢CHILDREN ART EXHIBITION 2024: BEYOND BARRIERS
➢ WOW K-Music Festival 2023
➢ Winner [CROSS] Tour in HCM
➢ Super Show 9 in HCM with Super Junior
➢ HCMC - Gyeongsangbuk-do Culture and Tourism Festival
➢ Korean Vietnam Partnership - Fair with LG
➢ Korean President visits Samsung Electronics R&D Center
➢ Vietnam Food Expo with Lotte Wellfood
"𝐄𝐯𝐞𝐫𝐲 𝐞𝐯𝐞𝐧𝐭 𝐢𝐬 𝐚 𝐬𝐭𝐨𝐫𝐲, 𝐚 𝐬𝐩𝐞𝐜𝐢𝐚𝐥 𝐣𝐨𝐮𝐫𝐧𝐞𝐲. 𝐖𝐞 𝐚𝐥𝐰𝐚𝐲𝐬 𝐛𝐞𝐥𝐢𝐞𝐯𝐞 𝐭𝐡𝐚𝐭 𝐬𝐡𝐨𝐫𝐭𝐥𝐲 𝐲𝐨𝐮 𝐰𝐢𝐥𝐥 𝐛𝐞 𝐚 𝐩𝐚𝐫𝐭 𝐨𝐟 𝐨𝐮𝐫 𝐬𝐭𝐨𝐫𝐢𝐞𝐬."
The world of search engine optimization (SEO) is buzzing with discussions after Google confirmed that around 2,500 leaked internal documents related to its Search feature are indeed authentic. The revelation has sparked significant concerns within the SEO community. The leaked documents were initially reported by SEO experts Rand Fishkin and Mike King, igniting widespread analysis and discourse. For More Info:- https://news.arihantwebtech.com/search-disrupted-googles-leaked-documents-rock-the-seo-world/
Cracking the Workplace Discipline Code Main.pptxWorkforce Group
Cultivating and maintaining discipline within teams is a critical differentiator for successful organisations.
Forward-thinking leaders and business managers understand the impact that discipline has on organisational success. A disciplined workforce operates with clarity, focus, and a shared understanding of expectations, ultimately driving better results, optimising productivity, and facilitating seamless collaboration.
Although discipline is not a one-size-fits-all approach, it can help create a work environment that encourages personal growth and accountability rather than solely relying on punitive measures.
In this deck, you will learn the significance of workplace discipline for organisational success. You’ll also learn
• Four (4) workplace discipline methods you should consider
• The best and most practical approach to implementing workplace discipline.
• Three (3) key tips to maintain a disciplined workplace.
Discover the innovative and creative projects that highlight my journey throu...dylandmeas
Discover the innovative and creative projects that highlight my journey through Full Sail University. Below, you’ll find a collection of my work showcasing my skills and expertise in digital marketing, event planning, and media production.
1. August
082019
This is an uncontrolled copy. Before use, make sure that this is the current version by visiting www.railsafe.org.au/safe-tracks
1 SafeTracks August 2019
Network Rules, Procedures and Forms
amendments
This information has been
prepared to give a summary of
amendments to Network Rules,
Network Procedures and
Network Forms.
Network Rules amendments
NGE 204 Network communication
Changes to differentiate between the
types of boxes used in forms i.e.
check boxes, numbered boxes and
assurance boxes.
NWT 300 Planning work in the rail
corridor
A reference to ‘a lack of trained
workers’ has been changed to ‘a lack
of Qualified Workers’.
The responsibilities of Protection
Officers for briefing workers have
been expanded to provide greater
detail.
Several instances of the term
‘adjacent line’ have been replaced
with the term’s definition.
The responsibilities of Protection
Officers for assessing safety workers
have been expanded to include
assessing the risk from road traffic.
Signal Key Switch (SKS) blocking has
been added to the methods for work
in the Danger Zone, and references
for related Network Procedures
added.
NWT 302 Local Possession Authority
Requirements and responsibilities
related to coordinated worksites and
Coordinating Protection Officers
have been added.
The responsibilities of Protection
Officers for briefing workers have
been expanded to provide greater
detail.
Requirements for protecting Local
Possession Authority (LPA) limits
have been amended to include:
• Signallers, if possible, preventing
unauthorised rail traffic from
exiting the LPA
• using possession limit markers
• extending the limits of an LPA
• managing intermediate access
points.
Requirements for using worksite
protection markers for protecting
worksites have been added.
Requirements for protecting
worksites within 500m of an LPA limit
have been expanded to include:
• the use of the use of worksite
protection markers
• prohibition on rail traffic
associated with such worksites
unless a Track Occupancy
Authority (TOA) adjoining the
limits has been authorised.
Requirements for protecting multiple
worksites have been amended to
include requirements for coordinated
worksites, and the use of worksite
protection markers and worksite
delineation markers.
NWT 306 Track Work Authority
Protection Officer responsibilities
have been amended to make them
the only person to speak to
Signallers and workers about
protection arrangements.
The requirements for identifying a
worksite’s location have been
amended:
• platforms are no longer valid
reference features
• the end of a terminal line can be
used as a reference feature.
The use of automatic signals to
protect worksites has been changed:
• a Handsignaller at a signal may
not be used for protection
• signal key switches and
associated Handsignaller may be
used for protection.
The placement of WORKSITE
warning signs has been clarified.
2. Partnering industry for Better Safety for all August 2019
This is an uncontrolled copy. Before use, make sure that this is the current version by visiting www.railsafe.org.ausafe-tracks
2 SafeTracks August 2019
NWT 312 Infrastructure Booking
Authority
Requirements for infrastructure being
permanently removed have been
added.
The requirements for compiling an
Infrastructure Booking Authority (IBA)
form now include the need to include
details of using uncommissioned
infrastructure.
NWT 320 Signal Key Switch Blocking
This new Network Rule prescribes the
rules for working in the Danger Zone
using Signal Key Switch Blocking.
NTR 400 Protecting rail traffic
Removed the requirement to place
railway track signals to protect rail
traffic outside the area bounded by
Waterfall, Macarthur, Emu Plains and
Cowan.
Existing instructions for protecting
rail traffic within the area bounded by
Waterfall, Macarthur, Emu Plains and
Cowan will be extended to the entire
Sydney Trains Network to ensure
consistency of application.
NSY 512 Manual block working
Clarified that a clearance
Handsignaller must be placed at the
exit-end limit signal if the entire
block to the first signal beyond
cannot be seen to be clear.
Clarified the signals that must not be
included on a CAN form as signals
that can be passed at STOP.
Network Procedures
amendments
NPR 700 Using a Local Possession
Authority
Procedure now includes:
• the use of possession limit
markers
• clarified instructions for clipping
and locking intermediate points
• the use of possession limit
markers, worksite protection
markers and worksite delineation
markers
• managing coordinated worksites
NPR 702 Using a Track Work Authority
The requirements for identifying a
worksite’s location have been
amended:
• platforms are no longer valid
reference features
• the end of a terminal line can be
used as a reference feature.
The instructions for the Protection
Officer confirming details from the
Signaller have changed.
Instructions for keeping an automatic
signal at stop include an option to
use a signal key switch, and
instructions have been added for
operating a signal key switch.
NPR 712 Protecting work from rail
traffic on adjacent lines
The glossary definition of the term
‘adjacent line’ has been included.
The use of Signal Key Switch (SKS)
Blocking to protect adjacent lines has
been added.
The demarcation fencing instructions
define approved demarcation
fencing, and include a description of
using a dedicated worker to keep
workers from straying out of their
worksite.
NPR 713 Placing temporary speed
signs
Temporary speed WARNING and
INTERMEDIATE WARNING signs
may no longer be black text on a
yellow background.
NPR 720 Protecting rail traffic
Instructions for delayed rail traffic
have been removed.
The use of railway track signals to
protect disabled rail traffic is no
longer required. A Qualified Worker
must, where practicable, be used
instead.
Instructions related to assisting rail
traffic have been added.
Instructions for protecting
obstructions have changed to allow a
Signaller to give assurance that rail
traffic has been prevented from
approaching the affected portion of
track instead of always requiring the
use of track-circuit shorting clips.
Separate instructions are given for
the use of railway track signals to
protect obstructions.
NPR 725 Using a large pilot staff and
NPR 726 Using half pilot staffs
An NRF 011 Worksite Warning form is
now required to be used if there are
more than six worksites in the
affected portion of track. The
previous limit was two worksites.
NPR 753 Using Signal Key Switch
Blocking
This new Network Procedure gives
instructions for using the Signal Key
Switch Blocking method of work on
track.
NPR 754 Using a signal key switch
This new Network Procedure gives
instructions for using signal key
switches.
3. Partnering industry for Better Safety for all August 2019
This is an uncontrolled copy. Before use, make sure that this is the current version by visiting www.railsafe.org.ausafe-tracks
3 SafeTracks August 2019
Network Forms amendments
If appropriate, in each of the Network
Forms:
• instructions have been added for
numbering forms
• the term ‘Train Controller’ has
been replaced by ‘Network
Controller’
• the term ‘check box’ has been
replaced by ‘numbered box’.
NRF 000 General information about
Network Forms
Changes to differentiate between the
types of boxes used in forms i.e.
check boxes, numbered boxes and
assurance boxes.
NOTE
These changes are reflected in
each amended Network Form.
A reference to ’Train Controller‘ has been
change to ’Network Controller’.
NRF 003 Infrastructure Booking
Authority (IBA)
Details must be provided for using
uncommissioned infrastructure.
The requirement to include the date
that booking-out was advertised has
been removed.
People attesting to the booking-out
or booking-in of infrastructure or the
use of uncommissioned
infrastructure must now record their
depot/contact No. or location/panel,
and are no longer required to sign
the form.
NRF 004 Condition Affecting the
Network (CAN)
The signals at STOP instructions
have been reworded for additional
clarity.
NRF 005 Special Proceed Authority
(SPA)
The term ‘Train Controller’ has been
replaced by ‘Network Controller’.
There have been non-substantial
changes to improve clarity.
NRF 008 Pilot Staff Notice (PSN)
The form has been restructured and
amended:
• to make the form easier to
compile
• to include details of up to six
worksites on the adjacent line.
NRF 010 Pilot Staff Working
Introduction
The form has been restructured and
amended to make the form easier to
compile.
NRF 011 Worksite Warning
The number of worksites in a pilot
staff working section above which
this form must be issued has
changed from two to six.
The form has been restructured and
amended to make the form easier to
compile.
NRF 013 Temporary Rail Bond
Approval
The form has been restructured and
amended to make the form easier to
compile.
The requester and approver must
now enter the time and date they
requested or approved the
temporary rail bond.
NRF 014 Worksite protection pre-work
briefing
The Workplace Supervisor role
replaces the Site Supervisor role, and
more detailed instructions for the
Workplace Supervisor have been
added.
NRF 015 Worksite Protection Plan
The Workplace Supervisor role
replaces the Site Supervisor role.
A new form, NRF 015D Worksite
Protection Plan, has been
implemented specifically for work
using a Track Work Authority or
Signal Key Switch Blocking, and
instructions updated accordingly.
With the introduction of this new
form, NRF 015A will longer be used
for TWA.
Instructions for providing diagrams
and maps have been simplified.
The actual forms have been amended
to reflect changes to the related
Network Rules and Network
Procedures.
NRF 018 Absolute Signal Blocking
(ASB)
The actual form has been:
• amended to reflect changes to
the related Network Rules and
Network Procedures.
• restructured and amended to
make the form easier to compile.
The note relating to adjacent line
protection has been simplified.