2. What Is
Quantity
Surveyor?
Aquantity surveyor provide quantity
services and manages all
costs relating to building and civil
engineering projects, from the
pre-contract to post contract to
minimise the costs of a project
and enhance value for money, while
still achieving the required
standards and quality.
A quantity surveyor may work for
either the client or the contractor,
working in an office or on-
site. Quantity Surveyor cost out the
structures all based on the drawings
provided example like costing a
building according to architecture
drawings.
3. THE QUALIFICATIONS
TO BE A
QUANTITY SURVEYOR
Royal Institution of Surveyors
Malaysia
Board of Quantity Surveyors
Malaysia
Pacific Association of Quantity
Surveyors
Royal Institution of Chartered
Surveyors
After graduated, to be a qualification quantity surveyor needed to
register as a local professional which is RISM and BQSM.
Have a two years practical and sit for an exam.
4. THE ROLE OF
QUANTITY SURVEYOR
DURING A PROJECT
PRE-CONTRACT
Pre-contract involved estimating and
two methods of calculation which are
value management and cost planning.
VALUE MANAGEMENT:
Value Management
is a systematic approach
and process earlier referred
to as value engineering, to
ensure delivery of a function
or product at the lowest cost without
detriment to quality, performance or
reliability
COST PLANNING:
Cost planning is used to ensure that the developer
knows in the early stages of a project what the
anticipated final cost of the total development may
be, including the cost of land, legal issues,
demolitions, buildings, professionals, furniture,
connections, tax, financing and management. Your
text here
Tendering stage
Tendering Stage are the architects ,structural engineers, mechanical and electronic engineers, landscape
architects will prepare tender drawings. Then quantity surveyor will measure the structures and concretes,
based on the tender drawings
provided.
When all the contractors submitted the tenders,
quantity surveyor collect all the document
to do analysis for the submission check
and maybe the reason why contractor
stated the amount of their prices.
Then quantity surveyor will do a report and submit it to the clients and the clients will decide to select
Every each month, the contractor will submit a
claim to the clients. So quantity surveyor will go to
the site and have an observation on the site.
Quantity surveyor will look physically on the site
and measure wYour text here
hether the claim by contractor true or false.
After the completion
of the buildings,
quantity surveyor
will do a stamen
or final account is
where the
quantity surveyor
capture all the
variation orders.
POST CONTRACT
5. THE
RELATIONSHIP
Quantity surveyor is provide services so they must work as a team
and cooperate with one another people.
Architect Structural
engineer
M&E
Engineer
Quantity
Surveyor
The first
person come
out the
drawings.
Use architect
drawing to
produce
structure
drawings.
Use architect
drawing to
design its air
conditioning
connections.
Manages the
costs relating
needed for the
project.
6. In the conclusion, Mr CT Wan is the director at Juru Ukur Bahan
Malaysia as our interview person to answer us all the questions
about quantity surveyor in this magazine. Before we ended our
interview, he
gave us some
good advises
If want to be
a quantity
surveyor. To
be a quantity
surveyor need
to be systematic
and organize when doing their job. The people should have a
pair of eyes for details. This is because quantity surveyor will
face a lot of difficulties during a project which are contractor
claims to the developer and usually involved delay of the
project which caused liquidated damages. Lastly, the life of a
quantity surveyor is busy because it is very challenging due to a
lots of numbers, measurements, calculations. So a quantity
surveyor must very good background of mathematics.
ADVISES