Cutover Strategy In SAP FICO
Here we try to comprehensively cover the SAP Go live strategy as a reference guide as every
business are unique and as a SAP FICO Consultant, you need to adjust accordingly.
The Go Live strategy comprises of the following:-
1) Cut off procedure
2) Pre-Go live checks.
What is meant by cut off date?
SAP system is configured as per the requirement of the client. The system is ready for the client
to use. The client now needs to migrate from the Old system (Legacy system) to the new SAP
system.
The migration from the old system to the new system is known as cut off date.
The old system is switched off and the new SAP system is switched on.
The data will be migrated from the old system to SAP. The data will henceforth be entered in
the new SAP system.
To have a smooth switch over from the Legacy system to the new SAP systems are devised the
cut off procedure.
What is meant by Pre Go live check?
It is ensuring that SAP Production system is ready to go live smoothly.
Let proceed then.
Scenario
A Ltd. is a company implementing SAP system.
The company follows a January - December period for preparing financial accounts.
Therefore the go live data decided for A Ltd is 2nd January 2096.
The Trial balance will be uploaded with date as on 31st December 2095.
The Trial balance will consist only of balance sheet items since all the expense items are already
transferred to the retained earnings account in the old system.
The activities are divided as follows:-
1) Pre Go live activities
A Ltd will upload the GL codes, cost elements in the production system on 1st December 2095.
A Ltd will complete upload of all the material masters with all the views in the production
system by 2nd December 2095.
All Bill of Material, Routings will be uploaded in the production system by 4th December 2095.
The material masters for raw and packing material will be uploaded with the moving average
prices on 4th December 2095.
The cost center Plan will be uploaded, allocation cycles and activity price calculation will be
done by 6th December 2095.
Product cost calculation will be conducted from 7th Dec 2095 to 20th December 2095 to get the
correct cost calculation from system.
All other masters will be uploaded into the production system from 5th December 2095 and
completed by 18th December 2095.
2) Cut off activities
The company closes it sales on 26th December 2095.
The company stops all its stock movement on 26th December 2095 up to 1st January 2096.
All open purchase orders will be uploaded on 28th December 2095.
The provision for stock received and invoice not received will be accounted in a separate GL
code (different than the GR/IR).
The stocks will be finalized by 29th December 2095.
The company closes it old (legacy) system on 30th December 2095.
The stocks will be uploaded on 31st December 2095 and 1st Jan 2096.
The standard cost estimate will be marked and released on 2nd January 2096.
The system is available for data entry and operation to the users from 2nd January 2096.
Accounts Receivable open items will be uploaded from 1st January 2096 to 3rd January 2096.
Thus Accounts Receivable is available from 4th January 2096 to account for customer incoming
payment.
Accounts Payable open items will be uploaded from 3rd January 2096 to 4th January 2096.
Accounts Payable is available for payment from 5th January 2096.
Fixed assets are uploaded on 5th January 2096.
The Remaining GL Balances are uploaded on 7th January 2096.
Thus entire data take over activities are to be completed by 7th January 2096.
We will divide the activities as follows:-
A) Pre-Go Live activities
B) Pre-Go Live checks
C) Upload transaction data into the system
A) Pre-Go Live activities
1. Master data Load into Production system
Ensure all the master data is loaded into the production system.
We will broadly cover the master data which needs to be loaded and the module responsible.
Material Master (SAP Material Management)
Basic responsibility MM: All the respective views of the material masters the other modules
responsible . Ensure that all the required views are uploaded.
GL codes - FI
Customer Master - FI (accounting view) and SD (sales view)
Vendor Master - FI (accounting view) and MM (purchasing view)
Cost elements - CO
Secondary cost elements - CO
Profit centers - CO
Cost center - CO
Activity type - CO
Bill of Material - PP
Work Center/ Resource - PP
Routing / Master Recipe - PP
Purchasing Info Record - MM
Service Master - MM
Bank Master - FI
Quality Info Record - QM
Quality Inspection plan
2. Upload Cost center plan
Cost center plan must be updated through transaction code KP06 or using excel upload.
3. Execute the allocation cycles within cost center accounting
The plan allocation cycles (distribution, assessment) must be executed within the cost center
accounting module. This will allocate the costs from the service cost center to the receiver cost
center.
4. Update planned activity
After executing of the plan allocation cycles, the production cost centers are now ready with the
planned costs.
You can now calculate the activity prices through the system or manually update the planned
prices by calculating it outside.
The planned activity must be updated through transaction code KP26.
5. Calculate Activity prices
Calculate the activity prices using transaction code KSPI.
6. Execute product costing run
The product costing run will be executed for all semi-finished and finished materials in the
system using transaction code CK40N. This should be run after all the BOM and Master recipe
are uploaded.
The product cost finalization takes a long time and should begin well in advance before the go
live date. Normally the product costing run has to be executed again and again (3-4 times) since
data needs to be corrected and costs have to be compared with the existing legacy cost.
The possible errors in the product costing run are:-
1) Moving average prices or planned prices are not correctly maintained in the material masters.
2) Incorrect quantities in the Bill of Materials, incorrect base unit quantity in the Bill of Material.
3) Incorrect quantities (hours, KWH etc.) for activities in the Routing or Master recipe.
4) Incorrect alternate unit of Measure
The product costing is calculated and made ready. The actual Mark and release will happen on
after the stocks are uploaded into the system.
B) Pre-Go Live activities
1. Ensure all the customizing request are in the production system. Check that all the
customizing request are gone in the system and no major requests are pending. Request relating
to reports being developed can be transported as and when the reports are ready.
2. Ensure all the number ranges for all the modules have been maintained in the production
system.
3. Ensure that Operating concern has been generated.
4. Ensure that all the Customer Master data is loaded.
5. Ensure all material masters (all material types) have been loaded.
6. Ensure that all the Vendor Master data is loaded.
C) Upload transaction data into system
1. Upload Open purchase orders
Open purchase orders can well be uploaded into the system in advance before the cut off date if
no invoices are expected.
2. Stock upload
Stock upload happens in 2 steps:-
1) Finished goods: The standard prices are first uploaded through MR21 or through an ABAP
program which also uses MR21. The stock quantities are uploaded using movement type 561
through an ABAP program which calls transaction MB1C.
2) Raw Material, packing Material, stores and spare parts: The quantities and values are
uploaded at the same time using an ABAP program which calls transaction MB1C.
The stock upload will generate the following entry in the system:-
Finished goods stock a/c Debit
Semi-Finished goods stock a/c Debit
Raw Material stock a/c Debit
Packing Material stock a/c Debit
Stores and spares a/c Debit
Data take over Credit
3. Mark and Release the cost estimate
After the stock is uploaded into the system, the standard cost estimate will be marked and
released into the material master using transaction code CK40N.
4. Upload Accounts Receivable and Accounts Payable open items
The Accounts Receivable and Accounts Payable open items are uploaded through LSMW which
calls transaction code F-02 GL Account posting. The profit center is captured in the data take
over account. Baseline date must be captured, which will determine aging based on number of
days mentioned in the payment terms.
The accounting entry for Accounts Receivable open item upload is:-
Customer a/c (not GL) Debit
Data takeover a/c Credit
The accounting entry for Accounts Payable open item upload is:-
Data takeover a/c Debit
Vendor a/c (not GL) Credit
5. Asset Master and value upload
Asset Master is a special case of upload where in you upload not only the master data but also
the values. The total cost and accumulated depreciation are also uploaded at the same time.
This is done through transaction code AS91.
We will explain how it is done.
5.1 The upload of asset master and values through AS91
This upload of asset masters along with the values will not update the FI General Ledger. The FI
- GL entry balance update will be passed through another transaction.
5.2 Transfer Asset balance into profit center
Once the asset master along with the values is uploaded, the opening balance for the asset needs
to be transferred to profit center.
The asset balances opening balances are transferred into profit center accounting through
transaction code 1KEI.
5.3 Remove the GL codes for asset from 3KEH table
Remove the Asset reconciliation codes from the transaction code 3KEH. This is required because
a manual FI entry will be passed in the next step, which will duplicate posting into PCA for the
assets.
5.4 Update the FI entry for asset through transaction OASV.
We give an example of how a GL entry passed for Fixed asset upload:-
Let us take Plant and Machinery
Plant and Machinery a/c Dr 100,000
Accumulated depreciation a/c Cr 30,000
Data takeover a/c Cr 70,000
5.5 Reinstate the GL codes for asset in 3KEH
After passing the entry for asset upload update the asset reconciliation accounts in transaction
code 3KEH.
6. Upload General Ledger account balances
Finally we upload the remaining General Ledger account balances other than Fixed Assets,
Stock, Accounts Receivable and Accounts Payable. This is again uploaded through an LSMW
program which calls transaction code F-02 GL.
Posting.
Let us take an example for the accounting entry passed:-
Data takeover a/c Debit 550,000 (Balancing figure)
Cash a/c Debit 10,000
Bank a/c Debit 50,000
Advances Debit 90,000
Share capital a/c Credit 100,000
Short term Loan a/c Credit 200,000
Long term loan a/c Credit 400,000
The Data takeover will become zero on upload of this entry.

More Related Content

What's hot

Sap fi automatic payment configuration
Sap fi   automatic payment configurationSap fi   automatic payment configuration
Sap fi automatic payment configurationExpertPlug
 
S4 HANA Finance Contents
S4 HANA Finance Contents S4 HANA Finance Contents
S4 HANA Finance Contents Pradeep Hota
 
Copa configuration
Copa configurationCopa configuration
Copa configurationMithun Roy
 
New Asset Accounting in S4 HANA
New Asset Accounting in S4 HANANew Asset Accounting in S4 HANA
New Asset Accounting in S4 HANAraman2664
 
SAP CO step by step config guide & user manual part 1
SAP CO step by step config guide & user manual part 1SAP CO step by step config guide & user manual part 1
SAP CO step by step config guide & user manual part 1Srinivas Kasireddy
 
Configure and customize automatic credit management
Configure and customize automatic credit managementConfigure and customize automatic credit management
Configure and customize automatic credit managementAndrea Graziani
 
SAP Validation and substitution
SAP Validation and  substitution SAP Validation and  substitution
SAP Validation and substitution Hari Krishna
 
Project Systems: Materials
Project Systems: MaterialsProject Systems: Materials
Project Systems: Materialsvnhardik
 
Fico troubleshooting
Fico troubleshootingFico troubleshooting
Fico troubleshootingvinayk_35919
 
SAP CO Configuration Guide - Exclusive Document
SAP CO Configuration Guide - Exclusive DocumentSAP CO Configuration Guide - Exclusive Document
SAP CO Configuration Guide - Exclusive Documentsapdocs. info
 
FI & MM integration
FI & MM integrationFI & MM integration
FI & MM integrationsekhardatta
 
80467542 asset-closing-in-sap-fico
80467542 asset-closing-in-sap-fico80467542 asset-closing-in-sap-fico
80467542 asset-closing-in-sap-ficoSrinivas Y
 
SAP Roll Out - An Introduction and Advantages
SAP Roll Out - An Introduction and AdvantagesSAP Roll Out - An Introduction and Advantages
SAP Roll Out - An Introduction and Advantagesanjalirao366
 
SAP Treasury Configuration and End User Manual
SAP Treasury Configuration and End User ManualSAP Treasury Configuration and End User Manual
SAP Treasury Configuration and End User ManualRamanareddy Anathapur
 
Asset management in sap
Asset management in sapAsset management in sap
Asset management in sapAlice Mary Bag
 
Introduction to sap project systems
Introduction to sap project systemsIntroduction to sap project systems
Introduction to sap project systemsSoumya De
 
Po vendor down pay process SAP
Po vendor down pay process SAP Po vendor down pay process SAP
Po vendor down pay process SAP Jay Pal
 
Account Assignment Category
Account Assignment CategoryAccount Assignment Category
Account Assignment CategoryRameswara Vedula
 

What's hot (20)

Sap fi automatic payment configuration
Sap fi   automatic payment configurationSap fi   automatic payment configuration
Sap fi automatic payment configuration
 
S4 HANA Finance Contents
S4 HANA Finance Contents S4 HANA Finance Contents
S4 HANA Finance Contents
 
Copa configuration
Copa configurationCopa configuration
Copa configuration
 
New Asset Accounting in S4 HANA
New Asset Accounting in S4 HANANew Asset Accounting in S4 HANA
New Asset Accounting in S4 HANA
 
SAP CO step by step config guide & user manual part 1
SAP CO step by step config guide & user manual part 1SAP CO step by step config guide & user manual part 1
SAP CO step by step config guide & user manual part 1
 
Configure and customize automatic credit management
Configure and customize automatic credit managementConfigure and customize automatic credit management
Configure and customize automatic credit management
 
SAP Project system.pptx
SAP Project system.pptxSAP Project system.pptx
SAP Project system.pptx
 
SAP Validation and substitution
SAP Validation and  substitution SAP Validation and  substitution
SAP Validation and substitution
 
Project Systems: Materials
Project Systems: MaterialsProject Systems: Materials
Project Systems: Materials
 
Fico troubleshooting
Fico troubleshootingFico troubleshooting
Fico troubleshooting
 
SAP CO Configuration Guide - Exclusive Document
SAP CO Configuration Guide - Exclusive DocumentSAP CO Configuration Guide - Exclusive Document
SAP CO Configuration Guide - Exclusive Document
 
Sap fi overview
Sap fi overviewSap fi overview
Sap fi overview
 
FI & MM integration
FI & MM integrationFI & MM integration
FI & MM integration
 
80467542 asset-closing-in-sap-fico
80467542 asset-closing-in-sap-fico80467542 asset-closing-in-sap-fico
80467542 asset-closing-in-sap-fico
 
SAP Roll Out - An Introduction and Advantages
SAP Roll Out - An Introduction and AdvantagesSAP Roll Out - An Introduction and Advantages
SAP Roll Out - An Introduction and Advantages
 
SAP Treasury Configuration and End User Manual
SAP Treasury Configuration and End User ManualSAP Treasury Configuration and End User Manual
SAP Treasury Configuration and End User Manual
 
Asset management in sap
Asset management in sapAsset management in sap
Asset management in sap
 
Introduction to sap project systems
Introduction to sap project systemsIntroduction to sap project systems
Introduction to sap project systems
 
Po vendor down pay process SAP
Po vendor down pay process SAP Po vendor down pay process SAP
Po vendor down pay process SAP
 
Account Assignment Category
Account Assignment CategoryAccount Assignment Category
Account Assignment Category
 

Similar to Cutover strategy in sap fico

cutoverstrategy - Copy.ppt
cutoverstrategy - Copy.pptcutoverstrategy - Copy.ppt
cutoverstrategy - Copy.pptmaheshgaikwad93
 
SAP S/4 Simple Finance Implementation Strategy: Central Finance Deployment Op...
SAP S/4 Simple Finance Implementation Strategy: Central Finance Deployment Op...SAP S/4 Simple Finance Implementation Strategy: Central Finance Deployment Op...
SAP S/4 Simple Finance Implementation Strategy: Central Finance Deployment Op...Sanjay Kumar PMP
 
Sage 100 User Group – Nov 2017
Sage 100 User Group – Nov 2017Sage 100 User Group – Nov 2017
Sage 100 User Group – Nov 2017BCS ProSoft
 
HOLMES INSTITUTE FACULTY OF HIGHER EDUCATION .docx
HOLMES INSTITUTE  FACULTY OF HIGHER EDUCATION .docxHOLMES INSTITUTE  FACULTY OF HIGHER EDUCATION .docx
HOLMES INSTITUTE FACULTY OF HIGHER EDUCATION .docxmadlynplamondon
 
55811936 product-costing-cost-estimation-in-sap
55811936 product-costing-cost-estimation-in-sap55811936 product-costing-cost-estimation-in-sap
55811936 product-costing-cost-estimation-in-sapPepa Pencheva
 
Product costing343411327309984
Product costing343411327309984Product costing343411327309984
Product costing343411327309984shivaprakash
 
Production Module & Report Completion Sub-Module. .pptx
Production Module & Report Completion Sub-Module. .pptxProduction Module & Report Completion Sub-Module. .pptx
Production Module & Report Completion Sub-Module. .pptxLamees EL- Ghazoly
 
Productcostingsample
ProductcostingsampleProductcostingsample
Productcostingsamplejayaramreddy
 
J62_S4HANA2021_BPD_EN_FR.pdf
J62_S4HANA2021_BPD_EN_FR.pdfJ62_S4HANA2021_BPD_EN_FR.pdf
J62_S4HANA2021_BPD_EN_FR.pdfNareshKumar564728
 
Calculating cost of goods sold in manufacturing
Calculating cost of goods sold in manufacturingCalculating cost of goods sold in manufacturing
Calculating cost of goods sold in manufacturingMRPeasy
 
Engineering Product Mfg Co. Leverages Tally.ERP9 to run its Mfg Operations Im...
Engineering Product Mfg Co. Leverages Tally.ERP9 to run its Mfg Operations Im...Engineering Product Mfg Co. Leverages Tally.ERP9 to run its Mfg Operations Im...
Engineering Product Mfg Co. Leverages Tally.ERP9 to run its Mfg Operations Im...Bhavin Shah
 
Engineering Product Mfg Co. Leverages Tally.ERP9 to run its Mfg Operations Im...
Engineering Product Mfg Co. Leverages Tally.ERP9 to run its Mfg Operations Im...Engineering Product Mfg Co. Leverages Tally.ERP9 to run its Mfg Operations Im...
Engineering Product Mfg Co. Leverages Tally.ERP9 to run its Mfg Operations Im...Bhavin Shah
 
Transforming supply chain Harish Bawari - Hero MotoCorp May 2016
Transforming supply chain Harish Bawari - Hero MotoCorp May 2016Transforming supply chain Harish Bawari - Hero MotoCorp May 2016
Transforming supply chain Harish Bawari - Hero MotoCorp May 2016INDUSCommunity
 
SAP FICO Interview Questions By Garudatrainings
SAP FICO Interview Questions By GarudatrainingsSAP FICO Interview Questions By Garudatrainings
SAP FICO Interview Questions By Garudatrainingspiyushchawala
 
Sap scm ewm na muk 11 02
Sap scm ewm na muk 11  02 Sap scm ewm na muk 11  02
Sap scm ewm na muk 11 02 Gaddam Gaddam
 
Time based progress analysis in project system (revenue recognition) sap blogs
Time based progress analysis in project system (revenue recognition)   sap blogsTime based progress analysis in project system (revenue recognition)   sap blogs
Time based progress analysis in project system (revenue recognition) sap blogsVenu Vemula
 
SAP MM IM Physical inventory -cycle counting
SAP MM IM Physical inventory -cycle countingSAP MM IM Physical inventory -cycle counting
SAP MM IM Physical inventory -cycle countingLokesh Modem
 

Similar to Cutover strategy in sap fico (20)

cutoverstrategy - Copy.ppt
cutoverstrategy - Copy.pptcutoverstrategy - Copy.ppt
cutoverstrategy - Copy.ppt
 
cutoverstrategy.ppt
cutoverstrategy.pptcutoverstrategy.ppt
cutoverstrategy.ppt
 
SAP S/4 Simple Finance Implementation Strategy: Central Finance Deployment Op...
SAP S/4 Simple Finance Implementation Strategy: Central Finance Deployment Op...SAP S/4 Simple Finance Implementation Strategy: Central Finance Deployment Op...
SAP S/4 Simple Finance Implementation Strategy: Central Finance Deployment Op...
 
Sage 100 User Group – Nov 2017
Sage 100 User Group – Nov 2017Sage 100 User Group – Nov 2017
Sage 100 User Group – Nov 2017
 
SAP Treasury
SAP TreasurySAP Treasury
SAP Treasury
 
HOLMES INSTITUTE FACULTY OF HIGHER EDUCATION .docx
HOLMES INSTITUTE  FACULTY OF HIGHER EDUCATION .docxHOLMES INSTITUTE  FACULTY OF HIGHER EDUCATION .docx
HOLMES INSTITUTE FACULTY OF HIGHER EDUCATION .docx
 
55811936 product-costing-cost-estimation-in-sap
55811936 product-costing-cost-estimation-in-sap55811936 product-costing-cost-estimation-in-sap
55811936 product-costing-cost-estimation-in-sap
 
Product costing343411327309984
Product costing343411327309984Product costing343411327309984
Product costing343411327309984
 
Production Module & Report Completion Sub-Module. .pptx
Production Module & Report Completion Sub-Module. .pptxProduction Module & Report Completion Sub-Module. .pptx
Production Module & Report Completion Sub-Module. .pptx
 
Gsp workshop
Gsp workshopGsp workshop
Gsp workshop
 
Productcostingsample
ProductcostingsampleProductcostingsample
Productcostingsample
 
J62_S4HANA2021_BPD_EN_FR.pdf
J62_S4HANA2021_BPD_EN_FR.pdfJ62_S4HANA2021_BPD_EN_FR.pdf
J62_S4HANA2021_BPD_EN_FR.pdf
 
Calculating cost of goods sold in manufacturing
Calculating cost of goods sold in manufacturingCalculating cost of goods sold in manufacturing
Calculating cost of goods sold in manufacturing
 
Engineering Product Mfg Co. Leverages Tally.ERP9 to run its Mfg Operations Im...
Engineering Product Mfg Co. Leverages Tally.ERP9 to run its Mfg Operations Im...Engineering Product Mfg Co. Leverages Tally.ERP9 to run its Mfg Operations Im...
Engineering Product Mfg Co. Leverages Tally.ERP9 to run its Mfg Operations Im...
 
Engineering Product Mfg Co. Leverages Tally.ERP9 to run its Mfg Operations Im...
Engineering Product Mfg Co. Leverages Tally.ERP9 to run its Mfg Operations Im...Engineering Product Mfg Co. Leverages Tally.ERP9 to run its Mfg Operations Im...
Engineering Product Mfg Co. Leverages Tally.ERP9 to run its Mfg Operations Im...
 
Transforming supply chain Harish Bawari - Hero MotoCorp May 2016
Transforming supply chain Harish Bawari - Hero MotoCorp May 2016Transforming supply chain Harish Bawari - Hero MotoCorp May 2016
Transforming supply chain Harish Bawari - Hero MotoCorp May 2016
 
SAP FICO Interview Questions By Garudatrainings
SAP FICO Interview Questions By GarudatrainingsSAP FICO Interview Questions By Garudatrainings
SAP FICO Interview Questions By Garudatrainings
 
Sap scm ewm na muk 11 02
Sap scm ewm na muk 11  02 Sap scm ewm na muk 11  02
Sap scm ewm na muk 11 02
 
Time based progress analysis in project system (revenue recognition) sap blogs
Time based progress analysis in project system (revenue recognition)   sap blogsTime based progress analysis in project system (revenue recognition)   sap blogs
Time based progress analysis in project system (revenue recognition) sap blogs
 
SAP MM IM Physical inventory -cycle counting
SAP MM IM Physical inventory -cycle countingSAP MM IM Physical inventory -cycle counting
SAP MM IM Physical inventory -cycle counting
 

Recently uploaded

VIP Call Girl Bhiwandi Aashi 8250192130 Independent Escort Service Bhiwandi
VIP Call Girl Bhiwandi Aashi 8250192130 Independent Escort Service BhiwandiVIP Call Girl Bhiwandi Aashi 8250192130 Independent Escort Service Bhiwandi
VIP Call Girl Bhiwandi Aashi 8250192130 Independent Escort Service BhiwandiSuhani Kapoor
 
Delhi Call Girls South Delhi 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
Delhi Call Girls South Delhi 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip CallDelhi Call Girls South Delhi 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
Delhi Call Girls South Delhi 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Callshivangimorya083
 
CFO_SB_Career History_Multi Sector Experience
CFO_SB_Career History_Multi Sector ExperienceCFO_SB_Career History_Multi Sector Experience
CFO_SB_Career History_Multi Sector ExperienceSanjay Bokadia
 
Delhi Call Girls South Ex 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
Delhi Call Girls South Ex 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip CallDelhi Call Girls South Ex 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
Delhi Call Girls South Ex 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Callshivangimorya083
 
Delhi Call Girls Patparganj 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
Delhi Call Girls Patparganj 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip CallDelhi Call Girls Patparganj 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
Delhi Call Girls Patparganj 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Callshivangimorya083
 
VIP Call Girls in Jamshedpur Aarohi 8250192130 Independent Escort Service Jam...
VIP Call Girls in Jamshedpur Aarohi 8250192130 Independent Escort Service Jam...VIP Call Girls in Jamshedpur Aarohi 8250192130 Independent Escort Service Jam...
VIP Call Girls in Jamshedpur Aarohi 8250192130 Independent Escort Service Jam...Suhani Kapoor
 
内布拉斯加大学林肯分校毕业证录取书( 退学 )学位证书硕士
内布拉斯加大学林肯分校毕业证录取书( 退学 )学位证书硕士内布拉斯加大学林肯分校毕业证录取书( 退学 )学位证书硕士
内布拉斯加大学林肯分校毕业证录取书( 退学 )学位证书硕士obuhobo
 
CALL ON ➥8923113531 🔝Call Girls Gosainganj Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Gosainganj Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Gosainganj Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Gosainganj Lucknow best sexual serviceanilsa9823
 
Delhi Call Girls Preet Vihar 9711199171 ☎✔👌✔ Whatsapp Body to body massage wi...
Delhi Call Girls Preet Vihar 9711199171 ☎✔👌✔ Whatsapp Body to body massage wi...Delhi Call Girls Preet Vihar 9711199171 ☎✔👌✔ Whatsapp Body to body massage wi...
Delhi Call Girls Preet Vihar 9711199171 ☎✔👌✔ Whatsapp Body to body massage wi...shivangimorya083
 
Notes of bca Question paper for exams and tests
Notes of bca Question paper for exams and testsNotes of bca Question paper for exams and tests
Notes of bca Question paper for exams and testspriyanshukumar97908
 
VIP Call Girls Service Jamshedpur Aishwarya 8250192130 Independent Escort Ser...
VIP Call Girls Service Jamshedpur Aishwarya 8250192130 Independent Escort Ser...VIP Call Girls Service Jamshedpur Aishwarya 8250192130 Independent Escort Ser...
VIP Call Girls Service Jamshedpur Aishwarya 8250192130 Independent Escort Ser...Suhani Kapoor
 
Call Girls In Bhikaji Cama Place 24/7✡️9711147426✡️ Escorts Service
Call Girls In Bhikaji Cama Place 24/7✡️9711147426✡️ Escorts ServiceCall Girls In Bhikaji Cama Place 24/7✡️9711147426✡️ Escorts Service
Call Girls In Bhikaji Cama Place 24/7✡️9711147426✡️ Escorts Servicejennyeacort
 
Vip Modals Call Girls (Delhi) Rohini 9711199171✔️ Full night Service for one...
Vip  Modals Call Girls (Delhi) Rohini 9711199171✔️ Full night Service for one...Vip  Modals Call Girls (Delhi) Rohini 9711199171✔️ Full night Service for one...
Vip Modals Call Girls (Delhi) Rohini 9711199171✔️ Full night Service for one...shivangimorya083
 
Experience Certificate - Marketing Analyst-Soham Mondal.pdf
Experience Certificate - Marketing Analyst-Soham Mondal.pdfExperience Certificate - Marketing Analyst-Soham Mondal.pdf
Experience Certificate - Marketing Analyst-Soham Mondal.pdfSoham Mondal
 
do's and don'ts in Telephone Interview of Job
do's and don'ts in Telephone Interview of Jobdo's and don'ts in Telephone Interview of Job
do's and don'ts in Telephone Interview of JobRemote DBA Services
 
PM Job Search Council Info Session - PMI Silver Spring Chapter
PM Job Search Council Info Session - PMI Silver Spring ChapterPM Job Search Council Info Session - PMI Silver Spring Chapter
PM Job Search Council Info Session - PMI Silver Spring ChapterHector Del Castillo, CPM, CPMM
 
VIP Call Girls Firozabad Aaradhya 8250192130 Independent Escort Service Firoz...
VIP Call Girls Firozabad Aaradhya 8250192130 Independent Escort Service Firoz...VIP Call Girls Firozabad Aaradhya 8250192130 Independent Escort Service Firoz...
VIP Call Girls Firozabad Aaradhya 8250192130 Independent Escort Service Firoz...Suhani Kapoor
 
Full Masii Russian Call Girls In Dwarka (Delhi) 9711199012 💋✔💕😘We are availab...
Full Masii Russian Call Girls In Dwarka (Delhi) 9711199012 💋✔💕😘We are availab...Full Masii Russian Call Girls In Dwarka (Delhi) 9711199012 💋✔💕😘We are availab...
Full Masii Russian Call Girls In Dwarka (Delhi) 9711199012 💋✔💕😘We are availab...shivangimorya083
 
Sonam +91-9537192988-Mind-blowing skills and techniques of Ahmedabad Call Girls
Sonam +91-9537192988-Mind-blowing skills and techniques of Ahmedabad Call GirlsSonam +91-9537192988-Mind-blowing skills and techniques of Ahmedabad Call Girls
Sonam +91-9537192988-Mind-blowing skills and techniques of Ahmedabad Call GirlsNiya Khan
 

Recently uploaded (20)

VIP Call Girl Bhiwandi Aashi 8250192130 Independent Escort Service Bhiwandi
VIP Call Girl Bhiwandi Aashi 8250192130 Independent Escort Service BhiwandiVIP Call Girl Bhiwandi Aashi 8250192130 Independent Escort Service Bhiwandi
VIP Call Girl Bhiwandi Aashi 8250192130 Independent Escort Service Bhiwandi
 
Delhi Call Girls South Delhi 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
Delhi Call Girls South Delhi 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip CallDelhi Call Girls South Delhi 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
Delhi Call Girls South Delhi 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
 
CFO_SB_Career History_Multi Sector Experience
CFO_SB_Career History_Multi Sector ExperienceCFO_SB_Career History_Multi Sector Experience
CFO_SB_Career History_Multi Sector Experience
 
Delhi Call Girls South Ex 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
Delhi Call Girls South Ex 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip CallDelhi Call Girls South Ex 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
Delhi Call Girls South Ex 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
 
Call Girls In Prashant Vihar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In Prashant Vihar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCeCall Girls In Prashant Vihar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In Prashant Vihar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
 
Delhi Call Girls Patparganj 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
Delhi Call Girls Patparganj 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip CallDelhi Call Girls Patparganj 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
Delhi Call Girls Patparganj 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
 
VIP Call Girls in Jamshedpur Aarohi 8250192130 Independent Escort Service Jam...
VIP Call Girls in Jamshedpur Aarohi 8250192130 Independent Escort Service Jam...VIP Call Girls in Jamshedpur Aarohi 8250192130 Independent Escort Service Jam...
VIP Call Girls in Jamshedpur Aarohi 8250192130 Independent Escort Service Jam...
 
内布拉斯加大学林肯分校毕业证录取书( 退学 )学位证书硕士
内布拉斯加大学林肯分校毕业证录取书( 退学 )学位证书硕士内布拉斯加大学林肯分校毕业证录取书( 退学 )学位证书硕士
内布拉斯加大学林肯分校毕业证录取书( 退学 )学位证书硕士
 
CALL ON ➥8923113531 🔝Call Girls Gosainganj Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Gosainganj Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Gosainganj Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Gosainganj Lucknow best sexual service
 
Delhi Call Girls Preet Vihar 9711199171 ☎✔👌✔ Whatsapp Body to body massage wi...
Delhi Call Girls Preet Vihar 9711199171 ☎✔👌✔ Whatsapp Body to body massage wi...Delhi Call Girls Preet Vihar 9711199171 ☎✔👌✔ Whatsapp Body to body massage wi...
Delhi Call Girls Preet Vihar 9711199171 ☎✔👌✔ Whatsapp Body to body massage wi...
 
Notes of bca Question paper for exams and tests
Notes of bca Question paper for exams and testsNotes of bca Question paper for exams and tests
Notes of bca Question paper for exams and tests
 
VIP Call Girls Service Jamshedpur Aishwarya 8250192130 Independent Escort Ser...
VIP Call Girls Service Jamshedpur Aishwarya 8250192130 Independent Escort Ser...VIP Call Girls Service Jamshedpur Aishwarya 8250192130 Independent Escort Ser...
VIP Call Girls Service Jamshedpur Aishwarya 8250192130 Independent Escort Ser...
 
Call Girls In Bhikaji Cama Place 24/7✡️9711147426✡️ Escorts Service
Call Girls In Bhikaji Cama Place 24/7✡️9711147426✡️ Escorts ServiceCall Girls In Bhikaji Cama Place 24/7✡️9711147426✡️ Escorts Service
Call Girls In Bhikaji Cama Place 24/7✡️9711147426✡️ Escorts Service
 
Vip Modals Call Girls (Delhi) Rohini 9711199171✔️ Full night Service for one...
Vip  Modals Call Girls (Delhi) Rohini 9711199171✔️ Full night Service for one...Vip  Modals Call Girls (Delhi) Rohini 9711199171✔️ Full night Service for one...
Vip Modals Call Girls (Delhi) Rohini 9711199171✔️ Full night Service for one...
 
Experience Certificate - Marketing Analyst-Soham Mondal.pdf
Experience Certificate - Marketing Analyst-Soham Mondal.pdfExperience Certificate - Marketing Analyst-Soham Mondal.pdf
Experience Certificate - Marketing Analyst-Soham Mondal.pdf
 
do's and don'ts in Telephone Interview of Job
do's and don'ts in Telephone Interview of Jobdo's and don'ts in Telephone Interview of Job
do's and don'ts in Telephone Interview of Job
 
PM Job Search Council Info Session - PMI Silver Spring Chapter
PM Job Search Council Info Session - PMI Silver Spring ChapterPM Job Search Council Info Session - PMI Silver Spring Chapter
PM Job Search Council Info Session - PMI Silver Spring Chapter
 
VIP Call Girls Firozabad Aaradhya 8250192130 Independent Escort Service Firoz...
VIP Call Girls Firozabad Aaradhya 8250192130 Independent Escort Service Firoz...VIP Call Girls Firozabad Aaradhya 8250192130 Independent Escort Service Firoz...
VIP Call Girls Firozabad Aaradhya 8250192130 Independent Escort Service Firoz...
 
Full Masii Russian Call Girls In Dwarka (Delhi) 9711199012 💋✔💕😘We are availab...
Full Masii Russian Call Girls In Dwarka (Delhi) 9711199012 💋✔💕😘We are availab...Full Masii Russian Call Girls In Dwarka (Delhi) 9711199012 💋✔💕😘We are availab...
Full Masii Russian Call Girls In Dwarka (Delhi) 9711199012 💋✔💕😘We are availab...
 
Sonam +91-9537192988-Mind-blowing skills and techniques of Ahmedabad Call Girls
Sonam +91-9537192988-Mind-blowing skills and techniques of Ahmedabad Call GirlsSonam +91-9537192988-Mind-blowing skills and techniques of Ahmedabad Call Girls
Sonam +91-9537192988-Mind-blowing skills and techniques of Ahmedabad Call Girls
 

Cutover strategy in sap fico

  • 1. Cutover Strategy In SAP FICO Here we try to comprehensively cover the SAP Go live strategy as a reference guide as every business are unique and as a SAP FICO Consultant, you need to adjust accordingly. The Go Live strategy comprises of the following:- 1) Cut off procedure 2) Pre-Go live checks. What is meant by cut off date? SAP system is configured as per the requirement of the client. The system is ready for the client to use. The client now needs to migrate from the Old system (Legacy system) to the new SAP system. The migration from the old system to the new system is known as cut off date. The old system is switched off and the new SAP system is switched on. The data will be migrated from the old system to SAP. The data will henceforth be entered in the new SAP system. To have a smooth switch over from the Legacy system to the new SAP systems are devised the cut off procedure. What is meant by Pre Go live check? It is ensuring that SAP Production system is ready to go live smoothly. Let proceed then. Scenario A Ltd. is a company implementing SAP system. The company follows a January - December period for preparing financial accounts. Therefore the go live data decided for A Ltd is 2nd January 2096. The Trial balance will be uploaded with date as on 31st December 2095. The Trial balance will consist only of balance sheet items since all the expense items are already
  • 2. transferred to the retained earnings account in the old system. The activities are divided as follows:- 1) Pre Go live activities A Ltd will upload the GL codes, cost elements in the production system on 1st December 2095. A Ltd will complete upload of all the material masters with all the views in the production system by 2nd December 2095. All Bill of Material, Routings will be uploaded in the production system by 4th December 2095. The material masters for raw and packing material will be uploaded with the moving average prices on 4th December 2095. The cost center Plan will be uploaded, allocation cycles and activity price calculation will be done by 6th December 2095. Product cost calculation will be conducted from 7th Dec 2095 to 20th December 2095 to get the correct cost calculation from system. All other masters will be uploaded into the production system from 5th December 2095 and completed by 18th December 2095. 2) Cut off activities The company closes it sales on 26th December 2095. The company stops all its stock movement on 26th December 2095 up to 1st January 2096. All open purchase orders will be uploaded on 28th December 2095. The provision for stock received and invoice not received will be accounted in a separate GL code (different than the GR/IR). The stocks will be finalized by 29th December 2095. The company closes it old (legacy) system on 30th December 2095. The stocks will be uploaded on 31st December 2095 and 1st Jan 2096. The standard cost estimate will be marked and released on 2nd January 2096. The system is available for data entry and operation to the users from 2nd January 2096.
  • 3. Accounts Receivable open items will be uploaded from 1st January 2096 to 3rd January 2096. Thus Accounts Receivable is available from 4th January 2096 to account for customer incoming payment. Accounts Payable open items will be uploaded from 3rd January 2096 to 4th January 2096. Accounts Payable is available for payment from 5th January 2096. Fixed assets are uploaded on 5th January 2096. The Remaining GL Balances are uploaded on 7th January 2096. Thus entire data take over activities are to be completed by 7th January 2096. We will divide the activities as follows:- A) Pre-Go Live activities B) Pre-Go Live checks C) Upload transaction data into the system A) Pre-Go Live activities 1. Master data Load into Production system Ensure all the master data is loaded into the production system. We will broadly cover the master data which needs to be loaded and the module responsible. Material Master (SAP Material Management) Basic responsibility MM: All the respective views of the material masters the other modules responsible . Ensure that all the required views are uploaded. GL codes - FI Customer Master - FI (accounting view) and SD (sales view) Vendor Master - FI (accounting view) and MM (purchasing view) Cost elements - CO
  • 4. Secondary cost elements - CO Profit centers - CO Cost center - CO Activity type - CO Bill of Material - PP Work Center/ Resource - PP Routing / Master Recipe - PP Purchasing Info Record - MM Service Master - MM Bank Master - FI Quality Info Record - QM Quality Inspection plan 2. Upload Cost center plan Cost center plan must be updated through transaction code KP06 or using excel upload. 3. Execute the allocation cycles within cost center accounting The plan allocation cycles (distribution, assessment) must be executed within the cost center accounting module. This will allocate the costs from the service cost center to the receiver cost center. 4. Update planned activity After executing of the plan allocation cycles, the production cost centers are now ready with the planned costs. You can now calculate the activity prices through the system or manually update the planned prices by calculating it outside. The planned activity must be updated through transaction code KP26. 5. Calculate Activity prices
  • 5. Calculate the activity prices using transaction code KSPI. 6. Execute product costing run The product costing run will be executed for all semi-finished and finished materials in the system using transaction code CK40N. This should be run after all the BOM and Master recipe are uploaded. The product cost finalization takes a long time and should begin well in advance before the go live date. Normally the product costing run has to be executed again and again (3-4 times) since data needs to be corrected and costs have to be compared with the existing legacy cost. The possible errors in the product costing run are:- 1) Moving average prices or planned prices are not correctly maintained in the material masters. 2) Incorrect quantities in the Bill of Materials, incorrect base unit quantity in the Bill of Material. 3) Incorrect quantities (hours, KWH etc.) for activities in the Routing or Master recipe. 4) Incorrect alternate unit of Measure The product costing is calculated and made ready. The actual Mark and release will happen on after the stocks are uploaded into the system. B) Pre-Go Live activities 1. Ensure all the customizing request are in the production system. Check that all the customizing request are gone in the system and no major requests are pending. Request relating to reports being developed can be transported as and when the reports are ready. 2. Ensure all the number ranges for all the modules have been maintained in the production system. 3. Ensure that Operating concern has been generated. 4. Ensure that all the Customer Master data is loaded. 5. Ensure all material masters (all material types) have been loaded. 6. Ensure that all the Vendor Master data is loaded. C) Upload transaction data into system 1. Upload Open purchase orders
  • 6. Open purchase orders can well be uploaded into the system in advance before the cut off date if no invoices are expected. 2. Stock upload Stock upload happens in 2 steps:- 1) Finished goods: The standard prices are first uploaded through MR21 or through an ABAP program which also uses MR21. The stock quantities are uploaded using movement type 561 through an ABAP program which calls transaction MB1C. 2) Raw Material, packing Material, stores and spare parts: The quantities and values are uploaded at the same time using an ABAP program which calls transaction MB1C. The stock upload will generate the following entry in the system:- Finished goods stock a/c Debit Semi-Finished goods stock a/c Debit Raw Material stock a/c Debit Packing Material stock a/c Debit Stores and spares a/c Debit Data take over Credit 3. Mark and Release the cost estimate After the stock is uploaded into the system, the standard cost estimate will be marked and released into the material master using transaction code CK40N. 4. Upload Accounts Receivable and Accounts Payable open items The Accounts Receivable and Accounts Payable open items are uploaded through LSMW which calls transaction code F-02 GL Account posting. The profit center is captured in the data take over account. Baseline date must be captured, which will determine aging based on number of days mentioned in the payment terms. The accounting entry for Accounts Receivable open item upload is:- Customer a/c (not GL) Debit Data takeover a/c Credit
  • 7. The accounting entry for Accounts Payable open item upload is:- Data takeover a/c Debit Vendor a/c (not GL) Credit 5. Asset Master and value upload Asset Master is a special case of upload where in you upload not only the master data but also the values. The total cost and accumulated depreciation are also uploaded at the same time. This is done through transaction code AS91. We will explain how it is done. 5.1 The upload of asset master and values through AS91 This upload of asset masters along with the values will not update the FI General Ledger. The FI - GL entry balance update will be passed through another transaction. 5.2 Transfer Asset balance into profit center Once the asset master along with the values is uploaded, the opening balance for the asset needs to be transferred to profit center. The asset balances opening balances are transferred into profit center accounting through transaction code 1KEI. 5.3 Remove the GL codes for asset from 3KEH table Remove the Asset reconciliation codes from the transaction code 3KEH. This is required because a manual FI entry will be passed in the next step, which will duplicate posting into PCA for the assets. 5.4 Update the FI entry for asset through transaction OASV. We give an example of how a GL entry passed for Fixed asset upload:- Let us take Plant and Machinery Plant and Machinery a/c Dr 100,000 Accumulated depreciation a/c Cr 30,000 Data takeover a/c Cr 70,000
  • 8. 5.5 Reinstate the GL codes for asset in 3KEH After passing the entry for asset upload update the asset reconciliation accounts in transaction code 3KEH. 6. Upload General Ledger account balances Finally we upload the remaining General Ledger account balances other than Fixed Assets, Stock, Accounts Receivable and Accounts Payable. This is again uploaded through an LSMW program which calls transaction code F-02 GL. Posting. Let us take an example for the accounting entry passed:- Data takeover a/c Debit 550,000 (Balancing figure) Cash a/c Debit 10,000 Bank a/c Debit 50,000 Advances Debit 90,000 Share capital a/c Credit 100,000 Short term Loan a/c Credit 200,000 Long term loan a/c Credit 400,000 The Data takeover will become zero on upload of this entry.