Infrastructure
Management System
Your Company Name
Content
2
Introduction to Infrastructure
Asset Management Process
Inventory and Condition Assessment
Deterioration Modeling
Optimization and Decision Making
Performance and Cost Functions
Interdependence, Resiliency and Security
Contract and Workflow Management
Commissioning New Facilities
Capital Budgeting
KPI Metrics and Dashboard
01
02
03
04
05
06
07
08
09
10
11
Introduction to Infrastructure
3
o Infrastructure Services
o Infrastructure Market Size Globally
o Infrastructure Key Funding Areas
o Key Technology Trends In Infrastructure
o Key Drivers for Sustainable Infrastructure Management
01
4
Infrastructure Services
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
Different categories of
Infrastructure services
have been listed here.
You can edit this
according to your
project requirement.
Roadways
Infrastructure
Building
Infrastructure
Water
Infrastructure
Telecommunication
Infrastructure
Health
Infrastructure
Power Generation
Infrastructure
01
02
03
04
05
06
Infrastructure
Services
5
Infrastructure Market Size Globally
$0.80
$1.60
$2.40
$3.20
$3.90
2016 2017 2018 2019 2020
This graph/chart is linked to excel, and changes automatically based on data. Just left click on it and select “Edit Data”
Market in
Billion
U.S Dollars
This bar graph shows
market size for
consecutive years. You
can edit this as per
your requirement.
6
Infrastructure Key Funding Areas
Waterpower, Environmental, & Public
Facility Management
Transport and
Warehousing
Electricity, Gas & Water
Production
InformationTransmission, Computing
Services & Software
36%
37%
4%
23%
This graph/chart is linked to excel, and changes automatically based on data. Just left click on it and select “Edit Data”
This slide shows key
areas of infrastructure
investment. You can
edit this as per your
requirement.
7
KeyTechnologyTrends in Infrastructure
Urbanization &
Ageing
Infrastructure
o Your Text Here
o Your Text Here
o Your Text Here
o Your Text Here
o Your Text Here
o Your Text Here
o Your Text Here
o Your Text Here
o Your Text Here
o Your Text Here
Smart City &
Smart
Customer
o Your Text Here
o Your Text Here
o Your Text Here
o Your Text Here
o Your Text Here
o Your Text Here
o Your Text Here
o Your Text Here
o Your Text Here
o Your Text Here
Ageing
Workforce
o Your Text Here
o Your Text Here
o Your Text Here
o Your Text Here
o Your Text Here
o Your Text Here
o Your Text Here
o Your Text Here
o Your Text Here
o Your Text Here
Industrial
Internet of
Things IoT
o Your Text Here
o Your Text Here
o Your Text Here
o Your Text Here
o Your Text Here
o Your Text Here
o Your Text Here
o Your Text Here
o Your Text Here
o Your Text Here
Diversification
&
Internationalization
o Your Text Here
o Your Text Here
o Your Text Here
o Your Text Here
o Your Text Here
o Your Text Here
o Your Text Here
o Your Text Here
o Your Text Here
o Your Text Here
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
8
Key Drivers for Sustainable Infrastructure Management
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
Sustainability
o Community Engagement
o Social Responsibility
o Growth Opportunities
o Better Financial Stability
o Job Creation
o Improved Productivity
o Better health & wellbeing
o Improved resilience to disaster
o Climate Resilience
o Lower Clean-up cost
o Greener Environment
o 2oC Limit
o Climate Change migration & adaption
o Reduced Pollution
Environmental
SocialEconomic
Sustainable infrastructure
means designing,
building, and operating in
ways that do not
adversely effect the
environmental, social, and
economic system.
Asset Management Process
9
o Asset Management Framework
o Asset Management Process
o Asset Management Lifecycle (1/1)
o Asset Management Lifecycle(1/2)
02
10
Asset Management Framework
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
This framework depicts an
organisation's asset
management
responsibilities.
Classes/ types of assets, location, amount or extent
Current Status or Condition
Current Asset Value
Current under-performing deficient assets
Potential future under-performers
Program costs & returns
Future asset values
Decision
Process
Measures
Methods
Criteria
Models/ Estimates
Time Horizons
Corporate Database &
Executive Information
System
Implementation
GeneralPrinciplesof
AssetManagement
11
Asset Management Process
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
This asset management
process can aid you in
meeting your
investment goals.
Discuss your business
goals and expectations.
Devise an Investment
Policy Statement
Discuss your
Goals
Analyse the current
financial situation and
define a new financial path
for future
Analyze &
Assess
Strategically implement new
financial plan according to
your portfolio. Try to
minimize expenditure and
market risks
Strategic
Implementation
Monitor individual
portfolios to make sure
that they are in alignment
with your financial plans
Monitor, Review,
Update
The most important thing
is to keep changing
portfolio according to the
changing needs
Plan
Changes
Asset Management Process
12
Asset Management Lifecycle (1/1)
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
Procurement
o Your Text Here
o Your Text Here
o Your Text Here
Deploy & Discover
o Your Text Here
o Your Text Here
o Your Text Here
Support
o Your Text Here
o Your Text Here
o Your Text Here
Retirement & Disposal
o Your Text Here
o Your Text Here
o Your Text Here
Maintain
o Your Text Here
o Your Text Here
o Your Text Here
13
Asset Management Lifecycle (1/2)
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
AuditControl
Reconcile
Acquisition & Commissioning
o Asset Inward & Inspection
o Asset Returns
o Commissioning & Trial Run
o Your Text Here
o Your Text Here
Acquire
Allocation & Tracking
o Asset Allocation Planning
o Asset Allocation Workflow
o Operator Assignment Planning
o Your Text Here
o Your Text Here
Deploy
Disposing & Reconditioning
o Asset Retirement Planning
o Asset Decommissioning
o Reconditioning & Refurbishment
o Your Text Here
o Your Text Here
Retire
Maintenance & Compliance
o Regular/ Preventive Maintenance Planning
o Asset/ Parts issue for Maintenance/ Repairs
o Maintenance Checklist
o Your Text Here
o Your Text Here
Manage
Planning & Purchase
o Asset Procurement Planning
o Asset Vendor Management
o Quotes
o Your Text Here
o Your Text Here
Plan
Security
o User Authentication
o User Authorization
o Role Based Access Privileges
o Your Text Here
o Your Text Here
Reporting
o Standard Reports
o Graphical Reports
o Mis Reports with Drill Downs
o Your Text Here
o Your Text Here
General
o Latest Microsoft Technology
o Completely Browser Based
o Integration Ready with ERPs
o Your Text Here
o Your Text Here
Asset and Condition Assessment
14
o Inventory Assessment for Infrastructure Companies
o Condition Assessment for Individual Facility
03
15
Asset Assessment for Infrastructure Companies
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
In this assessment table
you can include all your
assets as well any
hazards associated with
them. You can edit it as
per your requirement.
Type of
Equipment/
Machinery
Process Locations No. of Machines Energy Sources
All Exposed
Moving Parts
Guarded Y/N/U
Guarding Meets
Standards Y/N/U
Noise Hazard
Y/N/U
Ergonomic
Hazards Y/N/U
Hazardous
Fugitive
Emissions Y/N/U
Other Hazards
(List)
Previous Injuries/
Illness or Worker
Complaints Y/N
Surface Grinder Centre of Trade Shop 2 Electrical Y Y Y Y
U
(need to assess
material)
Injury to eye if safety
glasses are not worn
N
Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here
Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here
Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here
Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here
Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here
Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here
Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here
Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here
Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here
Y =Yes N = No U = Uncertain
16
Condition Assessment for Individual Facility
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
This slide shows
condition assessment
for individual facilities.
You can replace the
data with your own.
Structure
Exterior
Finishes
Roof HVAC Electrical Plumbing Conveyance
Interior
Finishes
Program-
support
Equipment
Facility
Description
Facility Current
Replacement
Value (CRV)
Inspection
Rate
System
CRV
Inspection
Rate
System
CRV
Inspection
Rate
System
CRV
Inspection
Rate
System
CRV
Inspection
Rate
System
CRV
Inspection
Rate
System
CRV
Inspection
Rate
System
CRV
Inspection
Rate
System
CRV
Inspection
Rate
System
CRV
General
Warehouse
5,856,231 4 0.06 5 0.10 3 0.05 4 0.10 3 0.02 2 0.01 1 0.2 1 0.5 4 0.04
Administration
Building
11,523,333 2 0.16 3 0.06 5 0.12 4 0.16 2 0.03 5 0.06 5 0.03 4 0.15 5 0.16
Main Library 5,716,055 3 0.019 2 0.016 4 0.09 5 0.01 1 0.05 3 0.03 3 0.06 2 0.16 3 0.15
Deterioration Modelling
17
o Types of Deterioration Models
o Asset Deterioration Modelling
o Risk Assessment and Deterioration Modelling
04
18
Types of Deterioration Models
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
Infrastructure deterioration
models are an integral part
of asset management.
Deterioration models are
used to predict future asset
condition and to estimate
funding requirements.
Deterministic
Models
Stochastic
Models
Al
Models
Deterioration
Models
o Straight – Line Extrapolation
o Regression Models
o Stepwise regression
o Linear regression
o Non – Linear regression
o Curve – Fitting Models
o B – Spline approximation
o Constrained least squares
o Stochastic Models
o Markovian Models
o Percentage prediction
o Expected – value method
o Poisson distribution
o Negative – binomial model
o Ordered – Probit model
o Random – Effects model
o Latent Markov – Decision process
o Artificial Neural Networks
o Case – Based Reasoning
19
Asset Deterioration Modelling
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
This slide shows the
past and future
condition of your assets
and also prescriptive
measures to be taken.
Descriptive Predictive Prescriptive
What happened to our assets in the last 10yrs?
o Long term data collection
o Trend analysis on historic data
o Understanding past performance
o Scorecards
o Data warehousing
What will happen to our assets in the next 25yrs?
o Data mining
o Forecasting the future
o Probability of failure
o Asset deterioration
o Statistical analysis software
What future investments do we need to make on our
assets?
o Long term investment scenarios
o Whole life cost modelling
o Optimisation and simulation
o Uncertainty and sensitivity
o Decision support tools
What happened to our assets in the last year?
o Annual data collection & refresh
o Review seasonal trends
o Identify localised issues
o Dashboards
o Annual business reporting
What will happen to our assets in the next year?
o Detailed data mining
o Forecast annual performance
o Account for localised factors
o Engineering validation
o GIS tools and techniques
What assets do we need to replace or maintain this
year?
o Annual investment scenarios
o Set annual budgets
o Set annual performance targets
o Candidate assets for investment
o Decision support tools
What is happening to our assets today?
o Daily data collection
o Real time monitoring of assets
o Early warning of faults
o Rapid response to assets failure
o SCADA and monitoring tools
What will happen to our assets tomorrow?
o Real time data analysis
o Predict highest risk assets
o Condition and criticality scores
o Process engineering
o Integration of analytics to SCADA
What assets do we need to inspect or maintain
tomorrow?
o Daily schedules of work
o Improve operational efficiency
o Optimise proactive Investment
o Prioritise reactive investment
o Job optimization schedulers
Strategic
Tactical
Operational
20
Risk Assessment and Deterioration Modelling
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
Data
Input
01
Data
Analysis
02
Decision Making
Constraints
03
Optimization
Process
04
Optimal
Decision
05
o Pipe condition data
o GIS data
o Other data formats
o Risk analysis of assets
o Development of
deterioration model
o Validation of
deterioration model
o Ranking critical assets
o Fixed yearly budget
o Technological constraints
o Other constraints
o Minimize cost (Operational,
Capital, Lifecycle, etc.)
o Maximize expected life of
pipe
o Minimize condition rating
o Ranking of optimal solutions
o Optimal renewal method
based on constrains
o Optimal condition inspection
policy
Optimization and Decision Making
21
o Infrastructure Optimization
o Asset Management Decision Journey
o Value Driven Decision Making Methodology
05
22
Infrastructure Optimization
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
01 02 03 04 05 06 07
Spare Parts
Management
Spare Parts
Repair Services
LocalTest &
Repair
Refurbish &
Redeploy
Surplus Asset
Management
Core Network
Optimization &
Support
Network
Implementation
Process Improvement &
Efficiency
Total Inventory Identification &
Transparency
Cost Reduction & Revenue
Generation
23
Asset Management Decision Journey
Phase
1
Phase
2
Phase
3
Phase
4
o Solution strategy
o User interviews
o Audit current methods
o Identify business requirements
Strategize
o Read white papers and articles
o Review industry reports
o Talk to industry experts
o Talk to other AM users
o Attend AM Conferences
Research
o Calculate ROI
o Assign AM champion
o Prepare and present the case for AM
o Get buy-in from design makers
Justify
o Compare solutions against system requirements
o Use a proof of Concept (Demos, Sandbox, Pilot,
etc) to validate use cases
o Roadmap for implementation and beyond
Evaluate
24
Value Driven Decision Making Methodology
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
Establish the
Context
Value
Mapping
Value
Assessment
Set the objectives & scope
Define the problem statement
Determine the time period for
evaluation
Identify the stakeholders
Determine how the asset can directly
influence each of the value metrics
Determine the factors that influence the
decisions
Identify stakeholder requirements & objectives
Identify the value drives that contribute
to stakeholders requirements
Identify the value metrics to assess each
value driver
Determine how the asset can indirectly
influence each of the value metrics
Determine the external factors that
influences asset & value metrics
Determine the various intervention &
control options
Identify & map the link between
various factors to value generation
Identity Modelling Requirements
Determine the potential techniques to
encapsulate the modelling requirements
Perform sensitivity analysis & choose
the best option
Develop the model
A B C
Performance and Cost Functions
25
o Asset Performance Management
o Performance Management Maintenance Pyramid
o Performance Scoring and Analytics
o Infrastructure Cost Table
o Cost Determining Factors of Infrastructure Projects
06
26
Asset Performance Management
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
01
02
03
04
05
Maintenance & Reliability Engineering
o Maintenance System Build
o Work Management/ Execution
o Your Text Here
o Your Text Here
o Your Text Here
Shutdown Management
o Shutdown Strategy & Plaining
o Shutdown Scope Assessment & Prioritisation
o Integrated Shutdown Teams
o Shutdown Program Delivery
Integrity Management & Compliance
o Integrity Management Plans
o Audit & Inspection
o Compliance Management
o Safety Critical Equipment
Training & Development
o Competency Training
o Coaching/ Mentoring
o Course Development
o Training Needs Analysis
o Training Management
o LMS Implementation
Maintenance & Support Services
o Preventative Maintenance Works
o Maintenance Upgrades
o Plant Improvement Projects
o Project Execution Works
27
Performance Management Maintenance Pyramid
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
Reliability - Cantered Maintenance
Requiers a compréhensive maintenance infrastructure
Reactive Maintenance
Run to failure
Predictive Maintenance
APR & diagnostics to predict impeding failure
Condition-Based Maintenance
Rules - based logic using sensor data
Preventive Maintenance
Planned based on time or usage statistics
Strategic Proactive,
Optimized
28
Performance Scoring and Analytics
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
AdoptionManagement
AssetInventory
Management
Auditing
Budgeting&
Forecasting
BusinessAnalysis
ChangeControl
ContractManagement
DisasterRecovery
ExceptionManagement
Fixed&Mobile
Strategy
Governance
HelpDesk
InvoiceProcessing
ProjectManagement
RegulatoryCompliance
Reporting
RiskManagement
Security
ServiceDelivery
ServiceInventory
Management
ServiceOrdering
Sourcing&
Procurement
Processes
Structure
Skills
Technology
Services
Assets
Costs
Vendors
Information
Business
High Medium Low
This slide includes various
asset performance
parameter. You can
change parameters and
scores to suit your
requirement.
29
Infrastructure CostTable
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
You can edit this slide as
per your requirement to
show major areas of
expenditure.
Planning/ Design Fees 8-9% 9-15% 30-40% 85-96% 82-9% 82-96%
Land Purchase 5-6% 15-20% 50-60% 56-62% 35-66% 51-63%
Building & Construction 6-7% 50-70% 60-70% 66-70% 46-57% 60-70%
Plant & Machinery 9-10% 20-30% 80-90% 33-53% 59-80% 50-60%
Contingencies 4-5% 40-50% 40-55% 43-56% 46-53% 64-75%
Roadway
Construction
Gas
Distribution
Network
Power
Station
Building
Water Supply
Network
Sewage
Treatment
Plant
30
Cost Determining Factors of Infrastructure Projects
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
This slide shows
various factors that
may change the cost of
your infrastructure
project.
Cost Elements Design Changes
Land Acquisition
Problems
Poor Project
Management
Unexpected Ground
Conditions
Inflation/ Relative Price
Rise
Difficulties with
Contractors
Planning/
Design Fees - - -
Land
Purchase - -
Site
Preparation -
Building & Construction -
Plant & Machinery - -
Cost Changing Factors
Low
Medium
High
Interdependence, Resiliency and Security
31
o Critical Infrastructure Dependencies & Interdependencies
Assessment Framework
o Infrastructure Resilience Wheel
o Lifecycle Adaptive Components of Resilience Framework
o 4 Dimensions of Infrastructure Security
07
32
Critical Infrastructure Dependencies & Interdependencies Assessment Framework
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
The products or services
provided to
one infrastructure by
another
external infrastructure are
necessary to support its
operations and functions.
Geographic
Dependencies
Logical
Dependences
Interdependencies
Supply
Chain
Cascading
Failure
Escalating
Failure
Physical
Dependencies
Cyber
Dependences
Analysis
Expertise
o Computer Science & Information
Technology
o Engineering
o Management Science
o Your text here
o Your text here
o Your text here
Partnerships
o Federal Agencies
o International Organizations
o National Laboratories
o Your text here
o Your text here
o Your text here
Data
o Commercial Databases
o Custom Collection
o Open Source Data
o Your text here
o Your text here
o Your text here
Infrastructure Metrics
o Critical Infrastructure Resilience
o Dependency Curves
o Emergency Services Sector
Capabilities
o Text Here
o Text Here
Agent Based & Complex Adaptive
System Models
o Electricity Market Complex Adaptive
System
o Oil & Gas Model
o Text Here
o Text Here
Infrastructure Models
o EPfast
o NGfast
o Polfast
o Text Here
o Text Here
Tools
Stakeholder Needs & Requirements
Scope Goals & Objectives
Products
o Custom Product
o Decision Support
o Intelligence Fusion
o Your Text Here
o Your Text Here
o Your Text Here
o Your Text Here
o Your Text Here
33
Infrastructure ResilienceWheel
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
Resiliency is the ability
of an asset to recover
quickly and continue
operating even when
there has been any
disruption.
Good
Governance
Information
Flows
Robustness
Capacity to
Learn
Resourcefulness
Flexibility
Responsiveness
Redundancy
Safe Failure
What Makes
Infrastructure
Resilient?
Policies, Institutions &
Processes
Operations &
Maintenance
Technical Plaining &
Design
Financial Arrangements &
Incentives Expertise
34
Lifecycle Adaptive Components of a Resilience Framework
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
Pre-Incident Adaptive Prevention
o Reduce Vulnerabilities
o Retrofit & Upgrade Structure
o Reduce Exposure
o Plan for Climate Change
o Maintain Real-Time Situational Awareness
EvolvingThreats: Predictive
Problem Solution
o Detect Emerging Threats
o Monitor Unfolding Events
o Correct Drift & Variation
Post-Disaster Response & Recovery
o Search & Rescue
o Mitigation of Consequences
o Restoration of normal Operations
Disaster Unfolding:Alternative
Operational Paths
o Redundant Distributed
o Input Substantiation
o Decentralized Operations
o Loose Coupling
Adaptive
Components of
Resiliency
35
4 Dimensions of Infrastructure Security
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
Hackers Suspires
TerroristsConsultants
Employees Outsources
Customers
Web
Applications
Systems Applications Web 2.0 Mobile Applications
At RestStructured Unstructured In Motion
Non-
Traditional
Datacenters CloudPCs Laptop Mobile
PeopleDataApplicationsInfrastructure
Contract andWorkflow Management
36
o Key Components of Contract Management
o Contract Lifecycle Management
o Workflow Management Process Flow
08
37
Key Components of Contract Management
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
Relationship
Management
Monitoring
Performance
Record
Keeping
Contract
Administration
Risk
Management
Governance
Contract
Management
38
Contract Lifecycle Management
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
Create Negotiate Approve Sign
ExecuteTrackRenewExit
Contract Lifecycle Management
39
Workflow Management Process
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
Proposed:
Idea
Declined :
Step for Declined
Analysis :
Check Results
End :
Finished
Analysis :
Collect Info
Waiting for Approval :
Waiting for Approval
Active :
Campaign in Action
Waiting for Start :
Start Scheduled
Preparation:
Prepare Materials
Deferred:
Postponed
Budgeting :
Allocate Budget
Commissioning New Facilities
40
o Commissioning by Project Phase
o Commissioning Levels
09
41
Commissioning by Project Phase
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
Develop Overall
Commissioning Plan
Develop Level 1,2,3
Commissioning Documents
Review Design
Commissioning Readiness
DesignPre-Design
Build
Commissioning Team
OPR+ BOD
Development
Construction
Execute Level 1, 2, 3
Commissioning
Development Level 4 & 5
Commissioning Script
Commissioning
Execute Level 4 & 5
Commissioning
Reset to Normal
Configuration
Final Site Clean
Up
Turnover/
Re-Commissioning
Verify IT Equipment Dual
Corded
Develop
Commissioning Scripts
Execute Commissioning
Activities
Design Facility Operations
This slide shows
various levels of
commissioning at
different project phases
42
Commissioning Levels
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
Level 1 - Execution commissioning Factory Witness Testing Your Text Here
Level 2 - Execution Commissioning Receipt , Installation, &
Post- Installation Checks
Your Text Here
Level 3 - Execution Commissioning Component Functional
Testing
Your Text Here
Level 4 & 5 - Develop Commissioning Plans & Scripts Your Text Here
Level 4 & 5 - Review Commissioning
Plans & Scripts
Your Text Here
Maintenance Warranty Your Text Here
Maintenance Life Cycle Your Text Here
Owner or Owner’s
Representative
Contractor
Architects
& Engineers
Operations
Personnel
Commissioning
Agent
Capital Budgeting
43
o Capex Summary
o Capital Expenditure Details
o Discounted Payback Period
o Net PresentValue
o Internal Rate of Return
o Valuation Methods Comparison
10
44
Capex Summary
This graph/chart is linked to excel, and changes automatically based on data. Just left click on it and select “Edit Data”
0.4 0.3
2
3
0.6
0.4
3
4
0
1
2
3
4
Machine 1 Machine 2 Building 1 Building 2
Millions
FY 19 FY 20
60% 35% 25% 75%
45
Capital Expenditure Details
$600,000
Preparing an asset to be
used in business
$300,000
Acquiring fixed, & in some
cases, intangible assets
$300,000
Restoring property or adapting
it to a new or different use
$500,000
Repairing an existing asset so
as to improve its useful life
$400,000
Starting or acquiring a
new business
$800,000
Upgrading an existing assets if it
results in a superior fixture
46
Discounted Payback Period-Valuation Summary
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
Year Cash Inflows ($) (A) PV Factors at 10% (B) Present Value (A*B)
Cumulative PV of Cash
Inflows
1 22,000 0.902 10,608 10,508
2 24,000 0.81 11,864 22,632
3 26,000 0.652 12,416 34,428
4 24,000 0.585 10,145 44,713
5 24,000 0.422 8,894 53,527
Discounted
Payback Period
3 years + (43000 – 34, 488) /10245
3 years + 0.83 years
3.83 years
Cost of the Project
$ 43,000
Year
Cash
Inflows
PV Factor
at 10%
1 13,000 0.809
2 15,000 0.926
3 17,000 0.451
4 18,000 0.883
5 19,000 0.821
47
Net PresentValue -Valuation Summary
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
1 1,20,000 0.209 89.990
2 1,10,000 0.426 1,42,160
3 30,000 0.551 21,530
2,54,680
2,54,680 - 2,00,000
$ 54,680
Cash
Inflows
($) (A)
PV
Factor at
10% (B)
Present
Value
(A*B)
Year
NPV
48
Internal Rate of Return-Valuation Summary
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
Rate Discount Factor
10% 3.1024
IRR 3.08
11% 3.0373
IRR 11.34%
(IRR- 11) / 12-11 = (3.08 – 3.1024 ) / 3.0373 – 3.1024
(IRR- 11) /1 = (-0.0224) / (-0.0651)
IRR-11 = 0.34
Alternatively,Simple Interpolation Method
Payback
Period
Initial Investment
Annual Cash Inflow
3.08
40000 13000
The nearest value
corresponding to
3.08 in the present
value of annuity
table for 4 years
3.1024
IRR is 11% which corresponds to 3.1024
49
Valuation Methods Comparison
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
Discounted Payback Period 3.23Years
o Your Text here
o Your Text here
Net PresentValue 44,680
o Your Text here
o Your Text here
Internal Rate of Return 21.34%
o Your Text here
o Your Text here
Valuation Method Results Comments
Discounted Payback Period
The most suitable choice for valuation
KPI Metrics and Dashboard
50
o KPI Metrics
o KPI Dashboards
11
51
Infrastructure KPI Dashboard Showing Cost Reduction & Procurement
This graph/chart is linked to excel, and changes automatically based on data. Just left click on it and select “Edit Data”
Top 5 Supplier by Cost Reduction Top
Top
Supplier 01 $22.856
Supplier 02 $17.941
Supplier 03 $13.255
Supplier 04 $14.465
Supplier 05 $11.364
Cost of Purchase
$12.000
This Year
5 Year
Trend
Cost of Reduction
$400,500
This Year
5 Year
Trend
Cost Savings
$14,2%
This Year
5 Year
Trend
Cost Avoidance
$8,3%
This Year
5 Year
Trend
Procurement ROI
$5,2%
This Year
5 Year
Trend
25%
35%
45%
55%
60%
75%
0 20 40 60 80
Other
Display
Battery
Sensors
Switches
Transistors
Savings
25.8%
35.2%
40.4%
45.4%
55.2%
66.2%
0 10 20 30 40 50 60 70
Other
Display
Battery
Sensors
Switches
Transistors
Avoidance
Transistors, $18
Switches, $12
Sensors, $27
Battery, $19
Display, $11
Other, $13
Cost Reduction
0
5
10
15
Transistors Switches Sensors Battery Display Other
Procurement ROI
ROI Benchmark
52
Infrastructure KPI Dashboard Showing Resource Allocation
This graph/chart is linked to excel, and changes automatically based on data. Just left click on it and select “Edit Data”
23 Jul, 18 16 Jun, 18 05 My, 18 12 Apr, 18 21 Mar, 18
Project 1
Project 2
Project 3
Project 4
Project 5
Project 6
0
50
100
150
200
250
300
Project 1 Project 2 Project 3 Project 4 Project 5 Project 6
Days Per Project
$0
$1
$2
$3
$4
$5
Project 1 Project 2 Project 3 Project 4
InThousands
Project Financial
Delivery Timeline & Resources
Project 1, 25%
Project 2, 25%
Project 3, 15%
Project 4, 20%
Project 5, 15%
Resource Allocation
53
Infrastructure KPI Dashboard Showing Project Revenue
This graph/chart is linked to excel, and changes automatically based on data. Just left click on it and select “Edit Data”
300
900
1,200.00
1,800.00
2,400.00
3,000.00
3,600.00
3,900.00
$0 $500 $1000 $1500 $2000 $2500 $3000 $3500 $4000
Project 8
Project 7
Project 6
Project 5
Project 4
Project 3
Project 2
Project 1
Dollars in Million
Net Project Revenue per Employee
All Other
Materials, 15%
Textiles, 15%
Plastic, 10%
Rubble, 10%Paper, 14%
Asphalt, 8%
Wood, 22%
Household, 6%
% of Construction & Demolition
west Recycled
Square Meter Price
$ 600 Dollars per
Employee
54
Infrastructure KPI Metrics Showing Square Meter Area
01
Square Meter
Price
$600
This slide is 100%
editable. Adapt it to
your needs and
capture your
audience's attention.
02
Actual Construction
Time
16 Months
This slide is 100%
editable. Adapt it to
your needs and
capture your
audience's attention.
03
No. of Activities
Starting on Time
8
This slide is 100%
editable. Adapt it to
your needs and
capture your
audience's attention.
Infrastructure KPI Metrics
Showing Cost Saving
55
9%
% of Defects
$1600
Net Project Revenue Per Employee
13%
Cost Savings
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
56
Infrastructure
Management
System Icons Slide
Additional Slides
57
58
Infrastructure Industry Key Stats
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
7
Subsidiary Companies
8
MajorTier 1
Networks/ Providers
13
Points of Presence
1500
Gbps Capacity
>1K
Peering Partners
5
Data Centers
>1K
Racks Utilized
>16K
Servers Managed
Our Mission
59
Vision
This slide is 100% editable. Adapt it to your
needs and capture your audience's attention.
Mission
This slide is 100% editable. Adapt it to your
needs and capture your audience's attention.
Goal
This slide is 100% editable. Adapt it to your
needs and capture your audience's attention.
60
OurTeam
Name Here
Designation
This slide is 100% editable. Adapt it
to your needs and capture your
audience's attention.
Name Here
Designation
This slide is 100% editable. Adapt it
to your needs and capture your
audience's attention.
Name Here
Designation
This slide is 100% editable. Adapt it
to your needs and capture your
audience's attention.
About Us
61
Target Audiences
This slide is 100% editable. Adapt it to your
needs and capture your audience's attention.
Preferred by Many
This slide is 100% editable. Adapt it to your
needs and capture your audience's attention.
Value Clients
This slide is 100% editable. Adapt it to your
needs and capture your audience's attention.
62
Venn
Text Here
This slide is 100% editable. Adapt it
to your needs and capture your
audience's attention.
Text Here
This slide is 100% editable. Adapt it
to your needs and capture your
audience's attention.
Text Here
This slide is 100% editable. Adapt it
to your needs and capture your
audience's attention.
Text Here
This slide is 100% editable. Adapt it
to your needs and capture your
audience's attention.
Text Here
This slide is 100% editable. Adapt it
to your needs and capture your
audience's attention.
63
Timeline
2020
2017
This slide is 100%
editable. Adapt it to your
needs and capture your
audience's attention.
2018
This slide is 100%
editable. Adapt it to your
needs and capture your
audience's attention.
2019
This slide is 100%
editable. Adapt it to your
needs and capture your
audience's attention.
64
Area Chart
0
10
20
30
40
50
60
70
80
90
100
DecNovOctSepAugJulJunMayAprMarFebJan
InPercentage
2020
Product 02
Product 01
65
Column Chart
This graph/chart is linked to excel, and changes automatically based on data. Just left click on it and select “Edit Data”
80
75
50
55
45
35
30
40
60
28
0
10
20
30
40
50
60
70
80
90
100
FY '16 FY '17 FY '18 FY '19 FY '20
SalesinPercentage(%)
Product 01
Product 02
ThankYou
66
Office Hour
Monday – Saturday
09.00 – 6.00
Call Us
0123456789
Visit Us
# street number, city, state
Follow Us
emailaddress123@gmail.com

Infrastructure Management System PowerPoint Presentation Slides

  • 1.
  • 2.
    Content 2 Introduction to Infrastructure AssetManagement Process Inventory and Condition Assessment Deterioration Modeling Optimization and Decision Making Performance and Cost Functions Interdependence, Resiliency and Security Contract and Workflow Management Commissioning New Facilities Capital Budgeting KPI Metrics and Dashboard 01 02 03 04 05 06 07 08 09 10 11
  • 3.
    Introduction to Infrastructure 3 oInfrastructure Services o Infrastructure Market Size Globally o Infrastructure Key Funding Areas o Key Technology Trends In Infrastructure o Key Drivers for Sustainable Infrastructure Management 01
  • 4.
    4 Infrastructure Services This slideis 100% editable. Adapt it to your needs and capture your audience's attention. Different categories of Infrastructure services have been listed here. You can edit this according to your project requirement. Roadways Infrastructure Building Infrastructure Water Infrastructure Telecommunication Infrastructure Health Infrastructure Power Generation Infrastructure 01 02 03 04 05 06 Infrastructure Services
  • 5.
    5 Infrastructure Market SizeGlobally $0.80 $1.60 $2.40 $3.20 $3.90 2016 2017 2018 2019 2020 This graph/chart is linked to excel, and changes automatically based on data. Just left click on it and select “Edit Data” Market in Billion U.S Dollars This bar graph shows market size for consecutive years. You can edit this as per your requirement.
  • 6.
    6 Infrastructure Key FundingAreas Waterpower, Environmental, & Public Facility Management Transport and Warehousing Electricity, Gas & Water Production InformationTransmission, Computing Services & Software 36% 37% 4% 23% This graph/chart is linked to excel, and changes automatically based on data. Just left click on it and select “Edit Data” This slide shows key areas of infrastructure investment. You can edit this as per your requirement.
  • 7.
    7 KeyTechnologyTrends in Infrastructure Urbanization& Ageing Infrastructure o Your Text Here o Your Text Here o Your Text Here o Your Text Here o Your Text Here o Your Text Here o Your Text Here o Your Text Here o Your Text Here o Your Text Here Smart City & Smart Customer o Your Text Here o Your Text Here o Your Text Here o Your Text Here o Your Text Here o Your Text Here o Your Text Here o Your Text Here o Your Text Here o Your Text Here Ageing Workforce o Your Text Here o Your Text Here o Your Text Here o Your Text Here o Your Text Here o Your Text Here o Your Text Here o Your Text Here o Your Text Here o Your Text Here Industrial Internet of Things IoT o Your Text Here o Your Text Here o Your Text Here o Your Text Here o Your Text Here o Your Text Here o Your Text Here o Your Text Here o Your Text Here o Your Text Here Diversification & Internationalization o Your Text Here o Your Text Here o Your Text Here o Your Text Here o Your Text Here o Your Text Here o Your Text Here o Your Text Here o Your Text Here o Your Text Here This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
  • 8.
    8 Key Drivers forSustainable Infrastructure Management This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Sustainability o Community Engagement o Social Responsibility o Growth Opportunities o Better Financial Stability o Job Creation o Improved Productivity o Better health & wellbeing o Improved resilience to disaster o Climate Resilience o Lower Clean-up cost o Greener Environment o 2oC Limit o Climate Change migration & adaption o Reduced Pollution Environmental SocialEconomic Sustainable infrastructure means designing, building, and operating in ways that do not adversely effect the environmental, social, and economic system.
  • 9.
    Asset Management Process 9 oAsset Management Framework o Asset Management Process o Asset Management Lifecycle (1/1) o Asset Management Lifecycle(1/2) 02
  • 10.
    10 Asset Management Framework Thisslide is 100% editable. Adapt it to your needs and capture your audience's attention. This framework depicts an organisation's asset management responsibilities. Classes/ types of assets, location, amount or extent Current Status or Condition Current Asset Value Current under-performing deficient assets Potential future under-performers Program costs & returns Future asset values Decision Process Measures Methods Criteria Models/ Estimates Time Horizons Corporate Database & Executive Information System Implementation GeneralPrinciplesof AssetManagement
  • 11.
    11 Asset Management Process Thisslide is 100% editable. Adapt it to your needs and capture your audience's attention. This asset management process can aid you in meeting your investment goals. Discuss your business goals and expectations. Devise an Investment Policy Statement Discuss your Goals Analyse the current financial situation and define a new financial path for future Analyze & Assess Strategically implement new financial plan according to your portfolio. Try to minimize expenditure and market risks Strategic Implementation Monitor individual portfolios to make sure that they are in alignment with your financial plans Monitor, Review, Update The most important thing is to keep changing portfolio according to the changing needs Plan Changes Asset Management Process
  • 12.
    12 Asset Management Lifecycle(1/1) This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Procurement o Your Text Here o Your Text Here o Your Text Here Deploy & Discover o Your Text Here o Your Text Here o Your Text Here Support o Your Text Here o Your Text Here o Your Text Here Retirement & Disposal o Your Text Here o Your Text Here o Your Text Here Maintain o Your Text Here o Your Text Here o Your Text Here
  • 13.
    13 Asset Management Lifecycle(1/2) This slide is 100% editable. Adapt it to your needs and capture your audience's attention. AuditControl Reconcile Acquisition & Commissioning o Asset Inward & Inspection o Asset Returns o Commissioning & Trial Run o Your Text Here o Your Text Here Acquire Allocation & Tracking o Asset Allocation Planning o Asset Allocation Workflow o Operator Assignment Planning o Your Text Here o Your Text Here Deploy Disposing & Reconditioning o Asset Retirement Planning o Asset Decommissioning o Reconditioning & Refurbishment o Your Text Here o Your Text Here Retire Maintenance & Compliance o Regular/ Preventive Maintenance Planning o Asset/ Parts issue for Maintenance/ Repairs o Maintenance Checklist o Your Text Here o Your Text Here Manage Planning & Purchase o Asset Procurement Planning o Asset Vendor Management o Quotes o Your Text Here o Your Text Here Plan Security o User Authentication o User Authorization o Role Based Access Privileges o Your Text Here o Your Text Here Reporting o Standard Reports o Graphical Reports o Mis Reports with Drill Downs o Your Text Here o Your Text Here General o Latest Microsoft Technology o Completely Browser Based o Integration Ready with ERPs o Your Text Here o Your Text Here
  • 14.
    Asset and ConditionAssessment 14 o Inventory Assessment for Infrastructure Companies o Condition Assessment for Individual Facility 03
  • 15.
    15 Asset Assessment forInfrastructure Companies This slide is 100% editable. Adapt it to your needs and capture your audience's attention. In this assessment table you can include all your assets as well any hazards associated with them. You can edit it as per your requirement. Type of Equipment/ Machinery Process Locations No. of Machines Energy Sources All Exposed Moving Parts Guarded Y/N/U Guarding Meets Standards Y/N/U Noise Hazard Y/N/U Ergonomic Hazards Y/N/U Hazardous Fugitive Emissions Y/N/U Other Hazards (List) Previous Injuries/ Illness or Worker Complaints Y/N Surface Grinder Centre of Trade Shop 2 Electrical Y Y Y Y U (need to assess material) Injury to eye if safety glasses are not worn N Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Y =Yes N = No U = Uncertain
  • 16.
    16 Condition Assessment forIndividual Facility This slide is 100% editable. Adapt it to your needs and capture your audience's attention. This slide shows condition assessment for individual facilities. You can replace the data with your own. Structure Exterior Finishes Roof HVAC Electrical Plumbing Conveyance Interior Finishes Program- support Equipment Facility Description Facility Current Replacement Value (CRV) Inspection Rate System CRV Inspection Rate System CRV Inspection Rate System CRV Inspection Rate System CRV Inspection Rate System CRV Inspection Rate System CRV Inspection Rate System CRV Inspection Rate System CRV Inspection Rate System CRV General Warehouse 5,856,231 4 0.06 5 0.10 3 0.05 4 0.10 3 0.02 2 0.01 1 0.2 1 0.5 4 0.04 Administration Building 11,523,333 2 0.16 3 0.06 5 0.12 4 0.16 2 0.03 5 0.06 5 0.03 4 0.15 5 0.16 Main Library 5,716,055 3 0.019 2 0.016 4 0.09 5 0.01 1 0.05 3 0.03 3 0.06 2 0.16 3 0.15
  • 17.
    Deterioration Modelling 17 o Typesof Deterioration Models o Asset Deterioration Modelling o Risk Assessment and Deterioration Modelling 04
  • 18.
    18 Types of DeteriorationModels This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Infrastructure deterioration models are an integral part of asset management. Deterioration models are used to predict future asset condition and to estimate funding requirements. Deterministic Models Stochastic Models Al Models Deterioration Models o Straight – Line Extrapolation o Regression Models o Stepwise regression o Linear regression o Non – Linear regression o Curve – Fitting Models o B – Spline approximation o Constrained least squares o Stochastic Models o Markovian Models o Percentage prediction o Expected – value method o Poisson distribution o Negative – binomial model o Ordered – Probit model o Random – Effects model o Latent Markov – Decision process o Artificial Neural Networks o Case – Based Reasoning
  • 19.
    19 Asset Deterioration Modelling Thisslide is 100% editable. Adapt it to your needs and capture your audience's attention. This slide shows the past and future condition of your assets and also prescriptive measures to be taken. Descriptive Predictive Prescriptive What happened to our assets in the last 10yrs? o Long term data collection o Trend analysis on historic data o Understanding past performance o Scorecards o Data warehousing What will happen to our assets in the next 25yrs? o Data mining o Forecasting the future o Probability of failure o Asset deterioration o Statistical analysis software What future investments do we need to make on our assets? o Long term investment scenarios o Whole life cost modelling o Optimisation and simulation o Uncertainty and sensitivity o Decision support tools What happened to our assets in the last year? o Annual data collection & refresh o Review seasonal trends o Identify localised issues o Dashboards o Annual business reporting What will happen to our assets in the next year? o Detailed data mining o Forecast annual performance o Account for localised factors o Engineering validation o GIS tools and techniques What assets do we need to replace or maintain this year? o Annual investment scenarios o Set annual budgets o Set annual performance targets o Candidate assets for investment o Decision support tools What is happening to our assets today? o Daily data collection o Real time monitoring of assets o Early warning of faults o Rapid response to assets failure o SCADA and monitoring tools What will happen to our assets tomorrow? o Real time data analysis o Predict highest risk assets o Condition and criticality scores o Process engineering o Integration of analytics to SCADA What assets do we need to inspect or maintain tomorrow? o Daily schedules of work o Improve operational efficiency o Optimise proactive Investment o Prioritise reactive investment o Job optimization schedulers Strategic Tactical Operational
  • 20.
    20 Risk Assessment andDeterioration Modelling This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Data Input 01 Data Analysis 02 Decision Making Constraints 03 Optimization Process 04 Optimal Decision 05 o Pipe condition data o GIS data o Other data formats o Risk analysis of assets o Development of deterioration model o Validation of deterioration model o Ranking critical assets o Fixed yearly budget o Technological constraints o Other constraints o Minimize cost (Operational, Capital, Lifecycle, etc.) o Maximize expected life of pipe o Minimize condition rating o Ranking of optimal solutions o Optimal renewal method based on constrains o Optimal condition inspection policy
  • 21.
    Optimization and DecisionMaking 21 o Infrastructure Optimization o Asset Management Decision Journey o Value Driven Decision Making Methodology 05
  • 22.
    22 Infrastructure Optimization This slideis 100% editable. Adapt it to your needs and capture your audience's attention. 01 02 03 04 05 06 07 Spare Parts Management Spare Parts Repair Services LocalTest & Repair Refurbish & Redeploy Surplus Asset Management Core Network Optimization & Support Network Implementation Process Improvement & Efficiency Total Inventory Identification & Transparency Cost Reduction & Revenue Generation
  • 23.
    23 Asset Management DecisionJourney Phase 1 Phase 2 Phase 3 Phase 4 o Solution strategy o User interviews o Audit current methods o Identify business requirements Strategize o Read white papers and articles o Review industry reports o Talk to industry experts o Talk to other AM users o Attend AM Conferences Research o Calculate ROI o Assign AM champion o Prepare and present the case for AM o Get buy-in from design makers Justify o Compare solutions against system requirements o Use a proof of Concept (Demos, Sandbox, Pilot, etc) to validate use cases o Roadmap for implementation and beyond Evaluate
  • 24.
    24 Value Driven DecisionMaking Methodology This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Establish the Context Value Mapping Value Assessment Set the objectives & scope Define the problem statement Determine the time period for evaluation Identify the stakeholders Determine how the asset can directly influence each of the value metrics Determine the factors that influence the decisions Identify stakeholder requirements & objectives Identify the value drives that contribute to stakeholders requirements Identify the value metrics to assess each value driver Determine how the asset can indirectly influence each of the value metrics Determine the external factors that influences asset & value metrics Determine the various intervention & control options Identify & map the link between various factors to value generation Identity Modelling Requirements Determine the potential techniques to encapsulate the modelling requirements Perform sensitivity analysis & choose the best option Develop the model A B C
  • 25.
    Performance and CostFunctions 25 o Asset Performance Management o Performance Management Maintenance Pyramid o Performance Scoring and Analytics o Infrastructure Cost Table o Cost Determining Factors of Infrastructure Projects 06
  • 26.
    26 Asset Performance Management Thisslide is 100% editable. Adapt it to your needs and capture your audience's attention. 01 02 03 04 05 Maintenance & Reliability Engineering o Maintenance System Build o Work Management/ Execution o Your Text Here o Your Text Here o Your Text Here Shutdown Management o Shutdown Strategy & Plaining o Shutdown Scope Assessment & Prioritisation o Integrated Shutdown Teams o Shutdown Program Delivery Integrity Management & Compliance o Integrity Management Plans o Audit & Inspection o Compliance Management o Safety Critical Equipment Training & Development o Competency Training o Coaching/ Mentoring o Course Development o Training Needs Analysis o Training Management o LMS Implementation Maintenance & Support Services o Preventative Maintenance Works o Maintenance Upgrades o Plant Improvement Projects o Project Execution Works
  • 27.
    27 Performance Management MaintenancePyramid This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Reliability - Cantered Maintenance Requiers a compréhensive maintenance infrastructure Reactive Maintenance Run to failure Predictive Maintenance APR & diagnostics to predict impeding failure Condition-Based Maintenance Rules - based logic using sensor data Preventive Maintenance Planned based on time or usage statistics Strategic Proactive, Optimized
  • 28.
    28 Performance Scoring andAnalytics This slide is 100% editable. Adapt it to your needs and capture your audience's attention. AdoptionManagement AssetInventory Management Auditing Budgeting& Forecasting BusinessAnalysis ChangeControl ContractManagement DisasterRecovery ExceptionManagement Fixed&Mobile Strategy Governance HelpDesk InvoiceProcessing ProjectManagement RegulatoryCompliance Reporting RiskManagement Security ServiceDelivery ServiceInventory Management ServiceOrdering Sourcing& Procurement Processes Structure Skills Technology Services Assets Costs Vendors Information Business High Medium Low This slide includes various asset performance parameter. You can change parameters and scores to suit your requirement.
  • 29.
    29 Infrastructure CostTable This slideis 100% editable. Adapt it to your needs and capture your audience's attention. You can edit this slide as per your requirement to show major areas of expenditure. Planning/ Design Fees 8-9% 9-15% 30-40% 85-96% 82-9% 82-96% Land Purchase 5-6% 15-20% 50-60% 56-62% 35-66% 51-63% Building & Construction 6-7% 50-70% 60-70% 66-70% 46-57% 60-70% Plant & Machinery 9-10% 20-30% 80-90% 33-53% 59-80% 50-60% Contingencies 4-5% 40-50% 40-55% 43-56% 46-53% 64-75% Roadway Construction Gas Distribution Network Power Station Building Water Supply Network Sewage Treatment Plant
  • 30.
    30 Cost Determining Factorsof Infrastructure Projects This slide is 100% editable. Adapt it to your needs and capture your audience's attention. This slide shows various factors that may change the cost of your infrastructure project. Cost Elements Design Changes Land Acquisition Problems Poor Project Management Unexpected Ground Conditions Inflation/ Relative Price Rise Difficulties with Contractors Planning/ Design Fees - - - Land Purchase - - Site Preparation - Building & Construction - Plant & Machinery - - Cost Changing Factors Low Medium High
  • 31.
    Interdependence, Resiliency andSecurity 31 o Critical Infrastructure Dependencies & Interdependencies Assessment Framework o Infrastructure Resilience Wheel o Lifecycle Adaptive Components of Resilience Framework o 4 Dimensions of Infrastructure Security 07
  • 32.
    32 Critical Infrastructure Dependencies& Interdependencies Assessment Framework This slide is 100% editable. Adapt it to your needs and capture your audience's attention. The products or services provided to one infrastructure by another external infrastructure are necessary to support its operations and functions. Geographic Dependencies Logical Dependences Interdependencies Supply Chain Cascading Failure Escalating Failure Physical Dependencies Cyber Dependences Analysis Expertise o Computer Science & Information Technology o Engineering o Management Science o Your text here o Your text here o Your text here Partnerships o Federal Agencies o International Organizations o National Laboratories o Your text here o Your text here o Your text here Data o Commercial Databases o Custom Collection o Open Source Data o Your text here o Your text here o Your text here Infrastructure Metrics o Critical Infrastructure Resilience o Dependency Curves o Emergency Services Sector Capabilities o Text Here o Text Here Agent Based & Complex Adaptive System Models o Electricity Market Complex Adaptive System o Oil & Gas Model o Text Here o Text Here Infrastructure Models o EPfast o NGfast o Polfast o Text Here o Text Here Tools Stakeholder Needs & Requirements Scope Goals & Objectives Products o Custom Product o Decision Support o Intelligence Fusion o Your Text Here o Your Text Here o Your Text Here o Your Text Here o Your Text Here
  • 33.
    33 Infrastructure ResilienceWheel This slideis 100% editable. Adapt it to your needs and capture your audience's attention. Resiliency is the ability of an asset to recover quickly and continue operating even when there has been any disruption. Good Governance Information Flows Robustness Capacity to Learn Resourcefulness Flexibility Responsiveness Redundancy Safe Failure What Makes Infrastructure Resilient? Policies, Institutions & Processes Operations & Maintenance Technical Plaining & Design Financial Arrangements & Incentives Expertise
  • 34.
    34 Lifecycle Adaptive Componentsof a Resilience Framework This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Pre-Incident Adaptive Prevention o Reduce Vulnerabilities o Retrofit & Upgrade Structure o Reduce Exposure o Plan for Climate Change o Maintain Real-Time Situational Awareness EvolvingThreats: Predictive Problem Solution o Detect Emerging Threats o Monitor Unfolding Events o Correct Drift & Variation Post-Disaster Response & Recovery o Search & Rescue o Mitigation of Consequences o Restoration of normal Operations Disaster Unfolding:Alternative Operational Paths o Redundant Distributed o Input Substantiation o Decentralized Operations o Loose Coupling Adaptive Components of Resiliency
  • 35.
    35 4 Dimensions ofInfrastructure Security This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Hackers Suspires TerroristsConsultants Employees Outsources Customers Web Applications Systems Applications Web 2.0 Mobile Applications At RestStructured Unstructured In Motion Non- Traditional Datacenters CloudPCs Laptop Mobile PeopleDataApplicationsInfrastructure
  • 36.
    Contract andWorkflow Management 36 oKey Components of Contract Management o Contract Lifecycle Management o Workflow Management Process Flow 08
  • 37.
    37 Key Components ofContract Management This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Relationship Management Monitoring Performance Record Keeping Contract Administration Risk Management Governance Contract Management
  • 38.
    38 Contract Lifecycle Management Thisslide is 100% editable. Adapt it to your needs and capture your audience's attention. Create Negotiate Approve Sign ExecuteTrackRenewExit Contract Lifecycle Management
  • 39.
    39 Workflow Management Process Thisslide is 100% editable. Adapt it to your needs and capture your audience's attention. Proposed: Idea Declined : Step for Declined Analysis : Check Results End : Finished Analysis : Collect Info Waiting for Approval : Waiting for Approval Active : Campaign in Action Waiting for Start : Start Scheduled Preparation: Prepare Materials Deferred: Postponed Budgeting : Allocate Budget
  • 40.
    Commissioning New Facilities 40 oCommissioning by Project Phase o Commissioning Levels 09
  • 41.
    41 Commissioning by ProjectPhase This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Develop Overall Commissioning Plan Develop Level 1,2,3 Commissioning Documents Review Design Commissioning Readiness DesignPre-Design Build Commissioning Team OPR+ BOD Development Construction Execute Level 1, 2, 3 Commissioning Development Level 4 & 5 Commissioning Script Commissioning Execute Level 4 & 5 Commissioning Reset to Normal Configuration Final Site Clean Up Turnover/ Re-Commissioning Verify IT Equipment Dual Corded Develop Commissioning Scripts Execute Commissioning Activities Design Facility Operations This slide shows various levels of commissioning at different project phases
  • 42.
    42 Commissioning Levels This slideis 100% editable. Adapt it to your needs and capture your audience's attention. Level 1 - Execution commissioning Factory Witness Testing Your Text Here Level 2 - Execution Commissioning Receipt , Installation, & Post- Installation Checks Your Text Here Level 3 - Execution Commissioning Component Functional Testing Your Text Here Level 4 & 5 - Develop Commissioning Plans & Scripts Your Text Here Level 4 & 5 - Review Commissioning Plans & Scripts Your Text Here Maintenance Warranty Your Text Here Maintenance Life Cycle Your Text Here Owner or Owner’s Representative Contractor Architects & Engineers Operations Personnel Commissioning Agent
  • 43.
    Capital Budgeting 43 o CapexSummary o Capital Expenditure Details o Discounted Payback Period o Net PresentValue o Internal Rate of Return o Valuation Methods Comparison 10
  • 44.
    44 Capex Summary This graph/chartis linked to excel, and changes automatically based on data. Just left click on it and select “Edit Data” 0.4 0.3 2 3 0.6 0.4 3 4 0 1 2 3 4 Machine 1 Machine 2 Building 1 Building 2 Millions FY 19 FY 20 60% 35% 25% 75%
  • 45.
    45 Capital Expenditure Details $600,000 Preparingan asset to be used in business $300,000 Acquiring fixed, & in some cases, intangible assets $300,000 Restoring property or adapting it to a new or different use $500,000 Repairing an existing asset so as to improve its useful life $400,000 Starting or acquiring a new business $800,000 Upgrading an existing assets if it results in a superior fixture
  • 46.
    46 Discounted Payback Period-ValuationSummary This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Year Cash Inflows ($) (A) PV Factors at 10% (B) Present Value (A*B) Cumulative PV of Cash Inflows 1 22,000 0.902 10,608 10,508 2 24,000 0.81 11,864 22,632 3 26,000 0.652 12,416 34,428 4 24,000 0.585 10,145 44,713 5 24,000 0.422 8,894 53,527 Discounted Payback Period 3 years + (43000 – 34, 488) /10245 3 years + 0.83 years 3.83 years Cost of the Project $ 43,000 Year Cash Inflows PV Factor at 10% 1 13,000 0.809 2 15,000 0.926 3 17,000 0.451 4 18,000 0.883 5 19,000 0.821
  • 47.
    47 Net PresentValue -ValuationSummary This slide is 100% editable. Adapt it to your needs and capture your audience's attention. 1 1,20,000 0.209 89.990 2 1,10,000 0.426 1,42,160 3 30,000 0.551 21,530 2,54,680 2,54,680 - 2,00,000 $ 54,680 Cash Inflows ($) (A) PV Factor at 10% (B) Present Value (A*B) Year NPV
  • 48.
    48 Internal Rate ofReturn-Valuation Summary This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Rate Discount Factor 10% 3.1024 IRR 3.08 11% 3.0373 IRR 11.34% (IRR- 11) / 12-11 = (3.08 – 3.1024 ) / 3.0373 – 3.1024 (IRR- 11) /1 = (-0.0224) / (-0.0651) IRR-11 = 0.34 Alternatively,Simple Interpolation Method Payback Period Initial Investment Annual Cash Inflow 3.08 40000 13000 The nearest value corresponding to 3.08 in the present value of annuity table for 4 years 3.1024 IRR is 11% which corresponds to 3.1024
  • 49.
    49 Valuation Methods Comparison Thisslide is 100% editable. Adapt it to your needs and capture your audience's attention. Discounted Payback Period 3.23Years o Your Text here o Your Text here Net PresentValue 44,680 o Your Text here o Your Text here Internal Rate of Return 21.34% o Your Text here o Your Text here Valuation Method Results Comments Discounted Payback Period The most suitable choice for valuation
  • 50.
    KPI Metrics andDashboard 50 o KPI Metrics o KPI Dashboards 11
  • 51.
    51 Infrastructure KPI DashboardShowing Cost Reduction & Procurement This graph/chart is linked to excel, and changes automatically based on data. Just left click on it and select “Edit Data” Top 5 Supplier by Cost Reduction Top Top Supplier 01 $22.856 Supplier 02 $17.941 Supplier 03 $13.255 Supplier 04 $14.465 Supplier 05 $11.364 Cost of Purchase $12.000 This Year 5 Year Trend Cost of Reduction $400,500 This Year 5 Year Trend Cost Savings $14,2% This Year 5 Year Trend Cost Avoidance $8,3% This Year 5 Year Trend Procurement ROI $5,2% This Year 5 Year Trend 25% 35% 45% 55% 60% 75% 0 20 40 60 80 Other Display Battery Sensors Switches Transistors Savings 25.8% 35.2% 40.4% 45.4% 55.2% 66.2% 0 10 20 30 40 50 60 70 Other Display Battery Sensors Switches Transistors Avoidance Transistors, $18 Switches, $12 Sensors, $27 Battery, $19 Display, $11 Other, $13 Cost Reduction 0 5 10 15 Transistors Switches Sensors Battery Display Other Procurement ROI ROI Benchmark
  • 52.
    52 Infrastructure KPI DashboardShowing Resource Allocation This graph/chart is linked to excel, and changes automatically based on data. Just left click on it and select “Edit Data” 23 Jul, 18 16 Jun, 18 05 My, 18 12 Apr, 18 21 Mar, 18 Project 1 Project 2 Project 3 Project 4 Project 5 Project 6 0 50 100 150 200 250 300 Project 1 Project 2 Project 3 Project 4 Project 5 Project 6 Days Per Project $0 $1 $2 $3 $4 $5 Project 1 Project 2 Project 3 Project 4 InThousands Project Financial Delivery Timeline & Resources Project 1, 25% Project 2, 25% Project 3, 15% Project 4, 20% Project 5, 15% Resource Allocation
  • 53.
    53 Infrastructure KPI DashboardShowing Project Revenue This graph/chart is linked to excel, and changes automatically based on data. Just left click on it and select “Edit Data” 300 900 1,200.00 1,800.00 2,400.00 3,000.00 3,600.00 3,900.00 $0 $500 $1000 $1500 $2000 $2500 $3000 $3500 $4000 Project 8 Project 7 Project 6 Project 5 Project 4 Project 3 Project 2 Project 1 Dollars in Million Net Project Revenue per Employee All Other Materials, 15% Textiles, 15% Plastic, 10% Rubble, 10%Paper, 14% Asphalt, 8% Wood, 22% Household, 6% % of Construction & Demolition west Recycled Square Meter Price $ 600 Dollars per Employee
  • 54.
    54 Infrastructure KPI MetricsShowing Square Meter Area 01 Square Meter Price $600 This slide is 100% editable. Adapt it to your needs and capture your audience's attention. 02 Actual Construction Time 16 Months This slide is 100% editable. Adapt it to your needs and capture your audience's attention. 03 No. of Activities Starting on Time 8 This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
  • 55.
    Infrastructure KPI Metrics ShowingCost Saving 55 9% % of Defects $1600 Net Project Revenue Per Employee 13% Cost Savings This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
  • 56.
  • 57.
  • 58.
    58 Infrastructure Industry KeyStats This slide is 100% editable. Adapt it to your needs and capture your audience's attention. 7 Subsidiary Companies 8 MajorTier 1 Networks/ Providers 13 Points of Presence 1500 Gbps Capacity >1K Peering Partners 5 Data Centers >1K Racks Utilized >16K Servers Managed
  • 59.
    Our Mission 59 Vision This slideis 100% editable. Adapt it to your needs and capture your audience's attention. Mission This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Goal This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
  • 60.
    60 OurTeam Name Here Designation This slideis 100% editable. Adapt it to your needs and capture your audience's attention. Name Here Designation This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Name Here Designation This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
  • 61.
    About Us 61 Target Audiences Thisslide is 100% editable. Adapt it to your needs and capture your audience's attention. Preferred by Many This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Value Clients This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
  • 62.
    62 Venn Text Here This slideis 100% editable. Adapt it to your needs and capture your audience's attention. Text Here This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Text Here This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Text Here This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Text Here This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
  • 63.
    63 Timeline 2020 2017 This slide is100% editable. Adapt it to your needs and capture your audience's attention. 2018 This slide is 100% editable. Adapt it to your needs and capture your audience's attention. 2019 This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
  • 64.
  • 65.
    65 Column Chart This graph/chartis linked to excel, and changes automatically based on data. Just left click on it and select “Edit Data” 80 75 50 55 45 35 30 40 60 28 0 10 20 30 40 50 60 70 80 90 100 FY '16 FY '17 FY '18 FY '19 FY '20 SalesinPercentage(%) Product 01 Product 02
  • 66.
    ThankYou 66 Office Hour Monday –Saturday 09.00 – 6.00 Call Us 0123456789 Visit Us # street number, city, state Follow Us emailaddress123@gmail.com