Hydraulics of Structures
What are structures? 
 Structures in this context are simply something 
placed in the channel to either measure or control 
flow. 
 Example: A principle spillway is used as part of a 
dam design to control the rate at which water is 
discharged from a reservoir. 
 Include both inlet and outlet control devices. 
 Control devices can operate as : 
 Open channel flow in which the flow has a 
free surface or 
 Pipe flow in which the flow is in a closed 
conduit under pressure.
Most basic principle of hydraulics 
of structures: 
As head on a structure increases, the flow that 
is discharged through the structure increases. 
 Figure 5.1 (Haan et al., 1994) shows the 
head-discharge relationships for several flow 
control structures.
Weirs 
 At its most basic, just an obstruction placed in a 
channel that constricts flow as it goes over a 
crest. 
 The crest is the edge of the weir over which the 
water flows. 
 As the water level (head) over the crest increases, 
the flow rate increases dramatically. 
 Two basic types of weirs 
 sharp crested 
 broad crested
Sharp Crested Weirs 
 A sharp crested weir is defined by a thin 
crest over which the water springs free as it 
leaves the upstream face of the weir. 
 Flow over a weir is also called the nappe. 
 Sharp crested weirs are generally 
constructed of sheet metal or similar thin 
material.
Sharp Crested Weir 
H 
nappe
Sharp Crested Weirs 
 Can have several shapes 
 Triangular (or v-notch) 
 Rectangular 
 Trapezoidal 
 Classified by the shape of its notch. 
 V-notch weirs have greater control under low flow 
conditions. 
 Rectangular weirs have larger capacity but are less 
sensitive for flow measurement.
Sharp Crested Weirs-General 
v 
2 
2 
1 
g 
H h dh 
Using Bernoulli’s equation 
v 
2 
2 
2 
2 
1 + + = + + - 
(H z h) 
v 22 
(H z) v 
2g 
2g 
z 
g
 Making the assumption that the velocity head at 
the upstream point will be much smaller than the 
velocity head as the flow goes over the weir we 
assume v2/2g is negligible and: 
1 
v 2gh 2 = 
H 
Crest 
dh 
L 
dQ v Ldh 2 = 
or 
dQ = 2ghLdh h
Integrating this from h = 0 to h = H gives 
2 
3 
= 
Q L 2g h 2 L gH 
= ò = 
0 
1 2 
2 
3 
h H 
h 
= 
Multiplying by a loss term to compensate for 
the deviation from ideal flow we get: 
2 
3 
Q = C 2 
d L 2gH 
3
Rectangular Weirs 
A rectangular weir that spans the full width of the channel 
is known as a suppressed weir. 
2 
Q = CLH3 
H 
L 
H 
Coefficient of Discharge
 Hydraulic head (H) for weirs is simply the height 
of the water surface above the weir crest, 
measured at a point upstream so that the influence 
of the velocity head can be ignored. 
 L is the length of the weir. 
 The coefficient of discharge (C) is dependent 
upon units and of the weir shape. 
 For a suppressed weir with H/h < 0.4 (where h is the 
height of the weir) C= 3.33 can be used. 
 For 0.4 < H/h < 10, C = 3.27 + 0.4 H/h
A rectangular weir that does not span the whole channel 
is called a weir with end contractions . The effective 
length of the weir will be less than the actual weir length 
due to contraction of the flow jet caused by the sidewalls. 
L’ 
L = L'-0.1NH 
Where N is the number of 
contractions and L’ is the 
measured length of the 
crest.
Triangular (v-notch ) weirs 
 Used to measure flow in low flow 
conditions. 
Q H 
Q = K tan q 
H2.5 
2
 For Q = 90°, K = 2.5 (typically), 
tan (Q/2) = 1 therefore, 
2 
Q = 2.5H5 
For other angles 
2g 
K C 8 d = 
15 
Where Cd is based on the angle, Q, and head, H.
 Note: Your handout with Figure 12.28 
presents the equation for a v-notch weir as: 
2 
Q = KH5 
with 
= q 
2 
2g tan 
K C 8 d 
15
Broad Crested Weirs 
H 
W 
Q = 3.09LH1.5 
Where L is the width of the weir.
Broad Crested Weirs 
 Broad crested weirs support the flow in the 
longitudinal direction (direction of flow). 
 They are used where sharp-crested weirs 
may have maintenance problems. 
 The nappe of a broad crested weir does not 
spring free.
Roadway Overtopping 
( ) 3 
2 
o d r Q = C L HW 
Where 
Qo – overtopping flowrate 
Cd - overtopping discharge coefficient 
L – length of roadway crest 
HWr – upstream depth 
Cd = ktCr 
Cr – discharge 
coefficient 
kt – submergence 
factor 
Figure 5.7
Orifices 
 An orifice is simply an opening through 
which flow occurs. 
 They can be used to: 
 Control flow as in a drop inlet 
 Measure the flow through a pipe.
 The discharge equation for orifice flow is: 
2 
Q = C'A(2gH) 1 
Where: 
C’ is the orifice coefficient (0.6 for sharp edges, 0.98 for 
rounded edges). 
A is the cross-sectional area of the orifice in ft2 
g is the gravitational constant 
H is the head on the orifice
 At low heads, orifices can act as weirs. 
 Calculate the discharge using the suppressed 
weir equation where L is equal to the 
circumference of the pipe. 
 Calculate the discharge using the orifice 
equation. 
 The lower discharge will be the actual 
discharge.
Pipes as Flow Control Devices 
0.6D 
D 
H’ 
H K v 
2 
2g 
e e = 
H K v 
2 
2g 
b b = 
H K L v 
2 
2g 
c c = 
v2 
2g 
H 
Energy Grade 
Line 
Elbow and Transition L 
H'= v + + + 
e b c 
2 
H H H 
2g
2 
H' v e b c 
(1 K K K L) 
2g 
= + + + 
2 
1 
2 
1 
v (2gH') 
+ + + 
(1 K K K L) 
e b c 
= 
2 
1 
2 
1 
Q a(2gH') 
+ + + 
(1 K K K L) 
e b c 
=
Head Loss Coefficients 
 Ke is the entrance head loss coefficient and is typically 
given a value of 1.0 for circular inlets. 
 Kb is the bend head loss coefficient and is typically 
given a value of 0.5 for circular risers connected to 
round conduits. 
 For risers with rectangular inlets, the bend head losses 
and entrance head losses are typically combined to a 
term Ke’ where values of Ke’ can be found in Table 5.3 
and : 
2 
1 
Q a(2gH') 
+ + 
e c 
2 
1 
(1 K ' K L) 
=
Head Loss Coefficients 
 Kc is the head loss coefficient due to 
friction. 
 Values for Kc are given in Tables 5.1 and 
5.2 for circular and square pipes. 
 Kc is multiplied by L, the entire length of 
the pipe, including the riser.
 Frequently, when the drop inlet is the same 
size as the remainder of the pipe, orifice 
flow will control and the pipe will never 
flow full. 
 If it is desirable to have the pipe flowing 
full, it may be necessary to increase the 
size of the drop inlet.
Using Flow Control Structures as 
Spillways 
 A given drop inlet spillway can have a variety of 
discharge relationships, given the head. 
 At the lowest stages the riser acts as a weir. 
 As the level of the reservoir rises, water flowing in from 
all sides of the inlet interferes so that the inlet begins to 
act as an orifice. 
 As the level continues to rise, the outlet eventually begins 
to flow full and pipe flow prevails. 
 A stage-discharge curve is developed by plotting Q vs. H 
for each of the three relationships. The minimum flow for 
a given head is the actual discharge used.
Rockfill Outlets as Controls 
ROCKFILL 
have 
h1 
dh 
h2 
dl 
HYDRAULIC PROFILE
Rockfill Outlets 
 Advantages 
 Abundant 
 Generally available 
 Usually inexpensive 
 Relative permanence
Rockfill Outlets 
 Major expenses 
 Grading 
 Transporting 
 Placing stone
Rockfill Outlets 
 Used for 
 Protective channel linings and breakwaters 
 Add stability to dams 
 Provide energy dissipation zones for reservoir 
outlets 
 Flow control structure
Modified Darcy-Weisbach 
Equation 
V 
g 
1 
x 
d 
f 
dh 
dl 
k 
2 
2 
=
Rockfill as Control Structure 
Model 
Reynolds Number Equation 
( ) 
nx 
R = d - 
s V e 
Friction factor 
dh 
dl 
x 2 = 
f gd k 2 
V
Friction Factor-Reynolds 
Number Relationship 
= 1600 +3.83 
k R 
e 
f
h2 – have Relationships 
h1 = h2 + dh 
h h1 h2 ave 
= + 
2

More Related Content

What's hot

Canal regulation works. m4pptx
Canal regulation works. m4pptxCanal regulation works. m4pptx
Canal regulation works. m4pptxBibhabasu Mohanty
 
Diversion headworks
Diversion headworksDiversion headworks
Diversion headworksJimit Shah
 
(Part iii)- open channels
(Part iii)- open channels(Part iii)- open channels
(Part iii)- open channelsMohsin Siddique
 
Lec-00-Weir&Barrages.pptx
Lec-00-Weir&Barrages.pptxLec-00-Weir&Barrages.pptx
Lec-00-Weir&Barrages.pptxWaqas Khan
 
Canal & canal types with design of channels by dj sir covered kennedy lacey t...
Canal & canal types with design of channels by dj sir covered kennedy lacey t...Canal & canal types with design of channels by dj sir covered kennedy lacey t...
Canal & canal types with design of channels by dj sir covered kennedy lacey t...Denish Jangid
 
Canal Regulation Works
Canal Regulation WorksCanal Regulation Works
Canal Regulation WorksAbdul Sahid
 
Failure of weir and barrage
Failure of weir and barrageFailure of weir and barrage
Failure of weir and barrageDivya Vishnoi
 
Design of Hydraulic Structures
Design of Hydraulic StructuresDesign of Hydraulic Structures
Design of Hydraulic StructuresDamalla Rams
 
Energy dissipation - irrigation engineering
Energy dissipation - irrigation engineeringEnergy dissipation - irrigation engineering
Energy dissipation - irrigation engineeringKavin Raval
 
Chapter 8 hydraulic jump
Chapter 8 hydraulic jumpChapter 8 hydraulic jump
Chapter 8 hydraulic jumpBinu Karki
 
Design of stilling basin and roughness devices
Design of stilling basin and roughness devices Design of stilling basin and roughness devices
Design of stilling basin and roughness devices Bilal Mirani
 
Kennedy's and laccy's theory
Kennedy's and laccy's theoryKennedy's and laccy's theory
Kennedy's and laccy's theoryamanraj20501920
 
Canal outlets and modules
Canal outlets and modulesCanal outlets and modules
Canal outlets and modulesbhalinder singh
 
Geotechnical Engineering-I [Lec #27: Flow Nets]
Geotechnical Engineering-I [Lec #27: Flow Nets]Geotechnical Engineering-I [Lec #27: Flow Nets]
Geotechnical Engineering-I [Lec #27: Flow Nets]Muhammad Irfan
 
measurement of infiltration
measurement of infiltrationmeasurement of infiltration
measurement of infiltrationTharun Reddy
 
Design of Canal (Kennedy & Lacey Theory) & Diversion Headwork
Design of Canal (Kennedy & Lacey Theory) & Diversion HeadworkDesign of Canal (Kennedy & Lacey Theory) & Diversion Headwork
Design of Canal (Kennedy & Lacey Theory) & Diversion HeadworkRamanuj Jaldhari
 
150860106006 54 55_62
150860106006 54 55_62150860106006 54 55_62
150860106006 54 55_62Riya2001998
 

What's hot (20)

Canal regulation works. m4pptx
Canal regulation works. m4pptxCanal regulation works. m4pptx
Canal regulation works. m4pptx
 
types of canal
types of canaltypes of canal
types of canal
 
Diversion headworks
Diversion headworksDiversion headworks
Diversion headworks
 
(Part iii)- open channels
(Part iii)- open channels(Part iii)- open channels
(Part iii)- open channels
 
Khosla theory
Khosla theoryKhosla theory
Khosla theory
 
Lec-00-Weir&Barrages.pptx
Lec-00-Weir&Barrages.pptxLec-00-Weir&Barrages.pptx
Lec-00-Weir&Barrages.pptx
 
Spillways
SpillwaysSpillways
Spillways
 
Canal & canal types with design of channels by dj sir covered kennedy lacey t...
Canal & canal types with design of channels by dj sir covered kennedy lacey t...Canal & canal types with design of channels by dj sir covered kennedy lacey t...
Canal & canal types with design of channels by dj sir covered kennedy lacey t...
 
Canal Regulation Works
Canal Regulation WorksCanal Regulation Works
Canal Regulation Works
 
Failure of weir and barrage
Failure of weir and barrageFailure of weir and barrage
Failure of weir and barrage
 
Design of Hydraulic Structures
Design of Hydraulic StructuresDesign of Hydraulic Structures
Design of Hydraulic Structures
 
Energy dissipation - irrigation engineering
Energy dissipation - irrigation engineeringEnergy dissipation - irrigation engineering
Energy dissipation - irrigation engineering
 
Chapter 8 hydraulic jump
Chapter 8 hydraulic jumpChapter 8 hydraulic jump
Chapter 8 hydraulic jump
 
Design of stilling basin and roughness devices
Design of stilling basin and roughness devices Design of stilling basin and roughness devices
Design of stilling basin and roughness devices
 
Kennedy's and laccy's theory
Kennedy's and laccy's theoryKennedy's and laccy's theory
Kennedy's and laccy's theory
 
Canal outlets and modules
Canal outlets and modulesCanal outlets and modules
Canal outlets and modules
 
Geotechnical Engineering-I [Lec #27: Flow Nets]
Geotechnical Engineering-I [Lec #27: Flow Nets]Geotechnical Engineering-I [Lec #27: Flow Nets]
Geotechnical Engineering-I [Lec #27: Flow Nets]
 
measurement of infiltration
measurement of infiltrationmeasurement of infiltration
measurement of infiltration
 
Design of Canal (Kennedy & Lacey Theory) & Diversion Headwork
Design of Canal (Kennedy & Lacey Theory) & Diversion HeadworkDesign of Canal (Kennedy & Lacey Theory) & Diversion Headwork
Design of Canal (Kennedy & Lacey Theory) & Diversion Headwork
 
150860106006 54 55_62
150860106006 54 55_62150860106006 54 55_62
150860106006 54 55_62
 

Viewers also liked

open channel flow
open channel flowopen channel flow
open channel flowGeoRuizO
 
Characteristics of sharp weirs and the hydraulic jump
Characteristics of sharp weirs and the hydraulic jumpCharacteristics of sharp weirs and the hydraulic jump
Characteristics of sharp weirs and the hydraulic jumpDickens Mimisa
 
Introduction with weirs flumes and orifices
Introduction with weirs flumes and orificesIntroduction with weirs flumes and orifices
Introduction with weirs flumes and orificesAKHIL BHARTI
 
Cu06997 lecture 11_hydraulic_structures
Cu06997 lecture 11_hydraulic_structuresCu06997 lecture 11_hydraulic_structures
Cu06997 lecture 11_hydraulic_structuresHenk Massink
 
"Hybrid" KT & Project Planning GUIDE
"Hybrid" KT & Project Planning GUIDE"Hybrid" KT & Project Planning GUIDE
"Hybrid" KT & Project Planning GUIDEKBHN KT
 
Assessment of the preference of smallholders' farmers on the adoption of soil...
Assessment of the preference of smallholders' farmers on the adoption of soil...Assessment of the preference of smallholders' farmers on the adoption of soil...
Assessment of the preference of smallholders' farmers on the adoption of soil...Mziray14
 
Design of Bandhara / Weir Dam gates using plastic materials_Design Directions...
Design of Bandhara / Weir Dam gates using plastic materials_Design Directions...Design of Bandhara / Weir Dam gates using plastic materials_Design Directions...
Design of Bandhara / Weir Dam gates using plastic materials_Design Directions...India Water Portal
 
Modern methods of irrigation
Modern methods of irrigationModern methods of irrigation
Modern methods of irrigationSanjan Banerjee
 
Stormwater management presentation slides
Stormwater management presentation slidesStormwater management presentation slides
Stormwater management presentation slidesDoreen Yeo
 
Drip irrigation............
Drip irrigation............Drip irrigation............
Drip irrigation............Bhupesh Katriya
 

Viewers also liked (20)

Weirs
WeirsWeirs
Weirs
 
open channel flow
open channel flowopen channel flow
open channel flow
 
Characteristics of sharp weirs and the hydraulic jump
Characteristics of sharp weirs and the hydraulic jumpCharacteristics of sharp weirs and the hydraulic jump
Characteristics of sharp weirs and the hydraulic jump
 
Introduction with weirs flumes and orifices
Introduction with weirs flumes and orificesIntroduction with weirs flumes and orifices
Introduction with weirs flumes and orifices
 
weirs
weirsweirs
weirs
 
Cu06997 lecture 11_hydraulic_structures
Cu06997 lecture 11_hydraulic_structuresCu06997 lecture 11_hydraulic_structures
Cu06997 lecture 11_hydraulic_structures
 
Notches and weir
Notches and weirNotches and weir
Notches and weir
 
"Hybrid" KT & Project Planning GUIDE
"Hybrid" KT & Project Planning GUIDE"Hybrid" KT & Project Planning GUIDE
"Hybrid" KT & Project Planning GUIDE
 
Smart tunnel
Smart  tunnelSmart  tunnel
Smart tunnel
 
Assessment of the preference of smallholders' farmers on the adoption of soil...
Assessment of the preference of smallholders' farmers on the adoption of soil...Assessment of the preference of smallholders' farmers on the adoption of soil...
Assessment of the preference of smallholders' farmers on the adoption of soil...
 
Design of Bandhara / Weir Dam gates using plastic materials_Design Directions...
Design of Bandhara / Weir Dam gates using plastic materials_Design Directions...Design of Bandhara / Weir Dam gates using plastic materials_Design Directions...
Design of Bandhara / Weir Dam gates using plastic materials_Design Directions...
 
Modern methods of irrigation
Modern methods of irrigationModern methods of irrigation
Modern methods of irrigation
 
Sprinkler irrigation kvg
Sprinkler irrigation kvgSprinkler irrigation kvg
Sprinkler irrigation kvg
 
Sprinkler irrigation system
Sprinkler irrigation systemSprinkler irrigation system
Sprinkler irrigation system
 
Flow measurement
Flow measurementFlow measurement
Flow measurement
 
Stormwater management presentation slides
Stormwater management presentation slidesStormwater management presentation slides
Stormwater management presentation slides
 
Drip irrigation
Drip irrigationDrip irrigation
Drip irrigation
 
Chap1 open channel flow
Chap1 open channel flowChap1 open channel flow
Chap1 open channel flow
 
Open Channel Flow
Open Channel FlowOpen Channel Flow
Open Channel Flow
 
Drip irrigation............
Drip irrigation............Drip irrigation............
Drip irrigation............
 

Similar to Hydraulics of structures

Presentation on notches and weirs
Presentation on notches and weirsPresentation on notches and weirs
Presentation on notches and weirssush_vyas
 
0 open channel intro 5
0 open channel   intro 50 open channel   intro 5
0 open channel intro 5Refee Lubong
 
Classification of weis new
Classification of weis newClassification of weis new
Classification of weis newsonukhan123
 
Flow of incompressible fluids through pipes
Flow of incompressible fluids through pipes Flow of incompressible fluids through pipes
Flow of incompressible fluids through pipes MAULIKM1
 
Open channel flow equation
Open channel flow equationOpen channel flow equation
Open channel flow equationMrinmoy Majumder
 
FluidMech_2014_5.ppt
FluidMech_2014_5.pptFluidMech_2014_5.ppt
FluidMech_2014_5.pptgemadogelgalu
 
Fluidmnhggffhyrfytftydtdtdtre65Mech_2014_5 (2).ppt
Fluidmnhggffhyrfytftydtdtdtre65Mech_2014_5 (2).pptFluidmnhggffhyrfytftydtdtdtre65Mech_2014_5 (2).ppt
Fluidmnhggffhyrfytftydtdtdtre65Mech_2014_5 (2).pptna9er98dallah3
 
Basic equation of fluid flow mechan.pptx
Basic equation of fluid flow mechan.pptxBasic equation of fluid flow mechan.pptx
Basic equation of fluid flow mechan.pptxAjithPArun1
 
6. Flow Through uc Channels (CE).pdf
6. Flow Through uc Channels (CE).pdf6. Flow Through uc Channels (CE).pdf
6. Flow Through uc Channels (CE).pdfRakeshKumar660472
 
Ce 3205-lecture-08-spillways
Ce 3205-lecture-08-spillwaysCe 3205-lecture-08-spillways
Ce 3205-lecture-08-spillwayssaibabu48
 
Flow In Pipes
Flow In PipesFlow In Pipes
Flow In PipesIla Lee
 
notch and its types
 notch and its types notch and its types
notch and its typesUsama Pervaiz
 
Friction in noncircular conduits of fluid.pptx
Friction in noncircular conduits of fluid.pptxFriction in noncircular conduits of fluid.pptx
Friction in noncircular conduits of fluid.pptxMuhammadHabib533231
 

Similar to Hydraulics of structures (20)

Notches and weir
Notches and weirNotches and weir
Notches and weir
 
Weirs and flumes with broad
Weirs and flumes  with broad Weirs and flumes  with broad
Weirs and flumes with broad
 
Presentation on notches and weirs
Presentation on notches and weirsPresentation on notches and weirs
Presentation on notches and weirs
 
0 open channel intro 5
0 open channel   intro 50 open channel   intro 5
0 open channel intro 5
 
Classification of weis new
Classification of weis newClassification of weis new
Classification of weis new
 
Flow of incompressible fluids through pipes
Flow of incompressible fluids through pipes Flow of incompressible fluids through pipes
Flow of incompressible fluids through pipes
 
Open channel flow equation
Open channel flow equationOpen channel flow equation
Open channel flow equation
 
FluidMech_2014_5.ppt
FluidMech_2014_5.pptFluidMech_2014_5.ppt
FluidMech_2014_5.ppt
 
Fluidmnhggffhyrfytftydtdtdtre65Mech_2014_5 (2).ppt
Fluidmnhggffhyrfytftydtdtdtre65Mech_2014_5 (2).pptFluidmnhggffhyrfytftydtdtdtre65Mech_2014_5 (2).ppt
Fluidmnhggffhyrfytftydtdtdtre65Mech_2014_5 (2).ppt
 
lecture-2.pdf
lecture-2.pdflecture-2.pdf
lecture-2.pdf
 
Basic equation of fluid flow mechan.pptx
Basic equation of fluid flow mechan.pptxBasic equation of fluid flow mechan.pptx
Basic equation of fluid flow mechan.pptx
 
6. Flow Through uc Channels (CE).pdf
6. Flow Through uc Channels (CE).pdf6. Flow Through uc Channels (CE).pdf
6. Flow Through uc Channels (CE).pdf
 
Ce 3205-lecture-08-spillways
Ce 3205-lecture-08-spillwaysCe 3205-lecture-08-spillways
Ce 3205-lecture-08-spillways
 
Flow through pipes ppt
Flow through pipes pptFlow through pipes ppt
Flow through pipes ppt
 
Flow In Pipes
Flow In PipesFlow In Pipes
Flow In Pipes
 
notch and its types
 notch and its types notch and its types
notch and its types
 
Culvertdesign
CulvertdesignCulvertdesign
Culvertdesign
 
Friction in noncircular conduits of fluid.pptx
Friction in noncircular conduits of fluid.pptxFriction in noncircular conduits of fluid.pptx
Friction in noncircular conduits of fluid.pptx
 
Pipe sizing
Pipe sizingPipe sizing
Pipe sizing
 
Flow through pipes
Flow through pipesFlow through pipes
Flow through pipes
 

More from Zagazig University

للتخلص من العيون
للتخلص من العيونللتخلص من العيون
للتخلص من العيونZagazig University
 
أدعية تيسير الزّواج والتّعجيل فيه
أدعية تيسير الزّواج والتّعجيل فيهأدعية تيسير الزّواج والتّعجيل فيه
أدعية تيسير الزّواج والتّعجيل فيهZagazig University
 
اللهم ﻳﺎﻗﺎﺻﻢ ﺍﻟﺠﺒﺎﺑﺮﺓ ﻭﻛﺎﺳﺮ ﺍﻷﻛﺎﺳﺮﺓ
اللهم ﻳﺎﻗﺎﺻﻢ ﺍﻟﺠﺒﺎﺑﺮﺓ ﻭﻛﺎﺳﺮ ﺍﻷﻛﺎﺳﺮﺓاللهم ﻳﺎﻗﺎﺻﻢ ﺍﻟﺠﺒﺎﺑﺮﺓ ﻭﻛﺎﺳﺮ ﺍﻷﻛﺎﺳﺮﺓ
اللهم ﻳﺎﻗﺎﺻﻢ ﺍﻟﺠﺒﺎﺑﺮﺓ ﻭﻛﺎﺳﺮ ﺍﻷﻛﺎﺳﺮﺓZagazig University
 
[Peter fritz, xiong_zheng]_a_finite_element_framew(book_fi)
[Peter fritz, xiong_zheng]_a_finite_element_framew(book_fi)[Peter fritz, xiong_zheng]_a_finite_element_framew(book_fi)
[Peter fritz, xiong_zheng]_a_finite_element_framew(book_fi)Zagazig University
 
(صفحه مهندس تنفيذى) استلام اعمال التنفيذ
(صفحه مهندس تنفيذى) استلام اعمال التنفيذ(صفحه مهندس تنفيذى) استلام اعمال التنفيذ
(صفحه مهندس تنفيذى) استلام اعمال التنفيذZagazig University
 
Art 3 a10.1007-2fs11269-013-0407-z
Art 3 a10.1007-2fs11269-013-0407-zArt 3 a10.1007-2fs11269-013-0407-z
Art 3 a10.1007-2fs11269-013-0407-zZagazig University
 
2 hydrology overview_quantities
2 hydrology overview_quantities2 hydrology overview_quantities
2 hydrology overview_quantitiesZagazig University
 
21637 محاضرة (8)calibration
21637 محاضرة (8)calibration21637 محاضرة (8)calibration
21637 محاضرة (8)calibrationZagazig University
 
2 hydrology overview_quantities
2 hydrology overview_quantities2 hydrology overview_quantities
2 hydrology overview_quantitiesZagazig University
 

More from Zagazig University (15)

حرب المعلومات
حرب المعلوماتحرب المعلومات
حرب المعلومات
 
دعاء للأبناء
دعاء للأبناءدعاء للأبناء
دعاء للأبناء
 
للتخلص من العيون
للتخلص من العيونللتخلص من العيون
للتخلص من العيون
 
أدعية تيسير الزّواج والتّعجيل فيه
أدعية تيسير الزّواج والتّعجيل فيهأدعية تيسير الزّواج والتّعجيل فيه
أدعية تيسير الزّواج والتّعجيل فيه
 
اللهم ﻳﺎﻗﺎﺻﻢ ﺍﻟﺠﺒﺎﺑﺮﺓ ﻭﻛﺎﺳﺮ ﺍﻷﻛﺎﺳﺮﺓ
اللهم ﻳﺎﻗﺎﺻﻢ ﺍﻟﺠﺒﺎﺑﺮﺓ ﻭﻛﺎﺳﺮ ﺍﻷﻛﺎﺳﺮﺓاللهم ﻳﺎﻗﺎﺻﻢ ﺍﻟﺠﺒﺎﺑﺮﺓ ﻭﻛﺎﺳﺮ ﺍﻷﻛﺎﺳﺮﺓ
اللهم ﻳﺎﻗﺎﺻﻢ ﺍﻟﺠﺒﺎﺑﺮﺓ ﻭﻛﺎﺳﺮ ﺍﻷﻛﺎﺳﺮﺓ
 
[Peter fritz, xiong_zheng]_a_finite_element_framew(book_fi)
[Peter fritz, xiong_zheng]_a_finite_element_framew(book_fi)[Peter fritz, xiong_zheng]_a_finite_element_framew(book_fi)
[Peter fritz, xiong_zheng]_a_finite_element_framew(book_fi)
 
(صفحه مهندس تنفيذى) استلام اعمال التنفيذ
(صفحه مهندس تنفيذى) استلام اعمال التنفيذ(صفحه مهندس تنفيذى) استلام اعمال التنفيذ
(صفحه مهندس تنفيذى) استلام اعمال التنفيذ
 
Art 3 a10.1007-2fs11269-013-0407-z
Art 3 a10.1007-2fs11269-013-0407-zArt 3 a10.1007-2fs11269-013-0407-z
Art 3 a10.1007-2fs11269-013-0407-z
 
1 purpose definitions
1 purpose definitions1 purpose definitions
1 purpose definitions
 
2 hydrology overview_quantities
2 hydrology overview_quantities2 hydrology overview_quantities
2 hydrology overview_quantities
 
21637 محاضرة (8)calibration
21637 محاضرة (8)calibration21637 محاضرة (8)calibration
21637 محاضرة (8)calibration
 
8 calibration
8 calibration8 calibration
8 calibration
 
7 routing
7 routing7 routing
7 routing
 
2 hydrology overview_quantities
2 hydrology overview_quantities2 hydrology overview_quantities
2 hydrology overview_quantities
 
2012 pe review__hyd_
2012 pe review__hyd_2012 pe review__hyd_
2012 pe review__hyd_
 

Recently uploaded

Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxbritheesh05
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learningmisbanausheenparvam
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)dollysharma2066
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfme23b1001
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxk795866
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and usesDevarapalliHaritha
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 

Recently uploaded (20)

Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptx
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learning
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdf
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptx
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
Design and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdfDesign and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdf
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and uses
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 

Hydraulics of structures

  • 2. What are structures?  Structures in this context are simply something placed in the channel to either measure or control flow.  Example: A principle spillway is used as part of a dam design to control the rate at which water is discharged from a reservoir.  Include both inlet and outlet control devices.  Control devices can operate as :  Open channel flow in which the flow has a free surface or  Pipe flow in which the flow is in a closed conduit under pressure.
  • 3. Most basic principle of hydraulics of structures: As head on a structure increases, the flow that is discharged through the structure increases.  Figure 5.1 (Haan et al., 1994) shows the head-discharge relationships for several flow control structures.
  • 4. Weirs  At its most basic, just an obstruction placed in a channel that constricts flow as it goes over a crest.  The crest is the edge of the weir over which the water flows.  As the water level (head) over the crest increases, the flow rate increases dramatically.  Two basic types of weirs  sharp crested  broad crested
  • 5. Sharp Crested Weirs  A sharp crested weir is defined by a thin crest over which the water springs free as it leaves the upstream face of the weir.  Flow over a weir is also called the nappe.  Sharp crested weirs are generally constructed of sheet metal or similar thin material.
  • 7. Sharp Crested Weirs  Can have several shapes  Triangular (or v-notch)  Rectangular  Trapezoidal  Classified by the shape of its notch.  V-notch weirs have greater control under low flow conditions.  Rectangular weirs have larger capacity but are less sensitive for flow measurement.
  • 8. Sharp Crested Weirs-General v 2 2 1 g H h dh Using Bernoulli’s equation v 2 2 2 2 1 + + = + + - (H z h) v 22 (H z) v 2g 2g z g
  • 9.  Making the assumption that the velocity head at the upstream point will be much smaller than the velocity head as the flow goes over the weir we assume v2/2g is negligible and: 1 v 2gh 2 = H Crest dh L dQ v Ldh 2 = or dQ = 2ghLdh h
  • 10. Integrating this from h = 0 to h = H gives 2 3 = Q L 2g h 2 L gH = ò = 0 1 2 2 3 h H h = Multiplying by a loss term to compensate for the deviation from ideal flow we get: 2 3 Q = C 2 d L 2gH 3
  • 11. Rectangular Weirs A rectangular weir that spans the full width of the channel is known as a suppressed weir. 2 Q = CLH3 H L H Coefficient of Discharge
  • 12.  Hydraulic head (H) for weirs is simply the height of the water surface above the weir crest, measured at a point upstream so that the influence of the velocity head can be ignored.  L is the length of the weir.  The coefficient of discharge (C) is dependent upon units and of the weir shape.  For a suppressed weir with H/h < 0.4 (where h is the height of the weir) C= 3.33 can be used.  For 0.4 < H/h < 10, C = 3.27 + 0.4 H/h
  • 13. A rectangular weir that does not span the whole channel is called a weir with end contractions . The effective length of the weir will be less than the actual weir length due to contraction of the flow jet caused by the sidewalls. L’ L = L'-0.1NH Where N is the number of contractions and L’ is the measured length of the crest.
  • 14. Triangular (v-notch ) weirs  Used to measure flow in low flow conditions. Q H Q = K tan q H2.5 2
  • 15.  For Q = 90°, K = 2.5 (typically), tan (Q/2) = 1 therefore, 2 Q = 2.5H5 For other angles 2g K C 8 d = 15 Where Cd is based on the angle, Q, and head, H.
  • 16.  Note: Your handout with Figure 12.28 presents the equation for a v-notch weir as: 2 Q = KH5 with = q 2 2g tan K C 8 d 15
  • 17. Broad Crested Weirs H W Q = 3.09LH1.5 Where L is the width of the weir.
  • 18. Broad Crested Weirs  Broad crested weirs support the flow in the longitudinal direction (direction of flow).  They are used where sharp-crested weirs may have maintenance problems.  The nappe of a broad crested weir does not spring free.
  • 19. Roadway Overtopping ( ) 3 2 o d r Q = C L HW Where Qo – overtopping flowrate Cd - overtopping discharge coefficient L – length of roadway crest HWr – upstream depth Cd = ktCr Cr – discharge coefficient kt – submergence factor Figure 5.7
  • 20. Orifices  An orifice is simply an opening through which flow occurs.  They can be used to:  Control flow as in a drop inlet  Measure the flow through a pipe.
  • 21.  The discharge equation for orifice flow is: 2 Q = C'A(2gH) 1 Where: C’ is the orifice coefficient (0.6 for sharp edges, 0.98 for rounded edges). A is the cross-sectional area of the orifice in ft2 g is the gravitational constant H is the head on the orifice
  • 22.  At low heads, orifices can act as weirs.  Calculate the discharge using the suppressed weir equation where L is equal to the circumference of the pipe.  Calculate the discharge using the orifice equation.  The lower discharge will be the actual discharge.
  • 23. Pipes as Flow Control Devices 0.6D D H’ H K v 2 2g e e = H K v 2 2g b b = H K L v 2 2g c c = v2 2g H Energy Grade Line Elbow and Transition L H'= v + + + e b c 2 H H H 2g
  • 24. 2 H' v e b c (1 K K K L) 2g = + + + 2 1 2 1 v (2gH') + + + (1 K K K L) e b c = 2 1 2 1 Q a(2gH') + + + (1 K K K L) e b c =
  • 25. Head Loss Coefficients  Ke is the entrance head loss coefficient and is typically given a value of 1.0 for circular inlets.  Kb is the bend head loss coefficient and is typically given a value of 0.5 for circular risers connected to round conduits.  For risers with rectangular inlets, the bend head losses and entrance head losses are typically combined to a term Ke’ where values of Ke’ can be found in Table 5.3 and : 2 1 Q a(2gH') + + e c 2 1 (1 K ' K L) =
  • 26. Head Loss Coefficients  Kc is the head loss coefficient due to friction.  Values for Kc are given in Tables 5.1 and 5.2 for circular and square pipes.  Kc is multiplied by L, the entire length of the pipe, including the riser.
  • 27.  Frequently, when the drop inlet is the same size as the remainder of the pipe, orifice flow will control and the pipe will never flow full.  If it is desirable to have the pipe flowing full, it may be necessary to increase the size of the drop inlet.
  • 28. Using Flow Control Structures as Spillways  A given drop inlet spillway can have a variety of discharge relationships, given the head.  At the lowest stages the riser acts as a weir.  As the level of the reservoir rises, water flowing in from all sides of the inlet interferes so that the inlet begins to act as an orifice.  As the level continues to rise, the outlet eventually begins to flow full and pipe flow prevails.  A stage-discharge curve is developed by plotting Q vs. H for each of the three relationships. The minimum flow for a given head is the actual discharge used.
  • 29. Rockfill Outlets as Controls ROCKFILL have h1 dh h2 dl HYDRAULIC PROFILE
  • 30. Rockfill Outlets  Advantages  Abundant  Generally available  Usually inexpensive  Relative permanence
  • 31. Rockfill Outlets  Major expenses  Grading  Transporting  Placing stone
  • 32. Rockfill Outlets  Used for  Protective channel linings and breakwaters  Add stability to dams  Provide energy dissipation zones for reservoir outlets  Flow control structure
  • 33. Modified Darcy-Weisbach Equation V g 1 x d f dh dl k 2 2 =
  • 34. Rockfill as Control Structure Model Reynolds Number Equation ( ) nx R = d - s V e Friction factor dh dl x 2 = f gd k 2 V
  • 35. Friction Factor-Reynolds Number Relationship = 1600 +3.83 k R e f
  • 36. h2 – have Relationships h1 = h2 + dh h h1 h2 ave = + 2