© 2015 ERP Corp. All rights reserved.
SAP’s Innovations – Are
You Overlooking
Important Functionality in
SAP Controlling?
Janet Salmon
SAP SE
Introduction
• With the huge interest around SAP HANA and SAP Fiori it can
be easy to miss some of the other innovations that SAP has
been introducing.
• In this session we’ll look at how you can use some of the SAP
HANA innovations without even implementing SAP HANA!
• We’ll look at some key business functions introduced with
Enhancement Package 5:
• FIN_CO_COGM
• LOG_MM_SIT
• LOG_EAM_OLC
• We’ll look at some new user interfaces introduced with
Enhancement Package 6:
• FIN_CO_CCMGMT
• FIN_CO_CCPLAN and FIN_CO_ORPLAN3
Topics
• Finding Out About SAP’s innovations
• New Reporting Options with SAP HANA
• Material Ledger
• CO-PA
• New Business Functions for Controlling
• FIN_CO_COGM
• LOG_MM_SIT
• LOG_EAM_OLC
• New Business Functions for the User Interfaces in Controlling
• FIN_CO_CCMGMT
• FIN_CO_CCPLAN, FIN_CO_ORPLAN
• Summary
4
SAP Innovation Discovery – Try It
https://apps.support.sap.com/innovation-discovery/index.html
Installing an SAP Enhancement Package
You will need to install
an Enhancement
Package to use many of
the options discussed in
this presentation.
Installing an Add-On…
You will need to install an add-on
to use the following applications
in Controlling:
• SAP Fiori Add-On,
• SAP Financial Closing cockpit
Topics
• Finding Out About SAP’s innovations
• New Reporting Options with SAP HANA
• Material Ledger
• CO-PA
• New Business Functions for Controlling
• FIN_CO_COGM
• LOG_MM_SIT
• LOG_EAM_OLC
• New Business Functions for the User Interfaces in Controlling
• FIN_CO_CCMGMT
• FIN_CO_CCPLAN, FIN_CO_ORPLAN
• Summary
8
One atomic copy of data for
Transactions + Analysis, all in Memory
 Eliminate unnecessary complexity and latency
 Less hardware to manage
 Accelerate through innovation, simplification + in-memory
 3 copies of data in different data models
 Inherent data latency
 Poor innovation leading to wastage
Transactions + Analysis + Acceleration
processes separated
SAP HANA
(DRAM)
Transact
ETL
Analyze
ETL
Re-think Data Management for Real-time Business
A Common Database Approach for OLTP and
OLAP Using an In-Memory Column Database
Hasso Plattner
Accelerate
Cache
VS
Data Warehouse Approach to Profitability Reporting
Transact
ETL
Analyze
ETL
Accelerate
Cache
Assigned to
Operating Concern
Characteristics/
Value Fields
Totals Records
Summarization Levels
…
Moved to
InfoProviders
Extract
Enrich
Load
…
Transactions Recorded
In CO-PA
Invoices
Sales Documents
Assessment Cycles
Settlement
Others
…
To Deliver
Profitability by Dimension…
Data Latency – Around 8 Hours
Leaner Approach to Profitability Reporting
UI: Analysis for Microsoft Office
Transact
Analyze
ETL
DataSource:
BW Query
Operating Concern
on SAP HANA
CE1 table (transactions)
CE4 table (dimensions)
Virtual Info Provicder
(Create using
transaction KEIP)
Result for SAP IT: Postings to CO-PA are
visible immediately and close schedule is
reduced by three days.
Topics
• Finding Out About SAP’s innovations
• New Reporting Options with SAP HANA
• Material Ledger
• CO-PA
• New Business Functions for Controlling
• FIN_CO_COGM
• LOG_MM_SIT
• LOG_EAM_OLC
• New Business Functions for the User Interfaces in Controlling
• FIN_CO_CCMGMT
• FIN_CO_CCPLAN, FIN_CO_ORPLAN
• Summary
12
Virtual InfoProviders for Material Ledger
1. Use Transaction HDBC to display all options
2. Select Material Ledger > Virtual InfoProviders
3. Generate Virtual InfoProviders for Material
Ledger and Actual Cost Component Split
Virtual InfoProviders for Material Ledger (cont.)
Sample Report Provisioned
Using Virtual Infoprovider
Generated Virtual Info Provider
• See Also:
SAP Note 1654843 – ERP accelerators:
Material Ledger- Virtual InfoProviders
Topics
• Finding Out About SAP’s innovations
• New Reporting Options with SAP HANA
• Material Ledger
• CO-PA
• New Business Functions for Controlling
• FIN_CO_COGM
• LOG_MM_SIT
• LOG_EAM_OLC
• New Business Functions for the User Interfaces in Controlling
• FIN_CO_CCMGMT
• FIN_CO_CCPLAN, FIN_CO_ORPLAN
• Summary
15
Virtual Info Providers for CO-PA
Use Transaction KEIP to Generate Your Virtual InfoProvider
See Also SAP Note 1667584 – Virtual InfoProvider for CO-PA
Virtual Info Providers for CO-PA (cont.)
Info Provider for Your
Operating Concern
(Under Unassigned
Nodes)
Sample Report Provisioned
Using Virtual InfoProvider
Topics
• Finding Out About SAP’s innovations
• New Reporting Options with SAP HANA
• Material Ledger
• CO-PA
• New Business Functions for Controlling
• FIN_CO_COGM
• LOG_MM_SIT
• LOG_EAM_OLC
• New Business Functions for the User Interfaces in Controlling
• FIN_CO_CCMGMT
• FIN_CO_CCPLAN, FIN_CO_ORPLAN
• Summary
18
Activate Using Transaction SFW5 (Switch Framework)
All business functions
are off by default.
You will need to have
your system
administrator activate
those you need.
Topics
• Finding Out About SAP’s innovations
• New Reporting Options with SAP HANA
• Material Ledger
• CO-PA
• New Business Functions for Controlling
• FIN_CO_COGM
• LOG_MM_SIT
• LOG_EAM_OLC
• New Business Functions for the User Interfaces in Controlling
• FIN_CO_CCMGMT
• FIN_CO_CCPLAN, FIN_CO_ORPLAN
• Summary
20
Parallel Accounting: Cost of Goods Manufactured
Value Flow — Overview
Controlling
Update of Depreciation Expenses by Cost
Center and Version
Actual Costing
Periodic Costing Run
Updates either leading valuation or local valuation*
Version 0 (legal)
(Actual rate)
Version N (par.
COGM)
(Actual rate)
Actual Costing
Alternative Valuation Run
Updates local valuation if both valuations use actual costs*
Depreciation Area 01
(IFRS)Asset Accounting
Perform Depreciation Run
Version 0
(legal valuation)
Ledger 0L
(IFRS)
Version N
Depreciation Area 02
(Local GAAP)
Ledger N
(Local GAAP)
(parallel COGM)
Version N (par.
COGM)
(Actual rate)
Controlling
Direct Activity Allocation at standard;
Actual Rate Calculated at Period
Close
Version 0 (legal)
(Actual rate)
Version 0
(legal)
(Standard rate)
Version N
(par.COGM)
(Actual rate)
OR
Financial Accounting
Update of General Ledger
Post depreciation in
Asset Accounting
Transfer depreciation
to General Ledger
Transfer depreciation
to Cost Center
Accounting
Transfer of depreciation from asset accounting to
controlling
 The depreciation values for the international accounting principle are updated to the leading ledger in the
SAP General Ledger application (or the global accounts in the classic general ledger) and to version 0 in
controlling. The depreciation values for the second accounting principle are updated to a nonleading ledger
in the SAP General Ledger (or the local accounts in the classic general ledger) and to a delta version in
controlling.
* Improvements
Allows global manufacturing organizations to set activity prices that
take account of depreciation according to IFRS and local GAAP.
In previous releases, only the values in the leading ledger were
transferred to controlling. Other values were unavailable for
controlling and therefore could not be used to determine activity
prices and update inventory values for the goods manufactured.
Customer business challenges Business value
Asset Accountant
*
Financial Accountant Controller
Parallel Accounting and
related processes*
Calculation of activity prices to reflect multiple accounting
approaches
 During all operational processes (such as confirmations and backflushing in logistics), the hours worked
are valued with the planned activity rate in version 0 in controlling. At period close, activity price calculation
is used to determine the actual activity rates for the leading version (international accounting standard) and
the alternative version (local GAAP) in that period. Both are calculated as deltas to the initial standard
activity price.
Perform order
confirmation/
backflushing
* Improvements
Calculate standard
activity rates
Include standard
activity rates in
material ledger
Calculate actual
activity rates for
both approaches
Controller
Reduces manual effort at period close.
In previous releases, it was possible to calculate only activity
prices to take account of the leading valuation. Alternative
approaches required manual workarounds.
Customer business challenges Business value
Record working
time
*
ControllerShopfloor
Employee
Inventory Accountant
Parallel Accounting and
related processes*
Select actual activity
rates for activities used
during period
Calculate actual product
costs in leading or
alternative valuation
Revalue material
inventory in leading or
alternative valuation
Inclusion of multiple activity prices in periodic costing run
 Allows the periodic costing run to use activity price from leading valuation to determine the cost of goods
manufactured according to the global accounting standard, and update the inventory values accordingly
 May also be used to calculate actual costs according to the local accounting standard, if the group
accounting approach is standard costs
* Improvements
Reduces manual effort at period closePeriodic costing run only allows the inclusion of activity prices in
version 0
Customer business challenges Business value
**
Parallel Accounting and
related processes*
Controller/
Inventory
Accountant Inventory Accountant
Controller/
Inventory
Accountant
Select actual activity
rates for activities used
during period
Calculate actual product
costs for period in
alternative valuation
Revalue material
inventory in alternative
valuation
Inclusion of multiple activity rates in alternative valuation run
 Allows multiple valuation runs to be created to determine the value of the cost of goods manufactured. The
periodic costing run uses the activity price for the leading valuation (version 0) while the alternative
valuation run uses the activity price for the alternative valuation. It is then possible to revaluate inventory
(create closing entries) to take account of both valuations.
*
* Improvements
Reduces manual effort at period close.In previous releases, the alternative valuation run could include
different approaches to the valuation of raw materials, such as
FIFO, LIFO, and so on, and initiate activity price calculations for
the periods selected. Now activity prices for the relevant version
can be included in the run.
Customer business challenges Business value
*
Parallel Accounting and
related processes*
Controller/
Inventory
Accountant Inventory Accountant
Controller/
Inventory
Accountant
Parallel Accounting: Asset Accounting
Smart Financials
Process
flow:
Generated documents by settlement:
(2) With Acc.Principle local GAAP
D 70 Machines 32000 10.200
C 50 Other Expenses 415000 10.000
C 50 Freight Expenses 472000 200
IFRS
D 70 Machines 32000 10.000
C 50 Other Expenses 415000 10.000
Assumptions:
• Freight Costs are capitalized under
IFRS only
• 100% of other expenses are
capitalized under IFRS and local
GAAP
• 80% of other expenses are
capitalized under Tax Law.
local GAAP
(2c) With Acc.Principle TAX
D 70 Machines 32000 8.000
C 50 Other Expenses 415000 8.000
Tax
(1) With Acc.Principle IFRS
Investm.
Order
Other expenses,
Freight costs
Ext. Procurement,
Production costs
Settlement AuC, Asset
Parallel Accounting for Fixed Assets
FI-AA (New) – Settlement
• CO generates accounting principle specific postings
• Assign settlement rule for AuC: you need to assign a settlement
rule for each line item (per accounting principle)
Topics
• Finding Out About SAP’s innovations
• New Reporting Options with SAP HANA
• Material Ledger
• CO-PA
• New Business Functions for Controlling
• FIN_CO_COGM
• LOG_MM_SIT
• LOG_EAM_OLC
• New Business Functions for the User Interfaces in Controlling
• FIN_CO_CCMGMT
• FIN_CO_CCPLAN, FIN_CO_ORPLAN
• Summary
30
Stock in Transit and Actual Costing
Stock in Transit for (Cross-Company-Code) Sales
Processes
 During the transportation phase companies, can keep ownership of the materials that are sent to a
customer or another company code (visible as stock in transit in this company).
 Alternatively, ownership for these materials (during the transportation phase) can be directly transferred to
the receiving company code (visible as stock in transit in the receiving company code).
 There is also an option to move materials from one stock in transit to another.
Delivered by Business Function: Cross-Company-Code Stock Transfer & Actual Costing
Create Stock
Transport Order
* Improvements
This functionality enables companies to track and manage ownership
changes better when selling materials to a customer or another
company code.
Companies can more easily fulfill the legal requirement of showing all
the stock values in the group.
In sales processes and cross-company transfer processes, it was
impossible to model stock in transit. The ownership of the
material was not reflected correctly in SAP ERP.
When selling materials from one company code to another using the
two-step approach, the stock value did not automatically appear
in the balance sheet after the first step.
Customer business challenges Business value
Purchaser
Create Cross-
Company
Delivery
Perform Goods
Issue
Perform Goods
Receipt
Manage
Ownership
Transfer *
*
Plant Manager Warehouse Clerk Warehouse Clerk
*
EHP 5: Cross-Company Code Material Transfer with
Stock in Transit
Sender Company Code Receiver Company Code
Sender‘s
Free Stock
In plant In transit In plantIn transit
Outbound
Delivery
Purchase
Order
Receiver‘s
Free Stock
Sender‘s
Free Stock
Receiver‘s
Free Stock
Sender‘s
Transit Stock1
Sender‘s
Free Stock
Receiver‘s
Free Stock
Sender‘s
Transit Stock2 Receiver‘s
Transit Stock
Sender‘s
Free Stock
Receiver‘s
Free Stock
Receiver‘s
Transit Stock3
Immediate Transfer
(1-step scenario)
Goods stay in sender’s
ownership during transfer
Ownership changes
during the transfer, e.g.,
upon arrival in the port
of destination
Ownership changes
when leaving the sender
0
Actual costs and
internal profit in
company 1
Actual costs and
internal profit in
company 2
Actual costs and
internal profit for the
whole group
Cross-Company-Code Actual Costing
 By activating this business function, you can extend material and actual costing to run across company
codes without losing actual costs and actual cost component split at the company code border. The
intercompany sales process allows transfer of the costs and cost component split information from the
sending company code to the receiving company code. Calculation of mark-up or intercompany profit in
such a value chain is also supported.
Delivered by Business Function: Cross-Company-Code Stock Transfer
& Actual Costing
*
* Improvements
• Markups and transfer profits visible in cost element
• Legal valuation: show transfer profit in actual cost component split
• Group valuation: rollup of price variances
• Group valuation: rollup of actual cost component split
Up to now, customers could not transfer actual cost component split
information from one company code to another.
Marks-ups could not be used in a cross-company-code sales
scenario.
Customer business challenges Business value
Cost accountant company 1
**
Cost accountant company 2 Group controller and portfolio
manager
Cross-Company Actual Costing
Group
Company
A
Company
B
Costs
Raw Mat. 20
Energy 25
Labor 15
Production 40
Costs
Raw Mat. 100
Energy 0
Labor 0
Production 0
Sales process
Actual costing provides no visibility into
cost structure after intercompany sales
The enhanced solution shall
ensure cost transparency during
intra-company sales by adding
freight costs and intra-company
profits to the costs incurred in the
selling company code to provide
a correct valuation from a group
perspective
Issue Requirement
General Mechanism of Cost Transfer
• The new stock in transit processes secure that the inventory
value is always recorded and present in material ledger.
• When a stock transfer between company codes is posted, ML
records the value from the purchase order in parallel to the cost
at the sending side.
• The PO price is used for the legal valuation, the cost is used for
group valuation. The difference of both is shown as mark-up.
• If actual costs at sender are recalculated the mark-up and the
group costs are adjusted.
Plant 1
Total cost 1000
Materials 500
Labor 400
Overhead 100
Freight
CC Markup 0
Sold to
Plant 2
Total cost 1100
Materials 1100
Labor 0
Overhead 0
Freight
CC Markup 100
PO-Price
1100,-
Comparison of Views
37
• There are 3 different implementation options:
• Legal View (LV): contains the markup, but will show no cost component
information from supply chain members outside the own company. Materials
purchased from affiliate companies will populate only the material cost
component and the markup
• Default in currency type 10.
• Transparent Legal View (TLV): Contains the markup, and will preserve cost
component information coming from affiliate companies if the logistical
process allows that.
• Activated by a BADI in currency type 10.
• Group View (GV): Can be used in parallel to the LV or TLV in a parallel valuation.
Does not show a markup, since all processes are treated as if the plants were part
of the same organization, without taking company code borders into account.
• Currency type 11 or 31.
• An implementation can use either LV or TLV. GV can be added for both
• The 2 typical scenarios to evaluate would be only TLV or LV + GV
Valuation Example in 3 Views
• LV (Legal View)
• Total Cost from PO +
Freight Cost
• Markup shown
• CC collapsed
Plant 1
Total cost 1000
Materials 500
Labor 400
Overhead 100
Freight
CC Markup 0
Sold to
Shipper
Plant 2 LV TLV GV
Total cost 1175 1175 1075
Materials 1100 600 500
Labor 0 400 400
Overhead 0 100 100
Freight 75 75 75
CC Markup 100 100 100
PO Price
1100,-
Freight
invoice
75,-
• TLV (Transparent Legal View)
• Total Cost from PO +
Freight Cost
• Markup shown
• CC from Sender
• Material cost include
markup
• GV (Group View)
• Total Cost from
Sender + Freight
• No Markup
• CC from Sender
Screenshots in Group View
Plant 2000 sold 5 PC to plant
1000 within the same group:
Cost Info is preserved
No Mark-up is shown
A transit stock on the sending
side was used intermediately
Screenshots in Transparent Legal View
Plant 2000 sold 5 PC to plant
1000 in another company code
Consider the different currencies:
GBP in plant 200
EUR in plant 1000
Currency conversion will take place
using the rate GBP /EUR
The PO / Invoice Price was 4000
EUR
The cost component info is
transferred (TLV is activated via
BADI)
The consumption cost component
for the material in plant 1000 is
‘other cost’. Therefore the ‘Delta
Company Code’ is mirrored there
Usage of Transit Stock (Legal View)
1. Material is produced
in plant 2000 using 2
materials and one
activity
2. Material is moved
into the transit stock,
keeping its value
3. Material arrives in
plant 1000 at the PO
price of 4000 EUR
Topics
• Finding Out About SAP’s innovations
• New Reporting Options with SAP HANA
• Material Ledger
• CO-PA
• New Business Functions for Controlling
• FIN_CO_COGM
• LOG_MM_SIT
• LOG_EAM_OLC
• New Business Functions for the User Interfaces in Controlling
• FIN_CO_CCMGMT
• FIN_CO_CCPLAN, FIN_CO_ORPLAN
• Summary
42
Operation Account Assignment
existing header costed orders operation level costing
header
operation
operation
operation
costs:
plan/actual header
operation
operation
operation
costs:
plan/actual
costs:
plan/actual
costs:
plan/actual
Operation Costs
Update of Plant Maintenance Cost View
OAA Order
The system status I0053 (ACAS in English) is displayed when the
order operation is the account assignment object. This is the same
indicator as for a PS network with activity level costing.
• Indication using System Status
OAA Order
• Account assignment details and operation costs
The account assignment
details for an operation are
shown on the Account
Assignment tab of the
operation detail view.
Sub-operation account
assignment values are
inherited from the superior
operation.
The costs are displayed in
the cost tabs on the lower
panel.
existing header
costed orders
operation level
costing
header
operation
operation
operation
costs:
plan/actual header
operation
operation
operation
costs:
plan/actual
costs:
plan/actual
costs:
plan/actual
ORnnnn
………
Reporting / Transactions / Extraction
Transformation of
costs (plan/actual)
according to value
categories
OVnnnn
OVnnnn
OVnnnn
…………
Stored in database as
Dynamic summation
for header values
Operation Costs
• Update of Plant Maintenance Cost View
OAA order costs are only stored for the operation objects. Header totals are dynamically summed as
required. No costs are stored on the database for the OAA Order object.
Reporting
The operation cost overview report shows costs for all operations by value category.
The report can be run as a transaction IW40N and include sub-orders.
• Operation overview report
Topics
• Finding Out About SAP’s innovations
• New Reporting Options with SAP HANA
• Material Ledger
• CO-PA
• New Business Functions for Controlling
• FIN_CO_COGM
• LOG_MM_SIT
• LOG_EAM_OLC
• New Business Functions for the User Interfaces in Controlling
• FIN_CO_CCMGMT
• FIN_CO_CCPLAN, FIN_CO_ORPLAN
• Summary
49
Activate Business Function and Relevant WebDynpros!
50
Use transaction SICF to
activate the relevant
webdynpro applications
Copy the WebDynpros from the Sample Roles to Your
Controller Roles
51
Copy the delivered master
data applications from the role
SAP_CO_INTERNAL_CONTRO
LLER to your roles
Topics
• Finding Out About SAP’s innovations
• New Reporting Options with SAP HANA
• Material Ledger
• CO-PA
• New Business Functions for Controlling
• FIN_CO_COGM
• LOG_MM_SIT
• LOG_EAM_OLC
• New Business Functions for the User Interfaces in Controlling
• FIN_CO_CCMGMT
• FIN_CO_CCPLAN, FIN_CO_ORPLAN
• Summary
52
WebDynpro Application for Cost Center Maintenance
53
Rolle
Configurable UI
54
WebDynpro Application for Cost Center Hierarchies
55
Inactive Versions
56
Changes can be
made prior to a
reorganization
and stored as
an inactive
version
Inactive Versions (cont.)
57
Choose
between
versions in the
application and
in, e.g., Report
Writer
Web Dynpro Application for Internal Orders
58
Web Dynpro Application for Activity Types
59
Topics
• Finding Out About SAP’s innovations
• New Reporting Options with SAP HANA
• Material Ledger
• CO-PA
• New Business Functions for Controlling
• FIN_CO_COGM
• LOG_MM_SIT
• LOG_EAM_OLC
• New Business Functions for the User Interfaces in Controlling
• FIN_CO_CCMGMT
• FIN_CO_CCPLAN, FIN_CO_ORPLAN
• Summary
60
Projects: Cost Element Planning
61
Projects: Top-Down Planning
62
Web and Excel Frontend in EhP6
• Both frontends use the same backend planning model
• Same planning queries and same planning functions
• All features described are available in both frontends
Web Dynpro Analysis Office
Query Adaptations
• Customers want to see:
• Actual values
• Plan values from other
years/versions
• Formula columns
• „Planning is like reporting with
editable columns“
Topics
• Finding Out About SAP’s innovations
• New Reporting Options with SAP HANA
• Material Ledger
• CO-PA
• New Business Functions for Controlling
• FIN_CO_COGM
• LOG_MM_SIT
• LOG_EAM_OLC
• New Business Functions for the User Interfaces in Controlling
• FIN_CO_CCMGMT
• FIN_CO_CCPLAN, FIN_CO_ORPLAN
• Summary
65
SAP Resources
• http://help.sap.com/businesssuite > SAP ERP
• Business Functions in SAP ERP > Enterprise Business
Functions > Accounting
• CO, Parallel Cost of Goods Manufactured
• CO, Cost Center Managerment
• CO, Cost Center Planning
• CO, Order Planning
• Business Functions in SAP ERP > Enterprise Business
Functions > Logistics
• MM, Stock in Transit and Actual Costing
• Operation Account Assignment
Resources (cont.)
67
• www.financialsexpertonline.com/
• Janet Salmon, “Provide Parallel Product Costs for Inventory Valuation in
the SAP General Ledger” (Financials Expert, October 2009).
• Janet Salmon, “Use Alternative Valuation Runs in the Material Ledger to
Smooth Seasonal Price Variances” (Financials Expert, November 2007).
• Marco Jordy “Don’t Wait Until After Go-live to Set Up Cross-Company
Code Controlling” (Financials Expert, September 2006).
• Ashim A.Nanda “Cater to Arm’s Length Standards by automated
Intercompany Transfer Pricing Design” (Financials Expert, October 2010).
• Janet Salmon, “Capture Service and Maintenance Costs at Operation
Level from SAP Enhancement Package 5” (Financials Expert, December
2012).
• Janet Salmon, “Refresh the Look of the Master Data in Cost Center
Accounting with a New Business Function” (Financials Expert, February
2013).
Resources (cont.)
68
• https://scn.sap.com/docs/DOC-32680
• http://scn.sap.com/docs/DOC-29523
• SAP Notes 1836149, 1719702 (project planning) and
1777947 (cost center planning)
Other Resources
Janet Salmon, Controlling with SAP – Practical
Guide
ISBN: ISBN 978-1-4932-1012-1
https://www.sap-press.com/controlling-with-sap-
practical-guide_3625/
Martin Munzel, New SAP Controlling Planning
Interface
http://co.planning.espresso-tutorials.com
Five Key Ideas
70
• Use SAP Innovation Discovery to find out about Enhancement
Packages, SAP Notes and other innovations
• Consider using virtual InfoProviders to improve your end user
reporting
• If you are a global company, explore the new functions for
Actual Costing and Multiple Valuations
• Don’t forget that some of the CO-related innovations might be in
Logistics because of the integrated nature of SAP ERP
• Consider updating the look of your user interfaces and planning
applications, especially if you are bringing new users online
Questions
• Now:
• Ask questions now for immediate answers
• Later:
• Janet.dorothy.salmon@sap.com
71
Q&A
Disclaimer
SAP®, R/3, mySAP, mySAP.com, xApps, xApp, SAP NetWeaver®, Duet®, PartnerEdge, and other SAP® products and
services mentioned herein as well as their respective logos are trademarks or registered trademarks of SAP AG in
Germany and in several other countries all over the world. All other product and service names mentioned are the
trademarks of their respective companies. ERP Corp is neither owned nor controlled by SAP.

SAP Innovations:Are you overlooking important functionality in SAP Controlling

  • 2.
    © 2015 ERPCorp. All rights reserved. SAP’s Innovations – Are You Overlooking Important Functionality in SAP Controlling? Janet Salmon SAP SE
  • 3.
    Introduction • With thehuge interest around SAP HANA and SAP Fiori it can be easy to miss some of the other innovations that SAP has been introducing. • In this session we’ll look at how you can use some of the SAP HANA innovations without even implementing SAP HANA! • We’ll look at some key business functions introduced with Enhancement Package 5: • FIN_CO_COGM • LOG_MM_SIT • LOG_EAM_OLC • We’ll look at some new user interfaces introduced with Enhancement Package 6: • FIN_CO_CCMGMT • FIN_CO_CCPLAN and FIN_CO_ORPLAN3
  • 4.
    Topics • Finding OutAbout SAP’s innovations • New Reporting Options with SAP HANA • Material Ledger • CO-PA • New Business Functions for Controlling • FIN_CO_COGM • LOG_MM_SIT • LOG_EAM_OLC • New Business Functions for the User Interfaces in Controlling • FIN_CO_CCMGMT • FIN_CO_CCPLAN, FIN_CO_ORPLAN • Summary 4
  • 5.
    SAP Innovation Discovery– Try It https://apps.support.sap.com/innovation-discovery/index.html
  • 6.
    Installing an SAPEnhancement Package You will need to install an Enhancement Package to use many of the options discussed in this presentation.
  • 7.
    Installing an Add-On… Youwill need to install an add-on to use the following applications in Controlling: • SAP Fiori Add-On, • SAP Financial Closing cockpit
  • 8.
    Topics • Finding OutAbout SAP’s innovations • New Reporting Options with SAP HANA • Material Ledger • CO-PA • New Business Functions for Controlling • FIN_CO_COGM • LOG_MM_SIT • LOG_EAM_OLC • New Business Functions for the User Interfaces in Controlling • FIN_CO_CCMGMT • FIN_CO_CCPLAN, FIN_CO_ORPLAN • Summary 8
  • 9.
    One atomic copyof data for Transactions + Analysis, all in Memory  Eliminate unnecessary complexity and latency  Less hardware to manage  Accelerate through innovation, simplification + in-memory  3 copies of data in different data models  Inherent data latency  Poor innovation leading to wastage Transactions + Analysis + Acceleration processes separated SAP HANA (DRAM) Transact ETL Analyze ETL Re-think Data Management for Real-time Business A Common Database Approach for OLTP and OLAP Using an In-Memory Column Database Hasso Plattner Accelerate Cache VS
  • 10.
    Data Warehouse Approachto Profitability Reporting Transact ETL Analyze ETL Accelerate Cache Assigned to Operating Concern Characteristics/ Value Fields Totals Records Summarization Levels … Moved to InfoProviders Extract Enrich Load … Transactions Recorded In CO-PA Invoices Sales Documents Assessment Cycles Settlement Others … To Deliver Profitability by Dimension… Data Latency – Around 8 Hours
  • 11.
    Leaner Approach toProfitability Reporting UI: Analysis for Microsoft Office Transact Analyze ETL DataSource: BW Query Operating Concern on SAP HANA CE1 table (transactions) CE4 table (dimensions) Virtual Info Provicder (Create using transaction KEIP) Result for SAP IT: Postings to CO-PA are visible immediately and close schedule is reduced by three days.
  • 12.
    Topics • Finding OutAbout SAP’s innovations • New Reporting Options with SAP HANA • Material Ledger • CO-PA • New Business Functions for Controlling • FIN_CO_COGM • LOG_MM_SIT • LOG_EAM_OLC • New Business Functions for the User Interfaces in Controlling • FIN_CO_CCMGMT • FIN_CO_CCPLAN, FIN_CO_ORPLAN • Summary 12
  • 13.
    Virtual InfoProviders forMaterial Ledger 1. Use Transaction HDBC to display all options 2. Select Material Ledger > Virtual InfoProviders 3. Generate Virtual InfoProviders for Material Ledger and Actual Cost Component Split
  • 14.
    Virtual InfoProviders forMaterial Ledger (cont.) Sample Report Provisioned Using Virtual Infoprovider Generated Virtual Info Provider • See Also: SAP Note 1654843 – ERP accelerators: Material Ledger- Virtual InfoProviders
  • 15.
    Topics • Finding OutAbout SAP’s innovations • New Reporting Options with SAP HANA • Material Ledger • CO-PA • New Business Functions for Controlling • FIN_CO_COGM • LOG_MM_SIT • LOG_EAM_OLC • New Business Functions for the User Interfaces in Controlling • FIN_CO_CCMGMT • FIN_CO_CCPLAN, FIN_CO_ORPLAN • Summary 15
  • 16.
    Virtual Info Providersfor CO-PA Use Transaction KEIP to Generate Your Virtual InfoProvider See Also SAP Note 1667584 – Virtual InfoProvider for CO-PA
  • 17.
    Virtual Info Providersfor CO-PA (cont.) Info Provider for Your Operating Concern (Under Unassigned Nodes) Sample Report Provisioned Using Virtual InfoProvider
  • 18.
    Topics • Finding OutAbout SAP’s innovations • New Reporting Options with SAP HANA • Material Ledger • CO-PA • New Business Functions for Controlling • FIN_CO_COGM • LOG_MM_SIT • LOG_EAM_OLC • New Business Functions for the User Interfaces in Controlling • FIN_CO_CCMGMT • FIN_CO_CCPLAN, FIN_CO_ORPLAN • Summary 18
  • 19.
    Activate Using TransactionSFW5 (Switch Framework) All business functions are off by default. You will need to have your system administrator activate those you need.
  • 20.
    Topics • Finding OutAbout SAP’s innovations • New Reporting Options with SAP HANA • Material Ledger • CO-PA • New Business Functions for Controlling • FIN_CO_COGM • LOG_MM_SIT • LOG_EAM_OLC • New Business Functions for the User Interfaces in Controlling • FIN_CO_CCMGMT • FIN_CO_CCPLAN, FIN_CO_ORPLAN • Summary 20
  • 21.
    Parallel Accounting: Costof Goods Manufactured
  • 22.
    Value Flow —Overview Controlling Update of Depreciation Expenses by Cost Center and Version Actual Costing Periodic Costing Run Updates either leading valuation or local valuation* Version 0 (legal) (Actual rate) Version N (par. COGM) (Actual rate) Actual Costing Alternative Valuation Run Updates local valuation if both valuations use actual costs* Depreciation Area 01 (IFRS)Asset Accounting Perform Depreciation Run Version 0 (legal valuation) Ledger 0L (IFRS) Version N Depreciation Area 02 (Local GAAP) Ledger N (Local GAAP) (parallel COGM) Version N (par. COGM) (Actual rate) Controlling Direct Activity Allocation at standard; Actual Rate Calculated at Period Close Version 0 (legal) (Actual rate) Version 0 (legal) (Standard rate) Version N (par.COGM) (Actual rate) OR Financial Accounting Update of General Ledger
  • 23.
    Post depreciation in AssetAccounting Transfer depreciation to General Ledger Transfer depreciation to Cost Center Accounting Transfer of depreciation from asset accounting to controlling  The depreciation values for the international accounting principle are updated to the leading ledger in the SAP General Ledger application (or the global accounts in the classic general ledger) and to version 0 in controlling. The depreciation values for the second accounting principle are updated to a nonleading ledger in the SAP General Ledger (or the local accounts in the classic general ledger) and to a delta version in controlling. * Improvements Allows global manufacturing organizations to set activity prices that take account of depreciation according to IFRS and local GAAP. In previous releases, only the values in the leading ledger were transferred to controlling. Other values were unavailable for controlling and therefore could not be used to determine activity prices and update inventory values for the goods manufactured. Customer business challenges Business value Asset Accountant * Financial Accountant Controller Parallel Accounting and related processes*
  • 24.
    Calculation of activityprices to reflect multiple accounting approaches  During all operational processes (such as confirmations and backflushing in logistics), the hours worked are valued with the planned activity rate in version 0 in controlling. At period close, activity price calculation is used to determine the actual activity rates for the leading version (international accounting standard) and the alternative version (local GAAP) in that period. Both are calculated as deltas to the initial standard activity price. Perform order confirmation/ backflushing * Improvements Calculate standard activity rates Include standard activity rates in material ledger Calculate actual activity rates for both approaches Controller Reduces manual effort at period close. In previous releases, it was possible to calculate only activity prices to take account of the leading valuation. Alternative approaches required manual workarounds. Customer business challenges Business value Record working time * ControllerShopfloor Employee Inventory Accountant Parallel Accounting and related processes*
  • 25.
    Select actual activity ratesfor activities used during period Calculate actual product costs in leading or alternative valuation Revalue material inventory in leading or alternative valuation Inclusion of multiple activity prices in periodic costing run  Allows the periodic costing run to use activity price from leading valuation to determine the cost of goods manufactured according to the global accounting standard, and update the inventory values accordingly  May also be used to calculate actual costs according to the local accounting standard, if the group accounting approach is standard costs * Improvements Reduces manual effort at period closePeriodic costing run only allows the inclusion of activity prices in version 0 Customer business challenges Business value ** Parallel Accounting and related processes* Controller/ Inventory Accountant Inventory Accountant Controller/ Inventory Accountant
  • 26.
    Select actual activity ratesfor activities used during period Calculate actual product costs for period in alternative valuation Revalue material inventory in alternative valuation Inclusion of multiple activity rates in alternative valuation run  Allows multiple valuation runs to be created to determine the value of the cost of goods manufactured. The periodic costing run uses the activity price for the leading valuation (version 0) while the alternative valuation run uses the activity price for the alternative valuation. It is then possible to revaluate inventory (create closing entries) to take account of both valuations. * * Improvements Reduces manual effort at period close.In previous releases, the alternative valuation run could include different approaches to the valuation of raw materials, such as FIFO, LIFO, and so on, and initiate activity price calculations for the periods selected. Now activity prices for the relevant version can be included in the run. Customer business challenges Business value * Parallel Accounting and related processes* Controller/ Inventory Accountant Inventory Accountant Controller/ Inventory Accountant
  • 27.
  • 28.
    Smart Financials Process flow: Generated documentsby settlement: (2) With Acc.Principle local GAAP D 70 Machines 32000 10.200 C 50 Other Expenses 415000 10.000 C 50 Freight Expenses 472000 200 IFRS D 70 Machines 32000 10.000 C 50 Other Expenses 415000 10.000 Assumptions: • Freight Costs are capitalized under IFRS only • 100% of other expenses are capitalized under IFRS and local GAAP • 80% of other expenses are capitalized under Tax Law. local GAAP (2c) With Acc.Principle TAX D 70 Machines 32000 8.000 C 50 Other Expenses 415000 8.000 Tax (1) With Acc.Principle IFRS Investm. Order Other expenses, Freight costs Ext. Procurement, Production costs Settlement AuC, Asset Parallel Accounting for Fixed Assets
  • 29.
    FI-AA (New) –Settlement • CO generates accounting principle specific postings • Assign settlement rule for AuC: you need to assign a settlement rule for each line item (per accounting principle)
  • 30.
    Topics • Finding OutAbout SAP’s innovations • New Reporting Options with SAP HANA • Material Ledger • CO-PA • New Business Functions for Controlling • FIN_CO_COGM • LOG_MM_SIT • LOG_EAM_OLC • New Business Functions for the User Interfaces in Controlling • FIN_CO_CCMGMT • FIN_CO_CCPLAN, FIN_CO_ORPLAN • Summary 30
  • 31.
    Stock in Transitand Actual Costing
  • 32.
    Stock in Transitfor (Cross-Company-Code) Sales Processes  During the transportation phase companies, can keep ownership of the materials that are sent to a customer or another company code (visible as stock in transit in this company).  Alternatively, ownership for these materials (during the transportation phase) can be directly transferred to the receiving company code (visible as stock in transit in the receiving company code).  There is also an option to move materials from one stock in transit to another. Delivered by Business Function: Cross-Company-Code Stock Transfer & Actual Costing Create Stock Transport Order * Improvements This functionality enables companies to track and manage ownership changes better when selling materials to a customer or another company code. Companies can more easily fulfill the legal requirement of showing all the stock values in the group. In sales processes and cross-company transfer processes, it was impossible to model stock in transit. The ownership of the material was not reflected correctly in SAP ERP. When selling materials from one company code to another using the two-step approach, the stock value did not automatically appear in the balance sheet after the first step. Customer business challenges Business value Purchaser Create Cross- Company Delivery Perform Goods Issue Perform Goods Receipt Manage Ownership Transfer * * Plant Manager Warehouse Clerk Warehouse Clerk *
  • 33.
    EHP 5: Cross-CompanyCode Material Transfer with Stock in Transit Sender Company Code Receiver Company Code Sender‘s Free Stock In plant In transit In plantIn transit Outbound Delivery Purchase Order Receiver‘s Free Stock Sender‘s Free Stock Receiver‘s Free Stock Sender‘s Transit Stock1 Sender‘s Free Stock Receiver‘s Free Stock Sender‘s Transit Stock2 Receiver‘s Transit Stock Sender‘s Free Stock Receiver‘s Free Stock Receiver‘s Transit Stock3 Immediate Transfer (1-step scenario) Goods stay in sender’s ownership during transfer Ownership changes during the transfer, e.g., upon arrival in the port of destination Ownership changes when leaving the sender 0
  • 34.
    Actual costs and internalprofit in company 1 Actual costs and internal profit in company 2 Actual costs and internal profit for the whole group Cross-Company-Code Actual Costing  By activating this business function, you can extend material and actual costing to run across company codes without losing actual costs and actual cost component split at the company code border. The intercompany sales process allows transfer of the costs and cost component split information from the sending company code to the receiving company code. Calculation of mark-up or intercompany profit in such a value chain is also supported. Delivered by Business Function: Cross-Company-Code Stock Transfer & Actual Costing * * Improvements • Markups and transfer profits visible in cost element • Legal valuation: show transfer profit in actual cost component split • Group valuation: rollup of price variances • Group valuation: rollup of actual cost component split Up to now, customers could not transfer actual cost component split information from one company code to another. Marks-ups could not be used in a cross-company-code sales scenario. Customer business challenges Business value Cost accountant company 1 ** Cost accountant company 2 Group controller and portfolio manager
  • 35.
    Cross-Company Actual Costing Group Company A Company B Costs RawMat. 20 Energy 25 Labor 15 Production 40 Costs Raw Mat. 100 Energy 0 Labor 0 Production 0 Sales process Actual costing provides no visibility into cost structure after intercompany sales The enhanced solution shall ensure cost transparency during intra-company sales by adding freight costs and intra-company profits to the costs incurred in the selling company code to provide a correct valuation from a group perspective Issue Requirement
  • 36.
    General Mechanism ofCost Transfer • The new stock in transit processes secure that the inventory value is always recorded and present in material ledger. • When a stock transfer between company codes is posted, ML records the value from the purchase order in parallel to the cost at the sending side. • The PO price is used for the legal valuation, the cost is used for group valuation. The difference of both is shown as mark-up. • If actual costs at sender are recalculated the mark-up and the group costs are adjusted. Plant 1 Total cost 1000 Materials 500 Labor 400 Overhead 100 Freight CC Markup 0 Sold to Plant 2 Total cost 1100 Materials 1100 Labor 0 Overhead 0 Freight CC Markup 100 PO-Price 1100,-
  • 37.
    Comparison of Views 37 •There are 3 different implementation options: • Legal View (LV): contains the markup, but will show no cost component information from supply chain members outside the own company. Materials purchased from affiliate companies will populate only the material cost component and the markup • Default in currency type 10. • Transparent Legal View (TLV): Contains the markup, and will preserve cost component information coming from affiliate companies if the logistical process allows that. • Activated by a BADI in currency type 10. • Group View (GV): Can be used in parallel to the LV or TLV in a parallel valuation. Does not show a markup, since all processes are treated as if the plants were part of the same organization, without taking company code borders into account. • Currency type 11 or 31. • An implementation can use either LV or TLV. GV can be added for both • The 2 typical scenarios to evaluate would be only TLV or LV + GV
  • 38.
    Valuation Example in3 Views • LV (Legal View) • Total Cost from PO + Freight Cost • Markup shown • CC collapsed Plant 1 Total cost 1000 Materials 500 Labor 400 Overhead 100 Freight CC Markup 0 Sold to Shipper Plant 2 LV TLV GV Total cost 1175 1175 1075 Materials 1100 600 500 Labor 0 400 400 Overhead 0 100 100 Freight 75 75 75 CC Markup 100 100 100 PO Price 1100,- Freight invoice 75,- • TLV (Transparent Legal View) • Total Cost from PO + Freight Cost • Markup shown • CC from Sender • Material cost include markup • GV (Group View) • Total Cost from Sender + Freight • No Markup • CC from Sender
  • 39.
    Screenshots in GroupView Plant 2000 sold 5 PC to plant 1000 within the same group: Cost Info is preserved No Mark-up is shown A transit stock on the sending side was used intermediately
  • 40.
    Screenshots in TransparentLegal View Plant 2000 sold 5 PC to plant 1000 in another company code Consider the different currencies: GBP in plant 200 EUR in plant 1000 Currency conversion will take place using the rate GBP /EUR The PO / Invoice Price was 4000 EUR The cost component info is transferred (TLV is activated via BADI) The consumption cost component for the material in plant 1000 is ‘other cost’. Therefore the ‘Delta Company Code’ is mirrored there
  • 41.
    Usage of TransitStock (Legal View) 1. Material is produced in plant 2000 using 2 materials and one activity 2. Material is moved into the transit stock, keeping its value 3. Material arrives in plant 1000 at the PO price of 4000 EUR
  • 42.
    Topics • Finding OutAbout SAP’s innovations • New Reporting Options with SAP HANA • Material Ledger • CO-PA • New Business Functions for Controlling • FIN_CO_COGM • LOG_MM_SIT • LOG_EAM_OLC • New Business Functions for the User Interfaces in Controlling • FIN_CO_CCMGMT • FIN_CO_CCPLAN, FIN_CO_ORPLAN • Summary 42
  • 43.
  • 44.
    existing header costedorders operation level costing header operation operation operation costs: plan/actual header operation operation operation costs: plan/actual costs: plan/actual costs: plan/actual Operation Costs Update of Plant Maintenance Cost View
  • 45.
    OAA Order The systemstatus I0053 (ACAS in English) is displayed when the order operation is the account assignment object. This is the same indicator as for a PS network with activity level costing. • Indication using System Status
  • 46.
    OAA Order • Accountassignment details and operation costs The account assignment details for an operation are shown on the Account Assignment tab of the operation detail view. Sub-operation account assignment values are inherited from the superior operation. The costs are displayed in the cost tabs on the lower panel.
  • 47.
    existing header costed orders operationlevel costing header operation operation operation costs: plan/actual header operation operation operation costs: plan/actual costs: plan/actual costs: plan/actual ORnnnn ……… Reporting / Transactions / Extraction Transformation of costs (plan/actual) according to value categories OVnnnn OVnnnn OVnnnn ………… Stored in database as Dynamic summation for header values Operation Costs • Update of Plant Maintenance Cost View OAA order costs are only stored for the operation objects. Header totals are dynamically summed as required. No costs are stored on the database for the OAA Order object.
  • 48.
    Reporting The operation costoverview report shows costs for all operations by value category. The report can be run as a transaction IW40N and include sub-orders. • Operation overview report
  • 49.
    Topics • Finding OutAbout SAP’s innovations • New Reporting Options with SAP HANA • Material Ledger • CO-PA • New Business Functions for Controlling • FIN_CO_COGM • LOG_MM_SIT • LOG_EAM_OLC • New Business Functions for the User Interfaces in Controlling • FIN_CO_CCMGMT • FIN_CO_CCPLAN, FIN_CO_ORPLAN • Summary 49
  • 50.
    Activate Business Functionand Relevant WebDynpros! 50 Use transaction SICF to activate the relevant webdynpro applications
  • 51.
    Copy the WebDynprosfrom the Sample Roles to Your Controller Roles 51 Copy the delivered master data applications from the role SAP_CO_INTERNAL_CONTRO LLER to your roles
  • 52.
    Topics • Finding OutAbout SAP’s innovations • New Reporting Options with SAP HANA • Material Ledger • CO-PA • New Business Functions for Controlling • FIN_CO_COGM • LOG_MM_SIT • LOG_EAM_OLC • New Business Functions for the User Interfaces in Controlling • FIN_CO_CCMGMT • FIN_CO_CCPLAN, FIN_CO_ORPLAN • Summary 52
  • 53.
    WebDynpro Application forCost Center Maintenance 53 Rolle
  • 54.
  • 55.
    WebDynpro Application forCost Center Hierarchies 55
  • 56.
    Inactive Versions 56 Changes canbe made prior to a reorganization and stored as an inactive version
  • 57.
    Inactive Versions (cont.) 57 Choose between versionsin the application and in, e.g., Report Writer
  • 58.
    Web Dynpro Applicationfor Internal Orders 58
  • 59.
    Web Dynpro Applicationfor Activity Types 59
  • 60.
    Topics • Finding OutAbout SAP’s innovations • New Reporting Options with SAP HANA • Material Ledger • CO-PA • New Business Functions for Controlling • FIN_CO_COGM • LOG_MM_SIT • LOG_EAM_OLC • New Business Functions for the User Interfaces in Controlling • FIN_CO_CCMGMT • FIN_CO_CCPLAN, FIN_CO_ORPLAN • Summary 60
  • 61.
  • 62.
  • 63.
    Web and ExcelFrontend in EhP6 • Both frontends use the same backend planning model • Same planning queries and same planning functions • All features described are available in both frontends Web Dynpro Analysis Office
  • 64.
    Query Adaptations • Customerswant to see: • Actual values • Plan values from other years/versions • Formula columns • „Planning is like reporting with editable columns“
  • 65.
    Topics • Finding OutAbout SAP’s innovations • New Reporting Options with SAP HANA • Material Ledger • CO-PA • New Business Functions for Controlling • FIN_CO_COGM • LOG_MM_SIT • LOG_EAM_OLC • New Business Functions for the User Interfaces in Controlling • FIN_CO_CCMGMT • FIN_CO_CCPLAN, FIN_CO_ORPLAN • Summary 65
  • 66.
    SAP Resources • http://help.sap.com/businesssuite> SAP ERP • Business Functions in SAP ERP > Enterprise Business Functions > Accounting • CO, Parallel Cost of Goods Manufactured • CO, Cost Center Managerment • CO, Cost Center Planning • CO, Order Planning • Business Functions in SAP ERP > Enterprise Business Functions > Logistics • MM, Stock in Transit and Actual Costing • Operation Account Assignment
  • 67.
    Resources (cont.) 67 • www.financialsexpertonline.com/ •Janet Salmon, “Provide Parallel Product Costs for Inventory Valuation in the SAP General Ledger” (Financials Expert, October 2009). • Janet Salmon, “Use Alternative Valuation Runs in the Material Ledger to Smooth Seasonal Price Variances” (Financials Expert, November 2007). • Marco Jordy “Don’t Wait Until After Go-live to Set Up Cross-Company Code Controlling” (Financials Expert, September 2006). • Ashim A.Nanda “Cater to Arm’s Length Standards by automated Intercompany Transfer Pricing Design” (Financials Expert, October 2010). • Janet Salmon, “Capture Service and Maintenance Costs at Operation Level from SAP Enhancement Package 5” (Financials Expert, December 2012). • Janet Salmon, “Refresh the Look of the Master Data in Cost Center Accounting with a New Business Function” (Financials Expert, February 2013).
  • 68.
    Resources (cont.) 68 • https://scn.sap.com/docs/DOC-32680 •http://scn.sap.com/docs/DOC-29523 • SAP Notes 1836149, 1719702 (project planning) and 1777947 (cost center planning)
  • 69.
    Other Resources Janet Salmon,Controlling with SAP – Practical Guide ISBN: ISBN 978-1-4932-1012-1 https://www.sap-press.com/controlling-with-sap- practical-guide_3625/ Martin Munzel, New SAP Controlling Planning Interface http://co.planning.espresso-tutorials.com
  • 70.
    Five Key Ideas 70 •Use SAP Innovation Discovery to find out about Enhancement Packages, SAP Notes and other innovations • Consider using virtual InfoProviders to improve your end user reporting • If you are a global company, explore the new functions for Actual Costing and Multiple Valuations • Don’t forget that some of the CO-related innovations might be in Logistics because of the integrated nature of SAP ERP • Consider updating the look of your user interfaces and planning applications, especially if you are bringing new users online
  • 71.
    Questions • Now: • Askquestions now for immediate answers • Later: • Janet.dorothy.salmon@sap.com 71 Q&A
  • 72.
    Disclaimer SAP®, R/3, mySAP,mySAP.com, xApps, xApp, SAP NetWeaver®, Duet®, PartnerEdge, and other SAP® products and services mentioned herein as well as their respective logos are trademarks or registered trademarks of SAP AG in Germany and in several other countries all over the world. All other product and service names mentioned are the trademarks of their respective companies. ERP Corp is neither owned nor controlled by SAP.