This presentation discusses the difference between Microsoft Project and Primavera,their capabilities in managing project and overall project performance monitoring and controlling.
"This is why we can't have nice things"
A project risk retrospective.
This presentation takes a look at great projects throughout history and identifies common threads regarding the risk management techniques applied during their execution.
PMP Lecture 1: Introduction to Project ManagementMohamed Loey
https://mloey.github.io/courses/pmp2017.html
https://www.youtube.com/watch?v=XUoEr6kee6k&list=PLKYmvyjH53q13_6aS4VwgXU0Nb_4sjwuf&index=1&t=2s
We will discuss the following: History of Project Management, Project Management, Program Management, Portfolio Management, Project Management Office, PMBOK, PMI.
In this presentation we have done earlier a project for Phillip Morris (Pakistan) for the access control system and canteen management system. It is the project presentation for our subject Planning and Scheduling. i hope it is the best for the understanding Project planning and scheduling.
Construction Scheduling, Work Study and Work Measurement _ Unit 2 _ Construct...Shrikant Kate
Construction Scheduling, Work Study and Work Measurement _ Unit 2 _ Construction Management _ Final Year (BE) _ Department of Civil Engineering _ TAE _ SPPU _ by Shrikant R. Kate
Construction scheduling, work study and work measurement Construction scheduling.
Construction project scheduling – purpose, factors affecting scheduling, time as a control tool
Work Breakdown Structure, project work breakdown levels, line of balance technique
Repetitive project management Work study and work measurement
Definition, objectives, basic procedure of work study, symbols, activity charts, string diagrams, time and motion studies.
"This is why we can't have nice things"
A project risk retrospective.
This presentation takes a look at great projects throughout history and identifies common threads regarding the risk management techniques applied during their execution.
PMP Lecture 1: Introduction to Project ManagementMohamed Loey
https://mloey.github.io/courses/pmp2017.html
https://www.youtube.com/watch?v=XUoEr6kee6k&list=PLKYmvyjH53q13_6aS4VwgXU0Nb_4sjwuf&index=1&t=2s
We will discuss the following: History of Project Management, Project Management, Program Management, Portfolio Management, Project Management Office, PMBOK, PMI.
In this presentation we have done earlier a project for Phillip Morris (Pakistan) for the access control system and canteen management system. It is the project presentation for our subject Planning and Scheduling. i hope it is the best for the understanding Project planning and scheduling.
Construction Scheduling, Work Study and Work Measurement _ Unit 2 _ Construct...Shrikant Kate
Construction Scheduling, Work Study and Work Measurement _ Unit 2 _ Construction Management _ Final Year (BE) _ Department of Civil Engineering _ TAE _ SPPU _ by Shrikant R. Kate
Construction scheduling, work study and work measurement Construction scheduling.
Construction project scheduling – purpose, factors affecting scheduling, time as a control tool
Work Breakdown Structure, project work breakdown levels, line of balance technique
Repetitive project management Work study and work measurement
Definition, objectives, basic procedure of work study, symbols, activity charts, string diagrams, time and motion studies.
Chapter 09 of ICT Project Management based on IOE Engineering syllabus. This chapter mainly focuses on cost and project, cost management, cost estimating and more related to cost and project. Provided by Project Management Sir of KU
Project Time Management | Project Schedule Management | EdurekaEdureka!
( PMP® Training: https://www.edureka.co/pmp )
This Edureka tutorial on Project Schedule Management will give you an insight into the various process and activities covered in to maintain and manage the schedule of a project.
Project Schedule Management
Schedule Management Overview
Schedule Management Processes
Follow us to never miss an update in the future.
Instagram: https://www.instagram.com/edureka_learning/
Facebook: https://www.facebook.com/edurekaIN/
Twitter: https://twitter.com/edurekain
LinkedIn: https://www.linkedin.com/company/edureka
Scheduling by using microsoft project 2013Chetanraj M
Scheduling and optimising all the activities/tasks in selected building construction project with using resources and levelling of over allocation by using microsoft project 2013, which helps to target the finishing date of project within time and also within cost
Planning and Scheduling Construction Projects using Primavera Software A Case...ijtsrd
Planning and Scheduling are very essential in the large infrastructure projects like road and bridge construction. These projects have numerous stakeholders and large amount of money, resources are invested. Improper planning and scheduling leads to loss of resources, increase in project cost and unpleasant delays. But with computer and software evolution, it is now possible to plan these projects using software like Primavera P6 and Microsoft office project. This paper deals with presentation of AwasYojna project in New Market Bhopal comparing the two different blocks namely Block A and Block B. The project framed stated the advantage and added benefits of web based primavera P6 for planning and scheduling of structures under construction under the government scheme of “AwasYojna” framing the issues and complications faced in the time frame of construction and availability of resources. Nidhi Raghuwanshi | Prof. M. C. Paliwal "Planning and Scheduling Construction Projects using Primavera Software: A Case Study" Published in International Journal of Trend in Scientific Research and Development (ijtsrd), ISSN: 2456-6470, Volume-5 | Issue-2 , February 2021, URL: https://www.ijtsrd.com/papers/ijtsrd38447.pdf Paper Url: https://www.ijtsrd.com/engineering/civil-engineering/38447/planning-and-scheduling-construction-projects-using-primavera-software-a-case-study/nidhi-raghuwanshi
Chapter 09 of ICT Project Management based on IOE Engineering syllabus. This chapter mainly focuses on cost and project, cost management, cost estimating and more related to cost and project. Provided by Project Management Sir of KU
Project Time Management | Project Schedule Management | EdurekaEdureka!
( PMP® Training: https://www.edureka.co/pmp )
This Edureka tutorial on Project Schedule Management will give you an insight into the various process and activities covered in to maintain and manage the schedule of a project.
Project Schedule Management
Schedule Management Overview
Schedule Management Processes
Follow us to never miss an update in the future.
Instagram: https://www.instagram.com/edureka_learning/
Facebook: https://www.facebook.com/edurekaIN/
Twitter: https://twitter.com/edurekain
LinkedIn: https://www.linkedin.com/company/edureka
Scheduling by using microsoft project 2013Chetanraj M
Scheduling and optimising all the activities/tasks in selected building construction project with using resources and levelling of over allocation by using microsoft project 2013, which helps to target the finishing date of project within time and also within cost
Planning and Scheduling Construction Projects using Primavera Software A Case...ijtsrd
Planning and Scheduling are very essential in the large infrastructure projects like road and bridge construction. These projects have numerous stakeholders and large amount of money, resources are invested. Improper planning and scheduling leads to loss of resources, increase in project cost and unpleasant delays. But with computer and software evolution, it is now possible to plan these projects using software like Primavera P6 and Microsoft office project. This paper deals with presentation of AwasYojna project in New Market Bhopal comparing the two different blocks namely Block A and Block B. The project framed stated the advantage and added benefits of web based primavera P6 for planning and scheduling of structures under construction under the government scheme of “AwasYojna” framing the issues and complications faced in the time frame of construction and availability of resources. Nidhi Raghuwanshi | Prof. M. C. Paliwal "Planning and Scheduling Construction Projects using Primavera Software: A Case Study" Published in International Journal of Trend in Scientific Research and Development (ijtsrd), ISSN: 2456-6470, Volume-5 | Issue-2 , February 2021, URL: https://www.ijtsrd.com/papers/ijtsrd38447.pdf Paper Url: https://www.ijtsrd.com/engineering/civil-engineering/38447/planning-and-scheduling-construction-projects-using-primavera-software-a-case-study/nidhi-raghuwanshi
This Pre-construction Estimation Data Is Used By Designers, Engineers, And Other Project Team Members To Make Informed Decisions In Terms Of Project Planning, Cost Management,Purchase, Quality, Etc.
Strategic Product Development and Cost Estimates for Automotive IndustryVedant Borse
SAP Sapphire 2014
Session: 3803 strategic product development
https://www.asug.com/discussions/servlet/JiveServlet/downloadBody/38836-102-1-55996/3803%20Strategic%20Product%20Development%20and%20Cost%20Estimates%20for%20Futurisitc%20Products.pdf
2018 Australian Institute of Project Management (AIPM) National Conference Presentation on the benefits of BIM as a tool for Project Management.
Abstract:
Project planning, stakeholder engagement, cost and schedule management may all be improved if we think of Building Information Modeling (BIM) simply as information that needs to be managed. From the selection of a suitable work breakdown structure, to the type and nature of information being received, stored, processed and communicated, BIM is a model-centric structure for existing project management processes.
With this model centric view, a project may be broken into volumes, areas, models, assets and deliverables, with corresponding cost and reporting structures that enable monitoring of project performance and delivery of each asset. Aligning project delivery to the client’s view of an asset allows more transparent reporting and offers a clear understanding of not only the financial and schedule impacts of decisions throughout a project, but also the physical impacts and knock-on effects in the real world.
BIM also provides a rich focal point for stakeholder engagement. When combined with Virtual Reality and Augmented reality solutions, it offers a greater sense of awareness of project outcomes through real and interactive experiences for both the technical and non-technical stakeholder. Improving stakeholder interaction and the quality of feedback has been shown to improve buy-in to the final solution and reduces risk during implementation stages.
In this presentation I provide a simple way of looking at BIM, its benefits, and how one can use it to better manage projects in the future.
Resource planning for QC labs, R&D, RA, or multi- project environmentsGeert Vanhove
Binocs is a web-based resource planning and scheduling application that aligns the work demand and capacity of knowledge workers. Binocs takes your existing planning tools to a next level and is specifically designed for QC labs, R&D, regulatory affairs or multi-project environments. Binocs is trusted by some of the biggest companies in the world (Pfizer, GSK, Merck, UCB, Danone, …). For more info or to request a demo: https://discover-binocs.com/
How should we estimates agile projects (CAST)Glen Alleman
“Why do so many big projects overspend and
overrun? They’re managed as if they were merely
complicated when in fact they are complex. They’re planned as if everything was known at the start when in fact they involve high levels of uncertainty and risk.” ‒ Architecting Systems: Concepts, Principles and Practice, Hillary Sillitto
The 10 Most Influential Leaders Guiding Corporate Evolution, 2024.pdfthesiliconleaders
In the recent edition, The 10 Most Influential Leaders Guiding Corporate Evolution, 2024, The Silicon Leaders magazine gladly features Dejan Štancer, President of the Global Chamber of Business Leaders (GCBL), along with other leaders.
At Techbox Square, in Singapore, we're not just creative web designers and developers, we're the driving force behind your brand identity. Contact us today.
Structural Design Process: Step-by-Step Guide for BuildingsChandresh Chudasama
The structural design process is explained: Follow our step-by-step guide to understand building design intricacies and ensure structural integrity. Learn how to build wonderful buildings with the help of our detailed information. Learn how to create structures with durability and reliability and also gain insights on ways of managing structures.
B2B payments are rapidly changing. Find out the 5 key questions you need to be asking yourself to be sure you are mastering B2B payments today. Learn more at www.BlueSnap.com.
Navigating the world of forex trading can be challenging, especially for beginners. To help you make an informed decision, we have comprehensively compared the best forex brokers in India for 2024. This article, reviewed by Top Forex Brokers Review, will cover featured award winners, the best forex brokers, featured offers, the best copy trading platforms, the best forex brokers for beginners, the best MetaTrader brokers, and recently updated reviews. We will focus on FP Markets, Black Bull, EightCap, IC Markets, and Octa.
Understanding User Needs and Satisfying ThemAggregage
https://www.productmanagementtoday.com/frs/26903918/understanding-user-needs-and-satisfying-them
We know we want to create products which our customers find to be valuable. Whether we label it as customer-centric or product-led depends on how long we've been doing product management. There are three challenges we face when doing this. The obvious challenge is figuring out what our users need; the non-obvious challenges are in creating a shared understanding of those needs and in sensing if what we're doing is meeting those needs.
In this webinar, we won't focus on the research methods for discovering user-needs. We will focus on synthesis of the needs we discover, communication and alignment tools, and how we operationalize addressing those needs.
Industry expert Scott Sehlhorst will:
• Introduce a taxonomy for user goals with real world examples
• Present the Onion Diagram, a tool for contextualizing task-level goals
• Illustrate how customer journey maps capture activity-level and task-level goals
• Demonstrate the best approach to selection and prioritization of user-goals to address
• Highlight the crucial benchmarks, observable changes, in ensuring fulfillment of customer needs
How to Implement a Real Estate CRM SoftwareSalesTown
To implement a CRM for real estate, set clear goals, choose a CRM with key real estate features, and customize it to your needs. Migrate your data, train your team, and use automation to save time. Monitor performance, ensure data security, and use the CRM to enhance marketing. Regularly check its effectiveness to improve your business.
Company Valuation webinar series - Tuesday, 4 June 2024FelixPerez547899
This session provided an update as to the latest valuation data in the UK and then delved into a discussion on the upcoming election and the impacts on valuation. We finished, as always with a Q&A
LA HUG - Video Testimonials with Chynna Morgan - June 2024Lital Barkan
Have you ever heard that user-generated content or video testimonials can take your brand to the next level? We will explore how you can effectively use video testimonials to leverage and boost your sales, content strategy, and increase your CRM data.🤯
We will dig deeper into:
1. How to capture video testimonials that convert from your audience 🎥
2. How to leverage your testimonials to boost your sales 💲
3. How you can capture more CRM data to understand your audience better through video testimonials. 📊
Taurus Zodiac Sign: Unveiling the Traits, Dates, and Horoscope Insights of th...my Pandit
Dive into the steadfast world of the Taurus Zodiac Sign. Discover the grounded, stable, and logical nature of Taurus individuals, and explore their key personality traits, important dates, and horoscope insights. Learn how the determination and patience of the Taurus sign make them the rock-steady achievers and anchors of the zodiac.
3 Simple Steps To Buy Verified Payoneer Account In 2024SEOSMMEARTH
Buy Verified Payoneer Account: Quick and Secure Way to Receive Payments
Buy Verified Payoneer Account With 100% secure documents, [ USA, UK, CA ]. Are you looking for a reliable and safe way to receive payments online? Then you need buy verified Payoneer account ! Payoneer is a global payment platform that allows businesses and individuals to send and receive money in over 200 countries.
If You Want To More Information just Contact Now:
Skype: SEOSMMEARTH
Telegram: @seosmmearth
Gmail: seosmmearth@gmail.com
buy old yahoo accounts buy yahoo accountsSusan Laney
As a business owner, I understand the importance of having a strong online presence and leveraging various digital platforms to reach and engage with your target audience. One often overlooked yet highly valuable asset in this regard is the humble Yahoo account. While many may perceive Yahoo as a relic of the past, the truth is that these accounts still hold immense potential for businesses of all sizes.
2. Questions ?
CEPT
UNIVERSITY
Why Microsoft Project and Primavera ?
Why PMS ?
Planners only make schedules
Microsoft Project or Primavera ?
Microsoft Project cannot handle Complex Projects
Potential Used ?
3. Contents… CEPT
UNIVERSITY
Project Management Challenges
Market Penetration
Project planning:
PDM network
Assign Resources and Cost
Baseline the plan
Project review:
Identify resource over-allocations
Level if necessary
Project Execution:
Generate Reports
Project Monitoring and Tracking:
Update Baseline plan
Compare Actual against Baseline
Re-plan and Re-Baseline
Earned Value Concept
Difference between MSP and
Primavera
Microsoft Project or Primavera?
4. Work Performance Data/Info/Reports
CEPT
UNIVERSITY
PM Plan
The document which
describes how the
project will be
documented, monitored
and controlled
WPD
Physical work
completion, start and
finish dates, change
requests, actual costs,
actual duration etc.
WPI
Status of deliverables,
status for change requests,
forecasted estimates to
complete
WPR
Status
reports,memos,justifications,
recommendations
5. Project Management Challenges CEPT
UNIVERSITY
Geographic dispersion
Overbooked or
Unutilized
Resources
Project Scope Changes
Unnecessary Paperwork
6. Market Penetration CEPT
UNIVERSITY
Middle East United States
Source: The use of project management software in construction industry of Southeast Europe
Mladen Vukomanović, Mladen Radujković, Zlata Dolaček Alduk
16. Project Tracking: Setup Baseline CEPT
UNIVERSITY
Go to: Project/Set baseline to set a
baseline for your project
A Baseline is essentially a snapshot of your
project schedule, it should be captured once
your schedule is complete.
So that you can compare your original plan
with the current progress.
23. MS-Project or Primavera? Decision Matrix
CEPT
UNIVERSITY
Source: https://precisionschedulingconsultants.co
Factor MS-Project Primavera
Small & medium building project (<200 activities)
Program-level analysis or simultaneous multiple project analysis
Multiple user interface (more than one person updating/tracking the
schedule)
Construction schedule oversight and detailed analysis
Non-construction projects / simple schedules
Basic bar charts or timelines for display in MS PowerPoint™ presentation
System Integration (BIM,ERP)
Licensing Cost
User friendly , Beginner use, planning and scheduling
Recommended
Note: These decisions are based on professional opinion that were derived from years
and $billions worth of construction scheduling experience.
Not-Recommended
24. MICROSOFT PROJECT PRIMAVERA
Simple and user friendly Detailed and complex
Allows user to make Macros and Switches
with the help of VBA language
Macros , complex formulas cannot be made
in Primavera
Limited Baselines (Only 11) Unlimited baselines
Project Tracking with multiple projects at
same time is not possible.
Project Tracking with multiple projects at
same time is possible.
Multiple activity relationship not possible It is possible to have a FF as well as SS
relationship between two activities.
Relatively low cost of installation and
maintenance.
High installation and maintenance cost
Appealing appearance Needs configuration to make it appealing.
26. Difference a decade makes….
1994 2000 2003 2006 2010
P3-V1 for
Windows
P3 (V-02)
incorporated
EPS
P6- PrimaVision
web based
platform is
released
Incorporates
Risk
management
Enterprise
Project
Portfolio is
released
CEPT
UNIVERSITY
Introduce
Feel honored
No fancy stuff
Overview of slides
I would like it to be a discussion
Disclaimer
Misconceptions
Why MSP and Primavera ? Why not Excel?
Project Charter
Ask audience why is it so?
Marketting
Show off to get projects
Difference in levelling in Msp and Primavera (Levelling Priorities)
Case of contradiction
Difference in using Calendars : alternate Saturdays work/nonwork
Customise Ribbon option in msp
Total Float: ES-LS or EF-LF
Free Float: ES(succ) – EF(current)
Difference in levelling in Msp and Primavera (Levelling Priorities)
Case of contradiction
Difference in using Calendars : alternate Saturdays work/nonwork
Customise Ribbon option in msp
Total Float: ES-LS or EF-LF
Free Float: ES(succ) – EF(current)
Difference in levelling in Msp and Primavera (Levelling Priorities)
Case of contradiction
Difference in using Calendars : alternate Saturdays work/nonwork
Customise Ribbon option in msp
Total Float: ES-LS or EF-LF
Free Float: ES(succ) – EF(current)
Difference in levelling in Msp and Primavera (Levelling Priorities)
Case of contradiction
Difference in using Calendars : alternate Saturdays work/nonwork
Customise Ribbon option in msp
Total Float: ES-LS or EF-LF
Free Float: ES(succ) – EF(current)
Difference in levelling in Msp and Primavera (Levelling Priorities)
Case of contradiction
Difference in using Calendars : alternate Saturdays work/nonwork
Customise Ribbon option in msp
Total Float: ES-LS or EF-LF
Free Float: ES(succ) – EF(current)
MSP allows 11 baselines.
10 Interim Plans
Unusual feature for allowing to change details of summary task.
Recurring Task
Activity steps in Primavera
What is Earned Value?
Explain with Example
Difference between MSP and Primavera
Performance factor