SlideShare a Scribd company logo
Material Planning &Material Planning &
ProductionProduction
Recipe / Mold ProcessingRecipe / Mold Processing
For Sage 100 ERP
Material Planning & Production
 Ability to view Material Requirements by item
 Quantity to produce (MFG & Assembly) based on MRP run data
 Sub-assemblies to be manufactured (all levels)
 Items to purchase for all levels
 Min/Max/EOQ entries are included in calculated requirements
 Ability to maintain demand and generate Purchase Orders:
 Based on the purchasing requirements of the MRP run
 Components required for the manufacturing work orders
 Ability to maintain requirements and generate Work Orders:
 For finished good requirements of the MRP run
 Sub-assemblies required to manufacture requirements
 Ability to create Work Orders from the Sales Order Entry program
 Auto Schedule work orders based on capacity - shifts by day
Food Processing / Molds - Injection
 Ability to process BOMs with components’ percentage instead of
quantity.
 Ability to defined the type of item in the Inventory master file
 Ingredient
 Label
 Package
 Ability to create multiple finished goods for a batch
 Finished goods produced are defined by batch bill of materials
record
 Label, packaging type items are loaded from produced item’s bill
of material
 Ability to setup molds for a given item
 Recall Report – display customers recall info
 Tracking of raw material lots used for each finished goods
Material Planning & Production
Used to
group items
into separate
MRP runs.
Used by the MRP program’s WO Generation routine to assign priority during auto-
scheduling of Work Orders generated.
Item type is
used as part
of MFG
Process and
to group
items on
reports
Material Planning & Production
Routings are linked to bill of material
records and are used to generate the
needed manufacturing routing
transactions (setup
Components By Percentage
checkbox enables entering
Percentage for items instead of
Quantity/Bill.
Material Planning & Production
Components entered are used by MRP and Production
Planning programs. Demand is calculated for all component
levels of bill of materials.
Batch Processing Reports
Material Planning & Production
Molds are setup by items
Material Planning & Production
Work Order transactions / tasks will be
generated based on the routings created.
Duration of the work order step completion on the scheduling
board is setup based on quantity per hour setup for the item/mold
combination
Material Planning & Production
Purchase and work orders can be
auto generated for the selected items
Requirements calculated are loaded into a grid. Users have the
option to manually adjust the demand calculated
Selection filters are used to manage the MRP runs
Drill downs to item,
BOM, Vendor, Mold
MRP Inquiry
MRP Inquiry is accessed from Menu, Sales Order Entry or
Calculate Quantity to Produce programs.
WO Generation from Sales Order
WO Generation from Sales Order
WO Generation from Scheduling Board
Work orders can be generated by dragging and dropping the
items into machine columns.
Items selected by the Production
Requirements Calculation program
are loaded into a panel on the board.
WO Generation from Scheduling Board
Work Orders generated can be viewed and re-scheduled by
dragging and dropping them from one day to another or from
one machine/work center to another
Manufacturing Dispatch
Components are loaded from the BOM into the WO Dispatch
Transaction. Daily Production entry transactions are created upon
closing the Dispatch.
Production Generation
Production is generated
when Dispatch status is
changed to Closed.
Production Entry from Dispatch
Production button on the Closed dispatch enables access to the
Production Entry.
Dispatch Status Change Based on Availability
Programs allows for releasing work orders with sufficient component inventory
and displays a message if there is not sufficient inventory in stock to release a
work order
This program processes all
manufacturing dispatches for a given
status and dispatch date range to
check for availability of components
for production of W.O. quantity
Manufacturing Dispatch Generation from WO
Manufacturing dispatch/new Work
order for a Bill Item (having at least
one component) can be generated
directly from WO Entry.
Two options are available:By routing
and for current WO.
when generating by this option new
WO and manufacturing dispatch will
be generated based on the Routing
(having a step marked as MFG)
assigned to current Bill Item in the
Bill of Materials Maintenance.
New Manufacturing dispatch is
created for current Work Order
Outside Processing
The Outside processing is performed
by the following steps:
a.sending Items for outside processing
b.receiving the Items already processed
Transfer transaction is generated for the Items send out
for outside processing.
Transfer Transaction for Outside Processing
For the lines send out for outside processing the Item
Code cell becomes red colored:
The Outside Processing Warehouse is set as the Transfer To
Warehouse for current transaction.
Transfer Transaction for Outside Processing
Receiving of Items is performed similar to sending just
by pressing the Receive button.While receiving Items
Item may be replaced by another Item. While receiving
Items Transfer transaction is generated for receiving the
Item from OP Warehouse to the Warehouse specified
on the Dispatch Line.
If a replacement Item is entered for an Item in the
Receive Items from Outside Processing grid an
adjustment transaction is generated for that Item
and the Item Code in the Dispatch Line is
replaced with that item Code :
Auto Generate Production for Component Bill
Auto Production checkbox indicates that the component
Item, which is manufactured item (item that
has its own BOM) needs to be produced together
Two Dispatches (One for the main Bill Number and one
for the component Bill) will be generated for production
of these items when Work Order is generated for the
Bill Number from the Calculate Quantity To
Produce/Purchase program.
When the Dispatch generated for the main Bill Number
is closed, the first Production is generated for the
component Bill and then for the Main Bill.
Lot/Serial Distribution in Dispatch Data Entry
For Serial Items Serial number scanning is provided on the Dispatch entry Lines:
In the Add New mode upon scanning serial number respective Serial Item is
loaded in the grid with the ordered quantity set to 1 and the Serial Item is
distributed by the scanned Serial number.
If the Increment checkbox is selected the ordered quantity is incremented by
one with respective Serial Number auto distributed.
Contact Info
Alec Baghdasaryan
President , CEO
alec@iigservices.com
Information Integration Group, Inc.
www.iigservices.com
457 Palm Drive, Suite 200
Glendale, CA 91202
Telephone: (818) 956-3744, ext.: 222
Mobile: (818) 402-9932
Fax: (818) 956-3746

More Related Content

What's hot

Operations management
Operations managementOperations management
Operations management
Bharti Kumari
 
SAP Product costing Calculation With Components - Skillstek
SAP Product costing Calculation With Components  - SkillstekSAP Product costing Calculation With Components  - Skillstek
SAP Product costing Calculation With Components - Skillstek
Skillstek
 
Bom in sap
Bom in sapBom in sap
Bom in sap
Amarnath Reddy
 
Product costing part4-costing run
Product costing part4-costing runProduct costing part4-costing run
Product costing part4-costing run
Nallasamy Mohanraj
 
Co product costing detailed trng
Co product costing detailed trngCo product costing detailed trng
Co product costing detailed trng
Venkat Reddy
 
Product costing part3-quantity structure
Product costing part3-quantity structureProduct costing part3-quantity structure
Product costing part3-quantity structure
Nallasamy Mohanraj
 
sap b one production module
sap b one production modulesap b one production module
sap b one production module
Faisal Mk
 
eresource ERP Manufacturing (bom)
eresource ERP Manufacturing (bom)eresource ERP Manufacturing (bom)
eresource ERP Manufacturing (bom)
eresource infotech pvt ltd
 
Co productconfig jointprodn
Co productconfig jointprodnCo productconfig jointprodn
Co productconfig jointprodn
Bhaskar Biswas
 
Just in Time Cost
Just in Time CostJust in Time Cost
Just in Time Cost
acctg2012
 
Equivalent production in Cost Accounting
Equivalent production in Cost Accounting Equivalent production in Cost Accounting
Equivalent production in Cost Accounting
Sanjeet Yadav
 
SAP Innovations:Are you overlooking important functionality in SAP Controlling
SAP Innovations:Are you overlooking important functionality in SAP ControllingSAP Innovations:Are you overlooking important functionality in SAP Controlling
SAP Innovations:Are you overlooking important functionality in SAP Controlling
Alice Adams
 
Material Requisite Planning
Material Requisite PlanningMaterial Requisite Planning
Material Requisite Planning
ajithsrc
 
Mm overview
Mm overviewMm overview
Mm overview
spalroay
 
Materialnet specific user manual
Materialnet specific user manualMaterialnet specific user manual
Materialnet specific user manual
ibuyer.hk eddie
 
Product costing part5-actual costs
Product costing part5-actual costsProduct costing part5-actual costs
Product costing part5-actual costs
Nallasamy Mohanraj
 
Product costing part1-cost center planning
Product costing part1-cost center planningProduct costing part1-cost center planning
Product costing part1-cost center planning
Nallasamy Mohanraj
 
Product Costing
Product CostingProduct Costing
Product Costing
pmenocha
 
M.com (4)
M.com (4)M.com (4)
M.com (4)
Murtaza420
 
MATERIAL REQUIREMENTS PLANNING (MRP)
MATERIAL REQUIREMENTS PLANNING (MRP)MATERIAL REQUIREMENTS PLANNING (MRP)
MATERIAL REQUIREMENTS PLANNING (MRP)
Dipesh Pandey
 

What's hot (20)

Operations management
Operations managementOperations management
Operations management
 
SAP Product costing Calculation With Components - Skillstek
SAP Product costing Calculation With Components  - SkillstekSAP Product costing Calculation With Components  - Skillstek
SAP Product costing Calculation With Components - Skillstek
 
Bom in sap
Bom in sapBom in sap
Bom in sap
 
Product costing part4-costing run
Product costing part4-costing runProduct costing part4-costing run
Product costing part4-costing run
 
Co product costing detailed trng
Co product costing detailed trngCo product costing detailed trng
Co product costing detailed trng
 
Product costing part3-quantity structure
Product costing part3-quantity structureProduct costing part3-quantity structure
Product costing part3-quantity structure
 
sap b one production module
sap b one production modulesap b one production module
sap b one production module
 
eresource ERP Manufacturing (bom)
eresource ERP Manufacturing (bom)eresource ERP Manufacturing (bom)
eresource ERP Manufacturing (bom)
 
Co productconfig jointprodn
Co productconfig jointprodnCo productconfig jointprodn
Co productconfig jointprodn
 
Just in Time Cost
Just in Time CostJust in Time Cost
Just in Time Cost
 
Equivalent production in Cost Accounting
Equivalent production in Cost Accounting Equivalent production in Cost Accounting
Equivalent production in Cost Accounting
 
SAP Innovations:Are you overlooking important functionality in SAP Controlling
SAP Innovations:Are you overlooking important functionality in SAP ControllingSAP Innovations:Are you overlooking important functionality in SAP Controlling
SAP Innovations:Are you overlooking important functionality in SAP Controlling
 
Material Requisite Planning
Material Requisite PlanningMaterial Requisite Planning
Material Requisite Planning
 
Mm overview
Mm overviewMm overview
Mm overview
 
Materialnet specific user manual
Materialnet specific user manualMaterialnet specific user manual
Materialnet specific user manual
 
Product costing part5-actual costs
Product costing part5-actual costsProduct costing part5-actual costs
Product costing part5-actual costs
 
Product costing part1-cost center planning
Product costing part1-cost center planningProduct costing part1-cost center planning
Product costing part1-cost center planning
 
Product Costing
Product CostingProduct Costing
Product Costing
 
M.com (4)
M.com (4)M.com (4)
M.com (4)
 
MATERIAL REQUIREMENTS PLANNING (MRP)
MATERIAL REQUIREMENTS PLANNING (MRP)MATERIAL REQUIREMENTS PLANNING (MRP)
MATERIAL REQUIREMENTS PLANNING (MRP)
 

Similar to IIG's Process Manufacturing Solution for Sage 100

Planning & Route Sheet.ppt
Planning & Route Sheet.pptPlanning & Route Sheet.ppt
Planning & Route Sheet.ppt
SenbagarajaPhotos
 
Material requirement Planning (mrp) openbravo
Material requirement Planning (mrp)   openbravoMaterial requirement Planning (mrp)   openbravo
Material requirement Planning (mrp) openbravo
Abul Khayer
 
SAP Production Planning
SAP Production PlanningSAP Production Planning
SAP Production Planning
Rupesh Brahmankar
 
Top 5 manufacturing processes that will improve after implementing mrp
Top 5 manufacturing processes that will improve after implementing mrpTop 5 manufacturing processes that will improve after implementing mrp
Top 5 manufacturing processes that will improve after implementing mrp
MRPeasy
 
eresource nfra ERP - An exclusive ERP solution for Project Industry
eresource nfra ERP  - An exclusive ERP solution for Project Industryeresource nfra ERP  - An exclusive ERP solution for Project Industry
eresource nfra ERP - An exclusive ERP solution for Project Industry
Sunil Nair
 
MRP
MRPMRP
Heizer 14
Heizer 14Heizer 14
Heizer 14
ajithsrc
 
Sap mrp-configuration-pp
Sap mrp-configuration-ppSap mrp-configuration-pp
Sap mrp-configuration-pp
Lokesh Modem
 
Kcf bp-project-module
Kcf bp-project-moduleKcf bp-project-module
Kcf bp-project-module
Esh_Crystal
 
17085700 sap-pp-materials-requirement-planning-http-sapdocs-info
17085700 sap-pp-materials-requirement-planning-http-sapdocs-info17085700 sap-pp-materials-requirement-planning-http-sapdocs-info
17085700 sap-pp-materials-requirement-planning-http-sapdocs-info
MBA, MSc, Alberto Castellano
 
Lecture 24 conversion cycle -the traditional manufacturing environment accou...
Lecture 24  conversion cycle -the traditional manufacturing environment accou...Lecture 24  conversion cycle -the traditional manufacturing environment accou...
Lecture 24 conversion cycle -the traditional manufacturing environment accou...
Habib Ullah Qamar
 
Material Ledger Product costing
Material Ledger Product costingMaterial Ledger Product costing
Material Ledger Product costing
otchmarz
 
Cutover strategy in sap fico
Cutover strategy in sap ficoCutover strategy in sap fico
Cutover strategy in sap fico
Bhushan Dhande
 
How Manufacturing Execution System (MES) Works?
How Manufacturing Execution System (MES) Works?How Manufacturing Execution System (MES) Works?
How Manufacturing Execution System (MES) Works?
OmegaCube Technologies
 
PP-OVE_1.PPT
PP-OVE_1.PPTPP-OVE_1.PPT
PP-OVE_1.PPT
SIPLSIPL
 
Maria Khoso and Nimrta Nanwani Managerial-Accounting.pptx
Maria Khoso and Nimrta Nanwani Managerial-Accounting.pptxMaria Khoso and Nimrta Nanwani Managerial-Accounting.pptx
Maria Khoso and Nimrta Nanwani Managerial-Accounting.pptx
MariaKhoso1
 
Hand shake points.ppt
Hand  shake points.pptHand  shake points.ppt
Hand shake points.ppt
ParasShah640934
 
Purchasing software structure
Purchasing software structurePurchasing software structure
Purchasing software structure
Syed Kashif Ali
 
Checmate production management suite
Checmate production management suiteChecmate production management suite
Checmate production management suite
Dynamic Systems
 
Product costing343411327309984
Product costing343411327309984Product costing343411327309984
Product costing343411327309984
shivaprakash
 

Similar to IIG's Process Manufacturing Solution for Sage 100 (20)

Planning & Route Sheet.ppt
Planning & Route Sheet.pptPlanning & Route Sheet.ppt
Planning & Route Sheet.ppt
 
Material requirement Planning (mrp) openbravo
Material requirement Planning (mrp)   openbravoMaterial requirement Planning (mrp)   openbravo
Material requirement Planning (mrp) openbravo
 
SAP Production Planning
SAP Production PlanningSAP Production Planning
SAP Production Planning
 
Top 5 manufacturing processes that will improve after implementing mrp
Top 5 manufacturing processes that will improve after implementing mrpTop 5 manufacturing processes that will improve after implementing mrp
Top 5 manufacturing processes that will improve after implementing mrp
 
eresource nfra ERP - An exclusive ERP solution for Project Industry
eresource nfra ERP  - An exclusive ERP solution for Project Industryeresource nfra ERP  - An exclusive ERP solution for Project Industry
eresource nfra ERP - An exclusive ERP solution for Project Industry
 
MRP
MRPMRP
MRP
 
Heizer 14
Heizer 14Heizer 14
Heizer 14
 
Sap mrp-configuration-pp
Sap mrp-configuration-ppSap mrp-configuration-pp
Sap mrp-configuration-pp
 
Kcf bp-project-module
Kcf bp-project-moduleKcf bp-project-module
Kcf bp-project-module
 
17085700 sap-pp-materials-requirement-planning-http-sapdocs-info
17085700 sap-pp-materials-requirement-planning-http-sapdocs-info17085700 sap-pp-materials-requirement-planning-http-sapdocs-info
17085700 sap-pp-materials-requirement-planning-http-sapdocs-info
 
Lecture 24 conversion cycle -the traditional manufacturing environment accou...
Lecture 24  conversion cycle -the traditional manufacturing environment accou...Lecture 24  conversion cycle -the traditional manufacturing environment accou...
Lecture 24 conversion cycle -the traditional manufacturing environment accou...
 
Material Ledger Product costing
Material Ledger Product costingMaterial Ledger Product costing
Material Ledger Product costing
 
Cutover strategy in sap fico
Cutover strategy in sap ficoCutover strategy in sap fico
Cutover strategy in sap fico
 
How Manufacturing Execution System (MES) Works?
How Manufacturing Execution System (MES) Works?How Manufacturing Execution System (MES) Works?
How Manufacturing Execution System (MES) Works?
 
PP-OVE_1.PPT
PP-OVE_1.PPTPP-OVE_1.PPT
PP-OVE_1.PPT
 
Maria Khoso and Nimrta Nanwani Managerial-Accounting.pptx
Maria Khoso and Nimrta Nanwani Managerial-Accounting.pptxMaria Khoso and Nimrta Nanwani Managerial-Accounting.pptx
Maria Khoso and Nimrta Nanwani Managerial-Accounting.pptx
 
Hand shake points.ppt
Hand  shake points.pptHand  shake points.ppt
Hand shake points.ppt
 
Purchasing software structure
Purchasing software structurePurchasing software structure
Purchasing software structure
 
Checmate production management suite
Checmate production management suiteChecmate production management suite
Checmate production management suite
 
Product costing343411327309984
Product costing343411327309984Product costing343411327309984
Product costing343411327309984
 

Recently uploaded

Enums On Steroids - let's look at sealed classes !
Enums On Steroids - let's look at sealed classes !Enums On Steroids - let's look at sealed classes !
Enums On Steroids - let's look at sealed classes !
Marcin Chrost
 
Lecture 2 - software testing SE 412.pptx
Lecture 2 - software testing SE 412.pptxLecture 2 - software testing SE 412.pptx
Lecture 2 - software testing SE 412.pptx
TaghreedAltamimi
 
Need for Speed: Removing speed bumps from your Symfony projects ⚡️
Need for Speed: Removing speed bumps from your Symfony projects ⚡️Need for Speed: Removing speed bumps from your Symfony projects ⚡️
Need for Speed: Removing speed bumps from your Symfony projects ⚡️
Łukasz Chruściel
 
Odoo ERP Vs. Traditional ERP Systems – A Comparative Analysis
Odoo ERP Vs. Traditional ERP Systems – A Comparative AnalysisOdoo ERP Vs. Traditional ERP Systems – A Comparative Analysis
Odoo ERP Vs. Traditional ERP Systems – A Comparative Analysis
Envertis Software Solutions
 
316895207-SAP-Oil-and-Gas-Downstream-Training.pptx
316895207-SAP-Oil-and-Gas-Downstream-Training.pptx316895207-SAP-Oil-and-Gas-Downstream-Training.pptx
316895207-SAP-Oil-and-Gas-Downstream-Training.pptx
ssuserad3af4
 
WWDC 2024 Keynote Review: For CocoaCoders Austin
WWDC 2024 Keynote Review: For CocoaCoders AustinWWDC 2024 Keynote Review: For CocoaCoders Austin
WWDC 2024 Keynote Review: For CocoaCoders Austin
Patrick Weigel
 
socradar-q1-2024-aviation-industry-report.pdf
socradar-q1-2024-aviation-industry-report.pdfsocradar-q1-2024-aviation-industry-report.pdf
socradar-q1-2024-aviation-industry-report.pdf
SOCRadar
 
Malibou Pitch Deck For Its €3M Seed Round
Malibou Pitch Deck For Its €3M Seed RoundMalibou Pitch Deck For Its €3M Seed Round
Malibou Pitch Deck For Its €3M Seed Round
sjcobrien
 
Webinar On-Demand: Using Flutter for Embedded
Webinar On-Demand: Using Flutter for EmbeddedWebinar On-Demand: Using Flutter for Embedded
Webinar On-Demand: Using Flutter for Embedded
ICS
 
How to write a program in any programming language
How to write a program in any programming languageHow to write a program in any programming language
How to write a program in any programming language
Rakesh Kumar R
 
SQL Accounting Software Brochure Malaysia
SQL Accounting Software Brochure MalaysiaSQL Accounting Software Brochure Malaysia
SQL Accounting Software Brochure Malaysia
GohKiangHock
 
Energy consumption of Database Management - Florina Jonuzi
Energy consumption of Database Management - Florina JonuziEnergy consumption of Database Management - Florina Jonuzi
Energy consumption of Database Management - Florina Jonuzi
Green Software Development
 
2024 eCommerceDays Toulouse - Sylius 2.0.pdf
2024 eCommerceDays Toulouse - Sylius 2.0.pdf2024 eCommerceDays Toulouse - Sylius 2.0.pdf
2024 eCommerceDays Toulouse - Sylius 2.0.pdf
Łukasz Chruściel
 
GreenCode-A-VSCode-Plugin--Dario-Jurisic
GreenCode-A-VSCode-Plugin--Dario-JurisicGreenCode-A-VSCode-Plugin--Dario-Jurisic
GreenCode-A-VSCode-Plugin--Dario-Jurisic
Green Software Development
 
Microservice Teams - How the cloud changes the way we work
Microservice Teams - How the cloud changes the way we workMicroservice Teams - How the cloud changes the way we work
Microservice Teams - How the cloud changes the way we work
Sven Peters
 
Using Query Store in Azure PostgreSQL to Understand Query Performance
Using Query Store in Azure PostgreSQL to Understand Query PerformanceUsing Query Store in Azure PostgreSQL to Understand Query Performance
Using Query Store in Azure PostgreSQL to Understand Query Performance
Grant Fritchey
 
ALGIT - Assembly Line for Green IT - Numbers, Data, Facts
ALGIT - Assembly Line for Green IT - Numbers, Data, FactsALGIT - Assembly Line for Green IT - Numbers, Data, Facts
ALGIT - Assembly Line for Green IT - Numbers, Data, Facts
Green Software Development
 
Oracle 23c New Features For DBAs and Developers.pptx
Oracle 23c New Features For DBAs and Developers.pptxOracle 23c New Features For DBAs and Developers.pptx
Oracle 23c New Features For DBAs and Developers.pptx
Remote DBA Services
 
Hand Rolled Applicative User Validation Code Kata
Hand Rolled Applicative User ValidationCode KataHand Rolled Applicative User ValidationCode Kata
Hand Rolled Applicative User Validation Code Kata
Philip Schwarz
 
Requirement Traceability in Xen Functional Safety
Requirement Traceability in Xen Functional SafetyRequirement Traceability in Xen Functional Safety
Requirement Traceability in Xen Functional Safety
Ayan Halder
 

Recently uploaded (20)

Enums On Steroids - let's look at sealed classes !
Enums On Steroids - let's look at sealed classes !Enums On Steroids - let's look at sealed classes !
Enums On Steroids - let's look at sealed classes !
 
Lecture 2 - software testing SE 412.pptx
Lecture 2 - software testing SE 412.pptxLecture 2 - software testing SE 412.pptx
Lecture 2 - software testing SE 412.pptx
 
Need for Speed: Removing speed bumps from your Symfony projects ⚡️
Need for Speed: Removing speed bumps from your Symfony projects ⚡️Need for Speed: Removing speed bumps from your Symfony projects ⚡️
Need for Speed: Removing speed bumps from your Symfony projects ⚡️
 
Odoo ERP Vs. Traditional ERP Systems – A Comparative Analysis
Odoo ERP Vs. Traditional ERP Systems – A Comparative AnalysisOdoo ERP Vs. Traditional ERP Systems – A Comparative Analysis
Odoo ERP Vs. Traditional ERP Systems – A Comparative Analysis
 
316895207-SAP-Oil-and-Gas-Downstream-Training.pptx
316895207-SAP-Oil-and-Gas-Downstream-Training.pptx316895207-SAP-Oil-and-Gas-Downstream-Training.pptx
316895207-SAP-Oil-and-Gas-Downstream-Training.pptx
 
WWDC 2024 Keynote Review: For CocoaCoders Austin
WWDC 2024 Keynote Review: For CocoaCoders AustinWWDC 2024 Keynote Review: For CocoaCoders Austin
WWDC 2024 Keynote Review: For CocoaCoders Austin
 
socradar-q1-2024-aviation-industry-report.pdf
socradar-q1-2024-aviation-industry-report.pdfsocradar-q1-2024-aviation-industry-report.pdf
socradar-q1-2024-aviation-industry-report.pdf
 
Malibou Pitch Deck For Its €3M Seed Round
Malibou Pitch Deck For Its €3M Seed RoundMalibou Pitch Deck For Its €3M Seed Round
Malibou Pitch Deck For Its €3M Seed Round
 
Webinar On-Demand: Using Flutter for Embedded
Webinar On-Demand: Using Flutter for EmbeddedWebinar On-Demand: Using Flutter for Embedded
Webinar On-Demand: Using Flutter for Embedded
 
How to write a program in any programming language
How to write a program in any programming languageHow to write a program in any programming language
How to write a program in any programming language
 
SQL Accounting Software Brochure Malaysia
SQL Accounting Software Brochure MalaysiaSQL Accounting Software Brochure Malaysia
SQL Accounting Software Brochure Malaysia
 
Energy consumption of Database Management - Florina Jonuzi
Energy consumption of Database Management - Florina JonuziEnergy consumption of Database Management - Florina Jonuzi
Energy consumption of Database Management - Florina Jonuzi
 
2024 eCommerceDays Toulouse - Sylius 2.0.pdf
2024 eCommerceDays Toulouse - Sylius 2.0.pdf2024 eCommerceDays Toulouse - Sylius 2.0.pdf
2024 eCommerceDays Toulouse - Sylius 2.0.pdf
 
GreenCode-A-VSCode-Plugin--Dario-Jurisic
GreenCode-A-VSCode-Plugin--Dario-JurisicGreenCode-A-VSCode-Plugin--Dario-Jurisic
GreenCode-A-VSCode-Plugin--Dario-Jurisic
 
Microservice Teams - How the cloud changes the way we work
Microservice Teams - How the cloud changes the way we workMicroservice Teams - How the cloud changes the way we work
Microservice Teams - How the cloud changes the way we work
 
Using Query Store in Azure PostgreSQL to Understand Query Performance
Using Query Store in Azure PostgreSQL to Understand Query PerformanceUsing Query Store in Azure PostgreSQL to Understand Query Performance
Using Query Store in Azure PostgreSQL to Understand Query Performance
 
ALGIT - Assembly Line for Green IT - Numbers, Data, Facts
ALGIT - Assembly Line for Green IT - Numbers, Data, FactsALGIT - Assembly Line for Green IT - Numbers, Data, Facts
ALGIT - Assembly Line for Green IT - Numbers, Data, Facts
 
Oracle 23c New Features For DBAs and Developers.pptx
Oracle 23c New Features For DBAs and Developers.pptxOracle 23c New Features For DBAs and Developers.pptx
Oracle 23c New Features For DBAs and Developers.pptx
 
Hand Rolled Applicative User Validation Code Kata
Hand Rolled Applicative User ValidationCode KataHand Rolled Applicative User ValidationCode Kata
Hand Rolled Applicative User Validation Code Kata
 
Requirement Traceability in Xen Functional Safety
Requirement Traceability in Xen Functional SafetyRequirement Traceability in Xen Functional Safety
Requirement Traceability in Xen Functional Safety
 

IIG's Process Manufacturing Solution for Sage 100

  • 1. Material Planning &Material Planning & ProductionProduction Recipe / Mold ProcessingRecipe / Mold Processing For Sage 100 ERP
  • 2. Material Planning & Production  Ability to view Material Requirements by item  Quantity to produce (MFG & Assembly) based on MRP run data  Sub-assemblies to be manufactured (all levels)  Items to purchase for all levels  Min/Max/EOQ entries are included in calculated requirements  Ability to maintain demand and generate Purchase Orders:  Based on the purchasing requirements of the MRP run  Components required for the manufacturing work orders  Ability to maintain requirements and generate Work Orders:  For finished good requirements of the MRP run  Sub-assemblies required to manufacture requirements  Ability to create Work Orders from the Sales Order Entry program  Auto Schedule work orders based on capacity - shifts by day
  • 3. Food Processing / Molds - Injection  Ability to process BOMs with components’ percentage instead of quantity.  Ability to defined the type of item in the Inventory master file  Ingredient  Label  Package  Ability to create multiple finished goods for a batch  Finished goods produced are defined by batch bill of materials record  Label, packaging type items are loaded from produced item’s bill of material  Ability to setup molds for a given item  Recall Report – display customers recall info  Tracking of raw material lots used for each finished goods
  • 4. Material Planning & Production Used to group items into separate MRP runs. Used by the MRP program’s WO Generation routine to assign priority during auto- scheduling of Work Orders generated. Item type is used as part of MFG Process and to group items on reports
  • 5. Material Planning & Production Routings are linked to bill of material records and are used to generate the needed manufacturing routing transactions (setup Components By Percentage checkbox enables entering Percentage for items instead of Quantity/Bill.
  • 6. Material Planning & Production Components entered are used by MRP and Production Planning programs. Demand is calculated for all component levels of bill of materials.
  • 8. Material Planning & Production Molds are setup by items
  • 9. Material Planning & Production Work Order transactions / tasks will be generated based on the routings created. Duration of the work order step completion on the scheduling board is setup based on quantity per hour setup for the item/mold combination
  • 10. Material Planning & Production Purchase and work orders can be auto generated for the selected items Requirements calculated are loaded into a grid. Users have the option to manually adjust the demand calculated Selection filters are used to manage the MRP runs Drill downs to item, BOM, Vendor, Mold
  • 11. MRP Inquiry MRP Inquiry is accessed from Menu, Sales Order Entry or Calculate Quantity to Produce programs.
  • 12. WO Generation from Sales Order
  • 13. WO Generation from Sales Order
  • 14. WO Generation from Scheduling Board Work orders can be generated by dragging and dropping the items into machine columns. Items selected by the Production Requirements Calculation program are loaded into a panel on the board.
  • 15. WO Generation from Scheduling Board Work Orders generated can be viewed and re-scheduled by dragging and dropping them from one day to another or from one machine/work center to another
  • 16. Manufacturing Dispatch Components are loaded from the BOM into the WO Dispatch Transaction. Daily Production entry transactions are created upon closing the Dispatch.
  • 17. Production Generation Production is generated when Dispatch status is changed to Closed.
  • 18. Production Entry from Dispatch Production button on the Closed dispatch enables access to the Production Entry.
  • 19. Dispatch Status Change Based on Availability Programs allows for releasing work orders with sufficient component inventory and displays a message if there is not sufficient inventory in stock to release a work order This program processes all manufacturing dispatches for a given status and dispatch date range to check for availability of components for production of W.O. quantity
  • 20. Manufacturing Dispatch Generation from WO Manufacturing dispatch/new Work order for a Bill Item (having at least one component) can be generated directly from WO Entry. Two options are available:By routing and for current WO. when generating by this option new WO and manufacturing dispatch will be generated based on the Routing (having a step marked as MFG) assigned to current Bill Item in the Bill of Materials Maintenance. New Manufacturing dispatch is created for current Work Order
  • 21. Outside Processing The Outside processing is performed by the following steps: a.sending Items for outside processing b.receiving the Items already processed Transfer transaction is generated for the Items send out for outside processing.
  • 22. Transfer Transaction for Outside Processing For the lines send out for outside processing the Item Code cell becomes red colored: The Outside Processing Warehouse is set as the Transfer To Warehouse for current transaction.
  • 23. Transfer Transaction for Outside Processing Receiving of Items is performed similar to sending just by pressing the Receive button.While receiving Items Item may be replaced by another Item. While receiving Items Transfer transaction is generated for receiving the Item from OP Warehouse to the Warehouse specified on the Dispatch Line. If a replacement Item is entered for an Item in the Receive Items from Outside Processing grid an adjustment transaction is generated for that Item and the Item Code in the Dispatch Line is replaced with that item Code :
  • 24. Auto Generate Production for Component Bill Auto Production checkbox indicates that the component Item, which is manufactured item (item that has its own BOM) needs to be produced together Two Dispatches (One for the main Bill Number and one for the component Bill) will be generated for production of these items when Work Order is generated for the Bill Number from the Calculate Quantity To Produce/Purchase program. When the Dispatch generated for the main Bill Number is closed, the first Production is generated for the component Bill and then for the Main Bill.
  • 25. Lot/Serial Distribution in Dispatch Data Entry For Serial Items Serial number scanning is provided on the Dispatch entry Lines: In the Add New mode upon scanning serial number respective Serial Item is loaded in the grid with the ordered quantity set to 1 and the Serial Item is distributed by the scanned Serial number. If the Increment checkbox is selected the ordered quantity is incremented by one with respective Serial Number auto distributed.
  • 26. Contact Info Alec Baghdasaryan President , CEO alec@iigservices.com Information Integration Group, Inc. www.iigservices.com 457 Palm Drive, Suite 200 Glendale, CA 91202 Telephone: (818) 956-3744, ext.: 222 Mobile: (818) 402-9932 Fax: (818) 956-3746